This document is a comprehensive set of architectural and engineering construction drawings for Building 58 at Naval Weapons Station Charleston, South Carolina, involving the replacement of underground storage tanks and various mechanical, electrical, and HVAC system upgrades.

The project encompasses multiple building systems replacements and modifications, including: replacement of underground fuel oil storage tanks (2,500 gallons capacity); installation of new waste otto fuel collection systems; replacement of air compressor and A/C units; demolition and reconstruction of mechanical rooms; new HVAC piping, controls, and ductwork; electrical system upgrades including new panels and wiring; structural modifications to accommodate new equipment; and plumbing system alterations. The drawings detail existing site conditions, proposed demolition requirements, new equipment specifications, foundation and structural details, piping layouts for fuel systems and HVAC distribution, electrical schematics with control systems, and equipment schedules. Construction notes specify requirements for digging permits for excavations over 8 inches deep, extreme care during excavation near existing utilities, contractor responsibility for site-based chemical analysis, and coordination with the officer in charge of construction. The control systems include thermostats, temperature sensors, humidity sensors, air handling units with schedules, and a Building Automation System (BAS) network utilizing MS/TP bus architecture with controllers, network switches, and addressable thermostats located throughout the facility. Drawings are prepared by Southern Division, General Engineering Laboratories, Inc., dated between 1992-2013, with project documentation referencing NAVFAC contracts and various drawing index numbers for coordination among architectural, mechanical, electrical, and structural disciplines.

View the file

Other files

File Type Posted
Attachment 12 Section M Rev 2.pdf PDF
Questions and Answers 20260505.xlsx XLSX spreadsheet
Attachment 11 Section L Rev 2.pdf PDF
Attachment 01 Statement of Work (Rev2).pdf PDF
Solicitation Amendment FA441826R00040002 SF 30.pdf PDF
Attachment 13 Question and Answer Form.xlsx XLSX spreadsheet
Attachment 11 Section L Rev 1.pdf PDF
Attachment 14 Sign-In Sheet 20260422.pdf PDF
Attachment 12 Section M Rev 1.pdf PDF
Attachment 8 Sample Project DKGV 1148855 Repair HVAC System B-58 (WS) SOW.pdf PDF
Solicitation Amendment FA441826R00040001 SF 30.pdf PDF
Attachment 16 FA441816D0002 HISTORICAL INFORMATION.pdf PDF
Attachment 15 FA441821D0002 HISTORICAL INFORMATION.pdf PDF
Attachment 8A HVAC Zones Floor Plan.pdf PDF
SOW Attachment 12C Generator Sole Source.pdf PDF
SOW Attachment 09 014500 QUALITY CONTROL FOR MINOR CONSTRUCTION.pdf PDF
SOW Attachment 07 Brig Security Requirements (Fillable)(Official)2023.pdf PDF
Attachment 09 Past Performance Projects List.pdf PDF
Attachment 04 Charleston County WD SC20260023.pdf PDF
SOW Attachment 13 - JB CHS Transmittal Form 4025.pdf PDF
SOW Attachment 04 JBCGS 015720 Att A - Sustainable Procurement Program.pdf PDF
SOW Attachment 03 JBCGS 015720 Environmental.pdf PDF
SOW Attachment 02 JBC Cable Management Policy 2021.pdf PDF
Attachment 12 Section M.pdf PDF
Attachment 11 Section L.pdf PDF
Attachment 10 Schedule B.pdf PDF
Attachment 08 DKGV 1148855 Repair HVAC System B-58 (WS).pdf PDF
Attachment 06 Sumter County WD SC20260030.pdf PDF
Attachment 02 Orangeburg County WD SC20260016.pdf PDF
Attachment 01 Statement of Work.pdf PDF
SOW Attachment 12B FAP Sole Source.pdf PDF
SOW Attachment 05 JBCGS 017419 Construction Waste Management and Disposal.pdf PDF
SOW Attachment 01 Joint Base Charleston Achitectural Compatibility Plan.pdf PDF
Attachment 07 Green Procurement Form.pdf PDF
Attachment 05 Dorchester County WD SC20260024.pdf PDF
SOW Attachment 12A Chiller Sole Source.pdf PDF
SOW Attachment 11 Tree Ordinance New.pdf PDF
SOW Attachment 10 JBCGS 013526 GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
SOW Attachment 08 NPTU Contractor Special Conditions 2020.pdf PDF
SOW Attachment 06 JBCGS 015719 Temporary Environmental Controls.pdf PDF
Attachment 03 Berkeley County WD SC20260022.pdf PDF
Solicitation - FA441826R0004.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing Title

REFERENCE DRAWING

AHU

AHU DX 1-1

Project Title

NO. REVISION-LOCATION ECN DATE BY

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

Building 58

JTC .

