This document is a set of plumbing engineering drawings for the Upgrade VISN 1 Laundry Building 45 project located at the Brockton Campus in Brockton, Massachusetts. The drawings, dated July 14, 2025, include detailed plumbing plans for the foundation, basement, and first floor, as well as compressed air and sanitary piping risers. The engineering plans were prepared by ClarkNexsen, with additional services from Innovative Engineering, AXIAS, and Laundry Design Group, and are part of a VA project to upgrade the laundry facility's infrastructure. The drawings specify complex piping systems including waste pipes, vent pipes, water supply lines, compressed air lines, and connections to various equipment such as water heaters, sumps, and laundry machinery, with pipe sizes ranging from 1/2" to 8" and detailed routing across multiple building levels.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
PP
A1
B1
C1
4.2
3.3
2.4
BB AAA
2'
B
3'
C
4.5
4'
5'
E
6'
F
7'
G
8'
H
9'
I
EE
DD CC
FF
GG
5.1
SAN
S A
N
SAN
S A
N
8"
8"
4"
4"
6"
4" 6"
3"
8"
3"
SAN
SAN
6"
6"
3"
SP-1
SAN
3"
6" 6"
4"
EX 4"
1 1
3"
4"
3"
8" EXR
SAN
1'
8"
8"
4" EXR4" EXR
INVERT ELEVATION
OF EXISTING 8" PIPE
= 105.50
4"
6"
76"
6"
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
PLUMBING PLAN - FOUNDATION
PF101
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
# KEY NOTESGENERAL NOTES
1 SEE SHEET P-001 FOR LEGENDS, DETAILS AND GENERAL NOTES. 1 4" WASTE PIPE FROM FLOOR CLEAN OUT (FCO) ABOVE.
2 ABANDONED WASTE PIPE NOT SHOWN FOR CLARITY.
3 CONNECT NEW WASTE PIPE TO EXISTING WASTE PIPE, SIZE AS NOTED
4 6" WASTE PIPE DOWN, 3" VENT PIPE UP.
5 4" WASTE PIPE DOWN, 2" VENT PIPE UP.
6 4" WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.
7 6" WASTE PIPE FROM FLOOR PIT ABOVE.
8 EXISTING 6" DOMESTIC WATER SERVICE PIPE UP.
9 EXISTING 6" DOMESTIC WATER SERVICE PIPE.
10 3" VENT PIPE UP.
11 3" WASTE PIPE DOWN, 1-1/2" VENT PIPE UP.
12 3" WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.
13 3" WASTE PIPE FROM ABOVE.
14 1-1/2" WASTE PIPE FROM ABOVE.
SCALE: 1/8" = 1'-0"
PLUMBING PLAN - FOUNDATION
15 2" WASTE PIPE FROM ABOVE.
16 4" WASTE PIPE FROM FLOOR PIT ABOVE.
17 1-1/2" VENT PIPE UP.
18 2" PUMPED DISCHARGE PIPE FROM SP-1 UP.
19 4" WELL WATER SUPPLY PIPE UP.
20 CONNECT NEW 4" WELL WATER SUPPLY PIPE TO EXISTING 4" WELL WATER
SUPPLY PIPE. FIELD VERIFY EXACT LOCATION OF EXISTING WELL WATER
SUPPLY PIPE.
21 6" WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.
1 Revision 01 11/22/24
2 Revision 02 07/18/2025
7-14-2025
UP
4" DRAIN
6" DRAIN
18x24x18
18x18x18
6" DRAIN
18x18x18
6" DRAIN
18x24x18
39.3 39.3
40.1
"D"
CONTROL
"D"
CONTROL
J BOX
"A"
CONTROL
EXPAND
TANK
E X
P A
N D
T A
N K
39.3.1
10HP
WATER
HEAT'G
CIRC
PUMPS/
HEAT
EXCHG
CHEM
POT
IN
LE
T
O U T
IN
O U T
"C
LO
O P
H E A T
E X C H A N G E R
C O N T R O L
LWW FILTER SYST.
