This document is an Amendment (0006) to Solicitation 36C24125R0008 for the Department of Veterans Affairs Network Contracting Office 1 at the Central Western Massachusetts VAMC. The amendment updates project details for the 523A5-10-316 Upgrade VISN 1 Laundry Building 45 project, incorporating twelve new attachments including updated drawings, specifications, and a Request for Information (RFI) Questions and Answers document.
Key dates remain consistent: the site visit is scheduled for 7/28/2025 at 8:00 AM EDT (meeting outside Building 45), the RFI cut-off date is 8/4/2025 by 4:00 PM EDT, and the proposal submission deadline is 8/21/2025 at 4:00 PM EDT. The attachments include revised technical documents such as updated specifications for various building systems (plumbing, electrical, architectural, mechanical, structural), wage determinations, and technical drawings for the VA Brockton facility's laundry building upgrade project.
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-21-2025 523A5-10-316 00241 Department of Veterans Affairs Network Contracting Office 1 Central Western Massachusetts VAMC 421 North Main Street Leeds
MA
01053-9764 00241 Department of Veterans Affairs Network Contracting Office 1 Central Western Massachusetts VAMC 421 North Main Street Leeds
MA
01053-9764 To all Offerors/Bidders
36C24125R0008 04-17-2025
X X X Amendment 0006 is issued to provide the following:
1. Updated drawings, specifications, and attachments incorporated herein.
2. RFI Questions and Answers (attached). The RFI cut-off date remains 8/4/2025 by 4:00 PM EDT.
3. Site Visit remains 7/28/2025 at 8:00 AM EDT. Participants are to meet outside of Building 45 (see campus map attached to the solicitation).
4. Proposal due date remains 8/21/2025 at 4:00 PM EDT.
5. For reference there are a total of twelve (12) attachments incorporated in this amendment.
-----------------------------------------SEE ATTACHMENTS----------------------------------------------------------------
SEE ATTACHMENTS
See attached document: S06 RFI Questions and Answers 523A5-10-316 Upgrade VISN 1 Laundry Building 45.
See attached document: S06 WD MA20250012 07.18.2025.
See attached document: S06 2025-07-18 Addendum No. 2.
See attached document: S06 Updated Specifications 87100 R2.
See attached document: S06 Updated Specifications 000110.
See attached document: S06 Updated Specifications 085113.
See attached document: S06 Updated Drawings Plumbing Rev2 7-14-25.
See attached document: S06 Updated Drawings 250716 FP REV 2.
See attached document: S06 Updated Drawings 2224 VA Brockton REV 2 architectural.
See attached document: S06 Updated Drawings Mechanical Rev2.
See attached document: S06 Updated Drawings 10438_ELEC_REV2.
See attached document: S06 Updated Drawings 2025-07-18 VA Brockton B45 Laundry Structural Rev 2.