Questions and Answers 20260505.xlsx

XLSX spreadsheet 116 KB Posted

Attached to
New SABER (Simplified Acquisition of Base Engineering Requirements)
Solicitation number
FA441826R0004
Issued by

About this file

This is a Questions and Answers document for federal contract solicitation FA441826R0004, a new SABER (Simplified Acquisition of Base Engineering Requirements) contract issued by the Department of the Air Force Air Mobility Command. The Q&A addresses clarifications on proposal submission requirements, technical evaluation criteria, and contract performance specifications across 202 inquiries from prospective bidders. Key responses clarify that the 20-page limit for technical proposals has been removed; there is a single sample project (DKGV 1148855, Repair HVAC System B-58) to be addressed rather than two; the minimum font size has been reduced to 10-point; and the proposal due date has been extended from May 11, 2026 to May 20, 2026, with Q&A responses posted May 5, 2026. The document confirms that RS Means 2026 annual cost data (not quarterly) will be used with Charleston, SC City Cost Index set at 1.0 for the contract duration; coefficients may be negative or below 1.0; and a South Carolina general contractor license is required for commercial projects over $5,000.

The Q&A provides extensive guidance on staffing requirements, clarifying that minimum personnel include one Senior Project Manager, two Cost Estimators, three Quality Control Managers, three Project Managers, and two Safety Managers, with ratios of 15:1, 5:1, and 7:1 respectively for task order workloads; resumes are required for each individual key person proposed. Design services up to conceptual level are included in coefficients, while 35% or greater designs are direct task order costs negotiated separately. Past performance evaluation will prioritize offeror experience over subcontractor and personnel experience, with projects evaluated if performed within five years of solicitation release; up to ten contracts may be submitted. The contract covers maintenance, repair, and minor construction at multiple Joint Base Charleston locations and affiliated facilities with task orders valued $2,000-$2,000,000, requires bonding, and is an 8(a) set-aside contract with joint venture allowances subject to SBA approval before award.

View the file

Other files

File Type Posted
Attachment 11 Section L Rev 2.pdf PDF
Attachment 12 Section M Rev 2.pdf PDF
Attachment 01 Statement of Work (Rev2).pdf PDF
Attachment 8B B-58 Drawings.pdf PDF
Solicitation Amendment FA441826R00040002 SF 30.pdf PDF
Attachment 13 Question and Answer Form.xlsx XLSX spreadsheet
Solicitation Amendment FA441826R00040001 SF 30.pdf PDF
Attachment 16 FA441816D0002 HISTORICAL INFORMATION.pdf PDF
Attachment 15 FA441821D0002 HISTORICAL INFORMATION.pdf PDF
Attachment 14 Sign-In Sheet 20260422.pdf PDF
Attachment 8 Sample Project DKGV 1148855 Repair HVAC System B-58 (WS) SOW.pdf PDF
Attachment 12 Section M Rev 1.pdf PDF
Attachment 8A HVAC Zones Floor Plan.pdf PDF
Attachment 11 Section L Rev 1.pdf PDF
SOW Attachment 03 JBCGS 015720 Environmental.pdf PDF
SOW Attachment 09 014500 QUALITY CONTROL FOR MINOR CONSTRUCTION.pdf PDF
Attachment 03 Berkeley County WD SC20260022.pdf PDF
Attachment 07 Green Procurement Form.pdf PDF
SOW Attachment 08 NPTU Contractor Special Conditions 2020.pdf PDF
SOW Attachment 07 Brig Security Requirements (Fillable)(Official)2023.pdf PDF
SOW Attachment 12A Chiller Sole Source.pdf PDF
SOW Attachment 10 JBCGS 013526 GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
SOW Attachment 11 Tree Ordinance New.pdf PDF
Attachment 05 Dorchester County WD SC20260024.pdf PDF
SOW Attachment 01 Joint Base Charleston Achitectural Compatibility Plan.pdf PDF
SOW Attachment 05 JBCGS 017419 Construction Waste Management and Disposal.pdf PDF
SOW Attachment 12B FAP Sole Source.pdf PDF
SOW Attachment 12C Generator Sole Source.pdf PDF
Attachment 04 Charleston County WD SC20260023.pdf PDF
SOW Attachment 06 JBCGS 015719 Temporary Environmental Controls.pdf PDF
Solicitation - FA441826R0004.pdf PDF
Attachment 09 Past Performance Projects List.pdf PDF
Attachment 08 DKGV 1148855 Repair HVAC System B-58 (WS).pdf PDF
Attachment 06 Sumter County WD SC20260030.pdf PDF
SOW Attachment 02 JBC Cable Management Policy 2021.pdf PDF
Attachment 01 Statement of Work.pdf PDF
Attachment 02 Orangeburg County WD SC20260016.pdf PDF
SOW Attachment 13 - JB CHS Transmittal Form 4025.pdf PDF
SOW Attachment 04 JBCGS 015720 Att A - Sustainable Procurement Program.pdf PDF
Attachment 10 Schedule B.pdf PDF
Attachment 11 Section L.pdf PDF
Attachment 12 Section M.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 JB Charleston Bidder Inquiry Form EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984) Any prospective bidder desiring an explanation or interpretation of the solicitation, sample project, or statement of work, must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders. (Reference FAR 52.214-6). Responses will be posted to SAM.gov.

Solicitation Number: FA441826R0004
Project Name: SABER (Simplified Acquisition of Base Engineering Requirements
#Statement of Work (Attachment 01)Sample Project Questions (Sample Project Building 58)Solicitation Reference (Section, paragraph, sub-paragraph Reference, i.e. Section M, Paragraph 2.3)Attachments or Other (i.e. Submittal Register, Wage Determination, Site Visit Note, etc.)
1Question
Section L, Part II - Technical ProposalCould the Government please clarify and reconsider the 20-page limitation outlined in Section L, Part II – Technical Proposal?

