S02 Completion Instructions for 852.219-75 rev Jan 2023 Limitations on Subcontracting.docx

VAAR Clause Jan 2023 DOCX document 58 KB Posted

Attached to
Z1DA--36C26125R0071 | 36C261-25-AP-3702 | NRM 612A4-24-004
Solicitation number
36C26125R0071
Issued by

About this file

This document provides detailed instructions for completing the VAAR 852.219-75 Limitations on Subcontracting form for the VA contract opportunity. The instructions emphasize precise completion requirements, including matching the company name exactly as it appears in SAM.gov, ensuring the certification is signed by an authorized individual, and including the complete business name and address. Key compliance details include using the current version of the form without editing or reformatting, and submitting the entire clause as attached.

The instructions are specifically related to the VA solicitation (36C26125R0071) for a Power Upgrade project at McClellan Building 98 for the VA Northern California Health Care System. Contractors must provide comprehensive construction services, including all personnel, expertise, equipment, tools, materials, labor, and administrative support necessary for the power upgrade. The proposal response is due by 9:00 AM PDT on August 13, 2025, and must be submitted to Contracting Officer Jose Hernandez and Contract Specialist Nicole Renfrew.

View the file

Other versions and copies of VAAR 852.219-75

File Revision Posted Attached to
ATTACHMENT VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING - OCT 2026 - DEVIATON.docx Oct 2026 J063--Fire Alarm and Testing Inspection FY 2027 Services Procurement - 541 Engineering - VAMC CLEVELAND
Attachment VII VAAR 852.219-75 VA NOTICE OF LIMITATION ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE.docx Revision not stated Z2DA--FY27 NRM | 557-23-104 | Replace Boiler Plant Steam Boilers | Construction (VA-27-00003633)
Attachment VII VAAR 852.219-75 VA NOTICE OF LIMITATION ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE.docx Revision not stated Z2DA--FY27 NRM | 557-23-104 | Replace Boiler Plant Steam Boilers | Construction (VA-27-00003633)
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx Revision not stated Z2NE--FY26 INSPECTION OF WATER TANK SERVICES (B+OPT4)
D.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx Revision not stated J046--IDIQ | Deionization Water System Maintenance and Support
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.pdf Revision not stated Y1DA--Project620-22-110 Replace and Upgrade Fire alarm System at Montrose VAMC
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.pdf Revision not stated Y1DA--Project620-22-110 Replace and Upgrade Fire alarm System at Montrose VAMC
Attachment D - VAAR 852.219-75.pdf Revision not stated S206--Unarmed Security Guards at Sarasota National Cemetery
VAAR 852.219-75.pdf Revision not stated Z2NZ-- 658-23-108 Correct Stormwater Drainage
ATTACHMENT 4-VAAR 852.219-75 SDVOSB Certification-36C26227Q0062.pdf Revision not stated On-Site Document Destruction Services-Multi-Site
ATTACHMENT 4-VAAR 852.219-75 SDVOSB Certification-36C26227Q0074.pdf Revision not stated Surgical Laser Equipment Rental Services
ATTACHMENT 4-VAAR 852.219-75 SDVOSB Certification-36C26227Q0100.pdf Revision not stated Preventative Maintenance, Inspection, & Repair Services For Gov-Owned Fume Hoods/Equipment
VAAR 852.219-75.docx Revision not stated H945--Boiler Controls Inspection and Testing
ATTACHMENT II - VAAR 852.219-75.docx Revision not stated J012--Fire Suppression System Maintenance and
852.219-75 VA Notice of Limitations on Subcontracting_Certificate of Compliance for Services and Construction. .docx Revision not stated Z1DA--528A8-22-814 Consolidate Primary Care Reception
852.219-75 Attachment.docx Revision not stated H399--36C242-27-AP-0524| 528-27-1-6893-0009 Elevator Inspections, VA Medical Center (VAMC) & Bath VA Medical Center (VAMC)
Attachment IV - VAAR 852.219-75.pdf Revision not stated Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.
Attachment IV - VAAR 852.219-75.pdf Revision not stated Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.
VAAR 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.docx Revision not stated Radiant Heating Panel Replacement
VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING CERTIFICATE.docx Revision not stated F108--620-26-206 Asbestos Abatement
Show all 20

Who attaches VAAR 852.219-75

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions on compliant completion of VAAR 852.219-75, Jan 2023.

1. Offeror’s Name

0. Please go to SAM.gov and verify precisely how your firm’s name and address appear there.

0. When completing the attached VAAR 852.219-75 Limitations on Subcontracting, Jan 2023, please be sure to enter the name of your firm as it appears in SAM, this will be filled in three places on the certification, sample template snip shown below.

0. If your firm name as shown in SAM is “AAA Construction Corporation” please enter “AAA Construction Corporation”. Do not enter “AAA Construction Corp” or “AAA Construction”. Mirror name of firm and address on VAAR 852.219-75, Jan 2023, to info presented in SAM.

1. Printed Name and Title of Signee

1. Enter the printed name and job title of the signee.

1. Signature

2. The certification statement must be signed by an individual who is authorized to execute the certification on behalf of the offeror.

1. Date

3. The certification must be properly dated.

1. Company Name and Address

4. The certification must include the signee’s complete business name and address.

4. Mirror name of firm and address on VAAR 852.219-75, Jan 2023, to info presented in SAM.

1. Please complete and return the entire VAAR 852.219-75, Jan 2023, attached, not just the bottom section with the signature.

1. Please do not edit or reformat the VAAR 852.219-75, Jan 2023.

1. Please complete and return the current VAAR 852.219-75, Jan 2023, attached, not another copy or version.

Snip below is a snapshot template of only the bottom section of VAAR 852.219-75, Jan 2023 to assist in compliant completion. However, please complete and return the entire clause as attached.

Sample Filled Clause image1.png

File details come from the government source that posted it. Updated .