S06 Updated Drawings Mechanical Rev2.pdf

PDF 2 MB Posted

Attached to
Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45 Federal contract opportunity
Solicitation number
36C24125R0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

These are mechanical engineering drawings for the upgrade of the Laundry Building 45 at the Brockton VA Campus, prepared by ClarkNexsen and dated July 14, 2025. The comprehensive set of 10 technical drawings includes mechanical HVAC demolition plans for the basement, first floor, and roof, mechanical HVAC plans for each floor, mechanical piping plans, equipment schedules, and a laundry airflow diagram. The drawings detail the replacement and modification of existing mechanical systems, including variable refrigerant flow systems, ventilation ductwork, exhaust systems, heating equipment, and associated components. Key mechanical equipment includes multiple indoor and outdoor heat recovery units, heat pumps, energy recovery ventilators, fans, heat exchangers, and specialized laundry equipment exhaust and intake systems. The project involves a full mechanical system upgrade for a VA laundry facility, with careful coordination of new equipment installation and existing infrastructure preservation.

View the file

Other files for this federal contract opportunity

Other files attached to Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45, newest first.
File Type Posted
36C24125R0008 0007.docx DOCX document
S06 RFI Questions and Answers 8.11.2025 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
S06 Site Visit Sheet 7.28.2025.pdf PDF
S06 Updated Drawings 2025-07-18 VA Brockton B45 Laundry Structural Rev 2.pdf PDF
S06 Updated Drawings 10438_ELEC_REV2.pdf PDF
S06 WD MA20250012 07.18.2025.pdf PDF
S06 Updated Specifications 87100 R2.pdf PDF
S06 Updated Drawings 2224 VA Brockton REV 2 architectural.pdf PDF
S06 Updated Specifications 085113.pdf PDF
S06 2025-07-18 Addendum No. 2.pdf PDF
S06 Updated Drawings 250716 FP REV 2.pdf PDF
S06 Updated Drawings Plumbing Rev2 7-14-25.pdf PDF
S06 Updated Specifications 000110.pdf PDF
S06 RFI Questions and Answers 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
36C24125R0008 0006.docx DOCX document
S06 36C24125R0008 0005.docx DOCX document
S06 36C24125R00008 0004.pdf PDF
36C24125R0008 0003.docx DOCX document
36C24125R0008 0002.docx DOCX document
36C24125R0008 0001.docx DOCX document
S06 Site Visit Sign In Sheet 4.24.2025.pdf PDF
S02 Brockton Campus Map.pdf PDF
S02 Base Offer Price Breakdown.xlsx XLSX spreadsheet
S02 SSJ 523A-10-316 Laundry Building 45.pdf PDF
S02 F3-1 Code Search 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-1 Structural Design Criteria 523A5-10-316 Laundry Building 45.pdf PDF
S02 Submittal Register 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 Final Design Analysis Consolidated 523A5-10-316 Laundry Building 45.pdf PDF
36C24125R0008_2.docx DOCX document
S02 Attachment A Technical Project Information Sheet for 36C24125R0008.docx DOCX document
S02 WD MA20250012 04.04.2025.pdf PDF
S02 Primavera P6 Schedule Review Checklist 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 Equipment List - Existing vs New Equipment 523A5-10-316 Laundry Building 45.pdf PDF
S02 Attachment B Past Performance Project Information Sheet for 36C24125R0008.docx DOCX document
S02 SOW 523A5-10-316 Laundry Building 45.pdf PDF
S02 PCRA 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Specifications 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawings Revision 01 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawing Set 523A5-10-316 Laundry Building 45 08.21.2024.pdf PDF
S02 F8-1 Laundry Equipment Storage 523A5-10-316 Laundry Building 45.pdf PDF
S02 F3-3 HLAC Accreditation Standards 09.21.2023 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-2 Attachment 2 Structural Calculations 523A5-10-316 Laundry Building 45.pdf PDF
S02 6500 Appendix B and C Security Language 523A-10-316 Laundry Building 45.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

M M

M

M

M

M

M

M

TRUE

NORTH

PLAN

NORTH

PP

A1

EE

FF

B1

C1

GG

5.1

4.2

3.3

2.4

DD CC

BB

1'

AA A

2'

B

3'

C

4.5

4'

5'

E

6'

F

7'

G

8'

H

9'

I

MECHANICAL

STORAGE

B024

CONTROLLER

ROOM

B022

MENS

CHANGING

ROOM

B013

CLOSET

B029

MECHANICAL

SHOP

B023

WOMENS

TOILET

B009A

TOILET

VEST

B010

LOUNGE

B004

LINEN

STORAGE

B026

SERV

CORR

B012

STAIR

B007

WOMENS

SHOWER

B009

TOILET

HAC

B019

STORAGE

B001a

GAS

METER

AND

REGULATING

ROOM

B002

MECH

B018

WOMEN

CHANGING

B011

LIGHT

STORAGE

B005

SERVICE

ELEVATOR-1

B025-1

VEST

B008

CORR.

B006

SECURE

STORAGE

B028

STORAGE

B015

MECHANICAL

B017

IT ROOM

B020

MECH

B003

45-HWUH-14

45-HWUH-15

45-VRFAC-6C

45-VRFAC-6A

45-VRFAC-6B

45-VRFAC-2

45-HWUH-16

45-ERU-1

45-VRFAC-22

45-VRFAC-1

45-HV-2

45-HWUH-10

45-VRFAC-21C 45-VRFAC-21D

45-VRFAC-21A45-VRFAC-21B

45-HWUH-11

45-VRFHP-ELECTRIC

45-VRFHRU-1

45-VRFAC-7A

45-VRFAC-4B

45-VRFAC-3

45-VRFAC-4A

45-HV-3

45-HV-4

45-RF-1

45-HWUH-17

45-HWUH-18

45-HWUH-13

45-VRFAC-7B

x1

32x14 x1 x1

22x12

18x12 x1

30x16 x1

30x16

(800)

(500)

(500)

(500)

(500)

(500)

(500)

(100)

(142)

18x10

10x10

6x6

10x6

8x610x8

10x6

6x6

8x6

16x8

14x6

14x6

12x4

(100)

14x6

(50)

(125) (100)

(75) (100)

(50)

(225)

12x4 12x6 14x4

18x6

8x6

6x6

18x6

(100)

18x8 (75)

(75)

(275)

18x8

64x24

SECURITY

CLOSET

B027

18x8

TANK

ROOM

B001b

12x6

12x8

12x4

14x8

45-HWUH-12

2 3

FSD

FSD

FSD

FSD

FSD

FSDFSD

FSD

FSD

FSD

FSD

12x6

FSD

FSDFSD

FSDFSD

8FSD

FSD

18x6

18x8

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

MECHANICAL HVAC DEMOLITION PLAN -

BASEMENT

MD101

1/8" = 1' - 0" 0 5' 10' 15' 30'

GENERAL NOTES # DEMOLITION NOTES

1 EXISTING TO REMAIN 64x24 VENTILATION SUPPLY DUCTWORK RISER UP TO

FIRST FLOOR. FIRE DAMPER INSTALLED AT PENETRATION THROUGH FLOOR.

SEE SHEET MH102 FOR CONTINUATION.

2 EXISTING TO REMAIN 48x36 OUTSIDE AIR INTAKE LOUVER.

3 EXISTING TO REMAIN 48x30 OUTSIDE AIR INTAKE LOUVER.

4 EXISTING TO REMAIN 42x30 EXHAUST LOUVER WITH BACKDRAFT (GRAVITY)

DAMPER.

5 EXISTING TO REMAIN 42x30 EXHAUST LOUVER.

6 EXISTING TO REMAIN 24x16 OUTSIDE AIR INTAKE LOUVER.

7 EXISTING TO REMAIN 24x16 EXHAUST LOUVER.

8 EXISTING TO REMAIN 48x18 RETURN GRILLE.

9 REMOVE AND REINSTALL DUCTWORK AS NECESSARY IN THIS AREA TO

ACCOMODATE STEEL REINFORCEMENT OF EXISTING STRUCTURE.

1 SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2 SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.

3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF

PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.

4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY

EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.

5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER

MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT

PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.

6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT

PROVIDED PRIOR TO INSTALLATION.

7 BALANCE AIR DEVICES TO CFM SHOWN IN PARENTHESIS.

8 PROVIDE FIRE DAMPER/FIRE SMOKE DAMPERS WITH ACCESS DOOR.

9 MECHANICAL CONTRACTOR TO VERIFY DIFFUSER THROW AND LOCATION

TO REACH OPERATORS OCCUPIED ZONE TO OBTAIN EFFECTIVE POINT

COOILING.