As currently structured, the 20-page limitation appears insufficient to adequately address the three subfactors and the eight associated elements in a meaningful and compliant manner. In particular, Subfactor 1, Element 1 requires detailed resumes for multiple key personnel positions—including Senior Project Manager (SPM), Quality Control Managers (QCMs), Project Managers (PMs), Safety Managers (SMs), Cost Estimators, and the Office Administrator—which, by themselves, could reasonably exceed the allotted page count since offerors are required to submit the number of key personnel to address a hypothetical workload of 30 concurrent task orders; 25 under active construction with 5 in negotiation. Additionally, Subfactor 3 (Sample Project) requires a 35% design submission, including plans, a written scope, and a detailed price proposal with a detailed breakout. Given the breadth and technical nature of these requirements, it is difficult to fully comply within the overall page constraint without severely limiting the quality and completeness of the submission. In light of these considerations, would the Government consider either increasing the total page limitation and excluding Key Personnel resumes and the Subfactor 3 (Sample Project) submission from the page count to ensure offerors can provide thorough, high-quality responses for evaluation?

Answer
Section L Part II Technical Proposal was amended to remove the 20 page limit.
2Question
Section LSection L references a single sample project (DKGV 1148855). However, Section M repeatedly refers to “two sample projects” for evaluation. Can the government please confirm that a single sample project shall be addressed in Subfactor 3?
Answer
Section L is correct, there is a single sample project (DKGV 114885). Section M was amended to reference a single sample project in Subfactor 3 Elements 3-1, 3-2 and 3-3.
3Question
Section L, Part IV - DocumentsSection L Part IV – Documents, item (iv) b, states, “Typing shall not be less than 12-point font” for Parts II and III. Will the government respectfully consider excluding Element 3-1 35% Level of Design and Element 3-3 Detailed Price Proposals from the 12-point font requirement?
Answer
Section L Part IV – Documents, item (iv) b, was amended to "Typing shall be not less than 10-point font." NOTE: The 35% Design requirement per SOW HVAC/Electrical item 3. Contractor shall ensure the design complies with all applicable codes, standards and energy efficiency requirements.

NOTE: Fully incorporate a narrative in the sample project’s proposal clearly demonstrating how and to what extent this effort would be accomplished if this were an actual project. Ensure all associated costs are clearly identified and incorporated in the proposal. Proposers are not expected to obtain actual engineering services for the purposes of responding to this sample project proposal requirement.

4Question
Section L, Part IV - DocumentsSection L Part IV – Documents, item (iv) b, states, “Typing shall not be less than 12-point font” for Parts II and III. Regarding Attachment 09 Past Performance Projects List, the form is provided using 10-point font. Are offerors allowed to use 10-point font to complete this attachment?
Answer
Section L Part IV – Documents, item (iv) b, was amended to "Typing shall be not less than 10-point font."
5Question
Section MSection M states, “Past Performance is significantly more important than price.” However, the evaluation process detail ranks proposals by price first and evaluates only up to 7 lowest-priced offerors technically. Furthermore, past performance is only evaluated after technical acceptability and price ranking, in effect placing it last in priority. Can the Government confirm whether the stated order of importance (Past Performance over Price) is accurate, or clarify how the evaluation process ensures that Past Performance is, in practice, given greater weight than price in the source selection decision?
Answer
The stated order of importance is accurate. Per Section M, offerors will be: (1) ranked according to price, (2) evaluated for technical acceptability, and finally (3) assigned a Performance Confidence Assessment Rating based on past performance information. If the offeror is not given a rating of “Substantial Confidence” then the evaluation team moves on to the next lowest offeror’s proposal until an offeror is judged to have a “Substantial Confidence” performance assessment or until all offerors are evaluated. The Government shall then make an integrated assessment best value award decision.
6Question
CoefficientsIt has come to my attention with SABER projects, we need to RS Means Cost Schedule to be able to price and give our coefficients. RS Means Cost Data
•Cost Schedules & Types: Data is organized into four main sections: square foot costs, assembly costs, unit costs, and location factors.
•Quarterly Updates: The 2025 cost books are updated quarterly (Q1-Q4) to reflect fluctuations in material costs and labor rates.
•Unit Costs: Provides detailed line-item costs for over 9,000 items, including materials, equipment, and labor, categorized by CSI Master Format.
•Assemblies Costs: Offers pricing for 100+ commonly used construction systems, useful for conceptual estimating.
•Location Factors: Adjusts national average costs to specific local markets
Answer
The above information is the responsibility of the KTR. They should use current RS Means cost data (FY 2026 annual not quarterly) with the Charleston SC CCI. This contract uses detailed cost estimating and the assemblies book will not be utilized for task order proposals.
7Question
OtherCould you please confirm whether holding a GC license in the State of South Carolina will be requirement for this project?
Answer
In South Carolina, a state-mandated general contractor license is required for commercial projects over $5,000 and residential projects over $200. Local municipal/county business license taxes usually apply, regardless of whether the work is performed on a federal installation, because the tax is based on the business's presence or activity within that jurisdiction. General Contractor Licensing Federal Installation Exception: While the physical work may be on federal land, the contractor must be licensed by the state if they are based in SC or operate a business in the state.
8Question
Sample Project SOWNEW HVAC SYSTEM INSTALLATION: 1. Contractor shall provide and install one (1) new 15 Ton water to air Trane chiller and matched Air handling unit. Is the equipment required to be manufactured by Trane?
Answer
Yes, Joint Base Charleston has and approved J&A to sole source new Chillers to Trane. This applies to chillers only not DX units.
9Question
Sample Project SOWNEW HVAC SYSTEM INSTALLATION: The new equipment shall communicate via the existing Trane building control unit. Are the new controls required to be Trane?
Answer
The field devices must be able to integrate to the Trane Building control unit. They can be provided by other vendors as long as they can communicate via BacNet/IP protocol and will maintain full controllability and functionality via the base BAS front end.
10Question
Sample Project SOWNew HVAC system installation requires the use of Trane 15 ton water to air chiller. When using RS Means Unit Price Book, the line item pricing typically does not cover the cost to purchase Trane Brand equipment. Would we be able to use a Non-Priced line items for this effort?
Answer
No. For the sample project use book line items as your source pricing for the 15 ton water to air chiller found in Division 23- Heating, Ventilating, and Air-Conditioning (HVAC). Non-Priced line items require the submittal of three quotes and approval from the Contracting Officer. This effort would not be available for the sample project process.
11Question
Section L, Part IIIPast Performance, Performance Surveys (xi) states to provide supplemental information; are CPARS an acceptable form of supplemental information?
Answer
YES
12Question
Section L, Part IIIPast Performance, Performance Surveys (xi) states to provide supplemental information; are previously completed PPQs an acceptable form of supplemental information?
Answer
YES
13Question
Section H, Pre-proposal Conference Site Visit, paragraph c)
Section L, 2. General InformationThe RFP permits offerors to submit questions concerning the solicitation until 27 April 2026 at 2:00 pm ET. Will the Government incorporate its responses to these questions into the solicitation through an official amendment, where applicable?
Answer
Questions and Answers will be posted on Sam.gov
14Question
Section H, Pre-proposal Conference Site Visit, paragraph c)
Section L, 2. General InformationThe RFP establishes a deadline for questions of April 27, 2026 at 2:00 pm ET, which is approximately two weeks prior to the proposal due date. To support fair competition and ensure offerors have adequate time to incorporate any clarifications or amendments into their proposals, will the Government confirm that final responses to questions will be provided no later than 5 to 10 days before the proposal due date?

