S06 Updated Drawings Mechanical Rev2.pdf
PDF 2 MB Posted
- Attached to
- Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45 Federal contract opportunity
- Solicitation number
- 36C24125R0008
About this file
These are mechanical engineering drawings for the upgrade of the Laundry Building 45 at the Brockton VA Campus, prepared by ClarkNexsen and dated July 14, 2025. The comprehensive set of 10 technical drawings includes mechanical HVAC demolition plans for the basement, first floor, and roof, mechanical HVAC plans for each floor, mechanical piping plans, equipment schedules, and a laundry airflow diagram. The drawings detail the replacement and modification of existing mechanical systems, including variable refrigerant flow systems, ventilation ductwork, exhaust systems, heating equipment, and associated components. Key mechanical equipment includes multiple indoor and outdoor heat recovery units, heat pumps, energy recovery ventilators, fans, heat exchangers, and specialized laundry equipment exhaust and intake systems. The project involves a full mechanical system upgrade for a VA laundry facility, with careful coordination of new equipment installation and existing infrastructure preservation.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
M M
M
M
M
M
M
M
TRUE
NORTH
PLAN
NORTH
PP
A1
EE
FF
B1
C1
GG
5.1
4.2
3.3
2.4
DD CC
BB
1'
AA A
2'
B
3'
C
4.5
4'
5'
E
6'
F
7'
G
8'
H
9'
I
MECHANICAL
STORAGE
B024
CONTROLLER
ROOM
B022
MENS
CHANGING
ROOM
B013
CLOSET
B029
MECHANICAL
SHOP
B023
WOMENS
TOILET
B009A
TOILET
VEST
B010
LOUNGE
B004
LINEN
STORAGE
B026
SERV
CORR
B012
STAIR
B007
WOMENS
SHOWER
B009
TOILET
HAC
B019
STORAGE
B001a
GAS
METER
AND
REGULATING
ROOM
B002
MECH
B018
WOMEN
CHANGING
B011
LIGHT
STORAGE
B005
SERVICE
ELEVATOR-1
B025-1
VEST
B008
CORR.
B006
SECURE
STORAGE
B028
STORAGE
B015
MECHANICAL
B017
IT ROOM
B020
MECH
B003
45-HWUH-14
45-HWUH-15
45-VRFAC-6C
45-VRFAC-6A
45-VRFAC-6B
45-VRFAC-2
45-HWUH-16
45-ERU-1
45-VRFAC-22
45-VRFAC-1
45-HV-2
45-HWUH-10
45-VRFAC-21C 45-VRFAC-21D
45-VRFAC-21A45-VRFAC-21B
45-HWUH-11
45-VRFHP-ELECTRIC
45-VRFHRU-1
45-VRFAC-7A
45-VRFAC-4B
45-VRFAC-3
45-VRFAC-4A
45-HV-3
45-HV-4
45-RF-1
45-HWUH-17
45-HWUH-18
45-HWUH-13
45-VRFAC-7B
x1
32x14 x1 x1
22x12
18x12 x1
30x16 x1
30x16
(800)
(500)
(500)
(500)
(500)
(500)
(500)
(100)
(142)
18x10
10x10
6x6
10x6
8x610x8
10x6
6x6
8x6
16x8
14x6
14x6
12x4
(100)
14x6
(50)
(125) (100)
(75) (100)
(50)
(225)
12x4 12x6 14x4
18x6
8x6
6x6
18x6
(100)
18x8 (75)
(75)
(275)
18x8
64x24
SECURITY
CLOSET
B027
18x8
TANK
ROOM
B001b
12x6
12x8
12x4
14x8
45-HWUH-12
2 3
FSD
FSD
FSD
FSD
FSD
FSDFSD
FSD
FSD
FSD
FSD
12x6
FSD
FSDFSD
FSDFSD
8FSD
FSD
18x6
18x8
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
MECHANICAL HVAC DEMOLITION PLAN -
BASEMENT
MD101
1/8" = 1' - 0" 0 5' 10' 15' 30'
GENERAL NOTES # DEMOLITION NOTES
1 EXISTING TO REMAIN 64x24 VENTILATION SUPPLY DUCTWORK RISER UP TO
FIRST FLOOR. FIRE DAMPER INSTALLED AT PENETRATION THROUGH FLOOR.
SEE SHEET MH102 FOR CONTINUATION.
2 EXISTING TO REMAIN 48x36 OUTSIDE AIR INTAKE LOUVER.
3 EXISTING TO REMAIN 48x30 OUTSIDE AIR INTAKE LOUVER.
4 EXISTING TO REMAIN 42x30 EXHAUST LOUVER WITH BACKDRAFT (GRAVITY)
DAMPER.
5 EXISTING TO REMAIN 42x30 EXHAUST LOUVER.
6 EXISTING TO REMAIN 24x16 OUTSIDE AIR INTAKE LOUVER.
7 EXISTING TO REMAIN 24x16 EXHAUST LOUVER.
8 EXISTING TO REMAIN 48x18 RETURN GRILLE.
9 REMOVE AND REINSTALL DUCTWORK AS NECESSARY IN THIS AREA TO
ACCOMODATE STEEL REINFORCEMENT OF EXISTING STRUCTURE.
1 SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2 SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.
3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF
PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.
4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY
EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.
5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER
MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT
PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.
6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT
PROVIDED PRIOR TO INSTALLATION.
7 BALANCE AIR DEVICES TO CFM SHOWN IN PARENTHESIS.
8 PROVIDE FIRE DAMPER/FIRE SMOKE DAMPERS WITH ACCESS DOOR.
9 MECHANICAL CONTRACTOR TO VERIFY DIFFUSER THROW AND LOCATION
TO REACH OPERATORS OCCUPIED ZONE TO OBTAIN EFFECTIVE POINT
COOILING.
SCALE: 1/8" = 1'-0"
MECHANICAL HVAC DEMOLITION PLAN - BASEMENT
1 REV 2 07/18/25
7-14-2025
TRUE
NORTH
PLAN
NORTH
PP
A1
EE
FF
B1
C1
GG
5.1
4.2
3.3
2.4
DD CC
BB
1'
AA A
2'
B
3'
C
4.5
4'
5'
E
6'
F
7'
G
8'
H
9'
I
T VRFAC-1
T
45-HWUH-10
T 45-HWUH-11
T
T
VRFAC-4A
T VRFAC-5A TVRFAC-5B
T
VRFAC-3
TVRFAC-4B
TVRFAC-7B
T VRFAC-7A
TVRFAC-6C
TVRFAC-6A
T VRFAC-6B
TVRFAC-15
T
45-HWUH-14
T
45-HWUH-16
T VRFAC-2
T
VRFAC-21D
VRFAC-21C
VRFAC-21B
T
T
T
VRFAC-21A
T
HWUH-17
THWUH-18
45-HWUH-13
45-HV-2
HEX-2
GP-3
GP-4
45-HWUH-14
H W
S H
W R
RS/RL
RS/RL
PD
RS/RL
P D
PD
P D
HWS
HWR
G H
W S
H W
R H
W S
P D
P D
PD
R S
/R L
P D
R S
/R L
R S
/R L
RS/RL
R S
/R L
R S
/R L
R S
/R L
HWR
HWS
HWR
HWS
H W
R H
W S
P D
RS/RL
P D
PD
P D
HWS
HWR
PD
RS/RL
P D
GHWS
GHWR
AS-2
45-HWUH-15
HWS
HWR
RS/RL2
H W
S H
W R
H W
S H
W R
45-HV-3
45-HV-4
45-HWUH-17
45-HWUH-18
45-VRFAC-7B
45-VRFAC-4B45-VRFAC-7A
45-VRFAC-3 CMB
45-ERU-1
45-VRFAC-22
45-VRFAC-2
45-VRFAC-6A45-VRFAC-6B
45-VRFAC-6C
45-VRFAC-4A 45-HWUH-12
45-HWUH-13
45-VRFAC-21C 45-VRFAC-21D
45-VRFAC-21A45-VRFAC-21B
45-VRFHRU-1
45-VRFHP-ELECTRIC
45-HWUH-11
45-VRFAC-145-HWUH-10
3/4"
4"
1/2"
1/2"
1 1/4"
1/2"
1"
1/2"
1/2"
3/4"
1/2"
4"
1/2" 1/2"
3/4"
2"
1/2"
2 1/2"
SERV
CORR
B012
MECH
B003
LOUNGE
B004
MENS
CHANGING
ROOM
B013
TOILET
VEST
B010
TOILET
HAC
B019
WOMEN
CHANGING
B011
WOMENS
SHOWER
B009
WOMENS
TOILET
B009A
VEST
B008
STAIR
B007
GAS
METER
AND
REGULATING
ROOM
B002
CORR.
