S06 Updated Drawings 10438_ELEC_REV2.pdf

PDF 5 MB Posted

Attached to
Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45 Federal contract opportunity
Solicitation number
36C24125R0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

These electrical power plan drawings detail the electrical system for a Veterans Affairs laundry facility upgrade project. The documents include comprehensive electrical power plans for the basement, first floor, and roof levels, showing detailed electrical equipment connection schedules for various panels (HDP, HLE, HTA, HTB, LDP) and mechanical systems. The drawings specify electrical connections for numerous laundry equipment components, HVAC units, pumps, exhaust fans, and variable refrigerant flow (VRF) systems, with precise electrical load calculations, amperage ratings, and circuit specifications. The plans are part of the VA VISN 1 Laundry Building 45 upgrade project (Solicitation Number 36C24125R0008), prepared by ClarkNexsen as the engineering consultant, with revisions dated 11/22/24 and 07/18/2025, indicating an ongoing design refinement process for the facility's electrical infrastructure.

View the file

Other files for this federal contract opportunity

Other files attached to Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45, newest first.
File Type Posted
S06 RFI Questions and Answers 8.11.2025 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
S06 Site Visit Sheet 7.28.2025.pdf PDF
36C24125R0008 0007.docx DOCX document
S06 Updated Drawings Mechanical Rev2.pdf PDF
S06 Updated Specifications 87100 R2.pdf PDF
S06 Updated Drawings 2224 VA Brockton REV 2 architectural.pdf PDF
S06 Updated Specifications 085113.pdf PDF
S06 2025-07-18 Addendum No. 2.pdf PDF
S06 Updated Drawings 2025-07-18 VA Brockton B45 Laundry Structural Rev 2.pdf PDF
S06 WD MA20250012 07.18.2025.pdf PDF
S06 Updated Drawings 250716 FP REV 2.pdf PDF
S06 Updated Drawings Plumbing Rev2 7-14-25.pdf PDF
S06 Updated Specifications 000110.pdf PDF
S06 RFI Questions and Answers 523A5-10-316 Upgrade VISN 1 Laundry Building 45.docx DOCX document
36C24125R0008 0006.docx DOCX document
S06 36C24125R0008 0005.docx DOCX document
S06 36C24125R00008 0004.pdf PDF
36C24125R0008 0003.docx DOCX document
36C24125R0008 0002.docx DOCX document
36C24125R0008 0001.docx DOCX document
S06 Site Visit Sign In Sheet 4.24.2025.pdf PDF
S02 Submittal Register 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 Final Design Analysis Consolidated 523A5-10-316 Laundry Building 45.pdf PDF
36C24125R0008_2.docx DOCX document
S02 Attachment A Technical Project Information Sheet for 36C24125R0008.docx DOCX document
S02 WD MA20250012 04.04.2025.pdf PDF
S02 Primavera P6 Schedule Review Checklist 523A5-10-316 Laundry Building 45.xlsx XLSX spreadsheet
S02 Equipment List - Existing vs New Equipment 523A5-10-316 Laundry Building 45.pdf PDF
S02 Brockton Campus Map.pdf PDF
S02 Base Offer Price Breakdown.xlsx XLSX spreadsheet
S02 SSJ 523A-10-316 Laundry Building 45.pdf PDF
S02 F3-1 Code Search 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-1 Structural Design Criteria 523A5-10-316 Laundry Building 45.pdf PDF
S02 Attachment B Past Performance Project Information Sheet for 36C24125R0008.docx DOCX document
S02 SOW 523A5-10-316 Laundry Building 45.pdf PDF
S02 PCRA 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Specifications 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawings Revision 01 523A5-10-316 Laundry Building 45.pdf PDF
S02 Final Drawing Set 523A5-10-316 Laundry Building 45 08.21.2024.pdf PDF
S02 F8-1 Laundry Equipment Storage 523A5-10-316 Laundry Building 45.pdf PDF
S02 F3-3 HLAC Accreditation Standards 09.21.2023 523A5-10-316 Laundry Building 45.pdf PDF
S02 F2-2 Attachment 2 Structural Calculations 523A5-10-316 Laundry Building 45.pdf PDF
S02 6500 Appendix B and C Security Language 523A-10-316 Laundry Building 45.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

C G

C G

C G

C G

CG

C G

C G

CG

C G

E

E

E

E

E

E

E

E

E

E E

EE

E

E

E

E E

E

E

E

E

E

E

E

E E

E

E

E

E

E E

E

E

E

E

E

E EE

E

E

E

E

E

E

E E

E

PLAN

NORTH

TRUE

NORTH

A.1 A.8 B.8 C.8 D.8 E.8 F.8 G.8 H.7

6.2

2.1

2.2

3.2

4.1

5.1

A B C D E F G HAACCDD

EE

FF

GG

HH

II

JJ

KK LLMM

NN

EP401

B1

EP401

E5

STORAGE

B005

CORRIDOR

B006

GAS METER

AND

REGULATING

ROOM

B002

LINEN

STORAGE

B026

MECHANICAL

ROOM

B003

STAFF

BREAK

ROOM

B004

STAIR

B007

VESTIBULE

B008

WOMENS

TOILET

B009A

WOMENS

SHOWER

B009

WOMEN'S

RESTROOM

B010

HAC

B019

WOMEN'S

LOCKER

ROOM

B011

MEN'S

RESTROOM

B014

MEN'S

LOCKER

ROOM

B013

CLOSET

B029

CORRIDOR

B012

STORAGE

B015

SECURE

STORAGE

B028

SECURITY

OFFICE

B027

IT ROOM

B020

MECHANICAL

B017

TANK ROOM

B001b

STORAGE

B001a

ELEC ROOM

E001

MECHANICAL

STORAGE

B024

MECHANICAL

SHOP

B023

CONTROLLER

ROOM

B022

SERVICE

ELEVATOR

B025

MECH &

CHEM

STORAGE

B018

LDP-98,100

45-VRFAC-21B

LDP-98,100

45-VRFAC-21A

LDP-98,100

45-VRFAC-21D

LDP-98,100

45-VRFAC-21C

LDP-86

45-HWUH-11

LDP-88

45-HWUH-13

HDP-55,57,59

45-VRFHRU-1A

HDP-67,69,71

45-VRFHP-ELECTRIC-A

LDP-93,95

45-VRFAC-1

LDP-86

45-HWUH-10

LDP-86

45-HWUH-16

LDP-88

45-HWUH-17

HDP-13,15,17

45-HV-3

HDP-19,21,23

45-HV-4

LDP-88

45-HWUH-18

HD2-1,3,5

45-HV-2

LDP-93,95

45-VRFAC-6B

LDP-93,95

45-VRFAC-6A

LDP-93,95

45-VRFAC-6C LDP-143,145

45-VRFAC-7A

LDP-143,145

45-VRFAC-4B

LDP-93,95

45-VRFAC-3

LDP-143,145

45-VRFAC-7B

LDP-86

45-HWUH-15

LDP-86

45-HWUH-14

HDP-73,75,77

45-VRFHP-ELECTRIC-B

LDP-88

45-HWUH-12

HDP-61,63,65

45-VRFHRU-1B

HDP-62,64,66

45-RF-1

HDP-68,70,72

45-RF-2

SHADING INDICATES NO POWER WORK IN THIS AREA

EML-22

P-707

LDP-91

P-RP-1

HDP-80,82,84

P-EWH-1

MECHANICAL

B017

LDP-54

LDP-10

LDP-12

LDP-18

LDP-20

LDP-16

LDP-110

LDP-76

LDP-14

LDP-2

LDP-4

LDP-6LDP-8

LDP-56

LDP-70

LDP-52

LDP-66

LDP-64

LDP-62

LDP-60

LDP-108

LDP-80

LDP-58

LDP-74

LDP-68

HD2-7,9,11

GP-3

HD2-13,15,17

GP-4

HD2

HDP-31,33,35

ELEVATOR

HD2-8,10,12

VF-3

HD2-2,4,6

VF-4

EML-14

FACP BOOSTER 2

EML-12

FACP BOOSTER 1

EML-10

FACP

HDP-14,16,18

45-CP-1

HD2-19,21,23

P1-A

HD2-25,27,29

P1-B

HD2-14,16,18

GP-1

HD2-20,22,24

GP-2

EMH-31,33,35

P-SP-1

LDP-11

LLE-23

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

ELECTRICAL POWER PLAN - BASEMENT

EP101A

GENERAL NOTES KEY NOTES#

1/8" = 1'-0"EP101A

1 BASEMENT PLAN - MECH & GENERAL POWER

0' 4' 8' 16' 24'

SCALE: 1/8" = 1' - 0"

A. REFER TO SHEET EP102A FOR LAUNDRY EQUIPMENT CONNECTION PLANS IN THIS AREA.

B. PANELBOARDS LOCATED IN ELECTRICAL ROOM E001, SEE E1/EP401 FOR LOCATION.

C. COORDINATE NEW WIRING DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH LAUNDRY EQUIPMENT PRIOR TO ROUGH-IN.

1 EXISTING EQUIPMENT TO REMAIN. THIS EQUIPMENT WAS INSTALLED UNDER A

PREVIOUS PERMIT. THE PREVIOUS PERMIT WAS NOT CLOSED OUT AND IT IS

UNKNOWN TO WHAT LEVEL OF COMPLETION THE INSTALLATION WAS PERFORMED

TO. CONTRACTOR TO INSPECT, TEST, AND COMMISSION EQUIPMENT AND

INSTALLATION TO MANUFACTURER’S REQUIREMENTS AND TO ASSUME

OWNERSHIP OF PREVIOUS INSTALLATION. VERIFY INTEGRITY OF CIRCUIT AND

CONDUIT AND REPLACE AS NEEDED. VERIFY ALL CONDUIT FITTINGS ARE

TIGHTENED TO ENSURE SECURE MECHANICAL CONNECTION AND EFFECTIVE

BOND FOR GROUND FAULT PATH. MEG TEST BRANCH CIRCUIT WIRING TO ENSURE

INSULATION IS IN GOOD CONDITION AND REPLACE IF DEFICIENT. RETORQUE ALL

TERMINATIONS TO MANUFACTURER’S RECOMMENDED SETTINGS.