Providing timely responses is consistent with the intent of FAR 15.206(a), which emphasizes the importance of issuing amendments with sufficient time for offerors to meaningfully respond. Advance release of Q&As will help ensure a common understanding of requirements, improve proposal quality, and reduce the need for last-minute revisions or potential schedule extensions.

Answer
We estimate the Q&A to be posted to SAM.gov on 5 May 2026. The proposal due date will be extended from 11 May 2026 to 20 May 2026.
15Question
Section H, Pre-proposal Conference Site Visit, paragraph c)
Section L, 2. General InformationWe understand that the deadline for submitting questions is April 27, 2026, at 2:00 PM ET. If the government’s responses to those questions raise additional points requiring clarification, will offerors be permitted to submit follow-up questions after the deadline?
Answer
No
16Question
SF1442, Block 13
Section L, 1. Proposal Preparation InstructionsPer SF1442, block 13, an offer guarantee is required but the submission requirements for Part I, II and III do not address this requirement. Can the government please clarify whether the bid guarantee should be included in Part I – Price Proposal?
Answer
Yes, it should be included in Part I - Price Proposal.
17Question
Section L, 1. Proposal Preparation InstructionsSection L, Paragraph 1 (Proposal Preparation Instructions) states that offerors must clearly identify any exceptions to the solicitation terms and conditions and provide supporting rationale. Can the Government clarify in which Part of the proposal submission any such exceptions should be included?
Answer
You may include any exceptions to the solicitation terms and conditions, on a separate sheet, as part of Part I - Price Proposal.
18Question
Section L, 1. Proposal Preparation Instructions, Part II – Technical Proposal, Element 1-1: Management Organization, item (iii)Section L, Part II – Technical Proposal, Element 1-1: Management Organization, item (iii), requires offerors to identify the number of jobs assigned per Superintendent, Quality Control Manager/Inspector, and Safety Manager. However, Superintendents are not identified as required personnel in Attachment 1 or elsewhere in Element 1-1. Can the Government clarify whether this requirement is intended to refer to Project Managers (PMs) instead of Superintendents?
Answer
YES, this requirement is intended to refer to Project Managers (PMs) versus Superintendents?
19Question
Section L, 1. Proposal Preparation Instructions, Part III – Past Performance Information (Performance Surveys)Section L, Part III – Past Performance Information (Performance Surveys) includes conflicting language indicating that contracts must be both “completed” and “performed” within the last five years. Can the Government clarify whether offerors may submit contracts that were performed within the last five years but are not yet completed as of the solicitation release date?
Answer
Section L and Section M have been revised to clarify that projects are to have been performed within the past 5 years. For example, if you hold a current SABER at a different location, that contract may be submitted even though the period of performance is ongoing.
20Question
Section L, 1. Proposal Preparation Instructions, Part II – Technical ProposalPart II requires that the JV Agreement be included at the beginning of the Technical Volume (Part II). Part III, item (xiii), also states that if a teaming arrangement is contemplated, offerors must provide complete information, including written agreements. Can the Government clarify whether JV offerors are required to submit the JV Agreement in Part II only, or in both Part II and Part III?
Answer
Per Section L, Submission of Proposal, paragraph h) If the Offeror is part of a Joint Venture, a signed Joint Venture Agreement must be included at the front of the Technical Proposal.
21Question
Section L, 1. Proposal Preparation Instructions, Part III – Past Performance InformationAttachment 9, Past Performance Project ListThe Past Performance Projects List (Attachment 9) provides space to include up to 15 contracts. However, Section L, Part III – Past Performance (Performance Surveys) instructs offerors to provide no more than ten (10) of the most relevant contracts. Can the Government confirm that offerors are limited to submitting a maximum of 10 contracts in Attachment 9, even though the spreadsheet accommodates up to 15 entries?
Answer
Please provide no more than ten (10) of the most relevant contracts.
22Question
Section L, 1. Proposal Preparation Instructions, Part I - Price ProposalSection L, Part I – Price Proposal, item a) indicates to complete SF1442 block 17. Furthermore, item b) instructs offerors to insert proposed coefficients in Section B. Can the government clarify what information, if any, should be included in block 17 next to “Amounts” ?
Answer
Block 17 will be left blank. Please use Attachment 10, Schedule B, to enter your proposed coefficients. The government will complete Section B of the SF 1442 at the time of award.
23Question

Section B

Section L, 1. Proposal Preparation Instructions, Part I - Price Proposal Attachment 10, Schedule B Section L, Part I – Price Proposal, item b) states, “Insert proposed coefficients in Section B for each Coefficient Schedule Number….Coefficients shall also include all items delineated in Schedule B Contractor General Administrative (G&A) Expenses. The coefficients shall be entered into Section B of the solicitation, on the line next to each Coefficient Schedule Number description.” However, Section B does not include “Coefficient Schedule Number descriptions.” Furthermore, the line items within Section B state, “SEE SCHEDULE B, Coefficient Schedule.”

Conversely, Attachment 10, Schedule B, Note 1 states, “ In order to be considered for award, the offeror must submit a coefficient for each line item above.” This statement indicates that Schedule B should be completed and included within the offeror’s proposal. Furthermore, Attachment 10, Schedule B includes the required “Coefficient Schedule Number descriptions.”

Can the government please clarify whether offerors are required to complete and submit Attachment 10 (Schedule B) with their proposed coefficients, and confirm whether this satisfies the requirement in Section L, or if offerors are also required to enter coefficients separately in Section B? If required to submit Section B, please clarify if all eight coefficients should be included for each and every line item.

Answer
Please see Question #22
24Question
Section L, 1. Proposal Preparation Instructions, Part I - Price ProposalJBC Pre Sol Agenda HandoutSection L, Part I – Price Proposal identifies four required submission elements.
a)SF 1442
b)Proposed coefficients in Section B for each Coefficient Schedule Number.
c)Necessary fill-ins and certifications in Sections I through K.
d)Copy of the letter from the Small Business Administration (SBA) showing proof of Section 8(a) status.

However, the JBC Pre Sol Agenda Handout lists a slightly different set of requirements, including:

--SF1442

--Pricing Schedule --Necessary fill-ins and certifications in Sections I through K --Sections C through I, submit only those pages that require a fill-in --Standard Form 24, Bid Bond

Please clarify the definitive submission requirements for Part I – Price Proposal. Specifically:

1) Section B does not include Coefficient Schedule Numbers. Please clarify if the government intends for offerors to submit coefficients in the “Pricing Schedule” provided in Schedule B rather than in Section B.

Answer
Please see Question #22
25Question
Section L, 1. Proposal Preparation Instructions, Part I - Price ProposalJBC Pre Sol Agenda HandoutSection L, Part I – Price Proposal identifies four required submission elements.
a)SF 1442
b)Proposed coefficients in Section B for each Coefficient Schedule Number.
c)Necessary fill-ins and certifications in Sections I through K.
d)Copy of the letter from the Small Business Administration (SBA) showing proof of Section 8(a) status.

However, the JBC Pre Sol Agenda Handout lists a slightly different set of requirements, including:

--SF1442

--Pricing Schedule --Necessary fill-ins and certifications in Sections I through K --Sections C through I, submit only those pages that require a fill-in --Standard Form 24, Bid Bond

Please clarify the definitive submission requirements for Part I – Price Proposal. Specifically:

2) Are offerors required to submit both “Sections C through I” and “Sections I through K,” or should one instruction supersede the other?

If both “Sections C through I” and “Sections I through K,” are required, can the Government clarify how duplication of Section I should be handled, since it appears in both ranges?

Answer
Section L has precedence over the JBC Pre Sol Agenda Handout.
26Question
Section L, 1. Proposal Preparation Instructions, Part I - Price ProposalJBC Pre Sol Agenda HandoutSection L, Part I – Price Proposal identifies four required submission elements.
a)SF 1442
b)Proposed coefficients in Section B for each Coefficient Schedule Number.
c)Necessary fill-ins and certifications in Sections I through K.
d)Copy of the letter from the Small Business Administration (SBA) showing proof of Section 8(a) status.

However, the JBC Pre Sol Agenda Handout lists a slightly different set of requirements, including:

--SF1442

--Pricing Schedule --Necessary fill-ins and certifications in Sections I through K --Sections C through I, submit only those pages that require a fill-in --Standard Form 24, Bid Bond

Please clarify the definitive submission requirements for Part I – Price Proposal. Specifically:

3) Is submission of the SBA Section 8(a) status letter required at proposal submission, or will 8(a) eligibility be verified through SAM.gov registration instead?

Answer
Section L has precedence over the JBC Pre Sol Agenda Handout. Per Section L, Part I - Price Proposal, d) Provide a copy of the letter from the Small Business Administration (SBA) showing proof of Section 8(a) status. Joint Ventures are allowable on competitive 8(a) set- asides and there are no specific requirements that the joint venture agreement must be received by SBA prior to proposal due date, however, it must be approved before award of any resulting contract.
27Question
Section L, 1. Proposal Preparation Instructions, Part I - Price ProposalJBC Pre Sol Agenda HandoutSection L, Part I – Price Proposal identifies four required submission elements.
a)SF 1442
b)Proposed coefficients in Section B for each Coefficient Schedule Number.
c)Necessary fill-ins and certifications in Sections I through K.
d)Copy of the letter from the Small Business Administration (SBA) showing proof of Section 8(a) status.

However, the JBC Pre Sol Agenda Handout lists a slightly different set of requirements, including:

--SF1442

--Pricing Schedule --Necessary fill-ins and certifications in Sections I through K --Sections C through I, submit only those pages that require a fill-in --Standard Form 24, Bid Bond

Please clarify the definitive submission requirements for Part I – Price Proposal. Specifically:

4) Can you please confirm the Standard Form 24 (Bid Bond) should be included with the Part I response since it is not currently referenced in Section L?

Answer
It should be included in Part I - Price Proposal.
28Question
Section L, 1. Proposal Preparation Instructions, Part II – Technical ProposalSection L, Part II, Sub-factor 3 provides instructions for addressing a “Sample” Project. However, it also states, “The sample project Statement of Work (Project Number DKGV 1148855 Repair HVAC System B-58) as specified in Attachments 8, is a project currently planned, though not guaranteed, for execution in the Base Year of the contract. Can the government confirm its intention to award the sample project to the successful offeror?
Answer
No. It is a "Sample Project" that is currently planned, though not guaranteed to award.
29Question
Attachment 01 Statement of Work, Index page 2, item 3.4 and page 8, item 3.4Attachment 01 Statement of Work, Index page 2, item 3.4 refers to “Project Superintendent” though page 8, item 3.4 references a “Project Manager.” Please clarify which position should be listed for item 3.4
Answer
Index page 2, item 3.4 should reference "Project Manager" versus “Project Superintendent”
30Question
Attachment 01 Statement of Work, page 8, item 3.3Attachment 01 Statement of Work, page 8, item 3.3, Quality Control Manager (QCM), states “QCM shall conduct a minimum of twice daily site visits to each active project site to ensure full compliance with all safety requirements…” Can the government please clarify whether the QCM position is responsible for safety compliance or whether this should be referred to as part of the Safety Manager’s responsibilities?
Answer
Attachment 01 Statement of Work QCM, page 8, item 3.3,: QCM shall conduct a minimum of twice daily site visits to each active project site to ensure full compliance with all safety requirements, verification that the work and

materials in place and stored on site are in accordance with the approved construction drawings, shop drawings and material submittals. If the KTR decides to dual hat the QCM as their Safety Manger then yes they would be responsible for the safety aspects as well.

31Question
Attachment 01 Statement of Work, page 9, item 9Attachment 01 Statement of Work, page 9, item 9, states, “These reports shall be provided to the Government by close of business the following Monday and signed by the QCM and TO Superintendent.” Since a TO Superintendent is not identified as a required position under paragraph 3. Performance Capabilities, can the government please clarify this reference to the TO Superintendent position?
Answer
Attachment 01 Statement of Work, page 18, item 9. Daily Production/QC/Safety Reports: Should reference TO "Project Manager" versus Superintendent.
32Question
Attachment 01 Statement of Work, paragraph 13.1.4 (page 22)Attachment 01 Statement of Work, paragraph 13.1.4 Mobilization and Demobilization of Equipment (page 22) prescribes specific methods for transporting equipment that appear inconsistent with typical equipment weights, manufacturer specifications and safe hauling practices. Can the government please clarify whether these requirements are mandatory?

If the requirements in the SOW conflict with applicable safety regulations, manufacturer specifications, or industry-standard hauling practices, please confirm which standards will govern contract performance?

Additionally, because mobilization and transport costs are already included within the Unit Price Book (UPB), will the Government consider revising or removing this paragraph to better align with industry standards, reduce ambiguity and avoid potential safety risks?

Answer
Attachment 01 Statement of Work Paragraph 13.1.4 Mobilization and Demobilization of Equipment shall be

used for the identified equipment (and equivalent) to determine the appropriate mobilization and demobilization line items included in Task Order Proposals. The contractor is permitted to use different means and methods at their discretion, but the mobilization and demobilization line items in the Task Order Proposals shall not be permitted to change based on that.

33Question
Attachment 01 Statement of Work, paragraph 3.6.1 (page 9)Attachment 01 Statement of Work, paragraph 3.6.1 (page 9) states: “3.6.1. In order to demonstrate the Contractor is maintaining an adequate subcontractor pool, the Contractor shall provide a list of subcontractors from which quotes were obtained and, at the request of the Contracting Officer (CO), be prepared to provide copies of the quotes with pricing data redacted with each Task Order proposal.”

Given that this procurement is structured as a SABER contract utilizing a Unit Price Book (UPB) with competitively established coefficients, and that task orders are issued based on pre-priced line items, can the government please clarify the intent and authority for this requirement?

Under FAR 16.505(b), fair opportunity procedures for task orders under IDIQ contracts do not typically require additional competition at the subcontractor level when pricing is already established at the base contract level. Additionally, FAR 15.404-1(b)(2)(i) recognizes adequate price competition at the prime contract level as a basis for determining price reasonableness, which is inherent in the SABER procurement process.

In light of this, requiring subcontractor quotes for each task order appears inconsistent with the streamlined ordering procedures and efficiencies intended under SABER/UPB contracting methods.

Questions:

1 - Can the government please clarify the regulatory basis for requiring subcontractor quotes for each task order under this UPB-based SABER contract?

2 - Will the Government consider revising or removing this requirement to better align with standard SABER practices and FAR Part 16 ordering procedures?

3 - If the Government does intend to require subcontractor quotes (redacted or otherwise), will this be required on all task orders or at the Government’s discretion? If the latter, how will this be determined?

4 - How will price reasonableness be determined, specifically, from evaluating redacted subcontractor quotes?

Answer
This data is necessary in order to directly demonstrate the Contractor is complying with the contract requirement to maintain an adequate subcontractor pool in accordance with Attachment 01 Statement of Work Paragraph 3.6. Maintaining this pool is essential so the contractor is able to handle rapid increases in work volume, process submittals in a timely manner, and perform according to schedule. The contractor shall provide the list with each Task Order proposal. Copies of the quotes with all pricing data redacted will only be required if requested by the CO.

RFO 16.507-2, Fair Opportunity Procedures, applies only to multiple-award contracts. This is a single-award SABER, therefore it is not applicable. That aside, the intent is to determine if the contractor is maintaining a pool of contractors so that the prime is able to complete the volume of task orders for similar efforts with overlapping periods of performance. In response to inquiry on the fair and reasonable price determination, yes, prices from the price book are determined fair and reasonable, but we must also verify that the line items selected by the contractor are appropriate.

34Question
Attachment 01 Statement of Work, paragraph 1.2Attachment 01 Statement of Work, paragraph 1.2 states, “The Contractor shall provide limited design services after an individual TO award is made, normally up to no more than a conceptual design (i.e. sketches, pdf markups, simple calculations, mfr / vendor provided calculations and shop drawings) and complete as-built drawings. The TOPR shall specify if a 35% or greater design is also required, and this will be part of the negotiated cost.”

a. Is the Government stating that each task order will have an incidental design that is priced into the line items?

b. Can the Government clearly define how 35% design will be measured consistently?

c. If the design is to be priced and created after Task Order award; is the Contractor to assume that proposals, tech evaluations, and negotiations will be evaluated and agreed upon by both Government and Contractor solely by a written scope of work?

d. Does the Government have an approval process that will incorporate the design into the RFP timeline so that an approved design can be utilized in negotiations?

e. Will a Joint Scoping activity be included during the initial scope development to better align expectations and needs with how the proposal package is developed?

Answer
A. NO, your coefficient will cover limited design services after an individual TO award is made, normally up to no more than conceptual design (i.e. sketches, pdf markups, simple calculations, manufacturer/vendor provided calculations and shop drawings) and complete as-built drawings. The TOPR shall specify if a 35% or greater design is also required, and this will be part of a negotiated cost. B. See Attachment 1 SOW Sections 5.1 -5.1.6. C. The design is priced in you Task Order cost proposal and will be Tech evaluated and negotiated if needed. D. If required, the design timeframe shall be included in you projected schedule and period of performance. E. There is no joint scoping on this contract.
35Question
Attachment 01 Statement of Work, paragraph 3.4Attachment 01 Statement of Work, paragraph 3.4 lists the on-site superintendence role as being performed by a Project Manager position, but the duties listed match those a Project Superintendent typically performs, not a Project Manager. Furthermore, the minimum number of people is: 3 each, and a ratio of 7:1. This ratio suggests this is not a Project Manager role but rather a Superintendent role. Will the title of Project Manager be revised to Project Superintendent, consistent with the stated responsibilities?
Answer
NO
36Question
Attachment 01 Statement of Work, paragraphs 3.3 and 3.4Attachment 01 Statement of Work, paragraph 3.3 Quality Control Manager is listed as requiring a minimum of 3 each and a ratio to Active TOs not to exceed 5:1. At the stated TO concurrent workload of up to 50 concurrent TOs, this would equate to up to 10 QCMs.

Furthermore, paragraph 3.4 lists the minimum number of Project Managers performing on-site superintendence as 3, and a ratio of 7:1. At the stated TO concurrent workload of up to 50 concurrent TOs, this would equate to up to 8 Project Managers performing field superintendence.

Questions:

a. Is the government stipulating that to manage 50 TOs concurrently, a Contractor will need to have a staff of 18 to 20 members?

b. Will the government respectfully consider revising these ratios? If not, is it the Government's intent to strictly enforce this ratio based on the project list over the contract?

c.Is it the Government’s intent that the key personnel position of Sr. Project Manager will handle all project management for up to 10-50 concurrent task orders?
Answer
a. Attachment 01 Statement of Work, paragraph 3.3 & 3.4 are the minimum staffing levels for the QC/PM requirement and the contractor would plus up to meet the position ratios as need based on task order awards. b. NO and YES. c. The SPM will provide overall contract management of the prime contract to include; subcontract purchasing and administration, review of material submittals and shop drawings, full authority to develop cost proposals, negotiate, sign award/modify paperwork, supervise individual Project Managers, attend all joint Government/Contractor weekly status meetings as well as pre-performance site visits, pre-final and final inspections.
37Question
Attachment 01 Statement of Work, paragraph 13.1.8Attachment 01 Statement of Work, paragraph 13.1.8 Local Area Adjustment Factor states, “The RS Means® total weighted average City Cost Index (CCI) shall be set to 1.0.” Can the government please confirm if offeror proposals are to assume the CCI will always be a base of 1.0, or will it adjust with the changes that Gordian publishes, positive > 1.0?
Answer
The RS Means® total weighted average City Cost Index (CCI) shall be set to 1.0 and will remain the same for the duration of the contract.
38Question
Attachment 01 Statement of Work, paragraph 13.1.8Attachment 01 Statement of Work, paragraph 13.1.8 Local Area Adjustment Factor states, “The RS Means® total weighted average City Cost Index (CCI) shall be set to 1.0.” Should offerors assume the CCI will be set at 1.0 for every option year of the contract?
Answer
YES
39Question
Attachment 01 Statement of Work, paragraph 18.4,Regarding Attachment 01 Statement of Work, paragraph 18.4, Estimation of TOs in Advance of Funding, can the government provide a historical percentage of the TOs proceeding from Proposal to Award?
Answer
Posted on Sam.gov As Attachments 15 and 16 "Historical Information"
40Question
Attachment 01 Statement of Work, paragraph 18.4,Regarding Attachment 01 Statement of Work, paragraph 18.4, Estimation of TOs in Advance of Funding, is there a priority list or screening process that the CO will share with offerors to focus efforts where they are most likely to result in an Award?
Answer
Attachment 01 Statement of Work. paragraph 18.4.1: The Contractor may be given a list of TOs that Joint Base Charleston reasonably expects to receive funding. The list may be revised for both additions and deletions based on the Governments’ requirements. These TOs will be estimated, and negotiations completed. The Government shall incur no obligation until such time as funding becomes available and a TO is executed. The negotiated total quantities shall remain binding until funding becomes available. TOs are repriced after the annual unit price book update on or about 15 January. Agreed upon total prices that contain non-priced items shall be verified with the Contractor prior to execution of the TO. In the event the non-priced items have undergone a substantial change in the market (i.e., 10% difference), the items shall be re-quoted and an agreement reached prior to executing a TO.
41Question
Attachment 01 Statement of Work, Section 21Attachment 01 Statement of Work, Section 21 - Standard Working Hours: Given the requirement for the Contractor to respond to emergency work and execute quick-turnaround tasks, 24/7 access may be necessary to both Government facilities and Contractor offices to ensure timely performance. Will the Government confirm whether approved Contractor representatives will be granted 24/7 access to support contract performance requirements, particularly for emergency response activities?
Answer
YES, The Contracting Officer will approve selected contract individuals, i.e. HVAC, Plumbing, Electrical etc. to receive and identifier of 24/7 access on their badges for emergency response only.
42Question
Attachment 01 Statement of Work, Section 5Attachment 01 Statement of Work, Section 5, Technical Design Support, states “The Contractor shall employ or retain via subcontract licensed professional engineers and architects for incidental design...” Is it the Government’s intent to award line items (e.g. pay) on each Task Order to oversee an incidental design or project planning activities?
Answer
NO, Attachment 01 Statement of Work, Section 1.2: The Contractor shall provide limited design services after an individual TO award is made, normally up to no more than conceptual design (i.e. sketches, pdf markups, simple calculations, manufacturer/vendor provided calculations and shop drawings) and complete as-built drawings. The TOPR shall specify if a 35% or greater design is also required, and this will be part of a negotiated cost.
43Question
Attachment 01 Statement of Work, 13.1.9 Coefficient, paragraph 13.1.9.4, item 3Attachment 01 Statement of Work, 13.1.9 Coefficient, paragraph 13.1.9.4, item 3 states, “Daily clean up shall be performed at all active TO sites. It shall not be a direct TO cost but shall be paid from the coefficient. Some task orders require extensive daily cleaning efforts depending on environmental, occupancy and material factors. In the event a TO cleanup is beyond a standard daily construction cleanup, will the Government allow for task order level pricing to reflect this effort?
Answer
Daily housekeeping is mandatory at all active Task Order (TO) work sites. These routine cleanup activities are considered an overhead expense absorbed by the established coefficient and shall not be billed as direct TO costs. Conversely, final site cleanup will be treated as a direct, billable cost applicable to each individual TO. Any requests for additional site cleanup funding during the post-award phase require comprehensive justification and are subject to the Contracting Officer's approval, which will be granted only under exceptional circumstances.
44Question
Attachment 01 Statement of Work paragraph 13.1.3.1Attachment 12A – Chillers Sole Source, Attachment 12B – Fire Alarm Panel, and Attachment 12C – GeneratorRegarding SOW – Attachment 12A – Chillers Sole Source, Attachment 12B – Fire Alarm Panel, and Attachment 12C – Generator, Attachment 01 Statement of Work paragraph 13.1.3.1 states “NPP Item prices should be offered from at least 3 verifiable, independent, acceptable vendors” In the event the Contractor is supplying a proprietary piece of equipment (as referenced in Attachments 12A, 12B and 12C), how is the Contractor to supply 3 quotes to satisfy this requirement?
Answer
NPP items will not be used for the sample project, use book line items as your source pricing for the 15 ton water to air chiller found in Division 23- Heating, Ventilating, and Air-Conditioning (HVAC). Non-Priced line items require the submittal of three quotes and approval from the Contracting Officer. This effort would not be available for the sample project process.
45Question
Section L,
Part IV - Documents; para (iv) b.Requirement: Typing shall not be less than 12-point.

Question: Please allow 10-point font for graphics, tables, diagrams, etc.

Answer
Section L Part IV – Documents, item (iv) b, have been amended to "Typing shall be not less than 10-point font."
46Question
Section L,
Part II - Technical ProposalRequirement: Limited to 20 pages

Question: Please increase the page limitation at least 10 more pages for the Technical Proposal (at least 30 pages).

Answer
Section L Part II Technical Proposal will has been amended to remove the 20 page limit.
47Question
Section L,
Part II - Technical Proposal, Sub-Factor 1; Element 1-1, para (i)Question: Please exclude the resumes from the page limitation.
Answer
Section L Part II Technical Proposal will has been amended to remove the 20 page limit.
48Question
Section L,
Part II - Technical Proposal, Sub-Factor 3; Element 3-1Question: Given the amount of information required for Sub-Factor 3, please exclude Sub-Factor 3 in its entirety from the page limitation.
Answer
Section L Part II Technical Proposal will has been amended to remove the 20 page limit.
49Question
Section 3. Performance Capabilities; para 3.2 Cost Estimator; 3.2.2.Section L,
Part II - Technical Proposal, Sub-Factor 1; Element 1-1, para (i)"Reference: Resume for Cost Estimator

Question: Is it acceptable to provide one (1) Cost Estimator resume in our proposal submission and submit the names/qualifications for the two (2) Cost Estimators for CO approval (on Form 4025) after award?"

Answer
Section L, Part II - Technical Proposal, Sub-Factor 1; Element 1-1, para (i) Provide resumes clearly showing the level of education, experience, training and qualifications of proposed key personnel identified above. Resumes are required for two (2) Cost Estimators Per Attachment 1 SOW section 3.2.2.
50Question
Section 3. Performance Capabilities; para 3.3 QCM; 3.3.1.Section L,
Part II - Technical Proposal, Sub-Factor 1; Element 1-1, para (i)Reference: Resume for Quality Control Manager (QCM)

Question: Is it acceptable to provide one (1) QCM resume in our proposal submission and submit the names/qualifications for the three (3) QCMs for CO approval (on Form 4025) after award?

Answer
Section L, Part II - Technical Proposal, Sub-Factor 1; Element 1-1, para (i) Provide resumes clearly showing the level of education, experience, training and qualifications of proposed key personnel identified above. Resumes are required for three (3) QCM(s) Per Attachment 1 SOW section 3.3.1
51Question
Section 3. Performance Capabilities; para 3.4 PM; 3.4.1.Section L,
Part II - Technical Proposal, Sub-Factor 1; Element 1-1, para (i)Reference: Resume for Project Manager (PM)

Question: Is it acceptable to provide one (1) PM resume in our proposal submission and submit the names/qualifications for the three (3) PMs for CO approval (on Form 4025) after award?

Answer
Section L, Part II - Technical Proposal, Sub-Factor 1; Element 1-1, para (i) Provide resumes clearly showing the level of education, experience, training and qualifications of proposed key personnel identified above. Resumes are required for three (3) PM(s) Per Attachment 1 SOW section 3.4.1
52Question
Section 3. Performance Capabilities; para 3.5 SMSection L,
Part II - Technical Proposal, Sub-Factor 1; Element 1-1, para (i)Reference: Resume for Safety Manager (SM)

Question: Is it acceptable to provide one (1) SM resume in our proposal submission and submit the names/qualifications for the two (2) SMs for CO approval (on Form 4025) after award?

Answer
Section L, Part II - Technical Proposal, Sub-Factor 1; Element 1-1, para (i) Provide resumes clearly showing the level of education, experience, training and qualifications of proposed key personnel identified above. Resumes are required for two (2) on-site SM(s) Per Attachment 1 SOW section 3.5.
53Question
Section L,
Part III - Past Performance Info, Performance SurveysPlease clarify if recent contracts for Past Performance are required to be COMPLETE within the past 5 years of solicitation issuance date or are recent if they have been STARTED within past 5 years. Solicitation language states: "Past Performance is recent if one day of performance occurred within (5) years of the release of the solicitation"
Answer
Section L and Section M have been revised to clarify that projects are to have been performed within the past 5 years. For example, if you hold a current SABER at a different location, that contract may be submitted even though the period of performance is ongoing.
54Question
Section L,
Part III - Past Performance InfoAttachment 9Attachment 9 has space for 15 contracts, but the Performance Surveys requirement requests us to provide a list of no more than 10. Please clarify if we are to only list 10 projects on the Attachment 9 form.
Answer
Please provide no more than ten (10) of the most relevant contracts.
55Question
Section L,

Part III - Past Performance Info, Performance Surveys, para (xiii) Reference: Solicitation Language states "If this is a first-time joint effort, each party to the arrangement must provide a list of past relevant contracts."

Question: Please clarify if this means that each JV member needs to supply an Attachment 9 or does each JV member provide projects within the 10 total contracts needed for Performance Surveys.

Answer
Each party can provide a list of no more than ten (10) contracts.
56Question
GeneralAre there any temperature, relative humidity, or other conditions which have to be maintained throughout this project?
Answer
NO
57Question
GeneralIs temporary air conditioning required on this project?
Answer
NO
58Question
GeneralWho is responsible for relocating furniture?
Answer
The facility occupants will relocate furniture as needed.
59Question
GeneralDo any existing systems have seismic bracing requirements?
Answer
All installed systems are required to comply with seismic bracing standards as dictated by the specific system specifications.
60Question
GeneralPlease confirm that the existing roof new system is adequate for supporting the new system and bracing?
Answer
The existing roof is sufficient to support the new like in kind replacement.
61Question
GeneralWill all contractor laydown areas be located on site?
Answer
YES, onsite laydown area will be provided.
62Question
Are there any existing building record drawings in PDF format? Are they also available in CAD?
Answer
Drawings were posted with the solicitation Attachment 8a. No, CAD drawings are not available.
63Question
Are design drawings required for the sample project?
Answer
NO. Reference Sample Project SOW.
64Question
Will any duct detectors be required?
Answer
Equipment shall be installed in accordance with all applicable codes.
65Question
New Roof Installation, Page 5Joint Base Charleston is located within the coastal wind region for ASCE and IBC wind zones. To determine wind uplift for the roofs, we need to know the risk factor for this particular facility per Table 1604.5. Risk factor IV has a facility classification for critical national defense functions. Does the government consider this facility to fall in Risk Category 4?
Answer
This building is not considered to be in Risk Category 4 per Table 1604.5 of the IBC.
66Question
GeneralAre there any spaces in the building that are considered hazardous with respect to fire/explosion safety?
Answer
NO
67Question
Attachment 10 Schedule BCOEFFICIENT SCHEDULEAttachment 10 Schedule BAs an experienced federal framework contractor, we have direct experience with SABERs and similar contracts both with and without restrictions on pricing coefficients. When negative coefficients or coefficients below 1.000 are permitted, there is increased risk to the Government that an offeror may attempt to offset an insufficient coefficient by expanding line item quantities, selecting less appropriate “best fit” items, or otherwise inflating estimates to recover costs. This can result in lengthy, contentious negotiations and increased administrative burden for the Government to review detailed and potentially inaccurate line items, reducing overall efficiency. By contrast, on framework contracts where the coefficient is required to be at or above 1.000, the Government retains greater flexibility to require certain general requirements, administrative costs, and contract performance obligations to be captured within the coefficient. This approach also supports more concise, transparent, and accurate task order estimates, while reducing the incentive for artificial quantity escalation. Overall, requiring coefficients at or above 1.000 has proven to promote clarity, efficiency, and mutual trust, ultimately fostering a stronger and more collaborative Government-contractor partnership. Will the Government consider revising the solicitation to require that all proposed coefficients be no less than 1.000?
Answer
NO
68Question
Attachment+11+Section+L+Rev+1PART II – TECHNICAL PROPOSAL Element 1-1: Management OrganizationAttachment+11+Section+L+Rev+1Section L, Element 1-1 instructs Offerors that "for Technical Proposal evaluation purposes only, the number of key personnel to be included in the response to Sub-Factor 1 (Program Management) shall be the Offeror’s proposed staffing level which meets the requirements set forth in Paragraph 3 of the Statement of Work and Technical Specifications (Attachment 1 to the Solicitation) with a hypothetical workload of 30 concurrent task orders; 25 under active construction and 5 being actively negotiated."

Is the Government's expectation that the Offeror submit a…