Atch 4.7 - STS Initial Order Pricing Sheet.xlsx

XLSX spreadsheet 69 KB Posted

Attached to
Survivability Test Stand
Solicitation number
FA910126RB005
Issued by

About this file

This is an Initial Order Pricing Sheet template for the Survivability Test Stand (STS) contract FA9101-26-R-B022. Offerors must complete this Excel-based pricing sheet by itemizing all materials and labor across 16 Contract Line Items (CLINs) organized into three major categories: Test Stand components (Engine Stand, Turntable, Engine Specific Features), Radar systems (3-D Deep Cavity Scanner, IR Equipment, Acoustics, SAR/ISAR), and Infrastructure (Mission Control, Facility Storage and Control, Fuel Storage/Delivery, Target Prep, Fire Suppression, Earthwork), plus PDR Reporting/Documentation, Kickoff, and System Requirements Review (SRR). Each resource must include quantity/hours, fully burdened unit price (incorporating overhead, profit, and other surcharges), and extended price calculations. All material entries require detailed descriptions including grade, machining/modification requirements, and unique features to enable government evaluation for completeness, reasonableness, unbalanced pricing, and Total Evaluated Price (TEP).

The template includes separate tabs for each CLIN and a consolidated TEP summary sheet that automatically aggregates all line item totals. Offerors retain flexibility to add or remove rows within each CLIN section but must maintain the integrity of all existing formulas and cells. A Labor Categories tab requires offerors to populate position descriptions, labor classifications (SCA, CBA, or Professional), and rate components including direct rate, fringe, overhead, general and administrative (G&A), and profit/fee to calculate fully burdened labor rates. All tabs are subject to evaluation for completeness, reasonableness, unbalanced pricing, and labor rate realism. This pricing sheet applies to the initial order phase of the PDR (Preliminary Design Review).

View the file

Other files

File Type Posted
STS JA Final_Redacted Amendment 0002.pdf PDF
Atch 4 - Section L Amendment 0002.pdf PDF
Atch 8 - Delivery Order 1 SOO Amendment 0002.pdf PDF
Solicitation Amendment FA910126RB0050002 SF 30.pdf PDF
EXHIBIT A - STS CDRLs Amendment 0002.pdf PDF
STS Solicitation QA Amendment 0002.pdf PDF
AEDC Industry Day STS Slides Rev. 3.pdf PDF
Survivability Test Stand Industry Day Itinerary.pdf PDF
Solicitation Amendment FA910126RB0050001 SF 30.pdf PDF
Atch 4 - Section L Amendment 0001.pdf PDF
Atch 5 - Section M Amendment 0001.pdf PDF
Atch 4.7 - STS Initial Order Pricing Sheet.xlsx XLSX spreadsheet
Atch 4.7 - STS Initial Order Pricing Sheet Amendment 0001.xlsx XLSX spreadsheet
Atch 4 - Section L.pdf PDF
STS Solicitation QA.pdf PDF
Atch 4 - Section L.pdf PDF
Atch 5 - Section M.pdf PDF
Atch 4.7 - STS Initial Order Pricing Sheet Amendment 0001.xlsx XLSX spreadsheet
Solicitation Amendment FA910126RB0050001 SF 30.pdf PDF
Atch 4 - Section L Amendment 0001.pdf PDF
STS Solicitation QA.pdf PDF
Atch 5 - Section M Amendment 0001.pdf PDF
STS Solicitation Questions V2.xlsx XLSX spreadsheet
STS Solicitation Questions.xlsx XLSX spreadsheet
Solicitation-FA910126RB005-.pdf PDF
Atch 4.1 PPI Tool - Attachment for Section L.pdf PDF
Atch 4.5 - STS Subcontractor Consent Letter.pdf PDF
Atch 1 - Survivability Test Stand SOO.pdf PDF
SOO Attachment 1 - Survivability Test Stand Use Cases.pdf PDF
SOO Attachment 2 - Survivability Test Stand KPPs KSAs.pdf PDF
SOO Attachment 3 Initial Operating Capability.pdf PDF
Atch 3 - STS GFP List.pdf PDF
Atch 4 - Section L.pdf PDF
Atch 4.4 - STS Client Authorization Letter.pdf PDF
Atch 4.6 - STS Relevancy Matrix.xlsx XLSX spreadsheet
Atch 6 - Holloman Specific Language STS.pdf PDF
EXHIBIT A - STS CDRLs.pdf PDF
Atch 4.3 - PPQ Cover Letter.pdf PDF
Atch 5 - Section M.pdf PDF
STS Cover Letter.pdf PDF
SOO Attachment 4 Full Operating Capability.pdf PDF
Atch 2 - DRAFT STS DD254.pdf PDF
Atch 4.2 Past Present Performance Quest.pdf PDF
Atch 4.7 - STS Initial Order Pricing Sheet.xlsx XLSX spreadsheet
Atch 4.8 - SB Participation Commitment Document.pdf PDF
Atch 7 - Form 5000.pdf PDF
Atch 8 - Delivery Order 1 SOO .pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Survivability Test Stand

FA9101-26-R-B022

Attachment 4.7 Initial Order Pricing Sheet

'Resource Type' column:'Quantity/Hours' column:'Unit Price' column:'Extended Price' column:
Offerors shall enter itemized list of all materials under 'Resource Type' and include a brief description of labor/materials. Offerors will enter corresponding quantities with fully burdened price in the adjacent columns.Quantity shall be entered as the number of units/hours.Unit price shall include fully burdened cost (such as overhead, profit, and other surcharges).The Extended Price is the product of Quantity/Hours and Unit Price (i.e. Q x P).
Offerors shall develop labor/material categories in accordance with company policy and CLIN requirements. The material categories shall include pertinent information such as material description, grade, machining/modification requirements (if any), and any unique features such that the Government may evaluate the proposal for Completeness, Reasonableness, Unbalanced Pricing, and Total Evaluated Price (TEP).
General instructions:
Offerors are free to add or remove rows. However, it is ultimately the Offeror's responsibility to provide an accurate and complete Pricing Sheet.
Each CLIN tab is linked to the TEP tab, but with addition/deletion of rows Offerors will need to verify that the TEP for the PDR is complete and correct.
Any pre-existing tabs shall not be deleted and the integrity of all cells and formulas should remain intact.

All tabs will be evaluated for completeness, resonableness, and unbalanced pricing. In addition, the 'Labor Categories' tab data will be evaluated for realism.

&"Aptos"&14&K000000 CUI&1#_x000D_

_x000D_&1#&"Aptos"&14&K000000 CUI

Total Evaluated Price (TEP)

CLINDescriptionTotals
0001Test Stand - Engine Stand PDR$ - 0
0002Test Stand - Turntable PDR$ - 0
0003Test Stand - Engine Specific Features PDR$ - 0
0004Radar - 3-D Deep Cavity Scanner PDR$ - 0
0005Radar - IR Equipment PDR$ - 0
0006Radar - Acoustics PDR$ - 0
0007Radar - SAR/ISAR PDR$ - 0
0008Infrastructure - Mission Control PDR$ - 0
0009Infrastructure - Facility Storage and Control PDR$ - 0
0010Infrastructure - Fuel Storage/Delivery PDR$ - 0
0011Infrastructure - Target Prep PDR$ - 0
0012Infrastructure - Fire Suppression PDR$ - 0
0013Infrastructure - Earthwork PDR$ - 0
0014PDR Reporting/Documentation$ - 0
0015Kickoff$ - 0
0016System Requirements Review (SRR)$ - 0
Total Evaluated Price (TEP)$0.00

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Test Stand - Engine Stand PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Test Stand - Turntable PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Test Stand - Engine SF PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Radar - 3-D DCS PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Radar - IR Equipment PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Radar - Acoustics PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Radar - SAR_ISAR PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Infrastructure - MC PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Infrastructure - FSC PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Infrastructure - Fuel S_D PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Infrastructure - TargetPrep PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Infrastructure - FS PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Infrastructure - Earthwork PDR

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

PDR Reporting_Documentation

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

Kickoff

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_&"Calibri"&11&K000000&"Times New Roman,Bold"ATTACHMENT 4.7

INITIAL ORDER PRICING SHEET

_x000D_&1#&"Aptos"&14&K000000 CUI

System Requirements Review(SRR)

Resource TypeQuantity/HoursUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Aptos"&14&K000000 CUI&1#_x000D_

_x000D_&1#&"Aptos"&14&K000000 CUI

Labor Categories

Offeror shall fill in all requested labor data columns.

Labor Category Position Description Classification (SCA or CBA or Professional) Direct Rate Fringe Overhead G&A Profit/Fee Fully Burdened Labor Rate FY Applicable

File details come from the government source that posted it. Updated .