2 MAKE POWER CONNECTION TO EXISTING MECHANICAL UNIT.

3 REINSTALL EXISTING MECHANICAL EQUIPMENT AND RESTORE ELECTRICAL

CONNECTIONS AFTER STRUCTURAL WORK HAS BEEN COMPLETED.

4 MAKE POWER CONNECTION TO NEW MECHANICAL UNIT.

5 MAKE POWER CONNECTION TO NEW EMERGENCY EYE WASH ALARM.

6 THE CONTRACTOR SHALL ENGAGE BUCKLEY ELEVATOR, PHONE # 978-594-1197,

TO MAKE THE ELEVATOR OPERATIONAL AND PERFORM ALL REQUIRED

COMMISSIONING AND TESTING. CONTRACTOR TO MAKE FINAL ELECTRICAL

CONNECTIONS TO ELEVATOR EQUIPMENT.

1 REVISION 01 11/22/24

2 REVISION 02 07/18/2025

7 PROVIDE POWER CONNECTION TO NEW MOTORIZED DAMPER. DAMPER SHALL

OPEN WHEN BOILERS ARE OPERATING..

8 PROVIDE POWER CONNECTION TO NEW MOTORIZED DAMPER. DAMPER SHALL

OPEN WHEN AIR COMPRESSORS ARE OPERATING. COORDINATE AIR

COMPRESSOR DAMPER CONTROL WITH LAUNDRY EQUIPMENT CONTRACTOR.

Esmail.Hamidi G:\PE Stamps\Orders\2024\150294 Hamidi VA-Eng\150294 HAMIDI VA-Eng Final Model (1)

C G

CG

CGCG

CG

C G

CG

CGCG

CG

CG

CG CG

CG

CG CG

CGCG

CG CG CG CGCG CG

C G

C G

C G

C G

C G

C G

C G

CG

C G

CG CG

CG

CG

CG

CG

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

CG

CG

CG CG CGCG

CG

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

CG

CG

CG CG

CG

CG

CG

CG CG C

G

C G

CG

E X H

UNLOAD

FRONT

INLET

165GP

X

X

ZZ

X

Y

X

D ra w e r

D ra w e r

Input

Linen Output

Linen Output

Gate

Gate 2

REMOTE

STATUS

W O

R K

S T

A T

IO

N

W O

R K

S T

A T

IO

N

ENERGY

MONITOR

COMM.

SYST.

MONORAIL

CNTRLS

Y

FLOW

OF

GOODS

FLOW

OF

GOODS

24 24

27 27

10 10 10

8 8

212121 222222

10a

24 24

10a 10a 10a 10a

39.9

39.8

5a

VAC

CAB

PUMP/

CNTRL

1 43

C P

1 2 3 4

C A

R T

PATIENT CLOTHING

& SURGICAL LINEN

PROCESSING AREA

C P

CP-1

TOP CONVEYOR EL 4'0"

BOTTOM CONVEYOR EL 2'6"

YYY

X

Y

X

E

A

XX

X

YY

X

X

YY

X

X

YY

X

X

YY

X

X

Y

X

H W

C W

TW

H W

C W

TW

X

Y

X

Y

X

Y

X

Y

X

Y

X

Y

X

Y

X

Y

0. 3000

0. 3000

0. 5000

X

Y

X

Y

X

Y

X

Y

0. 3000

0. 3000

0. 5000

GOODS

FLOW

OF

X

Y

X

Y YY

Y Y

X X

Y Y

X X

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EE

E

E E E

E

E E

E E

E

PLAN

NORTH

TRUE

NORTH

A.1 A.8 B.8 C.8 D.8 E.8 F.8 G.8 H.7

6.2

2.1

2.2

3.2

4.1

5.1

A B C D E F G HAACCDD

EE

FF

GG

HH

II

JJ

KK LLMM

NN

OO

CLEAN

TEXTILE

MAKE UP

CART MAKE

UP

RECEPTION

OFFICE

OFFICE

TRAINING

ROOM

100A

EQUIPMENT

SPACE

DRYING

PRODUCTION

WASHING

PRODUCTION

SOIL

TEXTILE

SORTING

FLATWORK

FINISHING

LAUNDRY

SUPERVISOR

OFFICE

RESTROOM

RESTROOM

VESTIBULE

CLEAN

CART

STAGING

SERVICE

ELEVATOR

B025

AIR LOCK

ROOM

CART

WASHING

SOIL CART

STAGING

SOIL

TEXTILE

RECEIVING

LDP-148,150

45-VRFAC-10

LDP-148,150

45-VRFAC-9LDP-148,150

45-VRFAC-8

LDP-148,150

45-VRFAC-11

LDP-148,150

45-VRFAC-12

LDP-90

45-HWUH-3

LDP-90

45-HWUH-1

LDP-90

45-HWUH-2

LDP-90

45-HWUH-5

LDP-90

45-HWUH-4

LDP-148,150

45-VRFAC-13

LDP-92

45-HWUH-6

LDP-144,146

45-VRFAC-16

LDP-144,146

45-VRFAC-17

LDP-144,146

45-VRFAC-19

LDP-151,153

45-VRFAC-15

LDP-151,153

45-VRFAC-14

LDP-92

45-HWUH-7

LDP-92

45-HWUH-8

LDP-92

45-HWUH-9

LDP-144,146

45-VRFAC-20

LDP-144,146

45-VRFAC-18

LDP-131

45-PEF-1

LDP-133

45-PEF-2

EWC

LDP-135

45-PEF-3

LTD

'TD'

3P60

LTC

3P60

LTD-5

LTD-3LTD-1

LDP-55

LDP-53

LDP-79

LDP-61

LDP-72

LDP-24

LDP-25

LDP-26

LDP-22 LDP-25

LDP-59

LDP-57

LDP-67

LDP-65

LDP-63

LDP-42 (SC)

LDP-42 (SC)

HTA-68,70,72

HTB-37,39,41

LDP-34 LDP-36

LDP-148,150

VRF-BSB-11

LDP-32

LDP-30

LDP-71

LDP-73

LDP-28

LDP-112

TEX-1

LDP-114

TEX-2

HDP-26,28,30

45-REF-1B

HDP-20,22,24

45-REF-1A

HDP-49,51,53

45-REF-2B

HDP-43,45,47

45-REF-2A

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

ELECTRICAL POWER PLAN - FIRST FLOOR

EP101B

0' 4' 8' 16' 24'

SCALE: 1/8" = 1' - 0"

GENERAL NOTES KEY NOTES#

1/8" = 1'-0"EP101B

1 FIRST FLOOR - MECH & GENERAL POWER

A. OVERHEAD MONORAIL 'NO-FLY' CLEARANCE: CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE 'NO-FLY' CLEARANCE REQUIREMENTS PRIOR TO COMMENCING INSTALLATION. REFER TO ARCHITECTURAL PLANS AND LAUNDRY EQUIPMENT DRAWINGS.

B. REFER TO SHEET EP102B FOR LAUNDRY EQUIPMENT CONNECTION PLANS IN THIS AREA.

C. PANELBOARDS LOCATED IN ELECTRICAL ROOM E001, SEE E1/EP401 FOR LOCATION.

D. COORDINATE NEW WIRING DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH LAUNDRY EQUIPMENT PRIOR TO ROUGH-IN.

1 EXISTING EQUIPMENT TO REMAIN. THIS EQUIPMENT WAS INSTALLED UNDER A PREVIOUS PERMIT. THE PREVIOUS PERMIT WAS NOT CLOSED OUT AND IT IS UNKNOWN TO WHAT LEVEL OF COMPLETION THE INSTALLATION WAS PERFORMED TO. CONTRACTOR TO INSPECT, TEST, AND COMMISSION EQUIPMENT AND INSTALLATION TO MANUFACTURER’S REQUIREMENTS AND TO ASSUME OWNERSHIP OF PREVIOUS INSTALLATION. VERIFY INTEGRITY OF CIRCUIT AND CONDUIT AND REPLACE AS NEEDED. VERIFY ALL CONDUIT FITTINGS ARE TIGHTENED TO ENSURE SECURE MECHANICAL CONNECTION AND EFFECTIVE BOND FOR GROUND FAULT PATH. MEG TEST BRANCH CIRCUIT WIRING TO ENSURE INSULATION IS IN GOOD CONDITION AND REPLACE IF DEFICIENT.

RETORQUE ALL TERMINATIONS TO MANUFACTURER’S RECOMMENDED SETTINGS.

2 PROVIDE POWER CONNECTION TO NEW MOTORIZED DAMPER. DAMPER SHALL OPEN WHEN DRYERS ARE OPERATING.

COORDINATE DRYER DAMPER CONTROL WITH LAUNDRY EQUIPMENT CONTRACTOR.

2 REVISION 02 07/18/2025

3 100A 120/208 3P 4W PANEL LTC FED BY 30 KVA, 480V-120V/208V TRANSFORMER, CEILING SUSPENDED. REFER TO DETAIL C6/EP501 FOR MOUNTING. REFER TO ELECTRICAL RISER ON EP605. COORDINATE LOCATION WITH OVERHEAD MECHANICAL DUCTWORK IN

THIS AREA PRIOR TO INSTALLATION.

4 RELOCATE EXISTING HOT WATER UNIT HEATER.

5 100A 120/208 3P 4W PANEL LTD FED BY 30 KVA, 480V-120V/208V TRANSFORMER, CEILING SUSPENDED. REFER TO DETAIL C6/EP501

FOR MOUNTING. REFER TO ELECTRICAL RISER ON EP605.

