S06 Updated Drawings 10438_ELEC_REV2.pdf
PDF 5 MB Posted
- Attached to
- Z2EZ 523A5-10-316 Upgrade VISN 1 Laundry Building 45 Federal contract opportunity
- Solicitation number
- 36C24125R0008
About this file
These electrical power plan drawings detail the electrical system for a Veterans Affairs laundry facility upgrade project. The documents include comprehensive electrical power plans for the basement, first floor, and roof levels, showing detailed electrical equipment connection schedules for various panels (HDP, HLE, HTA, HTB, LDP) and mechanical systems. The drawings specify electrical connections for numerous laundry equipment components, HVAC units, pumps, exhaust fans, and variable refrigerant flow (VRF) systems, with precise electrical load calculations, amperage ratings, and circuit specifications. The plans are part of the VA VISN 1 Laundry Building 45 upgrade project (Solicitation Number 36C24125R0008), prepared by ClarkNexsen as the engineering consultant, with revisions dated 11/22/24 and 07/18/2025, indicating an ongoing design refinement process for the facility's electrical infrastructure.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
C G
C G
C G
C G
CG
C G
C G
CG
C G
E
E
E
E
E
E
E
E
E
E E
EE
E
E
E
E E
E
E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
E
E
E EE
E
E
E
E
E
E
E E
E
PLAN
NORTH
TRUE
NORTH
A.1 A.8 B.8 C.8 D.8 E.8 F.8 G.8 H.7
6.2
2.1
2.2
3.2
4.1
5.1
A B C D E F G HAACCDD
EE
FF
GG
HH
II
JJ
KK LLMM
NN
EP401
B1
EP401
E5
STORAGE
B005
CORRIDOR
B006
GAS METER
AND
REGULATING
ROOM
B002
LINEN
STORAGE
B026
MECHANICAL
ROOM
B003
STAFF
BREAK
ROOM
B004
STAIR
B007
VESTIBULE
B008
WOMENS
TOILET
B009A
WOMENS
SHOWER
B009
WOMEN'S
RESTROOM
B010
HAC
B019
WOMEN'S
LOCKER
ROOM
B011
MEN'S
RESTROOM
B014
MEN'S
LOCKER
ROOM
B013
CLOSET
B029
CORRIDOR
B012
STORAGE
B015
SECURE
STORAGE
B028
SECURITY
OFFICE
B027
IT ROOM
B020
MECHANICAL
B017
TANK ROOM
B001b
STORAGE
B001a
ELEC ROOM
E001
MECHANICAL
STORAGE
B024
MECHANICAL
SHOP
B023
CONTROLLER
ROOM
B022
SERVICE
ELEVATOR
B025
MECH &
CHEM
STORAGE
B018
LDP-98,100
45-VRFAC-21B
LDP-98,100
45-VRFAC-21A
LDP-98,100
45-VRFAC-21D
LDP-98,100
45-VRFAC-21C
LDP-86
45-HWUH-11
LDP-88
45-HWUH-13
HDP-55,57,59
45-VRFHRU-1A
HDP-67,69,71
45-VRFHP-ELECTRIC-A
LDP-93,95
45-VRFAC-1
LDP-86
45-HWUH-10
LDP-86
45-HWUH-16
LDP-88
45-HWUH-17
HDP-13,15,17
45-HV-3
HDP-19,21,23
45-HV-4
LDP-88
45-HWUH-18
HD2-1,3,5
45-HV-2
LDP-93,95
45-VRFAC-6B
LDP-93,95
45-VRFAC-6A
LDP-93,95
45-VRFAC-6C LDP-143,145
45-VRFAC-7A
LDP-143,145
45-VRFAC-4B
LDP-93,95
45-VRFAC-3
LDP-143,145
45-VRFAC-7B
LDP-86
45-HWUH-15
LDP-86
45-HWUH-14
HDP-73,75,77
45-VRFHP-ELECTRIC-B
LDP-88
45-HWUH-12
HDP-61,63,65
45-VRFHRU-1B
HDP-62,64,66
45-RF-1
HDP-68,70,72
45-RF-2
SHADING INDICATES NO POWER WORK IN THIS AREA
EML-22
P-707
LDP-91
P-RP-1
HDP-80,82,84
P-EWH-1
MECHANICAL
B017
LDP-54
LDP-10
LDP-12
LDP-18
LDP-20
LDP-16
LDP-110
LDP-76
LDP-14
LDP-2
LDP-4
LDP-6LDP-8
LDP-56
LDP-70
LDP-52
LDP-66
LDP-64
LDP-62
LDP-60
LDP-108
LDP-80
LDP-58
LDP-74
LDP-68
HD2-7,9,11
GP-3
HD2-13,15,17
GP-4
HD2
HDP-31,33,35
ELEVATOR
HD2-8,10,12
VF-3
HD2-2,4,6
VF-4
EML-14
FACP BOOSTER 2
EML-12
FACP BOOSTER 1
EML-10
FACP
HDP-14,16,18
45-CP-1
HD2-19,21,23
P1-A
HD2-25,27,29
P1-B
HD2-14,16,18
GP-1
HD2-20,22,24
GP-2
EMH-31,33,35
P-SP-1
LDP-11
LLE-23
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
ELECTRICAL POWER PLAN - BASEMENT
EP101A
GENERAL NOTES KEY NOTES#
1/8" = 1'-0"EP101A
1 BASEMENT PLAN - MECH & GENERAL POWER
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
A. REFER TO SHEET EP102A FOR LAUNDRY EQUIPMENT CONNECTION PLANS IN THIS AREA.
B. PANELBOARDS LOCATED IN ELECTRICAL ROOM E001, SEE E1/EP401 FOR LOCATION.
C. COORDINATE NEW WIRING DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH LAUNDRY EQUIPMENT PRIOR TO ROUGH-IN.
1 EXISTING EQUIPMENT TO REMAIN. THIS EQUIPMENT WAS INSTALLED UNDER A
PREVIOUS PERMIT. THE PREVIOUS PERMIT WAS NOT CLOSED OUT AND IT IS
UNKNOWN TO WHAT LEVEL OF COMPLETION THE INSTALLATION WAS PERFORMED
TO. CONTRACTOR TO INSPECT, TEST, AND COMMISSION EQUIPMENT AND
INSTALLATION TO MANUFACTURER’S REQUIREMENTS AND TO ASSUME
OWNERSHIP OF PREVIOUS INSTALLATION. VERIFY INTEGRITY OF CIRCUIT AND
CONDUIT AND REPLACE AS NEEDED. VERIFY ALL CONDUIT FITTINGS ARE
TIGHTENED TO ENSURE SECURE MECHANICAL CONNECTION AND EFFECTIVE
BOND FOR GROUND FAULT PATH. MEG TEST BRANCH CIRCUIT WIRING TO ENSURE
INSULATION IS IN GOOD CONDITION AND REPLACE IF DEFICIENT. RETORQUE ALL
TERMINATIONS TO MANUFACTURER’S RECOMMENDED SETTINGS.
2 MAKE POWER CONNECTION TO EXISTING MECHANICAL UNIT.
3 REINSTALL EXISTING MECHANICAL EQUIPMENT AND RESTORE ELECTRICAL
CONNECTIONS AFTER STRUCTURAL WORK HAS BEEN COMPLETED.
4 MAKE POWER CONNECTION TO NEW MECHANICAL UNIT.
5 MAKE POWER CONNECTION TO NEW EMERGENCY EYE WASH ALARM.
6 THE CONTRACTOR SHALL ENGAGE BUCKLEY ELEVATOR, PHONE # 978-594-1197,
TO MAKE THE ELEVATOR OPERATIONAL AND PERFORM ALL REQUIRED
COMMISSIONING AND TESTING. CONTRACTOR TO MAKE FINAL ELECTRICAL
CONNECTIONS TO ELEVATOR EQUIPMENT.
1 REVISION 01 11/22/24
2 REVISION 02 07/18/2025
7 PROVIDE POWER CONNECTION TO NEW MOTORIZED DAMPER. DAMPER SHALL
OPEN WHEN BOILERS ARE OPERATING..
8 PROVIDE POWER CONNECTION TO NEW MOTORIZED DAMPER. DAMPER SHALL
OPEN WHEN AIR COMPRESSORS ARE OPERATING. COORDINATE AIR
COMPRESSOR DAMPER CONTROL WITH LAUNDRY EQUIPMENT CONTRACTOR.
Esmail.Hamidi G:\PE Stamps\Orders\2024\150294 Hamidi VA-Eng\150294 HAMIDI VA-Eng Final Model (1)
C G
CG
CGCG
CG
C G
CG
CGCG
CG
CG
CG CG
CG
CG CG
CGCG
CG CG CG CGCG CG
C G
C G
C G
C G
C G
C G
C G
CG
C G
CG CG
CG
CG
CG
CG
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
CG
CG
CG CG CGCG
CG
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
C G
CG
CG
CG CG
CG
CG
CG
CG CG C
G
C G
CG
E X H
UNLOAD
FRONT
INLET
165GP
X
X
ZZ
X
Y
X
D ra w e r
D ra w e r
Input
Linen Output
Linen Output
Gate
Gate 2
REMOTE
STATUS
W O
R K
S T
A T
IO
N
W O
R K
S T
A T
IO
N
ENERGY
MONITOR
COMM.
SYST.
