This is a WebAIM Short Form Task Group Instruction (TGI) for maintenance work on the USS SHOUP (DDG-86). The document provides detailed technical instructions for preserving 800 square feet of port second platform deck plating in Engine Room No. One (compartment 4-174-0-E), including vertical surfaces up to 4 inches from the deck. The work is classified as non-security and involves potential asbestos hazards. The task is identified as TGI No. 38KC3123AY with ICN 38KC3123AY, prepared by T. Takanashi (Code 231A) and approved by Y. Nakamura (Code 231A) on 20-MAR-2026. The zone manager is T. Yaginuma, with technical support from engineer Y. Gouriki (Code 250).

The primary procedure requires accomplishing surface preparation requirements per reference 009-032, Table 3, Line 24, followed by visual inspection for structural integrity, deterioration, pitting, cracks, and damage. Inspection results must be submitted in hard copy or approved transferrable media to the supervisor. The government will furnish materials and provide supporting services including crane and rigging (C740), electrical utility (X99E), utility services for air, water, and steam (X99M), safety inspection (C106.1), QA inspection for marked items (C133), and technical support (C250) through service work TGI No. 38KC3123AYS02. The material list includes two adhesives (stock numbers 002738708 and 008419773) and two insulation items (stock numbers LL9607850 and LL4783096), all ordered through planner T. Shibano (Code 234). Reference documents include NSI FY-27 NAVSEA Standard Items, local standard items, and structural arrangement drawings (DWG 100-7060390 and DWG 100-7060395). An attachment sketch (Enclosure-01) provides preservation area location mapping within the compartment.

View the file

Other files

File Type Posted
Solicitation Amendment N6264926RA0600006 SF 30.pdf PDF
Solicitation Amendment N6264926RA0600005 SF 30.pdf PDF
Solicitation Amendment N6264926RA0600004 SF 30.pdf PDF
SOW_B-2_CLN-1_38KC3123CC_A01_NEW TGI_c1v1.pdf PDF
Solicitation Amendment N6264926RA0600003 SF 30.pdf PDF
Solicitation Amendment N6264926RA0600002 SF 30.pdf PDF
SOW_B-2_CLN-1_38KC3123CH_A01_NEW TGI_c1v1.pdf PDF
Solicitation Amendment N6264926RA0600001 SF 30.pdf PDF
SOW_B-2_CLN-1_38KC3123CC_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC312366_A01_NEW TGI_c2v1.pdf PDF
SOW_B-2_CLN-1_38KC312303_A01_NEW TGI_c0v0.pdf PDF
Attachment IV Request for Information Form.docx DOCX document
Attachment VI Warranty Tracking Information.pdf PDF
SOW_B-2_CLN-1_38KC312301_A01_NEW TGI_c0v0.pdf PDF
Attachment IV Request for Information Sheet (Fillable).pdf PDF
Exhibit A Contract Data Requirements List (CDRL) IPS.pdf PDF
SOW_B-2_CLN-1_38KC3123CH_A01_NEW TGI_c0v0.pdf PDF
Attachment I POP list BUNDLE-2_Rev2.pdf PDF
SOW_B-2_CLN-1_38KC331104_A01_NEW TGI_c0v0.pdf PDF
Attachment VIII Contract data.pdf PDF
Exhibit B Contract Data Requirements List (CDRL) GFP.pdf PDF
Attachment III DDG-115_BUNDLE1_GFP_List.xlsx XLSX spreadsheet
SOW_B-2_CLN-1_38KC312318_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC312302_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC3123CK_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC3123CQ_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC313905_A03_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC3123BT_A01_NEW TGI_c0v0.pdf PDF
Attachment VII QSAP.pdf PDF
Solicitation - N6264926RA060.pdf PDF
Attachment V Source of Repair Instruction.pdf PDF
SOW_B-2_CLN-1_38KC3123CT_A01_NEW TGI_c0v0.pdf PDF
SOW_B-2_CLN-1_38KC312304_A01_NEW TGI_c0v0.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

05-MAY-2026 1612

20.15.6.0.9333 (July 2025) ICN: 38KC3123AY KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 2ND DK PL 4-174-0-E AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC3

CU PHASE TITLE: F/O – PRESERVE PORT SECOND PLATFORM DECK PLATING IN 4-174-0-E

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

ES01NP8W

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TAKANASHI, TATSUNORI 231A 3152436238 20-MAR-2026

APPROVED BY: CODE: PHONE: DATE:

NAKAMURA, YUUJI 231A 3152436041 20-MAR-2026

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-NP8W

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A41AY

1. SCOPE/PURPOSE:

1.1 Title: Port Second Platform Deck Plating in 4-174-0-E; preserve

1.2 Location of Work:

1.2.1 Engine Room No. One (4-174-0-E)

1.3 Identification:

1.3.1 Quantity (800 SF), Port Second Platform Deck Plating in 4-174-0-E, including vertical surface up to height of 4 inches from deck

Remarks: See Sketch Enclosure-01 for location detail

1.4 Security Classification: None.

1.5 Initial Condition:

TGI Short Form

05-MAY-2026 1612

20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC3123AY KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 2ND DK PL 4-174-0-E AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC3

CU PHASE TITLE: F/O – PRESERVE PORT SECOND PLATFORM DECK PLATING IN 4-174-0-E

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.5.1 Potential Asbestos Hazard.

