S06 Updated Drawings Plumbing Rev2 7-14-25.pdf

PDF 2 MB Posted

Attached to
Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45 Federal contract opportunity
Solicitation number
36C24125R0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document is a set of plumbing engineering drawings for the Upgrade VISN 1 Laundry Building 45 project located at the Brockton Campus in Brockton, Massachusetts. The drawings, dated July 14, 2025, include detailed plumbing plans for the foundation, basement, and first floor, as well as compressed air and sanitary piping risers. The engineering plans were prepared by ClarkNexsen, with additional services from Innovative Engineering, AXIAS, and Laundry Design Group, and are part of a VA project to upgrade the laundry facility's infrastructure. The drawings specify complex piping systems including waste pipes, vent pipes, water supply lines, compressed air lines, and connections to various equipment such as water heaters, sumps, and laundry machinery, with pipe sizes ranging from 1/2" to 8" and detailed routing across multiple building levels.

View the file

Other files for this federal contract opportunity

Other files attached to Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45, newest first.
File Type Posted
S06 Site Visit Sheet 7.28.2025.pdf PDF
36C24125R0008 0007.docx DOCX document
S06 RFI Questions and Answers 8.11.2025 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
S06 Updated Drawings 2224 VA Brockton REV 2 architectural.pdf PDF
S06 Updated Specifications 085113.pdf PDF
S06 2025-07-18 Addendum No. 2.pdf PDF
S06 Updated Drawings 2025-07-18 VA Brockton B45 Laundry Structural Rev 2.pdf PDF
S06 Updated Drawings 10438_ELEC_REV2.pdf PDF
S06 WD MA20250012 07.18.2025.pdf PDF
S06 Updated Drawings 250716 FP REV 2.pdf PDF
S06 Updated Specifications 000110.pdf PDF
S06 RFI Questions and Answers 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
36C24125R0008 0006.docx DOCX document
S06 Updated Drawings Mechanical Rev2.pdf PDF
S06 Updated Specifications 87100 R2.pdf PDF
S06 36C24125R0008 0005.docx DOCX document
S06 36C24125R00008 0004.pdf PDF
36C24125R0008 0003.docx DOCX document
36C24125R0008 0002.docx DOCX document
S06 Site Visit Sign In Sheet 4.24.2025.pdf PDF
36C24125R0008 0001.docx DOCX document
S02 Attachment A Technical Project Information Sheet for 36C24125R0008.docx DOCX document
S02 WD MA20250012 04.04.2025.pdf PDF
S02 Primavera P6 Schedule Review Checklist 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 Equipment List - Existing vs New Equipment 523A5-10-316 Laundry Building 45.pdf PDF
S02 Brockton Campus Map.pdf PDF
S02 Base Offer Price Breakdown.xlsx XLSX spreadsheet
S02 SSJ 523A-10-316 Laundry Building 45.pdf PDF
S02 F3-1 Code Search 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-1 Structural Design Criteria 523A5-10-316 Laundry Building 45.pdf PDF
S02 Attachment B Past Performance Project Information Sheet for 36C24125R0008.docx DOCX document
S02 SOW 523A5-10-316 Laundry Building 45.pdf PDF
S02 PCRA 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Specifications 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawings Revision 01 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawing Set 523A5-10-316 Laundry Building 45 08.21.2024.pdf PDF
S02 F8-1 Laundry Equipment Storage 523A5-10-316 Laundry Building 45.pdf PDF
S02 F3-3 HLAC Accreditation Standards 09.21.2023 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-2 Attachment 2 Structural Calculations 523A5-10-316 Laundry Building 45.pdf PDF
S02 6500 Appendix B and C Security Language 523A-10-316 Laundry Building 45.pdf PDF
S02 Submittal Register 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 Final Design Analysis Consolidated 523A5-10-316 Laundry Building 45.pdf PDF
36C24125R0008_2.docx DOCX document
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

PP

A1

B1

C1

4.2

3.3

2.4

BB AAA

2'

B

3'

C

4.5

4'

5'

E

6'

F

7'

G

8'

H

9'

I

EE

DD CC

FF

GG

5.1

SAN

S A

N

SAN

S A

N

8"

8"

4"

4"

6"

4" 6"

3"

8"

3"

SAN

SAN

6"

6"

3"

SP-1

SAN

3"

6" 6"

4"

EX 4"

1 1

3"

4"

3"

8" EXR

SAN

1'

8"

8"

