SOO Attachment 3 Initial Operating Capability.pdf

PDF 78 KB Posted

Attached to
Survivability Test Stand
Solicitation number
FA910126RB005
Issued by

About this file

This document is an Initial Operating Capability (IOC) Checklist that establishes the minimum viable products and acceptance criteria for conducting one Radar Cross-Section (RCS) Use Case. The IOC definition requires completion of four primary components: secure Special Access Program (SAP) storage with infrastructure/facility modifications and fire suppression systems; conducting LSAR measurements across a full use case frequency range on a static stand using RCS measurement systems; engine support infrastructure for mounting, removing, transporting, and storing test engines including the Engine Test Stand, Shroud, and Controls; and data post-processing capability. All necessary components must complete testing with delivered reports and achieve full functionality.

The checklist contains seven product categories with specific acceptance criteria: Baseline Documentation (requiring bi-directional traceability, system configuration definition, design change documentation, ECP/deviation/waiver incorporation, software validation understanding, and technical review closure); Technical Plans (mandating complete SEMP, logistics support analysis, detailed FOC schedules, training plans, and updated TEMP); Process Control (establishing adequate program processes, critical program information management, and configuration change board operations); Risk Assessment (identifying technical risks with mitigation plans and demonstrating risk management execution); Life-Cycle Cost Estimate (requiring updated production cost models and CARD consistency); and Verification (confirming completion of system specification qualification tests, requirement verification traceability, subsystem and system tests, and functional/allocated baseline performance verification). Each criterion is evaluated as either Acceptable or Unacceptable.

View the file

Other files

File Type Posted
STS JA Final_Redacted Amendment 0002.pdf PDF
Solicitation Amendment FA910126RB0050002 SF 30.pdf PDF
EXHIBIT A - STS CDRLs Amendment 0002.pdf PDF
STS Solicitation QA Amendment 0002.pdf PDF
Atch 4 - Section L Amendment 0002.pdf PDF
Atch 8 - Delivery Order 1 SOO Amendment 0002.pdf PDF
AEDC Industry Day STS Slides Rev. 3.pdf PDF
Survivability Test Stand Industry Day Itinerary.pdf PDF
Solicitation Amendment FA910126RB0050001 SF 30.pdf PDF
Atch 4 - Section L Amendment 0001.pdf PDF
Atch 5 - Section M Amendment 0001.pdf PDF
Atch 4.7 - STS Initial Order Pricing Sheet.xlsx XLSX spreadsheet
Atch 4.7 - STS Initial Order Pricing Sheet Amendment 0001.xlsx XLSX spreadsheet
Atch 4 - Section L.pdf PDF
STS Solicitation QA.pdf PDF
Atch 4 - Section L.pdf PDF
Atch 5 - Section M.pdf PDF
Atch 4.7 - STS Initial Order Pricing Sheet.xlsx XLSX spreadsheet
Atch 4.7 - STS Initial Order Pricing Sheet Amendment 0001.xlsx XLSX spreadsheet
Atch 5 - Section M Amendment 0001.pdf PDF
Solicitation Amendment FA910126RB0050001 SF 30.pdf PDF
Atch 4 - Section L Amendment 0001.pdf PDF
STS Solicitation QA.pdf PDF
STS Solicitation Questions V2.xlsx XLSX spreadsheet
STS Solicitation Questions.xlsx XLSX spreadsheet
Solicitation-FA910126RB005-.pdf PDF
Atch 4.1 PPI Tool - Attachment for Section L.pdf PDF
Atch 4.5 - STS Subcontractor Consent Letter.pdf PDF
EXHIBIT A - STS CDRLs.pdf PDF
Atch 4.3 - PPQ Cover Letter.pdf PDF
Atch 5 - Section M.pdf PDF
STS Cover Letter.pdf PDF
SOO Attachment 4 Full Operating Capability.pdf PDF
Atch 2 - DRAFT STS DD254.pdf PDF
Atch 4.2 Past Present Performance Quest.pdf PDF
Atch 4.7 - STS Initial Order Pricing Sheet.xlsx XLSX spreadsheet
Atch 4.8 - SB Participation Commitment Document.pdf PDF
Atch 7 - Form 5000.pdf PDF
Atch 8 - Delivery Order 1 SOO .pdf PDF
Atch 1 - Survivability Test Stand SOO.pdf PDF
SOO Attachment 1 - Survivability Test Stand Use Cases.pdf PDF
SOO Attachment 2 - Survivability Test Stand KPPs KSAs.pdf PDF
Atch 3 - STS GFP List.pdf PDF
Atch 4 - Section L.pdf PDF
Atch 4.4 - STS Client Authorization Letter.pdf PDF
Atch 4.6 - STS Relevancy Matrix.xlsx XLSX spreadsheet
Atch 6 - Holloman Specific Language STS.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Initial Operating Capability (IOC)

