S06 Updated Drawings 250716 FP REV 2.pdf

PDF 704 KB Posted

Attached to
Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45 Federal contract opportunity
Solicitation number
36C24125R0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

These are fire suppression plan drawings for the Upgrade VISN 1 Laundry Building 45 project located at the Brockton Campus in Brockton, Massachusetts. The documents include detailed basement and first floor fire suppression plans with specific technical requirements, such as relocating existing sprinkler piping, modifying sprinkler layouts, and providing connections for equipment. The drawings are part of a 100% submittal for a fully sprinklered facility, with key notes addressing specific installation and modification requirements for different rooms, including the clean textile make-up room, drying production area, and various staging and processing spaces. The project involves the U.S. Department of Veterans Affairs and includes consulting services from multiple engineering and design firms, with the drawings prepared by Toland Mezzy Molnar and dated 08-21-2024.

View the file

Other files for this federal contract opportunity

Other files attached to Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45, newest first.
File Type Posted
S06 Site Visit Sheet 7.28.2025.pdf PDF
S06 RFI Questions and Answers 8.11.2025 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
36C24125R0008 0007.docx DOCX document
S06 Updated Drawings Plumbing Rev2 7-14-25.pdf PDF
S06 Updated Specifications 000110.pdf PDF
S06 RFI Questions and Answers 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
36C24125R0008 0006.docx DOCX document
S06 Updated Drawings 2224 VA Brockton REV 2 architectural.pdf PDF
S06 Updated Specifications 085113.pdf PDF
S06 2025-07-18 Addendum No. 2.pdf PDF
S06 Updated Drawings Mechanical Rev2.pdf PDF
S06 Updated Specifications 87100 R2.pdf PDF
S06 Updated Drawings 2025-07-18 VA Brockton B45 Laundry Structural Rev 2.pdf PDF
S06 Updated Drawings 10438_ELEC_REV2.pdf PDF
S06 WD MA20250012 07.18.2025.pdf PDF
S06 36C24125R0008 0005.docx DOCX document
S06 36C24125R00008 0004.pdf PDF
36C24125R0008 0003.docx DOCX document
36C24125R0008 0002.docx DOCX document
S06 Site Visit Sign In Sheet 4.24.2025.pdf PDF
36C24125R0008 0001.docx DOCX document
S02 Attachment B Past Performance Project Information Sheet for 36C24125R0008.docx DOCX document
S02 SOW 523A5-10-316 Laundry Building 45.pdf PDF
S02 PCRA 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Specifications 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawings Revision 01 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawing Set 523A5-10-316 Laundry Building 45 08.21.2024.pdf PDF
S02 F8-1 Laundry Equipment Storage 523A5-10-316 Laundry Building 45.pdf PDF
S02 F3-3 HLAC Accreditation Standards 09.21.2023 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-2 Attachment 2 Structural Calculations 523A5-10-316 Laundry Building 45.pdf PDF
S02 6500 Appendix B and C Security Language 523A-10-316 Laundry Building 45.pdf PDF
S02 Attachment A Technical Project Information Sheet for 36C24125R0008.docx DOCX document
S02 WD MA20250012 04.04.2025.pdf PDF
S02 Primavera P6 Schedule Review Checklist 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 Equipment List - Existing vs New Equipment 523A5-10-316 Laundry Building 45.pdf PDF
S02 Submittal Register 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 Final Design Analysis Consolidated 523A5-10-316 Laundry Building 45.pdf PDF
36C24125R0008_2.docx DOCX document
S02 Brockton Campus Map.pdf PDF
S02 Base Offer Price Breakdown.xlsx XLSX spreadsheet
S02 SSJ 523A-10-316 Laundry Building 45.pdf PDF
S02 F3-1 Code Search 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-1 Structural Design Criteria 523A5-10-316 Laundry Building 45.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

STORAGE

B005

VESTIBULE

B008

WOMENS

TOILET

B009A

WOMENS

SHOWER

B009 WOMEN'S

RESTROOM

B010

HAC

B019

MEN'S

RESTROOM

B014

MEN'S

LOCKER

ROOM

B013

STAFF

BREAK

ROOM

B004

STAIR

B007

CORRIDOR

B006

GAS METER

AND

REGULATING

ROOM

B002

MECHANICAL

ROOM

B003

CORRIDOR

B012

SECURE

STORAGE

B028

STORAGE

B015

MECHANICAL

STORAGE

B024

MECHANICAL

SHOP

B023

CONTROLLER

ROOM

B022

SERVICE

ELEVATOR

B025

MECHANICAL

B017

MECH &

CHEM

STORAGE

B018

IT ROOM

B020

SECURITY

OFFICE

B027

TANK ROOM

B001b

LINEN

STORAGE

B026

ELEC ROOM

E001

STORAGE

B001a

WOMEN'S

LOCKER

ROOM

B011

C5

FX001

H.7G.8F.8E.8D.8C.8B.8A.8A.1

8EE

DD CC

7FF

6.2

GG

5.1

4.1

3.2

2.2

2.1

AA B C D E F G H I

JJ

LLMMKKII

HH

OO

A

NN

PP

TRUE

NORTH

PLAN

NORTH

SCALE: 1/8" = 1'-0"

BASEMENT FIRE SUPPRESSION PLAN

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

CHB DRD

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-2024 REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

BASEMENT FLOOR FIRE SUPPRESSION PLAN

FX101

1. EXISTING RISER COMPONENTS TO INCLUDE BACKFLOW PREVENTER, RISER CHECK VALVE, FLOW SWITCH AND

TAMPER SWITCH ARE TO BE MOVED TO EAST SIDE OF MECH ROOM B018.