4" EXR4" EXR

INVERT ELEVATION

OF EXISTING 8" PIPE

= 105.50

4"

6"

76"

6"

TRUE

NORTH

PLAN

NORTH

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

PLUMBING PLAN - FOUNDATION

PF101

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

# KEY NOTESGENERAL NOTES

1 SEE SHEET P-001 FOR LEGENDS, DETAILS AND GENERAL NOTES. 1 4" WASTE PIPE FROM FLOOR CLEAN OUT (FCO) ABOVE.

2 ABANDONED WASTE PIPE NOT SHOWN FOR CLARITY.

3 CONNECT NEW WASTE PIPE TO EXISTING WASTE PIPE, SIZE AS NOTED

4 6" WASTE PIPE DOWN, 3" VENT PIPE UP.

5 4" WASTE PIPE DOWN, 2" VENT PIPE UP.

6 4" WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.

7 6" WASTE PIPE FROM FLOOR PIT ABOVE.

8 EXISTING 6" DOMESTIC WATER SERVICE PIPE UP.

9 EXISTING 6" DOMESTIC WATER SERVICE PIPE.

10 3" VENT PIPE UP.

11 3" WASTE PIPE DOWN, 1-1/2" VENT PIPE UP.

12 3" WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.

13 3" WASTE PIPE FROM ABOVE.

14 1-1/2" WASTE PIPE FROM ABOVE.

SCALE: 1/8" = 1'-0"

PLUMBING PLAN - FOUNDATION

15 2" WASTE PIPE FROM ABOVE.

16 4" WASTE PIPE FROM FLOOR PIT ABOVE.

17 1-1/2" VENT PIPE UP.

18 2" PUMPED DISCHARGE PIPE FROM SP-1 UP.

19 4" WELL WATER SUPPLY PIPE UP.

20 CONNECT NEW 4" WELL WATER SUPPLY PIPE TO EXISTING 4" WELL WATER

SUPPLY PIPE. FIELD VERIFY EXACT LOCATION OF EXISTING WELL WATER

SUPPLY PIPE.

21 6" WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.

1 Revision 01 11/22/24

2 Revision 02 07/18/2025

7-14-2025

UP

4" DRAIN

6" DRAIN

18x24x18

18x18x18

6" DRAIN

18x18x18

6" DRAIN

18x24x18

39.3 39.3

40.1

"D"

CONTROL

"D"

CONTROL

J BOX

"A"

CONTROL

EXPAND

TANK

E X

P A

N D

T A

N K

39.3.1

10HP

WATER

HEAT'G

CIRC

PUMPS/

HEAT

EXCHG

CHEM

POT

IN

LE

T

O U T

IN

O U T

"C

LO

O P

H E A T

E X C H A N G E R

C O N T R O L

LWW FILTER SYST.

80"∅ x 5'H Tank

PIPE_

3_

INC

H

PIPE_

3_

INC

H

PIPE_

3_

INC

H

39.1

H E

A T

R E

C L

A

IM

S Y

S T

'P2'

LWW WASTE WATER

RAISED PIT TANK

LWW

SUMP

PUMP

'P1'