MONORAIL
CNTRLS
Y
FLOW
OF
GOODS
FLOW
OF
GOODS
24 24
27 27
10 10 10
8 8
212121 222222
10a
24 24
10a 10a 10a 10a
39.9
39.8
5a
VAC
CAB
PUMP/
CNTRL
1 43
C P
1 2 3 4
C A
R T
PATIENT CLOTHING
& SURGICAL LINEN
PROCESSING AREA
C P
CP-1
TOP CONVEYOR EL 4'0"
BOTTOM CONVEYOR EL 2'6"
YYY
X
Y
X
E
A
XX
X
YY
X
X
YY
X
X
YY
X
X
YY
X
X
Y
X
H W
C W
TW
H W
C W
TW
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
X
Y
0. 3000
0. 3000
0. 5000
X
Y
X
Y
X
Y
X
Y
0. 3000
0. 3000
0. 5000
GOODS
FLOW
OF
X
Y
X
Y YY
Y Y
X X
Y Y
X X
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
E
E E E
E
E E
E E
E
PLAN
NORTH
TRUE
NORTH
A.1 A.8 B.8 C.8 D.8 E.8 F.8 G.8 H.7
6.2
2.1
2.2
3.2
4.1
5.1
A B C D E F G HAACCDD
EE
FF
GG
HH
II
JJ
KK LLMM
NN
OO
CLEAN
TEXTILE
MAKE UP
CART MAKE
UP
RECEPTION
OFFICE
OFFICE
TRAINING
ROOM
100A
EQUIPMENT
SPACE
DRYING
PRODUCTION
WASHING
PRODUCTION
SOIL
TEXTILE
SORTING
FLATWORK
FINISHING
LAUNDRY
SUPERVISOR
OFFICE
RESTROOM
RESTROOM
VESTIBULE
CLEAN
CART
STAGING
SERVICE
ELEVATOR
B025
AIR LOCK
ROOM
CART
WASHING
SOIL CART
STAGING
SOIL
TEXTILE
RECEIVING
LDP-148,150
45-VRFAC-10
LDP-148,150
45-VRFAC-9LDP-148,150
45-VRFAC-8
LDP-148,150
45-VRFAC-11
LDP-148,150
45-VRFAC-12
LDP-90
45-HWUH-3
LDP-90
45-HWUH-1
LDP-90
45-HWUH-2
LDP-90
45-HWUH-5
LDP-90
45-HWUH-4
LDP-148,150
45-VRFAC-13
LDP-92
45-HWUH-6
LDP-144,146
45-VRFAC-16
LDP-144,146
45-VRFAC-17
LDP-144,146
45-VRFAC-19
LDP-151,153
45-VRFAC-15
LDP-151,153
45-VRFAC-14
LDP-92
45-HWUH-7
LDP-92
45-HWUH-8
LDP-92
45-HWUH-9
LDP-144,146
45-VRFAC-20
LDP-144,146
45-VRFAC-18
LDP-131
45-PEF-1
LDP-133
45-PEF-2
EWC
LDP-135
45-PEF-3
LTD
'TD'
3P60
LTC
3P60
LTD-5
LTD-3LTD-1
LDP-55
LDP-53
LDP-79
LDP-61
LDP-72
LDP-24
LDP-25
LDP-26
LDP-22 LDP-25
LDP-59
LDP-57
LDP-67
LDP-65
LDP-63
LDP-42 (SC)
LDP-42 (SC)
HTA-68,70,72
HTB-37,39,41
LDP-34 LDP-36
LDP-148,150
VRF-BSB-11
LDP-32
LDP-30
LDP-71
LDP-73
LDP-28
LDP-112
TEX-1
LDP-114
TEX-2
HDP-26,28,30
45-REF-1B
HDP-20,22,24
45-REF-1A
HDP-49,51,53
45-REF-2B
HDP-43,45,47
45-REF-2A
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
ELECTRICAL POWER PLAN - FIRST FLOOR
EP101B
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
GENERAL NOTES KEY NOTES#
1/8" = 1'-0"EP101B
1 FIRST FLOOR - MECH & GENERAL POWER
A. OVERHEAD MONORAIL 'NO-FLY' CLEARANCE: CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE 'NO-FLY' CLEARANCE REQUIREMENTS PRIOR TO COMMENCING INSTALLATION. REFER TO ARCHITECTURAL PLANS AND LAUNDRY EQUIPMENT DRAWINGS.
B. REFER TO SHEET EP102B FOR LAUNDRY EQUIPMENT CONNECTION PLANS IN THIS AREA.
C. PANELBOARDS LOCATED IN ELECTRICAL ROOM E001, SEE E1/EP401 FOR LOCATION.
D. COORDINATE NEW WIRING DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH LAUNDRY EQUIPMENT PRIOR TO ROUGH-IN.
1 EXISTING EQUIPMENT TO REMAIN. THIS EQUIPMENT WAS INSTALLED UNDER A PREVIOUS PERMIT. THE PREVIOUS PERMIT WAS NOT CLOSED OUT AND IT IS UNKNOWN TO WHAT LEVEL OF COMPLETION THE INSTALLATION WAS PERFORMED TO. CONTRACTOR TO INSPECT, TEST, AND COMMISSION EQUIPMENT AND INSTALLATION TO MANUFACTURER’S REQUIREMENTS AND TO ASSUME OWNERSHIP OF PREVIOUS INSTALLATION. VERIFY INTEGRITY OF CIRCUIT AND CONDUIT AND REPLACE AS NEEDED. VERIFY ALL CONDUIT FITTINGS ARE TIGHTENED TO ENSURE SECURE MECHANICAL CONNECTION AND EFFECTIVE BOND FOR GROUND FAULT PATH. MEG TEST BRANCH CIRCUIT WIRING TO ENSURE INSULATION IS IN GOOD CONDITION AND REPLACE IF DEFICIENT.
RETORQUE ALL TERMINATIONS TO MANUFACTURER’S RECOMMENDED SETTINGS.
2 PROVIDE POWER CONNECTION TO NEW MOTORIZED DAMPER. DAMPER SHALL OPEN WHEN DRYERS ARE OPERATING.
COORDINATE DRYER DAMPER CONTROL WITH LAUNDRY EQUIPMENT CONTRACTOR.
2 REVISION 02 07/18/2025
3 100A 120/208 3P 4W PANEL LTC FED BY 30 KVA, 480V-120V/208V TRANSFORMER, CEILING SUSPENDED. REFER TO DETAIL C6/EP501 FOR MOUNTING. REFER TO ELECTRICAL RISER ON EP605. COORDINATE LOCATION WITH OVERHEAD MECHANICAL DUCTWORK IN
THIS AREA PRIOR TO INSTALLATION.
4 RELOCATE EXISTING HOT WATER UNIT HEATER.
5 100A 120/208 3P 4W PANEL LTD FED BY 30 KVA, 480V-120V/208V TRANSFORMER, CEILING SUSPENDED. REFER TO DETAIL C6/EP501
FOR MOUNTING. REFER TO ELECTRICAL RISER ON EP605.
6 MAKE POWER CONNECTION TO NEW EXHAUST FAN FROM NEAREST EXISTING JUNCTION BOX FOR INDICATED CIRCUIT. SEE
LAUNDRY EQUIPMENT CONNECTION SCHEDULE ON SHEET EP602.
E
E
E
E
E
E
E
PLAN
NORTH
TRUE
NORTH
A.1 A.8 B.8 C.8 D.8 E.8 F.8 G.8 H.7
6.2
2.12.2
3.2
4.1
5.1
A B C D E F G HAACCDD
EE
FF
GG
HH
II
JJ
KK
LLMM
NN
OO
PP
HDP-1,3,5
45-HV-1HDP-2,4,6
45-VRFHP-1A
HDP-8,10,12
45-VRFHP-1B
HDP-25,27,29
45-VRFHRU-2
HDP-79,81,83
45-REF-3WP
WP
WP
WP
WP
WP
LDP-75
LDP-77
LDP-116
TEX-3
LDP-136,138,140
EF-1
WP
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
ELECTRICAL POWER PLAN - ROOF
EP101C
0' 4' 8' 16' 24'
SCALE: 1/8" = 1' - 0"
GENERAL NOTES KEY NOTES#
1/8" = 1'-0"EP101C
1 ROOF - MECH & GENERAL POWER
1 EXISTING EQUIPMENT TO REMAIN. THIS EQUIPMENT WAS INSTALLED UNDER A
PREVIOUS PERMIT. THE PREVIOUS PERMIT WAS NOT CLOSED OUT AND IT IS
UNKNOWN TO WHAT LEVEL OF COMPLETION THE INSTALLATION WAS
PERFORMED TO. CONTRACTOR TO INSPECT, TEST, AND COMMISSION
EQUIPMENT AND INSTALLATION TO MANUFACTURER’S REQUIREMENTS AND TO
ASSUME OWNERSHIP OF PREVIOUS INSTALLATION. VERIFY INTEGRITY OF
CIRCUIT AND CONDUIT AND REPLACE AS NEEDED. VERIFY ALL CONDUIT FITTINGS
ARE TIGHTENED TO ENSURE SECURE MECHANICAL CONNECTION AND EFFECTIVE
BOND FOR GROUND FAULT PATH. MEG TEST BRANCH CIRCUIT WIRING TO
ENSURE INSULATION IS IN GOOD CONDITION AND REPLACE IF DEFICIENT.
RETORQUE ALL TERMINATIONS TO MANUFACTURER’S RECOMMENDED SETTINGS.
A. PANELBOARDS LOCATED IN ELECTRICAL ROOM E001,
SEE E1/EP401 FOR LOCATION.
2 MAKE POWER CONNECTION TO NEW EXHAUST FAN FROM NEAREST EXISTING
JUNCTION BOX FOR INDICATED CIRCUIT. SEE LAUNDRY EQUIPMENT CONNECTION
SCHEDULE ON SHEET EP602.