SCALE: 1/8" = 1'-0"

MECHANICAL HVAC DEMOLITION PLAN - BASEMENT

1 REV 2 07/18/25

7-14-2025

TRUE

NORTH

PLAN

NORTH

PP

A1

EE

FF

B1

C1

GG

5.1

4.2

3.3

2.4

DD CC

BB

1'

AA A

2'

B

3'

C

4.5

4'

5'

E

6'

F

7'

G

8'

H

9'

I

T VRFAC-1

T

45-HWUH-10

T 45-HWUH-11

T

T

VRFAC-4A

T VRFAC-5A TVRFAC-5B

T

VRFAC-3

TVRFAC-4B

TVRFAC-7B

T VRFAC-7A

TVRFAC-6C

TVRFAC-6A

T VRFAC-6B

TVRFAC-15

T

45-HWUH-14

T

45-HWUH-16

T VRFAC-2

T

VRFAC-21D

VRFAC-21C

VRFAC-21B

T

T

T

VRFAC-21A

T

HWUH-17

THWUH-18

45-HWUH-13

45-HV-2

HEX-2

GP-3

GP-4

45-HWUH-14

H W

S H

W R

RS/RL

RS/RL

PD

RS/RL

P D

PD

P D

HWS

HWR

G H

W S

H W

R H

W S

P D

P D

PD

R S

/R L

P D

R S

/R L

R S

/R L

RS/RL

R S

/R L

R S

/R L

R S

/R L

HWR

HWS

HWR

HWS

H W

R H

W S

P D

RS/RL

P D

PD

P D

HWS

HWR

PD

RS/RL

P D

GHWS

GHWR

AS-2

45-HWUH-15

HWS

HWR

RS/RL2

H W

S H

W R

H W

S H

W R

45-HV-3

45-HV-4

45-HWUH-17

45-HWUH-18

45-VRFAC-7B

45-VRFAC-4B45-VRFAC-7A

45-VRFAC-3 CMB

45-ERU-1

45-VRFAC-22

45-VRFAC-2

45-VRFAC-6A45-VRFAC-6B

45-VRFAC-6C

45-VRFAC-4A 45-HWUH-12

45-HWUH-13

45-VRFAC-21C 45-VRFAC-21D

45-VRFAC-21A45-VRFAC-21B

45-VRFHRU-1

45-VRFHP-ELECTRIC

45-HWUH-11

45-VRFAC-145-HWUH-10

3/4"

4"

1/2"

1/2"

1 1/4"

1/2"

1"

1/2"

1/2"

3/4"

1/2"

4"

1/2" 1/2"

3/4"

2"

1/2"

2 1/2"

SERV

CORR

B012

MECH

B003

LOUNGE

B004

MENS

CHANGING

ROOM

B013

TOILET

VEST

B010

TOILET

HAC

B019

WOMEN

CHANGING

B011

WOMENS

SHOWER

B009

WOMENS

TOILET

B009A

VEST

B008

STAIR

B007

GAS

METER

AND

REGULATING

ROOM

B002

CORR.

B006

LIGHT

STORAGE

B005

SECURE

STORAGE

B028

STORAGE

B015

MECHANICAL

STORAGE

B024

MECHANICAL

SHOP

B023

CONTROLLER

ROOM

B022

SERVICE

ELEVATOR-1

B025-1

MECHANICAL

B017

LINEN

STORAGE

B026

STORAGE

B001a

IT ROOM

B020

MECH

B018

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

MECHANICAL PIPING DEMOLITION PLAN -

BASEMENT

MD102

1/8" = 1' - 0" 0 5' 10' 15' 30'

GENERAL NOTES # DEMOLITION NOTES

1 EXISTING TO REMAIN 1-1/4" HOT WATER (HYDRONIC) SUPPLY AND RETURN

RISERS UP TO FIRST FLOOR. SEE SHEET MP102 FOR CONTINUATION.

2 EXISTING TO REMAIN HEX-2 ASSEMBLY. SEE SHEET M-802 FOR HEX-2

CONTROL DIAGRAM AND TYPICAL HEX ASSEMBLY PIPING INSTALLATION

DETAIL.

3 REMOVE AND REINSTALL PIPING AS NECESSARY IN THIS AREA TO

ACCOMODATE STEEL REINFORCEMENT OF EXISTING STRUCTURE.

1 SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2 SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.

3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF

PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.

4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY

EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.

5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER

MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT

PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.

6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT

PROVIDED PRIOR TO INSTALLATION.

7 BALANCE AIR DEVICES TO CFM SHOWN IN PARENTHESIS.

8 PROVIDE FIRE DAMPER/FIRE SMOKE DAMPERS WITH ACCESS DOOR.

9 MECHANICAL CONTRACTOR TO VERIFY DIFFUSER THROW AND LOCATION

TO REACH OPERATORS OCCUPIED ZONE TO OBTAIN EFFECTIVE POINT

COOILING.

SCALE: 1/8" = 1'-0"

MECHANICAL PIPING DEMOLITION PLAN - BASEMENT

M M

M

M M

PP

A1

EE

FF

B1

C1

GG

5.1

4.2

3.3

2.4

DD CC

BB

1'

AA A

2'

B

3'

C

4.5

4'

5'

E

6'

F

7'

G

8'

H

9'

I

SERVICE

ELEVATOR-2

B025-2

OFFICE

OPEN

RECEPTION

VEST

MENS

TOILET

WOMENS

TOILET

LAUNDRY

SUPERVISOR

OFFICE

SOIL

TEXTILE

RECEIVING

CLEAN

TEXTILE

MAKE UP

CART

WASHING

SOIL CART

STAGING

CLEAN

CART

STAGING

FLATWORK

FINISHING

106CART

MAKE UP

DRYING

PRODUCTION

SOIL

TEXTILE

SORTING

AIR LOCK

ROOM

WASHING

PRODUCTION

EQUIPMENT

SPACE

OFFICE

SUPERVISOR

TRAINING

ROOM

100A

45-PEF-245-PEF-1

45-HWUH-2

45-HWUH-5

45-HWUH-4

45-HWUH-1

45-HWUH-3

45-VRFAC-16

45-VRFAC-18

45-VRFAC-12

45-VRFAC-11

45-VRFAC-10

45-VRFAC-8

45-VRFAC-9

45-VRFAC-20

45-VRFAC-17

45-HWUH-6

45-VRFAC-13

45-VRFAC-15

45-VRFAC-14

45-HWUH-7

45-HWUH-8

45-PEF-3

45-HWUH-9

T

T

T

T

VRFAC-9

VRFAC-8

VRFAC-11

VRFAC-12

VRFAC-10

THWUH-3

T HWUH-4

T HWUH-5

THWUH-2

THWUH-1

TVRFAC-13

T HWUH-6

DP 45-HV-2 DPS

T HWUH-8

THWUH-9

DP45-HV-1 DPS

T 45-HV-1

T 45-HV-2

64x24 48x24 44x24 40x20 36x18

22x16

20x10

20x10 20x10

22x8 x1 x1

20x10 x8

32x824x6

18x610x6 x8

30x20

26x18

32x32 32x32 32x32

18ø

12x6

(226) (226) (226)

(226)

(226)(1575) (1575) (1575)

(1575) (1575)

18ø

10x6 18x6

18x6 10x6(220)(220)

(220) (220)

(1575)

(1575)

(1575)

(1575) 20x10

20x10

20x10

6x6

6x6

8x6

10x8

14x88x6

(60) (100)

(75)

10x6 6x6

45-TEX-245-TEX-1

(230)(230)(230) 18x610x6

14x6

(335)

22x16

(1575)

(1575)

20x10

8x6

6x6

4ø

4ø

4ø

4ø

4ø

14x6

(335)

20x10

20x10

14x6(335) x8

(226)(226)

22x818x818x610x6

(226)(226)(226)

24x16

16x10

16x10

(960)

(960) (960)

(960)

(960)

(960)

(960)

(960)

(960)

(960)

16x10

20x12

(1575) (1600)

16x10

16x10

16x10 16x1016ø

16ø

12ø

12ø

14ø

14ø

14ø

14ø

THWUH-7

x3

32x32

1 1

36x20

32x8 x1 x1 x1

45-VRFAC-19

TRUE

NORTH

PLAN

NORTH

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

MECHANICAL DEMOLITION PLAN - FIRST FLOOR

MD103

1/8" = 1' - 0" 0 5' 10' 15' 30'

GENERAL NOTES # DEMOLITION NOTES

1 DEMOLISH DUCTWORK, HANGERS AND ACCESSORIES.

2 DEMOLISH DUCTWORK, HANGERS AND ACCESSORIES UP TO INATKE HOOD

ON ROOF. SEE SHEET MD102 FOR CONTINUATION.

3 REMOVE DUCTWORK, HANGERS, ACCESSORIES AND AIR DEVICES TO

POINTS INDICATED. STORE FOR RELOCATION IN NEW WORK.

1 SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2 SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.

3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF

PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.

4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY

EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.

5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER

MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT

PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.

6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT

PROVIDED PRIOR TO INSTALLATION.

7 BALANCE AIR DEVICES TO CFM SHOWN IN PARENTHESIS.

8 PROVIDE FIRE DAMPER/FIRE SMOKE DAMPERS WITH ACCESS DOOR.

9 MECHANICAL CONTRACTOR TO VERIFY DIFFUSER THROW AND LOCATION

TO REACH OPERATORS OCCUPIED ZONE TO OBTAIN EFFECTIVE POINT

COOILING.

SCALE: 1/8" = 1'-0"

MECHANICAL DEMOLITION PLAN - FIRST FLOOR

1 REV 2 07/18/25

PP

A1

EE

FF

B1

C1

GG

5.1

4.2

3.3

2.4

DD CC

BB

1'

AA A

2'

B

3'

C

4.5

4'

5'

E

6'

F

7'

G

8'

H

9'

I

45-VRFHRU-2

45-VRFHP-1

45-RV-1 45-RV-1 45-RV-1

45-HV-1

45-RV-1

36x20

2 2 2

5 5 5

TRUE

NORTH

PLAN

NORTH

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

MECHANICAL DEMOLITION PLAN - ROOF

MD104

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

GENERAL NOTES # DEMOLITION NOTES

1 EXISTING TO REMAIN 10"DIA GOOSENECK.

2 REMOVE AND STORE 28" DIA EXHAUST CURB FOR RELOCATION IN NEW

WORK.