39.7

WATER

TRATMENT

A S

D C

-3

-2

.5 /1

/S S

39.4

39.4

TUNNEL HEATING

SYST.S

2 CONTROL

"F" x18 x18

D R A

IN

.2

.3 .2

L H

W T

A N

KL

T

W T

A N

K

T R

IP

L E

P U

M P

S

H

P H

W C

IR

C

D U

A L

P U

M P

S

C O N T R O L

"B

3" GAS INLET

GAS

CONTROL

T-6800

INSPECTION DOOR INSPECTION DOOR

PANEL

24" DRAFT HOODS

6" INLET 6" OUTLET

BARMETRIC DAMPER WITH 28" VERTICAL OUTLET

3" GAS INLET

GAS

CONTROL

T-6800

INSPECTION DOOR INSPECTION DOOR

PANEL

24" DRAFT HOODS

6" INLET 6" OUTLET

BARMETRIC DAMPER WITH 28" VERTICAL OUTLET

A

B

O P

EN

C LO SE

O P

EN

C LO SE

un io n_

2_inc h

B

ALL

VA

LVE

N

IB

CO

un io n_ 2_ inc h

B

ALL

VA

LVE

N

IB

CO

A

B

O P

EN

C LO SE

O P

EN

C LO SE

un io n_

2_inc h

B

ALL

VA

LVE

N

IB

CO

un io n_ 2_ inc h

B

ALL

VA

LVE

N

IB

CO

C A

O U T

LET

MODEL: ASD

40ST

CONTROL

COOLING

AIR

AIR

DISCHARGE

COOLING

AIR

INLET

AIR

ELEC

CONN

D R A I N

AIR

DRYER

COMPRESSOR

COMPRESSOR

OUTLET

INLET

AIR

AIR

DRYER

INLET

C A

O U T

LET

MODEL: ASD

40ST

CONTROL

COOLING

AIR

AIR

DISCHARGE

COOLING

AIR

INLET

AIR

ELEC

CONN

D R A I N

AIR

DRYER

COMPRESSOR

COMPRESSOR

OUTLET

INLET

AIR

AIR

DRYER

INLET

C G

C G

C G

C G

CG

C G

C G

CG

C G

PP

A1

B1

C1

4.2

3.3

2.4

BB AAA

2'

B

3'

C

4.5

4'

5'

E

6'

F

7'

G

8'

H

9'

I

EE

DD CC

FF

GG

5.1

B024

B022

B013

B029

B023

B009A

B010

B004

B026

B012

B007

B009

B019

B002 B003

B018

B011

B005

E001

B025

B008

B006

B028 B027

B017

B020

B001b

B001a

B015

FCO

FD-H

RP-1

EWH-1

N G

NG

N G

NG

N G

N G

3"

2 1/2"

3"

FD-HFCO

P-707

SAN

3/4"1"

1 1/4"

1"

NG

NG

1"

12 12

FD-H

3"

B014

4"

4"

3"

4"

4"

4"

2 1/2"

3"

3"

6"

6"

3" 2"

6"

3"

2"3"

2"1 1/4"

1"

1/2"

2"

1"

A

A

A

A

A

A

0.50 GPM

1.00 GPM

3/4"

3/4"

2"2"

1"

1 1/4"

1"

3/4"

3"1"

2 1/2"

3"

1"

4"

TMV-2

3"

C A

2"

1 1/2"

2 1.50 GPM

1 1/4"

3/4"

3"

20202"

2"

2"

2"

3"

CA CA

B017

COP

3"

1 1/2" 1 1/4"

1 1/4"

1 1/2"

1 1/2"

1 1/4"1/2"

B018

3"

3/4"

3/4"

3/4"

3/4"

1"

1 1/4"

FD-H

34 3"

BFP-1

W W

W

T W

H W

H W

T W

HW

TW

HW

TW

FD-H

BFP-1

(2-1/2")

(3")

6"

BFP-1

(4")

FD-H

OFF-SET BELOW

WALL LOUVER ABOVE

SWSW

S W

2"

3"

3"

3"

6"

1'

FD-H

TRUE

NORTH

PLAN

NORTH

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

PLUMBING PLAN - BASEMENT

PL101

SCALE: 1/8" = 1'-0"

PLUMBING PLAN - BASEMENT

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

# KEY NOTESGENERAL NOTES

1 SEE SHEET P-001 FOR LEGENDS, DETAILS AND GENERAL NOTES. 1 CONNECT EXISTING 1-2/"COLD, 1-1/2"HOT, AND 3/4"HOT WATER RETURN

PIPING TO NEW 1-1/2"COLD, 1-1/2"HOT, AND 3/4"HOT WATER RETURN PIPING.

2 HOT WATER RETURN BALANCING STATION, SET AT NOTED GPM.

3 EXISTING STORM PIPE (RL) TO REMAIN, SIZE AS NOTED.

4 2" VENT PIPE FROM BELOW.

5 REFER TO WATER HEATER DETAIL D3/P-501.

6 3" VENT PIPE FROM BELOW.

7 CONTINUATION OF EXISTING PIPING NOT SHOWN. WORK ON EXISTING

PIPING BEYOND THIS POINT IS NOT PERMITTED.

8 190 DEGREE F. 205 DEGREE F. MAX HOT LOOP SUPPLY PIPE, REFER TO

MECHANICAL WATER SYSTEM DIAGRAM DRAWINGS.

9 105 DEGREE F. TEMPERED WATER SUPPLY PIPE, REFER TO MECHANICAL

WATER SYSTEM DIAGRAM DRAWINGS.

10 115 DEGREE F. PRE-HEATED HOT WATER SUPPLY PIPE, REFER TO

MECHANICAL WATER SYSTEM DIAGRAM DRAWINGS.

