S02 Submittal Register 523A5-10-316 Laundry Building 45.xlsx
XLSX spreadsheet 81 KB Posted
- Attached to
- Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45 Federal contract opportunity
- Solicitation number
- 36C24125R0008
About this file
The file is a Submittal Register for the VA Brockton, Massachusetts project (Project No. 523A5-10-316), detailing comprehensive documentation requirements for a laundry building renovation at VISN 1. The register covers multiple technical disciplines including architectural, structural, mechanical, electrical, plumbing, communication, and safety systems, with extensive submittal requirements across 28 specification sections ranging from general requirements to electronic safety and security systems.
Key submittal categories include shop drawings, product data, samples, certificates, test reports, and commissioning documentation for components such as concrete, masonry, structural steel, HVAC systems, electrical installations, fire detection and alarm systems, and communication infrastructure. The document mandates detailed pre-construction, construction, and post-construction submittals, with specific review and approval processes requiring contractor submissions to the architect/engineer and VA approving authority, ensuring rigorous documentation and quality control throughout the renovation project.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| VISN 1 Laundry B45 Renovation | SUBMITTAL REGISTER | NET - NO EXCEPTIONS TAKEN |
| MXN - MAKE EXCEPTIONS NOTED | ||
| Project No.: 523A5-10-316 | RAR - REVISE AND RESUBMIT | |
| VA Brockton, Massachusetts | THIS LIST DOES NOT RELEIVE THE CONTRACTOR FROM SUBMITTAL REQUIREMENTS FOUND IN INDIVIDUAL SPECIFICATION SECTIONS NOT LISTED HERE. | REJ - REJECTED |
| TMM Project N0. 2224 | APP - APPROVED BY VA | |
| CONTRACTOR TRANSMIT. NUMBER |
Dan McTier: Dan McTier:
| TMM LOG NO. | SPECIFICATION SECTION NUMBER | SPECIFICATION PARAGRAPH NUMBER | SUBMITTAL DESCRIPTION | TYPE OF SUBMITTAL | CLASSIFICATION | REVIEW BY A/E | REVIEW BY APPROVING AUTHORITY - VA | REMARKS | |||||||||||||||||
| DATA | DRAWINGS | INSTRUCTIONS | SCHEDULES | STATEMENTS | REPORTS | CERTIFICATES | SAMPLES | RECORDS | COLOR CHART | CALCULATIONS | O&M MANUALS | INFORMATION ONLY | GOVERNMENT APPROVAL REQ'D. | DATE RECEIVED BY A/E | ACTION: A/E REVIEWER | ACTION DATE BY A/E | DATE RETURNED TO VA BY A/E | VA ACTION | ACTION DATE BY VA | DATE RETURNED TO GC BY VA | |||||
| 01 00 00 | GENERAL REQUIREMENTS | ||||||||||||||||||||||||
| per VA | Confined Space Program | X | X | X | |||||||||||||||||||||
| 1.5.A | SECURITY PLAN | X | X | X | |||||||||||||||||||||
| per VA | OSHA TRAINING RECORDS | X | X | X | X | ||||||||||||||||||||
| per VA | OSHA "COMPETENT PERSON" | X | X | ||||||||||||||||||||||
| per VA | ABATEMENT | X | X | X | |||||||||||||||||||||
| per VA | CHANGE OF WORK HOURS NOTIFICATION | X | X | ||||||||||||||||||||||
| ELECTRONIC SECURITY MEMORANDUM | X | X | X | ||||||||||||||||||||||
| 1.5.E.1 | VEHICLE AUTHORIZATION REQUEST | X | X | ||||||||||||||||||||||
| per VA | FIRE SAFETY PLAN; DOCUMENTATION OF PERSONNEL TRAINING | X | X | X | X | X | |||||||||||||||||||
| per VA | EGRESS ROUTES REPORT | X | X | ||||||||||||||||||||||
| 1.6.K.4 | SERVICE INTERRUPTIONS REQUEST | X | X | X | |||||||||||||||||||||