3 REMOVE AND STORE 24" DIA EXHAUST CURB FOR RELOCATION IN NEW

WORK.

4 EXISTING TO REMAIN 20x36 VENTILATION AIR DUCT DOWN TO FIRST FLOOR.

SEE SHEET MH102 FOR CONTINUATION.

5 DEMOISH INTAKE HOOD AND ACCESSORIES. PATCH ROOF.

6 EXISTING TO REMAIN 1/2" REFRIGERANT PIPING FROM 45-VRFHRU-2 DOWN

TO FIRST FLOOR. SEE SHEET MP102 FOR CONTINUATION.

7 EXISTING TO REMAIN 1/2" REFRIGERANT PIPING FROM 45-VRFHP-1 DOWN TO

FIRST FLOOR. SEE SHEET MP102 FOR CONTINUATION.

1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2. SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.

3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF

PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.

4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY

EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.

5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER

MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT

PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.

6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT

PROVIDED PRIOR TO INSTALLATION.

7 REFRIGERANT PIPING TO BE SIZED AS PER MANUFACTURER'S

RECOMMENDATIONS.

SCALE: 1/8" = 1'-0"

MECHANICAL DEMOLITION PLAN - ROOF

1 REV 2 07/18/25

4" DRAIN

6" DRAIN

18x24x18

18x18x18

6" DRAIN

18x18x18

6" DRAIN

18x24x18

39.3 39.3

40.1

"D"

CONTROL

"D"

CONTROL

J BOX

"A"

CONTROL

EXPAND

TANK

E X

P A

N D

T A

N K

39.3.1

10HP

WATER

HEAT'G

CIRC

PUMPS/

HEAT

EXCHG

CHEM

POT

IN

LE

T

O U T

IN

O U T

"C

LO

O P

H E A T

E X C H A N G E R

C O N T R O L

LWW FILTER SYST.

80"∅ x 5'H Tank

PIPE_

3_

INC

H

PIPE_

3_

INC

H

PIPE_

3_

INC

H

39.1

H E

A T

R E

C L

A

IM

S Y

S T

'P2'

LWW WASTE WATER

RAISED PIT TANK

LWW

SUMP

PUMP

'P1'

39.7

WATER

TRATMENT

A S

D C

-3

-2

.5 /1

/S S

39.4

39.4

TUNNEL HEATING

SYST.S

2 CONTROL

"F" x18 x18

D R A

IN

.2

.3 .2

L H

W T

A N

KL

T

W T

A N

K

T R

IP

L E

P U

M P

S

H

P H

W C

IR

C

D U

A L

P U

M P

S

C O N T R O L

"B

3" GAS INLET

GAS

CONTROL

T-6800

INSPECTION DOOR INSPECTION DOOR

PANEL

24" DRAFT HOODS

6" INLET 6" OUTLET

BARMETRIC DAMPER WITH 28" VERTICAL OUTLET

3" GAS INLET

GAS

CONTROL

T-6800

INSPECTION DOOR INSPECTION DOOR

PANEL

24" DRAFT HOODS

6" INLET 6" OUTLET

BARMETRIC DAMPER WITH 28" VERTICAL OUTLET

A

B

O P

EN

C LO SE

O P

EN

C LO SE

un io n_

2_inc h

B

ALL

VA

LVE

N

IB

CO

un io n_ 2_ inc h

B

ALL

VA

LVE

N

IB

CO

A

B

O P

EN

C LO SE

O P

EN

C LO SE

un io n_

2_inc h

B

ALL

VA

LVE

N

IB

CO

un io n_ 2_ inc h

B

ALL

VA

LVE

N

IB

CO

C A

O U T

LET

MODEL: ASD

40ST

CONTROL

COOLING

AIR

AIR

DISCHARGE

COOLING

AIR

INLET

AIR

ELEC

CONN

D R A I N

AIR

DRYER

COMPRESSOR

COMPRESSOR

OUTLET

INLET

AIR

AIR

DRYER

INLET

C A

O U T

LET

MODEL: ASD

40ST

CONTROL

COOLING

AIR

AIR

DISCHARGE

COOLING

AIR

INLET

AIR

ELEC

CONN

D R A I N

AIR

DRYER

COMPRESSOR

COMPRESSOR

OUTLET

INLET

AIR

AIR

DRYER

INLET

M M

M

M

M

M

M

M

M

M

M

PP

A1

EE

FF

B1

C1

GG

5.1

4.2

3.3

2.4

DD CC

BB

1'

AA A

2'

B

3'

C

4.5

4'

5'

E

6'

F

7'

G

8'

H

9'

I

MECHANICAL

STORAGE

B024

CONTROLLER

ROOM

B022

MENS

CHANGING

ROOM

B013

CLOSET

B029

MECHANICAL

SHOP

B023

WOMENS

TOILET

B009A

TOILET

VEST

B010

LOUNGE

B004

LINEN

STORAGE

B026

SERV

CORR

B012

STAIR

B007

WOMENS

SHOWER

B009

TOILET

HAC

B019

STORAGE

B001a

GAS

METER

AND

REGULATING

ROOM

B002

MECH

B018

WOMEN

CHANGING

B011

LIGHT

STORAGE

B005

SERVICE

ELEVATOR-1

B025-1

VEST

B008

CORR.

B006

SECURE

STORAGE

B028

STORAGE

B015

MECHANICAL

B017

IT ROOM

B020

MECH

B003

45-HWUH-14

45-HWUH-15

45-VRFAC-6C

45-VRFAC-6A

45-VRFAC-6B

45-VRFAC-2

45-HWUH-16

45-ERU-1

45-VRFAC-22

45-VRFAC-1

45-HV-2

45-HWUH-10

45-VRFAC-21C 45-VRFAC-21D

45-VRFAC-21A45-VRFAC-21B

45-HWUH-11

45-VRFHP-ELECTRIC

45-VRFHRU-1

45-VRFAC-7A

45-VRFAC-4B

45-VRFAC-3

45-VRFAC-4A

45-VRFAC-5A 45-VRFAC-5B

45-HV-3

45-HV-4

45-RF-1

45-HWUH-17

45-HWUH-18

45-HWUH-13

45-VRFAC-7B

x1

32x14 x1 x1

22x12

18x12 x1

30x16 x1

30x16

(800)

(500)

(500)

(500)

(500)

(500)

(500)

(100)

(142)

18x10

10x10

6x6

10x6

8x610x8

10x6

6x6

8x6

16x8

14x6

14x6

12x4

(100)

14x6

(50)

(125) (100)

(75) (100)

(50)

(225)

12x4 12x6 14x4 18x6

8x6

6x6

18x6

(100)

18x8 (75)

(75)

(275)

18x8

64x24

SECURITY

CLOSET

B027

18x8

TANK

ROOM

B001b

12x6

12x8

12x4

14x8

45-HWUH-12

2 3

(424)

(424)

(424) (424)

(424)

(424)

(424)

(424)

(424)

45-RF-2

30x1630x16

30x16

20x24

20x20

14x10

24x1414x10

16x12

14x10

(424)

12x8

20x16

28x28 x1

28x28

FSD

FSD

FSD

FSD

FSD

FSDFSD

FSD

FSD

FSD

FSD

12x6

FSD

FSDFSD

FSDFSD

18ø 24x18

28ø 28ø

VF-4

VF-3

(2000)

FSD

FSD

18x6

6x4

18x8

13 13

15 LV-3

LV-2

LV-1

TRUE

NORTH

PLAN

NORTH

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

MECHANICAL HVAC PLAN - BASEMENT

MH101

SCALE: 1/8" = 1'-0"

MECHANICAL HVAC PLAN - BASEMENT

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

# KEY NOTESGENERAL NOTES

1 SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2 SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.

3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF

PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.

4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY

EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.

5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER

MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT

PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.

6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT

PROVIDED PRIOR TO INSTALLATION.

7 BALANCE AIR DEVICES TO CFM SHOWN IN PARENTHESIS.

8 PROVIDE FIRE DAMPER/FIRE SMOKE DAMPERS WITH ACCESS DOOR.

9 MECHANICAL CONTRACTOR TO VERIFY DIFFUSER THROW AND LOCATION

TO REACH OPERATORS OCCUPIED ZONE TO OBTAIN EFFECTIVE POINT

COOILING.

1 EXISTING TO REMAIN 64x24 VENTILATION SUPPLY DUCTWORK RISER UP TO

FIRST FLOOR. FIRE DAMPER INSTALLED AT PENETRATION THROUGH FLOOR.

SEE SHEET MH102 FOR CONTINUATION.

2 EXISTING TO REMAIN 48x36 OUTSIDE AIR INTAKE LOUVER.

3 EXISTING TO REMAIN 48x30 OUTSIDE AIR INTAKE LOUVER.

4 EXISTING TO REMAIN 42x30 EXHAUST LOUVER WITH BACKDRAFT (GRAVITY)

DAMPER.

