S02 02 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf

PDF 13 MB Posted

Attached to
CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Solicitation number
36C78626R0058
Issued by

About this file

This document set contains construction and hazardous materials abatement drawings and specifications for the Camp Nelson National Cemetery FCA Deficiencies Correction project located in Kentucky, under National Cemetery Administration (NCA) authority. The project number is 833CM3030, with a bid set date of January 7, 2026.

The project involves renovation and construction work across five buildings: Building A (Public Restroom/Wash Bay—2,032 sq ft concrete block structure), Building B (Equipment Storage Garage—777 sq ft concrete block), Building C (Historic Brick Stable—512 sq ft), Building D (Maintenance Storage Garage—1,175 sq ft concrete block), and Building E (Historic Maintenance Garage—1,066 sq ft brick structure). Work is phased sequentially, beginning with historic structure restoration, followed by renovation of two pink CMU garages and the public restroom building, then site concrete work, and concluding with optional scope items including section replacement, catch basin replacement, and roadway reconstruction. The contractor must provide temporary office and restroom facilities during construction, including accessible connections, water, electric connections, and sewage holding tank services. Hazardous materials abatement is a significant component, requiring removal and disposal of asbestos-containing materials (ACM) identified in window frame caulking on the historic stable building and lead-based paint (LBP) on multiple structures throughout the facility. The contractor must comply with EPA 40 CFR Part 61 Subpart M, OSHA regulations (29 CFR 1926.1101), and state of Georgia requirements, including advance notification to Georgia EPD at least 10 business days prior to any asbestos abatement activities. Contractor qualifications, insurance, health and safety plans, and personnel credentials must be approved by the Contracting Officer's Representative (COR) prior to work commencement.

View the file

Other files

File Type Posted
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 amendment 2.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02_Price Proposal Breakdown.docx DOCX document
S02_Attachment - Past Performance Questionnaire.docx DOCX document
P07 Jessamine Camp Nelson Highway.pdf PDF
S02_Attachment - DOL Payroll Form.pdf PDF
S02 833CM3030_CNNC FCA Corrections_CONS_BD SPECIFICATIONS.pdf PDF
S02 08 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 10 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 04 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1 (1).pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
S02 07 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 03 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 06 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
P07 Jessamine Camp Nelson Heavy.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
S09 09 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 11 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 2_05212026 1.pdf PDF
S02 Camp Nelson Sol 36C78626R0058 draft 9-14-2026.pdf PDF
S02 05 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 01 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02_Attachment - Project Sample Template.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8"

30"

10"

24"

8"

8"

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X X

X

X X

X X

X

X X

X X

X

X X

X

X X

X X

X

X X

X X

X

X X

X

X X

X X

X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X

X X

X X X

X X

X X X

X X X

X X

X X X

X X

X X X

X X

X X

X X X X X X X X X X X X X X X X

X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X

X

X

X X

X X

X X

X

X X

X X

X X

X

BOC

BOC

BOC

X

X

X

X

X

X

X

X

X

X

X

Building "A"

PUBLIC RESTROOM/WASH BAY BUILDING

[CNNew3] 1 Story Concrete Block Structure

Foot Print = 2032 SqFt

FFE

North Side = 942.79' South Side = 940.83'

Building Height = Ceiling Height

North Side First Floor = 8.0' South Side Second Floor = 18.3'

Building "E"

HISTORIC MAINTENANCE GARAGE

[3002] 1 Story Brick Structure Foot Print = 1066 SqFt

FFE = 939.06'

Building Height =

Ceiling Height First Floor = 9.1'

Second Floor = 12.3' Top of Vault = 19.4'

Building "D"

MAINTENANCE STORAGE GARAGE

[3001] 1 Story Concrete Block Structure

Foot Print = 1175 SqFt

FFE = 938.28'

Building Height = Ceiling Height = 15.6'

Building "C"

HISTORIC BRICK STABLE

[HA2]

1 Story Brick Structure Foot Print = 512 SqFt

FFE = 936.97'

Building Height =

Ceiling Height = 12.0' Top of Vault = 19.2'

Building "B"

EQUIPMENT STORAGE GARAGE

[CNNew1] 1 Story Concrete Block Structure

Foot Print = 777 SqFt

FFE = 937.20'