| per VA | FIRE HAZARD PREVENTION & SAFETY INSPECTIONS | X | X | ||||||||||||||||||||||
| per VA | DUST CONTROL PLAN | X | X | X | |||||||||||||||||||||
| per VA | WORK PHASING SCHEDULE & PLAN | X | X | X | |||||||||||||||||||||
| per VA | SURVEY OF EXISTING CONDITIONS AFFECTED BY NEW WORK | X | X | X | |||||||||||||||||||||
| per VA | 30 DAY RESURVEY OF EXISTING CONDITIONS AFFECTED BY NEW WORK | X | X | X | |||||||||||||||||||||
| 1.11 | AS BUILT DRAWINGS AT EACH PHASE | X | X | ||||||||||||||||||||||
| per VA | MAINTENANCE / OPERATING MANUALS | X | X | ||||||||||||||||||||||
| per VA | CRITICAL PATH SCHEDULES | X | X | ||||||||||||||||||||||
| 01 32 16.15 | PROJECT SCHEDULES | ||||||||||||||||||||||||
| 1.3 | CONTRACTOR QUALIFICATION PROPOSAL | X | X | ||||||||||||||||||||||
| 1.5 | COMPLETE PROJECT SCHEDULE | X | X | X | |||||||||||||||||||||
| 1.12 | CPM REVISIONS | X | X | X | |||||||||||||||||||||
| 1.8 | CERTIFICATE FOR PAYMENT | X | X | ||||||||||||||||||||||
| 1.4 | COMPUTER PRODUCED SCHEDULE | X | X | ||||||||||||||||||||||
| 01 33 23 | SHOP DRAWINGS, PRODUCT DATA AND SAMPLES | INSTRUCTIONS, NO SUBMITTALS REQUIRED | |||||||||||||||||||||||
| 01 35 26 | SAFETY REQUIREMENTS | ||||||||||||||||||||||||
| 1.4 | ACCIDENT PREVENTION PLAN | X | X | X | |||||||||||||||||||||
| 1.15.D | ACTIVITY HAZARD ANALYSES (AHAS) | X | X | X | |||||||||||||||||||||
| 1.8E | OSHA TRAINING RECORDS | X | X | X | X | ||||||||||||||||||||
| 1.9B | SAFETY INSPECTIONS | X | X | X | |||||||||||||||||||||
| 1.14 | FIRE SAFETY PLAN | X | X | X | |||||||||||||||||||||
| 01 42 19 | REFERENCE STANDARDS | NO SUBMITTALS REQUIRED | |||||||||||||||||||||||
| 01 45 29 | TESTING LABORATORY SERVICES | ||||||||||||||||||||||||
| INSPECTION & TESTING SERVICES | X | X | X | ||||||||||||||||||||||
| 01 45 35 | SPECIAL INSPECTIONS | ||||||||||||||||||||||||
| STRUCTURAL OBSERVATIONS | X | X | X | ||||||||||||||||||||||
| 01 57 19 | TEMPORARY ENVIRONMENTAL CONTROLS | ||||||||||||||||||||||||
| ENVIRONMENTAL PROTECTION PLAN | X | X | X | X | |||||||||||||||||||||
| 01 74 19 | CONSTRUCTION WASTE MANAGEMENT | ||||||||||||||||||||||||
| 1.5B | DEBRIS MANAGEMENT PLAN | X | X | X | X | ||||||||||||||||||||
| 3.3 | SUMMARY OF DEBRIS MANAGEMENT & DISPOSAL | X | X | ||||||||||||||||||||||
| 01 81 13 | SUSTAINABLE CONSTRUCTION REQUIREMENTS | ||||||||||||||||||||||||
| 1.6 | SUSTAINABLE CONSTRUCTION REQUIREMENTS | X | X | X | |||||||||||||||||||||
| 1.5.H.1 | PROJECT MATERIALS COST DATA | X | X | ||||||||||||||||||||||
| 3.1.A | CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT PLAN | X | X | X | |||||||||||||||||||||
| 1.5.B | SUSTAINABLE ACTION PLAN | X | X | X | |||||||||||||||||||||
| 01 91 00 | GENERAL COMMISSIONING REQUIREMENTS | ||||||||||||||||||||||||
| 1.13.A | PRELIMINARY COMMISSIONING PLAN | X | X | X | X | ||||||||||||||||||||
| 1.12.H | FINAL COMMISSIONING PLAN | X | X | X | X | ||||||||||||||||||||
| 1.12.I | COMMISSIONING DOCUMENTATION | X | X | X | X | X | |||||||||||||||||||
| 3.2.A.1 | PRE-FUNCTIONAL CHECKLISTS | X | X | ||||||||||||||||||||||
| 1.12.D | TEST & INSPECTION REPORTS | X | X | ||||||||||||||||||||||
| 1.12.B | SYSTEMS FUNCTIONAL TEST PROCEDURE | X | X | ||||||||||||||||||||||
| 1.12.E | CORRECTIVE ACTION DOCUMENTS | X | X | ||||||||||||||||||||||