5 EXISTING TO REMAIN 42x30 EXHAUST LOUVER.

6 EXISTING TO REMAIN 24x16 OUTSIDE AIR INTAKE LOUVER.

7 EXISTING TO REMAIN 24x16 EXHAUST LOUVER.

8 EXISTING TO REMAIN 48x18 RETURN GRILLE.

9 PROVIDE 48x12 RETURN GRILLE. BASIS OF DESIGN: METALAIRE.

10 PROVIDE 57x36x12 PLENUM ATTACHED TO LOUVER LV-1.

11 PROVIDE 57x36x12 PLENUM ATTACHED TO LOUVER LV-2.

12 ROUTE 18" DIA EXHAUST DUCT UP THROUGH FLOOR. SEE SHEET MH102 FOR

CONTINUATION.

13 CONTRACTOR TO FURNISH AND INSTALL NEW 28" DIA FLUE PIPE THROUGH

OUTSIDE WALL AND UP ALONG WALL TO ABOVE ROOF. MOUNT PER SMACNA

SUPPORT DETAIL. FLUE PIPE OUTDOORS TO BE METAL-FAB IPIC-441 (304 SS

FLUE, SS CASING, AND 1" CERAMIC FIBER INSOLATION). SEE SHEET MH103

FOR CONTINUATION. SEE CONCENTRIC VENT DETAIL ON SHEET M-503.

14 PROVIDE 24x24 ALUMINUM GRILLE BY PRICE #96 (OR APPROVED EQUAL)

WITH 3/4" SPACING AND 45 DEG DEFLECTION; TRANSITION TO 18" DIA DUCT.

15 PROVIDE 114x60 LOUVER AS SCHEDULED. LOUVER IS COMBINATION

LOUVER WITH INTEGRAL MOTOR OPERATED DAMPER. INTERLOCK LOUVER

WITH BOILERS TO OPEN WHENEVER A BOILER IS IN USE.

E X H

UNLOAD

FRONT

INLET

165GP

X

X

ZZ

X

Y

X

D ra w e r

D ra w e r

Input

Linen Output

Linen Output

Gate

Gate 2

REMOTE

STATUS

W O

R K

S T

A T

IO

N

W O

R K

S T

A T

IO

N

ENERGY

MONITOR

COMM.

SYST.

MONORAIL

CNTRLS

Y

FLOW

OF

GOODS

FLOW

OF

GOODS

24 24

27 27

10 10 10

8 8

212121 222222

10a

24 24

10a 10a 10a 10a

39.9

39.8

5a

VAC

CAB

PUMP/

CNTRL

1 43

C P

1 2 3 4

C A

R T

PATIENT CLOTHING

& SURGICAL LINEN

PROCESSING AREA

C P

CP-1

TOP CONVEYOR EL 4'0"

BOTTOM CONVEYOR EL 2'6"

YYY

X

Y

X

E

A

XX

X

YY

X

X

YY

X

X

YY

X

X

YY

X

X

Y

X

H W

C W

TW

H W

C W

TW

X

Y

X

Y

X

Y

X

Y

X

Y

X

Y

X

Y

X

Y

0. 3000

0. 3000

0. 5000

X

Y

X

Y

X

Y

X

Y

0. 3000

0. 3000

0. 5000

GOODS

FLOW

OF

X

Y

X

Y YY

Y Y

X X

Y Y

X X

M M

M

M M

PP

A1

EE

FF

B1

C1

GG

5.1

4.2

3.3

2.4

DD CC

BB

1'

AA A

2'

B

3'

C

4.5

4'

5'

E

6'

F

7'

G

8'

H

9'

I

SERVICE

ELEVATOR-2

B025-2

OFFICE

OPEN

RECEPTION

VEST

MENS

TOILET

WOMENS

TOILET

LAUNDRY

SUPERVISOR

OFFICE

SOIL

TEXTILE

RECEIVING

CLEAN

TEXTILE

MAKE UP

CART

WASHING

SOIL CART

STAGING

CLEAN

CART

STAGING

FLATWORK

FINISHING

106CART

MAKE UP

DRYING

PRODUCTION

SOIL

TEXTILE

SORTING

AIR LOCK

ROOM

WASHING

PRODUCTION

EQUIPMENT

SPACE

OFFICE

SUPERVISOR

TRAINING

ROOM

100A

45-PEF-245-PEF-1

45-HWUH-2

45-HWUH-5

45-HWUH-4

45-HWUH-1

45-HWUH-3

45-VRFAC-16

45-VRFAC-18

45-VRFAC-12

45-VRFAC-11

45-VRFAC-10

45-VRFAC-8

45-VRFAC-9

45-VRFAC-20

45-VRFAC-17

45-HWUH-6

45-VRFAC-13

45-VRFAC-15

45-VRFAC-14

45-HWUH-7

45-HWUH-8

45-PEF-3

45-HWUH-9

48x24 44x24 40x20 36x18

20x10

20x10

22x8 x1 x1

20x10 x8

32x824x6

18x610x6 x8

30x20

26x18

12x6

(226) (226) (226) (226)

(226)(1575) (1575)

(1575)

10x6 18x6

18x6 10x6(220)(220)

(220) (220)

(1575)

(1575)

(1575)

(1575)

20x10

20x10

20x10

6x6

6x6

8x6

10x8

14x88x6

(60) (100)

(75)

10x6 6x6

45-TEX-245-TEX-1

(230)(230)

(230) 18x610x6

14x6

(335)

22x16

(1575)

(1575)

20x10

8x6

6x6

4ø

4ø

4ø

4ø

4ø

14x6 (335)

20x10

20x10

14x6

(335) x8

(226)(226)

22x818x818x610x6 (226)

(226)(226)

24x16

16x10 16x10 (960)

(960) (960)

(960)

(960)

(960)

(960)

(960)

(960)

(960)

16x10

20x12

(1575) (1600)

16x10

16x10

16x10

16x10

16x10 16x10

36x20

32x8

45-HC-5

36x36

64x24

22x16 20x10

12 12

13 13

14 15

12ø

12ø

12ø

12ø 12ø

(1575)

(1575) x1 x1

45-VRFAC-19

24 24 24

45-REF-1B

45-REF-1A

45-REF-2A

45-REF-2B

12ø16

12ø

12ø

TRUE

NORTH

PLAN

NORTH

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

MECHANICAL HVAC PLAN - FIRST FLOOR

MH102

SCALE: 1/8" = 1'-0"

MECHANICAL HVAC PLAN - FIRST FLOOR

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

# KEY NOTESGENERAL NOTES

1 PROVIDE 12" SCHEDULE 80 CPVC EXHAUST DUCT RISER UP TO GOOSENECK

ON ROOF. SEE SHEET MH103 FOR CONTINUATION.

2 PROVIDE 12" SCHEDULE 80 CPVC EXHAUST DUCT RISER UP TO GOOSENECK

ON ROOF. SEE SHEET MH103 FOR CONTINUATION.

3 PROVIDE 12" SCHEDULE 80 CPVC EXHAUST DUCT RISER UP TO GOOSENECK

ON ROOF. SEE SHEET MH103 FOR CONTINUATION.

4 PROVIDE 12" SCHEDULE 80 CPVC EXHAUST DUCT RISER UP TO GOOSENECK

ON ROOF. SEE SHEET MH103 FOR CONTINUATION.

5 EXISTING TO REMAIN 10"DIA EXHAUST DUCT RISER UP TO GOOSENECK ON

ROOF. INSTALLATION CONTRACTOR TO FIELD VERIFY DUCT ROUTING TO

LAUNDRY EQUIPMENT AND ADJUST ACCORDINGLY. SEE SHEET MH103 FOR

CONTINUATION.

6 CONNECT 36x36 OUTSIDE AIR DUCT TO EXISTING 69x69 DUCT RISER UP TO

VENTILATOR 45-RV-1 ON ROOF. SEE SHEET MH103 FOR CONTINUATION.

7 PROVIDE 10" DIA GAS VENT/FLUE STACK RISER UP TO ROOF. SEE SHEET

MH103 FOR CONTINUATION.

1 SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2 SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.

3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF

PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.

4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY

EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.

5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER

MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT

PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.

6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT

PROVIDED PRIOR TO INSTALLATION.

7 BALANCE AIR DEVICES TO CFM SHOWN IN PARENTHESIS.

8 PROVIDE FIRE DAMPER/FIRE SMOKE DAMPERS WITH ACCESS DOOR.

9 MECHANICAL CONTRACTOR TO VERIFY DIFFUSER THROW AND LOCATION

TO REACH OPERATORS OCCUPIED ZONE TO OBTAIN EFFECTIVE POINT

COOILING.

8 PROVIDE 8" DIA EXHAUST AIR VENT RISER UP TO ROOF. SEE SHEET MH103

FOR CONTINUATION.

9 EXISTING TO REMAIN 64x24 VENTILATION DUCT RISER DOWN TO BASEMENT.

SEE SHEET MH101 FOR CONTINUATION.

10 EXISTING TO REMAIN 36x20 VENTILATION DUCT RISER UP TO ROOF. SEE

SHEET MH103 FOR CONTINUATION.

11 PROVIDE 20x20 EXHAUST DUCT UP TO EXHAUST FAN 45-REF-3 ON ROOF.

SEE SHEET MH103 FOR CONTINUATION.

12 EXISTING TO REMAIN 48x12 OUTSIDE AIR INTAKE LOUVER.

13 EXISTING TO REMAIN 24x24 OUTSIDE AIR INTAKE LOUVER.

14 EXISTING TO REMAIN 12x8 EXHAUST LOUVER.

15 EXISTING TO REMAIN 12x8 OUTSIDE AIR INTAKE LOUVER.

16 SLOPE HORIZONTAL DUCT BACK TO EQUIPMENT FOR DRAINAGE.

17 PROVIDE 26" DIA OUTDOOR AIR DUCT FROM RECTANGULAR DRYER

CONNECTION UP THROUGH ROOF. SEE SHEET MH103 FOR CONTINUATION.

18 PROVIDE 24" DIA EXHAUST DUCT FROM DIRECT MOUNTED LINT FILTER

OUTLET CONNECTION UP THROUGH ROOF. SEE SHEET MH103 FOR

CONTINUATION.

19 PROVIDE 14" DIA OUTDOOR AIR DUCT UP THROUGH ROOF. SEE MH103 FOR

CONTINUATION.

20 MODIFY AND RE-INSTALL STORED DUCTWORK AND AIR DEVICES AS

NEEDED TO CLEAR LAUNDRY EQUIPMENT.

21 PROVIDE 76x30x24 OUTDOOR AIR PLENUM ABOVE CART WASHER WITH 18x30 DUCT DROPS ON EACH SIDE OF BLOWER INTAKE. PROVIDE 12x24

HINGED AND GASKETED ACCESS DOOR ON EACH DROP FOR SERVICE OF

CART WASHER COMPONENTS. MECHANICAL CONTRACTOR IS RESPONSIBLE

TO COORDINATE DUCT DROPS AND CONNECTIONS WITH EQUIPMENT ON

TOP OF CART WASHER.

22 CONTRACTOR TO FURNISH AND INSTALL NEW 40x20, 20 GAUGE GALVANIZED

STEEL, INSULATED DUCT FROM EQUIPMENT CONNECTION WITH OFFSET

THRU WALL. CART WASHER EXHAUST FURNISHED WITH BACKDRAFT

DAMPER BY MANUFACTURER.

23 PROVIDE 12" DIA OUTDOOR AIR INTAKE RISER UP TO ROOF WITH A

MOTORIZED ISOLATION DAMPER INSTALLED NEAR THE DUCT TERMINATION

OF 96" AFF. SHALL DROP DOWN NEAR RESPECTIVE IRONER COMBUSTION

AIR OPENING; INSTALL 10x12 HINGED ACCESS DOOR ON DUCT. INSTALL 1/2"

EXPANDED METAL OVER OPENING. SEE SHEET MH103 FOR CONTINUATION.

24 PROVIDE 25x16 OUTDOOR AIR DUCT FROM DRYER CONNECTION WITH IMMEDIATE TRANSITION TO 24x24 UP THRU ROOF. PROVIDE MOTORIZED

ISOLATION DAMPER IN OUTDOOR AIR DUCT TO BE INTER-LOCKED WITH

RESPECTIVE DRYER OPERATION. SEE SHEET MH103 FOR CONTINUATION.

25 PROVIDE 12" DIA OUTDOOR AIR DUCT DROP UP TO ROOF WITH A

MOTORIZED ISOLATION DAMPER INSTALLED NEAR THE DUCT TERMINATION

OF 96" AFF. SHALL DROP DOWN NEAR RESPECTIVE DRYER; FIELD

COORDINATE 12x12 HINGED ACCESS DOORS ON DROPS.

26 PROVIDE 12" DIA OUTDOOR AIR DUCT DROP WITH A MOTORIZED ISOLATION

DAMPER INSTALLED NEAR THE DUCT TERMINATION OF 96" AFF. SHALL

DROP DOWN NEAR RESPECTIVE DRYER; FIELD COORDINATE 12x12 HINGED

ACCESS DOORS ON DROPS.

27 PROVIDE 18" DIA EXHAUST DUCT UP THROUGH ROOF TO EF-1 AND DOWN

THROUGH FLOOR TO BASEMENT. SEE SHEETS MH101 AND MH103 FOR

CONTINUATIONS.

28 PROVIDE 28" DIA EXHAUST DUCT FROM DIRECT MOUNT LINT FILTER OUTLET

CONNECT (LE-MLF) UP THROUGH ROOF. SEE SHEET MH103 FOR

CONTINUATION.

PP

A1

EE

FF

B1

C1

GG

5.1

4.2

3.3

2.4

DD CC

BB

1'

AA A

2'

B

3'

C

4.5

4'

5'

E

6'

F

7'

G

8'

H

9'

I

45-VRFHRU-2

45-VRFHP-1

45-HV-1

45-RV-1

36x20

EF-1

45-REF-3

910 10 10

TRUE

NORTH

PLAN

NORTH

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

MECHANICAL HVAC PLAN - ROOF

MH103

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

# KEY NOTESGENERAL NOTES

SCALE: 1/8" = 1'-0"

MECHANICAL HVAC PLAN - ROOF

1 EXISTING TO REMAIN 10"DIA GOOSENECK.

2 PROVIDE 10" DIA GOOSENECK WITH ROOF CURB. SEE GOOSENECK DETAIL

ON SHEET M-503.

3 PROVIDE 8" DIA GOOSENECK WITH ROOF CURB. SEE GOOSENECK DETAIL

ON SHEET M-503.

4 PROVIDE EXHAUST FAN WITH ROOF CURB. SEE SHEET MH102 FOR

CONTINUATION.

5 EXISTING TO REMAIN 20x36 VENTILATION AIR DUCT DOWN TO FIRST FLOOR.

SEE SHEET MH102 FOR CONTINUATION.

6 EXISTING TO REMAIN 1/2" REFRIGERANT PIPING FROM 45-VRFHRU-2 DOWN

TO FIRST FLOOR. SEE SHEET MP102 FOR CONTINUATION.

7 PROVIDE 2 1/2" GLYCOL HOT WATER (HYDRONIC) SUPPLY AND RETURN

PIPING FROM 45-HV-1 DOWN TO FIRST FLOOR. SEE SHEET MP102 FOR

CONTINUATION.

8 PROVIDE 12" DIA GOOSENECK WITH ROOF CURB. SEE SHEET MH102 FOR

CONTINUATION. SEE GOOSENECK DETAIL ON SHEET M-503.

1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2. SEE SHEETS M-601, M-602 AND M-603 FOR EQUIPMENT SCHEDULES.

3 MECHANICAL CONTRACTOR TO PROVIDE DUCT FROM ROOF

PENETRATIONS DOWN TO WITHIN 15'-0" OF LAUNDRY EQUIPMENT.

4 LAUNDRY EQUIPMENT CONTRACTOR TO PROVIDE DUCT FROM LAUNDRY

EQUIPMENT TO MECHANICAL CONTRACTOR'S TERMINATIONS.

5 COORDINATE FLOWS AND CONNECTION SIZE/LOCATION PER

MANUFACTURERS RECOMMENDATIONS OF LAUNDRY EQUIPMENT

PROVIDED. SEE SHEET M-701 FOR LAUNDRY AIRFLOW DIAGRAM.

6 COORDINATE ALL ROOF PENETRATIONS WITH LAUNDRY EQUIPMENT

PROVIDED PRIOR TO INSTALLATION.

7 REFRIGERANT PIPING TO BE SIZED AS PER MANUFACTURER'S

RECOMMENDATIONS.

9 PROVIDE 24x24 OUTDOOR AIR DUCT WITH 18x18 HINGED ACCESS DOOR AND ASSOCIATED 30x30 ROOF CURB. ROUTE 24X24 DUCT DOWN TO FIRST

FLOOR. SEE SHEET MH102 FOR CONTINUATION.

10 PROVIDE 28" DIA EXHAUST DUCT GOOSENECK WITH 24x24 HINGED ACCESS DOOR AND ASSOCIATED 36x36 ROOF CURB. ROUTE 28" DIA DUCT DOWN TO

FIRST FLOOR. SEE SHEET MH102 FOR CONTINUATION. SEE GOOSENECK

DETAIL ON SHEET M-503.

11 PROVIDE 14" DIA OUTDOOR AIR DUCT WITH 18x18 ROOF CURB AND 180 DEG

GOOSENECK. ROUTE 14" DIA DUCT DOWN TO FIRST FLOOR. SEE SHEET

MH102 FOR CONTINUATION. SEE GOOSENECK DETAIL ON SHEET M-503.

12 PROVIDE 12" DIA OUTDOOR AIR DUCT WITH 18x18 ROOF CURB AND 180 DEG

GOOSENECK. ROUTE 12" DIA DUCT DOWN TO FIRST FLOOR. SEE SHEET

MH102 FOR CONTINUATION. SEE GOOSENECK DETAIL ON SHEET M-503.

13 PROVIDE 24" DIA EXHAUST DUCT GOOSENECK WITH 22x22 HINGED ACCESS DOOR AND ASSOCIATED 36x36 ROOF CURB. ROUTE 24" DIA DUCT DOWN TO

FIRST FLOOR. SEE SHEET MH102 FOR CONTINUATION. SEE GOOSENECK

DETAIL ON SHEET M-503.

14 PROVIDE 26" DIA OUTDOOR AIR DUCT GOOSENECK WITH 24x24 HINGED ACCESS DOOR AND ASSOCIATED 36x36 ROOF CURB. ROUTE 28" DIA DUCT

DOWN TO FIRST FLOOR. SEE SHEET MH102 FOR CONTINUATION. SEE

GOOSENECK DETAIL ON SHEET M-503.