2 REVISION 02 07/18/2025
BRANCH CIRCUIT WIRING AND RACEWAY:
SEE "E SHEETS FOR BRANCH CIRCUIT
REQUIREMENTS TO LINE SIDE OF
EQUIPMENT DISCONNECT.
TERMINATION TO LINE SIDE OF
EQUIPMENT DISCONNECT BY
DIVISION 26 CONTRACTOR.
COMBINATION MOTOR STARTER/DISCONNECT:
DISCONNECT AND STARTER MAY BE COMBINED
IN A SINGLE CABINET. IF COMBINATION MOTOR
STARTER IS PROVIDED, AN OVERCURRENT
PROTECTIVE DEVICE SHALL BE PROVIDED
WITH MOCP PER EQUIPMENT NAMEPLATE.
ADDITIONAL DISCONNECT: WHERE
EQUIPMENT IS NOT WITHIN SIGHT OF
EQUIPMENT DISCONNECT, TRADE FURNISHING
EQUIPMENT SHALL FURNISH AND INSTALL AN
ADDITIONAL NON-FUSED DISCONNECT SWITCH
WITHIN SIGHT OF EQUIPMENT.
EQUIPMENT: EQUIPMENT FURNISHED BY
DIVISION 23.
MOTOR STARTER (OR VFC): MOTOR STARTER (OR VFC) SHALL BE
AS RECOMMENDED BY EQUIPMENT MANUFACTURER OR AS
OTHERWISE INDICATED ON CONTRACT DOCUMENTS.
EQUIPMENT DISCONNECT: EQUIPMENT DISCONNECT SWITCH,
FUSED OR NON-FUSED PER EQUIPMENT CONNECTION SCHEDULE.
GENERAL NOTES:
1. WIRING AND RACEWAY ON LOAD SIDE OF EQUIPMENT DISCONNECT SHALL BE FURNISHED AND INSTALLED BY DIVISION 23 AND
SIZED IN ACCORDANCE WITH EQUIPMENT NAMEPLATE DATA AND THE NEC. PROVIDE SEPARATE GROUND WIRE SIZED PER NEC.
2. REQUIREMENTS FOR WIRING, MATERIALS, METHODS, AND COMPONENTS SHALL BE PER DIVISION 26 SPECIFICATIONS.
DIVISION 26 RESPONSIBILITIES DIVISION 23 RESPONSIBILITIES
LINE SIDE LOAD SIDE
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
ELECTRICAL EQUIPMENT CONNECTION
SCHEDULE
EP601
NOT TO SCALE
B1
DIVISION OF WORK DETAIL
MECHANICAL EQUIPMENT CONNECTION SCHEDULE GENERAL NOTES
A. ALL MECHANICAL UNIT LISTED ARE EXISTING TO REMAIN UON. THIS EQUIPMENT WAS INSTALLED UNDER A PREVIOUS PERMIT. THE PREVIOUS PERMIT WAS NOT CLOSED OUT AND IT IS UNKNOWN TO WHAT LEVEL OF COMPLETION THE INSTALLATION WAS PERFORMED TO. CONTRACTOR TO INSPECT, TEST, AND COMMISSION
EQUIPMENT AND INSTALLATION TO MANUFACTURER’S REQUIREMENTS AND TO ASSUME OWNERSHIP OF PREVIOUS INSTALLATION. VERIFY INTEGRITY OF CIRCUIT AND CONDUIT AND REPLACE AS NEEDED. VERIFY ALL CONDUIT FITTINGS ARE TIGHTENED TO ENSURE SECURE MECHANICAL CONNECTION AND EFFECTIVE BOND FOR GROUND FAULT PATH. MEG TEST BRANCH CIRCUIT WIRING TO ENSURE INSULATION IS IN GOOD CONDITION AND REPLACE IF DEFICIENT. RETORQUE ALL TERMINATIONS TO MANUFACTURER’S RECOMMENDED SETTINGS.
PLUMBING EQUIPMENT SCHEDULE
EQUIPMENT
DESIGNATION DESCRIPTION LOCATION FLA MCA MOCP VOLTS PHASE
CIRCUIT INFORMATION
PANEL CIRCUIT #
P1-A HEATING WATER PUMP MECH B018 21.00 A 26.25 A 30 A 480 V 3 HD2 19,21,23
P1-B HEATING WATER PUMP MECH B018 21.00 A 26.25 A 30 A 480 V 3 HD2 25,27,29
P-707 EMERGENCY EYE WASH
ALARM
SECURE STORAGE B028 15.00 A 20.00 A 20 A 120 V 1 EML 22
P-EWH-1 WATER HEATER MECH B018 54.20 A 67.75 A 70 A 480 V 3 HDP 80,82,84
P-RP-1 RECIRC PUMP MECH B018 1.01 A 1.26 A 15 A 120 V 1 LDP 91
P-SP-1 ELEVATOR SUMP PUMP 2.10 A 2.63 A 15 A 480 V 3 EMH 31,33,35
SONIC AIRE FAN SCHEDULE
EQUIPMENT
DESIGNATION
LOAD RATING
(HP) FLA MCA MOCP VOLTS PHASE REMARKS
SF-1 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.
SF-2 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.
SF-3 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.
SF-4 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.
SF-5 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.
SF-6 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.
SF-7 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.
SF-8 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.
SF-9 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.
SF-10 1 HP 2 A 3 A 20 A 480 V 3 SONIC AIRE PRO SERIES MODEL P100-460V.
VRF SYSTEM CONNECTION SCHEDULE
EQUIPMENT
DESIGNATION DESCRIPTION LOCATION FLA MCA MOCP VOLTS PHASE
CIRCUIT INFORMATION
REMARKSPANEL CIRCUIT #
45-VRFAC-1 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT LINEN STORAGE B026 0.66 A 1.20 A 15 A 208 V 1 LDP 93,95
45-VRFAC-2 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT MECH B003 0.30 A 0.38 A 15 A 208 V 1 LDP 93,95
45-VRFAC-3 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SECURE STORAGE B028 0.40 A 0.52 A 15 A 208 V 1 LDP 93,95
45-VRFAC-4A VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SECURITY CLOSET B027 0.50 A 0.63 A 15 A 208 V 1 LDP 143,145
45-VRFAC-4B VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT STORAGE B015 0.50 A 0.63 A 15 A 208 V 1 LDP 143,145
45-VRFAC-5A VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT IT ROOM B020 0.50 A 0.63 A 15 A 208 V 1 LDP 143,145
45-VRFAC-5B VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT IT ROOM B020 0.50 A 0.63 A 15 A 208 V 1 LDP 143,145
45-VRFAC-6A VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT LOUNGE B004 0.40 A 0.50 A 15 A 208 V 1 LDP 93,95
45-VRFAC-6B VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT LOUNGE B004 0.40 A 0.50 A 15 A 208 V 1 LDP 93,95
45-VRFAC-6C VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT LOUNGE B004 0.40 A 0.50 A 15 A 208 V 1 LDP 93,95
45-VRFAC-7A VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT STORAGE B015 2.20 A 2.70 A 15 A 208 V 1 LDP 143,145
45-VRFAC-7B VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT CONTROLLER RM B022 0.50 A 0.63 A 15 A 208 V 1 LDP 143,145
45-VRFAC-8 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT OFFICE 100 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150
45-VRFAC-9 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SUPERVISOR TRAINING 100A 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150
45-VRFAC-10 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT OFFICE 101 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150
45-VRFAC-11 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT RECEPTION 102 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150
45-VRFAC-12 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT RECEPTION 102 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150
45-VRFAC-13 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT VESTIBULE 110 1.32 A 1.63 A 15 A 208 V 1 LDP 148,150
45-VRFAC-14 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SOIL TEXTILE SORTING 116 3.10 A 4.16 A 15 A 208 V 1 LDP 151,153
45-VRFAC-15 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT SOIL TEXTILE SORTING 116 0.66 A 1.20 A 15 A 208 V 1 LDP 151,153
45-VRFAC-16 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT FLATWORK FINISHING 106 2.20 A 2.70 A 15 A 208 V 1 LDP 144,146
45-VRFAC-17 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT FLATWORK FINISHING 106 0.66 A 1.20 A 15 A 208 V 1 LDP 144,146
45-VRFAC-18 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT FLATWORK FINISHING 106 0.66 A 1.20 A 15 A 208 V 1 LDP 144,146
45-VRFAC-19 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT EQUIPMENT SPACE 105 1.61 A 2.11 A 15 A 208 V 1 LDP 144,146
45-VRFAC-20 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT EQUIPMENT SPACE 105 1.50 A 3.32 A 15 A 208 V 1 LDP 144,146
45-VRFAC-21A VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT ELECTRICAL ROOM 0.40 A 0.52 A 15 A 208 V 1 LDP 98,100
45-VRFAC-21B VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT ELECTRICAL ROOM 0.40 A 0.52 A 15 A 208 V 1 LDP 98,100
45-VRFAC-21C VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT ELECTRICAL ROOM 0.40 A 0.52 A 15 A 208 V 1 LDP 98,100
45-VRFAC-21D VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT ELECTRICAL ROOM 0.40 A 0.52 A 15 A 208 V 1 LDP 98,100
45-VRFAC-22 VARIABLE REFRIGERANT FLOW SYSTEM - INDOOR UNIT MECH B003 1.32 A 1.63 A 15 A 208 V 1 LDP 93,95