| 3.3.B | DATA FOR COMMISSIONING | X | X | ||||||||||||||||||||||
| 3.31.A | LIST OF DEFICIENCIES IN INITIAL STARTUP AND PRE-FUNCTIONAL CHECKLIST | X | X |
| 03 30 00 | CAST IN PLACE CONCRETE | |||||||
| Pre Construction Submittals | ||||||||
| 1.6 | Reinforcing Steel | X | X | X | ||||
| 1.6 | Rebar | X | X | X | ||||
| 1.6 | Concrete Mix Design | X | X | |||||
| 2.4 | Batching and Mixing | X | X | X | ||||
| 3.1 | Formwork | X | X | |||||
| 3.2 | Placing Reinforcement | X | X | X | ||||
| 3.3 | Vapor Barrier | X | X | X | ||||
| 3.4 | Construction Joints | X | X | |||||
| 3.5 | Exspansion Joints and Constraction Joints | X | X | X | ||||
| 3.6 | Testing Labatory Services | X | X | X | X | |||
| 3.9 | Protection And Curing | X | X | X | ||||
| 3.10 | Removal of Forms | X | X | X | ||||
| 3.10 | Control Test | X | X | X | X |
| 04 05 13 | MASONRY MORTARING | |||||||
| 1.2 | Mortar Color | X | X | x | x | x | X | |
| 2.1 | Admixtures | X | X | x | x | x | X | |
| 04 20 00 | UNIT MASONRY | |||||||
| 1.3 | Special Masonry Shapes | X | X | X | ||||
| Product Data | ||||||||
| 2.1 | Face Brick, Modular Size | X | X | |||||
| 2.1 | Building Brick | X | X | |||||
| Samples | ||||||||
| 2.1 | Face Brick | X | X | X | ||||
| 2.2 | Anchors, and Ties | X | X | X | ||||
| Certificates | ||||||||
| 1.3 | Facebrick | X | X | X |
| 05 12 00 | STRUCTURAL STEEL FRAMING | ||||||||
| 2.1 | Structural Steel | X | X | ||||||
| 2.1 | Steel for all Connections | X | X | ||||||
| 2.1 | Welding Material | X | X | ||||||
| 2.1 | Shop Coat Primer Paint | X | X | ||||||
| Product Data | |||||||||
| 2.1 | Structural Steel | X | X | ||||||
| 2.1 | Structural Tubing | X | X | ||||||
| 2.1 | Steel Pipe | X | X | ||||||
| 2.1 | Angles, Plates, Bars | X | X | ||||||
| 2.1 | Bolts, Nuts & Washers | X | X | ||||||
| 2.1 | Zinc Coating | X | X | ||||||
| 2.1 | Galvanizing Repair Paint | X | X | ||||||
| Test Reports | |||||||||
| 3.1 | Welders Qualifying Tests | X | X | ||||||
| Certificates | |||||||||
| 2.1 | Structural Steel | X | X | ||||||
| 3.1 | Steel for all Connections | X | X | ||||||
| 2.1 | Welding Material | X | X | ||||||
| 3.3 | Shop Coat Primer Paint | X | X | ||||||
| 05 31 00 | STEEL DECKING | ||||||||
| 3.1 | Shop & Erection Drawings | X | X | ||||||
| 2.1 | Steel Decking | X | X | X | X | ||||
| 05 50 00 | METAL FABRICATIONS | ||||||||
| 1.3 | Metal Fabrication | X | X | ||||||
| 2.2 | Structural Steel | X | X | ||||||
| 2.3 | Rough Hardware | X | X | ||||||
| 2.3 | Fasteners / Anchor Bolts | X | X | X | |||||
| 2.3 | Fasteners / Anchor Bolts | X | X | X | |||||
| 2.1 | Live Load Designs | X | X | X | |||||
| 1.3 | Anodized Finish | X | X | X | |||||
| 1.3 | Live Load Designs | X | X | ||||||
| 05 51 00 | METAL STAIRS | ||||||||
| 1.3 | Metal Stairs | X | X | X | X |
06 10 00 ROUGH CARPENTRY X X X X
| 07 21 13 | THERMAL INSULATION | X | X | X | X | |||
| 07 27 26 | FLUID APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE | X | X | X | X | X | X | |
| 07 84 00 | FIRESTOPPING | X | X | X | X | |||
| 07 92 00 | JOINT SEALANTS | X | X | X | X |
| 08 11 13 | HOLLOW METAL DOORS AND FRAMES | X | X | |||||||
| 08 31 13 | ACCESS DOORS AND FRAMES | X | X | X | X | |||||
| 08 71 00 | DOOR HARDWARE | X | X | X | X | X | X | X | X | |