6 MAKE POWER CONNECTION TO NEW EXHAUST FAN FROM NEAREST EXISTING JUNCTION BOX FOR INDICATED CIRCUIT. SEE

LAUNDRY EQUIPMENT CONNECTION SCHEDULE ON SHEET EP602.

E

E

E

E

E

E

E

PLAN

NORTH

TRUE

NORTH

A.1 A.8 B.8 C.8 D.8 E.8 F.8 G.8 H.7

6.2

2.12.2

3.2

4.1

5.1

A B C D E F G HAACCDD

EE

FF

GG

HH

II

JJ

KK

LLMM

NN

OO

PP

HDP-1,3,5

45-HV-1HDP-2,4,6

45-VRFHP-1A

HDP-8,10,12

45-VRFHP-1B

HDP-25,27,29

45-VRFHRU-2

HDP-79,81,83

45-REF-3WP

WP

WP

WP

WP

WP

LDP-75

LDP-77

LDP-116

TEX-3

LDP-136,138,140

EF-1

WP

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

ELECTRICAL POWER PLAN - ROOF

EP101C

0' 4' 8' 16' 24'

SCALE: 1/8" = 1' - 0"

GENERAL NOTES KEY NOTES#

1/8" = 1'-0"EP101C

1 ROOF - MECH & GENERAL POWER

1 EXISTING EQUIPMENT TO REMAIN. THIS EQUIPMENT WAS INSTALLED UNDER A

PREVIOUS PERMIT. THE PREVIOUS PERMIT WAS NOT CLOSED OUT AND IT IS

UNKNOWN TO WHAT LEVEL OF COMPLETION THE INSTALLATION WAS

PERFORMED TO. CONTRACTOR TO INSPECT, TEST, AND COMMISSION

EQUIPMENT AND INSTALLATION TO MANUFACTURER’S REQUIREMENTS AND TO

ASSUME OWNERSHIP OF PREVIOUS INSTALLATION. VERIFY INTEGRITY OF

CIRCUIT AND CONDUIT AND REPLACE AS NEEDED. VERIFY ALL CONDUIT FITTINGS

ARE TIGHTENED TO ENSURE SECURE MECHANICAL CONNECTION AND EFFECTIVE

BOND FOR GROUND FAULT PATH. MEG TEST BRANCH CIRCUIT WIRING TO

ENSURE INSULATION IS IN GOOD CONDITION AND REPLACE IF DEFICIENT.

RETORQUE ALL TERMINATIONS TO MANUFACTURER’S RECOMMENDED SETTINGS.

A. PANELBOARDS LOCATED IN ELECTRICAL ROOM E001,

SEE E1/EP401 FOR LOCATION.

2 MAKE POWER CONNECTION TO NEW EXHAUST FAN FROM NEAREST EXISTING

JUNCTION BOX FOR INDICATED CIRCUIT. SEE LAUNDRY EQUIPMENT CONNECTION

SCHEDULE ON SHEET EP602.

2 REVISION 02 07/18/2025

BRANCH CIRCUIT WIRING AND RACEWAY:

SEE "E SHEETS FOR BRANCH CIRCUIT

REQUIREMENTS TO LINE SIDE OF

EQUIPMENT DISCONNECT.

TERMINATION TO LINE SIDE OF

EQUIPMENT DISCONNECT BY

DIVISION 26 CONTRACTOR.

COMBINATION MOTOR STARTER/DISCONNECT:

DISCONNECT AND STARTER MAY BE COMBINED

IN A SINGLE CABINET. IF COMBINATION MOTOR

STARTER IS PROVIDED, AN OVERCURRENT

PROTECTIVE DEVICE SHALL BE PROVIDED

WITH MOCP PER EQUIPMENT NAMEPLATE.

ADDITIONAL DISCONNECT: WHERE

EQUIPMENT IS NOT WITHIN SIGHT OF

EQUIPMENT DISCONNECT, TRADE FURNISHING

EQUIPMENT SHALL FURNISH AND INSTALL AN

ADDITIONAL NON-FUSED DISCONNECT SWITCH

WITHIN SIGHT OF EQUIPMENT.

EQUIPMENT: EQUIPMENT FURNISHED BY

DIVISION 23.

MOTOR STARTER (OR VFC): MOTOR STARTER (OR VFC) SHALL BE

AS RECOMMENDED BY EQUIPMENT MANUFACTURER OR AS

OTHERWISE INDICATED ON CONTRACT DOCUMENTS.

EQUIPMENT DISCONNECT: EQUIPMENT DISCONNECT SWITCH,

FUSED OR NON-FUSED PER EQUIPMENT CONNECTION SCHEDULE.

GENERAL NOTES:

1. WIRING AND RACEWAY ON LOAD SIDE OF EQUIPMENT DISCONNECT SHALL BE FURNISHED AND INSTALLED BY DIVISION 23 AND

SIZED IN ACCORDANCE WITH EQUIPMENT NAMEPLATE DATA AND THE NEC. PROVIDE SEPARATE GROUND WIRE SIZED PER NEC.

2. REQUIREMENTS FOR WIRING, MATERIALS, METHODS, AND COMPONENTS SHALL BE PER DIVISION 26 SPECIFICATIONS.

DIVISION 26 RESPONSIBILITIES DIVISION 23 RESPONSIBILITIES

LINE SIDE LOAD SIDE

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

ELECTRICAL EQUIPMENT CONNECTION

SCHEDULE

EP601

NOT TO SCALE

B1

DIVISION OF WORK DETAIL

MECHANICAL EQUIPMENT CONNECTION SCHEDULE GENERAL NOTES

A. ALL MECHANICAL UNIT LISTED ARE EXISTING TO REMAIN UON. THIS EQUIPMENT WAS INSTALLED UNDER A PREVIOUS PERMIT. THE PREVIOUS PERMIT WAS NOT CLOSED OUT AND IT IS UNKNOWN TO WHAT LEVEL OF COMPLETION THE INSTALLATION WAS PERFORMED TO. CONTRACTOR TO INSPECT, TEST, AND COMMISSION

EQUIPMENT AND INSTALLATION TO MANUFACTURER’S REQUIREMENTS AND TO ASSUME OWNERSHIP OF PREVIOUS INSTALLATION. VERIFY INTEGRITY OF CIRCUIT AND CONDUIT AND REPLACE AS NEEDED. VERIFY ALL CONDUIT FITTINGS ARE TIGHTENED TO ENSURE SECURE MECHANICAL CONNECTION AND EFFECTIVE BOND FOR GROUND FAULT PATH. MEG TEST BRANCH CIRCUIT WIRING TO ENSURE INSULATION IS IN GOOD CONDITION AND REPLACE IF DEFICIENT. RETORQUE ALL TERMINATIONS TO MANUFACTURER’S RECOMMENDED SETTINGS.

PLUMBING EQUIPMENT SCHEDULE

EQUIPMENT

DESIGNATION DESCRIPTION LOCATION FLA MCA MOCP VOLTS PHASE

CIRCUIT INFORMATION

PANEL CIRCUIT #

P1-A HEATING WATER PUMP MECH B018 21.00 A 26.25 A 30 A 480 V 3 HD2 19,21,23

P1-B HEATING WATER PUMP MECH B018 21.00 A 26.25 A 30 A 480 V 3 HD2 25,27,29

P-707 EMERGENCY EYE WASH

ALARM

SECURE STORAGE B028 15.00 A 20.00 A 20 A 120 V 1 EML 22

P-EWH-1 WATER HEATER MECH B018 54.20 A 67.75 A 70 A 480 V 3 HDP 80,82,84

P-RP-1 RECIRC PUMP MECH B018 1.01 A 1.26 A 15 A 120 V 1 LDP 91

P-SP-1 ELEVATOR SUMP PUMP 2.10 A 2.63 A 15 A 480 V 3 EMH 31,33,35

SONIC AIRE FAN SCHEDULE

EQUIPMENT

DESIGNATION

LOAD RATING

(HP) FLA MCA MOCP VOLTS PHASE REMARKS

SF-1 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.

SF-2 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.

SF-3 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.

SF-4 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.

SF-5 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.

SF-6 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.

SF-7 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.

SF-8 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.

SF-9 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.

SF-10 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.

VRF SYSTEM CONNECTION SCHEDULE

EQUIPMENT

DESIGNATION DESCRIPTION LOCATION FLA MCA MOCP VOLTS PHASE

CIRCUIT INFORMATION

REMARKSPANEL CIRCUIT #

45-VRFAC-1 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT LINEN STORAGE B026 0.66 A 1.20 A 15 A 208 V 1 LDP 93,95

45-VRFAC-2 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT MECH B003 0.30 A 0.38 A 15 A 208 V 1 LDP 93,95

45-VRFAC-3 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SECURE STORAGE B028 0.40 A 0.52 A 15 A 208 V 1 LDP 93,95

45-VRFAC-4A VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SECURITY CLOSET B027 0.50 A 0.63 A 15 A 208 V 1 LDP 143,145

45-VRFAC-4B VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT STORAGE B015 0.50 A 0.63 A 15 A 208 V 1 LDP 143,145

45-VRFAC-5A VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT IT ROOM B020 0.50 A 0.63 A 15 A 208 V 1 LDP 143,145

45-VRFAC-5B VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT IT ROOM B020 0.50 A 0.63 A 15 A 208 V 1 LDP 143,145

45-VRFAC-6A VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT LOUNGE B004 0.40 A 0.50 A 15 A 208 V 1 LDP 93,95

45-VRFAC-6B VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT LOUNGE B004 0.40 A 0.50 A 15 A 208 V 1 LDP 93,95

45-VRFAC-6C VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT LOUNGE B004 0.40 A 0.50 A 15 A 208 V 1 LDP 93,95

45-VRFAC-7A VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT STORAGE B015 2.20 A 2.70 A 15 A 208 V 1 LDP 143,145

45-VRFAC-7B VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT CONTROLLER RM B022 0.50 A 0.63 A 15 A 208 V 1 LDP 143,145

45-VRFAC-8 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT OFFICE 100 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150

