This document is Addendum No. 2 for the VA Brockton, Building 45 Laundry Upgrade project, dated July 18, 2025, for the Malcom Randall VA Medical Center. The addendum introduces multiple technical modifications across architectural, structural, mechanical, plumbing, electrical, and fire protection disciplines, including replacing steel windows with aluminum windows, relocating water tanks and pumps, adding sump pits, modifying ductwork and exhaust systems, updating electrical connections, and relocating sprinkler piping.

Key changes include adding four double service access doors to Room 118, updating boiler flue pipe routing, adding boiler combustion louvers, installing 24 compressed air taps for the laundry conveying system, moving fans from the roof, and providing new equipment connection circuits. The addendum is issued in accordance with VA requirements and is to be incorporated into the Contractor's Bid Documents, reflecting comprehensive modifications to the original project specifications and drawings.

View the file

Other files for this federal contract opportunity

Other files attached to Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45, newest first.
File Type Posted
S06 RFI Questions and Answers 8.11.2025 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
S06 Site Visit Sheet 7.28.2025.pdf PDF
36C24125R0008 0007.docx DOCX document
S06 Updated Drawings Mechanical Rev2.pdf PDF
S06 Updated Specifications 87100 R2.pdf PDF
S06 Updated Drawings 250716 FP REV 2.pdf PDF
S06 Updated Drawings Plumbing Rev2 7-14-25.pdf PDF
S06 Updated Specifications 000110.pdf PDF
S06 RFI Questions and Answers 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
36C24125R0008 0006.docx DOCX document
S06 Updated Drawings 2224 VA Brockton REV 2 architectural.pdf PDF
S06 Updated Specifications 085113.pdf PDF
S06 Updated Drawings 2025-07-18 VA Brockton B45 Laundry Structural Rev 2.pdf PDF
S06 Updated Drawings 10438_ELEC_REV2.pdf PDF
S06 WD MA20250012 07.18.2025.pdf PDF
S06 36C24125R0008 0005.docx DOCX document
S06 36C24125R00008 0004.pdf PDF
36C24125R0008 0003.docx DOCX document
36C24125R0008 0002.docx DOCX document
36C24125R0008 0001.docx DOCX document
S06 Site Visit Sign In Sheet 4.24.2025.pdf PDF
S02 Submittal Register 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 Final Design Analysis Consolidated 523A5-10-316 Laundry Building 45.pdf PDF
36C24125R0008_2.docx DOCX document
S02 Attachment B Past Performance Project Information Sheet for 36C24125R0008.docx DOCX document
S02 SOW 523A5-10-316 Laundry Building 45.pdf PDF
S02 PCRA 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Specifications 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawings Revision 01 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawing Set 523A5-10-316 Laundry Building 45 08.21.2024.pdf PDF
S02 F8-1 Laundry Equipment Storage 523A5-10-316 Laundry Building 45.pdf PDF
S02 F3-3 HLAC Accreditation Standards 09.21.2023 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-2 Attachment 2 Structural Calculations 523A5-10-316 Laundry Building 45.pdf PDF
S02 6500 Appendix B and C Security Language 523A-10-316 Laundry Building 45.pdf PDF
S02 Attachment A Technical Project Information Sheet for 36C24125R0008.docx DOCX document
S02 WD MA20250012 04.04.2025.pdf PDF
S02 Primavera P6 Schedule Review Checklist 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 Equipment List - Existing vs New Equipment 523A5-10-316 Laundry Building 45.pdf PDF
S02 Brockton Campus Map.pdf PDF
S02 Base Offer Price Breakdown.xlsx XLSX spreadsheet
S02 SSJ 523A-10-316 Laundry Building 45.pdf PDF
S02 F3-1 Code Search 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-1 Structural Design Criteria 523A5-10-316 Laundry Building 45.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2224 VA Brockton, Bldg. 45, Laundry Upgrade 8-21-24 (R2 7-18-25)

523A5-10-16

ADDENDUM NO. 2

July 18, 2025

The following changes, additions, or deletions are hereby made a part of the Contract Documents for the above noted project, fully and completely as if the same were fully contained therein.

Each Bidder is hereby instructed and authorized to incorporate into their proposal the instructions contained in this Addendum.

