SOW Attachment 13 - JB CHS Transmittal Form 4025.pdf

PDF 1 MB Posted

Attached to
New SABER (Simplified Acquisition of Base Engineering Requirements)
Solicitation number
FA441826R0004
Issued by

About this file

This document is a transmittal form (JB CHS TRANSMITTAL FORM 4025) used for submitting shop drawings, equipment data, material samples, or manufacturer's certificates of compliance for federal construction contracts under the 628th Civil Engineer Squadron (628CES/CEN).

The form functions as a structured submission and approval mechanism for contractors to present items requiring government review and authorization. Section I requires contractors to identify submittal details including the contract number, project information, specification section coverage, and item descriptions with associated model/catalog numbers and manufacturer information. Each submittal item must be classified by type (SD-01 through SD-11, ranging from preconstruction documents to shop drawings, product data, samples, design data, test reports, certificates, manufacturer instructions, field reports, operation and maintenance data, and closeout documentation). Contractors must also indicate whether submissions are new or resubmittals and identify the required approval source (Government Approval, Designer of Record Approval, Government Conformance Review, or combinations thereof). Section II establishes the approval process with a quality control manager certification and approving authority signature requirement. The form specifies that each transmittal cover only one specification section, items requiring expeditious handling receive separate forms, and variations from contract requirements must be documented with impact assessments. Resubmittals follow a decimal-point numbering system appended to original transmittal numbers. Approval action codes range from "A" (approved as submitted) through "R" (design submittal acceptable for construction release in design-build contracts), with specific codes addressing conditional approvals, disapprovals, and government concurrence.

View the file

Other files

File Type Posted
Attachment 12 Section M Rev 2.pdf PDF
Questions and Answers 20260505.xlsx XLSX spreadsheet
Attachment 11 Section L Rev 2.pdf PDF
Attachment 8B B-58 Drawings.pdf PDF
Attachment 01 Statement of Work (Rev2).pdf PDF
Solicitation Amendment FA441826R00040002 SF 30.pdf PDF
Attachment 14 Sign-In Sheet 20260422.pdf PDF
Attachment 12 Section M Rev 1.pdf PDF
Attachment 8 Sample Project DKGV 1148855 Repair HVAC System B-58 (WS) SOW.pdf PDF
Solicitation Amendment FA441826R00040001 SF 30.pdf PDF
Attachment 13 Question and Answer Form.xlsx XLSX spreadsheet
Attachment 11 Section L Rev 1.pdf PDF
Attachment 16 FA441816D0002 HISTORICAL INFORMATION.pdf PDF
Attachment 15 FA441821D0002 HISTORICAL INFORMATION.pdf PDF
Attachment 8A HVAC Zones Floor Plan.pdf PDF
SOW Attachment 12C Generator Sole Source.pdf PDF
SOW Attachment 09 014500 QUALITY CONTROL FOR MINOR CONSTRUCTION.pdf PDF
SOW Attachment 07 Brig Security Requirements (Fillable)(Official)2023.pdf PDF
Attachment 09 Past Performance Projects List.pdf PDF
Attachment 04 Charleston County WD SC20260023.pdf PDF
SOW Attachment 12B FAP Sole Source.pdf PDF
SOW Attachment 05 JBCGS 017419 Construction Waste Management and Disposal.pdf PDF
SOW Attachment 01 Joint Base Charleston Achitectural Compatibility Plan.pdf PDF
Attachment 07 Green Procurement Form.pdf PDF
Attachment 05 Dorchester County WD SC20260024.pdf PDF
SOW Attachment 04 JBCGS 015720 Att A - Sustainable Procurement Program.pdf PDF
SOW Attachment 03 JBCGS 015720 Environmental.pdf PDF
SOW Attachment 02 JBC Cable Management Policy 2021.pdf PDF
Attachment 12 Section M.pdf PDF
Attachment 11 Section L.pdf PDF
Attachment 10 Schedule B.pdf PDF
Attachment 08 DKGV 1148855 Repair HVAC System B-58 (WS).pdf PDF
Attachment 06 Sumter County WD SC20260030.pdf PDF
Attachment 02 Orangeburg County WD SC20260016.pdf PDF
Attachment 01 Statement of Work.pdf PDF
SOW Attachment 12A Chiller Sole Source.pdf PDF
SOW Attachment 11 Tree Ordinance New.pdf PDF
SOW Attachment 10 JBCGS 013526 GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
SOW Attachment 08 NPTU Contractor Special Conditions 2020.pdf PDF
SOW Attachment 06 JBCGS 015719 Temporary Environmental Controls.pdf PDF
Attachment 03 Berkeley County WD SC20260022.pdf PDF
Solicitation - FA441826R0004.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

The proponent agency is 628CES/CEN.

