S02_Attachment - Project Sample Template.docx

DOCX document 16 KB Posted

Attached to
CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Solicitation number
36C78626R0058
Issued by

About this file

This is a project sample template document intended to serve as a guideline for contractors preparing proposals for the Camp Nelson National Cemetery deficiency correction project. The template does not specify required products or services, pricing structures, or substantive deliverables; rather, it functions as a formatting and submission example to guide respondents in structuring their proposals in accordance with solicitation requirements.

The template is ancillary to the primary solicitation 36C78626R0058 for correcting facility condition deficiencies at Camp Nelson National Cemetery in Nicholasville, Kentucky. The underlying project involves an estimated construction magnitude between $20,000,000 and $30,000,000 under NAICS code 237990, with the solicitation designated as a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. A mandatory site visit is scheduled for September 25, 2026, at 10:00 AM EST at the cemetery's administration building, with proposals due by 10:00 AM EST on October 15, 2026. The Department of Veterans Affairs National Cemetery Administration is the issuing agency.

View the file

Other files

File Type Posted
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 amendment 2.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
S02 08 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 06 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 02 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 10 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02 11 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 2_05212026 1.pdf PDF
S09 09 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 05 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 01 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 Camp Nelson Sol 36C78626R0058 draft 9-14-2026.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
S02_Attachment - Past Performance Questionnaire.docx DOCX document
S02_Price Proposal Breakdown.docx DOCX document
S02 07 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 03 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 04 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1 (1).pdf PDF
S02 833CM3030_CNNC FCA Corrections_CONS_BD SPECIFICATIONS.pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
S02_Attachment - DOL Payroll Form.pdf PDF
P07 Jessamine Camp Nelson Highway.pdf PDF
P07 Jessamine Camp Nelson Heavy.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVALUATION FACTOR 1 – EXPERIENCE AS A PRIME CONTACTOR

PROJECT INFORMATION

Title:

Location:

Prime Contractor:
Yes/No

PROJECT DESCRIPTION (include scope and size)

PROJECT PHOTOS (optional)

PROJECT START AND COMPLETION DATES
EXPLAIN REASON FOR INCREASE IN SCHEDULE
ORIGINAL
ACTUAL
START DATE
COMPLETION DATE
START DATE
COMPLETION DATE
PROJECT COST
EXPLAIN REASON FOR INCREASE IN COST
ORIGINAL
ACTUAL

KEY SUBCONTRACTORS AND EFFORT PERFORMED

NAME AND PHONE #
ROLE

PROJECT OWNER

PROJECT OWNER INFORMATION
POINT OF CONTACT
POINT OF CONTACT TELEPHONE # AND EMAIL

File details come from the government source that posted it. Updated .