TO ALL BIDDERS

A. SPECIFICATIONS

1. Replace Section 00 01 10 – TABLE OF CONTENTS herein attached.

2. Add Section 085113 – ALUMINUM WINDOWS herein attached

3. Delete Section 08 51 23 – STEEL WINDOWS

4. Replace Section 87 10 00 – DOOR HARDWARE herein attached.

B. Drawings

Architectural

1. LE101 Replaced and relocated water tank and associated pump, re-oriented exit path striping, added sump pit

2. LE102 Added four double service access doors to room 118.

3. LS101 Replaced and relocated water tank and associated pump, re-oriented exit path striping, added sump pit

4. LS102 Added four double service access doors to room 118.

5. AD100 Deleted old sump pit, show new and relocated sump pits, show demolition for new louver locations.

6. AD101 Show demolition required for new service access doors Room 118

7. AD111 Show demolition for new louver locations.

8. AE101A Replaced and relocated water tank and associated pump, re-oriented exit path striping, show new and relocated sump pits, show new louver locations. Show corrected existing RTU frame structure.

9. AE101b Added four double service access doors to room 118. Replaced Doors 116A & 118A in Room

118. Show corrected existing RTU frame structure.

10. AE111A Show new louver locations. Show corrected existing RTU frame structure.

11. AE121 Delete fans that were removed, Show corrected RTU rack location.

12. AE201 Show new louver locations, show corrected RTU Rack location.

13. AE351 Add new details showing exhaust duct penetration and stacks.

14. AE401 Show four new double service access doors to room 118.

15. AE601 Add details for new windows and louvers, Add uneven double door elevation, update Door

Schedule for new service access doors and revised access doors at Room 118.

Renovation of Hospital Stairwells

Malcom Randall VA Medical Center

16. AE701A Replaced and relocated water tank and associated pump, re-oriented exit path striping, added sump pit

17. AE701B Added four double service access doors to room 118.

18. AE901A Replaced and relocated water tank and associated pump, re-oriented exit path striping, added sump pit

19. AE901B Added four double service access doors to room 118.

Structural

1. S101 Foundation plan added sumps and pads

2. S102 Floor framing plan added lintel details, floor framing, louver framing and flue framing

3. S103 Roof framing plan added flue framing

4. S202 added louver framing elevations

5. S303 added concrete details

6. S502 added flue framing details

Mechanical

1. MD101 New Sheet added to show removal of equipment for reinforcing steel installation

2. MD102 New Sheet added to show removal of equipment for reinforcing steel installation

3. MD103 Sheet renamed. Previously calledMD101. Changed tunnel washer duct to show demo without reinstallation.

4. MD104 Sheet renamed. Previously called MD102

5. MH101 Updated Boiler Flue pipe routing, Adde d Boiler combustion Louver L-3

6. MH102 Updated Tunnel Washer Exhaust Ductwork routing and sizes, Added inline exhaust fans for tunnel washers

7. MH103 Replaced roof exhaust fans with gooseneck

8. M-601 Updated Louver Schedule to add LV-3

9. M-603 Updated Fan schedule notes for inline fans.

10. M-701 Updated ductwork one-line to show new inline fans and goosenecks for tunnel washers.

Plumbing

1. PF101 & P-704: Added sewer piping for floor drain (x1) and connected sanitary piping to sump pits (x2) for equipment’ s drainage.

2. PL101 & P-704: Added floor drain (x1) and revised the vent piping as required for system venting.

3. PL102 & P-702: Provided 24 compressed air taps for the laundry conveying system

Electrical

1. EP101A Added (3) equipment connections for louvers (2 interlocked with boilers, 1 interlocked with air compressors).

2. P101B Moved fans down from roof (same quantity), 45-REF-1A, 45-REF-1B, 45-REF-2A, 45-REF-2B

3. EP101C Moved fans down from roof (no longer shown on this plan), Keynote 1 is now showing correctly

Renovation of Hospital Stairwells

Malcom Randall VA Medical Center

4. EP601 Added note to Sonic Aire Fan Schedule to perform startup service per specs 45-REF-1A, 1B, 2A, 2B are noted as “new equipment” in the schedule

5. EP604 Provided circuits on panel schedules for additional louvers/dampers

Removed “ROOF” from REF-1A and 1B circuit names

Fire Protection

1. FX101 Added notes to remove/re-install sprinkler piping as necessary to facilitate reinforcing steel installation.

2. FX101 Added notes to relocate sprinkler piping above no-fly zone.

This addendum is issued in accordance with VA requirements and shall be incorporated into the Contractor’s Bid

Documents.

END OF DOCUMENT