11 TEMPERED WATER SUPPLY PIPE, REFER TO MECHANICAL WATER SYSTEM

DIAGRAM DRAWINGS.

12 HOT WATER SUPPLY PIPE, REFER TO MECHANICAL WATER SYSTEM

DIAGRAM DRAWINGS.

13 HOT LOOP RETURN PIPE, REFER TO MECHANICAL WATER SYSTEM DIAGRAM

DRAWINGS.

14 140 DEGREE F. HOT LOOP RETURN PIPE, REFER TO MECHANICAL WATER

SYSTEM DIAGRAM DRAWINGS.

15 3" VENT PIPE THROUGH ROOF.

16 GAS PIPE UP, SIZE AS NOTED.

17 SANITARY AND WATER PIPING ABOVE CEILING AND BELOW FLOOR ARE OFF

LIMITS IN THIS AREA. EXISTING PIPING MUST NOT BE USED FOR NEW WORK

CONSTRUCTION.

18 CONNECT NEW GAS METER TO EXISTING PIPING.

19 EXISTING 6" DOMESTIC WATER SERVICE PIPE FROM BELOW.

20 TEMPERED AND HOT WATER SUPPLY PIPES UP, SIZE AS NOTED.

21 CONNECT PIPING TO VERTICAL AIR SEPERATOR 'AS', REFER TO

'MECHANICAL WATER SYSTEM DIAGRAM' DRAWINGS.

22 TO TUNNEL WASHER FILTERING & HEATING SYSTEM, REFER TO

'MECHANICAL WATER SYSTEM DIAGRAM' DRAWINGS.

23 3/4" LHW & 3/4" LTW HEADER RETURN LINES TO RESPECTIVE WATER

STORAGE TANKS 24.4 & 24.5, REFER TO 'MECHANICAL WATER SYSTEM

DIAGRAM' DRAWINGS.

24 1" TO TUNNEL PRESS EXTRACTORS LE-4, REFER TO 'MECHANICAL WATER

SYSTEM DIAGRAM' DRAWINGS.

27 1-1/2" VENT PIPE FROM BELOW.

28 1-1/2" VENT PIPE UP.

29 1/2" COLD AND HOT WATER PIPE UP.

30 3" WASTE PIPE FROM ABOVE.

31 3" WASTE PIPE DOWN.

32 2" WASTE PIPE DOWN.

33 3" WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.

34 1-1/4" COLD AND 1" HOT WATER PIPES UP.

35 1-1/4" COLD AND 1" HOT WATER PIPES DOWN, RUN EXPOSED ON WALL.

36 1-1/2" VENT PIPE UP, RUN EXPOSED ON WALL.

37 2" WASTE PIPE FROM ABOVE.

38 3" VENT PIPE UP.

39 3" WASTE PIPE DOWN, RUN EXPOSED ON WALL.

40 2" PUMPED DISCHARGE RISER PIPE FROM BELOW.

41 6" WASTE PIPE DOWN.

42 4" WELL WATER SUPPLY PIPE FROM BELOW.

43 CONNECT 4" WELL WATER SUPPLY PIPE TO 4" DOMESTIC WATER SUPPLY

PIPE.

44 CONNECT NEW 4" WATER PIPE TO EXISTING 6" WATER PIPE.

45 4" WASTE PIPE DOWN.

46 2" COMPRESSED AIR PIPE UP.

1 Revision 02 07/18/2025

E X H

UNLOAD

FRONT

INLET

165GP

X

X

ZZ

X

Y

X

D ra w e r

D ra w e r

Input

Linen Output

Linen Output

Gate

Gate 2

REMOTE

STATUS

W O

R K

S T

A T

IO

N

W O

R K

S T

A T

IO

N

ENERGY

MONITOR

COMM.

SYST.

MONORAIL

CNTRLS

Y

FLOW

OF

GOODS

FLOW

OF

GOODS

24 24

27 27

10 10 10

8 8

212121 222222

10a

24 24

10a 10a 10a 10a

39.9

39.8

5a

VAC

CAB

PUMP/

CNTRL

1 43

C P

1 2 3 4

C A

R T

PATIENT CLOTHING

& SURGICAL LINEN

PROCESSING AREA

C P

CP-1

TOP CONVEYOR EL 4'0"

BOTTOM CONVEYOR EL 2'6"