45-VRFBC-1 VARIABLE REFRIGERANT FLOW SYSTEM - BRANCH SELECTOR SECURITY CLOSET B027 1.00 A 1.45 A 15 A 208 V 1 LDP 147,149
45-VRFHP-1A VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT PUMP UNIT ROOF 20.00 A 20.00 A 25 A 480 V 3 HDP 2,4,6
45-VRFHP-1B VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT PUMP UNIT ROOF 12.00 A 12.00 A 15 A 480 V 3 HDP 8,10,12
45-VRFHP-ELECTRIC-A VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT PUMP UNIT OUTDOOR 12.00 A 12.00 A 15 A 480 V 3 HDP 67,69,71
45-VRFHP-ELECTRIC-B VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT PUMP UNIT OUTDOOR 12.00 A 12.00 A 15 A 480 V 3 HDP 73,75,77
45-VRFHRU-1A VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT RECOVERY UNIT OUTDOOR 16.80 A 21.00 A 25 A 480 V 3 HDP 55,57,59
45-VRFHRU-1B VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT RECOVERY UNIT OUTDOOR 16.80 A 21.00 A 25 A 480 V 3 HDP 61,63,65
45-VRFHRU-2 VARIABLE REFRIGERANT FLOW SYSTEM - OUTDOOR HEAT RECOVERY UNIT ROOF 8.80 A 11.00 A 15 A 480 V 3 HDP 25,27,29
VRF-BSB-11 VARIABLE REFRIGERANT FLOW SYSTEM - BRANCH SELECTOR RECEPTION 102 0.23 A 0.29 A 15 A 208 V 1 LDP 148,150
MECHANICAL EQUIPMENT CONNECTION SCHEDULE
EQUIPMENT
DESIGNATION DESCRIPTION
LOAD
RATING (HP,
KW, ETC) LOCATION FLA MCA MOCP VOLTS PHASE
DISCONNECT
SWITCH WIRE SIZING CIRCUIT INFORMATION
REMARKSRATING (A) CN Phase Size AWG
CONDUIT
SIZE PANEL CIRCUIT #
45-CP-1 STEAM CONDENSATE PUMP 5 HP MECH B018 7.60 A 9.50 A 15 A 480 V 3 30 2#12, #12G 3/4" HDP 14,16,18 NEW EQUIPMENT
45-ERU-1 ENERGY RECOVERY UNIT - MECH B003 5.80 A 7.10 A 15 A 208 V 1 20 2#12, #12G 3/4" LDP 94,96
45-HV-1 HVAC UNIT 10 HP ROOF 14.00 A 17.50 A 20 A 480 V 3 30 2#12, #12G 0" HDP 1,3,5 FAN SF-1 INTEGRAL TO UNIT, SEE MECH DRAWINGS
45-HV-2 HVAC UNIT 20 HP OUTDOOR 27.00 A 33.75 A 40 A 480 V 3 60 3#8, #10G 0" HD2 1,3,5 FAN SF-2 INTEGRAL TO UNIT, SEE MECH DRAWINGS
45-HV-3 HVAC UNIT 5 HP MECH B018 7.60 A 9.50 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 13,15,17 FAN SF-3 INTEGRAL TO UNIT, SEE MECH DRAWINGS
45-HV-4 HVAC UNIT 5 HP MECH B018 7.60 A 9.50 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 19,21,23 FAN SF-4 INTEGRAL TO UNIT, SEE MECH DRAWINGS
45-HWUH-1 HOT WATER UNIT HEATER - CLEAN TEXTILE MAKEUP 103 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 90
45-HWUH-2 HOT WATER UNIT HEATER - CLEAN TEXTILE MAKEUP 103 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 90
45-HWUH-3 HOT WATER UNIT HEATER - CART MAKEUP 104 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 90
45-HWUH-4 HOT WATER UNIT HEATER - FLATWORK FINISHING 106 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 90
45-HWUH-5 HOT WATER UNIT HEATER - FLATWORK FINISHING 106 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 90
45-HWUH-6 HOT WATER UNIT HEATER - CLEAN CART STAGING 111 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 92
45-HWUH-7 HOT WATER UNIT HEATER - SOIL TEXTILE SORTING 116 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 92
45-HWUH-8 HOT WATER UNIT HEATER - SOIL TEXTILE RECEIVING 117 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 92
45-HWUH-9 HOT WATER UNIT HEATER - SOIL TEXTILE RECEIVING 117 1.20 A 1.50 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 92
45-HWUH-10 HOT WATER UNIT HEATER - STORAGE B001A 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 86
45-HWUH-11 HOT WATER UNIT HEATER - STORAGE B001A 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 86
45-HWUH-12 HOT WATER UNIT HEATER - STORAGE B001A 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 88
45-HWUH-13 HOT WATER UNIT HEATER - STORAGE B001A 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 88
45-HWUH-14 HOT WATER UNIT HEATER - LIGHT STORAGE B005 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 86
45-HWUH-15 HOT WATER UNIT HEATER - LIGHT STORAGE B005 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 86
45-HWUH-16 HOT WATER UNIT HEATER - GAS METER AND REGULATING ROOM B002 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 86
45-HWUH-17 HOT WATER UNIT HEATER - MECH B018 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 88
45-HWUH-18 HOT WATER UNIT HEATER - MECH B018 0.80 A 1.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 88
45-PEF-1 EXHAUST FAN 1 HP CLEAN TEXTILE 103 11.40 A 14.25 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 131
45-PEF-2 EXHAUST FAN 1 HP CLEAN TEXTILE 103 11.40 A 14.25 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 133
45-PEF-3 EXHAUST FAN 3/4 HP SOIL TEXTILE RECEIVING 117 9.00 A 11.25 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 135
45-REF-1A EXHAUST FAN 2 HP ROOF 3.40 A 4.25 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 20,22,24 NEW EQUIPMENT
45-REF-1B EXHAUST FAN 2 HP ROOF 3.40 A 4.25 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 26,28,30 NEW EQUIPMENT
45-REF-2A EXHAUST FAN 2 HP ROOF 3.40 A 4.25 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 43,45,47 NEW EQUIPMENT
45-REF-2B EXHAUST FAN 2 HP ROOF 3.40 A 4.25 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 49,51,53 NEW EQUIPMENT
45-REF-3 EXHAUST FAN 1 HP ROOF 2.10 A 2.63 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 79,81,83 NEW EQUIPMENT
45-RF-1 EXHAUST FAN 3 HP MECH B018 4.80 A 6.00 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 62,64,66
45-RF-2 EXHAUST FAN 5 HP MECH B018 7.60 A 9.50 A 15 A 480 V 3 30 3#12, #12G 3/4" HDP 68,70,72
EF-1 EXHAUST FAN 3/4 HP ROOF 3.50 A 4.38 A 15 A 208 V 3 30 3#12, #12G 3/4" LDP 136,138,140
GP-1 GLYCOL PUMP 7.5 HP MECH B018 11.00 A 13.75 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 14,16,18 NEW EQUIPMENT
GP-2 GLYCOL PUMP 7.5 HP MECH B018 11.00 A 13.75 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 20,22,24 NEW EQUIPMENT
GP-3 GLYCOL PUMP 7.5 HP LIGHT STORAGE B005 11.00 A 13.75 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 7,9,11
GP-4 GLYCOL PUMP 7.5 HP LIGHT STORAGE B005 11.00 A 13.75 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 13,15,17
TEX-1 EXHAUST FAN - ROOF 8.80 A 11.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 112
TEX-2 EXHAUST FAN - ROOF 8.80 A 11.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 114
TEX-3 EXHAUST FAN - ROOF 8.80 A 11.00 A 15 A 120 V 1 20 2#12, #12G 3/4" LDP 116
VF-3 FAN (FOR AIR COMPRESSOR LE-40) 3 HP TANK ROOM B001B 4.80 A 6.00 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 8,10,12 NEW EQUIPMENT
VF-4 FAN (FOR AIR COMPRESSOR LE-40) 3 HP TANK ROOM B001B 4.80 A 6.00 A 15 A 480 V 3 30 3#12, #12G 3/4" HD2 2,4,6 NEW EQUIPMENT
VRF SYSTEM EQUIPMENT CONNECTION SCHEDULE GENERAL NOTES
A. ALL MECHANICAL UNIT LISTED ARE EXISTING TO REMAIN UON. THIS EQUIPMENT WAS INSTALLED UNDER A PREVIOUS PERMIT. THE PREVIOUS PERMIT WAS NOT CLOSED OUT AND IT IS UNKNOWN TO WHAT LEVEL OF COMPLETION THE INSTALLATION WAS PERFORMED TO. CONTRACTOR TO INSPECT, TEST, AND COMMISSION
EQUIPMENT AND INSTALLATION TO MANUFACTURER’S REQUIREMENTS AND TO ASSUME OWNERSHIP OF PREVIOUS INSTALLATION. VERIFY INTEGRITY OF CIRCUIT AND CONDUIT AND REPLACE AS NEEDED. VERIFY ALL CONDUIT FITTINGS ARE TIGHTENED TO ENSURE SECURE MECHANICAL CONNECTION AND EFFECTIVE BOND FOR GROUND FAULT PATH. MEG TEST BRANCH CIRCUIT WIRING TO ENSURE INSULATION IS IN GOOD CONDITION AND REPLACE IF DEFICIENT. RETORQUE ALL TERMINATIONS TO MANUFACTURER’S RECOMMENDED SETTINGS.
1 REVISION 01 11/22/24
2 REVISION 02 07/18/2025
SONIC AIRE FAN SCHEDULE NOTES: (APPLICABLE THIS SCHEDULE ONLY):
1. INSTALLING CONTRACTOR MUST INCLUDE FACTORY COMMISSIONING SERVICE OF THESE FANS IN THEIR SCOPE OF WORK IN ACCORDANCE
WITH PROJECT SPECIFICATIONS.
