SF_30.pdf

PDF 31 KB Posted

Attached to
Equitable Access to Education and Learning Project
Solicitation number
SOL-660-14-000004
Issued by

About this file

Amendment 02 to SOL-660-14-000004 - Equitable Access to Education and Learning Project

View the file

Other files

File Type Posted
Attachment_J.33_-_DRC_Local_Compensation_Plan.docx DOCX document
Attachment_J.33_-_DRC_Local_Compensation_Plan.pdf PDF
Attachment_J.31_Pre-Proposal_Conference_Presentation.pdf PDF
Attachment_J.32_Subcontracting_Plan_Format.doc DOC document
SOL-660-14-000004_-_EAELP_(REVISED).pdf PDF
Attachment_J.29_Questions_and_Answers.pdf PDF
Attachment J.28 PAQUED Final Evaluation.pdf PDF
Attachment J.27 Paqued Literacy Pilot - Planning Guide —
Attachment J.22 EGRA EGMA Reports.pdf PDF
Attachment_J.30_Pre-Propsal_Conference_Attendees.xlsx XLSX spreadsheet
Attachment J.27 Paqued Literacy Pilot - Weekly Lesson Structure.docx DOCX document
Attachment J.8 RESEN Presentations - Chapter 6.docx DOCX document
Attachment J.27 Paqued Literacy Pilot -Teacher Activity Guide.docx DOCX document
Attachment J.27 Paqued Literacy Pilot -EGRA-lite test.doc DOC document
Attachment_J.29_Questions_and_Answers.docx DOCX document
SF_30.doc DOC document
Attachment_J.19_OPEQ_Reports_1.zip ZIP file
Attachment_J.7_LA_STRATEGIE_SECTORIELLE_DE_LEDUCATION_ET_DE_LA_FORMATION_2014-2023.pdf PDF
Attachment_J.8_RESEN_Presentations_(1).zip ZIP file
Attachment_J.14_Elaboration_du_cadre_normatif_de_lducation_en_RDC_enjeux _dfis_et_perspectives.pdf PDF
Attachment_J.5__Feuille_de_Route_pour_lAmlioration_de_la_Lecture_au_Primaire.pdf PDF
Attachment_J.20_PAQUED_Reports_2.zip ZIP file
Attachment_J.9_Revue_Conjointe_Presentations_3.zip ZIP file
Attachment_J.1_AID_1420_-_Contractor_Employee_Biographical_Data_Sheet.pdf PDF
Attachment_J.19_OPEQ_Reports_2.zip ZIP file
Attachment_J.24_Rfrentiels_des_Habilets_des_Elevs_et_des_Pratiques_Pdagogiques.zip ZIP file
Attachment_J.11_Enjeux_et_acteurs_autour_de_la_frais_scolaire_en_RDC.pdf PDF
Attachment_J.17_2014_RAPPORT_PERIODIQUE_DE_SUIVI_DES_ACTIVITES_PROSEB.pdf PDF
Attachment_J.27_PAQUED_Literacy_Pilot.zip ZIP file
Attachment_J.16_Rfrentiel_des_comptences_de_lenseignant_du_primaire.pdf PDF
Attachment_J.9_Revue_Conjointe_Presentations_4.zip ZIP file
Attachment_J.18_2013_Aide_Memoire_PROSEB_-_PARSE.pdf PDF
Attachment_J.10_Logical_Framework_Template.pdf PDF
Attachment_J.12_Situation_Analysis_of_women_and_girls_in_DRC_and_development_of_a_gender_strategy_and_action_plan_for_DFID_DRC.pdf PDF
Attachment_J.9_Revue_Conjointe_Presentations_1.zip ZIP file
Attachment_J.25_Tableau_de_Bord_de_lEducation_en_RDC_Anne_scolaire_2009-2010.pdf PDF
Attachment_J.26_Population-Based_Survey_on_Perceptions_and_Attitudes_about_Peace _Security_and_Justice_in_Eastern_DRC.zip ZIP file
Attachment_J.21_EAGLE_Reports.zip ZIP file
Attachment_J.19_OPEQ_Reports_3.zip ZIP file
Attachment_J.20_PAQUED_Reports_3.zip ZIP file
Attachment_J.22_DRC_EGRA_EGMA_Reports.zip ZIP file
SOL-660-14-000004_-_Equitable_Access_to_Education_and_Learning_Project.pdf PDF
SOL-660-14-000004_-_Equitable_Access_to_Education_and_Learning_Project.docx DOCX document
Attachment_J.9_Revue_Conjointe_Presentations_2.zip ZIP file
Attachment_J.13_Politique_Formation_Continue_de_l'Enseignant_du_Primaire.pdf PDF
Attachment_J.20_PAQUED_Reports_1.zip ZIP file
Attachment_J.6_Annuaire_Statistique_de__lEnseignement_Primaire _Secondaire_et_Professionnel_Anne__Scolaire__2009-2010.pdf PDF
Attachment_J.15_2014_RDC_Projet_Loi_Cadre_de_l'Enseignement_National.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

11/19/2014

4. REQUISITION/PURCHASE REQ. NO

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (IF OTHER THAN ITEM 6) CODE

USAID/East Africa/Regional Acquisition & Assistance Office United Nations Avenue, Gigiri Nairobi, Kenya

Same as Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State, and Zip Code)

9A. AMENDMENT OF SOLICITATION NO.

SOL-660-14-000004

9B. DATED (SEE ITEM 11) 10/15/2014

10A. MODIFICATION OF CONTRACT/ORDER NO.

CODE:

FACILITY CODE:

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered, solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers, FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If Required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO., AS DESCRIBED IN ITEM 14

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43,103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is NOT is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1) Post the Questions and Answers received in response to the referenced solicitation (Attachment J.29);

2) Post the amended solicitation in line with the responses to the questions and answers in 1) above;

3) Post the list of attendees at both pre-proposal conferences in London, UK and Washington DC, USA (Attachment J.30) and the presentation (Attachment J.31);

4) Include attachments as follows:

• Attachment J.8 – Chapter 6, which was missing in the original posting

• Attachment J.22 – PAQUED EGRA EGMA Reports

• Attachment J.27 – Paqued Literacy Pilot, which consists of Planning Guide for 8 weeks (Grade 1); Weekly Lesson Structure; EGRA-lite test; Teacher

Activity Guide

• Attachment J.28 – PAQUED Final Evaluation

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

Linda McElroy

15B. CONTRACTOR/OFFEROR 15C. DATE

SIGNED

16B. UNITED STATES OF AMERICA

16C. DATE

SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)

Previous Edition Unusable Prescribed by GSA FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .