S09 09 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf

PDF 18 MB Posted

Attached to
CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Solicitation number
36C78626R0058
Issued by

About this file

This document is a comprehensive set of construction bid drawings for a federal cemetery facility correction project at Camp Nelson National Cemetery in Kentucky, prepared by Prime Consultant/ASTUTE ENGINEERING, PLLC. The project scope encompasses plumbing, electrical, and related infrastructure improvements across multiple cemetery buildings and site locations, with a bid set effective January 7, 2026.

The plumbing scope includes domestic water piping installation with new water heater (EWH-1) and hot water recirculation system, sanitary and vent piping modifications, floor drains and cleanouts, mixing valves for lavatories and eyewash stations set to 110°F, and water hammer arresters. Gas piping work involves connection to existing radiant tube heaters and propane systems. The electrical work encompasses new electrical panels (designated as Panel M, Panel A, Panel D, Panel F), lighting fixture installations with occupancy sensors and photocell controls, grounding and lightning protection systems with multiple ground rods and test wells, new utility service connections, and underground conduit runs. Specific site improvements include a new above-ground fuel storage tank with monitoring systems, pond fountain electrical controls, temporary restroom and office trailer electrical feeds, and flagpole lighting fixture upgrades. All work requires compliance with 2018 Kentucky Building Code, 2021 International Energy Conservation Code (IECC), 2021 International Mechanical Code (IMC), NFPA standards, and VA Fire Protection Design Manual. The contractor must provide complete submittal documentation, as-built drawings, warranty coverage for one year post-acceptance, and operator training. Fire-stopping, insulation, coordination with multiple trades, and protection of existing conditions during construction are mandatory requirements throughout all work areas.

View the file

Other files

File Type Posted
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 amendment 2.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02_Price Proposal Breakdown.docx DOCX document
S02_Attachment - Past Performance Questionnaire.docx DOCX document
P07 Jessamine Camp Nelson Highway.pdf PDF
S02_Attachment - DOL Payroll Form.pdf PDF
S02 833CM3030_CNNC FCA Corrections_CONS_BD SPECIFICATIONS.pdf PDF
S02 08 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 10 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 04 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1 (1).pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
S02 02 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 07 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 03 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 06 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
P07 Jessamine Camp Nelson Heavy.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
S02 11 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 2_05212026 1.pdf PDF
S02 Camp Nelson Sol 36C78626R0058 draft 9-14-2026.pdf PDF
S02 05 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 01 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02_Attachment - Project Sample Template.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

SA AB, MM

JANUARY 7, 2026

Bid Set

BID SET 1-7-2026

PLUMBING NOTES,

ABBREVIATIONS, AND LEGEND

P-001

SYMBOL DESCRIPTION

SANITARY PIPE (SAN)

GREASE WASTE PIPE (GW)

STORM WATER PIPE (ST)

COLD WATER PIPE (CW)

HOT WATER PIPE (HW)

HOT WATER RECIRCULATION PIPE (HWR)

VENT PIPE (V)

GAS PIPE (G)

GATE VALVE

BALL VALVE

BACK FLOW PREVENTER

BACK WATER VALVE

BALANCING VALVE

PRESSURE REDUCING VALVE (PRV)

OS&Y VALVE

OS&Y VALVE (IN VERTICAL)

BUTTERFLY VALVE

THERMOSTATIC MIXING VALVE

GAS COCK

PRESSURE RELIEF VALVE

REDUCER

PIPE DOWN

PIPE UP

PIPE CAP

FLANGE

UNION

WATER HAMMER ARRESTER

FLOOR DRAIN

FLOOR CLEAN OUT (FCO)

WALL CLEAN OUT (WCO)

EXPANSION TANK

PUMP

WATER METER

GAS PRESSURE REGULATOR

FLOOR SINK

RECIRCULATION PUMP

CONNECT TO EXISTING (CX)

POINT OF DISCONNECT (POD)

ABBREVIATION DESCRIPTION

Ø OR DIA DIAMETER

AFF ABOVE FINISHED FLOOR

AP ACCESS PANEL

BT BATHTUB

BLDG BUILDING

CLG CEILING

CO CLEAN OUT

CW COLD WATER

DEG DEGREES

DF DRINKING FOUNTAIN

DFU DAINAGE FIXTURE UNITS

DIA DIAMETER

DN DOWN

DW DISHWASHER

DWH DOMESTIC WATER HEATER

ETR EXISTING TO REMAIN

EWH ELECTRIC WATER HEATER

EWS EYE WASH STATION

EX EXISTING

F FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FS FLOOR SINK

G GAS

GAL GALLONS

GPM GALLONS PER MINUTE

GWH GAS WATER HEATER

HB HOSE BIB

HP HORSE POWER

HS HAND SINK

HW HOT WATER

HWR HOT WATER RECIRCULATION

I.E. INVERT ELEVATION

JAN JANITOR

LAV LAVATORY

LP LIQUID PROPANE

MAX MAXIMUM

MBH 1000 BTU/HR

MFR MANUFACTURER

MIN MINIMUM

MS MOP SINK

NIC NOT IN CONTRACT

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

PW POWER WASHER

RH RELATIVE HUMIDITY

RX REMOVE EXISTING

SAN SANITARY

SHW SHOWER

SP STATIC PRESSURE

TEMP TEMPERATURE

TYP TYPICAL

UR URINAL

V VENT

VA VETERANS AFFAIRS

VTR VENT THROUGH ROOF

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

PLUMBING ABBREVIATIONS

PLUMBING LEGEND

APPLICABLE CODES & STANDARDSPLUMBING NOTES

DIVISION 22 PLUMBING

22-0000 GENERAL REQUIREMENTS

SCOPE AND DRAWINGS

1. CONTRACTOR SHALL REFER TO ALL DRAWINGS AND SPECIFICATIONS IN THIS PACKAGE SUCH AS ARCHITECTURAL, STRUCTURAL, ELECTRICAL, AND PLUMBING. FULLY COORDINATE WITH ALL OTHER TRADES, OWNER, AND ARCHITECT REQUIREMENTS. ALL OF THE ABOVE-MENTIONED DRAWINGS AND

SPECIFICATIONS ARE CONSIDERED A PART OF THE CONTRACT DOCUMENTS.

2. CONTRACTOR IS TO INSPECT THE SITE BEFORE SUBMITTING BID AND MAKE ALLOWANCES FOR ALL VISIBLE, SPECIFIED OR REASONABLY ANTICIPATED FIELD CONDITIONS. SIGNIFICANT DISCREPANCIES FROM THE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT, ARE TO BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER, ARCHITECT AND ENGINEER IN

WRITING PRIOR TO SUBMITTAL OF BID.

3. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATE THE GENERAL LOCATION AND INTENT OF THE SYSTEMS. AS SUCH DRAWINGS DO NOT INDICATE EVERY FITTING, ELBOW, OFFSET, VALVE, AND OTHER COMPONENTS NECESSARY TO INSURE PROPER INSTALLATION OF A WORKING SYSTEM.

CONTRACTOR SHALL PROVIDE ALL NECESSARY FITTINGS, ACCESSORIES, AND AUXILIARY ITEMS TO

INSTALL THE SYSTEM AS DIAGRAMMED.

4. DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER, WHEN IN CONFLICT, THE STRICTEST PROVISION SHALL GOVERN. IF ONE IS MISSING MATERIAL OR LABOR SCOPE, CONTRACTOR SHALL PROVIDE AS IF IT IS MENTIONED IN BOTH.

5. CONTRACTOR SHALL PROVIDE AND INSTALL ALL WORK EQUIPMENT AND MATERIALS AS INDICATED ON THE PROJECT DRAWINGS AND SPECIFICATIONS TO PROVIDE A COMPLETELY OPERATIONAL SYSTEM.

6. PROVIDE ALL SUPERVISION, LABOR, MATERIALS, EQUIPMENT MISCELLANEOUS ITEMS, SERVICES AND ACCESSORIES REQUIRED BY STANDARD INDUSTRY PRACTICE FOR SUCH INSTALLATIONS, AND FOR

THE SAFE AND CORRECT OPERATION OF THE ENTIRE INSTALLATION.

7. PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH MANUALS, GUIDELINES, OR INSTRUCTIONS

FURNISHED BY THE PRODUCT MANUFACTURER.

8. COMPETENT MECHANICS AND SUBCONTRACTORS USING PROPER TOOLS AND EQUIPMENT SHALL

PERFORM ALL WORK TO PRODUCE FIRST-QUALITY INSTALLATIONS. ALL WORK SHALL BE NEATLY INSTALLED, ACCESSIBLE FOR MAINTENANCE, AND COMPLETE WITH ALL ACCESSORIES REQUIRED.

9. COORDINATE ALL WORK WITH OTHER TRADES TO ENSURE ALL SYSTEMS FIT IN GIVEN SPACE SUCH AS ABOVE CEILINGS. ALL CEILING HEIGHTS INDICATED ON ARCHITECTURAL AND/OR INTERIOR DESIGN DRAWINGS AS WELL AS MINIMUM CLEARANCES REQUIRED BY LOCAL CODES SHALL BE MAINTAINED

THROUGHOUT THE BUILDING.

APPLICABLE CODES

1. ALL WORK AND EQUIPMENT SHALL BE INSTALLED AND COMPLY WITH THE LOCAL CODES. THE

CONTRACTOR SHALL COMPLY WITH THE LAWS, ORDINANCES, RULES, AND REGULATIONS OF ALL

GOVERNMENTAL AND PUBLIC UTILITY AUTHORITIES HAVING JURISDICTION OF ANY OF THE SYSTEMS

SPECIFIED.

2. ALL WORK SHALL CONFORM TO LOCAL AND STATE CODES AND TO APPLICABLE STATE LAWS AND, INCLUDING, BUT NOT LIMITED TO NATIONAL ELECTRIC CODE, IMC, IPC, IECC AND NFPA CODES. WHERE

CODE REQUIRES A VARIATION FROM SPECIFIC INFORMATION IN CONTRACT DOCUMENTS,

CONTRACTOR SHALL INCLUDE WORK REQUIRED TO COMPLY WITH CODE. CERTAIN CODE-REQUIRED ITEMS ARE MENTIONED IN THESE CRITERIA FOR EMPHASIS OR EXAMPLE ONLY. IDENTIFICATION AND

COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS ARE THE CONTRACTOR'S

RESPONSIBILITY.

3. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL APPLICABLE PERMITS AND CERTIFICATES OF

INSPECTION.

4. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S INSURANCE CARRIER, INDUSTRY PRACTICE STANDARDS AND THE AMERICANS WITH DISABILITIES ACT (ADA).

ADDITIONALLY, FOOD SERVICE FACILITIES MUST ADHERE TO THE PERTINENT DEPARTMENT OF HEALTH REGULATIONS, SANITARY CODES, AND ALL OTHER APPLICABLE CODES, LAWS, REGULATIONS AND

DIRECTIVES.

GENERAL

1. CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, SEQUENCES AND

WORKMAN SAFETY.

2. COORDINATE SEQUENCING OF INSTALLATION, PHASING OF EQUIPMENT DEMOLITION, SCHEDULE OF WORK, UTILITY SHUTDOWNS, PARKING, MATERIAL STAGING AND OTHER POTENTIALLY DISRUPTIVE

ACTIVITIES WITH BUILDING MANAGEMENT.

3. THE DESIGN AND APPEARANCE OF ALL EXPOSED PIPING WHICH ARE VISIBLE FROM THE PUBLIC AREAS

ARE CRITICAL TO THE OVERALL VISUAL EFFECT AND ARE SUBJECT TO DETAILED REVIEW AND

APPROVAL BY THE OWNER.

4. ALL WATER AND VENT PIPING, CONDUIT SHALL BE INSTALLED AS HIGH AS REASONABLY POSSIBLE. ALL SANITARY PIPING SHALL BE INSTALLED BELOW THE SLAB AND AS TIGHT TO THE UNDERSIDE OF THE

SLAB AS POSSIBLE.

5. PIPING SHALL BE INSTALLED CONCEALED ABOVE CEILINGS OR IN WALL CHASES UNLESS OTHERWISE NOTED. PIPING SHALL BE INSTALLED AS DIRECT AS POSSIBLE WITHOUT UNNECESSARY BENDS OR

OFFSETS.

6. PIPING SHALL NOT BE INSTALLED OR ROUTED ABOVE OR BELOW ELECTRICAL PANELS AND

EQUIPMENT, THROUGH ELEVATOR EQUIPMENT ROOMS, ELEVATOR SHAFTS, OR STAIRWAYS UNLESS

THESE ITEMS SERVE THESE AREAS ONLY.

7. CONNECTIONS BETWEEN DISSIMILAR PIPING METALS SHALL BE MADE WITH SUITABLE DIELECTRIC

UNIONS.

8. PIPE OPENINGS SHALL BE STORED WITH CAPS OR COVERINGS DURING INSTALLATION.

9. CONFIRM UTILITY COMPANY REQUIREMENTS AND CONNECTION POINTS IN THE FIELD PRIOR TO

STARTING WORK.

10. IN CASE OF PARTIAL OCCUPANCY OF BUILDING, PERFORM THOSE ITEMS SPECIFICALLY MENTIONED AND OTHER ACTIVITIES THAT PRODUCE OBJECTIONABLE NOISE IN A MANNER PRESCRIBED BY OWNER

AND IN A MANNER THAT DOES NOT INTERFERE WITH THE USE OF THE EXISTING FACILITY.

11. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR APPROVED FLOOR PLAN DIMENSIONS

AND EXACT COMPONENT LOCATIONS. DO NOT SCALE ENGINEERING DRAWINGS.

CUTTING, DRILLING, AND PATCHING

1. ALL CUTTING AND REPAIRING NECESSARY TO THE EXECUTION OF THIS WORK SHALL BE DONE AND REPAIRED BY CONTRACTOR. ALL OPENINGS IN FIRE RATED ENCLOSURES SHALL BE FIRE STOPPED.

ALL OPENINGS SHALL BE FINISHED WITH NEAT TRIM OR FLANGES. PATCH AND FINISH AREAS

DAMAGED AS A RESULT OF OPENINGS TO MATCH ADJACENT AREAS.

2. ALL OPENINGS MUST BE NEATLY SAW CUT, CORE-BORED, SLEEVED, GROUTED, SEALED AND MADE

WATER AND FIREPROOF.

3. CONTRACTOR SHALL OBTAIN WRITTEN STRUCTURAL ENGINEER APPROVAL BEFORE DRILLING OR

CUTTING STRUCTURAL COMPONENTS.

4. SEAL ALL OPENINGS AND PENETRATIONS THROUGH FIRE RATED WALLS AND PARTITIONS WITH FIRE RESISTANT SEALANT THAT WILL PREVENT THE PASSAGE OF FIRE AND SMOKE. SEALANT SHALL HAVE

RATING EQUAL OR GREATER TO PENETRATED WALL.

5. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT EQUIPMENT LOCATIONS BEFORE CUTTING.

6. ALL ROOF PENETRATIONS SHALL BE COMPLETED BY ROOFER OF RECORD SO AS NOT TO VOID THE WARRANTY. PROVIDE CURBS AT LEAST 12” HIGH FROM THE TOP OF THE FINISHED ROOF, FOR ALL

ROOF OPENINGS AND EQUIPMENT MOUNTING. SUPPORT CURBS ON STRUCTURAL MEMBERS AND

FLASH INTO ROOFING FOR WATER TIGHT SEAL.

EXISTING CONDITIONS:

1. WHEN EXISTING WORK IS REMOVED, PIPES AND CONDUITS SHALL BE REMOVED, INCLUDING HANGERS, TO A POINT BELOW FINISHED FLOORS OR BEHIND FINISHED WALLS AND CAPPED. SUCH POINT SHALL BE FAR ENOUGH BEHIND FINISHED SURFACES TO ALLOW FOR INSTALLATION OF NORMAL THICKNESS OF REQUIRED FINISH MATERIAL. EQUIPMENT SHALL BE REMOVED AND NOT ABANDONED IN PLACE UNLESS OTHERWISE NOTED. AS REQUESTED BY OWNER, EXISTING EQUIPMENT SHALL REMAIN THEIR

PROPERTY AND BE DELIVERED TO THEM ON THE PREMISES WHERE DIRECTED. ALL OTHER

MATERIALS AND EQUIPMENT THAT ARE REMOVED SHALL BECOME PROPERTY OF THE CONTRACTOR

AND SHALL BE PROMPTLY REMOVED AND DISPOSED OF IN AN APPROVED MANNER.

2. WHEN WORK SPECIFIED CONNECTS TO EXISTING EQUIPMENT, PERFORM ALL NECESSARY

ALTERATIONS, CUTTINGS, FITTINGS, ETC., OF EXISTING WORK AS MAY BE NECESSARY TO MAKE

SATISFACTORY CONNECTIONS BETWEEN NEW AND EXISTING WORK, AND TO LEAVE COMPLETED

WORK IN A FINISHED AND WORKMANLIKE CONDITION.

3. REMOVAL AND RELOCATION OF SOME EXISTING COMPONENTS MAY BE NECESSARY FOR THE

COMPLETION OF THIS SCOPE. NOT ALL EXISTING CONDITIONS CAN BE COMPLETELY DETAILED ON THE

DRAWINGS AND AS SUCH THE CONTRACTOR SHALL SURVEY THE SITE PRIOR TO BIDDING.

4. WHEN THE WORK REQUIRES RELOCATION OF EXISTING EQUIPMENT, PERFORM ALL WORK AND MAKE NECESSARY CHANGES TO EXISTING WORK AS MAY BE REQUIRED TO LEAVE COMPLETED WORK IN A FINISHED AND WORKMANLIKE CONDITION. WHERE EXISTING INSULATION IS DISTURBED, REPLACE INSULATION WHERE REMOVED OR DAMAGED EQUAL TO EXISTING, IN TYPE THICKNESS AND R VALUE.

5. ENGINEER HAS NOT FUNCTIONALLY TESTED EXISTING EQUIPMENT. WHERE EXISTING EQUIPMENT IS TO BE REUSED, CONTRACTOR SHALL ALLOW FOR REASONABLE CHECKING, ADJUSTMENT AND MINOR

REPAIR TO RESTORE FULL FUNCTION. WORK WHICH IS REQUIRED AND WHICH IS BEYOND THAT

DESCRIBED ABOVE OR ON THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER,

ARCHITECT AND ENGINEER.

SITE PROTECTION AND CLEAN UP

1. THE CONTRACTOR SHALL PROVIDE FOR HIS OWN CLEAN UP, REMOVAL AND DISPOSAL OF DAILY TRASH. THE CONTRACTOR SHALL KEEP CLEAN AND MAINTAIN EACH AREA FOR USE AFTER WORK IN

THAT AREA IS COMPLETE.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF HIS OWN WORK, MATERIALS, AND OTHER BELONGINGS FROM DAMAGE.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL OWNER-PROPERTY IN THE WORK AREA. ALL MATERIALS THAT CAN BE DAMAGED BY TEMPERATURE OR HUMIDITY EXCURSIONS SHALL

BE REMOVED FROM THE WORK AREA AND STORED IN AN AIR-CONDITIONED ENVIRONMENT.

4. PROTECTION OF ROOF: THE ROOF SURROUNDING THE WORK AREA WHERE NEW EQUIPMENT IS TO BE DEMOLISHED OR INSTALLED SHALL BE PROTECTED WITH 1” INSULATION BOARD COVERED BY ½” PLYWOOD. SEAMS OF THE BOARD AND PLYWOOD SHALL BE STAGGERED SO NO ROOF MEMBRANE IS EXPOSED. FOLLOWING THE COMPLETION OF THE WORK, ALL DEBRIS IS TO BE CAREFULLY REMOVED

FROM THE ROOF PRIOR TO REMOVAL OF THE ROOF PROTECTION.

5. PROVIDE TEMPORARY HEATERS TO MAINTAIN WORKING TEMPERATURES. DO NOT USE INSTALLED

HVAC SYSTEMS FOR CONDITIONING DURING CONSTRUCTION.

6. WORK AREA SHALL BE COMPLETELY ENCLOSED AND SEALED FROM OCCUPIED AREAS. NEGATIVE

PRESSURE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SUCH AS

DRYWALL SANDING, CUTTING AND GRINDING THAT RELEASE PARTICLES; OR ACTIVITIES SUCH AS

GLUING, PAINTING OR WELDING THAT RELEASE GASEOUS CONTAMINANTS. CLOSE SUPPLY AIR

OUTLETS AND RETURN AIR INLETS, CONNECT EXHAUST FAN TO EXHAUST SYSTEM OR TO BUILDING EXTERIOR AND OPERATE CONTINUOUSLY UNTIL COMPLETION OF ALL CONSTRUCTION ACTIVITIES.

7. PERFORM ALL ACTIVITIES THAT RELEASE PARTICLES, SUCH AS CUTTING AND SANDING, OR GASEOUS CONTAMINANTS, SUCH AS USE OF ADHESIVES AND PAINT, AT LEAST 72 HOURS PRIOR TO OCCUPANCY.

FULLY FLUSH SPACE WITH FRESH AIR AS MUCH AS CONDITIONS PERMIT IN THE 72 HOURS PRIOR TO

OCCUPANCY, BY OPENING DOORS, RUNNING HVAC UNITS AND EXHAUST FANS.

SUBMITTALS

1. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, CATALOG CUTS OR CERTIFIED PRINTS COVERING

ITEMS OF MECHANICAL AND ELECTRICAL EQUIPMENT, INCLUDING BUT NOT LIMITED TO, THE

FOLLOWING:

PIPING VALVES INSULATION

PUMPS BACKFLOW PREVENTERS WATER HEATERS

TANKS PLUMBING FIXTURES ALL OTHER PLUMBING EQUIPMENT

2. CONTRACTOR SHALL CLEARLY INDICATE CHARACTERISTICS ON EACH REQUIRED SUBMITTAL AND CERTIFY THAT THE EQUIPMENT & MATERIALS REPRESENTED BY THE SUBMITTALS ARE IN COMPLIANCE

WITH CONTRACT DOCUMENTS.

3. SUBMITTALS WILL BE REVIEWED FOR GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS.

SUBMITTAL REVIEW SHALL NOT RELIEVE THE CONTRACTOR OF COMPLIANCE WITH CONTRACT

DOCUMENTS.

4. VERIFY ALL ELECTRICAL REQUIREMENTS FOR EQUIPMENT BEFORE ISSUING SUBMITTALS AND

EQUIPMENT PURCHASE.

5. EQUIPMENT SHALL BE AS SCHEDULED AND MEET ALL REQUIREMENTS AND PERFORMANCE LISTED IN SCHEDULES. MANUFACTURERS LISTED ARE BASIS OF DESIGN. SUBSTITUTIONS ARE SUBJECT TO OWNER AND ENGINEER'S APPROVAL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO RE-EVALUATE ANY

SUBSTITUTED EQUIPMENT, REDESIGN IN ORDER TO COORDINATE THE SUBSTITUTION WITH THE

SYSTEM AND CERTIFY THAT THE SUBSTITUTION IS EQUIVALENT TO BASIS OF DESIGN.

RECORD DRAWINGS

1. MAINTAIN RECORD SET OF PLANS AS WORK PROGRESSES, SHOWING ADDITIONS AND SUBSTITUTIONS FROM DESIGN AND CONCEALED WORK. AT COMPLETION, A RECORD SET OF PLANS SHALL BE TURNED OVER TO THE OWNER AND INCORPORATED INTO THE OPERATION AND MAINTENANCE MANUALS. AS BUILT SET SHALL BE COMPETED IN CAD OR CLEAN NEAT PDF FORMAT WITH MARK-UPS IN RED.

CLOSEOUT & WARRANTY

1. UPON COMPLETION OF WORK, THE CONTRACTOR SHALL REMOVE ALL DEBRIS & UNUSED MATERIALS

AND THOROUGHLY CLEAN THE CONTRACT AREA.

2. PROVIDE OWNER WITH THREE BOUND COPIES OF ALL EQUIPMENT MANUFACTURER'S INSTALLATION, OPERATION AND MAINTENANCE MANUALS, TEST AND BALANCE REPORTS, RECORD DRAWINGS

EQUIPMENT SUBMITTALS, PARTS DIAGRAMS, AND OTHER MATERIALS RECEIVED OR PRODUCED

DURING CONSTRUCTION.

3. PROVIDE AT LEAST ONE DAY OF TRAINING TO OWNER'S PERSONNEL IN OPERATION OF EQUIPMENT

AND PREVENTATIVE MAINTENANCE REQUIRED FOR EACH SYSTEM.

4. ALL WORK SHALL BE GUARANTEED AGAINST DEFECTS OF MATERIAL AND/OR WORKMANSHIP FOR A PERIOD OF ONE YEAR AFTER ACCEPTANCE OF THE WORK BY THE OWNER FOR THE BENEFICIAL USE THEREOF. THE CONTRACTOR WILL REMEDY ANY DEFECTS AND ANY DAMAGE RESULTING FROM THE

WORK THAT OCCURS WITHIN THE PERIOD NAMED ABOVE.

5. REPAIR OR REPLACE WITHOUT MATERIAL AND LABOR CHARGE TO THE OWNER ALL ITEMS FOUND DEFECTIVE DURING THE WARRANTY PERIODS. IN THE CASE OF REPLACEMENT OR REPAIR DUE TO FAILURE WITHIN THE WARRANTY PERIOD, THE WARRANTY ON THAT PORTION OF THE WORK SHALL BE EXTENDED FOR A MINIMUM PERIOD OF ONE (1) YEAR FROM THE DATE OF SUCH REPLACEMENT OR

REPAIR.

GW

ST

G G

M

R

IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THESE

CONSTRUCTION DOCUMENTS WITH THE LOCAL INSPECTORS FOR THEIR

APPROVAL. CONTACT ENGINEER WITH ANY ISSUES RAISED BY THE

INSPECTOR. THIS REVIEW SHALL TAKE PLACE BEFORE STARTING ANY

WORK.

CODE & PLANS REVIEW

2018 KENTUCKY BUILDING CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

2021 INTERNATIONAL MECHANICAL CODE (IMC)

2005 ENERGY POLICY ACT (EPAct)

2019 ASHRAE 90.1

ASHRAE 62.1

2024 VA FIRE PROTECTION DESIGN MANUAL

FEDERAL ENERGY MANAGEMENT PROGRAM (FEMP)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA 72, 88A, 90A, 96, 101)

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text

CONSULTANTS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

SA AB, MM

JANUARY 7, 2026

Bid Set

BID SET 1-7-2026

PLUMBING DETAILS

P-002

2"CWSEE PLANS FOR

CONTINUATION

SEE SITE PLAN FOR

CONTINUATION.

2" C

W

1/ 2"

C W5' -0

" M

AX

P

EXISTING BACKFLOW

PREVENTER (RPZ)

SERVING DRINKING

FOUNTAIN

EXISTING BACKFLOW

PREVENTER (RPZ)

STRAINER

NEW UTILITY

ROOM WALL

STAND PIPE

IN ROOM

EXISTING PRESSURE

REDUCING VALVE

(SET TO 70 PSI)

PRESSURE

GAUGE

P

EXTEND DOMESTIC WATER PIPES

BELOW SLAB TO LOCATION SHOWN

ON NEW WORK WATER PLAN

EXISTING DOMESTIC

WATER PIPES BELOW

SLAB

SCALE: NTS3 DOMESTIC WATER SERVICE ENTRANCE

TOP OF STRAINER TO BE SLIGHTLY LOWER

THAN FINISHED FLOOR - FINISHED FLOOR

TO BE SLOPED DOWN TOWARD DRAINS.

COORDINATE WITH FLOORING INSTALLER

CUT OFF EXCESSIVE RING

IF REQUIRED

FINISHED FLOOR ON REQUIRED

SETTING BED (SEE ARCHITECTURAL

FOR FLOOR SLOPES)

INSIDE CAULK

DRAIN SUPPORT

STRAP

PIPE

DRAIN BODY

ADJUSTABLE DRAIN

HEAD

TRAP PRIMER CONNECTION

(WHEN REQUIRED)

SCALE: NTS2 FLOOR DRAIN DETAIL

NOTES:

1. PROVIDE ROUND SECURED NICKEL BRONZE ADJUSTABLE TOP WITH "CO" CAST IN COVER. PROVIDE

CLEANOUT TOP WITH VARIATIONS SUITABLE FOR FLOOR COVERING (CARPET MARKER, RECESSED FOR TILE, SCORIATED FOR UNFINISHED FLOORS). PROVIDE PLASTIC PLUG IN CAST IRON BODY. CLEAN THE

TOP OF EXPOSED FCO AFTER INSTALLATION.

2. LOCATE AT BUILDING EXIT, AT ENDS OF RUNS, AT TURNS OF PIPE GREATER THAN 45 DEGREES, AT 50'

INTERVALS ON STRAIGHT RUNS, AND WHERE SHOWN ON PLANS. PROVIDE BACKFILL PER

ARCHITECTURAL SPECIFICATION. LOCATE CLEANOUTS WHERE THERE IS 18'' CLEAR AROUND. CONSULT

LOCAL CODES FOR OTHER FCO REQUIREMENTS.

MEMBRANE CLAMP

FLOOR SLAB ON

GRADE

HUB AND SPIGOT CAST

IRON PIPE BELOW FLOOR

SANITARY OR STORM

SEWER LINE

TWO-WAY CLEANOUT, FOR LOCATION

SEE SANITARY PLUMBING PLAN

COMBINATION WYE AND EIGHTH

BEND IN RUN. ENTER TOP OF PIPE.

LONG SWEEP ELBOW AT END

OR TURN OF RUN

SAME SIZE AS SANITARY PIPE

UP TO 4'' MAXIMUM

DIRECTION

OF FLOW

TOP OF STRAINER TO BE FLUSH

WITH FINISHED FLOOR -

COORDINATE WITH ARCHITECTURAL

PLANS

CUT OFF EXCESSIVE

RING IF REQUIRED

DRAIN BODY

ADJUSTABLE DRAIN

HEAD

TRAP PRIMER CONNECTION

(WHEN REQUIRED)

AS REQUIRED FOR

DEPTH OF SANITARY

PIPE

SCALE: NTS4 FLOOR CLEAN OUT DETAIL

PIPE

PIPE WITHOUT INSULATION PIPE WITH INSULATION

INSULATION

METAL JACKET

PIPE SLEEVE OR

CORE DRILLED

OPENING

SEALANT - JOINT 14"

MINIMUM WIDE BY 3 8"

DEEP

PIPE SLEEVE OR

CORE DRILLED

OPENING

POLY BACKUP

MATERIAL

SCALE: NTS6 PIPE THRU FLOOR DETAIL

4" 4" 4" 4"

SCALE: NTS5 SLAB REPAIR DETAIL

NEW SLAB

6X6X10 10 W.W.M.

EXIST.

ADJACENT SLAB

MIN. 4,000 P.S.I. CONC. SLAB

INFILL DEPTH TO MATCH

EXIST.

NEW WASTE LINE 6 MIL VIZQUEEN BARRIER W/

4'' COMPACTED GRANULAR

BASE BELOW

#4 REBAR X8'' @ 18'' O.C. MIN.

4'' EMBEDMENT HILTI HY150

ADHESIVE ANCHOR SYSTEM

NOTES:

1. ANY DISTURBED SOIL WILL BE RE-TREATED FOR

TERMITE PROTECTION

EXIST. EXIST.

SCALE: NTS9 PIPE SUPPORT DETAIL

NOTES:

1. ALL PIPE, CONDUIT, ETC. OF ALL TRADES SHALL BE COMBINED ON

SAME SUPPORT CHANNEL WHERE PRACTICAL.

2. SUPPORT CHANNEL LENGTH SHALL NOT BE DETERMINED UNTIL ALL

PIPING, CONDUIT, ETC. TO BE SUPPORTED IS COORDINATED.

3. SUPPORT CHANNEL SPACING SHALL BE NO MORE THAN 10'-0"

UNISTRUT P-1100 SERIES PIPE CLAMP,

USE FOR PIPING (TYP.)

NUMBER OF HANGER RODS SHALL BE

REQUIRED FOR PROPER SUPPORT

(MIN OF 2) ONLY ONE IS SHOWN FOR

CLARITY

UNISTRUT SUPPORT NUT (TYP.)

20 GA. GALV. 12" LONG METAL SHIELDS

SHALL BE USED AROUND INSULATION

AT ALL SUPPORT LOCATIONS (TYP.)

INSULATION (TYP.)

PIPE (TYP.)

CONDUIT (TYP.)

UNISTRUT UNI-CLIP CLAMP USE FOR

ELEC. CONDUIT

UNISTRUT 1 5 8" x 1 5 8" CHANNEL

SUPPORT (TYP.)

SCALE: NTS8 INSULATED PIPE HANGER DETAIL

CLEVIS HANGER (TYP.)

PIPE INSULATION COVER AND

FINISH TO MATCH ADJACENT

INSULATION

PRECAST INSULATION WITHIN

VAPOR BARRIER AS PER

MFRG. SPEC. COLD PIPE-TYPE

2 FIBERGLASS 7 14# DENSITY.

HOT PIPE-CALCIUM SILICATE

PIPE INSULATION BETWEEN

HANGER SECTION

16 GA. SHEET METAL

SADDLE 12" LONG

THREADED STEEL ROD WITH NUT

AND WASHER, BOTH SIDES (TYP.)

SECURE PIPE HANGER TO

STRUCTURE (TYP.)

HANGER ROD (TYP.)

SUPPORT ADJUSTMENT

NUT (TYP.)

PIPE

2'' CW SUPPLY

1 12'' O.D. P-TRAP

2'' HW 140° F

SUPPLY

2'' THERMOSTATIC

TEMPERING VALVE SEE NOTE

BELOW

NOTE:

1. PROVIDE THERMOSTATIC MIXING VALVE WITH CHECK STOPS

BELOW LAVS, SINKS & EYE WASH STATIONS. VALVE SHALL BE:

ZURN MODEL NO. TMV-1 W/ 12'' INLET/OUTLET, OR SYMMONS

MODEL NO. 7-225-CK-MS W/ 12'' INLET/OUTLET, 2.0 GPM SUPPLY,

MAX. SET SUPPLY TEMP. AT 110°F FOR LAVS & SINKS AND 90°F

FOR EYE WASH STATIONS.

SCALE: NTS1 MIXING VALVE DETAIL

WATER

HEATER

SCALE: NTS7 EWH-1 WATER HEATER DETAIL

VACUUM RELIEF VALVE LOCATED 6"

ABOVE TOP OF WATER HEATER

T&P RELIEF VALVE

MINIMUM 1-12"

AIR GAP

30"x30"x6" DRAIN PAN 18

GA. GALV. STEEL W/

HEMMED EDGES

2" DISCHARGE DRAIN FOR

T&P RELIEF VALVE

UNION (TYP)

EXPANSION TANK

4" CW

4" HW

BALL VALVE (TYP)

1" DRAIN LINE

2" DRAIN LINE.

DISCHARGE INTO

FLOOR DRAIN.

CHECK VALVE

4" HWR

RECIRC PUMP

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

CG-1

CG-1

CG-1

1 2 3 4 5

FE

FE

FE

EXISTING

GENERATOR

RX GWH

50-GAL

EXISTING 500 GAL

PROPANE TANK

EX 3" SAN UP TO

RX 3" STANDPIPE

RX

FD

EX

FD

EX

FCOEX 4" SAN

EX

I.E.=98.4'

EX I.E.=98.5'

EX 2" VENT UP

EX

" S

AN

RX 11

2" VENT UP

EX 2" SANEX

FCO

RX 11

2" VENT UP

RX

FD EX

" S

AN

EX 4" SAN

EX 4" SAN RX 2" SAN

EX 11

2" VENT UP

RX 11

2" VENT UP

RX

FD

EX

FCO

RX 11

4" VENT UP

EX 4" SAN

EX I.E.=94'

EX 4" SAN. REFER TO

CIVIL PLANS FOR

CONTINUATION.

EX 4" SAN. REFER TO

CIVIL PLANS FOR

CONTINUATION.

EX I.E.=94'

EX

" S

AN

EX OIL

SEPERATOR

EX 2" VENT

EX 2" VENT UP

EX 3" VENT

EX 4" VTR EX 4" VENT

EX 3" VENT

EX 11

2" VENT

EX 2" VENT

EX 4" VTR

EX 3" VENTEX 2" VENT

RX 2" VENT

PUBLIC

MALE

A-103

UTILITIES

A-102

IT ROOM

B-100

VESTIBULE

BW-117M

MULTI PURPOSE

A-100

A-101

PUBLIC

FEMALE

A-104

CORRIDOR

A-105

STAFF FEMALE

A-107

WASH BAY

STAFF MALE

A-106

RX

WC

RX

SHW RX

SHW

RX 2" VENT

RX

LAV

RX

LAV

RX

WC

RX

LAV

RX

LAV

RX

UR

RX WC RX

WC

RX MS

EX

FD

CG-1

CG-1

CG-1

CG-1

1 2 3 4 5

FE

FE

FE

RX GWH

50-GAL

EXISTING

GENERATOR

EXISTING 500 GAL

PROPANE TANK

EX SNK

EX

SHWR

RX

MS

RX

LAV

RX

LAV

RX

WC

RX

WCRX

UR

EX

HB

RX

LAV

RX

LAV

EX

SHWREX

HB

EX

REF

RX

UR

RX

WC

EX

EWS

EX

WALL

HYDRANT

EX

PW

2" INCOMING CW. REFER

TO CIVIL PLANS FOR

CONTINUATION.

2" CW

2" CW TO EXISTING

DRINKING FOUNTAIN.

REFER TO CIVIL PLANS

FOR EXACT LOCATION.

PUBLIC

MALE

A-103

UTILITIES

A-102

IT ROOM

B-100

VESTIBULE

BW-117M

MULTI PURPOSE

A-100

A-101

PUBLIC

FEMALE

A-104

CORRIDOR

A-105

STAFF FEMALE

A-107

WASH BAY

STAFF MALE

A-106

G G

G G

GGGG

GG

GG

EX 3 4" GAS TO

EX WATER HEATER

RX 3 4" GAS

EX 1" GAS

EX 3 4" GAS

EX 3 4" GAS

EX 3 4" GAS

EXISTING RADIANT

TUBE HEATER

EX BACKFLOW

PREVENTER

EX GAS

BELOW

GRADE

RX

WC

EX 1" CW

EX 3 4" CW

EX 3 4" HW

EX 1" HW

EX 11

2" HW

EX 2" CW

EX 11

2" HW

EX 2" CW

EX 11

2" CW

EX 11

4" HW

EX 1" CW

EX 1" CW

EX

" H W

EX 3 4" CW

EX 3 4" HW

EX 1" HW

EX 2" CW

EX 3 4" HWR

EX GAS

BELOW

GRADE

EX PUMP

1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF

ANY WORK AND ADVISE ENGINEER OF ANY DISCREPANCIES.