Building Height = Ceiling Height

First Floor = 9.7' Second Floor = 12.5' Top of Vault = 21.1'

D D D D D D D D D D D D D D

Concrete Wall

Concrete Wall

Concrete "D" Curb

Concrete "D" Curb

Concrete

Concrete

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

O L

6' Chain Link Fence

6' Chain Link Fence

6' Chain Link Fence

4' Chain Link Fence

Concrete "D" Curb

X

X

X

X

5' Wrought Iron Fence

P. Tank

CO

CO

D

CO

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE UE

U E

U E

U E

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE UE

UE

UG UG UG UG

New Fuel Storage Tank

(500/500) BY

CONTRACTOR.

E

Concrete "E" Curb

UE

UE

UE

UE

UE

U E

U E

U E

U E

U E

U E

U E

Concrete

Trash Cans

Water Fountain

P. Tank

UW UW UW UW

UW UW UW

UW UW UW UW

UW UW UW UW UW UW UW UW UW UW UW

UW UW UW UW UW UW UW UW UW UW

UW UW UW UW UW

UW

UW

UW

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

U W

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

GA

L

HY

D

PU

M

P

BA

TT

ER

Y

ST

EP

ST

EP

ST

EP

ST

EP

TEMPORARY

RESTROOM TRAILER

1 ADA, 2 STANDARD

20' x 8' - 4"

3.2

3.1

OPTION: STONE WALL REPAIR

AND REPOINT. SEE SEPARATE

DRAWING SET.

56' CONSTRUCTION

TRAILER, POWER

CONNECTION BY

CONTRACTOR

6' Chain Link Fence

NIS

LEECH FIELD

LOW LOW

LO

W

LO

W

LOW

LOW

LOW

LOW

LO

W

SPOILS

AREA

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

EXISTING

GARAGE

IRRIGATION

TANK

EXISTING 6' CHAIN LINK FENCE

PARKING

40' SHIPPING CONTAINER FOR TOOL STORAGE

TEMPORARY FUEL TANKS (250/250)

OPTION: 3-BAY MATERIAL SPOILS SHED.

SEE CIVIL DRAWINGS FOR DETAILS

CONTRACTOR TO PROVIDE TEMPORARY OFFICE TRAILER. SEE 3/GI-104 FOR

NOTES AND GENERAL LAYOUT.

GSA VEHICLE FENCED-IN PARKING

3 SPACES

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

LOW

LIMITS OF WORK; INSTALL CONSTRUCTION

FENCE PER 01 00 02

CONTRACTOR PRIMARY CONSTRUCTION

ACCESS

LIMITS OF UNDERBRUSH REMOVAL

PROPERTY LINE, APPROXIMATE

EXISTING FENCE TO BE REFINISHED

PRE-ENGINEERED/OUTFITTED

MODULAR OFFICE TRAILER

SYSTEM.

SEE ELECTRIC AND TELECOM

DRAWINGS FOR INFORMATION ON

POWER AND IT, CONTRACTOR TO

PROVIDE AND MAINTAIN FOR THE

DURATION OF ITS USE.

CONTRACTOR TO PROVIDE AND

MAINTAIN SANITARY AND

WATER TANKS FOR THE

DURATION OF ITS USE.

ACCESS PANEL ACCESS PANEL

18'-0 12"

RECEPTIONBREAK/CONFERENCE

RE

F.

FILE

STORAGE

AREA

FILE

STORAGE

AREA

13'-3"

PHASE PLAN

GI-104

0 30 60 120 180

LEGEND

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

NWG

NOT TO SCALE

KEY

1/16" = 1'-0"1 PHASE PLAN

1/32" = 1'-0"2 SPOILS AREA

PHASING NOTES

· EXISTING FURNITURE/FF&E, TOOLS, LOCKERS,

REFRIGERATOR(S), AND MICROWAVE TO BE RELOCATED TO

TEMPORARY FACILITY BY CONTRACTOR, COORDINATED WITH

CEMETERY STAFF.

1. PERFORM WORK ASSOCIATED WITH HISTORIC STRUCTURES

1.1. HISTORIC FINISHES AND RESTORATIONS WILL INCUR LONG

LEAD TIMES.