80"∅ x 5'H Tank
PIPE_
3_
INC
H
PIPE_
3_
INC
H
PIPE_
3_
INC
H
39.1
H E
A T
R E
C L
A
IM
S Y
S T
'P2'
LWW WASTE WATER
RAISED PIT TANK
LWW
SUMP
PUMP
'P1'
39.7
WATER
TRATMENT
A S
D C
-3
-2
.5 /1
/S S
39.4
39.4
TUNNEL HEATING
SYST.S
2 CONTROL
"F" x18 x18
D R A
IN
.2
.3 .2
L H
W T
A N
KL
T
W T
A N
K
T R
IP
L E
P U
M P
S
H
P H
W C
IR
C
D U
A L
P U
M P
S
C O N T R O L
"B
3" GAS INLET
GAS
CONTROL
T-6800
INSPECTION DOOR INSPECTION DOOR
PANEL
24" DRAFT HOODS
6" INLET 6" OUTLET
BARMETRIC DAMPER WITH 28" VERTICAL OUTLET
3" GAS INLET
GAS
CONTROL
T-6800
INSPECTION DOOR INSPECTION DOOR
PANEL
24" DRAFT HOODS
6" INLET 6" OUTLET
BARMETRIC DAMPER WITH 28" VERTICAL OUTLET
A
B
O P
EN
C LO SE
O P
EN
C LO SE
un io n_
2_inc h
B
ALL
VA
LVE
N
IB
CO
un io n_ 2_ inc h
B
ALL
VA
LVE
N
IB
CO
A
B
O P
EN
C LO SE
O P
EN
C LO SE
un io n_
2_inc h
B
ALL
VA
LVE
N
IB
CO
un io n_ 2_ inc h
B
ALL
VA
LVE
N
IB
CO
C A
O U T
LET
MODEL: ASD
40ST
CONTROL
COOLING
AIR
AIR
DISCHARGE
COOLING
AIR
INLET
AIR
ELEC
CONN
D R A I N
AIR
DRYER
COMPRESSOR
COMPRESSOR
OUTLET
INLET
AIR
AIR
DRYER
INLET
C A
O U T
LET
MODEL: ASD
40ST
CONTROL
COOLING
AIR
AIR
DISCHARGE
COOLING
AIR
INLET
AIR
ELEC
CONN
D R A I N
AIR
DRYER
COMPRESSOR
COMPRESSOR
OUTLET
INLET
AIR
AIR
DRYER
INLET
C G
C G
C G
C G
CG
C G
C G
CG
C G
PP
A1
B1
C1
4.2
3.3
2.4
BB AAA
2'
B
3'
C
4.5
4'
5'
E
6'
F
7'
G
8'
H
9'
I
EE
DD CC
FF
GG
5.1
B024
B022
B013
B029
B023
B009A
B010
B004
B026
B012
B007
B009
B019
B002 B003
B018
B011
B005
E001
B025
B008
B006
B028 B027
B017
B020
B001b
B001a
B015
FCO
FD-H
RP-1
EWH-1
N G
NG
N G
NG
N G
N G
3"
2 1/2"
3"
FD-HFCO
P-707
SAN
3/4"1"
1 1/4"
1"
NG
NG
1"
12 12
FD-H
3"
B014
4"
4"
3"
4"
4"
4"
2 1/2"
3"
3"
6"
6"
3" 2"
6"
3"
2"3"
2"1 1/4"
1"
1/2"
2"
1"
A
A
A
A
A
A
0.50 GPM
1.00 GPM
3/4"
3/4"
2"2"
1"
1 1/4"
1"
3/4"
3"1"
2 1/2"
3"
1"
4"
TMV-2
3"
C A
2"
1 1/2"
2 1.50 GPM
1 1/4"
3/4"
3"
20202"
2"
2"
2"
3"
CA CA
B017
COP
3"
1 1/2" 1 1/4"
1 1/4"
1 1/2"
1 1/2"
1 1/4"1/2"
B018
3"
3/4"
3/4"
3/4"
3/4"
1"
1 1/4"
FD-H
34 3"
BFP-1
W W
W
T W
H W
H W
T W
HW
TW
HW
TW
FD-H
BFP-1