B006
LIGHT
STORAGE
B005
SECURE
STORAGE
B028
STORAGE
B015
MECHANICAL
STORAGE
B024
MECHANICAL
SHOP
B023
CONTROLLER
ROOM
B022
SERVICE
ELEVATOR-1
B025-1
MECHANICAL
B017
LINEN
STORAGE
B026
STORAGE
B001a
IT ROOM
B020
MECH
B018
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
MECHANICAL PIPING DEMOLITION PLAN -
BASEMENT
MD102
1/8" = 1' - 0" 0 5' 10' 15' 30'
GENERAL NOTES # DEMOLITION NOTES
1 EXISTING TO REMAIN 1-1/4" HOT WATER (HYDRONIC) SUPPLY AND RETURN
RISERS UP TO FIRST FLOOR. SEE SHEET MP102 FOR CONTINUATION.
2 EXISTING TO REMAIN HEX-2 ASSEMBLY. SEE SHEET M-802 FOR HEX-2
CONTROL DIAGRAM AND TYPICAL HEX ASSEMBLY PIPING INSTALLATION
DETAIL.
3 REMOVE AND REINSTALL PIPING AS NECESSARY IN THIS AREA TO
ACCOMODATE STEEL REINFORCEMENT OF EXISTING STRUCTURE.
1 SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2 SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.
3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF
PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.
4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY
EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.
5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER
MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT
PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.
6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT
PROVIDED PRIOR TO INSTALLATION.
7 BALANCE AIR DEVICES TO CFM SHOWN IN PARENTHESIS.
8 PROVIDE FIRE DAMPER/FIRE SMOKE DAMPERS WITH ACCESS DOOR.
9 MECHANICAL CONTRACTOR TO VERIFY DIFFUSER THROW AND LOCATION
TO REACH OPERATORS OCCUPIED ZONE TO OBTAIN EFFECTIVE POINT
COOILING.
SCALE: 1/8" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - BASEMENT
M M
M
M M
PP
A1
EE
FF
B1
C1
GG
5.1
4.2
3.3
2.4
DD CC
BB
1'
AA A
2'
B
3'
C
4.5
4'
5'
E
6'
F
7'
G
8'
H
9'
I
SERVICE
ELEVATOR-2
B025-2
OFFICE
OPEN
RECEPTION
VEST
MENS
TOILET
WOMENS
TOILET
LAUNDRY
SUPERVISOR
OFFICE
SOIL
TEXTILE
RECEIVING
CLEAN
TEXTILE
MAKE UP
CART
WASHING
SOIL CART
STAGING
CLEAN
CART
STAGING
FLATWORK
FINISHING
106CART
MAKE UP
DRYING
PRODUCTION
SOIL
TEXTILE
SORTING
AIR LOCK
ROOM
WASHING
PRODUCTION
EQUIPMENT
SPACE
OFFICE
SUPERVISOR
TRAINING
ROOM
100A
45-PEF-245-PEF-1
45-HWUH-2
45-HWUH-5
45-HWUH-4
45-HWUH-1
45-HWUH-3
45-VRFAC-16
45-VRFAC-18
45-VRFAC-12
45-VRFAC-11
45-VRFAC-10
45-VRFAC-8
45-VRFAC-9
45-VRFAC-20
45-VRFAC-17
45-HWUH-6
45-VRFAC-13
45-VRFAC-15
45-VRFAC-14
45-HWUH-7
45-HWUH-8
45-PEF-3
45-HWUH-9
T
T
T
T
VRFAC-9
VRFAC-8
VRFAC-11
VRFAC-12
VRFAC-10
THWUH-3
T HWUH-4
T HWUH-5
THWUH-2
THWUH-1
TVRFAC-13
T HWUH-6
DP 45-HV-2 DPS
T HWUH-8
THWUH-9
DP45-HV-1 DPS
T 45-HV-1
T 45-HV-2
64x24 48x24 44x24 40x20 36x18
22x16
20x10
20x10 20x10
22x8 x1 x1
20x10 x8
32x824x6
18x610x6 x8
30x20
26x18
32x32 32x32 32x32
18ø
12x6
(226) (226) (226)
(226)
(226)(1575) (1575) (1575)
(1575) (1575)
18ø
10x6 18x6
18x6 10x6(220)(220)
(220) (220)
(1575)
(1575)
(1575)
(1575) 20x10
20x10
20x10
6x6
6x6
8x6
10x8
14x88x6
(60) (100)
(75)
10x6 6x6
45-TEX-245-TEX-1
(230)(230)(230) 18x610x6
14x6
(335)
22x16
(1575)
(1575)
20x10
8x6
6x6
4ø
4ø
4ø
4ø
4ø
14x6
(335)
20x10
20x10
14x6(335) x8
(226)(226)
22x818x818x610x6
(226)(226)(226)
24x16
16x10
16x10
(960)
(960) (960)
(960)
(960)
(960)
(960)
(960)
(960)
(960)
16x10
20x12
(1575) (1600)
16x10
16x10
16x10 16x1016ø
16ø
12ø
12ø
14ø
14ø
14ø
14ø
THWUH-7
x3
32x32
1 1
36x20
32x8 x1 x1 x1
45-VRFAC-19
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
MECHANICAL DEMOLITION PLAN - FIRST FLOOR
MD103
1/8" = 1' - 0" 0 5' 10' 15' 30'
GENERAL NOTES # DEMOLITION NOTES
1 DEMOLISH DUCTWORK, HANGERS AND ACCESSORIES.
2 DEMOLISH DUCTWORK, HANGERS AND ACCESSORIES UP TO INATKE HOOD
ON ROOF. SEE SHEET MD102 FOR CONTINUATION.
3 REMOVE DUCTWORK, HANGERS, ACCESSORIES AND AIR DEVICES TO
POINTS INDICATED. STORE FOR RELOCATION IN NEW WORK.
1 SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2 SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.
3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF
PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.
4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY
EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.
5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER
MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT
PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.
6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT
PROVIDED PRIOR TO INSTALLATION.
7 BALANCE AIR DEVICES TO CFM SHOWN IN PARENTHESIS.
8 PROVIDE FIRE DAMPER/FIRE SMOKE DAMPERS WITH ACCESS DOOR.
9 MECHANICAL CONTRACTOR TO VERIFY DIFFUSER THROW AND LOCATION
TO REACH OPERATORS OCCUPIED ZONE TO OBTAIN EFFECTIVE POINT
COOILING.
SCALE: 1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - FIRST FLOOR
1 REV 2 07/18/25
PP
A1
EE
FF
B1
C1
GG
5.1
4.2
3.3
2.4
DD CC
BB
1'
AA A
2'
B
3'
C
4.5
4'
5'
E
6'
F
7'
G
8'
H
9'
I
45-VRFHRU-2
45-VRFHP-1
45-RV-1 45-RV-1 45-RV-1
45-HV-1
45-RV-1
36x20
2 2 2
5 5 5
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
MECHANICAL DEMOLITION PLAN - ROOF
MD104
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
GENERAL NOTES # DEMOLITION NOTES
1 EXISTING TO REMAIN 10"DIA GOOSENECK.
2 REMOVE AND STORE 28" DIA EXHAUST CURB FOR RELOCATION IN NEW
WORK.
3 REMOVE AND STORE 24" DIA EXHAUST CURB FOR RELOCATION IN NEW
WORK.
4 EXISTING TO REMAIN 20x36 VENTILATION AIR DUCT DOWN TO FIRST FLOOR.
SEE SHEET MH102 FOR CONTINUATION.
5 DEMOISH INTAKE HOOD AND ACCESSORIES. PATCH ROOF.
6 EXISTING TO REMAIN 1/2" REFRIGERANT PIPING FROM 45-VRFHRU-2 DOWN
TO FIRST FLOOR. SEE SHEET MP102 FOR CONTINUATION.
7 EXISTING TO REMAIN 1/2" REFRIGERANT PIPING FROM 45-VRFHP-1 DOWN TO
FIRST FLOOR. SEE SHEET MP102 FOR CONTINUATION.
1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2. SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.
3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF
PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.
4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY
EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.
5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER
MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT
PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.
6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT
PROVIDED PRIOR TO INSTALLATION.
7 REFRIGERANT PIPING TO BE SIZED AS PER MANUFACTURER'S
RECOMMENDATIONS.
SCALE: 1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - ROOF
1 REV 2 07/18/25
4" DRAIN
6" DRAIN
18x24x18
18x18x18
6" DRAIN
18x18x18
6" DRAIN
18x24x18
39.3 39.3
40.1
"D"
CONTROL
"D"
CONTROL
J BOX
"A"
CONTROL
EXPAND
TANK
E X
P A
N D
T A
N K
39.3.1
10HP
WATER
HEAT'G
CIRC
PUMPS/
HEAT
EXCHG
CHEM
POT
IN
LE
T
O U T
IN
O U T
"C
LO
O P
H E A T
E X C H A N G E R
C O N T R O L
LWW FILTER SYST.