1.2. UPON COMPLETION, WORK FORCE CAN UTILIZE RESTROOM

AND LOUNGE FOR TEMPORARY BREAK ROOM.

2. PERFORM WORK ASSOCIATED WITH THE TWO PINK CMU

GARAGES.

3. PERFORM WORK ASSOCIATED WITH PUBLIC RESTROOM BUILDING

3.1. INSTALL TEMPORARY RESTROOMS TRAILER. CONTRACTOR

TO PROVIDE AND MAINTAIN ACCESSIBLE CONNECTION

FROM EXISTING SIDEWALK TO ACCESSIBLE TEMPORARY

RESTROOM.

3.1.1. PROVIDE WATER IN TANK

3.1.2. PROVIDE ELECTRIC CONNECTION(S)

3.1.3. INSTALL TEMPORARY SIGNAGE

3.1.4. PROVIDE AND SERVICE SEWAGE HOLDING TANK

3.2. COMMENCE WORK ON PUBLIC RESTROOM BUILDING.

4. AFTER BUILDINGS ARE COMPLETE, THE SITE CONCRETE WORK

CAN TAKE PLACE

4.1. TEMPORARY STORAGE FOR MATERIALS AT TOP OF DRIVE

AISLE.

5. OPTION: PERFORM SECTION C-C IDENT. LAYER REPLACEMENT.

6. OPTION: CONSTRUCT CATCH BASIN REPLACEMENT AND

ROADWAY A & B RECONSTRUCTION.

7. PAVING IN CONTRACTOR TRAILER AREA TO BE DONE LAST.

8. REMOVE TEMPORARY OFFICE TRAILER.

9. OPTION: CONSTRUCT MATERIALS SPOILS SHED.

· SITE WORK AT FLAG POLE, ENTRANCE, AND RETENTION POND

CAN BE DONE CONCURRENTLY WITH ANY PHASE. SEE SITE

PLAN G-103.

GENERAL LAYOUT 3" = 1' - 0"3 TEMPORARY OFFICE TRAILER

32'-6"

'-5

Bid Set DateDateDate

JANUARY 7, 2026

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text

CONSULTANTS

HAZARDOUS MATERIALS

ABATEMENT NOTES

AND SCHEDULES

HA-001

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

Project No.

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

NWG

NOT TO SCALE1 GENERAL LEAD AND ASBESTOS ABATEMENT NOTES

GENERAL NOTES:

ASBESTOS NOTES:

ASBESTOS ABATEMENT PHASING:

HISTORIC BRICK STABLE BUILDING

ASBESTOS MATERIALS LOCATIONS QUANTITY

Exterior window frame caulk (original tan caulking)

Window frames on 1st floor & attic (under new caulk in replacement windows) 9 windows

HISTORIC BRICK STABLE BUILDING

LEAD PAINTED BUILDING

COMPONENTS LOCATIONS PAINT

COLOR

Window frames & trim (int.

and ext.)

Original wood windows (attic and shower room) WHITE

Door frames and trim (int.

and ext.)

Wood entry doors for attic and front sliding doors WHITE

Exterior roof trusses and trim Wood roof trusses and trim boards WHITE

Sliding garage doors Wood doors WHITE

HISTORIC MAINTENANCE GARAGE

LEAD PAINTED BUILDING

COMPONENTS LOCATIONS PAINT

COLOR

Window frames & trim (int.

and ext.) Wood windows on 1st floor & attic WHITE

Door frames and trim (int.

and ext.) Wood entry doors on 1st floor and attic WHITE

Exterior roof trusses and trim Wood roof trusses and trim boards WHITE

Garage door trim Wood trim WHITE

PAINT CONTAINING LEAD:

GENERAL: THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY AND LIABILITY FOR

COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING

TO WORK PRACTICES, HAULING, DISPOSAL, AND PROTECTION OF WORKERS, VISITORS TO THE

SITE, AND PERSONS OCCUPYING AREAS ADJACENT TO THE SITE.