LEGEND

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

SA AB, MM

JANUARY 7, 2026

Bid Set

BID SET 1-7-2026

NOTES

NOT TO SCALE

KEY PLAN

1 SANITARY AND VENT PIPING PLAN - EXISTING AND REMOVAL

SCALE: 1/4" = 1'-0"

PUBLIC RESTROOM AND WASH

HOUSE BUILDING PLUMBING

PLAN - EXISTING AND REMOVAL

PD-101

2 DOMESTIC WATER AND GAS PIPING PLAN - EXISTING AND REMOVAL

SCALE: 1/4" = 1'-0"

DISCONNECT EXISTING AAON DOAS UNIT FROM EXISTING GAS PIPING. REMOVE

EXISTING GAS PIPING BACK TO LOCATION SHOWN. CAP AND SEAL PIPE AIRTIGHT.

REMOVE AND DISCARD EXISTING GAS WATER HEATER AND ASSOCIATED

EXPANSION TANK.

RELOCATE EXISTING BACKFLOW PREVENTER TO LOCATION SHOWN ON NEW

WORK DRAWINGS, ON SHEET PN-101.

REMOVE EXISTING HOT/COLD WATER BRANCH PIPE BACK TO MAIN, CAP AND

SEAL WATERTIGHT.

RELOCATE STUB-UP FOR DOMESTIC WATER SUPPLY AND COLD WATER FEED

FOR REMOTE WATER FOUNTAIN TO LOCATION SHOWN ON NEW WORK

DRAWINGS, ON SHEET PN-101.

REMOVE EXISTING GAS BRANCH PIPE TO EXISTING RADIANT TUBE HEATER. CAP

AND SEAL EXISTING GAS MAIN AIRTIGHT.

CAP EXISTING SANITARY PIPE WITH CLEANOUT PLUG, FLUSH WITH FINISHED

FLOOR.

INSULATE ALL NEW AND EXISTING

WATER PIPING ACCORDING TO

SPECIFICATION SECTION 22 07 11

-PLUMBING INSULATION

INSULATE ALL NEW AND EXISTING

WATER PIPING ACCORDING TO

SPECIFICATION SECTION 22 07 11

-PLUMBING INSULATION

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

SERVICE BAY

B1

OFFICE

B3

LOUNGE

B2

VESTIBULE

B4

LOCKER RM

B5

WOMEN

B6

MEN

B7

RX EWH

EX

HB

RX

SNK

RX

UR

RX

WC

EX

WC

EX

WC

EX

LAV

EX

LAV

RX

SNK

RX

EWS

EX 3 4" CW

RX 12" CW

& HW

EX 3 4" HW

EX 3 4" HW

EX 12" CW

EX 12" CW

& HW

RX

SHW

1 1

SERVICE BAY

B1

OFFICE

B3

LOUNGE

B2

VESTIBULE

B4

LOCKER RM

B5

WOMEN

B6

MEN

B7

RX EWH

RX

SHW

RX

SNK

RX

UR

RX

WC

EX

WC

EX

WC

EX

LAV

EX

LAV

RX

SNK

RX

EWS

EX 2" VENT UP

RX 2" VENT UP

EX 4" VTR

EX

CO

EX

CO

EX 4" SAN TO

EX SEPTIC TANK

EX 4" SANEX 2" SAN

EX 3" SAN

EX 2" SAN

EX 2" VENT UP

EX 4" SAN

EX 2" VENT

RX 2" VENT

EX 2" VENT

EX

FD

EX

FD

REMOVE EXISTING HOT/COLD WATER BRANCH PIPE BACK TO MAIN, CAP AND

SEAL WATERTIGHT.

REMOVE EXISTING WATER HEATER. DISCONNECT AND REMOVE ASSOCIATED

EXISTING CW & HW PIPING BACK TO MAIN, CAP AND SEAL WATERTIGHT.

MODIFY EXISTING SANITARY PIPE IN WALL TO CONNECT TO PLUMBING FIXTURES

SEE NEW WORK PLANS FOR MORE INFORMATION.

REMOVE EXISTING HOT/COLD WATER STUB OUTS BACK TO WALL, TEMPORARILY

CAP, WATERTIGHT.

REMOVE EXISTING SANITARY PIPE BACK TO WALL CAVITY. CAP AND SEAL

SANITARY IN WALL CAVITY, WATERTIGHT.

REMOVE EXISTING TOILET FLANGE AND ASSOCIATED SANITARY BACK TO SLAB.

CAP AND SEAL SANITARY WITH CLEANOUT PLUG FLUSH WITH FINISHED FLOOR,

WATERTIGHT.

1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF

ANY WORK AND ADVISE ENGINEER OF ANY DISCREPANCIES.

LEGEND

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

SA AB, MM

JANUARY 7, 2026

Bid Set

BID SET 1-7-2026

NOTES

NOT TO SCALE

KEY PLAN

2 DOMESTIC WATER PIPING PLAN - EXISTING AND REMOVAL

SCALE: 1/4" = 1'-0"

HISTORIC MAINTENANCE

BUILDING PLUMBING PLAN -

EXISTING AND REMOVAL

PD-102

1 SANITARY AND VENT PIPING PLAN - EXISTING AND REMOVAL

SCALE: 1/4" = 1'-0"

INSULATE ALL NEW AND EXISTING

WATER PIPING ACCORDING TO

SPECIFICATION SECTION 22 07 11

-PLUMBING INSULATION

INSULATE ALL NEW AND EXISTING

WATER PIPING ACCORDING TO

SPECIFICATION SECTION 22 07 11

-PLUMBING INSULATION

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

1 2 3 4 5

CG-1

CG-1

CG-1 CG-1

FE

FE

FE

CG-1

EXISTING

GENERATOR

GWH-1

50-GAL

EXISTING 500 GAL

PROPANE TANK

3" SAN UP TO

3" STANDPIPE

EX 4" SAN

EX I.E.=98.4'

EX I.E.=98.5'

EX

FCO

EX 4" SAN

4" VENT UP

EX I.E.=94'

EX 4" SAN. REFER TO

CIVIL PLANS FOR

CONTINUATION.

EX 4" SAN. REFER TO

CIVIL PLANS FOR

CONTINUATION.

EX I.E.=94'

EX

" S

AN

EX OIL

SEPERATOR

EX 2" VENT UP

EX 3" VENT

EX 4" VTR

EX 4" VENT

EX 3" VENT

EX 11

2" VENT

EX 2" VENT

EX 4" VTR

EX 3" VENT

EX 2" VENT

UTILITIES

A-102

MULTI PURPOSE

A-100

EX

FCO

LAV-1

LAV-1

LAV-1

LAV-1

MS-1

UR-1

WC-1

FD-1

EX 4" SAN

WC-1

WC-1

FCO

4" SAN

EX 4" SAN

WC-1

EX 4" SAN

EX 4" SAN

EX 2" SAN

FCO

EX 2" VENT

EX 4" SAN

PUBLIC

MALE

A-103

IT ROOM

B-100

VESTIBULE

BW-117MA-101 PUBLIC

FEMALE

A-104

WASH BAY

STAFF

TOILET

A-106

CORRIDOR

A-105

EX

EWS

DF-1 DF-2

ICE-1

HD-1

2" VENT

LAV-1

WC-1

SHW-1

EX 3" SAN

2" VENT

FD-1

2" VENT

EX

FD

EX

FD

2" VENT

EX 11

2" SAN

CG-1

CG-1

1 2 3 4 5

CG-1

CG-1

CG-1 CG-1

FE

FE

FE

CG-1

EXISTING

GENERATOR

EXISTING 500 GAL

PROPANE TANK

GWH-1

50-GAL

EX 1" CW

EX 3 4" CW

EX 3 4" HW

EX 1" HW

EX 11

2" HW

EX 2" CW

EX 11

2" HW

EX 2" CW

EX 11

2" CW

EX 11

4" HW

EX 1" CW

EX

" H W

EX 3 4" CW

EX 3 4" HW

EX 1" HW

EX 2" CW

EX

SNK

MS-1

EX

HB

EX

HB

EX

REF

EX 3 4" HWR

EX

EWS

EX

WALL

HYDRANT

2" INCOMING CW. REFER

TO CIVIL PLANS FOR

CONTINUATION.

2" CW

2" CW TO EXISTING

DRINKING FOUNTAIN.

REFER TO CIVIL PLANS

FOR EXACT LOCATION.

PUBLIC

MALE

A-103

UTILITIES

A-102

IT ROOM

B-100

VESTIBULE

BW-117M

MULTI PURPOSE

A-100

A-101 PUBLIC

FEMALE

A-104

WASH BAY

G G

G G

G G

GGGG

GG

G

EX 1" GAS

EX 3 4" GAS

EX 3 4" GAS

EXISTING RADIANT

TUBE HEATER

EX BACKFLOW

PREVENTER

EX GAS

BELOW

GRADE

4" GAS TO EX

WATER HEATER

LAV-1

LAV-1

LAV-1

LAV-1

UR-1

WC-1

WC-1 WC-1

STAFF

TOILET

A-106

CORRIDOR

A-105

RTH-1

40,000 BTU

RTH-2

40,000 BTU

EX

PW

G G

G G

G

4" GAS

G

4" GAS

4" GAS

4" GAS

1" HW

2" CW

LAV-1

WC-1

DF-1

ICE

MACHINE

EX 1" CW

2" HW

1" CW

EX PUMP

SHW-1

LEGEND

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

SA AB, MM

JANUARY 7, 2026

Bid Set

BID SET 1-7-2026

NOTES

NOT TO SCALE

KEY PLAN

1 SANITARY AND VENT PIPING PLAN - EXISTING AND NEW WORK

SCALE: 1/4" = 1'-0"

PUBLIC RESTROOM AND WASH

HOUSE BUILDING PLUMBING

PLAN - EXISTING & NEW WORK

PN-101

1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF

ANY WORK AND ADVISE ENGINEER OF ANY DISCREPANCIES.