15 EXISTING TO REMAIN 1/2" REFRIGERANT PIPING FROM 45-VRFHP-1 DOWN TO

FIRST FLOOR. SEE SHEET MP102 FOR CONTINUATION.

16 PROVIDE 12x12 GOOSENECK WITH ROOF CURB. SEE SHEET MH102 FOR

CONTINUATION.

17 EXTEND FLUE DUCT A MINIMUM OF 3' ABOVE ROOF ELEVATION. PROVIDE

RAIN HOOD CAP ON EACH FLUE.

45-VRFAC-1

EXISTING VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SCHEDULE

MARK

PEFY-P12NMAU-E3

MODEL

No.

TYPE

ROOM B026

AREA

SERVED

TOTAL

CAPACITY

SENSIBLE

CAPACITY

EVAPORATOR

7,639 BTUH 10,237 BTUH 11,936 BTUH

HEATING CAPACITY

PHASEVOLTS

ELECTRICAL

MCA MOCP

28x29x10

APPROX.

DIMENSIONS

WxDxH

APPROX.

WEIGHT

(LBS)

208 1 1.2 15

REMARKS

45-VRFAC-2 PKFY-P12NMAU-E2 WALL MOUNTED UNIT ROOM B003 8,694 BTUH 10,237 BTUH 11,936 BTUH 35x10x12 29208 1 0.4 15

45-VRFAC-3 PCFY-P24NKMU-ER1 CEILING SUSPENDED UNIT ROOM B028 208 1 15

PKFY-P24NKMU-E2 TH WALL MOUNTED UNIT 1 15

ROOM B004 1 15

PKFY-P24NKMU-E2 TH WALL MOUNTED UNIT ROM B022 18,932 BTUH 25,593 BTUH 30,060 BTUH 208 1 0.6 15

45-VRFAC-7a

PLFY-P12NFMU-E 2'x2' 4-WAY CASSETTE ROOM 100 7,511 BTUH 10,646 BTUH 12,213 BTUH 22x22x8 31.31 0.3 1545-VRFAC-8

PLFY-P12NFMU-E ROOM 101 1 0.3 15

45-VRFAC-9

45-VRFAC-10

2'x2' 4-WAY CASSETTE ROOM 102 1 157,511 BTUH 10,646 BTUH 12,213 BTUH

45-VRFAC-11

ROOMS 107, 108, 109, 110 1 15

45-VRFAC-12

DC DUCTED CONCEALED ROOMS 113, 116 47x35x15 1531 15

45-VRFAC-13

45-VRFAC-14

45-VRFAC-15 PEFY-P12NMAU-E3 ROOMS 113, 116 1 1.2 158,359 BTUH 12,010 BTUH 13,492 BTUH

PEFY-P30NMHU-E2 ROOM 106 1 2.7 1520,742 BTUH 30,025 BTUH 33,981 BTUH

PEFY-P12NMAU-E3 ROOM 106 1 1.2 158,359 BTUH 12,010 BTUH 13,492 BTUH

45-VRFHRU-1

EXISTING VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT RECOVERY UNIT SCHEDULE

MARK

PURY-P240YSKMU-A

PACKAGE MODEL

45-VRFAC-1,2,3,4a,4b,5a,5b,5c,6a, 6b, 6c,7a,7b, 22

SERVICE

(2) 65x69x29

DIMENSIONS

WxDxH

20 TONS

NOMINAL

CAPACITY

PHASEVOLTS

ELECTRICAL

MCA MOCP

18.5460 3 21 + 21 25 + 25 10.9

EER

3.42 1486

APPROX.

WEIGHT

(LBS)

REMARKS

PCFY-P36NKMU-ER1 CEILING SUSPENDED UNIT ELECTRICAL ADDITION 63x27x9 84208 1 1.2 1524,430 BTUH 34,162 BTUH 39,137 BTUH

45-VRFAC-16

45-VRFAC-17

BASIS OF DESIGN DAIKIN

PEFY-P12NMAU-E3 DC DUCTED CONCEALED ROOM 106 1 1.2 158,359 BTUH 12,010 BTUH 13,492 BTUH

PEFY-P24NMHU-E2 DC DUCTED CONCEALED ROOM 105 1

45-VRFHRU-2

BASIS OF DESIGN DAIKIN

45-VRFAC-18

PEFY-P24NMHU-E2 DC DUCTED CONCEALED ROOM 105 1

45-VRFAC-19

PCFY-P36NKMU-ER1 CEILING SUSPENDED UNIT ELECTRICAL ADDITION 1 1.2 1524,430 BTUH 34,162 BTUH 39,137 BTUH

45-VRFAC-20

PCFY-P36NKMU-ER1 CEILING SUSPENDED UNIT ELECTRICAL ADDITION 1 1.2 1524,430 BTUH 34,162 BTUH 39,137 BTUH

ROOM 102 1 15

DC DUCTED CONCEALED

2'x2' 4-WAY CASSETTE

2'x2' 4-WAY CASSETTE

DC DUCTED CONCEALED

7,511 BTUH 10,646 BTUH 12,213 BTUH

7,511 BTUH 10,646 BTUH 12,213 BTUH

11,255 BTUH 15,969 BTUH 18,094 BTUH

27,797 BTUH 36,030 BTUH 39,977 BTUH

29x35x15 98

0.3

0.3

1.6

4.2

DC DUCTED CONCEALED

DC DUCTED CONCEALED

DC DUCTED CONCEALED

16,558 BTUH 24,020 BTUH 26,985 BTUH

16,558 BTUH 24,020 BTUH 26,985 BTUH

2.1 15

29x35x15 1002.1 15

45-VRFHP-1

EXISTING VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT PUMP UNIT SCHEDULE

MARK

PUHY-P192YSKMU-A

PACKAGE MODEL

45-VRFAC-14 THRU 45-VRFAC-20

SERVICE

65x69x29 + 65x36x29 16 TONS

PHASEVOLTS

ELECTRICAL

MCA MOCP

19.1

COOLING

IEER

460 3 20 + 12 25 + 15 12.5

EER

3.61

HEATING

COP

APPROX.

WEIGHT

(LBS)

REMARKS

BASIS OF DESIGN DAIKIN

PLFY-P18NFMU-E 2'x2' 4-WAY CASSETTE 15,356 BTUH 0.5

PLFY-P18NFMU-E 2'x2' 4-WAY CASSETTE 15,356 BTUH 0.5

PEFY-P30NMHU-E2 DC DUCTED CONCEALED 18,279 BTUH 20,474 BTUH 23,871 BTUH 41x35x15 1242.7

ROOM B004

ROOMS B015, B023, B024

1 15

1 15

45-VRFAC-7b

PLFY-P12NFMU-E 2'x2' 4-WAY CASSETTE ROOM 100A 7,511 BTUH 10,646 BTUH 12,213 BTUH 1 150.3

45-VRFAC-4a

PLFY-P18NFMU-E 2'x2' 4-WAY CASSETTE 15,356 BTUH 22x22x8 31.30.5

45-VRFAC-4b

ROOM B004 1 15

PKFY-P24NKMU-E2 TH WALL MOUNTED UNIT 18,279 BTUH 20,474 BTUH 1 0.6 15

ROOM B027

ROOM B015

20,474 BTUH 46x12x14 460.6

14,158 BTUH 20,474 BTUH 23,871 BTUH 50x27x9 710.5

PURY-P72YKMU-A 45-VRFAC-8 THRU 45-VRFAC-13 65x48x29 6 TONS 22.1460 3 15 15 15.5 3.72 534

10,789 BTUH

10,789 BTUH

18,279 BTUH

10,789 BTUH

23,871 BTUH

23,871 BTUH

17,683 BTUH

17,683 BTUH

17,683 BTUH

PLFY-P12NFMU-E

PLFY-P12NFMU-E

PEFY-P18NMHU-E2

PEFY-P36NMHU-E2

45-VRFHP-ELECTRIC PUHY-P144YSKMU-A 45-VRFAC-21a, 21b, 21c, 21d (2) 65x36x29 12 TONS 20.3460 3 12 + 12 15 + 15 13.2 3.95 926

DIMENSIONS

WxDxH

45-VRFAC-6a

45-VRFAC-6b

45-VRFAC-6c

45-VRFAC-21d

45-VRFAC-21a

45-VRFAC-21b

45-VRFAC-21c PCFY-P36NKMU-ER1 CEILING SUSPENDED UNIT ELECTRICAL ADDITION 208 1 1.2 1524,430 BTUH 34,162 BTUH 39,137 BTUH

PEFY-P18NMHU-E2 DC DUCTED CONCEALED 29x35x15 98208 1 1.6 1511,004 BTUH 15,356 BTUH 17,683 BTUH45-VRFAC-22

ROOMS B006, B009, B011

THRU B014, B019, B028

45-ERU-1

EXISTING VARIABLE REFRIGERANT FLOW SYSTEM - ENERGY RECOVERY VENTILATOR UNIT SCHEDULE

MARK

LGH-F1200RX5-E1

PACKAGE MODEL SERVICE

800 0.2

E.S.P.

PHASEVOLTS

ELECTRICAL

MCA MOCP

208 1 7.1 15 256

APPROX.