ASBESTOS WAS FOUND IN THE WINDOW FRAME CAULKING ON THE HISTORIC HORSE STABLE

BUILDING. SEE ARCHITECTURAL DRAWINGS AND SCHEDULE FOR FURTHER DETAILS.

1. THE FOLLOWING REGULATIONS PUBLISHED BY THE ENVIRONMENTAL PROTECTION

AGENCY (EPA):

a. "NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR POLLUTANTS ASBESTOS," 40

CFR PART 61, SUBPART M.

b. "GENERAL PROVISIONS," 40 CFR PART 61, SUBPART A.

c. "GUIDANCE FOR CONTROLLING ASBESTOS-CONTAINING MATERIALS IN BUILDINGS"

JUNE 1985. (EPA # 560/5-85-024).

d. "ASBESTOS-CONTAINING MATERIALS IN SCHOOLS," 40 CFR PART 763, SUBPART E

INCLUDING APPENDICES.

2. THE FOLLOWING REGULATIONS PUBLISHED BY THE U.S. DEPARTMENT OF LABOR, OSHA:

a. “OCCUPATIONAL EXPOSURE TO ASBESTOS, TREMOLITE, ANTHOPHYLLITE, AND

ACTINOLITE; FINAL RULES,” TITLE 29, PART 1910, SECTION 1001 AND PART 1926,

SECTION 1101 OF THE CODE OF FEDERAL REGULATIONS.

b. “RESPIRATORY PROTECTION,” TITLE 29, PART 1910, SECTION 134 OF THE CODE OF

FEDERAL REGULATIONS.

c. CONSTRUCTION INDUSTRY, TITLE 29, PART 1926, OF THE CODE OF FEDERAL

REGULATIONS.

d. “ACCESS TO EMPLOYEE EXPOSURE AND MEDICAL RECORDS,” TITLE 29, PART 1910, SECTION 20 OF THE CODE OF FEDERAL REGULATIONS.

e. “HAZARD COMMUNICATION,” TITLE 29, PART 1926, SECTION 59 OF THE CODE OF

FEDERAL REGULATIONS.

f. “SPECIFICATIONS FOR ACCIDENT PREVENTION SIGNS AND TAGS,” TITLE 29, PART 1910, SECTION 145 OF THE CODE OF FEDERAL REGULATIONS.

3. THE FOLLOWING DOCUMENTS PUBLISHED BY THE AMERICAN NATIONAL STANDARDS

INSTITUTE:

a. "FUNDAMENTALS GOVERNING THE DESIGN AND OPERATION OF LOCAL EXHAUST

SYSTEMS," Z9.2_1979.

b. "AMERICAN NATIONAL STANDARD FOR RESPIRATORY PROTECTION RESPIRATORY USE _

PHYSICAL QUALIFICATIONS FOR PERSONNEL," Z88.6_1984.

c. "PRACTICES FOR RESPIRATORY PROTECTION," Z88.2_1992.

4. THE CONTRACTOR SHALL NOTIFY THE FOLLOWING OFFICES IN WRITING WITHIN THE TIME

FRAME SPECIFIED BY THE NESHAP REGULATIONS PRIOR TO BEGINNING ANY ASBESTOS

REMOVAL OPERATIONS. THE STATE OF GEORGIA REQUIRES A NOTIFICATION BE

SUBMITTED TO GEORGIA EPD 10 BUSINESS DAYS PRIOR TO ANY DEMOLITION,

RENOVATION, OR ASBESTOS ABATEMENT ACTIVITIES.

a. GEORGIA ENVIRONMENTAL PROTECTION DIVISION

ASBESTOS TECHNICAL ASSISTANCE DUTY OFFICER

404) 363-7026

5. MAINTAIN CURRENT LICENSES FOR CONTRACTOR AND ACCREDITATION FOR WORKERS

AND SUPERVISORS AS REQUIRED BY APPLICABLE STATE OR LOCAL JURISDICTIONS FOR

THE REMOVAL, TRANSPORTING, DISPOSAL, OR OTHER REGULATED ACTIVITY RELATIVE TO

THE WORK.