2. SANITARY PIPING SHOWN SHALL BE BELOW THE SLAB, VENT PIPING SHALL BE

INSTALLED TIGHT TO CEILING ABOVE.

3. INSTALL WATER HAMMER ARRESTERS ON THE HOT & COLD SUPPLY FOR ALL

LAVATORIES AND SINKS ON THE HIGHEST POINT AT THE END OF EACH BRANCH.

4. SLOPE ALL SANITARY PIPING, 3" AND ABOVE AT 18" PER FOOT (MIN), AND 2" AND

SMALLER AT 14" PER FOOT (MIN).

5. ALL LAVATORIES AND SINKS SHALL HAVE MIXING VALVES, SEE DETAIL SHEET.

DISCHARGE SHALL BE SET TO 110°F (ADJUSTABLE).

6. HOT WATER PIPING HAS BEEN DESIGNED TO MEET IECC 404.5. INSTALL PIPING AS

PER DRAWINGS SUCH THAT HOT WATER TERMINATION POINT TO ALL PUBLIC

LAVATORIES ARE WITHIN 24" OF HOT WATER LOOP.

2 DOMESTIC WATER AND GAS PIPING PLAN - EXISTING AND NEW WORK

SCALE: 1/4" = 1'-0"

NEW LOCATION OF EXISTING BACKFLOW PREVENTER. SEE DETAIL ON SHEET

PN-002 FOR WATER SERVICE ENTRANCE AND BACKFLOW INSTALLTION

INFORMATION.

EXTEND EXISTING WATER SERVICE AND DRINKING FOUNTAIN WATER FEED

PIPING BELOW GRADE TO NEW EQUIPMENT ROOM LOCATION.

DROP 3 4" COLD WATER IN WALL FOR RESTROOM LAVATORIES. INSTALL

SHUT-OFF VALVE IN DROP, PROVIDE ACCESS PANEL FOR VALVES.

DROP 11

2" COLD WATER IN WALL FOR RESTROOM WATER CLOSETS. INSTALL

SHUT-OFF VALVE IN DROP, PROVIDE ACCESS PANEL FOR VALVES.

INSTALL WATER HAMMER ARRESTORS IN COLD AND HOT WATER LINES. PROVIDE

ACCESS PANEL.

INSTALL GWH-1 WITH DRAIN PAN. ROUTE DRAIN PAN TO NEAREST FLOOR DRAIN.

INSULATE ALL NEW AND EXISTING WATER

PIPING ACCORDING TO SPECIFICATION

SECTION 22 07 11 -PLUMBING INSULATION

INSULATE ALL NEW AND EXISTING WATER

PIPING ACCORDING TO SPECIFICATION

SECTION 22 07 11 -PLUMBING INSULATION

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

EX

HB

EX

WC

EX

LAV

EX 3 4" CW

EX 3 4" HW

EX 3 4" HW

EX 12" CW

SERVICE BAY

B1

OFFICE

B3

MEN'S

LOCKER

ROOM

B5

MEN

B7

WOMEN'S

LOCKER

ROOM

B4

WOMEN

B6

EX 12" CW

& HW

4" HW DN

IN WALL

SNK-1

DF-1 EWH-1

IN ATTIC

2" HWR

PUMP-1

IN ATTIC

4" HW

EX

WC

EX

LAV

DRAINPAN

4" OVERFLOW

4" OVERFLOW

DN TO SPLASHBLOCK

EXPANSION TANK

IN ATTIC

EWS-13

OPEN OFFICE

B2

EX 4" VTR

EX

CO

EX

CO

EX 4" SAN TO

EX SEPTIC TANK

EX 4" SANEX 2" SAN

EX 3" SAN

EX

FD

EX 2" SAN

EX 2" VENT UP

EX 4" SAN

EX 2" VENT

EX

FD

FD-1

SERVICE BAY

B1

OFFICE

B3

MEN'S

LOCKER

ROOM

B5

MEN

B7

WOMEN'S

LOCKER

ROOM

B4

WOMEN

B6

EX

WC

EX

LAV

SNK-1

DF-1

EX

WC

EX

LAV

2" VENT UP

EX 2" VENTFCO

2" VENT UP

EX 2" VENT

EWS-1

OPEN OFFICE

B2

FCO

INSTALL EWH-1 AND PUMP-1 IN ATTIC ABOVE MEN'S RESTROOM.

CONNECT 12" CW & HW PIPING TO EXISTING CW & HW PIPING INSIDE

WALL.

EMERGENCY EYEWASH TO BE PROVIDED WITH POINT-OF-USE MIXING

VALVE. DISCHARGE TO BE SET TO 90° (ADJUSTABLE).

ENGINEER HAS NOT VERIFIED EXISTING SANITARY PIPING BELOW

GRADE. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS

PRIOR TO START OF ANY WORK AND ADVISE ENGINEER OF ANY

DISCREPANCIES.

1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF

ANY WORK AND ADVISE ENGINEER OF ANY DISCREPANCIES.

2. SANITARY PIPING SHOWN SHALL BE BELOW THE SLAB, VENT PIPING SHALL BE

INSTALLED TIGHT TO CEILING ABOVE.

3. SLOPE ALL SANITARY PIPING, 3" AND ABOVE AT 18" PER FOOT (MIN), AND 2" AND

SMALLER AT 14" PER FOOT (MIN).

4. ALL EYE WASH STATIONS HAVE MIXING VALVES. DISCHARGE SHALL BE SET TO

90°F (ADJUSTABLE).

LEGEND

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

SA AB, MM

JANUARY 7, 2026

Bid Set

BID SET 1-7-2026

NOTES

NOT TO SCALE

KEY PLAN

2 DOMESTIC WATER PIPING PLAN - EXISTING AND NEW WORK

SCALE: 1/4" = 1'-0"

HISTORIC MAINTENANCE

BUILDING PLUMBING PLAN -

EXISTING AND NEW WORK

PN-102

1 SANITARY AND VENT PIPING PLAN - EXISTING AND NEW WORK

SCALE: 1/4" = 1'-0"

INSULATE ALL NEW AND EXISTING WATER

PIPING ACCORDING TO SPECIFICATION

SECTION 22 07 11 -PLUMBING INSULATION

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

GROUND

ROOF

CEILING

EX

GWH-1

LAV-1 LAV-1 LAV-1LAV-1WC-1UR-1WC-1WC-1LAV-1 WC-1 EX

HB

EX

EWS

EX

HB

EX

PW

EX

SNK

EX

REF

EX

HB

MS-1

EX 3 4" HWR

EX 2" CW SERVICE

2" CW

SERVICE

2" CW

EX 2" CWEX 2" CWEX 1" CW EX 1" CW

EX 11

2" HWEX 1" HW

EX 1" HWEX 3 4" CW

EX 3 4" HW NEW LOCATION

OF EX BACKFLOW

PREVENTERS

4" CW

4" HW

2" CW11

2" CW

2" CW

2" HW

2" CW

2" HW

SHW-1 DF-1

DF-2

ICE

EX 12" CW TO FOUNTAIN

EX WATER HAMMER ARRESTER

GROUND

ROOF

CEILING

LAV-1

(1-DFU)

WC-1

(4 DFU)

LAV-1

(1-DFU)

LAV-1

(1-DFU)

LAV-1

(1-DFU)

FD-1 EX

FCO

UR-1

(4 DFU)FD-1FD-1 3" STAND

PIPE FCOMS-1

(2-DFU)

WC-1

(4 DFU)

WC-1

(4 DFU)

EX

FCO

EX SNK

(2-DFU)

WC-1

(4 DFU) FCO

EX EWS

(1-DFU)

EX OIL/ WATER

SEPERATOR

EX 4" SAN. REFER

TO CIVIL PLANS FOR

CONTINUATION.

EX 4" VTR EX 4" VTR

EX 4" SAN

(30-DFU)

EX 4" SAN

(28-DFU)

EX 4" SAN

(14-DFU)

EX 4" SANEX 4" SAN

(12-DFU)

2" SAN

(4-DFU)

EX 4" SAN4" SAN

(8-DFU)

EX 2" SAN

(2-DFU)

EX 4" SAN

2" VENT

EX 3" VENTEX 4" VENTEX 3" VENT

4" VENT

EX 2" VENT

2" V 2" V 2" V 2" V 3" V 2" V 2" V

2" VENT

EX 3" VENTEX 2" VENT

2" VENT 2" VENT

SHW-1

(2-DFU)

DF-1

DF-2

(1-DFU)

HD-1

(1-DFU)

LAV-1

(1-DFU)

2" V

FD-1

(2-DFU)

2" V

GROUND

ROOF

CEILING

EXISTING PROPANE TANK

(500 GALLONS)

PP

EXISTING

GENERATOR

(203 MBH)

FIRST STAGE

REGULATOR

EX SECOND STAGE REGULATOR

(OUTLET PRESSURE 11" WC)

BELOW GRADE

PIPING

EX 3 4" GAS

P

EX SECOND STAGE

REGULATOR (OUTLET

PRESSURE 11" WC)

RTH-1

40 MBH

EX GWH-1

(45 MBH)

EX

4" G

AS EX

" G

AS3

4" GAS

UTILITY ROOM WASHBAY

EXTERIOR

EX RTH

40 MBH

RTH-2

40 MBH

4" GAS

RRR

4" GAS 3

4" GAS3

4" GAS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

SA AB, MM

JANUARY 7, 2026

Bid Set

BID SET 1-7-2026

2 PUBLIC RESTROOM/WASHBAY BUILDING DOMESTIC WATER PIPING RISER DIAGRAM

SCALE: NTS

PLUMBING SCHEDULES AND

RISER DIAGRAMS

PN-601

1 PUBLIC RESTROOM/WASHBAY BUILDING SANITARY AND VENT PIPING RISER DIAGRAM

SCALE: NTS

3 PUBLIC RESTROOM/WASHBAY BUILDING GAS PIPING RISER DIAGRAM

SCALE: NTS

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

G

(3)

ELECTRICAL SYMBOLS ELECTRICAL ABBREVIATIONS

SINGLE POLE TOGGLE SWITCH - 20 AMP, 120V OR 277V, M.H. 48" AFF, UON.