WEIGHT

(LBS)

REMARKS

BASIS OF DESIGN DAIKIN

AIR

FLOW

31.5x48.5x45

DIMENSIONS

WxDxH

ROOMS B004, B006, B009, B011

THRU B014, B019, B028

NOMINAL

CAPACITY

COOLING

IEER

HEATING

COP

EXISTING VARIABLE REFRIGERANT FLOW SYSTEM - BRANCH SELECTOR BOX SCHEDULE

MARK PACKAGE MODEL SERVICE

DIMENSIONS

PHASEVOLTS

ELECTRICAL

MCA MOCP

APPROX.

WEIGHT

(LBS)

REMARKS

BASIS OF DESIGN DAIKIN

WxDxH

CMB 208 1 11.0 15 534

45-BSB-11 BSV6Q36PVJU 45-VRFAC-8,9,10,11,12,13 63x25x9 230 1 0.6 15 68

45-VRFBC-1 64x48x2945-VRFAC-1,2,6A,6C,3C,4A,5A,5B,7A,7B,22

46x12x14 46

22x22x8 31.3

22x22x8 31.3

46x12x14 46

22x22x8 31.3

22x22x8 31.3

22x22x8 31.3

22x22x8 31.3

28x29x10 49

28x29x10 49

28x29x10 49

41x35x15 124

29x35x15 100

63x27x9 84

63x27x9 84

63x27x9 84

EXISTING AIR SEPARATOR SCHEDULE

MARK LOCATION

AREA AND/OR

BUILDING

SERVED

BASIS OF

DESIGN

TYPE

AS-2 BASEMENT IN-LINELAUNDRY TACO 437

CONNECTION

FLANGED

SYSTEM

AND/OR

SERVICE

HEX-2

MIN. CV

45-RV-1

EXISTING INTAKE/EXHAUST HOOD SCHEDULE

MARK

ROOF

LOCATION

SYSTEM

AND/OR

SERVICE

DAMPER

TYPE

0.10 NA

DRYER /

CARTWASH

APD (IN WG) REMARKS

LOUVERED

PENTHOUSE

DUCTED

APPLICATION

INTAKE

TYPE

THROAT

SIZE

(IN)

AIRFLOW

(CFM)

69x69 16,000

LV-1

LOUVER SCHEDULE

MARK

RUSKIN

MAKE MODEL FINISH

0.09 ENAMELELF811DD

APD

(IN

WG)

SERVICE

VF-336

HEIGHT (IN)

WIDTH (IN)

MIN FREE

AREA

(SQ FT)

AIRFLOW

(CFM)

7.73 6400

NOTES:

1. ALL LOUVERS SHALL BE SUPPLIED BY THE SAME MANUFACTURER.

2. ALL LOUVERS SHALL BE SUPPLIED WITH BIRD SCREENS OF THE SAME MATERIAL AS LOUVER ITSELF.

3. LOUVERS SHALL BE SUPPLIED WITH ACCESSORY ITEMS FOR INSTALLATION IN THE APPLICABLE WALL CONSTRUCTION.

(FLANGES, CLIP ANGLES, EXTENDED SILL, ETC)

4. DIMENSIONS INDICATED ARE NOMINAL. EXACT DIMENSIONS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR.

5. UNLESS OTHERWISE NOTED, LOUVERS SHALL BE RATED FOR ZERO WATER PENETRATION WHEN TESTED IN

ACCORDANCE WITH AMCA PUBLICATION #511.

6. LOUVER FINISH COLOR SHALL BE SELECTED BY THE ARCHITECT UNLESS OTHERWISE NOTED.

7. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

8. LV-3 IS SIZED BASED ON 1 INCH FREE AREA FOR EACH 4,000 BTUH INPUT AS REQUIRED BY THE FUEL GAS CODE.

LV-2 RUSKIN 0.09 ENAMELELF811DD VF-43657 7.73 6400

LV-3 RUSKIN - ENAMELELC6375DAX BOILER60114 21.25 -

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

MECHANICAL SCHEDULES

M-601

45-SWHX-1 & 2

STEAM TO WATER HEAT EXCHANGER SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

BASEMENT LAUNDRY

LOCATIONMARK TYPE

SHELL &

400 160 20

AREA AND/OR

BLDG SERVED

SYSTEM AND/OR

SERVICE

WATER CONDITIONS

FLOW

GPM

EWT

°F

LWT

°F

WPD

FT

2.1

STEAM PRESSURE

ENT CONTROL VALVE ENT HEAT EXCHANGER

CONTROL VALVE

PSIG PSIG LB/HR

TRAP

TRAP NO

CAPACITY

LB/HR

REMARKS

15 8145 - -

BELL GOSSETT

QS4-16-4-2

HEATING

WATER TUBE

MARK

TOTAL SP.

(IN W.C.)

FAN TYPE WHEEL DRIVECFM

ELECTRICAL

VOLTAGE PHASE RPM

SPEED

CONTROL

REMARKS

LOCATIONMARK

SYSTEM

AND/OR

SERVICE

AREA AND/OR

BLDG SERVED

HOT WATER COIL

FLOW

(GPM)

REMARKSAPPLICATION

AIR FLOW

(CFM)

TOTAL MIN

CAPACITY

(MBH)

EWT

(DEG F)

LWT

(DEG F)

WPD

(FT)

MAX FACE

VELOCITY

(FPM)

AIR

PRESSURE

DROP

(IN WG)

EAT

(DEG F)

LAT

(DEG F)

HOT WATER HEATING COIL SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

TEMPERATURES

FAN SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

LOCATION

AREA AND/OR

BUILDING

SERVED

SYSTEM

AND/OR

SERVICE

MIN. EFF.

HPBHP

NOTES:

1. CONTROL VIA LOCAL LIGHT SWITCH.

2. CONTROL VIA TIME CLOCK.

3. INLERLOCK WITH ASSOCIATE H&V UNIT STARTER.

45-HC-5 RM 111 HEAT 10614800 1000 840 175 158 3.9CART WASH 0.11 5 55CART WASH

FLUID

TYPE

40% PPG

45-RF-2 1.25 INLINE FC BELT 480 60 3 NONE70 53.28RM B017 MECHANICAL 45-HV-3 4240 NOTE 3

PROVIDE AS PART OF SKID MOUNTED HEAT TRANSFER PACKAGE

VF-3 0.75 BELT

MARK

TOTAL SP.

(IN W.C.)

FAN TYPE DRIVECFM

ELECTRICAL

VOLTAGE PHASE RPM

460 60 1336

REMARKS

FAN SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

MAKE

GREENHECK

MODEL

SYSTEM

AND/OR

SERVICE HP

BHP

2.78

NOTES:

1. MOTOR OPERATED DAMPER.

2. VIBRATION ISOLATORS.

3. OSHA APPROVED BELT GUARD.

BSQ-200-30

INTER-LOCK RELAY WITH

VF-4 AND AIR COMP

6400 1,2,3

VF-4 0.75 BELT 460 60 133632.78

INTER-LOCK RELAY WITH

VF-3 AND AIR COMP

6400 1,2,3GREENHECK BSQ-200-30

CENTRIFUGAL INLINE

CENTRIFUGAL INLINE

45-REF-1A,B 1.0 DIRECT

MARK

TOTAL SP.

(IN W.C.)

FAN TYPE DRIVECFM

ELECTRICAL

VOLTAGE PHASE RPM

460 60 1400

REMARKS

FAN SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

MAKE

TEXEL

MODEL

SYSTEM

AND/OR

SERVICE HP

BHP

NOTES:

1. MOTOR OPERATED DAMPER.

2. INSTALL 3/4" CPVC DRAIN FROM FAN CASING TO TUNNEL WASHER DRIP PAN.

3. NEMA-1 DISCONNECT SWITCH.

4. COMPANION FLANGES.

5. HANG FAN FROM STRUCTURE AND PROVIDE VIBRATION ISOLATORS.

6. OSHA APPROVED BELT GUARD.

7. FRP FAN CONSTRUCTION WITH FRP DISCHARGE TRANSITION.

8. STAINLESS STEEL SHAFT.

CES151D

INTER-LOCK RELAY WITH

TUNNEL WASHER

1500 2,3,4,5,7,8

BI UTILITY VENT SET;

CW, HORZ DISCHARGE

45-REF-2A,B 1.0 DIRECT 460 60 1400TEXEL 2-CES151D 1500 2,3,4,5,7,8

BI UTILITY VENT SET;

CW, HORZ DISCHARGE

EF-1 0.8 BELT 460 60 1702GREENHECK 3/40.59GB-131-7 2000 1,5,6

CENTRIFUGAL

ROOF EXHAUST

GENERAL NOTES FOR ALL FANS:

A. WHEN MOTOR OPERATED DAMPERS ARE SPECIFIED THEY SHALL BE

120 VOLTS. FURNISH WITH 24V TRANSFORMER FOR CONTROL WIRING.

GENERAL NOTES FOR ALL FANS:

A. WHEN MOTOR OPERATED DAMPERS ARE SPECIFIED THEY SHALL BE

120 VOLTS. FURNISH WITH 24V TRANSFORMER FOR CONTROL WIRING.

INTER-LOCK RELAY WITH

TUNNEL WASHER

INTER-LOCK RELAY WITH

TUNNEL WASHER

45-REF-3

RELIEF FAN SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

MARK

ROOF

LOCATION

AREA AND/OR BUILDING

SERVED

2,500 0.5

TOTAL SP.

(IN W.C.)

