Attachment 8B B-58 Drawings.pdf
PDF 21 MB Posted
- Solicitation number
- FA441826R0004
About this file
This document is a comprehensive set of architectural and engineering construction drawings for Building 58 at Naval Weapons Station Charleston, South Carolina, involving the replacement of underground storage tanks and various mechanical, electrical, and HVAC system upgrades.
The project encompasses multiple building systems replacements and modifications, including: replacement of underground fuel oil storage tanks (2,500 gallons capacity); installation of new waste otto fuel collection systems; replacement of air compressor and A/C units; demolition and reconstruction of mechanical rooms; new HVAC piping, controls, and ductwork; electrical system upgrades including new panels and wiring; structural modifications to accommodate new equipment; and plumbing system alterations. The drawings detail existing site conditions, proposed demolition requirements, new equipment specifications, foundation and structural details, piping layouts for fuel systems and HVAC distribution, electrical schematics with control systems, and equipment schedules. Construction notes specify requirements for digging permits for excavations over 8 inches deep, extreme care during excavation near existing utilities, contractor responsibility for site-based chemical analysis, and coordination with the officer in charge of construction. The control systems include thermostats, temperature sensors, humidity sensors, air handling units with schedules, and a Building Automation System (BAS) network utilizing MS/TP bus architecture with controllers, network switches, and addressable thermostats located throughout the facility. Drawings are prepared by Southern Division, General Engineering Laboratories, Inc., dated between 1992-2013, with project documentation referencing NAVFAC contracts and various drawing index numbers for coordination among architectural, mechanical, electrical, and structural disciplines.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
REFERENCE DRAWING
AHU
AHU DX 1-1
Project Title
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Building 58
JTC .
Air Flow Diagram
AHU DX AIR FLOW CONTROL SCHEMATIC
10/21/13JTCWEB
1-6930479581
4415 Sea Ray Drive
North Charleston SC
29405
Phone: 843.744.7144
Fax: 843.744.5553
BILL OF MATERIALS
Designation Qty Part Number Description
Field Devices:
SF-S 1 CSD-CA1G1-1 Supply Fan Status
DA-T 1 TE-6311M-1 Discharge Air Temp Sensor
RA-T/H 1 HE-67P2-0N00P Return Air Temp Sensor
SEQUENCE OF OPERATIONS:
AHU WILL BE UNDER ZONE TEMP CONTROL BY TEC IN EAST HALL. UPON A RISE IN ZONE TEMP ABOVE EFF COOLING
SETPOINT, COOLING WILL BE ENABLED TO CONTROL TO SETPOINT. UPON A DECREASE IN ZONE TEMP BELOW EFF
HEATING SETPOINT, HEATING WILL BE ENABLED TO CONTROL TO SETPOINT. FAN WILL CYCLE ON DURING THESE TIMES. T-
STATS IN THE NORTH HALL AND BREAKROOM ARE FOR MONITORING ONLY.
O
Y2
Y1
W1
D
X
Return
Air
E
H
SF-S
DA-T
DETAIL
F301
DETAIL
F131
RA-T/H
DETAIL
F153
D1
D2
REF
RS
SCOM
OS
Y1
Y2
G
RC
C
RH
W1
O/B
AUX
MS
TEC2602
G
R
Circuit Board
On Trane Unit
Blu
Blk
White
MS/TP to NCE
C
CO2
Existing by others
REFERENCE DRAWING
AHU
AHU DX 1-2
Project Title
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Building 58
JTC .
Details
10/1/13JTCWEB
1-6930479581
North Charleston SC
29405
Phone: 843.744.7144
Fax: 843.744.5553
DETAIL F153 HE-6700 SERIES
DUCT HUMIDITY SENSOR
Ground
(Common)
Power
Output
HE-67xx
TEMP
TEMP
Humidity
Input
Temp Sensor
Input (If Used)
HE-67xx JUMPER POSITIONS
0-5V
0-10V
+15V
IN#
ICOM#
CONTROLLER
DETAIL F131 TEMPERATURE SENSOR INPUT
RTD
Temperature Element
CONTROLLER
DETAIL F301 BINARY INPUT (DRY CONTACT)
FIELD DEVICE
DRY CONTACT
(N.O. or N.C. as required)
CONTROLLER
JTC JTC 10/1/13
REFERENCE DRAWING
Building 58 Riser
RISER 1-1
Project Title
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Building 58
BUILDING 58 RISER
Hub/Switch
MS-NCE2560-1
FC Bus Add= 4
IP=192.168.0.131
Subnet= 255.255.255.0
MS/TP Bus EOL on card
4415 Sea Ray Drive
North Charleston SC
29405
Phone: 843.744.7144
Fax: 843.744.5553
3/C #22
Shielded
BILL OF MATERIALS
Designation Qty Part Number Description
Field Devices:
Network Control Engine 1 MS-NCE2560-0 Network Controller, FEC
Comm Card 1 BAYBCIR001A Trane BacNet card for Relia Tel
TEC 1 TEC2602-4 BacNet MS/TP T-Stat
Net Stat 2 NS-BTB7003-0 Net Stat SP ADJ. Addressable
Display 1 MS-DIS1710-0 Local Controller Display
BacNet Comm
Card for Relia Tel
FC Bus Add= 5
Located inTrane Unit
TEC2602-4
East Hall
FC Bus Add= 6
SA Bus
NS-BTB7003-0
ADDR: 201
North Hall
NS-BTB7003-0
ADDR: 202
Breakroom
2pr #22
Shielded
NAE
BATT FAULT
ETHERNET
10 LINK
100 LINK
RUN
PEER COM
POWER
FAULT
FC BUS
S H
D
R E
F
FC BUS
C O
M
H O
T
24V~
S H
L
D
R E
F
A
BATTERY
FC BUS
ETHERNET USBRS232C A RS232C B
MS-DIS1710-0
SA Bus
JTCWEB JTC 10/1/13
REFERENCE DRAWING
Building 58 Details
Riser 1-2
Project Title
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Building 58
BUILDING 58 RISER DETAILS
North Charleston SC
29405
Phone: 843.744.7144
Fax: 843.744.5553
DETAIL NS102 NET STAT WITH TERMINALS
ADDRESSABLE
S A
P W
R
C O
M
J2
JACK J2 IS FOR
COMMISIONING TOOLS.