THREE WAY TOGGLE SWITCH - 20 AMP, 120V OR 277V, M.H. 48" AFF, UON.

WEATHER PROOF SWITCH - 20 AMP, 120V OR 277V, M.H. 48" AFF, UON.

LIGHT SWITCH WITH BUILT-IN OCCUPANCY SENSOR.

OCCUPANCY SENSOR

MOTION SENSOR

MOTOR OPERATED SWITCH

SINGLE/DUPLEX TYPE RECEPTACLE - 20 AMP, 120 VOLT, NEMA 5-20R,

M.H. 18" AFF, UON.

QUADRUPLEX TYPE RECEPTACLE - 20 AMP, 120 VOLT, NEMA 5-20R,

M.H. 18" AFF, UON.

DUPLEX WEATHER PROOF RECEPTACLE WITH GROUND FAULT CIRCUIT

INTERRUPTER PROTECTION - 20 AMP, 120 VOLT, NEMA 5-20R, M.H. 18"

AFF, UON.

QUADRUPLEX RECEPTACLE WITH GROUND FAULT CIRCUIT

INTERRUPTER PROTECTION - 20 AMP, 120 VOLT, NEMA 5-20R, M.H. 18"

AFF, UON.

DUPLEX RECEPTACLE WITH GROUND FAULT CIRCUIT INTERRUPTER

PROTECTION - 20 AMP, 120 VOLT, NEMA 5-20R, M.H. 18" AFF, UON.

SPECIAL TYPE RECEPTACLE - 120 VOLT , 1PHASE, L5-30A

SPECIAL TYPE RECEPTACLE - 240 VOLT , 1PHASE

CEILING MOUNTED DUPLEX RECEPTACLE - 20 AMP, 120 VOLT, NEMA

5-20R

CEILING MOUNTED DUPLEX GFCI RECEPTACLE - 20 AMP, 120 VOLT,

NEMA 5-20R

FLOOR BOX WITH (4) POWER, (2) CAT 6E, (1) HDMI AND (1) DUAL USB

PORT TYPE OUTLET

DISCONNECT SWITCH, AMP/ POLES / ENCLOSURE NEMA RATING / FUSE

PER NAME PLATE.

COMBINATION MOTOR STARTER WITH DISCONNECT SWITCH

MOTOR STARTER

ELECTRIC MOTOR

PANELBOARD

JUNCTION BOX, PULL BOX WALL/CEILING MOUNTED

M

HOMERUN WIRING WITH A DEDICATED EQUIPMENT GROUND WIRE TO

THE REFERENCED PANELBOARD. ARROW HEADS AND NUMERALS

INDICATE THE CIRCUIT NUMBERS.

CONDUIT DOWN OR AWAY

CONDUIT UP OR TOWARD VIEWER

CONDUIT, STUBBED AND CAPPED AS SHOWN

GROUND GRID CABLE

UNDERGROUND ELECTRIC

CIRCUIT BREAKER, THERMAL MAGNETIC TRIP SHOWN,

3 POLE UON.

FUSE - RATING INDICATED

DELTA CONNECTION, THREE PHASE

DELTA CONNECTION, SINGLE PHASE

WYE CONNECTION - UNGROUNDED, GROUNDED, THREE PHASE

WYE CONNECTION - UNGROUNDED, GROUNDED, SINGLE PHASE,

FUSED SWITCH, MEDIUM VOLTAGE

SURGE ARRESTER/LIGHTNING ARRESTER

DRY CONTACTS - NO, NC

GROUND

POTENTIAL TRANSFORMER

TRANSFORMER

CURRENT TRANSFORMER,

NUMBER INDICATED

CORE BALANCE CURRENT TRANSFORMER

MH-X

EXISTING, NEW ELECTRIC MANHOLE OR

HANDHOLE AND NUMBER

INTERLOCKED RECEPTACLE WITH

DISCONNECT SWITCH

FIELD PHOTOGRAPHPX

EX.XX

TERMINATION

GROUNDING RESISTOR

A

AC

AF

AFF

AFG

AHU

AIC

AL

AM

AT

ATS

AUTO

AUX

AWG

BAT

BKR

BLDG

BOCA

C

CB

CC

CH

CIR,CKT

CLR

COMB

CONT'D

CPT

CR

CT

CU

DC

DIA

DIST

DIV

DN

DP

DSW

DWG

E

EA

EC

ECB

EF

EL

EMH

EO

ER

ETM

ETR

EX

F

FA

FAAP

FACP

FDR

FLR

FSS

FUT

G

GALV

GC

GFI

GFP

GFR

GND

HH

HP

HVAC

HZ

IC

ICCB

I & C

ID

IG

INST

ITC

JB

K

KCMIL

KVA

KW

LA

LB

LO

LCP

LOS

LVL

AMPERE

ALTERNATING CURRENT

AMPERE FRAME

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AIR HANDLING UNIT

AMPERES INTERRUPTING

CAPACITY (SYM, RMS, AMPS)

ALUMINIUM

AMMETER

AMPERE TRIP

AUTOMATIC TRANSFER SWITCH

AUTOMATIC

AUXILIARY

AMERICAN WIRE GAUGE

BATTERY

BREAKER

BUILDING

BUILDING OFFICIALS AND

CODE ADMINISTRATORS

CONDUIT

CIRCUIT BREAKER

CONTROL CABLE

CABINET HEATER

CIRCUIT

CLEAR

COMBINATION

CONTINUED

CONTROL POWER TRANSFORMER

CONTROL RELAY

CURRENT TRANSFORMER

COPPER, COMPRESSOR UNIT

DIRECT CURRENT

DIAMETER

DISTRIBUTION

DIVISION

DOWN

DISTRIBUTION PANEL

DISCONNECTING SWITCH

DRAWING

EMPTY, ELECTRICAL INTERLOCK,

EXISTING

EACH

EMPTY CONDUIT

ENCLOSED CIRCUIT BREAKER

EXHAUST FAN

ELEVATION

ELECTRIC MANHOLE

ELECTRIC OPERATOR

EXISTING RELOCATED

ELAPSED TIME METER

EXISTING TO REMAIN

EXISTING

FUSE, FRAME, FRONT

FRAME AMPS

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

FEEDER

FLOOR

FUSED SAFETY SWITCH

FUTURE

GREEN, GROUND, GROUND GRID

GALVANIZED

GENERATOR CONTACTOR,

GENERATOR CONTROL PANEL

GROUND FAULT INTERRUPTER

GROUND FAULT PROTECTION

GROUND FAULT RELAY

GROUND

HANDHOLE

HORSE POWER

HEATING VENTILATION AND AIR

CONDITION

HERTZ

INTERRUPTING CAPACITY

INSULATED CASE CIRCUIT BREAKER

INSTRUMENTATION & CONTROL

IDENTIFICATION

ISOLATED GROUND

INSTANTANEOUS

INTERFACE TERMINAL CABINET

JUNCTION BOX

KEY INTERLOCK

KILO CIRCULAR MILS

KILOVOLT-AMPERE

KILOWATT

LIGHTNING ARRESTER

CONDUIT BOX, RIGHT ANGLE

LOCKOUT

LOCAL CONTROL PANEL

LOCKOUT STOP PUSH BUTTON

LEVEL

MAIN CIRCUIT BREAKER

MACHINE

MULTIFUNCTION RELAY

MANHOLE, MOUNTING HEIGHT

MINIMUM

MAIN LUG ONLY

MOUNT

MOUNTED

NEUTRAL

NON-AUTOMATIC

NORMALLY CLOSED

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NATIONAL FIRE PROTECTION ASSOCIATION

NON-FUSED SAFETY SWITCH

NORMALLY OPEN

NUMBER

NAMEPLATE

NOT TO SCALE

OVERLOAD

POLE OR POLES

PULL BOX, PUSH BUTTON

POWER FACTOR

PHASE

PILOT LIGHT

MICROPROCESSOR BASED METERING

PHASE MONITOR RELAY

POWER MONITORING DEVICE

PANEL

POWER QUALITY MONITOR

PAIR

PRIMARY

POTENTIAL TRANSFORMER

REMOVE, RED, REAR, RUN CONTRACTORS

RIGID GALVANIZED STEEL / GALVANIZED RIGID

CONDUIT

RECEPTACLE

REQUIRED

ROOT MEAN SQUARE

ROOM

ROOF TOP UNIT

SURGE ARRESTOR

SURGE PROTECTION DEVICE

SWITCH

SYMMETRICAL

TRIP AMPS

TERMINAL BOARD, TERMINAL BLOCK

TIME DELAY RELAY

TERMINAL JUNCTION BOX

TWISTED SHIELDED PAIR

HIGH-TEMP RELAY

TEST SWITCH

TRANSIENT VOLTAGE SURGE SUPPRESSOR

TYPICAL

UNDERGROUND

UNDERWRITERS LABORATORY

UNLESS OTHERWISE NOTED

VOLTS OR VOLTAGE

VOLTAMPS

MB,MCB

M/C

MFR

MH

MIN

MLO

MT

MTD

N

NA

NC

NEC

NEMA

NFPA

NFSS

NO

NO.