DATE TRANSMITTAL NO.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO:

PROJECT TITLE AND LOCATIONSPECIFICATION SEC. NO. (Cover only one section with each transmittal)

FROM: CONTRACT NO. CHECK ONE:

THIS TRANSMITTAL IS FOR: (See Note 8)

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL OF

TRANSMITTAL

FIO GA DA CR DA/CR DA/GA

ITEM

NO.

(See

Note 3)

GOV

ACTION

CODE

(Note 10)

SUBMITTAL

TYPE CODE

(See Note 9)

TYPE

OF

COPIES

(See Note 1)

SPEC.

PARA. NO.

DRAWING

SHEET NO.

VARIATION

(See Note 6) g.

TIME/COST

IMPACT

(See Note 7)

DESCRIPTION OF SUBMITTAL ITEM

(Model Number, Catalog Number, Manufacturer, Nomenclature of Material, etc.)

a. i.c. d. e. f.b.

CONTRACT DOCUMENT

REFERENCE

REMARKS

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

NAME OF QC MANAGER SIGNATURE OF QC MANAGER

NAME AND TITLE OF APPROVING AUTHORITY

SIGNATURE OF APPROVING AUTHORITY DATE

REMARKS

REPLACES AF IMT 3000, WHICH IS OBSOLETE.JB CHS TRANSMITTAL FORM 4025, 20210421

h.

NOTES

9. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

10. For each submittal item, the Contractor will assign Submittal Action Codes in column g. The approving authority will assign Submittal Action Codes in column i.

The Submittal Action Codes are:

A -- Approved as submitted.

B -- Approved, except as noted. Resubmission not required.

C -- Approved, except as noted Refer to attached comments.

Resubmission required.

D -- Will be returned by separate correspondence.

E -- Disapproved. Refer to attached comments.

11. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify)

K -- Government concurs with intermediate design. (For D-B contracts)

R -- Design submittal is acceptable for release for construction. (For D-B contracts)

JB CHS TRANSMITTAL FORM 4025, MAR 2021

1. Indicate "E" For Electronically Submitted or "H-#” for hard copy (replacing “#” with the quantity)

2. Each Transmittal shall be numbered consecutively. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on the submittal register.

4. Submittals requiring expeditious handling will be submitted on a separate Transmittal Form.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column g, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. If the variation causes an impact to time or cost indicate the type of impact in column h, and enter the associated RFI number in the remarks

8. Select one of the following depending on which approval source is required.

FIO – For Information Only GA – Government Approval DA - Designer of Record Approval CR - Government Conformance Review of Design DA/CR - Designer of Record Approval/Government Conformance Review DA/GA - Designer of Record Approval/Government Approval

Reason: Off
Transmittal: Off
Previous Transmittal:
Transmittal No:
Project Title:
Spec No:
Item No:
0:
1:
2:
3:
4:
5:
6:
7:
Submittal Code:
0:
1:
2:
3:
4:
5:
6:
7:
Submittal Discription:
0:
1:
2:
3:
4:
5:
6:
7:
No of Copies:
0:
1:
2:
3:
4:
5:
6:
7:
Spec para:
0:
1:
2:
3:
4:
5:
6:
7:
Sheet No:
0:
1:
2:
3:
4:
5:
6:
7:
Contractor Review Code:
0:
1:
2:
3:
4:
5:
6:
7:
Variation:
0:
1:
2:
3:
4:
5:
6:
7:
USACE:
0:
1:
2:
3:
4:
5:
6:
7:
Contractor Name:
Date:
1:
Authority Remarks:
Authority Name:
Authority Date:
Contractor Remarks:
Contract No:
From:
To:

File details come from the government source that posted it. Updated .