Recovered Materials Determination Form Summary

This is a Recovered Materials Determination Form used for the JB CHS SABER Contract to document compliance with the EPA's Affirmative Procurement Program for Recovered Materials when procuring EPA-designated items from outside vendors. The form requires the procurement originator to identify which EPA-designated items are being purchased, specify required and actual recycled content percentages, and certify compliance with EPA standards. The form is not required for items obtained from established Federal supply sources and becomes part of the contracting office contract file upon completion.

The form identifies numerous EPA-designated product categories eligible for procurement, including construction products (building insulation, carpeting, cement and concrete with fly ash or blast furnace slag, latex paint, floor tiles, and fiberboard), landscaping products (garden hoses, lawn edging, and plastic lumber), vehicular products (engine coolants, re-refined lubricating oils, and retread tires), park and recreation products (plastic fencing, playground surfaces and equipment), nonpaper office products (binders, folders, clipboards, and toner cartridges), paper products (newsprint, printing and writing papers, and paperboard), miscellaneous products (signage, pallets, and sorbents), and transportation products (parking stops and traffic control items). The procurement originator Warren Wade certified on December 12, 2024, that the Statement of Work/Specifications for all materials listed comply with EPA standards. Part B of the certification allows for exemptions based on performance standards, availability, competitive sourcing, or unreasonable pricing, requiring both procurement originator and commander signatures.

View the file

Other files

File Type Posted
Questions and Answers 20260505.xlsx XLSX spreadsheet
Attachment 11 Section L Rev 2.pdf PDF
Attachment 12 Section M Rev 2.pdf PDF
Attachment 8B B-58 Drawings.pdf PDF
Attachment 01 Statement of Work (Rev2).pdf PDF
Solicitation Amendment FA441826R00040002 SF 30.pdf PDF
Attachment 14 Sign-In Sheet 20260422.pdf PDF
Attachment 12 Section M Rev 1.pdf PDF
Attachment 8 Sample Project DKGV 1148855 Repair HVAC System B-58 (WS) SOW.pdf PDF
Solicitation Amendment FA441826R00040001 SF 30.pdf PDF
Attachment 13 Question and Answer Form.xlsx XLSX spreadsheet
Attachment 11 Section L Rev 1.pdf PDF
Attachment 16 FA441816D0002 HISTORICAL INFORMATION.pdf PDF
Attachment 15 FA441821D0002 HISTORICAL INFORMATION.pdf PDF
Attachment 8A HVAC Zones Floor Plan.pdf PDF
SOW Attachment 12B FAP Sole Source.pdf PDF
SOW Attachment 05 JBCGS 017419 Construction Waste Management and Disposal.pdf PDF
SOW Attachment 01 Joint Base Charleston Achitectural Compatibility Plan.pdf PDF
Attachment 05 Dorchester County WD SC20260024.pdf PDF
SOW Attachment 12C Generator Sole Source.pdf PDF
SOW Attachment 09 014500 QUALITY CONTROL FOR MINOR CONSTRUCTION.pdf PDF
SOW Attachment 07 Brig Security Requirements (Fillable)(Official)2023.pdf PDF
Attachment 09 Past Performance Projects List.pdf PDF
Attachment 04 Charleston County WD SC20260023.pdf PDF
SOW Attachment 13 - JB CHS Transmittal Form 4025.pdf PDF
SOW Attachment 04 JBCGS 015720 Att A - Sustainable Procurement Program.pdf PDF
SOW Attachment 03 JBCGS 015720 Environmental.pdf PDF
SOW Attachment 02 JBC Cable Management Policy 2021.pdf PDF
Attachment 12 Section M.pdf PDF
Attachment 11 Section L.pdf PDF
Attachment 10 Schedule B.pdf PDF
Attachment 08 DKGV 1148855 Repair HVAC System B-58 (WS).pdf PDF
Attachment 06 Sumter County WD SC20260030.pdf PDF
Attachment 02 Orangeburg County WD SC20260016.pdf PDF
Attachment 01 Statement of Work.pdf PDF
SOW Attachment 12A Chiller Sole Source.pdf PDF
SOW Attachment 11 Tree Ordinance New.pdf PDF
SOW Attachment 10 JBCGS 013526 GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
SOW Attachment 08 NPTU Contractor Special Conditions 2020.pdf PDF
SOW Attachment 06 JBCGS 015719 Temporary Environmental Controls.pdf PDF
Attachment 03 Berkeley County WD SC20260022.pdf PDF
Solicitation - FA441826R0004.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Recovered Materials Determination Form Instructions

This form is to be completed by the procurement originator when EPA-designated items included in the Affirmative Procurement Program for Recovered Materials are being procured from outside vendors. For questions on whether the product counts as “EPA designated” or what the required recycled content is, refer to product descriptions on EPA’s website at http://www.epa.gov/cpg. This form is not required for items requisitioned from established Federal supply sources.

1. The procurement originator lists which item(s) apply to the procurement request, the required recycled content, the actual recycled content, and signs and dates the appropriate Certification on the back of this form.

2. If an exemption is being claimed, the procurement originator’s unit commander also signs the

Certification on the back of this form.

3. The completed form becomes part of the contracting office contract file.

Contract: JB CHS SABER Contract

The EPA-designated items being procured are:

Construction Products Nonpaper Office Products

Building Insulation Binders (paper, solid plastic or plastic covered) Polyester Carpeting Plastic presentation folders Carpet Backing Plastic file folders Carpet Cushion Plastic clip portfolios

Cement & concrete containing: Plastic clipboards Coal fly ash, or Office recycling containers Ground granulated blast Office waste receptacles furnace slag Plastic desktop accessories Flowable fill Plastic envelopes Latex paint Plastic trash bags Floor tiles Printer ribbons Laminated paperboard Toner cartridges Patio blocks Paper and Paper Products Shower & restroom dividers Newsprint Structural fiberboard Commercial/industrial sanitary tissue products Railroad grade crossings/surfaces Printing and writing papers

Landscaping Products Paperboard and packaging Garden & soaker hoses Tray liners Lawn & garden edging Bristols (File folders, cards, tags, tickets, etc.)

Landscaping timbers & posts (plastic lumber) Miscellaneous Products Hydraulic mulch Awards and plaques Compost from yard trimmings or food waste Signage

Vehicular Products Strapping and stretch wrap Engine coolants Pallets Re-refined lubricating oils Mats Retread tires Industrial drums

Park and Recreation Products Sorbents Plastic fencing (erosion control safety barrier) Transportation Products Playground surfaces Parking stops Park and recreation furniture Traffic cones Running tracks Traffic barricades Playground equipment Channelizers

Delineators/Flexible delineators http://www.epa.gov/cpg

CERTIFICATION

Contract: JB CHS SABER Contract

Complete Part A or Part B as appropriate:

A. To the best of my knowledge the Statement of Work/Specifications for the requisition of all materials listed on this form complies with EPA standards for recycled/recovered materials content.

Warren Wade 12 Dec 2024 Procurement Originator’s Signature Date

B. The following item does not comply with EPA standards for recycled/recovered materials (please complete a separate justification for each noncompliant item purchased as part of this procurement action):

The exemption being claimed for this purchase is:

The product does not meet appropriate performance standards

The product is not available within a reasonable time frame

The product is not available competitively (from two or more sources)

The product is only available at an unreasonable price (it costs more than a comparable non-recycled-content product). The recycled-content product costs $ per and the non-recycled-content product costs $ per .

Procurement Originator Date

Commander Date

Instructions
Structural fiberboard Commercial/industrial sanitary tissue products
Hydraulic mulch Awards and plaques
CERTIFICATION

File details come from the government source that posted it. Updated .