NP

NTS

OL

P

PB

PF

PH

PL

PM

PMR

PMT

PNL

PQM

PR

PRI

PT

R

RGS,GRC

RECPT

REQ'D

RMS

RM

RTU

SA

SPD

SW

SYM

TA

TB

TDR

TJB

TSP

TSH

TS

TVSS

TYP

UG

UL

UON

V

VA

W W/

WH

WP

WR

XFMR

Z

O

WATTS, WIRE

WITH

WATTHOUR

WEATHERPROOF

WELDING RECEPTACLE

TRANSFORMER

IMPEDANCE

PHASE, DIAMETER

NUMBER

ELECTRICAL GENERAL NOTES

1. IT IS THE INTENT OF THESE DRAWINGS AND OTHER RELATED DOCUMENTS TO PRODUCE A

COMPLETE AND FUNCTIONING ELECTRICAL SYSTEM. PROVIDE ALL LABOR, MATERIAL, TESTS,

AND OTHER SERVICES AS MAY BE NECESSARY TO ACHIEVE THIS PRODUCT. ACKNOWLEDGE

ACCEPTANCE OF THE PLANS AS AN ADEQUATE DEFINITION OF THE SCOPE OF WORK. EXTRA

COST CLAIMS BASED ON DISCREPANCIES ON THE PLANS WILL NOT BE CONSIDERED.

2. ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE

(NEC) AND ALL LOCAL CODES HAVING JURISDICTION. ALL EQUIPMENT, DEVICES, AND

MATERIAL SHALL BE LISTED WITH UNDERWRITERS LABORATORIES FOR ITS APPLICATION AS

INSTALLED AND SHALL BEAR THE UL LABEL.

3. OBTAIN THE REQUIRED BUILDING AND TRADES PERMIT AND COORDINATE WITH THE

GOVERNMENT.

4. VISIT THE SITE AND EXAMINE CONDITIONS OF THE PREMISES AND THE CHARACTER AND

EXTENT OF WORK REQUIRED PRIOR TO CONSTRUCTION. BRING TO THE ATTENTION OF

GOVERNMENT FOR FURTHER DIRECTIONS, IF THERE ARE DIFFICULTIES IN COMPLYING WITH

DRAWINGS/SPECIFICATIONS.

5. ELECTRICAL PLANS ARE DIAGRAMMATIC. DO NOT SCALE DRAWINGS.

6. CONSULT PLANS, IF ANY, OF ALL OTHER AFFECTED AREAS FOR COORDINATION AND RELATED

WORK.

7. CONSULT EXISTING AS BUILT ARCHITECTURAL AND STRUCTURAL PLANS AND DETAILS FOR

CONSTRUCTION TYPE, HEADROOM, ROOM FINISHES, CEILINGS, ETC. COORDINATE WITH

GOVERNMENT, AS REQUIRED.

8. CIRCUIT NUMBERS ARE FOR IDENTIFICATION PURPOSES ONLY. CONTRACTOR SHALL BE

RESPONSIBLE FOR CORRECTLY SPACING THE CIRCUITS IN THE PANEL AND BALANCE THE

LOAD ON THE PHASES UNDER NORMAL OPERATING CONDITIONS.

9. SUBMIT SHOP DRAWINGS FOR ALL ELECTRICAL EQUIPMENT, FIXTURES, DEVICES AND

MATERIALS TO OBTAIN COR'S APPROVAL BEFORE DELIVERY TO THE JOB SITE. REPLACE ALL

NON-CONFIRMING EQUIPMENT AND DEVICES, AT NOT EXTRA CHARGE TO GOVERNMENT.

10. VERIFY WIRE SIZES, CB AND FUSE RATINGS FOR ALL EQUIPMENT, AND BRING TO THE

ATTENTION OF THE GOVERNMENT ANY DISCREPANCIES AFFECTING THE WORK PRIOR TO

PROCEEDING.

11. ALL WORK SHALL BE DONE AT SUCH TIMES AND IN SUCH A MANNER AS WILL LEAST

INTERFERE WITH THE MAINTENANCE AND OPERATION OF ALL RELATED OR AFFECTED

SYSTEMS. COORDINATE ALL POWER OUTAGES, FIRE ALARM SHUT DOWNS, ETC. WITH

GOVERNMENT.

12. WHERE APPLICABLE, CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER SIZING OF ALL

MOTOR OVERLOAD DEVICES (HEATERS) IN STARTERS BASED ON ACTUAL NAMEPLATE

RATINGS ON THE MOTORS BEING INSTALLED.

13. HORSEPOWER / WATTAGE INDICATED ON DRAWINGS MAY DIFFER FROM ACTUAL

EQUIPMENT FURNISHED. IF FURNISHED EQUIPMENT DIFFERS FROM RATINGS ON

DRAWINGS, MARK THE DRAWINGS FOR AS BUILT CONDITION.

14. THE EXACT NUMBER OF WIRES MAY NOT BE INDICATED FOR ALL CIRCUITS, ONLY THOSE

WHERE CLARIFICATION IS NECESSARY. PROVIDE ALL WIRES NECESSARY FOR THE PROPER

FUNCTIONING OF THE SYSTEM WHETHER INDICATED ON DRAWINGS OR NOT.

15. PROVIDE PULL WIRE AND FISH CORD FOR ALL NEW EMPTY CONDUIT RUNS IN EXCESS OF 10

FEET.

1. IT SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO COORDINATE EXACT REQUIREMENTS FOR INCOMING SERVICE OF LOCAL UTILITIES FOR POWER AND TELEPHONE, PAY ALL

FEES, AND INSTALL A COMPLETE AND FUNCTIONAL SYSTEM.

2. COORDINATE INSTALLATION OF TELEPHONE SYSTEM INCLUDING TELEPHONE WIRING AND TELEPHONE

OUTLETS WITH THE GOVERNMENT/ENGINEER.

3. REFER TO BASE BUILDING DRAWINGS FOR LOCATION OF UTILITY SERVICE JUNCTION BOX.

COORDINATION WITH POWER AND TELEPHONE COMPANIES:

1. COORDINATE ALL MOUNTING HEIGHTS FOR SWITCHES, RECEPTACLES, WALL MOUNTED LIGHT

FIXTURES, AND TELEPHONE OUTLETS BY THE USE OF THE ARCHITECTURAL AND ENGINEERING

DRAWINGS. SHOULD ANY CONFLICTS BECOME APPARENT, REQUEST CLARIFICATION PRIOR TO

INSTALLATION. IF THE WORK IS NOT COORDINATED, PROVIDE ANY REMEDIAL WORK, AS

APPROVED BY COR, AT NO ADDITIONAL COST TO THE GOVERNMENT.

WIRING DEVICES

1. BALLAST FOR LIGHTING FIXTURES SHALL OPERATE THE SPECIFIED LAMPS. ELECTRONIC BALLAST

SHALL HAVE A POWER FACTOR GREATER THAN .95, LESS THAN 10% HARMONIC DISTORTION.

LIGHT FIXTURES:

16. CONCEAL ALL CONDUCTORS, RACEWAYS AND CABLES IN CEILING OR WALL UNLESS OTHERWISE

INDICATED.

17. DO NOT CUT OPENINGS IN EXISTING BUILDING STRUCTURE FOR PASSAGE OF CONDUITS/CABLES

WITHOUT WRITTEN APPROVAL FROM THE GOVERNMENT.

18. FURNISH AND INSTALL NEW LIGHTING FIXTURES COMPLETE WITH ALL ACCESSORIES (INCLUDING

LAMPS).

19. SYMBOLS SHOWN ON THIS SHEET ARE STANDARD SYMBOLS. ALL OF THEM MAY NOT BE

APPLICABLE TO THIS PROJECT.

20. GUARANTEE ALL WORK AND MATERIALS FOR A PERIOD OF ONE YEAR AFTER ACCEPTANCE BY

GOVERNMENT.

21. FIRE STOP ALL NEW PENETRATIONS THROUGH FLOOR AND WALLS IN ACCORDANCE WITH BOCA, NEC, AND NFPA.

22. INSTALL CONDUCTORS CONTINUOUS BETWEEN DEVICES, WITH SPLICES LOCATED ONLY IN

JUNCTION BOXES OR IN CABINETS, AS SHOWN. CONDUCTORS SHALL BE OF SUFFICIENT LENGTH

TO REACH THE FARTHEST POINT. A MINIMUM OF 6" LOOPS SHALL REMAIN WHERE

CONNECTIONS OR TAPS ARE TO BE MADE.

23. PROVIDE AN UPDATED TYPEWRITTEN PANEL DIRECTORY IN THE PANEL AFTER COMPLETION OF

WORK.

24. PROVIDE AS BUILT DRAWINGS, ALL MANUFACTURERS' DATA AND WARRANTY LITERATURE AT THE

COMPLETION OF THE CONTRACT.

XX/X/XX/FPN

AV

S

S3

SOS

SM

OS

WP

PBJ

SW

OC OCCUPANCY SENSOR, CEILING MOUNTED 360 DEGREE, DUAL TECHNOLOGY

PASSIVE INFRARED/ULTRASONIC FREQUENCY GREATER THAN 40 KHz, DUAL

SENSING VERIFICATIONS (REQUIRES BOTH TECHNOLOGIES TO ACTIVATE), EITHER

TECHNOLOGY MAINTAINS ON STATUS,…

This is the start of the file's text. The full file is on GovTribe.