DDG86 7C1 SRA Farm Out B-2 TGI POP List
This document is a Period of Performance (POP) list for farm-out work related to DDG86 (USS Kidd-class destroyer) maintenance and repair activities under contract 7C1. The list identifies 15 individual task assignments (ICNKOs) with corresponding work descriptions, all scheduled to begin on 22 March 2027.
The work encompasses various repair and maintenance activities on the naval vessel, including potable water tank repairs with gas-free base metal repair and touch-up operations (four separate tanks), low-storage tank coating and lining work, aft uptake repairs, second platform deck port coating, gas turbine module intake repairs, structural repairs across multiple foundations, and gas turbine enclosure performance sheet repairs. Performance periods vary slightly, with most tasks ending by 24 August 2027, except for four water tank-related tasks and one structural repair task extending to 31 August 2027 and 22 July 2027 respectively. The document was prepared and accepted by C1209.3 T. Konuta on 14 July 2026 under Revision-2, indicating this is an updated version of the period of performance baseline for contracted farm-out maintenance work.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DDG86 7C1 SRA FARM OUT B-2 TGI POP LIST Revision-2 7/14/2026
ICNKO Description START DATE END DATE 38KC312301A01 (7C1)(F/O)(TK) 4-126-1-W POT WTR TK - G1N5 GAS FREE BASE MTL RPR AND TOUCH-UP 22-Mar-27 31-Aug-27 38KC312302A01 (7C1)(F/O)(TK) 4-126-2-W POT WTR TK - G1N5 GAS FREE BASE MTL RPR AND TOUCH-UP 22-Mar-27 31-Aug-27 38KC312303A01 (7C1)(F/O)(TK) 4-150-1-W POT WTR TK - G1N5 GAS FREE BASE MTL RPR AND TOUCH-UP 22-Mar-27 31-Aug-27 38KC312304A01 (7C1)(F/O)(TK) 4-150-2-W POT WTR TK - G1N5 GAS FREE BASE MTL RPR AND TOUCH-UP 22-Mar-27 31-Aug-27 38KC312318A01 (7C1)(F/O)(TK) 5-254-6-F LO STRG TK - G1N5 GAS FREE BMR COAT AND TLI 22-Mar-27 24-Aug-27 38KC312366A01 (7C1)(F/O) AFT UPTK RPR 22-Mar-27 24-Aug-27 38KC3123AYA01 (7C1)(F/O) MER 1 CCIMS-G1N6-DDG86-107-25 FND 2 2ND PLTFM DK PORT COAT 22-Mar-27 24-Aug-27 38KC3123BTA01 (7C1)(F/O) 1A GTM INTK RPR 2ND 22-Mar-27 24-Aug-27 38KC3123CCA01 (7C1)(F/O)(DFS) 3-370-0-E CCIMS-G1N6-DDG86-042-26 FND 1 STIF AND 5 DBL PLT 22-Mar-27 24-Aug-27 38KC3123CHA01 (7C1)(F/O) 5-300-01-E CCIMS-G1N6-DDG86-041-26 FND 4 LONG 22-Mar-27 24-Aug-27 38KC3123CKA01 (7C1)(F/O) 1A AND 1 B GTM FOD SCRN REPL 22-Mar-27 24-Aug-27 38KC3123CQA01 (7C1)(F/O) MER 2 UPTK EXH DUCT INSUL IN VOID 01-248-0-Q REPL 22-Mar-27 24-Aug-27 38KC3123CTA01 (7C1)(F/O) INSUL FOR 2A EXH DUCT IN 1-268-2-Q REPL 22-Mar-27 24-Aug-27 38KC313905A03 (7C1)(PART F/O) 05-130-0-X CCIMS-G1N6-DDG86-102-25 FND 2, 3, 5 AND 9 STR RPR 22-Mar-27 22-Jul-27 38KC331104A01 (7C1)(F/O) NR 1 GTG ENCL PERF SHT RPR 22-Mar-27 24-Aug-27
Prepared/Accepted by: C1209.3 T.KONUTA Signiture:
| 2026-07-16T09:22:08+0900 | |
| KONUTA.TAKASHI.1278795418 |