80"∅ x 5'H Tank
PIPE_
3_
INC
H
PIPE_
3_
INC
H
PIPE_
3_
INC
H
39.1
H E
A T
R E
C L
A
IM
S Y
S T
'P2'
LWW WASTE WATER
RAISED PIT TANK
LWW
SUMP
PUMP
'P1'
39.7
WATER
TRATMENT
A S
D C
-3
-2
.5 /1
/S S
39.4
39.4
TUNNEL HEATING
SYST.S
2 CONTROL
"F" x18 x18
D R A
IN
.2
.3 .2
L H
W T
A N
KL
T
W T
A N
K
T R
IP
L E
P U
M P
S
H
P H
W C
IR
C
D U
A L
P U
M P
S
C O N T R O L
"B
3" GAS INLET
GAS
CONTROL
T-6800
INSPECTION DOOR INSPECTION DOOR
PANEL
24" DRAFT HOODS
6" INLET 6" OUTLET
BARMETRIC DAMPER WITH 28" VERTICAL OUTLET
3" GAS INLET
GAS
CONTROL
T-6800
INSPECTION DOOR INSPECTION DOOR
PANEL
24" DRAFT HOODS
6" INLET 6" OUTLET
BARMETRIC DAMPER WITH 28" VERTICAL OUTLET
A
B
O P
EN
C LO SE
O P
EN
C LO SE
un io n_
2_inc h
B
ALL
VA
LVE
N
IB
CO
un io n_ 2_ inc h
B
ALL
VA
LVE
N
IB
CO
A
B
O P
EN
C LO SE
O P
EN
C LO SE
un io n_
2_inc h
B
ALL
VA
LVE
N
IB
CO
un io n_ 2_ inc h
B
ALL
VA
LVE
N
IB
CO
C A
O U T
LET
MODEL: ASD
40ST
CONTROL
COOLING
AIR
AIR
DISCHARGE
COOLING
AIR
INLET
AIR
ELEC
CONN
D R A I N
AIR
DRYER
COMPRESSOR
COMPRESSOR
OUTLET
INLET
AIR
AIR
DRYER
INLET
C A
O U T
LET
MODEL: ASD
40ST
CONTROL
COOLING
AIR
AIR
DISCHARGE
COOLING
AIR
INLET
AIR
ELEC
CONN
D R A I N
AIR
DRYER
COMPRESSOR
COMPRESSOR
OUTLET
INLET
AIR
AIR
DRYER
INLET
M M
M
M
M
M
M
M
M
M
M
PP
A1
EE
FF
B1
C1
GG
5.1
4.2
3.3
2.4
DD CC
BB
1'
AA A
2'
B
3'
C
4.5
4'
5'
E
6'
F
7'
G
8'
H
9'
I
MECHANICAL
STORAGE
B024
CONTROLLER
ROOM
B022
MENS
CHANGING
ROOM
B013
CLOSET
B029
MECHANICAL
SHOP
B023
WOMENS
TOILET
B009A
TOILET
VEST
B010
LOUNGE
B004
LINEN
STORAGE
B026
SERV
CORR
B012
STAIR
B007
WOMENS
SHOWER
B009
TOILET
HAC
B019
STORAGE
B001a
GAS
METER
AND
REGULATING
ROOM
B002
MECH
B018
WOMEN
CHANGING
B011
LIGHT
STORAGE
B005
SERVICE
ELEVATOR-1
B025-1
VEST
B008
CORR.
B006
SECURE
STORAGE
B028
STORAGE
B015
MECHANICAL
B017
IT ROOM
B020
MECH
B003
45-HWUH-14
45-HWUH-15
45-VRFAC-6C
45-VRFAC-6A
45-VRFAC-6B
45-VRFAC-2
45-HWUH-16
45-ERU-1
45-VRFAC-22
45-VRFAC-1
45-HV-2
45-HWUH-10
45-VRFAC-21C 45-VRFAC-21D
45-VRFAC-21A45-VRFAC-21B
45-HWUH-11
45-VRFHP-ELECTRIC
45-VRFHRU-1
45-VRFAC-7A
45-VRFAC-4B
45-VRFAC-3
45-VRFAC-4A
45-VRFAC-5A 45-VRFAC-5B
45-HV-3
45-HV-4
45-RF-1
45-HWUH-17
45-HWUH-18
45-HWUH-13
45-VRFAC-7B
x1
32x14 x1 x1
22x12
18x12 x1
30x16 x1
30x16
(800)
(500)
(500)
(500)
(500)
(500)
(500)
(100)
(142)
18x10
10x10
6x6
10x6
8x610x8
10x6
6x6
8x6
16x8
14x6
14x6
12x4
(100)
14x6
(50)
(125) (100)
(75) (100)
(50)
(225)
12x4 12x6 14x4 18x6
8x6
6x6
18x6
(100)
18x8 (75)
(75)
(275)
18x8
64x24
SECURITY
CLOSET
B027
18x8
TANK
ROOM
B001b
12x6
12x8
12x4
14x8
45-HWUH-12
2 3
(424)
(424)
(424) (424)
(424)
(424)
(424)
(424)
(424)
45-RF-2
30x1630x16
30x16
20x24
20x20
14x10
24x1414x10
16x12
14x10
(424)
12x8
20x16
28x28 x1
28x28
FSD
FSD
FSD
FSD
FSD
FSDFSD
FSD
FSD
FSD
FSD
12x6
FSD
FSDFSD
FSDFSD
18ø 24x18
28ø 28ø
VF-4
VF-3
(2000)
FSD
FSD
18x6
6x4
18x8
13 13
15 LV-3
LV-2
LV-1
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
MECHANICAL HVAC PLAN - BASEMENT
MH101
SCALE: 1/8" = 1'-0"
MECHANICAL HVAC PLAN - BASEMENT
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
# KEY NOTESGENERAL NOTES
1 SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2 SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.
3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF
PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.
4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY
EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.
5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER
MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT
PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.
6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT
PROVIDED PRIOR TO INSTALLATION.
7 BALANCE AIR DEVICES TO CFM SHOWN IN PARENTHESIS.
8 PROVIDE FIRE DAMPER/FIRE SMOKE DAMPERS WITH ACCESS DOOR.
9 MECHANICAL CONTRACTOR TO VERIFY DIFFUSER THROW AND LOCATION
TO REACH OPERATORS OCCUPIED ZONE TO OBTAIN EFFECTIVE POINT
COOILING.
1 EXISTING TO REMAIN 64x24 VENTILATION SUPPLY DUCTWORK RISER UP TO
FIRST FLOOR. FIRE DAMPER INSTALLED AT PENETRATION THROUGH FLOOR.
SEE SHEET MH102 FOR CONTINUATION.
2 EXISTING TO REMAIN 48x36 OUTSIDE AIR INTAKE LOUVER.
3 EXISTING TO REMAIN 48x30 OUTSIDE AIR INTAKE LOUVER.
4 EXISTING TO REMAIN 42x30 EXHAUST LOUVER WITH BACKDRAFT (GRAVITY)
DAMPER.
5 EXISTING TO REMAIN 42x30 EXHAUST LOUVER.
6 EXISTING TO REMAIN 24x16 OUTSIDE AIR INTAKE LOUVER.
7 EXISTING TO REMAIN 24x16 EXHAUST LOUVER.
8 EXISTING TO REMAIN 48x18 RETURN GRILLE.
9 PROVIDE 48x12 RETURN GRILLE. BASIS OF DESIGN: METALAIRE.
10 PROVIDE 57x36x12 PLENUM ATTACHED TO LOUVER LV-1.
11 PROVIDE 57x36x12 PLENUM ATTACHED TO LOUVER LV-2.
12 ROUTE 18" DIA EXHAUST DUCT UP THROUGH FLOOR. SEE SHEET MH102 FOR
CONTINUATION.
13 CONTRACTOR TO FURNISH AND INSTALL NEW 28" DIA FLUE PIPE THROUGH
OUTSIDE WALL AND UP ALONG WALL TO ABOVE ROOF. MOUNT PER SMACNA
SUPPORT DETAIL. FLUE PIPE OUTDOORS TO BE METAL-FAB IPIC-441 (304 SS
FLUE, SS CASING, AND 1" CERAMIC FIBER INSOLATION). SEE SHEET MH103
FOR CONTINUATION. SEE CONCENTRIC VENT DETAIL ON SHEET M-503.
14 PROVIDE 24x24 ALUMINUM GRILLE BY PRICE #96 (OR APPROVED EQUAL)
WITH 3/4" SPACING AND 45 DEG DEFLECTION; TRANSITION TO 18" DIA DUCT.
15 PROVIDE 114x60 LOUVER AS SCHEDULED. LOUVER IS COMBINATION
LOUVER WITH INTEGRAL MOTOR OPERATED DAMPER. INTERLOCK LOUVER
WITH BOILERS TO OPEN WHENEVER A BOILER IS IN USE.