(2-1/2")
(3")
6"
BFP-1
(4")
FD-H
OFF-SET BELOW
WALL LOUVER ABOVE
SWSW
S W
2"
3"
3"
3"
6"
1'
FD-H
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
PLUMBING PLAN - BASEMENT
PL101
SCALE: 1/8" = 1'-0"
PLUMBING PLAN - BASEMENT
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
# KEY NOTESGENERAL NOTES
1 SEE SHEET P-001 FOR LEGENDS, DETAILS AND GENERAL NOTES. 1 CONNECT EXISTING 1-2/"COLD, 1-1/2"HOT, AND 3/4"HOT WATER RETURN
PIPING TO NEW 1-1/2"COLD, 1-1/2"HOT, AND 3/4"HOT WATER RETURN PIPING.
2 HOT WATER RETURN BALANCING STATION, SET AT NOTED GPM.
3 EXISTING STORM PIPE (RL) TO REMAIN, SIZE AS NOTED.
4 2" VENT PIPE FROM BELOW.
5 REFER TO WATER HEATER DETAIL D3/P-501.
6 3" VENT PIPE FROM BELOW.
7 CONTINUATION OF EXISTING PIPING NOT SHOWN. WORK ON EXISTING
PIPING BEYOND THIS POINT IS NOT PERMITTED.
8 190 DEGREE F. 205 DEGREE F. MAX HOT LOOP SUPPLY PIPE, REFER TO
MECHANICAL WATER SYSTEM DIAGRAM DRAWINGS.
9 105 DEGREE F. TEMPERED WATER SUPPLY PIPE, REFER TO MECHANICAL
WATER SYSTEM DIAGRAM DRAWINGS.
10 115 DEGREE F. PRE-HEATED HOT WATER SUPPLY PIPE, REFER TO
MECHANICAL WATER SYSTEM DIAGRAM DRAWINGS.
11 TEMPERED WATER SUPPLY PIPE, REFER TO MECHANICAL WATER SYSTEM
DIAGRAM DRAWINGS.
12 HOT WATER SUPPLY PIPE, REFER TO MECHANICAL WATER SYSTEM
DIAGRAM DRAWINGS.
13 HOT LOOP RETURN PIPE, REFER TO MECHANICAL WATER SYSTEM DIAGRAM
DRAWINGS.
14 140 DEGREE F. HOT LOOP RETURN PIPE, REFER TO MECHANICAL WATER
SYSTEM DIAGRAM DRAWINGS.
15 3" VENT PIPE THROUGH ROOF.
16 GAS PIPE UP, SIZE AS NOTED.
17 SANITARY AND WATER PIPING ABOVE CEILING AND BELOW FLOOR ARE OFF
LIMITS IN THIS AREA. EXISTING PIPING MUST NOT BE USED FOR NEW WORK
CONSTRUCTION.
18 CONNECT NEW GAS METER TO EXISTING PIPING.
19 EXISTING 6" DOMESTIC WATER SERVICE PIPE FROM BELOW.
20 TEMPERED AND HOT WATER SUPPLY PIPES UP, SIZE AS NOTED.
21 CONNECT PIPING TO VERTICAL AIR SEPERATOR 'AS', REFER TO
'MECHANICAL WATER SYSTEM DIAGRAM' DRAWINGS.
22 TO TUNNEL WASHER FILTERING & HEATING SYSTEM, REFER TO
'MECHANICAL WATER SYSTEM DIAGRAM' DRAWINGS.