| 08 80 00 | GLAZING | X | X | X | X | |||||
| 08 90 00 | LOUVERS AND VENTS | X | X | X |
| 09 05 16 | SUBSURFACE PREPARATION FLOOR FINISHES | X | X | X | X | ||
| 09 22 16 | NON-STRUCTURAL METAL FRAMING | X | X | X | X | ||
| 09 29 00 | GYPSUM BOARD | X | X | X | X | X | |
| 09 51 00 | ACOUSTICAL CEILINGS | X | X | X | X | ||
| 09 65 13 | RESILIENT BASE AND ACCESSORIES | X | X | X | |||
| 09 91 00 | PAINTING | X | X | X | X | X |
| 10 14 00 | SIGNAGE | X | X | X | X | ||
| 10 26 00 | WALL AND DOOR PROTECTION | X | X | X | X | X | |
| 10 44 13 | FIRE EXTINQUISHER CABINETS | X | X | X |
| 21 13 13 | WET-PIPE SPRINKLER SYSTEMS | ||||||||||
| Shop Drawings | X | X | |||||||||
| UTILITIES | X | X | X | ||||||||
| UTILITIES | X | X | X | ||||||||
| Hydrant Flow Test | X | X | X | ||||||||
| Hydraulic Calculations | X | X | X | X | X | ||||||
| As-Built Drawings | X | X | |||||||||
| O&M Manual | X | X | X | ||||||||
| Designers Qualifications | X | X | |||||||||
| Installers Qualifications | X | X | |||||||||
| Testing | X | X |
| 22 05 11 | COMMON WORK RESULTS FOR PLUMBING | ||||||||||
| COMMON WORK | X | X | X | X | X | X | X | ||||
| 22 05 12 | GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT | ||||||||||
| GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT | X | X | X | X | X | ||||||
| MOTORS | X | X | X | ||||||||
| 22 05 19 | METERS AND GAGES FOR PLUMBING PIPING | ||||||||||
| METERS AND GAGES FOR PLUMBING PIPING | X | X | X | X | X | ||||||
| PRESSURE GAUGES | X | X | X | ||||||||
| THERMOMETERS | X | X | X | ||||||||
| 22 05 23 | GENERAL DUTY VALVES FOR PLUMBING PIPING | ||||||||||
| TEST AND BALANCE | X | X | |||||||||
| SHUT-OFF VALVES | X | X | X | ||||||||
| BALANCING VALVES | X | X | X | ||||||||
| CHECK VALVES | X | X | X | ||||||||
| BACKFLOW PREVENTORS | X | X | X | ||||||||
| THERMOSTATIC MIXING VALVES | X | X | X | ||||||||
| LABELING AND INDENTIFYING | X | X | |||||||||
| 22 07 11 | PLUMBING INSULATION | ||||||||||
| PLUMBING INSULATION | X | X | X | X | |||||||
| MINERAL FIBER | X | X | |||||||||
| FLEXIBLE ELASTOMERIC CELLULAR THERMAL | X | X | |||||||||
| INSULATION FACING AND JACKETS | X | X | |||||||||
| PIPE COVERING PROTECTION SADDLES | X | X | |||||||||
| ADHESIVE, MASTIC, CEMENT | X | X | |||||||||
| FIRE STOPPING | X | X | |||||||||
| 22 08 00 | COMMISSIONING OF PLUMBING SYSTEMS | ||||||||||
| PRE-FUNCTIONAL CHECKLISTS | X | X | |||||||||
| CONTRACTORS TESTS | X | X | |||||||||
| SYSTEMS FUNCTIONAL PERFORMANCE TESTING | X | X | |||||||||
| TRAINING OF VA PERSONNEL | X | X | X | ||||||||
| 22 11 00 | FACILITY WATER DISTRIBUTION | ||||||||||
| TESTING | X | X | X | X | X | ||||||
| FACILITY WATER DISTRIBUTION | X | X | X | X | X | X | |||||
| DUCTILE IRON | X | X | |||||||||
| COPER TUBEING, TYPE K | X | X | |||||||||
| BRASING ALLOYS | X | X | |||||||||
| EXPANSION JOINT | X | X | |||||||||
| COPER TUBEING, TYPE L | X | X | |||||||||
| FITTINGS | X | X | |||||||||
| ADAPTORS | X | X | |||||||||
| SOLDER | X | X | |||||||||
| TRAP PRIMER WATER PIPING | X | ||||||||||
| STRAINER | X | X | |||||||||
| DIELECTRIC FITTING | X | X | |||||||||
| WATER HAMMER ARRESTER | X | X | |||||||||
| PIPE HANGERS, SUPPORTS ACCESSORIES | X | X | |||||||||
| FIRE STOPPING | X | X | |||||||||
| WATER PROOFING | X | X | |||||||||
| TESTING | X | X | X | X | X | ||||||