Air Flow Diagram

AHU DX AIR FLOW CONTROL SCHEMATIC

10/21/13JTCWEB

1-6930479581

4415 Sea Ray Drive

North Charleston SC

29405

Phone: 843.744.7144

Fax: 843.744.5553

BILL OF MATERIALS

Designation Qty Part Number Description

Field Devices:

SF-S 1 CSD-CA1G1-1 Supply Fan Status

DA-T 1 TE-6311M-1 Discharge Air Temp Sensor

RA-T/H 1 HE-67P2-0N00P Return Air Temp Sensor

SEQUENCE OF OPERATIONS:

AHU WILL BE UNDER ZONE TEMP CONTROL BY TEC IN EAST HALL. UPON A RISE IN ZONE TEMP ABOVE EFF COOLING

SETPOINT, COOLING WILL BE ENABLED TO CONTROL TO SETPOINT. UPON A DECREASE IN ZONE TEMP BELOW EFF

HEATING SETPOINT, HEATING WILL BE ENABLED TO CONTROL TO SETPOINT. FAN WILL CYCLE ON DURING THESE TIMES. T-

STATS IN THE NORTH HALL AND BREAKROOM ARE FOR MONITORING ONLY.

O

Y2

Y1

W1

D

X

Return

Air

E

H

SF-S

DA-T

DETAIL

F301

DETAIL

F131

RA-T/H

DETAIL

F153

D1

D2

REF

RS

SCOM

OS

Y1

Y2

G

RC

C

RH

W1

O/B

AUX

MS

TEC2602

G

R

Circuit Board

On Trane Unit

Blu

Blk

White

MS/TP to NCE

C

CO2

Existing by others

REFERENCE DRAWING

AHU

AHU DX 1-2

Project Title

NO. REVISION-LOCATION ECN DATE BY

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

Building 58

JTC .

Details

10/1/13JTCWEB

1-6930479581

North Charleston SC

29405

Phone: 843.744.7144

Fax: 843.744.5553

DETAIL F153 HE-6700 SERIES

DUCT HUMIDITY SENSOR

Ground

(Common)

Power

Output

HE-67xx

TEMP

TEMP

Humidity

Input

Temp Sensor

Input (If Used)

HE-67xx JUMPER POSITIONS

0-5V

0-10V

+15V

IN#

ICOM#

CONTROLLER

DETAIL F131 TEMPERATURE SENSOR INPUT

RTD

Temperature Element

CONTROLLER

DETAIL F301 BINARY INPUT (DRY CONTACT)

FIELD DEVICE

DRY CONTACT

(N.O. or N.C. as required)

CONTROLLER

JTC JTC 10/1/13

REFERENCE DRAWING

Building 58 Riser

RISER 1-1

Project Title

NO. REVISION-LOCATION ECN DATE BY

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

Building 58

BUILDING 58 RISER

Hub/Switch

MS-NCE2560-1

FC Bus Add= 4

IP=192.168.0.131

Subnet= 255.255.255.0

MS/TP Bus EOL on card

4415 Sea Ray Drive

North Charleston SC

29405

Phone: 843.744.7144

Fax: 843.744.5553

3/C #22

Shielded

BILL OF MATERIALS

Designation Qty Part Number Description

Field Devices:

Network Control Engine 1 MS-NCE2560-0 Network Controller, FEC

Comm Card 1 BAYBCIR001A Trane BacNet card for Relia Tel

TEC 1 TEC2602-4 BacNet MS/TP T-Stat

Net Stat 2 NS-BTB7003-0 Net Stat SP ADJ. Addressable

Display 1 MS-DIS1710-0 Local Controller Display

BacNet Comm

Card for Relia Tel

FC Bus Add= 5

Located inTrane Unit

TEC2602-4

East Hall

FC Bus Add= 6

SA Bus

NS-BTB7003-0

ADDR: 201

North Hall

NS-BTB7003-0

ADDR: 202

Breakroom

2pr #22

Shielded

NAE

BATT FAULT

ETHERNET

10 LINK

100 LINK

RUN

PEER COM

POWER

FAULT

FC BUS

S H

D

R E

F

FC BUS

C O

M

H O

T

24V~

S H

L

D

R E

F

A

BATTERY

FC BUS

ETHERNET USBRS232C A RS232C B

MS-DIS1710-0

SA Bus

JTCWEB JTC 10/1/13

REFERENCE DRAWING

Building 58 Details

Riser 1-2

Project Title

NO. REVISION-LOCATION ECN DATE BY

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

Building 58

BUILDING 58 RISER DETAILS

North Charleston SC

29405

Phone: 843.744.7144

Fax: 843.744.5553

DETAIL NS102 NET STAT WITH TERMINALS

ADDRESSABLE

S A

P W

R

C O

M

J2

JACK J2 IS FOR

COMMISIONING TOOLS.

W4

THERMOSTAT CIRCUIT BOARD

+-C

COM

SA PWR

(15VDC)

COM

SA PWR

(15VDC)

FROM PREVIOUS

SA BUS DEVICE

TO NEXT

SA BUS DEVICE

(IF REQUIRED)

CONNECTOR ON STAT MOUNTING

BASE. SLIDES INTO W4 PINS ON

CIRCUIT BOARD.

ADDRESS SWITCH

ON

ON

SW1 SW2 ADDRESS

OFF OFF 200

ON OFF 201

OFF ON 202

ON ON 203

COM = BLU

SA- = WHT

SA+ = BLK

PWR = RED

D1

D2

REF

RS

SCOM

OS

Y1

Y2

G

RC

C

RH

W1

O/B

AUX

MS

TEC2602

Address:

SA BUS FC BUS

V

IN

IC

O

M

IN

IC

O

M

UNIVERSAL

FC BUS

O U

T

O C

O M

O U

T

O C

O M

BINARY

H O

T

24V

C O

M

NCE256x

FC EOL

ON

S A

P W

R

C O

M

+ - + - C O

M

S H

L D

V

IN

IC

O

M

IN

IC

O

M

V

IN

IC

O

M

IN

IC

O

M

V

IN

IC

O

M

IN

IC

O

M

V

IN

IC

O

M

IN

IC

O

M

SA BUS

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

BINARY

ETHERNET

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

O U

T

O C

O M

BO

TYPE

INT

BO

TYPE

EXT

CONFIGURABLE ANALOG

1994November21 As Built Dwgs Relocate 5 BLDGS
1994July14 Replace Underground Storage Tank BLDG 58
1994July14 Cover Sheet 1of5
1994July14 Cover Sheet 1of5 #2
1994July14 Existing Site Plan 2of5
1994July14 Existing Site Plan 2of5 #2
1994July14 New Work Site Plan 3of5
1994July14 New Work Site Plan 3of5 #2
1994July14 Details 4of5
1994July14 Details 4of5 #2
1994July14 Misc Details 5of5
1994July14 Misc Details 5of5 #2
1992October13 Replace Air Compressor BLDG 58
1992October13 Title Sheet 1of3
1992October13 Mechanical Plans 2of3
1992October13 Mechanical Legend and Schedules 3of3
1992October13 Replace AC BLDG 58
Title Sheet 1of8
Mechanical Demolition Plans 2of8
Large Scale Mechanical 3of8
Mechanical 58 4of8
Mechanical Details 5of8
Legend and Shedules 6of8
Electrical Demolition Plan 7of8
Electrical 8of8
1992April14 BLDG 58 WST Otto Coll. Sys
1992April14 Cover and Title Sheet 1of4
1992April14 Mechanical Details 2of4
1992April14 Structural Details 3of4
1992April14 Electrical Details 4of4
1991January1 Letter
1988July28 Architectural Projects Paint Interior and Exterior BLDG 58
1988July28 Cover Sheet T1
1988July28 Floor Plan A1
1988July28 Elevations A2
1985May31 Waste Otto Fuel Storage Tanks
1985May31 Demolition Plan, Site Plan 2of10
1985May31 Site and Floor Plans- Electrical 9of10
1983June8 Civil Repairs and Alterations Location 17- BLDG 58
1983June8 Plan and Elevation 17-1of67
1983June8 Elevation, Sections and Details 17-2of67
1983June8 Details and Electrical 17-3of67
1982August2 Electrical Projects Torpedo Shop, Otto Alarm, BLDG 58 3of12
1982July30 Civil Repairs and Alterations BLDG 58 Alterations New Shed and Doors at Decon Room 6of28
1982June11 Cooling Projects (FY-82) BLDGS 58, 900 Provide Air Conditiong Units 5of5
1980January25 Torpedo Shop
1980January25 Power, Telephone, Intercom, Fire Alarm 31of42 #2
1980January25 Grading Plan and Details 3of42
1980January25 Open Storage Shed, Plan and Details 19of42
1980January25 Power Plan RMS 104, 105 and 106 and, Details 32of42 #2
1980January25 Site Plan 2of42
1980January25 Site Plan 2of42 #2
1980January25 Sewer Profile and, Details 5of42
1980January25 Sewer Profile and Details 5of42
1980January25 New Shed and Doors at Decon Room 6of42
1980January25 Sections, Details 8of42
1980January25 Sections Details 8of42
1980January25 Roof Plan and, Details 11of42
1980January25 Roof Plan and Details 11of42
1980January25 Roof Framing Plan and, Details 15of42
1980January25 Structural Framing and, Details 16of42
1980January25 Special Foundations and, Details 18of42
1980January25 Plumbing 20of42
1980January25 Rooms 105 and 106, Ventilation 23of42
1980January25 Rooms 105 and 106, Ventilation 23of42
1980January25 Hvac Piping and, Details 24of42
1980January25 Schedules and Equipment Details 26of42
1980January25 Schedules and Equiptment Details 26of42
1980January25 Power , Telephone, Intercom, Fire Alarm 31of42
1980January25 Power Plan RMS 104, 105 and 106 and, Details 32of42
1980January25 Lightning Protection and Grounding Plan, Details, Details 33of42
1980January25 Torpedo Shop Plumbing Plan and Equiptment Details 40of42
1980February1 Torpedo Shop
1980February1 Site Plan 2of42
1980February1 Sections and Details 8of42
1980February1 Roof Plan and Details 11of42
1980February1 Roof Framing Plan and Details 15of42
1980February1 Structural Framing and Details 16of42
1980February1 Special Foundations and Details 18of42
1980February1 Open Storage Shed- Plan and Details 19of42
1980February1 Plumbing 20of42
1980February1 HVAC Plan 21of42
1980February1 Mechanical Room- Details 22of42
1980February1 Grading Plan and Details 3of42
1980February1 Floor Plan 6of42
1980February1 Elevations, Details 7of42
1980February1 Finish Schedule, Door Schedule, Details 9of42
1980February1 Blast Door Details 10of42
1980February1 Equipment Plan and Reflected Ceiling Plan 12of42
1980February1 Foundation Plan and Details 13of42
1980February1 Foundation Details- Soil Boring Logs 14of42
1980February1 Crane Schedule and Structural Details 17of42
1980February1 Rooms 105 and 106- Ventilation 23of42
1980February1 HVAC Piping and Details 24of42
1980February1 Schedules and Equipment Details 26of42
1980February1 Auxiliary Solar Heating System 27of42
1980February1 Electrical Site Plan, Details and Schedules 29of42
1980February1 277 V. Lighting Plan- Fixture Details 30of42
1980February1 Power- Telephone- Intercom- Fire Alarm 31of42
1980February1 Power Plan Rms. 104, 105 and 106 and Details 32of42
1980February1 Lightning Protection and Grounding Plan- Details 33of42
1974August27 Naval Weapons Station Pomflant General Development Map
1974August27 Existing Conditions 1of53
1974August27 Existing Conditions 13of53
Site Approval Request BLDG 58
Site Approval Request Authorize BLDG 58 for MPF Milvan Repair Operations
Site Approval Request Redefine Explosive Mission of BLDG 58
Site Approval Request Redefine Explosive Mission of BLDG 58
Site Approval Request Redefine Explosive Mission of BLDG 58 #2
Site Approval Request Resite BLDG 58 for Inert Operations
AHU Air Flow Diagram-BLDG 58
AHU Details- BLDG 58
Building 58 Riser
Building 58 Riser Detail