Checklist

Definition: IOC is defined as the minimum viable products to conduct one Radar Cross- Section (RCS) Use Case that includes completing:

1) Secure Special Access Program (SAP) storage (infrastructure/facility modifications, fire suppression)

2) Conducting LSAR measurements for a full use case frequency range on a static stand (RCS measurement systems)

3) Engine support infrastructure needed to mount, remove, transport and store an engine that is the unit under test (Engine Test Stand, Shroud and Controls)

4) Ability to post-process the collected data

All the necessary components will have completed testing, with reports delivered and be fully functional.

Product Criteria Acceptable Unacceptable Baseline Documentation

Bi-directional traceability has been documented

Baseline Documentation

Configuration of the system or system element(s) is clearly defined

Any design changes made to the system element(s) since CDR are documented in the technical documentation (TDP)

All approved engineering change proposals (ECP), requests for deviation, and requests for waiver have been incorporated into the system product baseline

For software, a technical understanding is reached on the validity and the degree of completeness of the software test reports and as appropriate, computer system operator’s manual, software user’s manual, and the system diagnostic manual

Audit of PDR and CDR minutes shows that all technical review findings have been addressed, all action items closed and corrections listed in corrective action plans have been successfully completed for the baseline documentation being audited

Demonstrated the capability to satisfy KPP and KSA thresholds based on available test data, analysis or inspection

Acceptance test reports are complete, have been reviewed, and deficiencies have been addressed

Audit of supplier/subcontractor test procedures and results shows compliance with specification requirements as mapped down to the lowest level end item in the requirements verification traceability documentation, and that formal test data is complete and accurate as judged against the test procedures

Assessment of the documented system product baseline for the initial production system shows a low risk of operational test failure during FOC

Technical Plans SEMP is complete, adequate, and aligned with the program SEP

Technical Plans Logistics support analysis and maintenance task analysis are complete and the results incorporated into the LCSP

Technical Plans Detailed plans and schedules have been established and sufficiently resourced to proceed into FOC activities

Technical Plans Training plan that adequately supports IOC is consistent with the system product baseline and has been reviewed and approved

Technical Plans TEMP is up-to-date, signed, and being properly executed

Process Control Adequate processes are in place for the program to succeed

Process Control Critical program information (CPI) is being adequately managed and protected

Process Control CCB is processing configuration changes in accordance with industry standards, supplier instructions, processes and procedures, and maintaining the proper configuration baselines

Process Control Configuration changes have been identified as required for reliability growth to ensure threshold compliance at FOC

Risk Assessment Technical risks are identified, and mitigation plans are in place

Risk Assessment Risk management process is in place demonstrated by documented execution results of existing mitigation plans associated with the purpose of the review

Life-Cycle Cost Estimate

System production cost model has been updated

Life-Cycle Cost Estimate

Updated CARD is consistent with the approved initial product baseline

Verification All system specification qualification test requirements have been successfully completed

Verification Each requirement listed in the requirements verification traceability documentation has been successfully verified in accordance with the identified methodology based on all available test data, analysis, or inspection

Verification

All subsystem and system tests are completed and documented (Test Reports)

Subsystem/element performance has been verified against the allocated baseline, and integrated functional performance has been verified against the functional baseline

Adequately detailed requirements verification traceability documentation exists outlining the method for verification for each requirement

System-level performance has been verified as satisfactory against the functional baseline