This document is a transmittal form (JB CHS TRANSMITTAL FORM 4025) used for submitting shop drawings, equipment data, material samples, or manufacturer's certificates of compliance for federal construction contracts under the 628th Civil Engineer Squadron (628CES/CEN).
The form functions as a structured submission and approval mechanism for contractors to present items requiring government review and authorization. Section I requires contractors to identify submittal details including the contract number, project information, specification section coverage, and item descriptions with associated model/catalog numbers and manufacturer information. Each submittal item must be classified by type (SD-01 through SD-11, ranging from preconstruction documents to shop drawings, product data, samples, design data, test reports, certificates, manufacturer instructions, field reports, operation and maintenance data, and closeout documentation). Contractors must also indicate whether submissions are new or resubmittals and identify the required approval source (Government Approval, Designer of Record Approval, Government Conformance Review, or combinations thereof). Section II establishes the approval process with a quality control manager certification and approving authority signature requirement. The form specifies that each transmittal cover only one specification section, items requiring expeditious handling receive separate forms, and variations from contract requirements must be documented with impact assessments. Resubmittals follow a decimal-point numbering system appended to original transmittal numbers. Approval action codes range from "A" (approved as submitted) through "R" (design submittal acceptable for construction release in design-build contracts), with specific codes addressing conditional approvals, disapprovals, and government concurrence.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
The proponent agency is 628CES/CEN.
DATE TRANSMITTAL NO.
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)
TO:
PROJECT TITLE AND LOCATIONSPECIFICATION SEC. NO. (Cover only one section with each transmittal)
FROM: CONTRACT NO. CHECK ONE:
THIS TRANSMITTAL IS FOR: (See Note 8)
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL
FIO GA DA CR DA/CR DA/GA
ITEM
NO.
(See
Note 3)
GOV
ACTION
CODE
(Note 10)
SUBMITTAL
TYPE CODE
(See Note 9)
TYPE
OF
COPIES
(See Note 1)
SPEC.
PARA. NO.
DRAWING
SHEET NO.
VARIATION
(See Note 6) g.
TIME/COST
IMPACT
(See Note 7)
DESCRIPTION OF SUBMITTAL ITEM
(Model Number, Catalog Number, Manufacturer, Nomenclature of Material, etc.)
a. i.c. d. e. f.b.
CONTRACT DOCUMENT
REFERENCE
REMARKS
SECTION II - APPROVAL ACTION
I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.
NAME OF QC MANAGER SIGNATURE OF QC MANAGER
NAME AND TITLE OF APPROVING AUTHORITY
SIGNATURE OF APPROVING AUTHORITY DATE
REMARKS
REPLACES AF IMT 3000, WHICH IS OBSOLETE.JB CHS TRANSMITTAL FORM 4025, 20210421
h.
NOTES
9. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.
Submittal types are the following:
SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports
SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout
10. For each submittal item, the Contractor will assign Submittal Action Codes in column g. The approving authority will assign Submittal Action Codes in column i.
The Submittal Action Codes are:
A -- Approved as submitted.
B -- Approved, except as noted. Resubmission not required.
C -- Approved, except as noted Refer to attached comments.
Resubmission required.
D -- Will be returned by separate correspondence.
E -- Disapproved. Refer to attached comments.
11. Approval of items does not relieve the contractor from complying with all the requirements of the contract.
F -- Receipt acknowledged.
X -- Receipt acknowledged, does not comply with contract requirements, as noted.
G -- Other action required (Specify)
K -- Government concurs with intermediate design. (For D-B contracts)
R -- Design submittal is acceptable for release for construction. (For D-B contracts)
JB CHS TRANSMITTAL FORM 4025, MAR 2021
1. Indicate "E" For Electronically Submitted or "H-#” for hard copy (replacing “#” with the quantity)
2. Each Transmittal shall be numbered consecutively. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.
3. The "Item No." for each entry on this form will be the same "Item No." as indicated on the submittal register.
4. Submittals requiring expeditious handling will be submitted on a separate Transmittal Form.
5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.
6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column g, and enter a statement in the Remarks block describing he detailed reason for the variation.
7. If the variation causes an impact to time or cost indicate the type of impact in column h, and enter the associated RFI number in the remarks
8. Select one of the following depending on which approval source is required.
FIO – For Information Only GA – Government Approval DA - Designer of Record Approval CR - Government Conformance Review of Design DA/CR - Designer of Record Approval/Government Conformance Review DA/GA - Designer of Record Approval/Government Approval
| Reason: Off |
| Transmittal: Off |
| Previous Transmittal: |
| Transmittal No: |
| Project Title: |
| Spec No: |
| Item No: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| Submittal Code: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| Submittal Discription: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| No of Copies: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| Spec para: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| Sheet No: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| Contractor Review Code: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| Variation: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| USACE: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| Contractor Name: |
| Date: |
| 1: |
| Authority Remarks: |
| Authority Name: |
| Authority Date: |
| Contractor Remarks: |
| Contract No: |
| From: |
| To: |