| 22 11 23 | DOMESTIC WATER PUMPS | ||||||||||
| DOMESTIC WATER PUMPS | X | X | X | X | X | X | X | X | |||
| RECIRCULATION PUMPS | X | X | |||||||||
| MOTORS | X | X | |||||||||
| STARTUP AND TESTING | X | X | X | X | X | ||||||
| 22 13 00 | FACILITY SANITARY AND VENT PIPING | ||||||||||
| FACILITY SANITARY AND VENT PIPING | X | X | X | X | |||||||
| GREASE REMOVAL UNIT | X | X | X | ||||||||
| GREASE REMOVAL UNIT RESUBMITTAL | X | X | X | ||||||||
| PIPE FITTINGS | X | X | |||||||||
| CLAMPS | X | ||||||||||
| CAST RION PIPING | X | X | |||||||||
| SPECIALTY PIPE FITTINGS | X | X | |||||||||
| CLEANOUTS | X | X | |||||||||
| FLOOR DRAINS | X | X | |||||||||
| TRAPS | X | X | |||||||||
| PENETRATION SLEEVES | X | X | |||||||||
| PIPE HANGERS, SUPPORTS ACCESSORIES | X | X | |||||||||
| TEST | X | X | X | X | X | ||||||
| 22 14 00 | FACILITY STORM DRAINAGE | ||||||||||
| STORM WATER DRAIN PIPING | X | X | X | X | X | X | |||||
| CAST IRON PIPING | X | X | |||||||||
| SPECIALTY PIPE FITTINGS | X | X | |||||||||
| CLEANOUTS | X | X | |||||||||
| ROOF DRAINS | X | X | |||||||||
| WATERPROOFING | X | X | |||||||||
| PIPE HANGERS, SUPPORTS ACCESSORIES | X | X | |||||||||
| TEST | X | X | X | X | X | ||||||
| COMMISSIONING | X | X | X | ||||||||
| 22 15 00 | GENERAL SERVICE COMPRESSED-AIR SYSTEMS | ||||||||||
| SUBMITTALS | X | X | X | X | X | ||||||
| 22 35 00 | DOMESTIC WATER HEAT EXCHANGERS | ||||||||||
| HEATER EXCHANGERS | X | X | |||||||||
| THERMOMETERS | X | X | |||||||||
| SAFETY VALVES | X | X | |||||||||
| HEAT TRAPS | X | X | |||||||||
| PRESSURE GAUGES | X | X | |||||||||
| THERMOMETERS | X | X | |||||||||
| COMMISSIONING | X | X | |||||||||
| 22 40 00 | PLUMBING FIXTURES | ||||||||||
| SUBMITTALS | X | X | X | X |
| ` | 23 05 11 | COMMON WORK RESULTS FOR HVAC | |||||||||
| X | X | ||||||||||
| 23 05 12 | GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT | ||||||||||
| X | |||||||||||
| 23 05 41 | NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT | ||||||||||
| UTILITIES | X | X | X | ||||||||
| VIBRATION ISOLATORS | X | X | X | X | |||||||
| 23 05 93 | TESTING, ADJUSTING AND BALANCING FOR HVAC | ||||||||||
| TAB REPORT | X | X | X | ||||||||
| DUCT AIR LEAKAGE REPORT | X | X | |||||||||
| VIBRATION TESTING | X | X | |||||||||
| 23 07 11 | HVAC AND BOILER PLANT INSULATION | ||||||||||
| PIPE INSULATION | X | X | X | ||||||||
| DUCT INSULATION | X | X | X | ||||||||
| GREASE DUCT WRAP | X | X | X | ||||||||
| INSULATION JACKETS | X | X | X | ||||||||
| ADHESIVES | X | X | X | ||||||||
| 23 08 00 | COMMISSIONING OF HVAC SYSTEMS | ||||||||||
| PRE-FUNCTIONAL CHECKLISTS | X | X | |||||||||
| CONTRACTORS TESTS | X | X | |||||||||
| SYSTEMS FUNCTIONAL PERFORMANCE TESTING | X | X | |||||||||
| TRAINING OF VA PERSONNEL | X | X | X | ||||||||
| 23 09 23 | DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC | ||||||||||
| DDC CONTROL DEVICES | X | X | X | ||||||||
| 23 09 24 | CONTINUOUS WATER QUALITY MONITORING AND INSTRUMENTATION | ||||||||||
| SUBMITTALS | X | X | X | X | X | X | |||||
| 23 21 23 | HYDRONIC PUMPS | ||||||||||
| CENTRIFUGAL PUMPS | X | X | |||||||||
| DRAIN PIPE | X | X | |||||||||
| 23 22 13 | STEAM AND CONDENSATE HEATING PIPING | ||||||||||
| PIPES AND TUBING | X | X | |||||||||
| VALVES | X | X | |||||||||
| 23 22 23 | STEAM CONDENSATE PUMPS | ||||||||||
| PUMPS | X | X | X | ||||||||
| 23 23 00 | REFRIGERANT PIPING | ||||||||||
| REFRIGERANT PIPING | X | X | |||||||||
| 23 25 00 | HVAC WATER TREATMENT | ||||||||||
| CLEANING COMPOUNDS | X | X | X | ||||||||
| CHEMICAL TREATMENT | X | X | X | ||||||||
| 23 31 00 | HVAC DUCTS AND CASINGS | ||||||||||
| GALVANIZED DUCT | X | X | |||||||||
| KITCHEN HOOD DUCT | X | X | |||||||||
| FLEX DUCT | X | X | |||||||||
| 23 34 00 | HVAC FANS | ||||||||||
| EXHAUST FANS | X | X | X | ||||||||
| 23 37 00 | AIR OUTLETS AND INLETS | ||||||||||
| GRILLES, REGISTERS, AND DIFFUSERS | X | X | |||||||||
| 23 73 00 | INDOOR CENTRAL-STATION AIR-HANDLING UNITS | ||||||||||
| AIR HANDLING UNITS | X | X | X | X | |||||||
| 23 81 43 | AIR-SOURCE UNITARY HEAT PUMPS | ||||||||||
| HEAT PUMPS | X | X | X | X | |||||||
| 23 82 16 | AIR COILS | ||||||||||
| HEATING AND COOLING | X | X | X | X | X | X | |||||
| TESTING | X | X |
| 26 05 11 | REQUIREMENTS FOR ELECTRICAL INSTALLATIONS | ||||||||
| X | X | X | X | ||||||
| 26 05 19 | LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES | ||||||||
| X | X | X | X | ||||||
| 26 05 26 | GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS | ||||||||
| CONDUCTORS | X | X | |||||||
| GROUND RODS | X | X | |||||||
| GROUND BARS | X | X | |||||||
| GROUND TERMINALS BLOCKS | X | X | |||||||
| GROUNDING BUS BAR | X | X | |||||||
| ACCEPTANCE TEST | X | X | |||||||
| 26 05 33 | RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS | ||||||||
| SIZE AND LOCATION OF FEEDERS | X | X | X | ||||||
| SIZE AND LOCATION OF PANELS AND PULL BOXES | X | X | X | ||||||
| LAYOUT OF CONDUIT PENETRATIONS | X | X | X | ||||||
| CONDUIT AND FITTINGS | X | X | X | ||||||
| CONDUIT AND FITTINGS | X | X | X | ||||||
| CONDUIT SUPPORTS | X | X | X | ||||||
| 26 05 41 | UNDERGROUND ELECTRICAL CONSTRUCTION | ||||||||
| PULLBOXES | X | X | X | ||||||
| 26 05 73 | OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY | ||||||||
| SOFTWARE | X | X | |||||||
| SHORT CIRCUIT STUDY | X | X | X | X | |||||
| COORDINATION STUDY | X | X | X | X | |||||
| DEVICE SETTINGS | X | X | |||||||
| 26 08 00 | COMMISSIONING OF ELECTRICAL SYSTEMS | ||||||||
| X | |||||||||
| 26 22 00 | LOW-VOLTAGE TRANSFORMERS | ||||||||
| LOW-VOLTAGE TRANSFORMERS | X | X | X | X | X | X | |||
| ACCEPTANCE CHECKS / TESTS | X | X | X | ||||||
| 26 24 16 | PANELBOARDS | ||||||||
| PANELBOARDS | X | X | X | X | |||||
| ENCLOSURES AND TRIMS | X | X | X | X | |||||
| MOLDED CASE CIRCUIT BREAKERS | X | X | X | X | |||||
| 26 27 26 | WIRING DEVICES | ||||||||
| RECEPTACLES | X | X | X | X | |||||
| TOGGLE SWITCHES | X | X | X | X | |||||
| MANUAL DIMMING CONTROL | X | X | X | X | |||||
| WALL PLATES | X | X | X | X | |||||
| 26 29 11 | MOTOR CONTROLLERS | ||||||||
| MOTOR CONTROLLERS | X | X | X | X | X | X | |||
| MANUAL MOTOR CONTROLLERS | X | X | X | X | X | X | |||
| MAGNETIC MOTOR CONTROLLERS | X | X | X | X | X | X | |||
| 26 32 13 | ENGINE GENERATORS | ||||||||
| FACTORY TESTS | X | X | X | ||||||
| ENGINE | X | X | X | X | X | ||||
| GOVERNOR | X | X | X | X | X | ||||
| LUBRICATION OIL SYSTEM | X | X | X | X | X | ||||
| FUEL SYSTEM | X | X | X | X | X | ||||
| COOLING SYSTEM | X | X | X | X | X | ||||