45-VRFAC-9 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SUPERVISOR TRAINING 100A 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150

45-VRFAC-10 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT OFFICE 101 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150

45-VRFAC-11 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT RECEPTION 102 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150

45-VRFAC-12 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT RECEPTION 102 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150

45-VRFAC-13 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT VESTIBULE 110 1.32 A 1.63 A 15 A 208 V 1 LDP 148,150

45-VRFAC-14 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SOIL TEXTILE SORTING 116 3.10 A 4.16 A 15 A 208 V 1 LDP 151,153

45-VRFAC-15 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SOIL TEXTILE SORTING 116 0.66 A 1.20 A 15 A 208 V 1 LDP 151,153

45-VRFAC-16 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT FLATWORK FINISHING 106 2.20 A 2.70 A 15 A 208 V 1 LDP 144,146

45-VRFAC-17 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT FLATWORK FINISHING 106 0.66 A 1.20 A 15 A 208 V 1 LDP 144,146

45-VRFAC-18 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT FLATWORK FINISHING 106 0.66 A 1.20 A 15 A 208 V 1 LDP 144,146

45-VRFAC-19 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT EQUIPMENT SPACE 105 1.61 A 2.11 A 15 A 208 V 1 LDP 144,146

45-VRFAC-20 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT EQUIPMENT SPACE 105 1.50 A 3.32 A 15 A 208 V 1 LDP 144,146

45-VRFAC-21A VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT ELECTRICAL ROOM 0.40 A 0.52 A 15 A 208 V 1 LDP 98,100

45-VRFAC-21B VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT ELECTRICAL ROOM 0.40 A 0.52 A 15 A 208 V 1 LDP 98,100

45-VRFAC-21C VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT ELECTRICAL ROOM 0.40 A 0.52 A 15 A 208 V 1 LDP 98,100

45-VRFAC-21D VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT ELECTRICAL ROOM 0.40 A 0.52 A 15 A 208 V 1 LDP 98,100

45-VRFAC-22 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT MECH B003 1.32 A 1.63 A 15 A 208 V 1 LDP 93,95

45-VRFBC-1 VARIABLE REFRIGERANT FLOW SYSTEM - BRANCH SELECTOR SECURITY CLOSET B027 1.00 A 1.45 A 15 A 208 V 1 LDP 147,149

45-VRFHP-1A VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT PUMP UNIT ROOF 20.00 A 20.00 A 25 A 480 V 3 HDP 2,4,6

45-VRFHP-1B VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT PUMP UNIT ROOF 12.00 A 12.00 A 15 A 480 V 3 HDP 8,10,12

45-VRFHP-ELECTRIC-A VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT PUMP UNIT OUTDOOR 12.00 A 12.00 A 15 A 480 V 3 HDP 67,69,71

45-VRFHP-ELECTRIC-B VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT PUMP UNIT OUTDOOR 12.00 A 12.00 A 15 A 480 V 3 HDP 73,75,77

45-VRFHRU-1A VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT RECOVERY UNIT OUTDOOR 16.80 A 21.00 A 25 A 480 V 3 HDP 55,57,59

45-VRFHRU-1B VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT RECOVERY UNIT OUTDOOR 16.80 A 21.00 A 25 A 480 V 3 HDP 61,63,65

45-VRFHRU-2 VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT RECOVERY UNIT ROOF 8.80 A 11.00 A 15 A 480 V 3 HDP 25,27,29

VRF-BSB-11 VARIABLE REFRIGERANT FLOW SYSTEM - BRANCH SELECTOR RECEPTION 102 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150

MECHANICAL EQUIPMENT CONNECTION SCHEDULE

EQUIPMENT

DESIGNATION DESCRIPTION

LOAD

RATING (HP,

KW, ETC) LOCATION FLA MCA MOCP VOLTS PHASE

DISCONNECT

SWITCH WIRE SIZING CIRCUIT INFORMATION

REMARKSRATING (A) CN Phase Size AWG

CONDUIT

SIZE PANEL CIRCUIT #

45-CP-1 STEAM CONDENSATE PUMP 5 HP MECH B018 7.60 A 9.50 A 15 A 480 V 3 30 2#12, #12G 3/4" HDP 14,16,18 NEW EQUIPMENT

45-ERU-1 ENERGY RECOVERY UNIT - MECH B003 5.80 A 7.10 A 15 A 208 V 1 20 2#12, #12G 3/4" LDP 94,96

45-HV-1 HVAC UNIT 10 HP ROOF 14.00 A 17.50 A 20 A 480 V 3 30 2#12, #12G 0" HDP 1,3,5 FAN SF-1 INTEGRAL TO UNIT, SEE MECH DRAWINGS

45-HV-2 HVAC UNIT 20 HP OUTDOOR 27.00 A 33.75 A 40 A 480 V 3 60 3#8, #10G 0" HD2 1,3,5 FAN SF-2 INTEGRAL TO UNIT, SEE MECH DRAWINGS

45-HV-3 HVAC UNIT 5 HP MECH B018 7.60 A 9.50 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 13,15,17 FAN SF-3 INTEGRAL TO UNIT, SEE MECH DRAWINGS

45-HV-4 HVAC UNIT 5 HP MECH B018 7.60 A 9.50 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 19,21,23 FAN SF-4 INTEGRAL TO UNIT, SEE MECH DRAWINGS

45-HWUH-1 HOT WATER UNIT HEATER - CLEAN TEXTILE MAKEUP 103 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 90

45-HWUH-2 HOT WATER UNIT HEATER - CLEAN TEXTILE MAKEUP 103 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 90

45-HWUH-3 HOT WATER UNIT HEATER - CART MAKEUP 104 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 90

45-HWUH-4 HOT WATER UNIT HEATER - FLATWORK FINISHING 106 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 90

45-HWUH-5 HOT WATER UNIT HEATER - FLATWORK FINISHING 106 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 90

45-HWUH-6 HOT WATER UNIT HEATER - CLEAN CART STAGING 111 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 92

45-HWUH-7 HOT WATER UNIT HEATER - SOIL TEXTILE SORTING 116 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 92

45-HWUH-8 HOT WATER UNIT HEATER - SOIL TEXTILE RECEIVING 117 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 92

45-HWUH-9 HOT WATER UNIT HEATER - SOIL TEXTILE RECEIVING 117 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 92

45-HWUH-10 HOT WATER UNIT HEATER - STORAGE B001A 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 86

45-HWUH-11 HOT WATER UNIT HEATER - STORAGE B001A 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 86

45-HWUH-12 HOT WATER UNIT HEATER - STORAGE B001A 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 88

45-HWUH-13 HOT WATER UNIT HEATER - STORAGE B001A 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 88

45-HWUH-14 HOT WATER UNIT HEATER - LIGHT STORAGE B005 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 86

45-HWUH-15 HOT WATER UNIT HEATER - LIGHT STORAGE B005 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 86

45-HWUH-16 HOT WATER UNIT HEATER - GAS METER AND REGULATING ROOM B002 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 86

45-HWUH-17 HOT WATER UNIT HEATER - MECH B018 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 88

45-HWUH-18 HOT WATER UNIT HEATER - MECH B018 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 88

45-PEF-1 EXHAUST FAN 1 HP CLEAN TEXTILE 103 11.40 A 14.25 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 131

45-PEF-2 EXHAUST FAN 1 HP CLEAN TEXTILE 103 11.40 A 14.25 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 133

45-PEF-3 EXHAUST FAN 3/4 HP SOIL TEXTILE RECEIVING 117 9.00 A 11.25 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 135

45-REF-1A EXHAUST FAN 2 HP ROOF 3.40 A 4.25 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 20,22,24 NEW EQUIPMENT

45-REF-1B EXHAUST FAN 2 HP ROOF 3.40 A 4.25 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 26,28,30 NEW EQUIPMENT

45-REF-2A EXHAUST FAN 2 HP ROOF 3.40 A 4.25 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 43,45,47 NEW EQUIPMENT

45-REF-2B EXHAUST FAN 2 HP ROOF 3.40 A 4.25 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 49,51,53 NEW EQUIPMENT

45-REF-3 EXHAUST FAN 1 HP ROOF 2.10 A 2.63 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 79,81,83 NEW EQUIPMENT

45-RF-1 EXHAUST FAN 3 HP MECH B018 4.80 A 6.00 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 62,64,66

45-RF-2 EXHAUST FAN 5 HP MECH B018 7.60 A 9.50 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 68,70,72

EF-1 EXHAUST FAN 3/4 HP ROOF 3.50 A 4.38 A 15 A 208 V 3 30 3#12, #12G 3/4" LDP 136,138,140

GP-1 GLYCOL PUMP 7.5 HP MECH B018 11.00 A 13.75 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 14,16,18 NEW EQUIPMENT

GP-2 GLYCOL PUMP 7.5 HP MECH B018 11.00 A 13.75 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 20,22,24 NEW EQUIPMENT

GP-3 GLYCOL PUMP 7.5 HP LIGHT STORAGE B005 11.00 A 13.75 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 7,9,11

GP-4 GLYCOL PUMP 7.5 HP LIGHT STORAGE B005 11.00 A 13.75 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 13,15,17

TEX-1 EXHAUST FAN - ROOF 8.80 A 11.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 112

TEX-2 EXHAUST FAN - ROOF 8.80 A 11.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 114

TEX-3 EXHAUST FAN - ROOF 8.80 A 11.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 116

VF-3 FAN (FOR AIR COMPRESSOR LE-40) 3 HP TANK ROOM B001B 4.80 A 6.00 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 8,10,12 NEW EQUIPMENT

VF-4 FAN (FOR AIR COMPRESSOR LE-40) 3 HP TANK ROOM B001B 4.80 A 6.00 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 2,4,6 NEW EQUIPMENT

VRF SYSTEM EQUIPMENT CONNECTION SCHEDULE GENERAL NOTES

A. ALL MECHANICAL UNIT LISTED ARE EXISTING TO REMAIN UON. THIS EQUIPMENT WAS INSTALLED UNDER A PREVIOUS PERMIT. THE PREVIOUS PERMIT WAS NOT CLOSED OUT AND IT IS UNKNOWN TO WHAT LEVEL OF COMPLETION THE INSTALLATION WAS PERFORMED TO. CONTRACTOR TO INSPECT, TEST, AND COMMISSION

EQUIPMENT AND INSTALLATION TO MANUFACTURER’S REQUIREMENTS AND TO ASSUME OWNERSHIP OF PREVIOUS INSTALLATION. VERIFY INTEGRITY OF CIRCUIT AND CONDUIT AND REPLACE AS NEEDED. VERIFY ALL CONDUIT FITTINGS ARE TIGHTENED TO ENSURE SECURE MECHANICAL CONNECTION AND EFFECTIVE BOND FOR GROUND FAULT PATH. MEG TEST BRANCH CIRCUIT WIRING TO ENSURE INSULATION IS IN GOOD CONDITION AND REPLACE IF DEFICIENT. RETORQUE ALL TERMINATIONS TO MANUFACTURER’S RECOMMENDED SETTINGS.