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
DATE:
Drawing Title:
Approved Project Director
Project Title:
1 2 3 4 5 6 7 8 9
100% SUBMITTAL
512 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 400
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and
Facilities Management
Drawn
DN/SV SV/ZN
UPGRADE VISN 1 LAUNDRY BUILDING 45
BROCKTON CAMPUS
523A5-10-316
BROCKTON, MA
08-21-24
REVISIONS:
MECHANICAL, ELECTRICAL, &
PLUMBING ENGINEERING SERVICES:
CLARKNEXSEN
3920 ARKWRIGHT ROAD SUITE 385
MACON, GA 31210
478.314.1206 DIRECT
478.743.8415 OFFICE
GEORGE SIMPSON
STRUCTURAL ENGINEERING
SERVICES:
INNOVATIVE ENGINEERING, INC.
3380 TRICKUM ROAD
BLDG 500 SUITE 100
WOODSTOCK, GA 30188
678-883-5862 DIRECT
770-517-5508 FAX
STEPHEN MORGAN
COST ESTIMATING SERVICES:
AXIAS, INC.
225 REINEKERS LANE, SUITE 200
ALEXANDRIA, VA 22314
703-706-0400
GEORGE SHIELDS
LAUNDRY EQUIPMENT VENDOR
SERVICES:
LAUNDRY DESIGN GROUP, LLC
5940 S RAINBOW BLVD, LAS
VEGAS NV USA 89118
1-855-226-3500
BOB CORFIELD
ELECTRICAL PANEL SCHEDULES
EP604
TOTALS (CONN. AMPS) AMPS 1940.0 AMPS 1940.0 AMPS 1912.5 AMPS
TOTALS (CONN. KVA + 20% SPARE) KVA 1935.5 KVA 1935.5 KVA 1908.0 KVA
TOTALS (CONN. KVA) KVA 1612.9 KVA 1612.9 KVA 1590.0 KVA
KVA KVA KVA KVA
KVA KVA KVA KVA
KVA KVA KVA KVA
KVA KVA KVA KVA
KVA KVA KVA KVA
KITCHEN EQUIP. KVA KVA KVA 0.65 KVA
ELEVATOR KVA 64.0 KVA 64.0 KVA 1.00 64.0 KVA
MISCELLANEOUS KVA 1136.7 KVA 1136.7 KVA 1.00 1136.7 KVA
ELECTRIC HEAT KVA KVA KVA 1.25 KVA
MECH EQUIP KVA 313.1 KVA 313.1 KVA 1.00 313.1 KVA
RECEPTACLES KVA 70.3 KVA 70.3 KVA NEC 40.1 KVA
LIGHTING KVA 28.9 KVA 28.9 KVA 1.25 36.1 KVA
LOAD DESCRIPTION CONN. LOAD CONN. LOAD TOTAL LOAD D.F. DEMAND
PANEL SUBFEED TOTAL
TOTAL CONNECTED AMPS A: 2204.8 B: 2213.3 C: 2153.9
C
100 B
A7 TVSS 100 A
63.1 17.5 C
250 85.6 23.7 B
A6 PANEL EMH * * 250 86.0 23.8 A
720.8 199.7 C
800 720.8 199.7 B
A5 PANEL HLE * * 800 720.8 199.7 A
364.3 100.9 C
600 372.1 103.1 B
A4 PANEL HTB * * 600 371.3 102.8 A
325.6 90.2 C
600 341.3 94.5 B
A3 PANEL HTA * * 600 334.6 92.7 A
227.6 63.1 C
FED VIA XFMR T-LDP (225 KVA) 350 235.6 65.3 B
A2 PANEL LDP SECTION 1 * * 400 234.1 64.9 A REFER TO EP-701.
452.8 125.4 C SHOWN ON ELECTRICAL RISER,
VIA ATS #2 600 458.0 126.9 B 1. (*) INDICATES CONDUIT AND WIRE SIZES ARE
A1 PANEL HDP * * 600 458.0 126.9 A SWITCHBOARD NOTES:
CUSTOMER METERING COMPARTMENT
MAIN CIRCUIT BREAKER 3000
3. PROVIDE INTERNALLY MOUNTED SPD.
INCOMING CABLE COMPARTMENT 2. PROVIDE GROUND FAULT PROTECTION.
1. PROVIDE WITH DIGITAL MULTIMETER.
LOAD SERVED COND WIRE AT AMPS KVA PH SWITCHBOARD OPTIONS:
COMPARTMENT DESCRIPTION AF
3000 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC FLOOR MOUNTED SE RATED
EXISTING SWBD DS SCHEDULE
TOTAL CONNECTED AMPS A: 2204.8 B: 2213.3 C: 2153.9
C
B
A7 TVSS A
720.8 199.7 C
VIA ATS #6 800 720.8 199.7 B
A6 PANEL HLE * * 800 720.8 199.7 A
364.3 100.9 C
VIA ATS #5 600 372.1 103.1 B
A5 PANEL HTB * * 600 371.3 102.8 A
325.6 90.2 C
VIA ATS #4 600 341.3 94.5 B
A4 PANEL HTA * * 600 334.6 92.7 A
63.1 17.5 C
VIA ATS #1 250 85.6 23.7 B
A3 PANEL EMH * * 250 86.0 23.8 A
VIA ATS #3 227.6 63.1 C
FED VIA XFMR T-LDP (225 KVA) 350 235.6 65.3 B
A2 PANEL LDP SECTION 1 * * 400 234.1 64.9 A REFER TO EP-701.
452.8 125.4 C SHOWN ON ELECTRICAL RISER,
VIA ATS #2 600 458.0 126.9 B 1. (*) INDICATES CONDUIT AND WIRE SIZES ARE
A1 PANEL HDP * * 600 458.0 126.9 A SWITCHBOARD NOTES:
CUSTOMER METERING COMPARTMENT
MAIN CIRCUIT BREAKER 3000
3. PROVIDE INTERNALLY MOUNTED SPD.
INCOMING CABLE COMPARTMENT 2. PROVIDE GROUND FAULT PROTECTION.
1. PROVIDE WITH DIGITAL MULTIMETER.
LOAD SERVED COND WIRE AT AMPS KVA PH SWITCHBOARD OPTIONS:
COMPARTMENT DESCRIPTION AF
3000 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC FLOOR MOUNTED SE RATED
EXISTING SWBD EDS SCHEDULE
REFER TO EP-605.
2. (**) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON ELECTRICAL RISER.
1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.
PANELBOARD OPTIONS: PANELBOARD NOTES:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 86.0 B: 85.6 C: 63.1
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD) A: 86.0 B: 85.6 C: 63.1
41 20.9 5.8 C 3.1 11.3 42
39 FED VIA XFMR T-IT (30 KVA) 28.0 7.8 B 5.4 19.5 FED VIA XFMR T-12 (30 KVA) 40
37 PANEL LIT ** ** 50 29.4 8.1 A 4.2 15.2 50 * * (E) PANEL EML 38
35 2.1 0.6 C BUSSED SPACE 36
33 2.1 0.6 B BUSSED SPACE 34
31 ELEVATOR SUMP PUMP SP-1 3/4 12 15 2.1 0.6 A BUSSED SPACE 32
29 C BUSSED SPACE 30
27 B BUSSED SPACE 28
25 SPARE 20 A BUSSED SPACE 26
23 C 1.0 3.7 20 12 3/4 (E) EXIT/EMERG LTG 24
21 B BUSSED SPACE 22
19 SPARE 20 A BUSSED SPACE 20
17 SHUNT TRIP CKT BKR C 0.7 2.5 20 12 3/4 (E) LTG CTRLS 18
15 B 0.1 0.5 20 12 3/4 (E) OUTSIDE BOLLARD LIGHTS 16
13 A 0.2 0.6 20 12 3/4 (E) OUTSIDE BOLLARD LIGHTS 14
11 SPARE 20 C 1.4 5.0 20 12 3/4 (E) LIGHTING BASEMENT 12
9 (E) LIGHTING BASEMENT 3/4 12 20 10.1 2.8 B 0.8 2.8 20 12 3/4 (E) LIGHTING EXTERIOR 10
7 (E) LIGHTING BASEMENT 3/4 12 20 8.3 2.3 A 1.6 5.9 20 12 3/4 (E) LIGHTING BASEMENT 8
5 (E) LIGHTING BASEMENT 3/4 12 20 9.7 2.7 C 2.2 7.9 20 12 3/4 (E) LIGHTING BASEMENT 6
3 (E) LIGHTING 1ST FLR 3/4 12 20 12.1 3.3 B 2.9 10.4 20 12 3/4 (E) LIGHTING 1ST FLR 4
1 (E) LIGHTING 1ST FLR 3/4 12 20 10.6 2.9 A 3.9 14.0 20 12 3/4 (E) LIGHTING 1ST FLR 2
NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.
CKT. COND WIRE BKR BKR WIRE COND CKT.
250 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC SURFACE MOUNTED
EXISTING PANEL EMH SCHEDULE
5. PROVIDE RED LOCKING DEVICE FOR FIRE ALARM CIRCUITS.
REFER TO EP-605.
4. (**) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON ELECTRICAL RISER.
REFER TO EP-602.
3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.
2. USE EXISTING BREAKER FOR NEW CONNECTION.
1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.