HZVOLTAGE

ELECTRICAL

PHASE

SPEED

CONTROL

115 60 1 INTEGRAL

REMARKS

GREENHECK MODEL G-143-VG

CFM

ROOF

FAN

TYPE

EX. WASHING MACHINE

ROOM 113

EXHAUST

SYSTEM

AND/OR

SERVICE

WHEEL

89.5

MIN.

EFF.

DIRECT

DRIVE

HP

BHP

INSULATED CURB; INTERLOCKED

DAMPER, ECM MOTOR

HEX-1

BRAZED PLATE HEAT EXCHANGER SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

MARK

BASEMENT

LOCATION SERVICE

LWT

(DEG F)

40% PPG

WPD

(FT)

CONTROL

VALVE

175 158 6.9 CV-HV1

REMARKS

45-H&V-1

TYPE

OUTDOOR AIR

EQUIPMENT

B&G

BP433-166

EWT

(DEG F)

FLOW

(GPM)

LWT

(DEG F)

HOT WATER

WPD

(FT)

180 160 4.3185

EWT

(DEG F)

FLOW

(GPM)

VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

MARK

MODEL

No.

TYPE

AREA

SERVED

TOTAL

CAPACITY

SENSIBLE

CAPACITY

EVAPORATOR

HEATING CAPACITY

PHASEVOLTS

ELECTRICAL

MCA MOCP

APPROX.

DIMENSIONS

WxDxH

APPROX.

WEIGHT

(LBS)

REMARKS

45-VRFAC-5a

45-VRFAC-5b

PKFY-P24NKMU-E2 TH WALL MOUNTED UNIT 1 15

PKFY-P24NKMU-E2 TH WALL MOUNTED UNIT 18,279 BTUH 20,474 BTUH 23,871 BTUH 1 0.6 15

ROOM B020

ROOM B020

18,279 BTUH 20,474 BTUH 0.623,871 BTUH 208

46x12x14 46

46x12x14 46

GP-1

GLYCOL HEATING PUMP SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

MARK

BASEMENT

LOCATION

AREA AND/OR

BUILDING

SERVED

TYPE

LAUNDRY 1

SP. GR

GP-2

REMARKS

B&G E80 3x3x9.5C

MIN % EFF

SYSTEM

AND/OR

SERVICE HEAD

(FT)

CALCULATING FLUID

TEMP

(°F)

226 50 17540% PPG

FLOW

(GPM)

FLUID

MAX

RPM

VOLT

ELECTRICAL MOTOR

SPEED

CONTROL

460 1750 VARIABLE

PHASE

NOMINAL

POWER (HP)

7.5

45-HV-1 &

45-HC-5

VERTICAL

IN-LINE

EXT-1

EXPANSION TANK SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

MARK

BASEMENT

LOCATION

AREA AND/OR

BUILDING

SERVED

DIA.

DIMENSIONS

HEIGHT

12 20 35

BASIS OF

DESIGN

BLADDER

TYPE

LAUNDRY B&G B-130LA

PRE-CHARGE

(PSI)

TANK

VOLUME

(GAL)

REMARKS

PRE-CHARGE

PRIOR TO

FILLING

SYSTEM

ACCEPTANCE

VOLUME (GAL)

HEX-1

SYSTEM

AND/OR

SERVICE

AS-1

AIR SEPARATOR SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

MARK

BASEMENT

LOCATION

AREA AND/OR

BUILDING SERVED

BASIS OF

DESIGN

IN-LINE

TYPE

LAUNDRY TACO 437FLANGED

CONNECTION

HEX-1

SYSTEM AND/OR

SERVICE

MIN. CV

P-1A & B BASEMENT LAUNDRY

LOCATIONMARK TYPE

400 50 180

AREA AND/OR

BUILDING

SERVED

HEATING

WATER

SYSTEM

AND/OR

SERVICE

CIRCULATING FLUID

FLOW

GPM

HEAD

FT

NPSH AVAILABLE

FT

NA

TEMPERATURE

MIN

EFF

HP

ELECTRICAL MOTOR

REMARKS

15 3 460 B&G 4BD

°F

SP.GR

NOMINAL

POWER

PHASE VOLT

MAX

RPM

SPEED

CONTROL

1 75 1750 VARIABLE

END

SUCTION

FLUID

WATER

PUMP SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

45-CP-1 BASEMENT

LOCATIONMARK TYPE

75 36 3BLDG STEAM

SYSTEM AND/OR

SERVICE

MOTOR

DISCHARGE

PRESSURE

PSIG

MIN

RECEIVER

SIZE

GAL

NOMINAL POWER

EACH

HP

PHASE RPM

REMARKS

VOLT

480 3600DUPLEX

FLOW

EACH

PUMP

STEAM CONDENSATE PUMP SCHEDULE (PROVIDED AND INSTALLED BY MECHANICAL CONTRACTOR)

GPM

BELL &

GOSSETT

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

MECHANICAL SCHEDULES

M-603

1 REV 1 11/22/24

2 REV 2 07/18/25

LE-19

STEAMLESS

FLATWORK IRONER

1120 CFM EXHAUST

650 CFM FLUE

LE-14 LINT

COLLECTOR

LE-19

STEAMLESS

FLATWORK IRONER

1120 CFM EXHAUST

650 CFM FLUE

LE-13

400/500 LB

DRYING AND

CONDITIONING 570

CFM AMBIENT

COMBUSTION AIR

LE-10A LINT

COLLECTOR

LE-10

200/300 LB PASS

THROUGH DRYER

1215 CFM AMBIENT

COMBUSTION AIR

LE-10A LINT

COLLECTOR

LE-10

200/300 LB PASS

THROUGH DRYER

1215 CFM AMBIENT

COMBUSTION AIR

LE-10A LINT

COLLECTOR

LE-10

200/300 LB PASS

THROUGH DRYER

1215 CFM AMBIENT

COMBUSTION AIR

LE-10A LINT

COLLECTOR

LE-10

200/300 LB PASS

THROUGH DRYER

1215 CFM AMBIENT

COMBUSTION AIR

LE-10A LINT

COLLECTOR

LE-10

200/300 LB PASS

THROUGH DRYER

1215 CFM AMBIENT

COMBUSTION AIR

LE-6

SINGLE STAGE

PRESS

EXTRACTOR

750 CFM EXHAUST

LE-6

SINGLE STAGE

PRESS

EXTRACTOR

750 CFM EXHAUST

LE-5

CONTINUOUS

BATCH WASHER

1750 CFM EXHAUST

LE-5

CONTINUOUS

BATCH WASHER

1750 CFM EXHAUST

HV-1

9600 CFM SUPPLY

HV-2

20500 CFM SUPPLY

LE-22

110/120 LB

DRYING AND

CONDITIONING

LE-22

110/120 LB

DRYING AND

CONDITIONING

LE-22

110/120 LB

DRYING AND

CONDITIONING

LE-22

110/120 LB

DRYING AND

CONDITIONING

8" GOOSENECK

1,120 CFM

EXHAUST

10" GOOSENECK

650 CFM

FLUE

26" GOOSENECK

9,800 CFM

INTAKE

24" GOOSENECK

10,370 CFM

EXHAUST

28" GOOSENECK

9,715 CFM

EXHAUST

24x24 GOOSENCK

8,500 CFM

INTAKE

24x24 GOOSENCK

17,000 CFM

INTAKE

28" GOOSENECK

19,430 CFM

EXHAUST

12x12 GOOSENECK

1,500 CFM

EXHAUST

45-REF-3

12,600 CFM EXHAUST

MODULATE TO

MAINTAIN PRESSURE

DIFFERENCE

14"Ø GOOSENECK

1,600 CFM

EXHAUST

EX WASHING MACHINE

ROOM 109

EX DRYER ROOM 109

EQUIPMENT SPACE ROOM 118

14"Ø GOOSENECK

1,600 CFM

EXHAUST

14"Ø GOOSENECK

1,600 CFM

EXHAUST

14"Ø GOOSENECK

1,600 CFM

EXHAUST

10" GOOSENECK

650 CFM

FLUE

8" GOOSENECK

1,120 CFM

EXHAUST

24x24 GOOSENCK

17,000 CFM

INTAKE

28" GOOSENECK

19,430 CFM

EXHAUST

12x12 GOOSENECK

1,500 CFM

EXHAUST

12x12 GOOSENECK

1,000 CFM

EXHAUST

12x12 GOOSENECK

1,000 CFM

EXHAUST

45-REF-2A 45-REF-1A 45-REF-2B 45-REF-1B

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

MECHANICAL FLOW DIAGRAMS

M-701

NOT TO SCALE

D1

LAUNDRY AIRFLOW DIAGRAM

1 REV 2 07/18/25

Sheets
MD101 - MECHANICAL HVAC DEMOLITION PLAN - BASEMENT
MD102 - MECHANICAL PIPING DEMOLITION PLAN - BASEMENT
MD103 - MECHANICAL DEMOLITION PLAN - FIRST FLOOR
MD104 - MECHANICAL DEMOLITION PLAN - ROOF
MH101 - MECHANICAL HVAC PLAN - BASEMENT
MH102 - MECHANICAL HVAC PLAN - FIRST FLOOR
MH103 - MECHANICAL HVAC PLAN - ROOF
M-601 - MECHANICAL SCHEDULES
M-603 - MECHANICAL SCHEDULES
M-701 - MECHANICAL FLOW DIAGRAMS

File details come from the government source that posted it. Updated .