1 REVISION 01 11/22/24

2 REVISION 02 07/18/2025

SONIC AIRE FAN SCHEDULE NOTES: (APPLICABLE THIS SCHEDULE ONLY):

1. INSTALLING CONTRACTOR MUST INCLUDE FACTORY COMMISSIONING SERVICE OF THESE FANS IN THEIR SCOPE OF WORK IN ACCORDANCE

WITH PROJECT SPECIFICATIONS.

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

DATE:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

100% SUBMITTAL

512 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date CheckedFULLY SPRINKLERED

STAMP

STE. 400

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

DN/SV SV/ZN

UPGRADE VISN 1 LAUNDRY BUILDING 45

BROCKTON CAMPUS

523A5-10-316

BROCKTON, MA

08-21-24

REVISIONS:

MECHANICAL, ELECTRICAL, &

PLUMBING ENGINEERING SERVICES:

CLARKNEXSEN

3920 ARKWRIGHT ROAD SUITE 385

MACON, GA 31210

478.314.1206 DIRECT

478.743.8415 OFFICE

GEORGE SIMPSON

STRUCTURAL ENGINEERING

SERVICES:

INNOVATIVE ENGINEERING, INC.

3380 TRICKUM ROAD

BLDG 500 SUITE 100

WOODSTOCK, GA 30188

678-883-5862 DIRECT

770-517-5508 FAX

STEPHEN MORGAN

COST ESTIMATING SERVICES:

AXIAS, INC.

225 REINEKERS LANE, SUITE 200

ALEXANDRIA, VA 22314

703-706-0400

GEORGE SHIELDS

LAUNDRY EQUIPMENT VENDOR

SERVICES:

LAUNDRY DESIGN GROUP, LLC

5940 S RAINBOW BLVD, LAS

VEGAS NV USA 89118

1-855-226-3500

BOB CORFIELD

ELECTRICAL PANEL SCHEDULES

EP604

TOTALS (CONN. AMPS) AMPS 1940.0 AMPS 1940.0 AMPS 1912.5 AMPS

TOTALS (CONN. KVA + 20% SPARE) KVA 1935.5 KVA 1935.5 KVA 1908.0 KVA

TOTALS (CONN. KVA) KVA 1612.9 KVA 1612.9 KVA 1590.0 KVA

KVA KVA KVA KVA

KVA KVA KVA KVA

KVA KVA KVA KVA

KVA KVA KVA KVA

KVA KVA KVA KVA

KITCHEN EQUIP. KVA KVA KVA 0.65 KVA

ELEVATOR KVA 64.0 KVA 64.0 KVA 1.00 64.0 KVA

MISCELLANEOUS KVA 1136.7 KVA 1136.7 KVA 1.00 1136.7 KVA

ELECTRIC HEAT KVA KVA KVA 1.25 KVA

MECH EQUIP KVA 313.1 KVA 313.1 KVA 1.00 313.1 KVA

RECEPTACLES KVA 70.3 KVA 70.3 KVA NEC 40.1 KVA

LIGHTING KVA 28.9 KVA 28.9 KVA 1.25 36.1 KVA

LOAD DESCRIPTION CONN. LOAD CONN. LOAD TOTAL LOAD D.F. DEMAND

PANEL SUBFEED TOTAL

TOTAL CONNECTED AMPS A: 2204.8 B: 2213.3 C: 2153.9

C

100 B

A7 TVSS 100 A

63.1 17.5 C

250 85.6 23.7 B

A6 PANEL EMH * * 250 86.0 23.8 A

720.8 199.7 C

800 720.8 199.7 B

A5 PANEL HLE * * 800 720.8 199.7 A

364.3 100.9 C

600 372.1 103.1 B

A4 PANEL HTB * * 600 371.3 102.8 A

325.6 90.2 C

600 341.3 94.5 B

A3 PANEL HTA * * 600 334.6 92.7 A

227.6 63.1 C

FED VIA XFMR T-LDP (225 KVA) 350 235.6 65.3 B

A2 PANEL LDP SECTION 1 * * 400 234.1 64.9 A REFER TO EP-701.

452.8 125.4 C SHOWN ON ELECTRICAL RISER,

VIA ATS #2 600 458.0 126.9 B 1. (*) INDICATES CONDUIT AND WIRE SIZES ARE

A1 PANEL HDP * * 600 458.0 126.9 A SWITCHBOARD NOTES:

CUSTOMER METERING COMPARTMENT

MAIN CIRCUIT BREAKER 3000

3. PROVIDE INTERNALLY MOUNTED SPD.

INCOMING CABLE COMPARTMENT 2. PROVIDE GROUND FAULT PROTECTION.

1. PROVIDE WITH DIGITAL MULTIMETER.

LOAD SERVED COND WIRE AT AMPS KVA PH SWITCHBOARD OPTIONS:

COMPARTMENT DESCRIPTION AF

3000 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC FLOOR MOUNTED SE RATED

EXISTING SWBD DS SCHEDULE

TOTAL CONNECTED AMPS A: 2204.8 B: 2213.3 C: 2153.9

C

B

A7 TVSS A

720.8 199.7 C

VIA ATS #6 800 720.8 199.7 B

A6 PANEL HLE * * 800 720.8 199.7 A

364.3 100.9 C

VIA ATS #5 600 372.1 103.1 B

A5 PANEL HTB * * 600 371.3 102.8 A

325.6 90.2 C

VIA ATS #4 600 341.3 94.5 B

A4 PANEL HTA * * 600 334.6 92.7 A

63.1 17.5 C

VIA ATS #1 250 85.6 23.7 B

A3 PANEL EMH * * 250 86.0 23.8 A

VIA ATS #3 227.6 63.1 C

FED VIA XFMR T-LDP (225 KVA) 350 235.6 65.3 B

A2 PANEL LDP SECTION 1 * * 400 234.1 64.9 A REFER TO EP-701.

452.8 125.4 C SHOWN ON ELECTRICAL RISER,

VIA ATS #2 600 458.0 126.9 B 1. (*) INDICATES CONDUIT AND WIRE SIZES ARE

A1 PANEL HDP * * 600 458.0 126.9 A SWITCHBOARD NOTES:

CUSTOMER METERING COMPARTMENT

MAIN CIRCUIT BREAKER 3000

3. PROVIDE INTERNALLY MOUNTED SPD.

INCOMING CABLE COMPARTMENT 2. PROVIDE GROUND FAULT PROTECTION.

1. PROVIDE WITH DIGITAL MULTIMETER.

LOAD SERVED COND WIRE AT AMPS KVA PH SWITCHBOARD OPTIONS:

COMPARTMENT DESCRIPTION AF

3000 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC FLOOR MOUNTED SE RATED

EXISTING SWBD EDS SCHEDULE

REFER TO EP-605.

2. (**) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON ELECTRICAL RISER.

1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.

PANELBOARD OPTIONS: PANELBOARD NOTES:

TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 86.0 B: 85.6 C: 63.1

TOTAL AMPS (FEEDTHRU) A: B: C:

TOTAL AMPS (CONN. LOAD) A: 86.0 B: 85.6 C: 63.1

41 20.9 5.8 C 3.1 11.3 42

39 FED VIA XFMR T-IT (30 KVA) 28.0 7.8 B 5.4 19.5 FED VIA XFMR T-12 (30 KVA) 40

37 PANEL LIT ** ** 50 29.4 8.1 A 4.2 15.2 50 * * (E) PANEL EML 38

35 2.1 0.6 C BUSSED SPACE 36

33 2.1 0.6 B BUSSED SPACE 34

31 ELEVATOR SUMP PUMP SP-1 3/4 12 15 2.1 0.6 A BUSSED SPACE 32

29 C BUSSED SPACE 30

27 B BUSSED SPACE 28

25 SPARE 20 A BUSSED SPACE 26

23 C 1.0 3.7 20 12 3/4 (E) EXIT/EMERG LTG 24

21 B BUSSED SPACE 22

19 SPARE 20 A BUSSED SPACE 20

17 SHUNT TRIP CKT BKR C 0.7 2.5 20 12 3/4 (E) LTG CTRLS 18

15 B 0.1 0.5 20 12 3/4 (E) OUTSIDE BOLLARD LIGHTS 16

13 A 0.2 0.6 20 12 3/4 (E) OUTSIDE BOLLARD LIGHTS 14

11 SPARE 20 C 1.4 5.0 20 12 3/4 (E) LIGHTING BASEMENT 12

9 (E) LIGHTING BASEMENT 3/4 12 20 10.1 2.8 B 0.8 2.8 20 12 3/4 (E) LIGHTING EXTERIOR 10

7 (E) LIGHTING BASEMENT 3/4 12 20 8.3 2.3 A 1.6 5.9 20 12 3/4 (E) LIGHTING BASEMENT 8

5 (E) LIGHTING BASEMENT 3/4 12 20 9.7 2.7 C 2.2 7.9 20 12 3/4 (E) LIGHTING BASEMENT 6

3 (E) LIGHTING 1ST FLR 3/4 12 20 12.1 3.3 B 2.9 10.4 20 12 3/4 (E) LIGHTING 1ST FLR 4

1 (E) LIGHTING 1ST FLR 3/4 12 20 10.6 2.9 A 3.9 14.0 20 12 3/4 (E) LIGHTING 1ST FLR 2

NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.