E X H
UNLOAD
FRONT
INLET
165GP
X
X
ZZ
X
Y
X
D ra w e r
D ra w e r
Input
Linen Output
Linen Output
Gate
Gate 2
REMOTE
STATUS
W O
R K
S T
A T
IO
N
W O
R K
S T
A T
IO
N
ENERGY
MONITOR
COMM.
SYST.
MONORAIL
CNTRLS
Y
FLOW
OF
GOODS
FLOW
OF
GOODS
24 24
27 27
10 10 10
8 8
212121 222222
10a
24 24
10a 10a 10a 10a
39.9
39.8
5a
VAC
CAB
PUMP/
CNTRL
1 43
C P
1 2 3 4
C A
R T
PATIENT CLOTHING
& SURGICAL LINEN
PROCESSING AREA
C P
CP-1
TOP CONVEYOR EL 4'0"
BOTTOM CONVEYOR EL 2'6"
YYY
X
Y
X
E
A
XX
X
YY
X
X
YY
X
X
YY
X
X
YY
X
X
Y
X
H W
C W
TW
H W
C W
TW
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
0. 3000
0. 3000
0. 5000
X
Y
X
Y
X
Y
X
Y
0. 3000
0. 3000
0. 5000
GOODS
FLOW
OF
X
Y
X
Y YY
Y Y
X X
Y Y
X X
M M
M
M M
PP
A1
EE
FF
B1
C1
GG
5.1
4.2
3.3
2.4
DD CC
BB
1'
AA A
2'
B
3'
C
4.5
4'
5'
E
6'
F
7'
G
8'
H
9'
I
SERVICE
ELEVATOR-2
B025-2
OFFICE
OPEN
RECEPTION
VEST
MENS
TOILET
WOMENS
TOILET
LAUNDRY
SUPERVISOR
OFFICE
SOIL
TEXTILE
RECEIVING
CLEAN
TEXTILE
MAKE UP
CART
WASHING
SOIL CART
STAGING
CLEAN
CART
STAGING
FLATWORK
FINISHING
106CART
MAKE UP
DRYING
PRODUCTION
SOIL
TEXTILE
SORTING
AIR LOCK
ROOM
WASHING
PRODUCTION
EQUIPMENT
SPACE
OFFICE
SUPERVISOR
TRAINING
ROOM
100A
45-PEF-245-PEF-1
45-HWUH-2
45-HWUH-5
45-HWUH-4
45-HWUH-1
45-HWUH-3
45-VRFAC-16
45-VRFAC-18
45-VRFAC-12
45-VRFAC-11
45-VRFAC-10
45-VRFAC-8
45-VRFAC-9
45-VRFAC-20
45-VRFAC-17
45-HWUH-6
45-VRFAC-13
45-VRFAC-15
45-VRFAC-14
45-HWUH-7
45-HWUH-8
45-PEF-3
45-HWUH-9
48x24 44x24 40x20 36x18
20x10
20x10
22x8 x1 x1
20x10 x8
32x824x6
18x610x6 x8
30x20
26x18
12x6
(226) (226) (226) (226)
(226)(1575) (1575)
(1575)
10x6 18x6
18x6 10x6(220)(220)
(220) (220)
(1575)
(1575)
(1575)
(1575)
20x10
20x10
20x10
6x6
6x6
8x6
10x8
14x88x6
(60) (100)
(75)
10x6 6x6
45-TEX-245-TEX-1
(230)(230)
(230) 18x610x6
14x6
(335)
22x16
(1575)
(1575)
20x10
8x6
6x6
4ø
4ø
4ø
4ø
4ø
14x6 (335)
20x10
20x10
14x6
(335) x8
(226)(226)
22x818x818x610x6 (226)
(226)(226)
24x16
16x10 16x10 (960)
(960) (960)
(960)
(960)
(960)
(960)
(960)
(960)
(960)
16x10
20x12
(1575) (1600)
16x10
16x10
16x10
16x10
16x10 16x10
36x20
32x8
45-HC-5
36x36
64x24
22x16 20x10
12 12
13 13
14 15
12ø
12ø
12ø
12ø 12ø
(1575)
(1575) x1 x1
45-VRFAC-19
24 24 24
45-REF-1B
45-REF-1A
45-REF-2A
45-REF-2B
12ø16
12ø
12ø
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
MECHANICAL HVAC PLAN - FIRST FLOOR
MH102
SCALE: 1/8" = 1'-0"
MECHANICAL HVAC PLAN - FIRST FLOOR
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
# KEY NOTESGENERAL NOTES
1 PROVIDE 12" SCHEDULE 80 CPVC EXHAUST DUCT RISER UP TO GOOSENECK
ON ROOF. SEE SHEET MH103 FOR CONTINUATION.
2 PROVIDE 12" SCHEDULE 80 CPVC EXHAUST DUCT RISER UP TO GOOSENECK
ON ROOF. SEE SHEET MH103 FOR CONTINUATION.
3 PROVIDE 12" SCHEDULE 80 CPVC EXHAUST DUCT RISER UP TO GOOSENECK
ON ROOF. SEE SHEET MH103 FOR CONTINUATION.
4 PROVIDE 12" SCHEDULE 80 CPVC EXHAUST DUCT RISER UP TO GOOSENECK
ON ROOF. SEE SHEET MH103 FOR CONTINUATION.
5 EXISTING TO REMAIN 10"DIA EXHAUST DUCT RISER UP TO GOOSENECK ON
ROOF. INSTALLATION CONTRACTOR TO FIELD VERIFY DUCT ROUTING TO
LAUNDRY EQUIPMENT AND ADJUST ACCORDINGLY. SEE SHEET MH103 FOR
CONTINUATION.
6 CONNECT 36x36 OUTSIDE AIR DUCT TO EXISTING 69x69 DUCT RISER UP TO
VENTILATOR 45-RV-1 ON ROOF. SEE SHEET MH103 FOR CONTINUATION.
7 PROVIDE 10" DIA GAS VENT/FLUE STACK RISER UP TO ROOF. SEE SHEET
MH103 FOR CONTINUATION.
1 SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2 SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.
3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF
PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.
4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY
EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.
5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER
MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT
PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.
6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT
PROVIDED PRIOR TO INSTALLATION.
7 BALANCE AIR DEVICES TO CFM SHOWN IN PARENTHESIS.
8 PROVIDE FIRE DAMPER/FIRE SMOKE DAMPERS WITH ACCESS DOOR.
9 MECHANICAL CONTRACTOR TO VERIFY DIFFUSER THROW AND LOCATION
TO REACH OPERATORS OCCUPIED ZONE TO OBTAIN EFFECTIVE POINT
COOILING.
8 PROVIDE 8" DIA EXHAUST AIR VENT RISER UP TO ROOF. SEE SHEET MH103
FOR CONTINUATION.
9 EXISTING TO REMAIN 64x24 VENTILATION DUCT RISER DOWN TO BASEMENT.
SEE SHEET MH101 FOR CONTINUATION.
10 EXISTING TO REMAIN 36x20 VENTILATION DUCT RISER UP TO ROOF. SEE
SHEET MH103 FOR CONTINUATION.
11 PROVIDE 20x20 EXHAUST DUCT UP TO EXHAUST FAN 45-REF-3 ON ROOF.
SEE SHEET MH103 FOR CONTINUATION.
12 EXISTING TO REMAIN 48x12 OUTSIDE AIR INTAKE LOUVER.
13 EXISTING TO REMAIN 24x24 OUTSIDE AIR INTAKE LOUVER.
14 EXISTING TO REMAIN 12x8 EXHAUST LOUVER.
15 EXISTING TO REMAIN 12x8 OUTSIDE AIR INTAKE LOUVER.
16 SLOPE HORIZONTAL DUCT BACK TO EQUIPMENT FOR DRAINAGE.
17 PROVIDE 26" DIA OUTDOOR AIR DUCT FROM RECTANGULAR DRYER
CONNECTION UP THROUGH ROOF. SEE SHEET MH103 FOR CONTINUATION.
18 PROVIDE 24" DIA EXHAUST DUCT FROM DIRECT MOUNTED LINT FILTER
OUTLET CONNECTION UP THROUGH ROOF. SEE SHEET MH103 FOR
CONTINUATION.
19 PROVIDE 14" DIA OUTDOOR AIR DUCT UP THROUGH ROOF. SEE MH103 FOR
CONTINUATION.
20 MODIFY AND RE-INSTALL STORED DUCTWORK AND AIR DEVICES AS
NEEDED TO CLEAR LAUNDRY EQUIPMENT.