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

# KEY NOTESGENERAL NOTES

2. SPRINKLER SYSTEM IN THIS AREA CURRENTLY ONLY CONSISTS OF MAINS. REMOVE/REINSTALL AS NECESSARY TO COORDINATE WITH STRUCTURAL REMEDIATION. FOLLOWING STRUCTURAL REMEDIATION, COMPLETE INSTALLATION OF SYSTEM, INCLUDING BUT NOT LIMITED TO, BRANCH LINE PIPING, SPRINKLERS, HANGERS, ETC.

4. SPRINKLER SYSTEM INSTALLATION IN THIS AREA IS SUBSTANTIALLY COMPLETE. REMOVE/REINSTALL IT IN ITS ENTIRETY TO FACILITATE STRUCTURAL REMEDIATION. EXISTING PIPING, FITTINGS, HANGERS, ETC., CAN BE REUSED AT CONTRACTOR'S

DISCRETION.

6. EXISTING FIRE DEPARTMENT CONNECTION.

7. EXISTING REDUCED PRESSURE BACKFLOW PREVENTER.

8. PROVIDE TEST HEADER HOSE VALVE.

9. ALL EXPOSED SPRINKLER PIPING SHALL BE PAINTED RED IN ACCORDANCE WITH SPECIFICATION SECTION 09 91 00.

1. REFER TO SHEET FX001 FOR GENERAL NOTES.

2. REFER TO SHEETS FX501 - FX503 FOR SPRINKLER

SHOP DRAWINGS FROM PREVIOUS CONTRACT.

5. SPRINKLER SYSTEM IN THIS AREA IS SUBSTANTIALLY COMPLETE. REMOVE/REINSTALL AS NECESSARY TO COORDINATE WITH STRUCTURAL REMEDIATION. EXISTING PIPING, FITTINGS, HANGERS, ETC., CAN BE REUSED AT CONTRACTOR'S DISCRETION.

3. SPRINKLER SYSTEM INSTALLATION IN THIS AREA UNDER PREVIOUS CONTRACT IS GENERALLY LIMITED TO MAINS ONLY. NO

BRANCH LINES OR SPRINKLERS WERE OBSERVED IN THIS AREA.

1 REV 2 07/18/25

RECEPTION

OFFICE

OFFICE

TRAINING

ROOM

100A

EQUIPMENT

SPACE

105 DRYING

PRODUCTION

WASHING

PRODUCTION

SOIL

TEXTILE

SORTING

SOIL

TEXTILE

RECEIVING

AIR LOCK

ROOM

SOIL CART

STAGING

CART

WASHING

CLEAN

CART

STAGING

VESTIBULE

LAUNDRY

SUPERVISOR

OFFICE

RESTROOM

RESTROOM

CART MAKE

UP

CLEAN

TEXTILE

MAKE UP

FLATWORK

FINISHING

SERVICE

ELEVATOR

B025

22222

HSKP

104A

H.7G.8F.8E.8D.8C.8B.8A.8A.1

8EE

DD CC

7FF

6.2

GG 6

5.1

4.1

3.2

2.2

2.1

AA B C D E F G H I

JJ

LLMMKKII

HH

OO

A

NN

PP

TRUE

NORTH

PLAN

NORTH

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

CHB DRD

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-2024 REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

FIRST FLOOR FIRE SUPPRESSION PLAN

FX102

SCALE: 1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION PLAN

1. PROVIDE ADDITIONAL BRANCHLINE IN CLEAN TEXTILE MAKE UP ROOM 103 IF REQUIRED TO MEET CRITERIA FOR OBSTRUCTIONS PER NFPA 13.

1/8" = 1' - 0" 0 5' 10' 15' 30'

GRAPHIC SCALE(S)

# KEY NOTESGENERAL NOTES

2. PROVIDE 1-1/4" CONNECTION TO SPRINKLER SYSTEM (WITH TAMPER AND FLOW SWITCH) FOR CONNECTION TO DRYING EQUIPMENT.

3. MODIFY SPRINKLER LAYOUT AS NECESSARY TO ACCOMMODATE NEW ROOM.

1. REFER TO SHEET FX001 FOR GENERAL NOTES.

2. REFER TO SHEETS FX501 - FX503 FOR SPRINKLER

SHOP DRAWINGS FROM PREVIOUS CONTRACT.

4. CONTRACTOR TO RELOCATE EXISTING SPRINKLER PIPING ALONG COLUMN LINE E-E TO ABOVE NO FLY ZONE. REFER TO ARCHITECTURAL PLANS

FOR CLEARANCE REQUIREMENTS.

5. CONTRACTOR TO RELOCATE EXISTING SPRINKLER PIPING TO ABOVE NO FLY ZONE IF REQUIRED BY E-TECH TO AVOID CONFLICT WITH MONORAIL

SYSTEM. REFER TO ARCHITECTURAL PLANS FOR CLEARANCE REQUIREMENTS.

1 REV 2 07/18/25

Sheets
FX101 - BASEMENT FLOOR FIRE SUPPRESSION PLAN
FX102 - FIRST FLOOR FIRE SUPPRESSION PLAN
2025-07-17T08:19:02-0400
Christopher Born, PE
2025-07-17T08:19:22-0400
Christopher Born, PE

File details come from the government source that posted it. Updated .