PANELBOARD OPTIONS: PANELBOARD NOTES:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 35.0 B: 45.0 C: 26.0
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD) A: 35.0 B: 45.0 C: 26.0
23 MANHOLE SUMP PUMP (NOTE 2) 3/4 12 20 1.5 0.2 C 20 SPARE (NOTE 2) 24
21 EXTERIOR LTG CONTROLS (NOTE 2) 3/4 12 20 1.5 0.2 B 1.8 15.0 20 12 3/4 EYE WASH ALARM (NOTE 2) 22
19 ELEV LIGHTS & GFCI 1ST FLR (NOTE 2) 3/4 12 20 3.0 0.4 A 1.2 10.0 20 12 3/4 LE-36 COMM/INTERCOM (NOTE 2) 20
17 ELEV PIT SUMP PUMP (NOTE 2) 3/4 12 20 10.0 1.2 C 20 SPARE (NOTE 2) 18
15 J-BOX ELEV CAB LIGHTS & REC (NOTE 2) 3/4 12 20 1.0 0.1 B 1.2 10.0 20 12 3/4 FACP SECURITY OFFICE (NOTE 5) 16
13 ELEV. PIT LIGHTS & GFCI (NOTE 2) 3/4 12 20 3.0 0.4 A 1.2 10.0 20 12 3/4 FACP BOOSTER (NOTE 5) 14
11 ELEV ROOM QUAD REC (NOTE 2) 3/4 12 20 3.0 0.4 C 1.2 10.0 20 12 3/4 FACP BOOSTER (NOTE 5) 12
9 XFMR ROOM QUAD REC (NOTE 2) 3/4 12 20 6.0 0.7 B 1.2 10.0 20 12 3/4 FACP (NOTE 5) 10
7 XFMR ROOM QUAD REC (NOTE 2) 3/4 12 20 6.0 0.7 A 0.2 1.5 20 12 3/4 FIRE ALARM SPRINKLER SOLENOID (NOTE 5) 8
5 SPARE (NOTE 2) 20 C 0.2 1.5 20 12 3/4 EXISTING ADV METERING SYSTEM (NOTE 2) 6
3 SPARE (NOTE 2) 20 B 0.2 1.5 20 12 3/4 DIESEL LEAK DETECTION SYSTEM (NOTE 2) 4
1 SPARE (NOTE 2) 20 A 0.2 1.5 20 12 3/4 MOISTURE DETECTION SYSTEM (NOTE 2) 2
NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.
CKT. COND WIRE BKR BKR WIRE COND CKT.
100 AMP MCB 208Y/120 VOLTS 3PH, 4W, 60 HZ MIN. 10 KAIC SURFACE MOUNTED
EXISTING PANEL EML SCHEDULE
2. RELOCATE BREAKER FROM EXISTING PANEL HDP.
REFER TO EP-601.
1. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.
PANELBOARD OPTIONS: PANELBOARD NOTES:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 122.7 B: 122.7 C: 122.7
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD) A: 122.7 B: 122.7 C: 122.7
41 BUSSED SPACE C BUSSED SPACE 42
39 BUSSED SPACE B BUSSED SPACE 40
37 BUSSED SPACE A BUSSED SPACE 38
35 BUSSED SPACE C BUSSED SPACE 36
33 BUSSED SPACE B BUSSED SPACE 34
31 BUSSED SPACE A BUSSED SPACE 32
29 21.0 5.8 C BUSSED SPACE 30
27 P1-B HEATING WATER PUMP 15HP * * 30 21.0 5.8 B BUSSED SPACE 28
25 21.0 5.8 A BUSSED SPACE 26
23 21.0 5.8 C 3.1 11.0 24
21 P1-A HEATING WATER PUMP 15HP * * 30 21.0 5.8 B 3.1 11.0 15 * * GP-2 GLYCOL PUMP 7.5HP 22
19 21.0 5.8 A 3.1 11.0 20
17 11.0 3.1 C 3.1 11.0 18
15 GP-4 GLYCOL PUMP 7.5HP * * 15 11.0 3.1 B 3.1 11.0 15 * * GP-1 GLYCOL PUMP 7.5HP 16
13 11.0 3.1 A 3.1 11.0 14
11 11.0 3.1 C 1.3 4.8 12
9 GP-3 GLYCOL PUMP 7.5HP * * 15 11.0 3.1 B 1.3 4.8 15 * * 10
7 11.0 3.1 A 1.3 4.8 VF-4 3HP 8
5 27.1 7.5 C 1.3 4.8 6
3 HV-2 20HP BASEMENT * * 40 27.1 7.5 B 1.3 4.8 15 * * 4
1 27.1 7.5 A 1.3 4.8 VF-3 3HP 2
NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.
CKT. COND WIRE BKR BKR WIRE COND CKT.
200 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 10 KAIC SURFACE MOUNTED
NEW PANEL HD2 SCHEDULE
REFER TO EP-605.
6. (**) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON ELECTRICAL RISER.
REFER TO EP-601.
5. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.
4. PROVIDE NEW BREAKER. BREAKER TYPE AND AIC RATING SHALL MATCH EXISTING.
3. RELOCATE BREAKER FROM EXISTING PANEL HLE.
2. USE EXISTING BREAKER FOR NEW CONNECTION.
1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.
PANELBOARD OPTIONS: PANELBOARD NOTES:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 458.0 B: 458.0 C: 452.6
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD) A: 458.0 B: 458.0 C: 452.6
83 2.1 0.6 C 15.0 54.2 84
81 45-REF-3 1 HP ROOF * * 15 2.1 0.6 B 15.0 54.2 (NOTE 4) 82
79 2.1 0.6 A 15.0 54.2 70 * * P-EWH-1 WATER HEATER BASEMENT 80
77 9.6 2.7 C BUSSED SPACE 78
75 12 TON OUTSIDE BASEMENT 9.6 2.7 B 1.5 5.4 20 12 3/4 (E) HEAT TRACE 76
73 VRFHP-ELECTRIC-B * * 15 9.6 2.7 A 1.5 5.4 20 12 3/4 (E) HEAT TRACE 74
71 9.6 2.7 C 2.1 7.6 72
69 12 TON OUTSIDE BASEMENT 9.6 2.7 B 2.1 7.6 15 * * RF-2 RETURN FAN 5HP 70
67 VRFHP-ELECTRIC-A * * 15 9.6 2.7 A 2.1 7.6 68
65 OUTSIDE BASEMENT 20.9 5.8 C 1.4 4.9 66
63 (E) VRFHRU-1 22 TON * * 20.9 5.8 B 1.4 4.9 15 * * RF-1 RETURN FAN 3HP 64
61 25 20.9 5.8 A 1.4 4.9 62
59 OUTSIDE BASEMENT 20.9 5.8 C 3.0 10.8 60
57 (E) VRFHRU-1 22 TON * * 20.9 5.8 B 3.0 10.8 20 12 3/4 (E) PP-4 WELL BOOSTER PUMP 7.5HP 58
55 25 20.9 5.8 A 3.0 10.8 56
53 3.4 0.9 C 1.4 5.1 54
51 45-REF-2B 2HP * * 15 3.4 0.9 B 1.4 5.1 15 12 3/4 (E) DOCK LEVELERS SOIL SIDE 52
49 3.4 0.9 A 1.4 5.1 50
47 3.4 0.9 C 1.4 5.1 48
45 45-REF-2A 2HP * * 15 3.4 0.9 B 1.4 5.1 15 12 3/4 (E) DOCK LEVELERS SOIL SIDE 46
43 3.4 0.9 A 1.4 5.1 44
41 C 1.4 5.1 42
39 (E) TVSS 1/2 10 30 B 1.4 5.1 15 12 3/4 (E) DOCK LEVELERS CLEAN SIDE 40
37 A 1.4 5.1 38
35 77.0 21.3 C 1.4 5.1 36
33 ELEVATOR (NOTE 3) 2 3/0 200 77.0 21.3 B 1.4 5.1 15 12 3/4 (E) DOCK LEVELERS CLEAN SIDE 34
31 77.0 21.3 A 1.4 5.1 32
29 16.0 4.4 C 0.9 3.4 30
27 (E) VRFHRU-2 6 TON ROOF 3/4 12 20 16.0 4.4 B 0.9 3.4 15 * * 45-REF-1B 2HP 28
25 16.0 4.4 A 0.9 3.4 26
23 7.6 2.1 C 0.9 3.4 24
21 (E) HV-4 5HP BASEMENT 3/4 12 15 7.6 2.1 B 0.9 3.4 15 * * 45-REF-1A 2HP 22
19 7.6 2.1 A 0.9 3.4 20
17 7.6 2.1 C 2.1 7.6 18
15 (E) HV-3 5HP BASEMENT 3/4 12 15 7.6 2.1 B 2.1 7.6 15 * * 45-CP-1 5HP (NOTE 2) 16
13 7.6 2.1 A 2.1 7.6 14
11 122.7 34.0 C 2.7 9.6 12
9 122.7 34.0 B 2.7 9.6 15 * * VRFHP-1B 16 TON ROOF 10
7 PANEL HD2 ** ** 200 122.7 34.0 A 2.7 9.6 8
5 14.1 3.9 C 4.4 16.0 6
3 (E) HV-1 10HP BASEMENT * * 20 14.1 3.9 B 4.4 16.0 25 * * VRFHP-1A 16 TON ROOF 4
1 14.1 3.9 A 4.4 16.0 2
NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.
CKT. COND WIRE BKR BKR WIRE COND CKT.
600 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC SURFACE MOUNTED
EXISTING PANEL HDP SCHEDULE
4. PROVIDE NEW BREAKER. BREAKER TYPE AND AIC RATING SHALL MATCH EXISTING PANEL.
REFER TO EP-601, EP-602, AND EP-603.