21 PROVIDE 76x30x24 OUTDOOR AIR PLENUM ABOVE CART WASHER WITH 18x30 DUCT DROPS ON EACH SIDE OF BLOWER INTAKE. PROVIDE 12x24
HINGED AND GASKETED ACCESS DOOR ON EACH DROP FOR SERVICE OF
CART WASHER COMPONENTS. MECHANICAL CONTRACTOR IS RESPONSIBLE
TO COORDINATE DUCT DROPS AND CONNECTIONS WITH EQUIPMENT ON
TOP OF CART WASHER.
22 CONTRACTOR TO FURNISH AND INSTALL NEW 40x20, 20 GAUGE GALVANIZED
STEEL, INSULATED DUCT FROM EQUIPMENT CONNECTION WITH OFFSET
THRU WALL. CART WASHER EXHAUST FURNISHED WITH BACKDRAFT
DAMPER BY MANUFACTURER.
23 PROVIDE 12" DIA OUTDOOR AIR INTAKE RISER UP TO ROOF WITH A
MOTORIZED ISOLATION DAMPER INSTALLED NEAR THE DUCT TERMINATION
OF 96" AFF. SHALL DROP DOWN NEAR RESPECTIVE IRONER COMBUSTION
AIR OPENING; INSTALL 10x12 HINGED ACCESS DOOR ON DUCT. INSTALL 1/2"
EXPANDED METAL OVER OPENING. SEE SHEET MH103 FOR CONTINUATION.
24 PROVIDE 25x16 OUTDOOR AIR DUCT FROM DRYER CONNECTION WITH IMMEDIATE TRANSITION TO 24x24 UP THRU ROOF. PROVIDE MOTORIZED
ISOLATION DAMPER IN OUTDOOR AIR DUCT TO BE INTER-LOCKED WITH
RESPECTIVE DRYER OPERATION. SEE SHEET MH103 FOR CONTINUATION.
25 PROVIDE 12" DIA OUTDOOR AIR DUCT DROP UP TO ROOF WITH A
MOTORIZED ISOLATION DAMPER INSTALLED NEAR THE DUCT TERMINATION
OF 96" AFF. SHALL DROP DOWN NEAR RESPECTIVE DRYER; FIELD
COORDINATE 12x12 HINGED ACCESS DOORS ON DROPS.
26 PROVIDE 12" DIA OUTDOOR AIR DUCT DROP WITH A MOTORIZED ISOLATION
DAMPER INSTALLED NEAR THE DUCT TERMINATION OF 96" AFF. SHALL
DROP DOWN NEAR RESPECTIVE DRYER; FIELD COORDINATE 12x12 HINGED
ACCESS DOORS ON DROPS.
27 PROVIDE 18" DIA EXHAUST DUCT UP THROUGH ROOF TO EF-1 AND DOWN
THROUGH FLOOR TO BASEMENT. SEE SHEETS MH101 AND MH103 FOR
CONTINUATIONS.
28 PROVIDE 28" DIA EXHAUST DUCT FROM DIRECT MOUNT LINT FILTER OUTLET
CONNECT (LE-MLF) UP THROUGH ROOF. SEE SHEET MH103 FOR
CONTINUATION.
PP
A1
EE
FF
B1
C1
GG
5.1
4.2
3.3
2.4
DD CC
BB
1'
AA A
2'
B
3'
C
4.5
4'
5'
E
6'
F
7'
G
8'
H
9'
I
45-VRFHRU-2
45-VRFHP-1
45-HV-1
45-RV-1
36x20
EF-1
45-REF-3
910 10 10
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
MECHANICAL HVAC PLAN - ROOF
MH103
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
# KEY NOTESGENERAL NOTES
SCALE: 1/8" = 1'-0"
MECHANICAL HVAC PLAN - ROOF
1 EXISTING TO REMAIN 10"DIA GOOSENECK.
2 PROVIDE 10" DIA GOOSENECK WITH ROOF CURB. SEE GOOSENECK DETAIL
ON SHEET M-503.
3 PROVIDE 8" DIA GOOSENECK WITH ROOF CURB. SEE GOOSENECK DETAIL
ON SHEET M-503.
4 PROVIDE EXHAUST FAN WITH ROOF CURB. SEE SHEET MH102 FOR
CONTINUATION.
5 EXISTING TO REMAIN 20x36 VENTILATION AIR DUCT DOWN TO FIRST FLOOR.
SEE SHEET MH102 FOR CONTINUATION.
6 EXISTING TO REMAIN 1/2" REFRIGERANT PIPING FROM 45-VRFHRU-2 DOWN
TO FIRST FLOOR. SEE SHEET MP102 FOR CONTINUATION.
7 PROVIDE 2 1/2" GLYCOL HOT WATER (HYDRONIC) SUPPLY AND RETURN
PIPING FROM 45-HV-1 DOWN TO FIRST FLOOR. SEE SHEET MP102 FOR
CONTINUATION.
8 PROVIDE 12" DIA GOOSENECK WITH ROOF CURB. SEE SHEET MH102 FOR
CONTINUATION. SEE GOOSENECK DETAIL ON SHEET M-503.
1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2. SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.
3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF
PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.
4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY
EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.
5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER
MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT
PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.
6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT
PROVIDED PRIOR TO INSTALLATION.
7 REFRIGERANT PIPING TO BE SIZED AS PER MANUFACTURER'S
RECOMMENDATIONS.
9 PROVIDE 24x24 OUTDOOR AIR DUCT WITH 18x18 HINGED ACCESS DOOR AND ASSOCIATED 30x30 ROOF CURB. ROUTE 24X24 DUCT DOWN TO FIRST
FLOOR. SEE SHEET MH102 FOR CONTINUATION.
10 PROVIDE 28" DIA EXHAUST DUCT GOOSENECK WITH 24x24 HINGED ACCESS DOOR AND ASSOCIATED 36x36 ROOF CURB. ROUTE 28" DIA DUCT DOWN TO
FIRST FLOOR. SEE SHEET MH102 FOR CONTINUATION. SEE GOOSENECK
DETAIL ON SHEET M-503.
11 PROVIDE 14" DIA OUTDOOR AIR DUCT WITH 18x18 ROOF CURB AND 180 DEG
GOOSENECK. ROUTE 14" DIA DUCT DOWN TO FIRST FLOOR. SEE SHEET
MH102 FOR CONTINUATION. SEE GOOSENECK DETAIL ON SHEET M-503.
12 PROVIDE 12" DIA OUTDOOR AIR DUCT WITH 18x18 ROOF CURB AND 180 DEG
GOOSENECK. ROUTE 12" DIA DUCT DOWN TO FIRST FLOOR. SEE SHEET
MH102 FOR CONTINUATION. SEE GOOSENECK DETAIL ON SHEET M-503.
13 PROVIDE 24" DIA EXHAUST DUCT GOOSENECK WITH 22x22 HINGED ACCESS DOOR AND ASSOCIATED 36x36 ROOF CURB. ROUTE 24" DIA DUCT DOWN TO
FIRST FLOOR. SEE SHEET MH102 FOR CONTINUATION. SEE GOOSENECK
DETAIL ON SHEET M-503.
14 PROVIDE 26" DIA OUTDOOR AIR DUCT GOOSENECK WITH 24x24 HINGED ACCESS DOOR AND ASSOCIATED 36x36 ROOF CURB. ROUTE 28" DIA DUCT
DOWN TO FIRST FLOOR. SEE SHEET MH102 FOR CONTINUATION. SEE
GOOSENECK DETAIL ON SHEET M-503.
15 EXISTING TO REMAIN 1/2" REFRIGERANT PIPING FROM 45-VRFHP-1 DOWN TO
FIRST FLOOR. SEE SHEET MP102 FOR CONTINUATION.
16 PROVIDE 12x12 GOOSENECK WITH ROOF CURB. SEE SHEET MH102 FOR
CONTINUATION.
17 EXTEND FLUE DUCT A MINIMUM OF 3' ABOVE ROOF ELEVATION. PROVIDE
RAIN HOOD CAP ON EACH FLUE.
45-VRFAC-1
EXISTING VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SCHEDULE
MARK
PEFY-P12NMAU-E3
MODEL
No.
TYPE
ROOM B026
AREA
SERVED
TOTAL
CAPACITY
SENSIBLE
CAPACITY
EVAPORATOR
7,639 BTUH 10,237 BTUH 11,936 BTUH
HEATING CAPACITY
PHASEVOLTS
ELECTRICAL
MCA MOCP
28x29x10
APPROX.
DIMENSIONS
WxDxH
APPROX.