CKT. COND WIRE BKR BKR WIRE COND CKT.

250 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC SURFACE MOUNTED

EXISTING PANEL EMH SCHEDULE

5. PROVIDE RED LOCKING DEVICE FOR FIRE ALARM CIRCUITS.

REFER TO EP-605.

4. (**) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON ELECTRICAL RISER.

REFER TO EP-602.

3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.

2. USE EXISTING BREAKER FOR NEW CONNECTION.

1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.

PANELBOARD OPTIONS: PANELBOARD NOTES:

TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 35.0 B: 45.0 C: 26.0

TOTAL AMPS (FEEDTHRU) A: B: C:

TOTAL AMPS (CONN. LOAD) A: 35.0 B: 45.0 C: 26.0

23 MANHOLE SUMP PUMP (NOTE 2) 3/4 12 20 1.5 0.2 C 20 SPARE (NOTE 2) 24

21 EXTERIOR LTG CONTROLS (NOTE 2) 3/4 12 20 1.5 0.2 B 1.8 15.0 20 12 3/4 EYE WASH ALARM (NOTE 2) 22

19 ELEV LIGHTS & GFCI 1ST FLR (NOTE 2) 3/4 12 20 3.0 0.4 A 1.2 10.0 20 12 3/4 LE-36 COMM/INTERCOM (NOTE 2) 20

17 ELEV PIT SUMP PUMP (NOTE 2) 3/4 12 20 10.0 1.2 C 20 SPARE (NOTE 2) 18

15 J-BOX ELEV CAB LIGHTS & REC (NOTE 2) 3/4 12 20 1.0 0.1 B 1.2 10.0 20 12 3/4 FACP SECURITY OFFICE (NOTE 5) 16

13 ELEV. PIT LIGHTS & GFCI (NOTE 2) 3/4 12 20 3.0 0.4 A 1.2 10.0 20 12 3/4 FACP BOOSTER (NOTE 5) 14

11 ELEV ROOM QUAD REC (NOTE 2) 3/4 12 20 3.0 0.4 C 1.2 10.0 20 12 3/4 FACP BOOSTER (NOTE 5) 12

9 XFMR ROOM QUAD REC (NOTE 2) 3/4 12 20 6.0 0.7 B 1.2 10.0 20 12 3/4 FACP (NOTE 5) 10

7 XFMR ROOM QUAD REC (NOTE 2) 3/4 12 20 6.0 0.7 A 0.2 1.5 20 12 3/4 FIRE ALARM SPRINKLER SOLENOID (NOTE 5) 8

5 SPARE (NOTE 2) 20 C 0.2 1.5 20 12 3/4 EXISTING ADV METERING SYSTEM (NOTE 2) 6

3 SPARE (NOTE 2) 20 B 0.2 1.5 20 12 3/4 DIESEL LEAK DETECTION SYSTEM (NOTE 2) 4

1 SPARE (NOTE 2) 20 A 0.2 1.5 20 12 3/4 MOISTURE DETECTION SYSTEM (NOTE 2) 2

NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.

CKT. COND WIRE BKR BKR WIRE COND CKT.

100 AMP MCB 208Y/120 VOLTS 3PH, 4W, 60 HZ MIN. 10 KAIC SURFACE MOUNTED

EXISTING PANEL EML SCHEDULE

2. RELOCATE BREAKER FROM EXISTING PANEL HDP.

REFER TO EP-601.

1. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.

PANELBOARD OPTIONS: PANELBOARD NOTES:

TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 122.7 B: 122.7 C: 122.7

TOTAL AMPS (FEEDTHRU) A: B: C:

TOTAL AMPS (CONN. LOAD) A: 122.7 B: 122.7 C: 122.7

41 BUSSED SPACE C BUSSED SPACE 42

39 BUSSED SPACE B BUSSED SPACE 40

37 BUSSED SPACE A BUSSED SPACE 38

35 BUSSED SPACE C BUSSED SPACE 36

33 BUSSED SPACE B BUSSED SPACE 34

31 BUSSED SPACE A BUSSED SPACE 32

29 21.0 5.8 C BUSSED SPACE 30

27 P1-B HEATING WATER PUMP 15HP * * 30 21.0 5.8 B BUSSED SPACE 28

25 21.0 5.8 A BUSSED SPACE 26

23 21.0 5.8 C 3.1 11.0 24

21 P1-A HEATING WATER PUMP 15HP * * 30 21.0 5.8 B 3.1 11.0 15 * * GP-2 GLYCOL PUMP 7.5HP 22

19 21.0 5.8 A 3.1 11.0 20

17 11.0 3.1 C 3.1 11.0 18

15 GP-4 GLYCOL PUMP 7.5HP * * 15 11.0 3.1 B 3.1 11.0 15 * * GP-1 GLYCOL PUMP 7.5HP 16

13 11.0 3.1 A 3.1 11.0 14

11 11.0 3.1 C 1.3 4.8 12

9 GP-3 GLYCOL PUMP 7.5HP * * 15 11.0 3.1 B 1.3 4.8 15 * * 10

7 11.0 3.1 A 1.3 4.8 VF-4 3HP 8

5 27.1 7.5 C 1.3 4.8 6

3 HV-2 20HP BASEMENT * * 40 27.1 7.5 B 1.3 4.8 15 * * 4

1 27.1 7.5 A 1.3 4.8 VF-3 3HP 2

NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.

CKT. COND WIRE BKR BKR WIRE COND CKT.

200 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 10 KAIC SURFACE MOUNTED

NEW PANEL HD2 SCHEDULE

REFER TO EP-605.

6. (**) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON ELECTRICAL RISER.

REFER TO EP-601.

5. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.

4. PROVIDE NEW BREAKER. BREAKER TYPE AND AIC RATING SHALL MATCH EXISTING.

3. RELOCATE BREAKER FROM EXISTING PANEL HLE.

2. USE EXISTING BREAKER FOR NEW CONNECTION.

1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.

PANELBOARD OPTIONS: PANELBOARD NOTES:

TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 458.0 B: 458.0 C: 452.6

TOTAL AMPS (FEEDTHRU) A: B: C:

TOTAL AMPS (CONN. LOAD) A: 458.0 B: 458.0 C: 452.6

83 2.1 0.6 C 15.0 54.2 84

81 45-REF-3 1 HP ROOF * * 15 2.1 0.6 B 15.0 54.2 (NOTE 4) 82

79 2.1 0.6 A 15.0 54.2 70 * * P-EWH-1 WATER HEATER BASEMENT 80

77 9.6 2.7 C BUSSED SPACE 78

75 12 TON OUTSIDE BASEMENT 9.6 2.7 B 1.5 5.4 20 12 3/4 (E) HEAT TRACE 76

73 VRFHP-ELECTRIC-B * * 15 9.6 2.7 A 1.5 5.4 20 12 3/4 (E) HEAT TRACE 74

71 9.6 2.7 C 2.1 7.6 72

69 12 TON OUTSIDE BASEMENT 9.6 2.7 B 2.1 7.6 15 * * RF-2 RETURN FAN 5HP 70

67 VRFHP-ELECTRIC-A * * 15 9.6 2.7 A 2.1 7.6 68

65 OUTSIDE BASEMENT 20.9 5.8 C 1.4 4.9 66

63 (E) VRFHRU-1 22 TON * * 20.9 5.8 B 1.4 4.9 15 * * RF-1 RETURN FAN 3HP 64

61 25 20.9 5.8 A 1.4 4.9 62

59 OUTSIDE BASEMENT 20.9 5.8 C 3.0 10.8 60

57 (E) VRFHRU-1 22 TON * * 20.9 5.8 B 3.0 10.8 20 12 3/4 (E) PP-4 WELL BOOSTER PUMP 7.5HP 58

55 25 20.9 5.8 A 3.0 10.8 56

53 3.4 0.9 C 1.4 5.1 54

51 45-REF-2B 2HP * * 15 3.4 0.9 B 1.4 5.1 15 12 3/4 (E) DOCK LEVELERS SOIL SIDE 52

49 3.4 0.9 A 1.4 5.1 50

47 3.4 0.9 C 1.4 5.1 48

45 45-REF-2A 2HP * * 15 3.4 0.9 B 1.4 5.1 15 12 3/4 (E) DOCK LEVELERS SOIL SIDE 46

43 3.4 0.9 A 1.4 5.1 44

41 C 1.4 5.1 42

39 (E) TVSS 1/2 10 30 B 1.4 5.1 15 12 3/4 (E) DOCK LEVELERS CLEAN SIDE 40

37 A 1.4 5.1 38

35 77.0 21.3 C 1.4 5.1 36

33 ELEVATOR (NOTE 3) 2 3/0 200 77.0 21.3 B 1.4 5.1 15 12 3/4 (E) DOCK LEVELERS CLEAN SIDE 34

31 77.0 21.3 A 1.4 5.1 32

29 16.0 4.4 C 0.9 3.4 30

27 (E) VRFHRU-2 6 TON ROOF 3/4 12 20 16.0 4.4 B 0.9 3.4 15 * * 45-REF-1B 2HP 28

25 16.0 4.4 A 0.9 3.4 26

23 7.6 2.1 C 0.9 3.4 24

21 (E) HV-4 5HP BASEMENT 3/4 12 15 7.6 2.1 B 0.9 3.4 15 * * 45-REF-1A 2HP 22

19 7.6 2.1 A 0.9 3.4 20

17 7.6 2.1 C 2.1 7.6 18

15 (E) HV-3 5HP BASEMENT 3/4 12 15 7.6 2.1 B 2.1 7.6 15 * * 45-CP-1 5HP (NOTE 2) 16

13 7.6 2.1 A 2.1 7.6 14

11 122.7 34.0 C 2.7 9.6 12

9 122.7 34.0 B 2.7 9.6 15 * * VRFHP-1B 16 TON ROOF 10

7 PANEL HD2 ** ** 200 122.7 34.0 A 2.7 9.6 8

5 14.1 3.9 C 4.4 16.0 6

3 (E) HV-1 10HP BASEMENT * * 20 14.1 3.9 B 4.4 16.0 25 * * VRFHP-1A 16 TON ROOF 4

1 14.1 3.9 A 4.4 16.0 2

NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.