3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.
2. USE EXISTING BREAKER FOR NEW CONNECTION.
1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.
PANELBOARD OPTIONS: PANELBOARD NOTES:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 720.8 B: 720.8 C: 720.8
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD) A: 720.8 B: 720.8 C: 720.8
89 BUSSED SPACE C BUSSED SPACE 90
87 BUSSED SPACE B BUSSED SPACE 88
85 BUSSED SPACE A BUSSED SPACE 86
83 21.0 5.8 C 84
81 (NOTE 5) 21.0 5.8 B 82
79 BLOW DOWN SYSTEM SONIC AIRE FANS 3/4 10 30 21.0 5.8 A 25 SPARE 80
77 (NOTE 2) 15.0 54.0 C 78
75 CIRCULATING PUMPS/HEAT EXCHANGER 15.0 54.0 B 76
73 LE-39.3.1 WATER HEATING * * 25 15.0 54.0 A 25 SPARE 74
71 (NOTE 2) 46.2 12.8 C 72
69 AND CONDITIONING TUMBLER 46.2 12.8 B 70
67 LE-13 400/500LB GAS DRYING * * 80 46.2 12.8 A 20 SPARE 68
65 C 8.9 32.0 66
63 B 8.9 32.0 SYSTEM (NOTE 5) 64
61 A 8.9 32.0 40 * * LE-39.1 WASTEWATER HEAT RECOVERY 62
59 48.0 13.3 C 10.9 39.4 (NOTE 2) 60
57 (NOTE 2) 48.0 13.3 B 10.9 39.4 SYSTEM 58
55 LE-40 AIR COMPRESSOR * * 90 48.0 13.3 A 10.9 39.4 60 * * LE-39.4 TUNNEL RECOVERY & FILTERING 56
53 48.0 13.3 C 10.9 39.4 (NOTE 2) 54
51 (NOTE 2) 48.0 13.3 B 10.9 39.4 SYSTEM 52
49 LE-40 AIR COMPRESSOR * * 90 48.0 13.3 A 10.9 39.4 60 * * LE-39.4 TUNNEL RECOVERY & FILTERING 50
47 (NOTE 2) 24.0 6.6 C 48
45 WASHER DRYER 24.0 6.6 B 46
43 LE-31 SEMI AUTOMATIC CART * * 40 24.0 6.6 A 225 SPARE (NOTE 2) 44
41 27.1 7.5 C 15.0 54.2 (NOTE 2) 42
39 (NOTE 2) 27.1 7.5 B 15.0 54.2 FED VIA XFMR XFMR-LLE (45 KVA) 40
37 LE-38 CENTRAL VACUUM * * 60 27.1 7.5 A 15.0 54.2 70 (E) PANEL LLE 38
35 C 14.0 50.5 (NOTE 2) 36
33 B 14.0 50.5 PUMPING SYSTEM 34
31 (E) TVSS - - 30 A 14.0 50.5 80 * * LE-39.2 WATER STORAGE AND 32
29 (NOTE 2) 33.9 9.4 C 1.0 3.8 30
27 WASHER EXTRACTOR 33.9 9.4 B 1.0 3.8 (NOTE 2) 28
25 LE-12 300/400LB PASS THROUGH * * 70 33.9 9.4 A 1.0 3.8 15 * * LE-28 CLEAN TAKE AWAY CONVEYOR 26
23 CONVEYOR SYSTEM (NOTE 2) 7.6 2.1 C 2.4 8.7 (NOTE 2) 24
21 UNLOADING TAKE AWAY 7.6 2.1 B 2.4 8.7 WITH STACKER CONVEYOR 22
19 LE-11 CWES DRYER * * 15 7.6 2.1 A 2.4 8.7 15 * * LE-26 AUTO LARGE PIECES FOLDER 20
17 3.4 0.9 C 0.9 3.4 18
15 (NOTE 2) 3.4 0.9 B 0.9 3.4 (NOTE 2) 16
13 LE-9A DRYER BYPASS CONVEYOR * * 15 3.4 0.9 A 0.9 3.4 15 * * LE-25 CART DUMPER 14
11 3.4 0.9 C 0.9 3.4 (NOTE 2) 12
9 CONVEYOR (NOTE 2) 3.4 0.9 B 0.9 3.4 CONVEYOR SYSTEM 10
7 LE-9 TWO CAKE SHUTTLE * * 15 3.4 0.9 A 0.9 3.4 15 * * LE-23 CLEAN FLATWORK TAKEAWAY 8
5 21.0 5.8 C 2.1 7.6 (NOTE 2) 6
3 (NOTE 2) 21.0 5.8 B 2.1 7.6 EXTERNAL LINT COLLECTION 4
1 LE-2 SOIL STORAGE CONVEYOR * * 40 21.0 5.8 A 2.1 7.6 15 * * LE-14 WASTE MANAGED AUTO 2
NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.
CKT. COND WIRE BKR BKR WIRE COND CKT.
800 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC SURFACE MOUNTED
EXISTING PANEL HLE SCHEDULE
5. PROVIDE NEW BREAKER. BREAKER TYPE AND AIC RATING SHALL MATCH EXISTING PANEL.
REFERTO EP-605
4. (**) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON ELECTRICAL RISER.
REFER TO EP-602.
3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.
2. USE EXISTING BREAKER FOR NEW CONNECTION.
1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.
PANELBOARD OPTIONS: PANELBOARD NOTES:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 334.6 B: 341.3 C: 325.6
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD) A: 334.6 B: 341.3 C: 325.6
83 C 84
81 B 82
79 BUSSED SPACE A BUSSED SPACE 80
77 C 78
75 B 76
73 BUSSED SPACE A BUSSED SPACE 74
71 C 0.8 2.7 (NOTE 5) 72
69 B 1.5 5.5 FED VIA XFMR T-LTC (30 KVA) 70
67 BUSSED SPACE A 0.8 2.7 50 ** ** PANEL LTC 68
65 C 66
63 B 64
61 SPARE 15 A 15 SPARE 62
59 C 60
57 B 58
55 SPARE 15 A 80 SPARE 56
53 2.7 0.8 C 54
51 (NOTE 2) 2.7 0.8 B 52
49 LE-24 SMALL PIECE FOLDER * * 15 2.7 0.8 A 15 SPARE 50
47 2.7 0.8 C 0.9 3.4 48
45 (NOTE 2) 2.7 0.8 B 0.9 3.4 (NOTE 2) 46
43 LE-24 SMALL PIECE FOLDER * * 15 2.7 0.8 A 0.9 3.4 15 * * LE-4 TUNNEL LOADING CONVEYOR 44
41 C 2.5 9.0 (NOTE 2) 42
39 B 6.1 22.0 FED VIA XFMR XFMR-LTA (30 KVA) 40
37 BUSSED SPACE A 5.0 18.1 45 (E) PANEL LTA 38
35 (NOTE 2) 14.1 3.9 C 1.1 4.0 (NOTE 2) 36
33 EXTRACTOR 14.1 3.9 B 1.1 4.0 AND CONDITIONING TUMBLER 34
31 LE-21 80/100LB OPEN POCKET WASHER * * 25 14.1 3.9 A 1.1 4.0 15 * * LE-22 110/120LB GAS HEATED DRYING 32
29 (NOTE 2) 14.1 3.9 C 1.1 4.0 (NOTE 2) 30
27 EXTRACTOR 14.1 3.9 B 1.1 4.0 AND CONDITIONING TUMBLER 28
25 LE-21 80/100LB OPEN POCKET WASHER * * 25 14.1 3.9 A 1.1 4.0 15 * * LE-22 110/120LB GAS HEATED DRYING 26
23 (NOTE 2) 3.4 0.9 C 14.4 52.0 (NOTE 2) 24
21 CONVEYOR 3.4 0.9 B 14.4 52.0 IRONER 22
19 LE-8 SINGLE CAKE ELEVATOR * * 15 3.4 0.9 A 14.4 52.0 90 * * LE-19 STEAMLESS TWO ROLL FLATWORK 20
17 (NOTE 2) 65.0 18.0 C 0.9 3.4 (NOTE 2) 18
15 EXTRACTOR 65.0 18.0 B 0.9 3.4 THROUGH CWES DRYER 16
13 LE-6 SINGLE STAGE PRESS * * 100 65.0 18.0 A 0.9 3.4 80 * * LE-10 220/330LB GAS HEATED PASS 14
11 65.0 18.0 C 11.1 40.1 (NOTE 2) 12
9 (NOTE 2) 65.0 18.0 B 11.1 40.1 THROUGH CWES DRYER 10
7 LE-5 150LB TUNNEL WASHER * * 100 65.0 18.0 A 11.1 40.1 80 * * LE-10 220/330LB GAS HEATED PASS 8
5 C 11.1 40.1 (NOTE 2) 6
3 B 11.1 40.1 THROUGH CWES DRYER 4
1 (E) TVSS * * 30 A 11.1 40.1 80 * * LE-10 220/330LB GAS HEATED PASS 2
NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.
CKT. COND WIRE BKR BKR WIRE COND CKT.
600 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 65 KAIC SURFACE MOUNTED
EXISTING PANEL HTA SCHEDULE
5. PROVIDE NEW BREAKER. BREAKER TYPE AND AIC RATING SHALL MATCH EXISTING PANEL.
REFER TO EP-605.
4. (**) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON ELECTRICAL RISER.
REFER TO EP-602.
3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.
2. USE EXISTING BREAKER FOR NEW CONNECTION.
1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.
