This document is a procurement guidance document for the Sustainable Procurement Program (formerly Green Procurement), administered by POC Barry Lewis (843-963-1470), Revision 1.

The program requires contractors to purchase environmentally preferable products and services in accordance with established Federal green procurement preference programs. For any purchased items where the collective purchase price of functionally similar items exceeds $10,000 during a fiscal year, contractors must procure items composed of the highest percentage of recovered materials or biobased content practicable. Contractors may decline such procurement only if items are not reasonably available within a reasonable timeframe, fail to meet satisfactory performance standards, or are available only at unreasonable prices. For contract actions exceeding $100,000, contractors must estimate the percentage of total materials utilized that are recovered materials. The document references the EPA's Comprehensive Procurement Guideline (CPG) Program, which provides a CPG Product Supplier Directory of green products and sources. For biobased products, contractors must comply with the USDA Biopreferred program by reporting to sam.gov with a copy to the Contracting Officer on product types and dollar values of USDA-designated biobased products purchased during the previous Government fiscal year (October 1 through September 30). Reports must be submitted no later than October 31 of each year during contract performance and at contract completion.

View the file

Other files

File Type Posted
Questions and Answers 20260505.xlsx XLSX spreadsheet
Attachment 11 Section L Rev 2.pdf PDF
Attachment 8B B-58 Drawings.pdf PDF
Attachment 01 Statement of Work (Rev2).pdf PDF
Solicitation Amendment FA441826R00040002 SF 30.pdf PDF
Attachment 12 Section M Rev 2.pdf PDF
Attachment 14 Sign-In Sheet 20260422.pdf PDF
Attachment 12 Section M Rev 1.pdf PDF
Attachment 8 Sample Project DKGV 1148855 Repair HVAC System B-58 (WS) SOW.pdf PDF
Solicitation Amendment FA441826R00040001 SF 30.pdf PDF
Attachment 13 Question and Answer Form.xlsx XLSX spreadsheet
Attachment 11 Section L Rev 1.pdf PDF
Attachment 16 FA441816D0002 HISTORICAL INFORMATION.pdf PDF
Attachment 15 FA441821D0002 HISTORICAL INFORMATION.pdf PDF
Attachment 8A HVAC Zones Floor Plan.pdf PDF
SOW Attachment 12B FAP Sole Source.pdf PDF
SOW Attachment 05 JBCGS 017419 Construction Waste Management and Disposal.pdf PDF
SOW Attachment 01 Joint Base Charleston Achitectural Compatibility Plan.pdf PDF
Attachment 07 Green Procurement Form.pdf PDF
Attachment 05 Dorchester County WD SC20260024.pdf PDF
SOW Attachment 13 - JB CHS Transmittal Form 4025.pdf PDF
SOW Attachment 03 JBCGS 015720 Environmental.pdf PDF
SOW Attachment 02 JBC Cable Management Policy 2021.pdf PDF
Attachment 12 Section M.pdf PDF
Attachment 11 Section L.pdf PDF
Attachment 10 Schedule B.pdf PDF
Attachment 08 DKGV 1148855 Repair HVAC System B-58 (WS).pdf PDF
Attachment 06 Sumter County WD SC20260030.pdf PDF
Attachment 02 Orangeburg County WD SC20260016.pdf PDF
Attachment 01 Statement of Work.pdf PDF
SOW Attachment 12A Chiller Sole Source.pdf PDF
SOW Attachment 11 Tree Ordinance New.pdf PDF
SOW Attachment 10 JBCGS 013526 GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
SOW Attachment 08 NPTU Contractor Special Conditions 2020.pdf PDF
SOW Attachment 06 JBCGS 015719 Temporary Environmental Controls.pdf PDF
Attachment 03 Berkeley County WD SC20260022.pdf PDF
Solicitation - FA441826R0004.pdf PDF
SOW Attachment 12C Generator Sole Source.pdf PDF
SOW Attachment 09 014500 QUALITY CONTROL FOR MINOR CONSTRUCTION.pdf PDF
SOW Attachment 07 Brig Security Requirements (Fillable)(Official)2023.pdf PDF
Attachment 09 Past Performance Projects List.pdf PDF
Attachment 04 Charleston County WD SC20260023.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sustainable Procurement Program (POC Barry Lewis, 843-963-1470) Rev 1

"Sustainable Procurement Program" (formerly known as Green Procurement) is the purchase of environmentally preferable products and services in accordance with one or more of the established Federal "green" procurement preference programs.

Text to include in contract Source

1. Contractors shall comply with this requirement with respect to any purchased item where the purchase price of functionally similar item collectively exceeds $10,000 during a fiscal year. Any item purchased by or for government use shall be composed of the highest percentage of recovered materials or biobased content practicable. The decision not to procure such items shall be based on a determination that such items—

a) are not reasonably available within a reasonable period of time;

b) fail to meet satisfactory performance standards; or

c) are only available at an unreasonable price.

FAR1 52.223-

2. For contract actions that exceed $100,000, contractors shall estimate the percentage of the total material utilized for the performance of the contract which is recovered materials.

FAR 52.223-9

3. The Comprehensive Procurement Guideline (CPG) Program is discussed in detail on the EPA’s website https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program. A CPG Product Supplier Directory of green products is provided on this website along with possible sources of such products.

Sec 01 33.29, para, 1.6.19

4. The Biopreferred program is discussed in detail on the USDA website https://www.biopreferred.gov/BioPreferred/. This website also has a list of products and sources that qualify as biobased products. In the performance of this contract, the Contractor shall -

a) Report to http://www.sam.gov, with a copy to the Contracting Officer , on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

b) Submit this report no later than-

i. October 31 of each year during contract performance; and

ii. At the end of contract performance.

Sec 01 33 29, para, 1.6.20

FAR 52.223-2

1 FAR – Federal Acquisition Regulation

File details come from the government source that posted it. Updated .