S06 RFI Questions and Answers 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx

DOCX document 20 KB Posted

Attached to
Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45
Solicitation number
36C24125R0008
Issued by

About this file

This document is a Request for Information (RFI) Questions and Answers for the VA project to upgrade VISN 1 Laundry Building 45, Solicitation #36C24125R0008. The document contains five technical questions from potential contractors regarding project details, including signage discrepancies, proposal submission guidelines, demolition work scope, structural steel connection issues, and concrete beam reinforcement requirements. For most questions, the VA referred respondents to updated drawings, specifications, and attachments issued in Amendment 0006, indicating ongoing refinement of project documentation. The project involves structural modifications to a VA laundry facility, with specific areas of focus including MEP equipment removal, structural support installation, and potential masonry wall adjustments between specific column lines.

View the file

Other files

File Type Posted
S06 Site Visit Sheet 7.28.2025.pdf PDF
S06 RFI Questions and Answers 8.11.2025 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
36C24125R0008 0007.docx DOCX document
S06 Updated Specifications 87100 R2.pdf PDF
S06 Updated Drawings Mechanical Rev2.pdf PDF
S06 Updated Drawings 10438_ELEC_REV2.pdf PDF
S06 Updated Drawings Plumbing Rev2 7-14-25.pdf PDF
S06 Updated Drawings 250716 FP REV 2.pdf PDF
S06 Updated Specifications 085113.pdf PDF
S06 2025-07-18 Addendum No. 2.pdf PDF
36C24125R0008 0006.docx DOCX document
S06 Updated Specifications 000110.pdf PDF
S06 Updated Drawings 2224 VA Brockton REV 2 architectural.pdf PDF
S06 Updated Drawings 2025-07-18 VA Brockton B45 Laundry Structural Rev 2.pdf PDF
S06 WD MA20250012 07.18.2025.pdf PDF
S06 36C24125R0008 0005.docx DOCX document
S06 36C24125R00008 0004.pdf PDF
36C24125R0008 0003.docx DOCX document
36C24125R0008 0002.docx DOCX document
36C24125R0008 0001.docx DOCX document
S06 Site Visit Sign In Sheet 4.24.2025.pdf PDF
S02 Base Offer Price Breakdown.xlsx XLSX spreadsheet
S02 F2-1 Structural Design Criteria 523A5-10-316 Laundry Building 45.pdf PDF
S02 F3-1 Code Search 523A5-10-316 Laundry Building 45.pdf PDF
S02 Attachment B Past Performance Project Information Sheet for 36C24125R0008.docx DOCX document
S02 F3-3 HLAC Accreditation Standards 09.21.2023 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Specifications 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawing Set 523A5-10-316 Laundry Building 45 08.21.2024.pdf PDF
S02 F8-1 Laundry Equipment Storage 523A5-10-316 Laundry Building 45.pdf PDF
S02 6500 Appendix B and C Security Language 523A-10-316 Laundry Building 45.pdf PDF
S02 Equipment List - Existing vs New Equipment 523A5-10-316 Laundry Building 45.pdf PDF
S02 Primavera P6 Schedule Review Checklist 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 SOW 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-2 Attachment 2 Structural Calculations 523A5-10-316 Laundry Building 45.pdf PDF
S02 PCRA 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawings Revision 01 523A5-10-316 Laundry Building 45.pdf PDF
S02 Submittal Register 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
36C24125R0008_2.docx DOCX document
S02 Final Design Analysis Consolidated 523A5-10-316 Laundry Building 45.pdf PDF
S02 Attachment A Technical Project Information Sheet for 36C24125R0008.docx DOCX document
S02 WD MA20250012 04.04.2025.pdf PDF
S02 SSJ 523A-10-316 Laundry Building 45.pdf PDF
S02 Brockton Campus Map.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Questions and Answers Project # 523A5-10-316 Upgrade VISN 1 Laundry Building 45 Solicitation # 36C24125R0008

Question # 1: Signage The sign schedule does not match what is shown on the drawings regarding sign types and descriptions. It also does not match up with the designations found on AE901A & B. Please provide clarification.

Answer: Refer to updated drawings, specifications, and attachments issued in Amendment 0006.

Question # 2: Submitting Proposals What is the size limit on the attachments required to be submitted to NCO1constructionteam2proposals@va.gov and can we submit multiple emails to cover all the required documents for this proposal if need to?

Answer: Yes, NCO1constructionteam2proposals@va.gov is the correct e-mail to submit your proposal package to. A google search says that the file size limit is 20MB max file size total for outlook outgoing mail. You can submit multiple e-mails to cover all the required documents for your proposal submission. I would recommend making it very clear in the subject line of the e-mail stating “e-mail 1 of 3” so on and so forth for example, so it is clear to me how many e-mails I need to look out for and compile together, so nothing gets missed or overlooked.

Question # 3: Demo work not shown on the drawings After reviewing the project with a Structural Steel Subcontractor, they stated to install the new structural supports for the first floor, all MEP equipment, sprinkler piping, and conduits between column lines 2.1 & 6 – between column lines A & F will need to be removed. Additionally, by extending the existing concrete beams 6” as shown S301 note 6, the ceiling height in the lounge will be approximately 6-6” and by the security office 7-2”. Please note that the floor is 22” higher in this area of the basement. Was this the intent of the design? None of the demo work is shown on the drawings. Please see attached marked up drawings and photos for reference.

Answer: Refer to updated drawings, specifications, and attachments issued in Amendment 0006.

Question # 4: Structural connections missing bolts The pictures attached for reference show structural steel connections that are missing bolts. These connections are located over the roll up door in the front of the building basement level. Please advise if this was included in the structural calculations for the project. If they were not and these need to be repaired, please provide a detail so we can include this in our proposal.

Answer: Refer to updated drawings, specifications, and attachments issued in Amendment 0006.

Question # 5: Concrete Beam Reinforcement Drawing S102 shows detail 6/S301, Concrete Beam Enlargement and reinforced. At this time, column lines D and F have a masonry wall directly positioned under the concrete beams, at its full length. Do we remove the top portion of the masonry to perform the work as detailed in 6/S301? Or can we utilize an alternative method of fully grouting the masonry wall?

Answer: Refer to updated drawings, specifications, and attachments issued in Amendment 0006.