WEIGHT
(LBS)
208 1 1.2 15
REMARKS
45-VRFAC-2 PKFY-P12NMAU-E2 WALL MOUNTED UNIT ROOM B003 8,694 BTUH 10,237 BTUH 11,936 BTUH 35x10x12 29208 1 0.4 15
45-VRFAC-3 PCFY-P24NKMU-ER1 CEILING SUSPENDED UNIT ROOM B028 208 1 15
PKFY-P24NKMU-E2 TH WALL MOUNTED UNIT 1 15
ROOM B004 1 15
PKFY-P24NKMU-E2 TH WALL MOUNTED UNIT ROM B022 18,932 BTUH 25,593 BTUH 30,060 BTUH 208 1 0.6 15
45-VRFAC-7a
PLFY-P12NFMU-E 2'x2' 4-WAY CASSETTE ROOM 100 7,511 BTUH 10,646 BTUH 12,213 BTUH 22x22x8 31.31 0.3 1545-VRFAC-8
PLFY-P12NFMU-E ROOM 101 1 0.3 15
45-VRFAC-9
45-VRFAC-10
2'x2' 4-WAY CASSETTE ROOM 102 1 157,511 BTUH 10,646 BTUH 12,213 BTUH
45-VRFAC-11
ROOMS 107, 108, 109, 110 1 15
45-VRFAC-12
DC DUCTED CONCEALED ROOMS 113, 116 47x35x15 1531 15
45-VRFAC-13
45-VRFAC-14
45-VRFAC-15 PEFY-P12NMAU-E3 ROOMS 113, 116 1 1.2 158,359 BTUH 12,010 BTUH 13,492 BTUH
PEFY-P30NMHU-E2 ROOM 106 1 2.7 1520,742 BTUH 30,025 BTUH 33,981 BTUH
PEFY-P12NMAU-E3 ROOM 106 1 1.2 158,359 BTUH 12,010 BTUH 13,492 BTUH
45-VRFHRU-1
EXISTING VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT RECOVERY UNIT SCHEDULE
MARK
PURY-P240YSKMU-A
PACKAGE MODEL
45-VRFAC-1,2,3,4a,4b,5a,5b,5c,6a, 6b, 6c,7a,7b, 22
SERVICE
(2) 65x69x29
DIMENSIONS
WxDxH
20 TONS
NOMINAL
CAPACITY
PHASEVOLTS
ELECTRICAL
MCA MOCP
18.5460 3 21 + 21 25 + 25 10.9
EER
3.42 1486
APPROX.
WEIGHT
(LBS)
REMARKS
PCFY-P36NKMU-ER1 CEILING SUSPENDED UNIT ELECTRICAL ADDITION 63x27x9 84208 1 1.2 1524,430 BTUH 34,162 BTUH 39,137 BTUH
45-VRFAC-16
45-VRFAC-17
BASIS OF DESIGN DAIKIN
PEFY-P12NMAU-E3 DC DUCTED CONCEALED ROOM 106 1 1.2 158,359 BTUH 12,010 BTUH 13,492 BTUH
PEFY-P24NMHU-E2 DC DUCTED CONCEALED ROOM 105 1
45-VRFHRU-2
BASIS OF DESIGN DAIKIN
45-VRFAC-18
PEFY-P24NMHU-E2 DC DUCTED CONCEALED ROOM 105 1
45-VRFAC-19
PCFY-P36NKMU-ER1 CEILING SUSPENDED UNIT ELECTRICAL ADDITION 1 1.2 1524,430 BTUH 34,162 BTUH 39,137 BTUH
45-VRFAC-20
PCFY-P36NKMU-ER1 CEILING SUSPENDED UNIT ELECTRICAL ADDITION 1 1.2 1524,430 BTUH 34,162 BTUH 39,137 BTUH
ROOM 102 1 15
DC DUCTED CONCEALED
2'x2' 4-WAY CASSETTE
2'x2' 4-WAY CASSETTE
DC DUCTED CONCEALED
7,511 BTUH 10,646 BTUH 12,213 BTUH
7,511 BTUH 10,646 BTUH 12,213 BTUH
11,255 BTUH 15,969 BTUH 18,094 BTUH
27,797 BTUH 36,030 BTUH 39,977 BTUH
29x35x15 98
0.3
0.3
1.6
4.2
DC DUCTED CONCEALED
DC DUCTED CONCEALED
DC DUCTED CONCEALED
16,558 BTUH 24,020 BTUH 26,985 BTUH
16,558 BTUH 24,020 BTUH 26,985 BTUH
2.1 15
29x35x15 1002.1 15
45-VRFHP-1
EXISTING VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT PUMP UNIT SCHEDULE
MARK
PUHY-P192YSKMU-A
PACKAGE MODEL
45-VRFAC-14 THRU 45-VRFAC-20
SERVICE
65x69x29 + 65x36x29 16 TONS
PHASEVOLTS
ELECTRICAL
MCA MOCP
19.1
COOLING
IEER
460 3 20 + 12 25 + 15 12.5
EER
3.61
HEATING
COP
APPROX.
WEIGHT
(LBS)
REMARKS
BASIS OF DESIGN DAIKIN
PLFY-P18NFMU-E 2'x2' 4-WAY CASSETTE 15,356 BTUH 0.5
PLFY-P18NFMU-E 2'x2' 4-WAY CASSETTE 15,356 BTUH 0.5
PEFY-P30NMHU-E2 DC DUCTED CONCEALED 18,279 BTUH 20,474 BTUH 23,871 BTUH 41x35x15 1242.7
ROOM B004
ROOMS B015, B023, B024
1 15
1 15
45-VRFAC-7b
PLFY-P12NFMU-E 2'x2' 4-WAY CASSETTE ROOM 100A 7,511 BTUH 10,646 BTUH 12,213 BTUH 1 150.3
45-VRFAC-4a
PLFY-P18NFMU-E 2'x2' 4-WAY CASSETTE 15,356 BTUH 22x22x8 31.30.5
45-VRFAC-4b
ROOM B004 1 15
PKFY-P24NKMU-E2 TH WALL MOUNTED UNIT 18,279 BTUH 20,474 BTUH 1 0.6 15
ROOM B027
ROOM B015
20,474 BTUH 46x12x14 460.6
14,158 BTUH 20,474 BTUH 23,871 BTUH 50x27x9 710.5
PURY-P72YKMU-A 45-VRFAC-8 THRU 45-VRFAC-13 65x48x29 6 TONS 22.1460 3 15 15 15.5 3.72 534
10,789 BTUH
10,789 BTUH
18,279 BTUH
10,789 BTUH
23,871 BTUH
23,871 BTUH
17,683 BTUH
17,683 BTUH
17,683 BTUH
PLFY-P12NFMU-E
PLFY-P12NFMU-E
PEFY-P18NMHU-E2
PEFY-P36NMHU-E2
45-VRFHP-ELECTRIC PUHY-P144YSKMU-A 45-VRFAC-21a, 21b, 21c, 21d (2) 65x36x29 12 TONS 20.3460 3 12 + 12 15 + 15 13.2 3.95 926
DIMENSIONS
WxDxH
45-VRFAC-6a
45-VRFAC-6b
45-VRFAC-6c
45-VRFAC-21d
45-VRFAC-21a
45-VRFAC-21b
45-VRFAC-21c PCFY-P36NKMU-ER1 CEILING SUSPENDED UNIT ELECTRICAL ADDITION 208 1 1.2 1524,430 BTUH 34,162 BTUH 39,137 BTUH
PEFY-P18NMHU-E2 DC DUCTED CONCEALED 29x35x15 98208 1 1.6 1511,004 BTUH 15,356 BTUH 17,683 BTUH45-VRFAC-22
ROOMS B006, B009, B011
THRU B014, B019, B028
45-ERU-1
EXISTING VARIABLE REFRIGERANT FLOW SYSTEM - ENERGY RECOVERY VENTILATOR UNIT SCHEDULE
MARK
LGH-F1200RX5-E1
PACKAGE MODEL SERVICE
800 0.2
E.S.P.
PHASEVOLTS
ELECTRICAL
MCA MOCP
208 1 7.1 15 256
APPROX.
WEIGHT
(LBS)
REMARKS
BASIS OF DESIGN DAIKIN
AIR
FLOW
31.5x48.5x45
DIMENSIONS
WxDxH
ROOMS B004, B006, B009, B011
THRU B014, B019, B028
NOMINAL
CAPACITY
COOLING
IEER
HEATING
COP
EXISTING VARIABLE REFRIGERANT FLOW SYSTEM - BRANCH SELECTOR BOX SCHEDULE
MARK PACKAGE MODEL SERVICE
DIMENSIONS
PHASEVOLTS
ELECTRICAL
MCA MOCP
APPROX.