6. PROVIDE WORKERS WITH PERSONALLY ISSUED AND MARKED RESPIRATORY EQUIPMENT

APPROVED BY NIOSH AND MSHA AND SUITABLE FOR THE ASBESTOS EXPOSURE LEVEL IN

THE WORK AREAS ACCORDING TO OSHA STANDARD 29 CFR 1926.1101 AND OTHER

POSSIBLE CONTAMINANTS EMPLOYEES MIGHT BE EXPOSED TO DURING THE PROJECT.

7. PROVIDE RESPIRATORY PROTECTION FROM THE TIME THE FIRST OPERATION INVOLVED IN

THE PROJECT REQUIRES CONTACT WITH ASBESTOS-CONTAINING MATERIALS (INCLUDING

CONSTRUCTION OF DECONTAMINATION UNITS, CONSTRUCTION OF AIRTIGHT

BARRIERS/BARRICADES, AND PLACING OF PLASTIC SHEETING ON WALLS).

8. THE MINIMUM RESPIRATORY PROTECTION FOR THE PROJECT DURING GROSS REMOVAL

OF FRIABLE MATERIALS SHALL BE A HALF-FACE RESPIRATOR WITH REPLACEABLE HEPA

FILTERS, AS LONG AS PERTINENT NEGATIVE EXPOSURE ASSESSMENT CAN BE SUBMITTED

TO THE PROJECT DESIGNER. OTHERWISE, A POWERED AIR PURIFYING RESPIRATORY

(PAPR) MUST BE USED.

9. HALF-FACE RESPIRATORS WITH REPLACEABLE HEPA FILTERS CAN BE USED FOR

NON-FRIABLE REMOVAL.

10. FIT TESTING IS TO BE PERFORMED BY ONE OF THE METHODS LISTED IN THE 29 CFR

1926.1101, APPENDIX C.

11. DO NOT ALLOW THE USE OF SINGLE-USE, DISPOSABLE, OR QUARTER-FACE RESPIRATORS

FOR ANY PURPOSE.

HAZARDOUS MATERIALS GENERAL NOTES:

1. PROJECT INCLUDES HAZARDOUS MATERIALS. REFER TO DEMOLITION DRAWINGS

AND 02 83 33.13 LEAD-BASED PAINT REMOVAL AND HAZARDOUS MATERIALS

SURVEY, JULY 26, 2024, PROJECT MANUAL APPENDIX A FOR SPECIFIC

INFORMATION. COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL

REQUIREMENTS. IF DISCREPANCIES ARISE BETWEEN PLANS, SPECIFICATIONS,

REPORT, AND APPLICABLE REQUIREMENTS, THE MORE CONSERVATIVE AND

STRINGENT REQUIREMENTS SHALL GOVERN.

2. NOT LESS THAN 30 DAYS PRIOR TO MOBILIZATION, PROVIDE CONTRACTOR'S AND

SUBCONTRACTORS' PROOF OF INSURANCE DEMONSTRATING ASBESTOS AND

LEAD-BASED PAINT ABATEMENT LIABILITY INSURANCE AND LIMITS, INCLUDING

PROTECTION AGAINST THIRD-PARTY CLAIMS OF BODILY INJURY AND PROPERTY

DAMAGE FROM ABATEMENT RELATED TO BOTH WORK IN PROGRESS AND

COMPLETED PROJECTS. OBTAIN COR'S APPROVAL PRIOR TO COMMENCEMENT OF

WORK.

3. PROVIDE A LIST OF PROPOSED CONTRACTOR AND SUBCONTRACTOR PERSONNEL

WHO WILL BE INVOLVED WITH AND PERFORM THE WORK. INCLUDE COMPLETE

HAZARDOUS MATERIALS QUALIFICATIONS AND CREDENTIALS. OBTAIN COR'S

APPROVAL PRIOR TO COMMENCEMENT OF WORK.

4. ANY PROPOSED CHANGES TO THE APPROVED SUBCONTRACTORS AND ASSIGNED

PERSONNEL SHALL REQUIRE RESUBMISSION OF THE ABOVE NOT LESS THAN 15

DAYS PRIOR TO EACH SUCH PROPOSED CHANGE. ACCEPTANCE OF ANY SUCH

PROPOSED CHANGE SHALL BE SUBJECT TO COR'S APPROVAL.