23 3/4" LHW & 3/4" LTW HEADER RETURN LINES TO RESPECTIVE WATER
STORAGE TANKS 24.4 & 24.5, REFER TO 'MECHANICAL WATER SYSTEM
DIAGRAM' DRAWINGS.
24 1" TO TUNNEL PRESS EXTRACTORS LE-4, REFER TO 'MECHANICAL WATER
SYSTEM DIAGRAM' DRAWINGS.
27 1-1/2" VENT PIPE FROM BELOW.
28 1-1/2" VENT PIPE UP.
29 1/2" COLD AND HOT WATER PIPE UP.
30 3" WASTE PIPE FROM ABOVE.
31 3" WASTE PIPE DOWN.
32 2" WASTE PIPE DOWN.
33 3" WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.
34 1-1/4" COLD AND 1" HOT WATER PIPES UP.
35 1-1/4" COLD AND 1" HOT WATER PIPES DOWN, RUN EXPOSED ON WALL.
36 1-1/2" VENT PIPE UP, RUN EXPOSED ON WALL.
37 2" WASTE PIPE FROM ABOVE.
38 3" VENT PIPE UP.
39 3" WASTE PIPE DOWN, RUN EXPOSED ON WALL.
40 2" PUMPED DISCHARGE RISER PIPE FROM BELOW.
41 6" WASTE PIPE DOWN.
42 4" WELL WATER SUPPLY PIPE FROM BELOW.
43 CONNECT 4" WELL WATER SUPPLY PIPE TO 4" DOMESTIC WATER SUPPLY
PIPE.
44 CONNECT NEW 4" WATER PIPE TO EXISTING 6" WATER PIPE.
45 4" WASTE PIPE DOWN.
46 2" COMPRESSED AIR PIPE UP.
1 Revision 02 07/18/2025
E X H
UNLOAD
FRONT
INLET
165GP
X
X
ZZ
X
Y
X
D ra w e r
D ra w e r
Input
Linen Output
Linen Output
Gate
Gate 2
REMOTE
STATUS
W O
R K
S T
A T
IO
N
W O
R K
S T
A T
IO
N
ENERGY
MONITOR
COMM.
SYST.
MONORAIL
CNTRLS
Y
FLOW
OF
GOODS
FLOW
OF
GOODS
24 24
27 27
10 10 10
8 8
212121 222222
10a
24 24
10a 10a 10a 10a
39.9
39.8
5a
VAC
CAB
PUMP/
CNTRL
1 43
C P
1 2 3 4
C A
R T
PATIENT CLOTHING
& SURGICAL LINEN
PROCESSING AREA
C P
CP-1
TOP CONVEYOR EL 4'0"
BOTTOM CONVEYOR EL 2'6"
YYY
X
Y
X
E
A
XX
X
YY
X
X
YY
X
X
YY
X
X
YY
X
X
Y
X
H W
C W
TW
H W
C W
TW
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
0. 3000
0. 3000
0. 5000
X
Y
X
Y
X
Y
X
Y
0. 3000
0. 3000
0. 5000
GOODS
FLOW
OF
X
Y
X
Y YY
Y Y
X X
Y Y
X X
C G
CG
CGCG
CG
C G
CG
CGCG
CG
CG
CG CG
CG
CG CG
CGCG
CG CG CG CGCG CG
C G
C G
C G
C G
C G
C G
C G
CG
C G
CG CG
CG
CG
CG
CG
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
CG
CG
CG CG CGCG
CG
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
CG
CG
CG CG
CG
CG
CG
CG CG C
G
C G
CG
PP
A1
B1
C1
4.2
3.3
2.4
BB AAA
2'
B
3'
C
4.5
4'
5'
E
6'
F
7'
G
8'
H
9'
I
EE
DD CC
FF
GG
5.1
B025
110108107
115111
100 100A
RL