CKT. COND WIRE BKR BKR WIRE COND CKT.

600 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC SURFACE MOUNTED

EXISTING PANEL HDP SCHEDULE

4. PROVIDE NEW BREAKER. BREAKER TYPE AND AIC RATING SHALL MATCH EXISTING PANEL.

REFER TO EP-601, EP-602, AND EP-603.

3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.

2. USE EXISTING BREAKER FOR NEW CONNECTION.

1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.

PANELBOARD OPTIONS: PANELBOARD NOTES:

TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 720.8 B: 720.8 C: 720.8

TOTAL AMPS (FEEDTHRU) A: B: C:

TOTAL AMPS (CONN. LOAD) A: 720.8 B: 720.8 C: 720.8

89 BUSSED SPACE C BUSSED SPACE 90

87 BUSSED SPACE B BUSSED SPACE 88

85 BUSSED SPACE A BUSSED SPACE 86

83 21.0 5.8 C 84

81 (NOTE 5) 21.0 5.8 B 82

79 BLOW DOWN SYSTEM SONIC AIRE FANS 3/4 10 30 21.0 5.8 A 25 SPARE 80

77 (NOTE 2) 15.0 54.0 C 78

75 CIRCULATING PUMPS/HEAT EXCHANGER 15.0 54.0 B 76

73 LE-39.3.1 WATER HEATING * * 25 15.0 54.0 A 25 SPARE 74

71 (NOTE 2) 46.2 12.8 C 72

69 AND CONDITIONING TUMBLER 46.2 12.8 B 70

67 LE-13 400/500LB GAS DRYING * * 80 46.2 12.8 A 20 SPARE 68

65 C 8.9 32.0 66

63 B 8.9 32.0 SYSTEM (NOTE 5) 64

61 A 8.9 32.0 40 * * LE-39.1 WASTEWATER HEAT RECOVERY 62

59 48.0 13.3 C 10.9 39.4 (NOTE 2) 60

57 (NOTE 2) 48.0 13.3 B 10.9 39.4 SYSTEM 58

55 LE-40 AIR COMPRESSOR * * 90 48.0 13.3 A 10.9 39.4 60 * * LE-39.4 TUNNEL RECOVERY & FILTERING 56

53 48.0 13.3 C 10.9 39.4 (NOTE 2) 54

51 (NOTE 2) 48.0 13.3 B 10.9 39.4 SYSTEM 52

49 LE-40 AIR COMPRESSOR * * 90 48.0 13.3 A 10.9 39.4 60 * * LE-39.4 TUNNEL RECOVERY & FILTERING 50

47 (NOTE 2) 24.0 6.6 C 48

45 WASHER DRYER 24.0 6.6 B 46

43 LE-31 SEMI AUTOMATIC CART * * 40 24.0 6.6 A 225 SPARE (NOTE 2) 44

41 27.1 7.5 C 15.0 54.2 (NOTE 2) 42

39 (NOTE 2) 27.1 7.5 B 15.0 54.2 FED VIA XFMR XFMR-LLE (45 KVA) 40

37 LE-38 CENTRAL VACUUM * * 60 27.1 7.5 A 15.0 54.2 70 (E) PANEL LLE 38

35 C 14.0 50.5 (NOTE 2) 36

33 B 14.0 50.5 PUMPING SYSTEM 34

31 (E) TVSS - - 30 A 14.0 50.5 80 * * LE-39.2 WATER STORAGE AND 32

29 (NOTE 2) 33.9 9.4 C 1.0 3.8 30

27 WASHER EXTRACTOR 33.9 9.4 B 1.0 3.8 (NOTE 2) 28

25 LE-12 300/400LB PASS THROUGH * * 70 33.9 9.4 A 1.0 3.8 15 * * LE-28 CLEAN TAKE AWAY CONVEYOR 26

23 CONVEYOR SYSTEM (NOTE 2) 7.6 2.1 C 2.4 8.7 (NOTE 2) 24

21 UNLOADING TAKE AWAY 7.6 2.1 B 2.4 8.7 WITH STACKER CONVEYOR 22

19 LE-11 CWES DRYER * * 15 7.6 2.1 A 2.4 8.7 15 * * LE-26 AUTO LARGE PIECES FOLDER 20

17 3.4 0.9 C 0.9 3.4 18

15 (NOTE 2) 3.4 0.9 B 0.9 3.4 (NOTE 2) 16

13 LE-9A DRYER BYPASS CONVEYOR * * 15 3.4 0.9 A 0.9 3.4 15 * * LE-25 CART DUMPER 14

11 3.4 0.9 C 0.9 3.4 (NOTE 2) 12

9 CONVEYOR (NOTE 2) 3.4 0.9 B 0.9 3.4 CONVEYOR SYSTEM 10

7 LE-9 TWO CAKE SHUTTLE * * 15 3.4 0.9 A 0.9 3.4 15 * * LE-23 CLEAN FLATWORK TAKEAWAY 8

5 21.0 5.8 C 2.1 7.6 (NOTE 2) 6

3 (NOTE 2) 21.0 5.8 B 2.1 7.6 EXTERNAL LINT COLLECTION 4

1 LE-2 SOIL STORAGE CONVEYOR * * 40 21.0 5.8 A 2.1 7.6 15 * * LE-14 WASTE MANAGED AUTO 2

NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.

CKT. COND WIRE BKR BKR WIRE COND CKT.

800 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC SURFACE MOUNTED

EXISTING PANEL HLE SCHEDULE

5. PROVIDE NEW BREAKER. BREAKER TYPE AND AIC RATING SHALL MATCH EXISTING PANEL.

REFERTO EP-605

4. (**) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON ELECTRICAL RISER.

REFER TO EP-602.

3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.

2. USE EXISTING BREAKER FOR NEW CONNECTION.

1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.

PANELBOARD OPTIONS: PANELBOARD NOTES:

TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 334.6 B: 341.3 C: 325.6

TOTAL AMPS (FEEDTHRU) A: B: C:

TOTAL AMPS (CONN. LOAD) A: 334.6 B: 341.3 C: 325.6

83 C 84

81 B 82

79 BUSSED SPACE A BUSSED SPACE 80

77 C 78

75 B 76

73 BUSSED SPACE A BUSSED SPACE 74

71 C 0.8 2.7 (NOTE 5) 72

69 B 1.5 5.5 FED VIA XFMR T-LTC (30 KVA) 70

67 BUSSED SPACE A 0.8 2.7 50 ** ** PANEL LTC 68

65 C 66

63 B 64

61 SPARE 15 A 15 SPARE 62

59 C 60

57 B 58

55 SPARE 15 A 80 SPARE 56

53 2.7 0.8 C 54

51 (NOTE 2) 2.7 0.8 B 52

49 LE-24 SMALL PIECE FOLDER * * 15 2.7 0.8 A 15 SPARE 50

47 2.7 0.8 C 0.9 3.4 48

45 (NOTE 2) 2.7 0.8 B 0.9 3.4 (NOTE 2) 46

43 LE-24 SMALL PIECE FOLDER * * 15 2.7 0.8 A 0.9 3.4 15 * * LE-4 TUNNEL LOADING CONVEYOR 44

41 C 2.5 9.0 (NOTE 2) 42

39 B 6.1 22.0 FED VIA XFMR XFMR-LTA (30 KVA) 40

37 BUSSED SPACE A 5.0 18.1 45 (E) PANEL LTA 38

35 (NOTE 2) 14.1 3.9 C 1.1 4.0 (NOTE 2) 36

33 EXTRACTOR 14.1 3.9 B 1.1 4.0 AND CONDITIONING TUMBLER 34

31 LE-21 80/100LB OPEN POCKET WASHER * * 25 14.1 3.9 A 1.1 4.0 15 * * LE-22 110/120LB GAS HEATED DRYING 32

29 (NOTE 2) 14.1 3.9 C 1.1 4.0 (NOTE 2) 30

27 EXTRACTOR 14.1 3.9 B 1.1 4.0 AND CONDITIONING TUMBLER 28

25 LE-21 80/100LB OPEN POCKET WASHER * * 25 14.1 3.9 A 1.1 4.0 15 * * LE-22 110/120LB GAS HEATED DRYING 26

23 (NOTE 2) 3.4 0.9 C 14.4 52.0 (NOTE 2) 24

21 CONVEYOR 3.4 0.9 B 14.4 52.0 IRONER 22

19 LE-8 SINGLE CAKE ELEVATOR * * 15 3.4 0.9 A 14.4 52.0 90 * * LE-19 STEAMLESS TWO ROLL FLATWORK 20

17 (NOTE 2) 65.0 18.0 C 0.9 3.4 (NOTE 2) 18

15 EXTRACTOR 65.0 18.0 B 0.9 3.4 THROUGH CWES DRYER 16

13 LE-6 SINGLE STAGE PRESS * * 100 65.0 18.0 A 0.9 3.4 80 * * LE-10 220/330LB GAS HEATED PASS 14

11 65.0 18.0 C 11.1 40.1 (NOTE 2) 12

9 (NOTE 2) 65.0 18.0 B 11.1 40.1 THROUGH CWES DRYER 10

7 LE-5 150LB TUNNEL WASHER * * 100 65.0 18.0 A 11.1 40.1 80 * * LE-10 220/330LB GAS HEATED PASS 8

5 C 11.1 40.1 (NOTE 2) 6

3 B 11.1 40.1 THROUGH CWES DRYER 4

1 (E) TVSS * * 30 A 11.1 40.1 80 * * LE-10 220/330LB GAS HEATED PASS 2

NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.