W4
THERMOSTAT CIRCUIT BOARD
+-C
COM
SA PWR
(15VDC)
COM
SA PWR
(15VDC)
FROM PREVIOUS
SA BUS DEVICE
TO NEXT
SA BUS DEVICE
(IF REQUIRED)
CONNECTOR ON STAT MOUNTING
BASE. SLIDES INTO W4 PINS ON
CIRCUIT BOARD.
ADDRESS SWITCH
ON
ON
SW1 SW2 ADDRESS
OFF OFF 200
ON OFF 201
OFF ON 202
ON ON 203
COM = BLU
SA- = WHT
SA+ = BLK
PWR = RED
D1
D2
REF
RS
SCOM
OS
Y1
Y2
G
RC
C
RH
W1
O/B
AUX
MS
TEC2602
Address:
SA BUS FC BUS
V
IN
IC
O
M
IN
IC
O
M
UNIVERSAL
FC BUS
O U
T
O C
O M
O U
T
O C
O M
BINARY
H O
T
24V
C O
M
NCE256x
FC EOL
ON
S A
P W
R
C O
M
+ - + - C O
M
S H
L D
V
IN
IC
O
M
IN
IC
O
M
V
IN
IC
O
M
IN
IC
O
M
V
IN
IC
O
M
IN
IC
O
M
V
IN
IC
O
M
IN
IC
O
M
SA BUS
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
BINARY
ETHERNET
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
O U
T
O C
O M
BO
TYPE
INT
BO
TYPE
EXT
CONFIGURABLE ANALOG
| 1994November21 As Built Dwgs Relocate 5 BLDGS |
| 1994July14 Replace Underground Storage Tank BLDG 58 |
| 1994July14 Cover Sheet 1of5 |
| 1994July14 Cover Sheet 1of5 #2 |
| 1994July14 Existing Site Plan 2of5 |
| 1994July14 Existing Site Plan 2of5 #2 |
| 1994July14 New Work Site Plan 3of5 |
| 1994July14 New Work Site Plan 3of5 #2 |
| 1994July14 Details 4of5 |
| 1994July14 Details 4of5 #2 |
| 1994July14 Misc Details 5of5 |
| 1994July14 Misc Details 5of5 #2 |
| 1992October13 Replace Air Compressor BLDG 58 |
| 1992October13 Title Sheet 1of3 |
| 1992October13 Mechanical Plans 2of3 |
| 1992October13 Mechanical Legend and Schedules 3of3 |
| 1992October13 Replace AC BLDG 58 |
| Title Sheet 1of8 |
| Mechanical Demolition Plans 2of8 |
| Large Scale Mechanical 3of8 |
| Mechanical 58 4of8 |
| Mechanical Details 5of8 |
| Legend and Shedules 6of8 |
| Electrical Demolition Plan 7of8 |
| Electrical 8of8 |
| 1992April14 BLDG 58 WST Otto Coll. Sys |
| 1992April14 Cover and Title Sheet 1of4 |
| 1992April14 Mechanical Details 2of4 |
| 1992April14 Structural Details 3of4 |
| 1992April14 Electrical Details 4of4 |
| 1991January1 Letter |
| 1988July28 Architectural Projects Paint Interior and Exterior BLDG 58 |
| 1988July28 Cover Sheet T1 |
| 1988July28 Floor Plan A1 |
| 1988July28 Elevations A2 |
| 1985May31 Waste Otto Fuel Storage Tanks |
| 1985May31 Demolition Plan, Site Plan 2of10 |
| 1985May31 Site and Floor Plans- Electrical 9of10 |
| 1983June8 Civil Repairs and Alterations Location 17- BLDG 58 |
| 1983June8 Plan and Elevation 17-1of67 |
| 1983June8 Elevation, Sections and Details 17-2of67 |
| 1983June8 Details and Electrical 17-3of67 |
| 1982August2 Electrical Projects Torpedo Shop, Otto Alarm, BLDG 58 3of12 |
| 1982July30 Civil Repairs and Alterations BLDG 58 Alterations New Shed and Doors at Decon Room 6of28 |
| 1982June11 Cooling Projects (FY-82) BLDGS 58, 900 Provide Air Conditiong Units 5of5 |
| 1980January25 Torpedo Shop |
| 1980January25 Power, Telephone, Intercom, Fire Alarm 31of42 #2 |
| 1980January25 Grading Plan and Details 3of42 |
| 1980January25 Open Storage Shed, Plan and Details 19of42 |
| 1980January25 Power Plan RMS 104, 105 and 106 and, Details 32of42 #2 |
| 1980January25 Site Plan 2of42 |
| 1980January25 Site Plan 2of42 #2 |
| 1980January25 Sewer Profile and, Details 5of42 |
| 1980January25 Sewer Profile and Details 5of42 |
| 1980January25 New Shed and Doors at Decon Room 6of42 |