| AIR INTAKE AND EXHAUST SYSTEMS | X | X | X | X | X | ||||
| ENGINE STARTING SYSTEM | X | X | X | X | X | ||||
| JACKET COOLANT HEATER | X | X | X | X | X | ||||
| GENERATOR | X | X | X | X | X | ||||
| GENERATOR OVERCURRENT AND FAULT PROTECTION | X | X | X | X | X | ||||
| CONTROLS | X | X | X | X | X | ||||
| SOUND-ATTENUATED ENCLOSURE | X | X | X | X | X | ||||
| SPARE PARTS | X | X | X | X | |||||
| ACCEPTANCE CHECKS AND TESTS | X | X | X | ||||||
| INSTRUCTIONS AND FINAL INSPECTIONS | X | X | X | X | |||||
| 26 36 23 | AUTOMATIC TRANSFER SWITCHES | ||||||||
| FACTORY TESTS | X | X | X | ||||||
| AUTOMATIC TRANSFER SWITCHES | X | X | X | X | X | ||||
| SEQUENCE OF OPERATION | X | X | X | X | |||||
| BYPASS-ISOLATION SWITCH | X | X | X | X | |||||
| ACCEPTANCE CHECKS AND TESTS | X | X | X | ||||||
| 26 43 13 | SURGE PROTECTIVE DEVICE | ||||||||
| SWITCHGEAR/SWITCHBOARD TVSS | X | X | X | X | X | ||||
| 26 51 00 | INTERIOR LIGHTING | ||||||||
| LIGHTING FIXTURES | X | X | X | ||||||
| BALLASTS | X | X | X | ||||||
| LAMPS | X | X | X | ||||||
| LED EXIT LIGHT FIXTURES | X | X | X | ||||||
| LED LIGHT FIXTURES | X | X | X | ||||||
| ACCEPTANCE CHECKS AND TESTS | X | X | X | ||||||
| 26 56 00 | EXTERIOR LIGHTING | ||||||||
| POLES | X | X | X | ||||||
| FOUNDATIONS FOR POLES | X | X | X | ||||||
| LUMINAIRES | X | X | X | ||||||
| LAMPS | X | X | X | ||||||
| LED DRIVERS | X | X | X | ||||||
| ACCEPTANCE CHECKS AND TESTS | X | X | X |
| 27 05 11 | REQUIREMENTS FOR COMMUNICATION INSTALLATIONS | ||||||||
| 1.1 | TELCOM PULLBOX | X | X | ||||||
| 27 05 26 | GROUNDING AND BONDING FOR COMMUNICATION SYSTEMS | ||||||||
| GROUNDING AND BONDING CONDUCTORS | X | X | |||||||
| SPLICES AND TERMINATION COMPONENTS | X | X | |||||||
| TELECOMMUNICATION SYSTEM GROUND BUSBARS | X | X | |||||||
| EQUIPMENT RACK AND CABINET GROUND BARS | X | X | |||||||
| GROUND TERMINAL BLOCKS | X | X | |||||||
| SPLICE CASE GROUND ACCESSORIES | X | X | |||||||
| GROUND RESISTANCE | X | X | X | ||||||
| 27 05 33 | RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS | ||||||||
| CONDUIT | X | X | X | ||||||
| FITTINGS | X | X | |||||||
| HANGERS | X | X | |||||||
| BOXES | X | X | X | ||||||
| 27 08 00 | COMMISSIONING OF COMMUNICATION SYSTEMS | ||||||||
| PRE-FUNCTIONAL CHECKLISTS | X | X | |||||||
| CONTRACTORS TESTS | X | X | |||||||
| SYSTEMS FUNCTIONAL PERFORMANCE TESTING | X | X | |||||||
| TRAINING OF VA PERSONNEL | X | X | X | ||||||
| 27 10 00 | COMMUNICATIONS EQUIPMENT ROOM FITTINGS | ||||||||
| CONTROL WIRING | X | X | X | ||||||
| COMMUNICATIONS / SIGNAL WIRING | X | X | |||||||
| INSTALLATION / AC POWER | X | X | X | ||||||
| CLOSEOUT SUBMITTAL | X | X | X | X | |||||
| 27 11 00 | COMMUNICATIONS EQUIPMENT ROOM FITTINGS | ||||||||
| AUTHORIZED DISTRIBUTOR AND SERVICE ORGANIZATION | X | X | X | ||||||
| INSTALLER OEM CERTIFICATION | X | X | X | ||||||
| SUBMITTALS | X | X | X | X | X | X | |||
| EQUIPMENT AND MATERIALS | X | X | X | X | |||||
| EQUIPMENT ITEMS | X | X | X | ||||||
| ENVIRONMENTAL REQUIREMENTS | X | X | X | ||||||
| INSTALLATION KIT | X | X | X | ||||||
| TESTS | X | X | X | ||||||
| TRAINING | X | X | X | ||||||
| GUARANTEE PERIOD OF SERVICE | X | X | X | ||||||
| 27 15 00 | COMMUNICATIONS HORIZONTAL CABLING | ||||||||
| AUTHORIZED DISTRIBUTOR AND SERVICE ORGANIZATION | X | X | X | ||||||