R L
R L
RL
R L
RL
R L
R L
RL
R L
R L
P-422
P-422
TMV-1
TMV-1
TMV-1
RL
P-422
CA
C A
CA
CA
N G
NG
CA
NG
N G
CA CA
C A
CA CA
C A
CA
C A
CA
CA
NG
NG
NGNG
1 1/2"
1/2"
1 1/2" 1 1/2"
1/2"
2"
2"
1 1/4"
1"
1" 3/4" 3/4"
1/2"
1 1/4"
3/4"
2" 1 1/4" 2 1/2"
2"
2"
A
A
A
A
A
A
A
A
A
A
A
2 1/2"
1 1/4" 5 5
CA
3"
3"
2"2"
2"
2" 2"
2"
P-707
P-707
P-502
1 1/2"
P-707
1/2"
2"
1 1/4" 1 1/4"
FD-H
FD-H
FD-H
PD
P D
2" 4 1
2"
2"
2"
2"
1/2"
A
A A
A
1/2"
1/2"
1/2"
1" 16
2"
1/2"
3/4" 1/2"
104A
1 1/2" 1 1/2"
P-60421
1'
A22
A21
A23 A24
A14 A20
A15 A8
A7
A9A6A17
A1
A2
A3
A11
A4
A10
A5
A13
A12
A16
A19
A18
TRUE
NORTH
PLAN
NORTH
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
PLUMBING PLAN - FIRST FLOOR
PL102
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
# KEY NOTESGENERAL NOTES
1 SEE SHEET P-001 FOR LEGENDS, DETAILS AND GENERAL NOTES. 1 EXISTING STORM PIPE (RL) TO REMAIN, SIZE AS NOTED.
2 TEMPERATURE BLENDING VALVE #2 - BY OTHERS, REFER TO 'MECHANICAL
WATER SYSTEM DIAGRAM' DRAWINGS.
3 GAS PIPE FROM BELOW, SIZE AS NOTED.
4 TEMPERED AND HOT WATER SUPPLY PIPES FROM BELOW, SIZE AS NOTED.
5 SANITARY AND WATER PIPING ABOVE CEILING AND BELOW FLOOR ARE OFF
LIMITS IN THIS AREA. EXISTING PIPING MUST NOT BE USED FOR NEW WORK
CONSTRUCTION.
6 2" VENT PIPE FROM BELOW.
7 3" VENT PIPE THROUGH ROOF.
8 1-1/2" VENT PIPE FROM BELOW.
9 1/2" COLD AND HOT WATER PIPE FROM BELOW.
10 1-1/4" COLD AND 1" HOT WATER PIPES FROM BELOW.
11 3" VENT PIPE FROM BELOW.
12 2" PUMPED DISCHARGE RISER PIPE FROM BELOW.
SCALE: 1/8" = 1'-0"
PLUMBING PLAN - FIRST FLOOR
13 2" PUMPED DISCHARGE PIPE DOWN TO 8" ABOVE FINISHED GRADE.
14 TERMINATE 2" DISCHARE PIPE WITH 45 DEGREE ELL TURNED DOWN ONTO
SPLASH BLOCK ON GRADE.
15 1-1/2" VENT PIPE FROM BELOW, INCREASE TO 3" VENT THROUGH ROOF.
16 3" VENT PIPE FROM BELOW, INCREASE TO 4" VENT THROUGH ROOF.
17 2" VENT PIPE FROM BELOW, INCREASE TO 3" VENT THROUGH ROOF.
18 4" VENT PIPE THROUGH ROOF.
19 SUMP PUMP SP-1 (OIL MINDER) CONTROL PANEL.
20 2" COMPRESSED AIR PIPE FROM BELOW.
21 REMOVE EXISTING ELECTRIC WATER COOLER AND PREPAIR EXISTING
PIPING FOR NEW CONNECTIONS. REPLACE WITH NEW ELECTRIC WATER
COOLER WITH BOTTLE FILLER (P-604).