WEIGHT
(LBS)
REMARKS
BASIS OF DESIGN DAIKIN
WxDxH
CMB 208 1 11.0 15 534
45-BSB-11 BSV6Q36PVJU 45-VRFAC-8,9,10,11,12,13 63x25x9 230 1 0.6 15 68
45-VRFBC-1 64x48x2945-VRFAC-1,2,6A,6C,3C,4A,5A,5B,7A,7B,22
46x12x14 46
22x22x8 31.3
22x22x8 31.3
46x12x14 46
22x22x8 31.3
22x22x8 31.3
22x22x8 31.3
22x22x8 31.3
28x29x10 49
28x29x10 49
28x29x10 49
41x35x15 124
29x35x15 100
63x27x9 84
63x27x9 84
63x27x9 84
EXISTING AIR SEPARATOR SCHEDULE
MARK LOCATION
AREA AND/OR
BUILDING
SERVED
BASIS OF
DESIGN
TYPE
AS-2 BASEMENT IN-LINELAUNDRY TACO 437
CONNECTION
FLANGED
SYSTEM
AND/OR
SERVICE
HEX-2
MIN. CV
45-RV-1
EXISTING INTAKE/EXHAUST HOOD SCHEDULE
MARK
ROOF
LOCATION
SYSTEM
AND/OR
SERVICE
DAMPER
TYPE
0.10 NA
DRYER /
CARTWASH
APD (IN WG) REMARKS
LOUVERED
PENTHOUSE
DUCTED
APPLICATION
INTAKE
TYPE
THROAT
SIZE
(IN)
AIRFLOW
(CFM)
69x69 16,000
LV-1
LOUVER SCHEDULE
MARK
RUSKIN
MAKE MODEL FINISH
0.09 ENAMELELF811DD
APD
(IN
WG)
SERVICE
VF-336
HEIGHT (IN)
WIDTH (IN)
MIN FREE
AREA
(SQ FT)
AIRFLOW
(CFM)
7.73 6400
NOTES:
1. ALL LOUVERS SHALL BE SUPPLIED BY THE SAME MANUFACTURER.
2. ALL LOUVERS SHALL BE SUPPLIED WITH BIRD SCREENS OF THE SAME MATERIAL AS LOUVER ITSELF.
3. LOUVERS SHALL BE SUPPLIED WITH ACCESSORY ITEMS FOR INSTALLATION IN THE APPLICABLE WALL CONSTRUCTION.
(FLANGES, CLIP ANGLES, EXTENDED SILL, ETC)
4. DIMENSIONS INDICATED ARE NOMINAL. EXACT DIMENSIONS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR.
5. UNLESS OTHERWISE NOTED, LOUVERS SHALL BE RATED FOR ZERO WATER PENETRATION WHEN TESTED IN
ACCORDANCE WITH AMCA PUBLICATION #511.
6. LOUVER FINISH COLOR SHALL BE SELECTED BY THE ARCHITECT UNLESS OTHERWISE NOTED.
7. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
8. LV-3 IS SIZED BASED ON 1 INCH FREE AREA FOR EACH 4,000 BTUH INPUT AS REQUIRED BY THE FUEL GAS CODE.
LV-2 RUSKIN 0.09 ENAMELELF811DD VF-43657 7.73 6400
LV-3 RUSKIN - ENAMELELC6375DAX BOILER60114 21.25 -
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
MECHANICAL SCHEDULES
M-601
45-SWHX-1 & 2
STEAM TO WATER HEAT EXCHANGER SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
BASEMENT LAUNDRY
LOCATIONMARK TYPE
SHELL &
400 160 20
AREA AND/OR
BLDG SERVED
SYSTEM AND/OR
SERVICE
WATER CONDITIONS
FLOW
GPM
EWT
°F
LWT
°F
WPD
FT
2.1
STEAM PRESSURE
ENT CONTROL VALVE ENT HEAT EXCHANGER
CONTROL VALVE
PSIG PSIG LB/HR
TRAP
TRAP NO
CAPACITY
LB/HR
REMARKS
15 8145 - -
BELL GOSSETT
QS4-16-4-2
HEATING
WATER TUBE
MARK
TOTAL SP.
(IN W.C.)
FAN TYPE WHEEL DRIVECFM
ELECTRICAL
VOLTAGE PHASE RPM
SPEED
CONTROL
REMARKS
LOCATIONMARK
SYSTEM
AND/OR
SERVICE
AREA AND/OR
BLDG SERVED
HOT WATER COIL
FLOW
(GPM)
REMARKSAPPLICATION
AIR FLOW
(CFM)
TOTAL MIN
CAPACITY
(MBH)
EWT
(DEG F)
LWT
(DEG F)
WPD
(FT)
MAX FACE
VELOCITY
(FPM)
AIR
PRESSURE
DROP
(IN WG)
EAT
(DEG F)
LAT
(DEG F)
HOT WATER HEATING COIL SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
TEMPERATURES
FAN SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
LOCATION
AREA AND/OR
BUILDING
SERVED
SYSTEM
AND/OR
SERVICE
MIN. EFF.
HPBHP
NOTES:
1. CONTROL VIA LOCAL LIGHT SWITCH.
2. CONTROL VIA TIME CLOCK.
3. INLERLOCK WITH ASSOCIATE H&V UNIT STARTER.
45-HC-5 RM 111 HEAT 10614800 1000 840 175 158 3.9CART WASH 0.11 5 55CART WASH
FLUID
TYPE
40% PPG
45-RF-2 1.25 INLINE FC BELT 480 60 3 NONE70 53.28RM B017 MECHANICAL 45-HV-3 4240 NOTE 3
PROVIDE AS PART OF SKID MOUNTED HEAT TRANSFER PACKAGE
VF-3 0.75 BELT
MARK
TOTAL SP.
(IN W.C.)
FAN TYPE DRIVECFM
ELECTRICAL
VOLTAGE PHASE RPM
460 60 1336
REMARKS
FAN SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
MAKE
GREENHECK
MODEL
SYSTEM
AND/OR
SERVICE HP
BHP
2.78
NOTES:
1. MOTOR OPERATED DAMPER.
2. VIBRATION ISOLATORS.
3. OSHA APPROVED BELT GUARD.
BSQ-200-30
INTER-LOCK RELAY WITH
VF-4 AND AIR COMP
6400 1,2,3
VF-4 0.75 BELT 460 60 133632.78
INTER-LOCK RELAY WITH
VF-3 AND AIR COMP
6400 1,2,3GREENHECK BSQ-200-30
CENTRIFUGAL INLINE
CENTRIFUGAL INLINE
45-REF-1A,B 1.0 DIRECT
MARK
TOTAL SP.
(IN W.C.)
FAN TYPE DRIVECFM
ELECTRICAL
VOLTAGE PHASE RPM
460 60 1400
REMARKS
FAN SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
MAKE
TEXEL
MODEL
SYSTEM
AND/OR
SERVICE HP
BHP
NOTES:
1. MOTOR OPERATED DAMPER.
2. INSTALL 3/4" CPVC DRAIN FROM FAN CASING TO TUNNEL WASHER DRIP PAN.
3. NEMA-1 DISCONNECT SWITCH.
4. COMPANION FLANGES.
5. HANG FAN FROM STRUCTURE AND PROVIDE VIBRATION ISOLATORS.
6. OSHA APPROVED BELT GUARD.
7. FRP FAN CONSTRUCTION WITH FRP DISCHARGE TRANSITION.
8. STAINLESS STEEL SHAFT.
CES151D
INTER-LOCK RELAY WITH
TUNNEL WASHER
1500 2,3,4,5,7,8
BI UTILITY VENT SET;
CW, HORZ DISCHARGE
45-REF-2A,B 1.0 DIRECT 460 60 1400TEXEL 2-CES151D 1500 2,3,4,5,7,8
BI UTILITY VENT SET;
CW, HORZ DISCHARGE
EF-1 0.8 BELT 460 60 1702GREENHECK 3/40.59GB-131-7 2000 1,5,6
CENTRIFUGAL
ROOF EXHAUST
GENERAL NOTES FOR ALL FANS:
A. WHEN MOTOR OPERATED DAMPERS ARE SPECIFIED THEY SHALL BE
120 VOLTS. FURNISH WITH 24V TRANSFORMER FOR CONTROL WIRING.
GENERAL NOTES FOR ALL FANS:
A. WHEN MOTOR OPERATED DAMPERS ARE SPECIFIED THEY SHALL BE
120 VOLTS. FURNISH WITH 24V TRANSFORMER FOR CONTROL WIRING.
INTER-LOCK RELAY WITH
TUNNEL WASHER
INTER-LOCK RELAY WITH
TUNNEL WASHER
45-REF-3
RELIEF FAN SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
MARK
ROOF
LOCATION
AREA AND/OR BUILDING
SERVED
2,500 0.5
TOTAL SP.
(IN W.C.)
HZVOLTAGE
ELECTRICAL
PHASE
SPEED
CONTROL
115 60 1 INTEGRAL
REMARKS
GREENHECK MODEL G-143-VG
CFM
ROOF
FAN
TYPE
EX. WASHING MACHINE
ROOM 113
EXHAUST
SYSTEM
AND/OR
SERVICE
WHEEL
89.5
MIN.
EFF.