| 1980January25 Sections, Details 8of42 |
| 1980January25 Sections Details 8of42 |
| 1980January25 Roof Plan and, Details 11of42 |
| 1980January25 Roof Plan and Details 11of42 |
| 1980January25 Roof Framing Plan and, Details 15of42 |
| 1980January25 Structural Framing and, Details 16of42 |
| 1980January25 Special Foundations and, Details 18of42 |
| 1980January25 Plumbing 20of42 |
| 1980January25 Rooms 105 and 106, Ventilation 23of42 |
| 1980January25 Rooms 105 and 106, Ventilation 23of42 |
| 1980January25 Hvac Piping and, Details 24of42 |
| 1980January25 Schedules and Equipment Details 26of42 |
| 1980January25 Schedules and Equiptment Details 26of42 |
| 1980January25 Power , Telephone, Intercom, Fire Alarm 31of42 |
| 1980January25 Power Plan RMS 104, 105 and 106 and, Details 32of42 |
| 1980January25 Lightning Protection and Grounding Plan, Details, Details 33of42 |
| 1980January25 Torpedo Shop Plumbing Plan and Equiptment Details 40of42 |
| 1980February1 Torpedo Shop |
| 1980February1 Site Plan 2of42 |
| 1980February1 Sections and Details 8of42 |
| 1980February1 Roof Plan and Details 11of42 |
| 1980February1 Roof Framing Plan and Details 15of42 |
| 1980February1 Structural Framing and Details 16of42 |
| 1980February1 Special Foundations and Details 18of42 |
| 1980February1 Open Storage Shed- Plan and Details 19of42 |
| 1980February1 Plumbing 20of42 |
| 1980February1 HVAC Plan 21of42 |
| 1980February1 Mechanical Room- Details 22of42 |
| 1980February1 Grading Plan and Details 3of42 |
| 1980February1 Floor Plan 6of42 |
| 1980February1 Elevations, Details 7of42 |
| 1980February1 Finish Schedule, Door Schedule, Details 9of42 |
| 1980February1 Blast Door Details 10of42 |
| 1980February1 Equipment Plan and Reflected Ceiling Plan 12of42 |
| 1980February1 Foundation Plan and Details 13of42 |
| 1980February1 Foundation Details- Soil Boring Logs 14of42 |
| 1980February1 Crane Schedule and Structural Details 17of42 |
| 1980February1 Rooms 105 and 106- Ventilation 23of42 |
| 1980February1 HVAC Piping and Details 24of42 |
| 1980February1 Schedules and Equipment Details 26of42 |
| 1980February1 Auxiliary Solar Heating System 27of42 |
| 1980February1 Electrical Site Plan, Details and Schedules 29of42 |
| 1980February1 277 V. Lighting Plan- Fixture Details 30of42 |
| 1980February1 Power- Telephone- Intercom- Fire Alarm 31of42 |
| 1980February1 Power Plan Rms. 104, 105 and 106 and Details 32of42 |
| 1980February1 Lightning Protection and Grounding Plan- Details 33of42 |
| 1974August27 Naval Weapons Station Pomflant General Development Map |
| 1974August27 Existing Conditions 1of53 |
| 1974August27 Existing Conditions 13of53 |
| Site Approval Request BLDG 58 |
| Site Approval Request Authorize BLDG 58 for MPF Milvan Repair Operations |
| Site Approval Request Redefine Explosive Mission of BLDG 58 |
| Site Approval Request Redefine Explosive Mission of BLDG 58 |
| Site Approval Request Redefine Explosive Mission of BLDG 58 #2 |
| Site Approval Request Resite BLDG 58 for Inert Operations |
| AHU Air Flow Diagram-BLDG 58 |
| AHU Details- BLDG 58 |
| Building 58 Riser |
| Building 58 Riser Detail |
File details come from the government source that posted it. Updated .