YYY

X

Y

X

E

A

XX

X

YY

X

X

YY

X

X

YY

X

X

YY

X

X

Y

X

H W

C W

TW

H W

C W

TW

X

Y

X

Y

X

Y

X

Y

X

Y

X

Y

X

Y

X

Y

0. 3000

0. 3000

0. 5000

X

Y

X

Y

X

Y

X

Y

0. 3000

0. 3000

0. 5000

GOODS

FLOW

OF

X

Y

X

Y YY

Y Y

X X

Y Y

X X

C G

CG

CGCG

CG

C G

CG

CGCG

CG

CG

CG CG

CG

CG CG

CGCG

CG CG CG CGCG CG

C G

C G

C G

C G

C G

C G

C G

CG

C G

CG CG

CG

CG

CG

CG

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

CG

CG

CG CG CGCG

CG

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

CG

CG

CG CG

CG

CG

CG

CG CG C

G

C G

CG

PP

A1

B1

C1

4.2

3.3

2.4

BB AAA

2'

B

3'

C

4.5

4'

5'

E

6'

F

7'

G

8'

H

9'

I

EE

DD CC

FF

GG

5.1

B025

110108107

115111

100 100A

RL

R L

R L

RL

R L

RL

R L

R L

RL

R L

R L

P-422

P-422

TMV-1

TMV-1

TMV-1

RL

P-422

CA

C A

CA

CA

N G

NG

CA

NG

N G

CA CA

C A

CA CA

C A

CA

C A

CA

CA

NG

NG

NGNG

1 1/2"

1/2"

1 1/2" 1 1/2"

1/2"

2"

2"

1 1/4"

1"

1" 3/4" 3/4"

1/2"

1 1/4"

3/4"

2" 1 1/4" 2 1/2"

2"

2"

A

A

A

A

A

A

A

A

A

A

A

2 1/2"

1 1/4" 5 5

CA

3"

3"

2"2"

2"

2" 2"

2"

P-707

P-707

P-502

1 1/2"

P-707

1/2"

2"

1 1/4" 1 1/4"

FD-H

FD-H

FD-H

PD

P D

2" 4 1

2"

2"

2"

2"

1/2"

A

A A

A

1/2"

1/2"

1/2"

1" 16

2"

1/2"

3/4" 1/2"

104A

1 1/2" 1 1/2"

P-60421

1'

A22

A21

A23 A24

A14 A20

A15 A8

A7

A9A6A17

A1

A2

A3

A11

A4

A10

A5

A13

A12

A16

A19

A18

TRUE

NORTH

PLAN

NORTH

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

PLUMBING PLAN - FIRST FLOOR

PL102

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

# KEY NOTESGENERAL NOTES

1 SEE SHEET P-001 FOR LEGENDS, DETAILS AND GENERAL NOTES. 1 EXISTING STORM PIPE (RL) TO REMAIN, SIZE AS NOTED.

2 TEMPERATURE BLENDING VALVE #2 - BY OTHERS, REFER TO 'MECHANICAL

WATER SYSTEM DIAGRAM' DRAWINGS.

3 GAS PIPE FROM BELOW, SIZE AS NOTED.

4 TEMPERED AND HOT WATER SUPPLY PIPES FROM BELOW, SIZE AS NOTED.

5 SANITARY AND WATER PIPING ABOVE CEILING AND BELOW FLOOR ARE OFF

LIMITS IN THIS AREA. EXISTING PIPING MUST NOT BE USED FOR NEW WORK

CONSTRUCTION.

6 2" VENT PIPE FROM BELOW.

7 3" VENT PIPE THROUGH ROOF.

8 1-1/2" VENT PIPE FROM BELOW.

9 1/2" COLD AND HOT WATER PIPE FROM BELOW.

10 1-1/4" COLD AND 1" HOT WATER PIPES FROM BELOW.

11 3" VENT PIPE FROM BELOW.

12 2" PUMPED DISCHARGE RISER PIPE FROM BELOW.

SCALE: 1/8" = 1'-0"

PLUMBING PLAN - FIRST FLOOR

13 2" PUMPED DISCHARGE PIPE DOWN TO 8" ABOVE FINISHED GRADE.

14 TERMINATE 2" DISCHARE PIPE WITH 45 DEGREE ELL TURNED DOWN ONTO

SPLASH BLOCK ON GRADE.

15 1-1/2" VENT PIPE FROM BELOW, INCREASE TO 3" VENT THROUGH ROOF.

16 3" VENT PIPE FROM BELOW, INCREASE TO 4" VENT THROUGH ROOF.

17 2" VENT PIPE FROM BELOW, INCREASE TO 3" VENT THROUGH ROOF.