1 Revision 02 07/18/2025
CA
CA
CA
CA
2"
1/2"
1 1/2" 2"
2"
2"
1 1/2"
1/2"
1/2"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
1"
1"
1/2"1/2"
1"
1/2" 1/2"
1"
1"
1/2"
1"
1"
1"
1"
1"
1/2"
1/2"
1/2"
1/2"
3/4"
1/2"
1/2" 2"
2"
3"
2"
3/4"
3"
1/2"
1/2"
3/4"
1 1/2"
1 1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2" 3/4"
3/4"
3"
2"
1/2" CA
2"
2"
2"
2"
2"
2"
1/2"
3"
2"
1/2"
1/2"
1 1/2"
1 1/2"
MAIN
LINE
REGULATOR
1 1/2"
2"
2"
2"
2"
1"
3"
1/2"
1/2"
1/2"
1/2"
1/2"
3"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2" 1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
PLUMBING COMPRESSED AIR RISER
P-702
NO SCALE
COMPRESSED AIR RISER
COMPRESSED AIR NOTES:
1. COORDINATE FINAL EQUIPMENT CONNECTION FITTING
REQUIREMENTS WITH SUPPLY PIPING.
2. COORDINATE EQUIPMENT CONNECTION LOCATION(S) WITH
ACTUAL EQUIPMENT BEING INSTALLED.
3. REFER TO SHEET LE3006 FOR EQUIPMENT PIPING CONNECTION
DETAILS.
4. REFER TO DETAIL 12/M19 DRAWING LE3006 FOR PIPING AND
VALVES BETWEEN THE AIR COMPRESSOR AND THE STORAGE
TANK.
B001b
B017
B001b
B001b
41 OUTLET, TO
FIXTURES
INLET, FROM
AIR COMPRESSORS
TO LAUNDRY EQUIPMENT 25
10a
10a
10a 10a
10a
39.4
39.4
39.1
1 Revision 02 07/18/2025
A22
A21
A23
A24
A20
A14
A15
A19 A18
A17
A6 A7
A9 A13
A1
A10
A5
A11
A4
A8
A16
A12
A2
A3
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
EX 4"
EX 4"
COP
FD-H
FCO
FD-H
FD-H
FD-H
FD-H
FD-H
FCO
FD-H
FD-H
3" 2"
3" VTR
4" VTR
3" VTR
3" VTR
4" VTR
3" VTR
4" VTR
1 1/2"
1 1/2"
1 1/2"
1 1/2"
3"
3"
3"
3"
3"
4"
FD-H
2"
3"
3"
6"
6"
6"
4"8"
4"
6"
3"
4"
8"
3"
3"
6"
3"
1 1/2"
3"
1 1/2"
1 1/2"
3" VTR
3"
6"
6"
6"
3"
3"
3"
2"
3"
1 1/2"
3"
6"
6"
4"
4"
FROM 18" X 18" X 18" SUMP
FROM 18" X 24" X 18" SUMP
FROM 18" X 18" X 18" SUMP
P-502
P-422
P-422 3"
FROM 18" X 18"
X 18" SUMP
EX 4"
P-422
EX 8"
4"
8"
8"
8"
FD-H
4"
6"
FROM 18" X
18" X 18" SUMP
4" VTR
3"
FROM 18" X 18" X 18" SUMP
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
SANITARY PIPING RISER
P-704
NO SCALE
SANITARY PIPING RISER
104A
B018
B017
B001b
B001b
B001b
B001b
B017
B017
1 Revision 01 11/22/24
2 Revision 02 07/18/2025
| Sheets |
| P-702 - PLUMBING COMPRESSED AIR RISER |
| P-704 - SANITARY PIPING RISER |
| PF101 - PLUMBING PLAN - FOUNDATION |
| PL101 - PLUMBING PLAN - BASEMENT |
| PL102 - PLUMBING PLAN - FIRST FLOOR |