5. PROVIDE WITH BID SUBMISSION THE FOLLOWING:

a. NARRATIVE PLAN OF HAZARDOUS MATERIALS WORK, SIGNED AND DATED BY

THE GENERAL CONTRACTOR'S PROJECT MANAGER AND AN OFFICER IN THE

COMPANY, WITNESSED BY A STATE-CERTIFIED NOTARY PUBLIC. INCLUDE

HOW CONTRACTOR WILL HANDLE EACH HAZARDOUS MATERIAL. INCLUDE A

WRITTEN ACKNOWLEDGEMENT THAT CONTRACTOR HAS REVIEWED THE

ENTIRETY OF THE CONTRACT DOCUMENTS, INCLUDING ALL ITEMS RELEVANT

AND POTENTIALLY RELEVANT TO HAZARDOUS MATERIALS, THAT PLAN AND

FEES INCLUDE ALL WORK REQUIRED UNDER THE CONTRACT DOCUMENTS,

WHETHER DIRECTLY OR INDIRECTLY BY REFERENCE SUCH AS NATIONALLY-

AND INDUSTRY- RECOGNIZED STANDARDS AND THE RULES, REGULATIONS,

AND LAWS OF LOCAL, STATE, AND FEDERAL AUTHORITIES HAVING

JURISDICTION.

b. DRAFT, PROJECT-SPECIFIC HEALTH AND SAFETY PLAN, INCLUDING

IDENTIFICATION AND CREDENTIALS OF THE COMPANY'S SAFETY

PROFESSIONAL(S) AND PROJECT SAFETY OFFICER ASSIGNED TO THIS PROJECT.

1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF

ASBESTOS-CONTAINING MATERIALS (ACM) AND LEAD-BASED PAINT (LBP) SUBJECT

TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED.

LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE

REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY

INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR

FIELD VERIFYING ALL MATERIAL LOCATIONS AND REMOVAL QUANTITIES, AND

EXISTING SITE CONDITIONS. NO CONTRACT MODIFICATIONS WILL BE

CONSIDERED FOR UNEXPECTED SITE CONDITIONS OR ABATEMENT

QUANTITIES. BY BIDDING THE PROJECT, THE ABATEMENT CONTRACTOR

ACKNOWLEDGES AND ACCEPTS ALL RISKS ASSOCIATED WITH SITE CONDITIONS

AND CONCEALED ACMS.

2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO RENOVATION OF THE

PROJECT AREAS. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH

APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED

ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE

ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT

IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK AND

CONTACT THE PROJECT MANAGER AND VPIH.

3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL,

STATE, AND LOCAL REGULATIONS; PROJECT SPECIFICATIONS, THE APPROVED

WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS

OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL

WORK SHALL BE CRAFTSMAN-LIKE AND SUBJECT TO INSPECTION BY THE OWNER,

THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.

4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO

ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS,

RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH

AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND

VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL

BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO

ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING

THE LIMITS OF DEMOLITION AND ABATEMENT WITH THE GENERAL

CONTRACTOR.

5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF

NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE

INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE

PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS

WORK.

HAZARDOUS MATERIALS - ASBESTOS REMOVAL:

1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE

ASBESTOS & LEAD PAINT SAMPLING REPORT BY CASTLE HILL ASSOCIATES,

REVISED JULY 26, 2024, FOR MORE INFORMATION ABOUT ACMS IDENTIFIED IN

THE PROJECT AREA.

2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS AND

CHASES AND ABOVE RIGID CEILINGS. COORDINATE ACCESS WITH DEMOLITION

DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY

DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS

PRESENT.

3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES

(NPE) WHERE APPLICABLE AND PERFORM REMOVAL IN ACCORDANCE WITH

APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 13-13, GLOVEBAG ASBESTOS

ABATEMENT; SEC 02 82 11, TRADITIONAL ASBESTOS ABATEMENT; SEC 02 82

13-19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT; 02 82 13-31

ASBESTOS TRANSITE AND CLASS II ABATEMENT. FINALIZE LIMITS OF

REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), (PDF),

PERSONAL DECONTAMINATION FACILITIES AND WASTE DECONTAMINATION

FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING

REQUIREMENTS.

