SOW_B-2_CLN-1_38KC312301_A01_NEW TGI_c0v0.pdf
PDF 205 KB Posted
- Attached to
- USS SHOUP (DDG-86) 7C1 SRA BUNDLE-2
- Solicitation number
- N6264926RA060
About this file
This is a Task Group Instruction (TGI) document for maintenance and repair work on the USS SHOUP (DDG-86) potable water tank system.
The TGI specifies the cleaning, assessment, repair, and preservation of Potable Water Tank 4-126-1-W, a 3,965-gallon tank located in Auxiliary Machinery Room No. One. Work includes conducting a Corrosion Control Assessment and Maintenance Manual (CCAMM) assessment to identify existing preservation coating conditions, structural integrity issues, deterioration, pitting, cracks, and damage or distortion. General cleaning must meet Level II standards. The contractor must perform base metal weld buildup totaling 36 square inches for each plate defect, with surfaces ground to sound metal prior to welding. Additional work includes preservation coating application for 127 square feet of defective painted surfaces (not exceeding 10 square feet per area), installation of new gaskets, washers, and nuts on two manhole cover plates (15" x 23" steel), and preservation coating of bolting rings and cover plates. Chlorination and bacteriological testing of the tank must be conducted by a qualified Japanese laboratory accredited by ISO 17025 or equivalent. Government-furnished materials include hex nuts (52 EA), flat washers (52 EA), and synthetic rubber gasket sheet (18 SF). The work is managed by Planner Code 231A S. Komatsu and Work Integration Manager Code 333 T. Yaginuma, with contractor work dates specified in the TGI Program of Period List.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: POT WTR 4-126-1-W TK A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-86 USS SHOUP 12314 KC3
CU PHASE TITLE:
F/O – CLEAN, ASSESS, REPAIR, AND PRESERVE POTABLE WATER TANK (4-126-1-W)
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
SHUUHEI KOMATSU 231A 315-243-6786 08-MAY-2026
APPROVED BY: CODE PHONE DATE
YUUJI NAKAMURA 231A 315-243-6041 08-MAY-2026
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
SURFMEPP
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: POT WTR 4-126-1-W TK A 0
FOUO
SHIP: DDG-86 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J-1 M1-2
1. SCOPE/PURPOSE
1.1 Title: Potable Water Tank (4-126-1-W); clean, assess, repair, and preserve
1.2 Location of Work:
1.2.1 Potable Water Tank (4-126-1-W)
1.2.2 Auxiliary Machinery Room No. One (4-126-0-E)
1.3 Identification:
1.3.1 Quantity (One EA), Potable Water Tank
Tank No.: 4-126-1-W Capacity: 3,965 Gallons
1.3.2 Quantity (2 EA), Manhole Cover Plate for 4-126-1-W
Manhole No(s).: 3-129-1 and 3-148-1 Size: 15 Inches x 23 Inches Material: Steel
1.3.3 Quantity (2 EA), Bolting Ring for Manhole Cover Plate for 4-126-1-W
Manhole No(s).: 3-129-1 and 3-148-1 Material: Steel
1.4 Security Classification: None. 1.5 Initial Condition: None.
1.6 Contractor work start date: See TGI POP List
1.7 Contractor work completion date: See TGI POP List
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-27 NAVSEA Standard Items - 2 N 2 LI FY-27 Local Standard Items - ORG N
3 TM T-9630-
AB-MMD-
Corrosion Control Assessment and Maintenance Manual (CCAMM)
3 N
4 TM NAVSEA
4790/14
Tank and Void Structural and Coating Condition Survey (MRC G1N5)
- N
FOUO
SHIP: DDG-86 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
5 TM S9086-
CJ-STM-
010/CH-075
Fasteners 7 N
6 DWG 8100-
1254-0085
FLUSH DK. W.T. & OIL TIGHT
BOLTED PLATE MANHOLE 15" x 36", 15" x 18" & 15" x 23"
AE Y 2,3
7 DWG 100-
7060385
UNIT STRL ARR DWG ASSY UNIT
D Y SE
E N
OT
E
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1. Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.
5.1.1 Accomplish an assessment of each tank listed in 1.3.1 for existing preservation coating, structural integrity, deterioration, pitting, cracks, and areas of damage or distortion, including sounding tubes, tank/void vents, overflows, piping and associated material, structural members, ladders, anodes, desiccant, tank level indicator (TLI), radar TLI, and their electric cables, stud, and tank top cable penetration, and manhole covers in accordance with 2.3 and 2.4.
Document the assessment on 2.4.
(I) "CCIMS ASSESSMENT"
5.1.1.1 Mark each corroded, damaged and/or deteriorated coating area in each tank.
5.1.1.2 Submit one legible copy, in hard copy or approved transferrable media, of completed assessment form 2.4 and a report with a sketch listing results of the requirements of 5.1.1.1 to the SUPERVISOR.
5.1.3 Ensure General Cleaning must be Level II.
5.1.4 Install each manhole cover, using new gasket(s), new washer(s), and new nut(s) in accordance with Figure 075-4-1 of 2.5, and 2.6.
5.2 Repair each tank listed in 1.3.1, based on the CCIMS assessment report as designated by the SUPERVISOR, using 2.7 for guidance. See 5.8.4.
5.2.1 Base metal weld buildup a total of 36 square inches of each plate defect in the tank.
5.2.1.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.