| INSTALLER OEM CERTIFICATION | X | X | X | ||||||
| SUBMITTALS | X | X | X | X | X | X | |||
| EQUIPMENT AND MATERIALS | X | X | X | X | |||||
| DISTRIBUTION EQUIPMENT AND SYSTEMS | X | X | X | ||||||
| TESTS | X | X | X | ||||||
| WARRANTY | X | X | X |
| 28 05 00 | COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY | ||||||||||
| SUBMITTALS | X | X | X | X | X | X | X | X | |||
| 28 05 13 | CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY | ||||||||||
| SUBMITTALS | X | X | X | X | X | X | X | X | |||
| CABLE SUPPORT | X | X | X | ||||||||
| CABLE TRAYS | X | X | X | X | |||||||
| CONDUIT AND BOXES | X | X | X | ||||||||
| UTP CABLE | X | X | X | ||||||||
| UTP CABLE HARDWARE | X | X | X | ||||||||
| COAXIAL CABLE | X | X | X | ||||||||
| COAXIAL CABLE HARDWARE | X | X | X | ||||||||
| RS-232 CABLE | X | X | X | ||||||||
| RS-485 CABLE | X | X | X | ||||||||
| LOW-VOLTAGE CONTROL CABLE | X | X | X | ||||||||
| CONTROL-CIRCUIT CONDUCTORS | X | X | X | ||||||||
| FIRE ALARM WIRE AND CABLE | X | X | X | ||||||||
| IDENTIFICATION PRODUCTS | X | X | X | ||||||||
| SOURCE QUALITY CONTROL | X | X | X | X | |||||||
| WIRE LUBRICATING COMPOUND | X | X | X | ||||||||
| FIREPROOFING TAPE | X | X | X | ||||||||
| FIELD QUALITY CONTROL | X | X | X | X | |||||||
| 28 05 26 | GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY | ||||||||||
| CONDUCTORS | X | X | X | ||||||||
| GROUNDING | X | X | X | ||||||||
| 28 05 28.33 | CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY | ||||||||||
| SUBMITTALS | X | X | X | X | |||||||
| CONDUIT | X | X | |||||||||
| PENETRATIONS | X | X | |||||||||
| 28 08 00 | COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS | ||||||||||
| SUBMITTALS | X | X | X | X | X | ||||||
| PRE-FUNCTIONAL CHECKLISTS | X | X | X | ||||||||
| CONTRACTORS TESTS | X | X | X | ||||||||
| SYSTEMS FUNCTIONAL PERFORMANCE TESTING | X | X | X | ||||||||
| TRAINING OF VA PERSONNEL | X | X | X | X | |||||||
| 28 13 00 | PHYSICAL ACCESS CONTROL SYSTEM | ||||||||||
| SUBMITTALS | X | X | X | X | X | X | X | X | |||
| SOFTWARE | X | X | X | ||||||||
| 28 23 00 | VIDEO SURVEILLANCE | ||||||||||
| SUBMITTALS | X | X | X | X | X | X | X | X | |||
| CAMERAS | X | X | X | ||||||||
| 28 31 00 | FIRE DETECTION AND ALARM | ||||||||||
| SUBMITTALS | X | X | X | X | X | X | X | X | |||
| WARRANTY | X | X | X | ||||||||
| GUARANTY PERIOD SERVICES | X | X | X | ||||||||
| CONDUIT, BOXES, AND WIRE | X | X | X | ||||||||
| FIRE ALARM CONTROL UNIT | X | X | X | X | |||||||
| STANDBY POWER SUPPLY | X | X | X | X | |||||||
| ANNUNCIATION | X | X | X | X | |||||||
| ALARM NOTIFICATION APPLIANCES | X | X | X | X | |||||||
| ALARM INITIATING DEVICES | X | X | X | X | |||||||
| SUPERVISORY DEVICES | X | X | X | X | |||||||
| ADDRESS REPORTING INTERFACE DEVICE | X | X | X | X | |||||||
| SMOKE BARRIER DOOR CONTROL | X | X | X | X | |||||||
| UTILITY LOCKS AND KEYS | X | X | X | ||||||||
| SPARE AND REPLACEMENT PARTS | X | X | X | ||||||||
| INSTRUCTION CHART | X | X | X | ||||||||
| TESTS | X | X | X | X | |||||||
| FINAL INSPECTION AND ACCEPTANCE | X | X | X | X | |||||||
| INSTRUCTION | X | X | X |
&"Courier New,Regular"&10Page &P of &N
Sheet1
Sheet2
File details come from the government source that posted it. Updated .