4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR

ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER

THAN -0.02" WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO

MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE

NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL CONTRACTOR,

OWNER'S REPRESENTATIVE , AND VPIH, IF NEEDED.

5. TSI ABATEMENT FROM SECTIONS OF PIPE AND FITTINGS TO BE DEMOLISHED MAY

BE PERFORMED USING WRAP AND CUT METHODS IF APPROVED BY THE GENERAL

CONTACTOR. COORDINATE WITH MECHANICAL DEMOLITION DRAWINGS AND

THE MECHANICAL CONTRACTOR.

6. ALL WASTE LOADOUT SHALL OCCUR AFTER HOURS. COORDINATE LOADOUT

ROUTES AND TIMES WITH THE GENERAL CONTRACTOR, OWNER'S

REPRESENTATIVE, AND VPIH.

1. ASBESTOS: THE ASBESTOS CONTAINING MATERIALS THAT WILL BE IMPACTED BY

THE PLANNED RENOVATIONS MUST BE REMOVED AND DISPOSED BY A KENTUCKY

LICENSED ASBESTOS CONTRACTOR. MATERIALS THAT WILL NOT BE DISTURBED

CAN REMAIN IN-PLACE INDEFINITELY UNTIL REMOVAL IS REQUIRED PRIOR TO

DEMOLITION OR RENOVATIONS.

2. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL

CONTRACTOR, OFFICER, CONTRACTING OWNER OR OWNER'S REPRESENTATIVE,

AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH

PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME

AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS

SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY

OPERATIONS.

1. LEAD-BASED PAINT: THE IDENTIFIED LEAD PAINTED COMPONENTS CAN REMAIN

IN-PLACE INDEFINITELY AND DO NOT REQUIRE ABATEMENT IF THEY REMAIN

IN-PLACE. IF THE COMPONENTS ARE TO BE REMOVED, DISTURBED, OR REPAINTED

DURING THE RENOVATIONS, THEN PERSONAL AIR MONITORING FOR THE

WORKERS MUST BE CONDUCTED TO COMPLY WITH OSHA REQUIREMENTS FOR

LEAD EXPOSURE IN CONSTRUCTION TO ESTABLISH A NEGATIVE EXPOSURE

ASSESSMENT. ALL PAINT CHIP DEBRIS AND DUST MUST BE COLLECTED THEN

DISPOSED OF IN ACCORDANCE WITH KENTUCKY AND RCRA DISPOSAL STANDARDS.

2. LEAD-BASED PAINT (LBP) ARE PAINTS THAT CONTAIN LEAD ≥ 0.5 PERCENT BY

WEIGHT. PAINT CONTAINING LEAD (PCL) IS PAINT WITH A DETECTABLE LEVEL OF

LEAD. LBP AND PCL ARE KNOWN TO EXIST ON MATERIALS, COMPONENTS,

AND SURFACES THAT MAY BE DISTURBED, PENETRATED, REFINISHED, OR

DEMOLISHED. PERFORM DEMOLITION OF MATERIALS AND COMPONENTS

WITH LBP AND/OR PCL IN ACCORDANCE WITH APPLICABLE REGULATIONS AND

THE APPROVED WORK PLAN.

3. FLAKING AND PEELING LBP AND/OR PCL ON SURFACES TO REMAIN SHALL BE

REMOVED AND STABILIZED USING METHODS IN ACCORDANCE WITH SECTION 02

83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.

4. REFER TO THE ASBESTOS & LEAD PAINT SAMPLING REPORT BY CASTLE HILL

ASSOCIATES, REVISED JULY 26, 2024, FOR INFORMATION CONCERNING THE

PRESENCE OF LBP AND PCL IN THE PROJECT AREAS.

1. THE ASBESTOS CONTAINING MATERIAL SAMPLED AS CAMP NELSON NATIONAL

CEMETERY IS CATEGORY I NON-FRIABLE ACM THAT WILL BE OR HAS BEEN

SUBJECTED TO SANDING, GRINDING, CUTTING, OR ABRADING

Bid Set DateDateDate

JANUARY 7, 2026

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

PRIME CONSULTANT

AutoCAD SHX Text

CONSULTANTS

File details come from the government source that posted it. Updated .