DIRECT
DRIVE
HP
BHP
INSULATED CURB; INTERLOCKED
DAMPER, ECM MOTOR
HEX-1
BRAZED PLATE HEAT EXCHANGER SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
MARK
BASEMENT
LOCATION SERVICE
LWT
(DEG F)
40% PPG
WPD
(FT)
CONTROL
VALVE
175 158 6.9 CV-HV1
REMARKS
45-H&V-1
TYPE
OUTDOOR AIR
EQUIPMENT
B&G
BP433-166
EWT
(DEG F)
FLOW
(GPM)
LWT
(DEG F)
HOT WATER
WPD
(FT)
180 160 4.3185
EWT
(DEG F)
FLOW
(GPM)
VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
MARK
MODEL
No.
TYPE
AREA
SERVED
TOTAL
CAPACITY
SENSIBLE
CAPACITY
EVAPORATOR
HEATING CAPACITY
PHASEVOLTS
ELECTRICAL
MCA MOCP
APPROX.
DIMENSIONS
WxDxH
APPROX.
WEIGHT
(LBS)
REMARKS
45-VRFAC-5a
45-VRFAC-5b
PKFY-P24NKMU-E2 TH WALL MOUNTED UNIT 1 15
PKFY-P24NKMU-E2 TH WALL MOUNTED UNIT 18,279 BTUH 20,474 BTUH 23,871 BTUH 1 0.6 15
ROOM B020
ROOM B020
18,279 BTUH 20,474 BTUH 0.623,871 BTUH 208
46x12x14 46
46x12x14 46
GP-1
GLYCOL HEATING PUMP SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
MARK
BASEMENT
LOCATION
AREA AND/OR
BUILDING
SERVED
TYPE
LAUNDRY 1
SP. GR
GP-2
REMARKS
B&G E80 3x3x9.5C
MIN % EFF
SYSTEM
AND/OR
SERVICE HEAD
(FT)
CALCULATING FLUID
TEMP
(°F)
226 50 17540% PPG
FLOW
(GPM)
FLUID
MAX
RPM
VOLT
ELECTRICAL MOTOR
SPEED
CONTROL
460 1750 VARIABLE
PHASE
NOMINAL
POWER (HP)
7.5
45-HV-1 &
45-HC-5
VERTICAL
IN-LINE
EXT-1
EXPANSION TANK SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
MARK
BASEMENT
LOCATION
AREA AND/OR
BUILDING
SERVED
DIA.
DIMENSIONS
HEIGHT
12 20 35
BASIS OF
DESIGN
BLADDER
TYPE
LAUNDRY B&G B-130LA
PRE-CHARGE
(PSI)
TANK
VOLUME
(GAL)
REMARKS
PRE-CHARGE
PRIOR TO
FILLING
SYSTEM
ACCEPTANCE
VOLUME (GAL)
HEX-1
SYSTEM
AND/OR
SERVICE
AS-1
AIR SEPARATOR SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
MARK
BASEMENT
LOCATION
AREA AND/OR
BUILDING SERVED
BASIS OF
DESIGN
IN-LINE
TYPE
LAUNDRY TACO 437FLANGED
CONNECTION
HEX-1
SYSTEM AND/OR
SERVICE
MIN. CV
P-1A & B BASEMENT LAUNDRY
LOCATIONMARK TYPE
400 50 180
AREA AND/OR
BUILDING
SERVED
HEATING
WATER
SYSTEM
AND/OR
SERVICE
CIRCULATING FLUID
FLOW
GPM
HEAD
FT
NPSH AVAILABLE
FT
NA
TEMPERATURE
MIN
EFF
HP
ELECTRICAL MOTOR
REMARKS
15 3 460 B&G 4BD
°F
SP.GR
NOMINAL
POWER
PHASE VOLT
MAX
RPM
SPEED
CONTROL
1 75 1750 VARIABLE
END
SUCTION
FLUID
WATER
PUMP SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
45-CP-1 BASEMENT
LOCATIONMARK TYPE
75 36 3BLDG STEAM
SYSTEM AND/OR
SERVICE
MOTOR
DISCHARGE
PRESSURE
PSIG
MIN
RECEIVER
SIZE
GAL
NOMINAL POWER
EACH
HP
PHASE RPM
REMARKS
VOLT
480 3600DUPLEX
FLOW
EACH
PUMP
STEAM CONDENSATE PUMP SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)
GPM
BELL &
GOSSETT
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
MECHANICAL SCHEDULES
M-603
1 REV 1 11/22/24
2 REV 2 07/18/25
LE-19
STEAMLESS
FLATWORK IRONER
1120 CFM EXHAUST
650 CFM FLUE
LE-14 LINT
COLLECTOR
LE-19
STEAMLESS
FLATWORK IRONER
1120 CFM EXHAUST
650 CFM FLUE
LE-13
400/500 LB
DRYING AND
CONDITIONING 570
CFM AMBIENT
COMBUSTION AIR
LE-10A LINT
COLLECTOR
LE-10
200/300 LB PASS
THROUGH DRYER
1215 CFM AMBIENT
COMBUSTION AIR
LE-10A LINT
COLLECTOR
LE-10
200/300 LB PASS
THROUGH DRYER
1215 CFM AMBIENT
COMBUSTION AIR
LE-10A LINT
COLLECTOR
LE-10
200/300 LB PASS
THROUGH DRYER
1215 CFM AMBIENT
COMBUSTION AIR
LE-10A LINT
COLLECTOR
LE-10
200/300 LB PASS
THROUGH DRYER
1215 CFM AMBIENT
COMBUSTION AIR
LE-10A LINT
COLLECTOR
LE-10
200/300 LB PASS
THROUGH DRYER
1215 CFM AMBIENT
COMBUSTION AIR
LE-6
SINGLE STAGE
PRESS
EXTRACTOR
750 CFM EXHAUST
LE-6
SINGLE STAGE
PRESS
EXTRACTOR
750 CFM EXHAUST
LE-5
CONTINUOUS
BATCH WASHER
1750 CFM EXHAUST
LE-5
CONTINUOUS
BATCH WASHER
1750 CFM EXHAUST
HV-1
9600 CFM SUPPLY
HV-2
20500 CFM SUPPLY
LE-22
110/120 LB
DRYING AND
CONDITIONING
LE-22
110/120 LB
DRYING AND
CONDITIONING
LE-22
110/120 LB
DRYING AND
CONDITIONING
LE-22
110/120 LB
DRYING AND
CONDITIONING
8" GOOSENECK
1,120 CFM
EXHAUST
10" GOOSENECK
650 CFM
FLUE
26" GOOSENECK
9,800 CFM
INTAKE
24" GOOSENECK
10,370 CFM
EXHAUST
28" GOOSENECK
9,715 CFM
EXHAUST
24x24 GOOSENCK
8,500 CFM
INTAKE
24x24 GOOSENCK
17,000 CFM
INTAKE
28" GOOSENECK
19,430 CFM
EXHAUST
12x12 GOOSENECK
1,500 CFM
EXHAUST
45-REF-3
12,600 CFM EXHAUST
MODULATE TO
MAINTAIN PRESSURE
DIFFERENCE
14"Ø GOOSENECK
1,600 CFM
EXHAUST
EX WASHING MACHINE
ROOM 109
EX DRYER ROOM 109
EQUIPMENT SPACE ROOM 118
14"Ø GOOSENECK
1,600 CFM
EXHAUST
14"Ø GOOSENECK
1,600 CFM
EXHAUST
14"Ø GOOSENECK
1,600 CFM
EXHAUST
10" GOOSENECK
650 CFM
FLUE
8" GOOSENECK
1,120 CFM
EXHAUST
24x24 GOOSENCK
17,000 CFM
INTAKE
28" GOOSENECK
19,430 CFM
EXHAUST
12x12 GOOSENECK
1,500 CFM
EXHAUST
12x12 GOOSENECK
1,000 CFM
EXHAUST
12x12 GOOSENECK
1,000 CFM
EXHAUST
45-REF-2A 45-REF-1A 45-REF-2B 45-REF-1B
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
MECHANICAL FLOW DIAGRAMS
M-701
NOT TO SCALE
D1
LAUNDRY AIRFLOW DIAGRAM
1 REV 2 07/18/25
| Sheets |
| MD101 - MECHANICAL HVAC DEMOLITION PLAN - BASEMENT |
| MD102 - MECHANICAL PIPING DEMOLITION PLAN - BASEMENT |
| MD103 - MECHANICAL DEMOLITION PLAN - FIRST FLOOR |
| MD104 - MECHANICAL DEMOLITION PLAN - ROOF |
| MH101 - MECHANICAL HVAC PLAN - BASEMENT |
| MH102 - MECHANICAL HVAC PLAN - FIRST FLOOR |
| MH103 - MECHANICAL HVAC PLAN - ROOF |
| M-601 - MECHANICAL SCHEDULES |
| M-603 - MECHANICAL SCHEDULES |
| M-701 - MECHANICAL FLOW DIAGRAMS |
File details come from the government source that posted it. Updated .