CKT. COND WIRE BKR BKR WIRE COND CKT.

600 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC SURFACE MOUNTED

EXISTING PANEL HTA SCHEDULE

5. PROVIDE NEW BREAKER. BREAKER TYPE AND AIC RATING SHALL MATCH EXISTING PANEL.

REFER TO EP-605.

4. (**) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON ELECTRICAL RISER.

REFER TO EP-602.

3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.

2. USE EXISTING BREAKER FOR NEW CONNECTION.

1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.

PANELBOARD OPTIONS: PANELBOARD NOTES:

TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 371.3 B: 372.1 C: 364.3

TOTAL AMPS (FEEDTHRU) A: B: C:

TOTAL AMPS (CONN. LOAD) A: 371.3 B: 372.1 C: 364.3

83 C 84

81 B 82

79 BUSSED SPACE A BUSSED SPACE 80

77 C 78

75 B 76

73 BUSSED SPACE A BUSSED SPACE 74

71 C 72

69 B 70

67 BUSSED SPACE A 15 SPARE 68

65 C 3.3 12.0 66

63 B 3.3 12.0 64

61 SPARE 15 A 3.3 12.0 15 (E) BLOCK HEATER GENERATOR #2 62

59 C 3.3 12.0 60

57 B 3.3 12.0 58

55 SPARE 15 A 3.3 12.0 15 (E) BLOCK HEATER GENERATOR #3 56

53 2.7 0.8 C 3.3 12.0 54

51 (NOTE 2) 2.7 0.8 B 3.3 12.0 52

49 LE-24 SMALL PIECE FOLDER * * 15 2.7 0.8 A 3.3 12.0 15 (E) BLOCK HEATER GENERATOR #1 50

47 2.7 0.8 C 0.9 3.4 48

45 (NOTE 2) 2.7 0.8 B 0.9 3.4 (NOTE 2) 46

43 LE-24 SMALL PIECE FOLDER * * 15 2.7 0.8 A 0.9 3.4 15 * * LE-4 TUNNEL LOADING CONVEYOR 44

41 5.5 1.5 C 2.5 9.0 42

39 FED VIA XFMR LTD-1 (30 KVA) 6.8 1.9 B 4.3 15.5 FED VIA XFMR LTB-1 (30 KVA) 40

37 PANEL LTD 1 6 50 12.9 3.6 A 2.4 8.7 45 ** ** (E) PANEL LTB 38

35 (NOTE 2) 14.1 3.9 C 1.1 4.0 (NOTE 2) 36

33 EXTRACTOR 14.1 3.9 B 1.1 4.0 AND CONDITIONING TUMBLER 34

31 LE-21 80/100LB OPEN POCKET WASHER * * 25 14.1 3.9 A 1.1 4.0 15 * * LE-22 110/120LB GAS HEATED DRYING 32

29 (NOTE 2) 14.1 3.9 C 1.1 4.0 (NOTE 2) 30

27 EXTRACTOR 14.1 3.9 B 1.1 4.0 AND CONDITIONING TUMBLER 28

25 LE-21 80/100LB OPEN POCKET WASHER * * 25 14.1 3.9 A 1.1 4.0 15 * * LE-22 110/120LB GAS HEATED DRYING 26

23 (NOTE 2) 3.4 0.9 C 14.4 52.0 (NOTE 2) 24

21 CONVEYOR 3.4 0.9 B 14.4 52.0 IRONER 22

19 LE-8 SINGLE CAKE ELEVATOR * * 15 3.4 0.9 A 14.4 52.0 90 * * LE-19 STEAMLESS TWO ROLL FLATWORK 20

17 (NOTE 2) 65.0 18.0 C 0.9 3.4 (NOTE 2) 18

15 EXTRACTOR 65.0 18.0 B 0.9 3.4 THROUGH CWES DRYER 16

13 LE-6 SINGLE STAGE PRESS * * 100 65.0 18.0 A 0.9 3.4 80 * * LE-10 220/330LB GAS HEATED PASS 14

11 65.0 18.0 C 11.1 40.1 (NOTE 2) 12

9 (NOTE 2) 65.0 18.0 B 11.1 40.1 THROUGH CWES DRYER 10

7 LE-5 150LB TUNNEL WASHER * * 100 65.0 18.0 A 11.1 40.1 80 * * LE-10 220/330LB GAS HEATED PASS 8

5 C 11.1 40.1 (NOTE 2) 6

3 B 11.1 40.1 THROUGH CWES DRYER 4

1 (E) TVSS * * 30 A 11.1 40.1 80 * * LE-10 220/330LB GAS HEATED PASS 2

NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.

CKT. COND WIRE BKR BKR WIRE COND CKT.

600 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 10 KAIC SURFACE MOUNTED

EXISTING PANEL HTB SCHEDULE

4. CIRCUIT NOT SHOWN ON PLANS. CONTRACTOR TO TRACE AND CONFIRM.

REFER TO EP-601.

3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.

2. USE EXISTING BREAKER FOR NEW CONNECTION.

1. PROVIDE WITH FEED-THRU LUGS. 1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.

PANELBOARD OPTIONS: PANELBOARD NOTES:

TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 234.1 B: 235.6 C: 227.6

TOTAL AMPS (FEEDTHRU) A: 114.6 B: 149.3 C: 134.7

TOTAL AMPS (CONN. LOAD) A: 119.5 B: 86.3 C: 92.8

49 BATHROOM (NOTE 4) 10.0 1.0 A 1.0 10.0 BATHROOM (NOTE 4) 50

47 (E) HAND DRYER 1ST FLOOR 3/4 12 20 10.0 1.0 C 1.0 10.0 20 12 1/2 (E) HAND DRYER 1ST FLOOR 48

45 BATHROOM (NOTE 4) 10.0 1.0 B 1.0 10.0 BATHROOM (NOTE 4) 46

43 (E) HAND DRYER 1ST FLOOR 3/4 12 20 10.0 1.0 A 1.0 10.0 20 12 1/2 (E) HAND DRYER 1ST FLOOR 44

41 SPARE (NOTE 4) 20 C 0.3 2.1 20 12 3/4 MOTORIZED DAMPERS 42

39 SPARE (NOTE 4) 20 B 20 SPARE 40

37 SPARE (NOTE 4) 20 A 20 SPARE 38

35 SPARE (NOTE 4) 20 C 0.7 6.0 20 12 3/4 (E) GEN. 1ST FL. RECEPTION RECS 36

33 SPARE (NOTE 4) 20 B 0.5 4.5 20 12 3/4 (E) GEN. 1ST FL. RECEPTION RECS 34

31 SPARE (NOTE 4) 20 A 0.9 7.5 20 12 3/4 (E) GEN. 1ST FL. OFFICE RECS 32

29 SPARE (NOTE 4) 20 C 0.7 6.0 20 12 3/4 (E) GEN. 1ST FL. OFFICE RECS 30

27 SPARE (NOTE 4) 20 B 0.9 7.5 20 12 3/4 (E) GEN. 1ST FL. OFFICE RECS 28

25 (E) HDTV CCTV MONITORS 3/4 12 20 4.5 0.5 A 0.9 7.5 20 12 3/4 (E) GEN. 1ST FL SUPERVISOR OFFICE REC 26

23 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 C 0.9 7.5 20 12 3/4 (E) GEN. 1ST FL SUPERVISOR OFFICE REC 24

21 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 B 0.4 3.0 20 12 3/4 (E) GEN. 1ST FL. BATHROOM RECS 22

19 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 A 0.7 6.0 20 12 3/4 (E) LOUNGE COUNTER HEIGHT GFCI QUAD 20

17 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 C 0.7 6.0 20 12 3/4 (E) LOUNGE COUNTER HEIGHT GFCI QUAD 18

15 SPARE 20 B 0.7 6.0 20 12 3/4 (E) LOUNGE COUNTER HEIGHT GFCI QUAD 16

13 SPARE 20 A 0.7 6.0 20 12 3/4 (E) LOUNGE COUNTER HEIGHT GFCI QUAD 14

11 MOTORIZED LOUVERS BASEMENT 3/4 12 20 5.0 0.6 C 0.8 6.2 20 12 3/4 (E) REFRIGERATOR LOUNGE 12

9 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 B 0.8 6.2 20 12 3/4 (E) REFRIGERATOR LOUNGE 10

7 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 A 1.4 11.7 20 12 3/4 (E) VENDING MACHINES LOUNGE 8

5 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 C 1.4 11.7 20 12 3/4 (E) VENDING MACHINES LOUNGE 6

3 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 B 1.4 11.7 20 12 3/4 (E) VENDING MACHINES LOUNGE 4

1 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 A 1.4 11.7 20 12 3/4 (E) VENDING MACHINES LOUNGE 2

NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.

CKT. COND WIRE BKR BKR WIRE COND CKT.

800 AMP MCB 208Y/120 VOLTS 3PH, 4W, 60 HZ MIN. 22 KAIC SURFACE MOUNTED

EXISTING PANEL LDP SECTION 1 SCHEDULE

4. CIRCUIT NOT SHOWN ON PLANS. CONTRACTOR TO TRACE AND CONFIRM.

REFER TO EP-601.

3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.

2. USE EXISTING BREAKER FOR NEW CONNECTION.

1. PROVIDE WITH FEED-THRU LUGS. 1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.

PANELBOARD OPTIONS: PANELBOARD NOTES:

TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 114.6 B: 149.3 C: 134.7

TOTAL AMPS (FEEDTHRU) A: 49.1 B:…