18 4" VENT PIPE THROUGH ROOF.

19 SUMP PUMP SP-1 (OIL MINDER) CONTROL PANEL.

20 2" COMPRESSED AIR PIPE FROM BELOW.

21 REMOVE EXISTING ELECTRIC WATER COOLER AND PREPAIR EXISTING

PIPING FOR NEW CONNECTIONS. REPLACE WITH NEW ELECTRIC WATER

COOLER WITH BOTTLE FILLER (P-604).

1 Revision 02 07/18/2025

CA

CA

CA

CA

2"

1/2"

1 1/2" 2"

2"

2"

1 1/2"

1/2"

1/2"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

1"

1"

1/2"1/2"

1"

1/2" 1/2"

1"

1"

1/2"

1"

1"

1"

1"

1"

1/2"

1/2"

1/2"

1/2"

3/4"

1/2"

1/2" 2"

2"

3"

2"

3/4"

3"

1/2"

1/2"

3/4"

1 1/2"

1 1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2" 3/4"

3/4"

3"

2"

1/2" CA

2"

2"

2"

2"

2"

2"

1/2"

3"

2"

1/2"

1/2"

1 1/2"

1 1/2"

MAIN

LINE

REGULATOR

1 1/2"

2"

2"

2"

2"

1"

3"

1/2"

1/2"

1/2"

1/2"

1/2"

3"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

1/2" 1/2"

1/2"

1/2"

1/2"

1/2"

1/2"

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

PLUMBING COMPRESSED AIR RISER

P-702

NO SCALE

COMPRESSED AIR RISER

COMPRESSED AIR NOTES:

1. COORDINATE FINAL EQUIPMENT CONNECTION FITTING

REQUIREMENTS WITH SUPPLY PIPING.

2. COORDINATE EQUIPMENT CONNECTION LOCATION(S) WITH

ACTUAL EQUIPMENT BEING INSTALLED.

3. REFER TO SHEET LE3006 FOR EQUIPMENT PIPING CONNECTION

DETAILS.

4. REFER TO DETAIL 12/M19 DRAWING LE3006 FOR PIPING AND

VALVES BETWEEN THE AIR COMPRESSOR AND THE STORAGE

TANK.

B001b

B017

B001b

B001b

41 OUTLET, TO

FIXTURES

INLET, FROM

AIR COMPRESSORS

TO LAUNDRY EQUIPMENT 25

10a

10a

10a 10a

10a

39.4

39.4

39.1

1 Revision 02 07/18/2025

A22

A21

A23

A24

A20

A14

A15

A19 A18

A17

A6 A7

A9 A13

A1

A10

A5

A11

A4

A8

A16

A12

A2

A3

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

EX 4"

EX 4"

COP

FD-H

FCO

FD-H

FD-H

FD-H

FD-H

FD-H

FCO

FD-H

FD-H

3" 2"

3" VTR

4" VTR

3" VTR

3" VTR

4" VTR

3" VTR

4" VTR

1 1/2"

1 1/2"

1 1/2"

1 1/2"

3"

3"

3"

3"

3"

4"

FD-H

2"

3"

3"

6"

6"

6"

4"8"

4"

6"

3"

4"

8"

3"

3"

6"

3"

1 1/2"

3"

1 1/2"

1 1/2"

3" VTR

3"

6"

6"

6"

3"

3"

3"

2"

3"

1 1/2"

3"

6"

6"

4"

4"

FROM 18" X 18" X 18" SUMP

FROM 18" X 24" X 18" SUMP

FROM 18" X 18" X 18" SUMP

P-502

P-422

P-422 3"

FROM 18" X 18"

X 18" SUMP

EX 4"

P-422

EX 8"

4"

8"

8"

8"

FD-H

4"

6"

FROM 18" X

18" X 18" SUMP

4" VTR

3"

FROM 18" X 18" X 18" SUMP

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

SANITARY PIPING RISER

P-704

NO SCALE

SANITARY PIPING RISER

104A

B018

B017

B001b

B001b

B001b

B001b

B017

B017

1 Revision 01 11/22/24

2 Revision 02 07/18/2025

Sheets
P-702 - PLUMBING COMPRESSED AIR RISER
P-704 - SANITARY PIPING RISER
PF101 - PLUMBING PLAN - FOUNDATION
PL101 - PLUMBING PLAN - BASEMENT
PL102 - PLUMBING PLAN - FIRST FLOOR

File details come from the government source that posted it. Updated .