5.2.1.2 Surface must be ground to sound metal prior to base metal weld buildup.
5.2.1.3 Fill each local pit and groove with weld material prior to application of each principal buildup layer.
FOUO
SHIP: DDG-86 CHG/VER: 0/0
5.2.1.4 Grind each surface of completed base metal weld buildup smooth if greater than 1/8 inch above plate surface.
5.2.2 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.2.2.1 Accomplish nondestructive testing in accordance with Line 11.
5.3 Accomplish the requirements of 009-032 of 2.1, including Table 4, Line(s) 5, for a total of 127 square feet of defective painted surfaces, for each tank listed in 1.3.1, as designated by the SUPERVISOR.
5.3.1 The preservation area must not exceed 10 square feet per one area.
5.4 Accomplish the requirements of 009-032 of 2.1, including Table 4, Line(s) 5, for tank side surface, and Table 3, Line(s) 12, for machinery space side surface of each cover plate listed in 1.3.2.
5.5 Accomplish the requirements of 009-032 of 2.1 for each bolting ring listed in 1.3.3.
5.6 Accomplish the requirements of 009-087 of 2.1 for each tank listed in 1.3.1.
5.6.1 Accomplish the requirements of 009-009 of 2.1 for chlorination and bacteriological tests. Analysis and testing conducted by a qualified Japanese laboratory (accredited by ISO 17025 or equal) are authorized by the
SUPERVISOR.
5.6.2 Record results of chlorination and bacteriological tests on a Laboratory Analysis Record(s) and DD Form 686, and submit one legible copy, in hard copy or approved transferrable media, of completed record(s) and form(s) to the
SUPERVISOR.
5.7 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
5.8 Notes:
5.8.1 Planner: Code 231A S. Komatsu, 243-6786
5.8.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
5.8.3 This TGI meets the intent of DDG CSWT File Nos. 123-096, 123-103, and 123-133.
5.8.4 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.8.5 2.4 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey
(MRC G1N5).
5.8.6 SRF-JRMC Code 134 will provide laboratory analysis and test service for disinfectant solution used for portable water tank when requested by the WIM Code 333.
5.8.7 WPC will copy the following pages in reference.
REF. 2.7: Pages 3, 4B, 6, 8, 5-2, and 5A-2
5.8.8 JCNs EA01-ZBI1, EA01-ZBI8, EA01-ZBH6, and EA01-ZBH8 are related to this TGI.
5.9 Government Furnished Material (GFM):
5.9.1 SRF-JRMC will provide GFM listed in Appendix “M”.
FOUO
SHIP: DDG-86 CHG/VER: 0/0
5.10 SRF-JRMC will provide the following service work: (TGI No. 38KC312301S02).
5.10.1 [C740] Crane and crane rigging service.
5.10.2 [X99E] Utility service, electrical.
5.10.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.10.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.10.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.10.6 [C133] QA inspection for (G) symbol(s) and data base entry for CCIMS.
5.10.7 [C135] QA inspection for (G) symbol(s).
5.10.8 [C250] Technical support and process of the tank/void assessment results.
FOUO
J-1
SHIP: DDG-86 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
12314 POT WTR 4-126-1-W TK A 0 0
CU PHASE TITLE:
F/O – CLEAN, ASSESS, REPAIR, AND PRESERVE POTABLE WATER TANK (4-126-1-W)
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
ATTACHMENT LIST:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE 4-126-1-W 4 U
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
38KC312301 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to clean, assess, repair, and preserve Potable Water Tank (4-126-1-W) Location of Work:
Potable Water Tank (4-126-1-W) Auxiliary Machinery Room No. One (4-126-0-E)
FOUO
M-1
SHIP: DDG-86 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
12314 POT WTR 4-126-1-W TK A 0 0
CU PHASE TITLE:
F/O – CLEAN, ASSESS, REPAIR, AND PRESERVE POTABLE WATER TANK (4-126-1-W)
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38KC312301 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M NUT, HEX, NUT, HEX,
SPEC: MIL-DTL-1222 TYPE I,
SIZE: 5/8"-11UNC-3B,
BEARING SURFACE:
CHAMFERED,
MATL: BRASS GRADE 464,
BIW CATALOG NO. 53094-210,
ORIG: C231A S. KOMATSU,
243-6786
ORDERED FOR KTR
9Z 5310 LL7033306 NA 4 N 61187457 52/EA
002 M WASHER, FLAT, WASHER,
FLAT, BOLT 5/8" DIA BOLT,
SPEC: FF-W-92 TY A GR I CL B,
SIZE: 1-3/8" OD (1.375") X
21/32" ID (0.656") X 1/16" THK
(0.062"), MATL: CRES 316,
BIW CATALOG NO. 53239-161
ORIG: C231A S. KOMATSU,
243-6786
ORDERED FOR KTR
9Z 5310 LL6991322 NA 4 N 61187458 52/EA
NOTES:
FOUO
M-2
SHIP: DDG-86 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
003 M RUBBER S, GASKET SHEET,
SYNTHETIC RUBBER,
SPEC: MIL-PRF-1149
(FORMERLY MIL-G-1149)
TYPE-I CLASS-1,
THK: 3/16",
SIZE: 3 FT X 3 FT,
MATL: SYNTHETIC RUBBER,
50 DUROMETER, OIL
RESISTANT,
*TYPE 1
ORIG: C231A S. KOMATSU,
243-6786
ORDERED FOR KTR
9G 9320 LL4820283 NA 4 N 61187459 18/SF
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-86 POT WTR 4-126-1-W TK A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38KC312301 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-86 POT WTR 4-126-1-W TK A 0