1.6 Contractor work start date: See TGI POP List

1.7 Contractor work completion date: See TGI POP List

2. PROCEDURE:

2.1 Accomplish the requirements of 009-032 of Ref. No. One, including Table 3, Line(s) 24, for each area listed in 1.3.1.

2.1.1 Upon completion of surface preparation, accomplish visual inspection of each area listed in 1.3.1, for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, using Ref. No. 3 and Ref. No. 4 for guidance.

2.1.1.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of

2.1.1 to the SUPERVISOR.

2.2 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.

2.3 Notes:

2.3.1 Planner: Code 231A T. Takanashi, 243-6238

Planner: Code 233 M. Yamaguchi, 080-9350-1450 Planner: Code 234 T. Shibano, 243-3583 Engineer: Code 250 Y. Gouriki, 243-4179

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.3.3 This TGI is in response to CCIMS report No. CCIMS-G1N6-DDG86-107-25 from TGI No. 38KC111009I02.

2.3.4 JCN ES01-NP8W is related to this TGI.

2.4 Government Furnished Material (GFM):

2.4.1 SRF-JRMC will provide GFM listed in the Material List.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38KC3123AYS02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C133] QA inspection for (G) symbol(s).

2.5.6 [C250] Technical support.

05-MAY-2026 1612

20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC3123AY KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 2ND DK PL 4-174-0-E AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC3

CU PHASE TITLE: F/O – PRESERVE PORT SECOND PLATFORM DECK PLATING IN 4-174-0-E

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

05-MAY-2026 1612

20.15.6.0.9333 (July 2025) (Continued) ICN: 38KC3123AY KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 2ND DK PL 4-174-0-E AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-86 USS SHOUP KC3

CU PHASE TITLE: F/O – PRESERVE PORT SECOND PLATFORM DECK PLATING IN 4-174-0-E

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-27 NAVSEA Standard Items - 2 N 2 LI FY-27 Local Standard Items - ORG N

3 DWG 100-7060390 UNIT STRL ARR DWG ASSY

UNIT 2220

C Y 3

4 DWG 100-7060395 UNIT STRL ARR DWG ASSY

UNIT 2320

B Y 3

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

400 M ADHESIVE,

ORDERED FOR KTR, ORG:

C234,T. SHIBANO, TEL: 243-

9B 8040 002738708 NA 4 Y 60695199 2/GL

401 M ADHESIVE,

ORDERED FOR KTR, ORG:

C234,T. SHIBANO, TEL: 243-

9B 8040 008419773 NA 4 Y 60695200 2/PT

402 M INSULATI,

ORDERED FOR KTR, ORG:

C234,T. SHIBANO, TEL: 243-

9B 5640 LL9607850 NA 4 N 60697456 2/EA

403 M INSULATI,

ORDERED FOR KTR, ORG:

C234,T. SHIBANO, TEL: 243-

9B 5640 LL4783096 NA 4 N 60697457 2/EA

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38KC3123AYA01-Sketch.pdf 20-MAR-2026 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38KC3123AY KEY OP: A01

38KC3123AYA01

SKETCH

ENCLOSURE-01 SHEET 1 of 2

PRESERVATION AREA LOCATION MAP

The preservation area must be limited to the maximum extent accessible without removal of the equipment listed below:

- REVERSE OSMOSIS DESALINATION UNIT 1A FILTER SKID

- REVERSE OSMOSIS DESALINATION UNIT 1A MODULE SKID

- REVERSE OSMOSIS DESALINATION UNIT 1A PUMP SKID

- REVERSE OSMOSIS DESALINATION UNIT 1B ILTER SKID

- REVERSE OSMOSIS DESALINATION UNIT 1B MODULE SKID

- REVERSE OSMOSIS DESALINATION UNIT 1B PUMP SKID

- BROMINATOR 1A/1B

- LP AIR DEHYDRATOR NO. ONE MEMBRANE

- SHIP'S SERVICE AIR RECEIVER

- LP AIR COMPRESSOR NO. ONE

- LP AIR DEHYDRATOR CONDENSER/FILTER

PLAN VIEW

4-174-0-E

2ND PLATF

PRESERVATION AREA

LP AIR DEHYDRATOR (LPAD) #1

CONDENSER/FILTER

LP AIR DEHYDRATOR (LPAD) #1

MEMBRANE

LP AIR

COMPRESSOR (LPAC) #1

SHIP'S SERVICE AIR

RECEIVER

REVERSE OSMOSIS

DESALINATION UNIT

(R/O UNIT) 1B

FILTER SKID

REVERSE OSMOSIS

DESALINATION UNIT

(R/O UNIT) 1A

FILTER SKID

REVERSE OSMOSIS

DESALINATION UNIT

(R/O UNIT) 1A

MODULE SKID

REVERSE OSMOSIS

DESALINATION UNIT

(R/O UNIT) 1B

MODULE SKID

REVERSE OSMOSIS

DESALINATION UNIT

(R/O UNIT) 1A

PUMP SKID

BROMINATOR 1A/1B

REVERSE OSMOSIS

DESALINATION UNIT

(R/O UNIT) 1B

PUMP SKID

38KC3123AYA01

SKETCH

ENCLOSURE-01 SHEET 2 of 2

EQUIPMENT LOCATION MAP