PANELBOARD OPTIONS: PANELBOARD NOTES:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 371.3 B: 372.1 C: 364.3
TOTAL AMPS (FEEDTHRU) A: B: C:
TOTAL AMPS (CONN. LOAD) A: 371.3 B: 372.1 C: 364.3
83 C 84
81 B 82
79 BUSSED SPACE A BUSSED SPACE 80
77 C 78
75 B 76
73 BUSSED SPACE A BUSSED SPACE 74
71 C 72
69 B 70
67 BUSSED SPACE A 15 SPARE 68
65 C 3.3 12.0 66
63 B 3.3 12.0 64
61 SPARE 15 A 3.3 12.0 15 (E) BLOCK HEATER GENERATOR #2 62
59 C 3.3 12.0 60
57 B 3.3 12.0 58
55 SPARE 15 A 3.3 12.0 15 (E) BLOCK HEATER GENERATOR #3 56
53 2.7 0.8 C 3.3 12.0 54
51 (NOTE 2) 2.7 0.8 B 3.3 12.0 52
49 LE-24 SMALL PIECE FOLDER * * 15 2.7 0.8 A 3.3 12.0 15 (E) BLOCK HEATER GENERATOR #1 50
47 2.7 0.8 C 0.9 3.4 48
45 (NOTE 2) 2.7 0.8 B 0.9 3.4 (NOTE 2) 46
43 LE-24 SMALL PIECE FOLDER * * 15 2.7 0.8 A 0.9 3.4 15 * * LE-4 TUNNEL LOADING CONVEYOR 44
41 5.5 1.5 C 2.5 9.0 42
39 FED VIA XFMR LTD-1 (30 KVA) 6.8 1.9 B 4.3 15.5 FED VIA XFMR LTB-1 (30 KVA) 40
37 PANEL LTD 1 6 50 12.9 3.6 A 2.4 8.7 45 ** ** (E) PANEL LTB 38
35 (NOTE 2) 14.1 3.9 C 1.1 4.0 (NOTE 2) 36
33 EXTRACTOR 14.1 3.9 B 1.1 4.0 AND CONDITIONING TUMBLER 34
31 LE-21 80/100LB OPEN POCKET WASHER * * 25 14.1 3.9 A 1.1 4.0 15 * * LE-22 110/120LB GAS HEATED DRYING 32
29 (NOTE 2) 14.1 3.9 C 1.1 4.0 (NOTE 2) 30
27 EXTRACTOR 14.1 3.9 B 1.1 4.0 AND CONDITIONING TUMBLER 28
25 LE-21 80/100LB OPEN POCKET WASHER * * 25 14.1 3.9 A 1.1 4.0 15 * * LE-22 110/120LB GAS HEATED DRYING 26
23 (NOTE 2) 3.4 0.9 C 14.4 52.0 (NOTE 2) 24
21 CONVEYOR 3.4 0.9 B 14.4 52.0 IRONER 22
19 LE-8 SINGLE CAKE ELEVATOR * * 15 3.4 0.9 A 14.4 52.0 90 * * LE-19 STEAMLESS TWO ROLL FLATWORK 20
17 (NOTE 2) 65.0 18.0 C 0.9 3.4 (NOTE 2) 18
15 EXTRACTOR 65.0 18.0 B 0.9 3.4 THROUGH CWES DRYER 16
13 LE-6 SINGLE STAGE PRESS * * 100 65.0 18.0 A 0.9 3.4 80 * * LE-10 220/330LB GAS HEATED PASS 14
11 65.0 18.0 C 11.1 40.1 (NOTE 2) 12
9 (NOTE 2) 65.0 18.0 B 11.1 40.1 THROUGH CWES DRYER 10
7 LE-5 150LB TUNNEL WASHER * * 100 65.0 18.0 A 11.1 40.1 80 * * LE-10 220/330LB GAS HEATED PASS 8
5 C 11.1 40.1 (NOTE 2) 6
3 B 11.1 40.1 THROUGH CWES DRYER 4
1 (E) TVSS * * 30 A 11.1 40.1 80 * * LE-10 220/330LB GAS HEATED PASS 2
NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.
CKT. COND WIRE BKR BKR WIRE COND CKT.
600 AMP MCB 480Y/277 VOLTS 3PH, 4W, 60 HZ MIN. 10 KAIC SURFACE MOUNTED
EXISTING PANEL HTB SCHEDULE
4. CIRCUIT NOT SHOWN ON PLANS. CONTRACTOR TO TRACE AND CONFIRM.
REFER TO EP-601.
3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.
2. USE EXISTING BREAKER FOR NEW CONNECTION.
1. PROVIDE WITH FEED-THRU LUGS. 1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.
PANELBOARD OPTIONS: PANELBOARD NOTES:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 234.1 B: 235.6 C: 227.6
TOTAL AMPS (FEEDTHRU) A: 114.6 B: 149.3 C: 134.7
TOTAL AMPS (CONN. LOAD) A: 119.5 B: 86.3 C: 92.8
49 BATHROOM (NOTE 4) 10.0 1.0 A 1.0 10.0 BATHROOM (NOTE 4) 50
47 (E) HAND DRYER 1ST FLOOR 3/4 12 20 10.0 1.0 C 1.0 10.0 20 12 1/2 (E) HAND DRYER 1ST FLOOR 48
45 BATHROOM (NOTE 4) 10.0 1.0 B 1.0 10.0 BATHROOM (NOTE 4) 46
43 (E) HAND DRYER 1ST FLOOR 3/4 12 20 10.0 1.0 A 1.0 10.0 20 12 1/2 (E) HAND DRYER 1ST FLOOR 44
41 SPARE (NOTE 4) 20 C 0.3 2.1 20 12 3/4 MOTORIZED DAMPERS 42
39 SPARE (NOTE 4) 20 B 20 SPARE 40
37 SPARE (NOTE 4) 20 A 20 SPARE 38
35 SPARE (NOTE 4) 20 C 0.7 6.0 20 12 3/4 (E) GEN. 1ST FL. RECEPTION RECS 36
33 SPARE (NOTE 4) 20 B 0.5 4.5 20 12 3/4 (E) GEN. 1ST FL. RECEPTION RECS 34
31 SPARE (NOTE 4) 20 A 0.9 7.5 20 12 3/4 (E) GEN. 1ST FL. OFFICE RECS 32
29 SPARE (NOTE 4) 20 C 0.7 6.0 20 12 3/4 (E) GEN. 1ST FL. OFFICE RECS 30
27 SPARE (NOTE 4) 20 B 0.9 7.5 20 12 3/4 (E) GEN. 1ST FL. OFFICE RECS 28
25 (E) HDTV CCTV MONITORS 3/4 12 20 4.5 0.5 A 0.9 7.5 20 12 3/4 (E) GEN. 1ST FL SUPERVISOR OFFICE REC 26
23 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 C 0.9 7.5 20 12 3/4 (E) GEN. 1ST FL SUPERVISOR OFFICE REC 24
21 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 B 0.4 3.0 20 12 3/4 (E) GEN. 1ST FL. BATHROOM RECS 22
19 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 A 0.7 6.0 20 12 3/4 (E) LOUNGE COUNTER HEIGHT GFCI QUAD 20
17 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 C 0.7 6.0 20 12 3/4 (E) LOUNGE COUNTER HEIGHT GFCI QUAD 18
15 SPARE 20 B 0.7 6.0 20 12 3/4 (E) LOUNGE COUNTER HEIGHT GFCI QUAD 16
13 SPARE 20 A 0.7 6.0 20 12 3/4 (E) LOUNGE COUNTER HEIGHT GFCI QUAD 14
11 MOTORIZED LOUVERS BASEMENT 3/4 12 20 5.0 0.6 C 0.8 6.2 20 12 3/4 (E) REFRIGERATOR LOUNGE 12
9 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 B 0.8 6.2 20 12 3/4 (E) REFRIGERATOR LOUNGE 10
7 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 A 1.4 11.7 20 12 3/4 (E) VENDING MACHINES LOUNGE 8
5 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 C 1.4 11.7 20 12 3/4 (E) VENDING MACHINES LOUNGE 6
3 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 B 1.4 11.7 20 12 3/4 (E) VENDING MACHINES LOUNGE 4
1 (E) Door @ 1/2 HP (NOTE 4) 3/4 12 20 10.0 1.2 A 1.4 11.7 20 12 3/4 (E) VENDING MACHINES LOUNGE 2
NO. LOAD DESCRIPTION SIZE SIZE TRIP AMPS KVA PH KVA AMPS TRIP SIZE SIZE LOAD DESCRIPTION NO.
CKT. COND WIRE BKR BKR WIRE COND CKT.
800 AMP MCB 208Y/120 VOLTS 3PH, 4W, 60 HZ MIN. 22 KAIC SURFACE MOUNTED
EXISTING PANEL LDP SECTION 1 SCHEDULE
4. CIRCUIT NOT SHOWN ON PLANS. CONTRACTOR TO TRACE AND CONFIRM.
REFER TO EP-601.
3. (*) INDICATES CONDUIT AND WIRE SIZES ARE SHOWN ON EQUIPMENT SCHEDULE.
2. USE EXISTING BREAKER FOR NEW CONNECTION.
1. PROVIDE WITH FEED-THRU LUGS. 1. BOLD (E) DENOTES KNOWN EXISTING CIRCUIT.
PANELBOARD OPTIONS: PANELBOARD NOTES:
TOTAL AMPS (CONN. LOAD + FEED-THRU) A: 114.6 B: 149.3 C: 134.7
TOTAL AMPS (FEEDTHRU) A: 49.1 B:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .