S02 B98 Generator Installation Drawings Rev1.pdf
PDF 9 MB Posted
- Solicitation number
- 36C26125R0071
About this file
These are construction documents for a generator relocation and power upgrade project at the VA Northern California Health Care System's McClellan Building 98, located in McClellan Park, CA. The detailed electrical and mechanical drawings specify the relocation of an existing 725kW Caterpillar generator from Mather VAMC to McClellan VAMC, including installing a new 1600A automatic transfer switch, SMUD-compliant metering switchboard, underground electrical conduits, and a new 5,000-gallon fuel oil tank with associated pumping and monitoring systems.
The comprehensive drawings include site plans, electrical one-line diagrams, control details, and mechanical equipment specifications that outline a complex power system upgrade. Key requirements include seismic bracing per VA design requirements, integration with the building's automation system, selective coordination of electrical protective devices, and configuring a Johnson Controls Metasys controller to monitor generator, utility power, and fuel oil system parameters. The project involves extensive electrical and mechanical work to ensure a reliable emergency power backup system that meets NFPA 110 standards and VA engineering specifications.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le P at h
6/
/2
:3 9:
P
M
CONSTRUCTION
DOCUMENTS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
06/21/2023Revisions: Date:
C-508-19-102
McCLELLAN VAMC, 5342 DUDLEY BLVD McCLELLAN PARK, CA 95652
NORTH ARROW
248 Copeland Street Quincy, MA 02169
(617) 481.6390
RELOCATION OF EXISTING 725kW GENERATOR TO McLELLAN VAMC
BUILDING 98
Office of Construction and Facilities Management
CONSULTANT
JPK AH
ELECTRICAL - SYMBOLS,
NOTES, & DETAILS
NP EP
L
MANUAL
BYPASS
NP EP
MANUAL
BYPASS
ATS WITH
MANUAL
BYPASS AND
DRAWOUT
SECTION
ATS WITH
MANUAL
BYPASS AND
DRAWOUT
SECTION
AUTOMATIC TRANSFER SWITCHES
UTILITY METERS
INSTRUMENT METER
SUBSCRIPTS & ABBREVIATIONS
AFCI - ARC FAULT CIRCUIT INTERRUPTER
AIC - AMPERES INTERRUPTING CAPACITY
C/B - CIRCUIT BREAKER
CO - ELECTRICAL METALLIC TUBING (EMT)
C - RMC OR STEEL EMT
CP - CONTROL PANEL
CTE - CONNECT TO EXISTING (SPLICE) WITH ALL ADDITIONAL
NECESSARY CONDUIT,CONDUCTOR, JUNCTION BOXES,
RACEWAY FITTINGS, ETC... MATERIALS FOR THE CONNECTION
DEMO - REMOVE EXISTING DEVICE
DISC - DISCONNECT
E - EXISTING TO REMAIN
EC - ELECTRICAL CONTRACTOR
EP- EMERGENCY POWER
EX- REMOVE EXISTING
EMT - (STEEL) ELECTRICAL METALLIC TUBING
ER - RELOCATE EXISTING
EST- ESTIMATED
ETR - EXISTING TO REMAIN
EUG - ELECTRICAL UNDER-GROUND
FD- FUSED DISCONNECT
GFI - GROUND FAULT INTERRUPTER
GFIC - GROUND FAULT INTERRUPTER
HOA - HANDS OFF AUTO
IG - ISOLATED GROUND
IMC - INTERMEDIATE METAL CONDUIT
kAIC - KILO-AMPERES INTERRUPTING CAPACITY
MCCB - MAIN CIRCUIT BREAKER
MS - MOTOR STARTER
N - NEW DEVICE
NEMA - NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NP - NORMAL POWER
NTS - NOT TO SCALE
QTY - QUANTITY
REC - RECEPTACLE
RECEP- RECEPTACLE
RMC - RIGID METALLIC CONDUIT
SCA - SHORT CIRCUIT AMPERES
SPD - SURGE PROTECTION DEVICE
SW - SWITCH
TC - TIME CLOCK
TD - TIME DELAY
UL- UNDERWRITERS LABORATORIES
UNO - UNLESS NOTED OTHERWISE
UON - UNLESS OTHERWISE NOTED
WP - WEATHER PROOF
NEMA MOTOR STARTER, SIZE ON PLANS
M
JB
NEMA 3R 200A FUSED DISCONNECT SWITCH,
EMERGENCY POWER PANELBOARD, SURFACE MOUNTED
SWITCH, SINGLE POLE
PANELBOARD, SURFACE MOUNTED
PANELBOARD, FLUSH MOUNTED
JUNCTION BOX, DIMENSIONS AS SHOWN
NEMA 3R 200A DISCONNECT SWITCH,
MOTOR, FAN OR PUMP AS NOTED
METER, KWH, CHECK.
NEMA 3R
3P,240V
WITH 175A FUSES, 3-POLE, 240V
3P,240V
NEMA 3R 200
3-POLE, 240V
400A,3P ELECTRICAL PANELBOARD WITH MAIN CIRCUIT
BREAKER. PANEL AMPACITY, VOLTAGE, WIRING
CONFIGURATION AND NAMING DESIGNATION AS
NOTED.
NEMA
3R
ELECTRICAL FUSED DISCONNECT WITH AMPACITY,
VOLTAGE, WIRING CONFIGURATION AND NAMING
DESIGNATION AS NOTED. SEE SPECIFICATIONS BELOW
FOR FURTHER INFORMATION.
ELECTRICAL UTILITY METER. UTILITY METER
AMPACITY, VOLTAGE, WIRING CONFIGURATION AND
NAMING DESIGNATION AS NOTED, EXACT MODEL AND
TYPE SHALL BE PER ELECTRICAL UTILITY
REQUIREMENTS.
ELECTRICAL FEEDERS RACEWAY AND CONDUCTOR.
USE STEEL ELECTRICAL METALLIC TUBING, UNO FOR
RACEWAYS WITH HANGERS PER ELECTRICAL CODE.
USE 600V XHHW-2 COPPER CONDUCTOR RATED AT 75F
ABOVE 100A AND COPPER CONDUCTOR RATED AT 60F
BELOW 100A.
ELECTRICAL TRANSFORMER POWER, VOLTAGE
(PRIMARY/SECONDARY), AND NAMING DESIGNATION
AS NOTED, PROVIDE HIGH EFFICIENCY "TP1"
TRANSFORMER TO MEET STATE ENERGY CODE.
M
ELECTRICAL SYSTEM GROUND CONSISTING OF ONE 8'
LONG 34"DIAMETER GROUND ROD
AND DEDICATED #3/0-Cu GROUNDING ELECTRODE
CONDUCTOR IN 1" EMT CONDUIT BONDED TO WITHIN 5'
OF WATER SERVICE ENTRANCE.
CLASS T BUSSMAN
C.L. FUSES
480V, 3P,4W
3-POLE 400A
TH01
480/277V 400A 3P, 4W
400A 3P,4W
4#1-Cu,1#6-Cu IN 1-1/2"C
ACCORDING TO THE VA ELECTRICAL DESIGN MANUAL AND VA MASTER SPECIFICATION SECTION 26 05 73, THE NEW 1600A 480Y/277V STANDBY GENERATOR BACKUP SYSTEM WILL REQUIRE THAT THE CONTRACTOR SATISFY SOME BASIC ELECTRICAL CODE AND PERFORM SOME INVESTIGATIONS AND TESTS, DESCRIBED BELOW. THE CONTRACTOR SHALL FIRST PREPARE AND SUBMIT A PHASING PLAN FOR VA REVIEW. A SAMPLE PHASING PLAN IS INCLUDED ON SHEET ES100. THE CONTRACTOR SHALL RELOCATE AN EXISTING 725KW 480Y/277V GENERATOR FROM MATHER VAMC TO MCLELLAN VAMC FOR BUILDING 98 STANDBY POWER. A NEW SMUD COMPLIANT 1600A, 480/277V NEMA 3R METERING SWITCHBOARD AND OUTDOOR 1600A, 480/277V NEMA 3R ATS IS REQUIRED FOR THE NEW STANDBY GENERATOR SYSTEM. SOME OF THE ADDITIONAL VA ELECTRICAL
DESIGN MANUAL, 2023 NFPA 70 AND PROJECT REQUIREMENTS ARE:
A. SELECTIVE COORDINATION AND STUDY – CONTRACTOR SHALL PERFORM A SELECTIVE COORDINATION STUDY FOR LOCALIZATION OF AN OVERCURRENT CONDITION TO RESTRICT OUTAGES TO THE CIRCUIT OR EQUIPMENT AFFECTED, ACCOMPLISHED BY THE SELECTION AND INSTALLATION OF OVERCURRENT PROTECTIVE DEVICES AND THEIR RATINGS OR SETTINGS FOR THE FULL RANGE OF AVAILABLE OVER CURRENTS, FROM OVERLOAD TO THE MAXIMUM AVAILABLE FAULT CURRENT, AND FOR THE FULL RANGE OF OVERCURRENT PROTECTIVE DEVICE OPENING TIMES ASSOCIATED WITH THOSE OVER CURRENTS. EXISTING MAIN SWITCHBOARD (MSB) DISTRIBUTION SHALL BE COORDINATED WITH ALL EXISTING TO REMAIN UPSTREAM AND DOWNSTREAM ELECTRICAL DISTRIBUTION.
B. SHORT-CIRCUIT RATINGS AND STUDY - CONTRACTOR SHALL PERFORM A SHORT-CIRCUIT STUDY TO DETERMINE THE PROSPECTIVE SYMMETRICAL FAULT CURRENTS AT THE NOMINAL VOLTAGE TO WHICH AN APPARATUS OR SYSTEM IS ABLE TO BE CONNECTED WITHOUT SUSTAINING DAMAGE EXCEEDING DEFINED ACCEPTANCE CRITERIA WITH ALL EXISTING TO REMAIN UPSTREAM AND DOWNSTREAM ELECTRICAL
DISTRIBUTION.
C. ARC-FLASH HAZARD WARNINGS AND STUDY - CONTRACTOR SHALL PERFORM A ARC-FLASH STUDY TO DETERMINE ELECTRICAL EQUIPMENT, SUCH AS SWITCHBOARDS, SWITCHGEAR, PANELBOARDS, INDUSTRIAL CONTROL PANELS, METER SOCKET ENCLOSURES, AND MOTOR CONTROL CENTERS, THAT IS IN OTHER THAN DWELLING UNITS, AND IS LIKELY TO REQUIRE EXAMINATION, ADJUSTMENT, SERVICING, OR MAINTENANCE WHILE ENERGIZED, SHALL BE FIELD OR FACTORY MARKED TO WARN QUALIFIED PERSONS OF POTENTIAL ELECTRIC ARC FLASH HAZARDS. THE MARKING SHALL MEET THE REQUIREMENTS IN NFPA 70 ARTICLE 110.21(B) AND SHALL BE LOCATED TO BE CLEARLY VISIBLE TO QUALIFIED PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING, OR MAINTENANCE OF THE EQUIPMENT.
D. THE REDESIGNED ELECTRICAL SERVICE ENTRANCE MUST MEET THE LOCAL UTILITY, SACRAMENTO MUNICIPAL UTILITY DISTRICT (SMUD) METERING REQUIREMENTS. FOR 1600A, 480Y/277V A SIEMENS NEMA 3R SWITCHBOARD CONFIGURED WITH HOT SEQUENCE METERING THAT IS SMUD AND EURSUC COMPLIANT IS NOTED IN THE DESIGN DOCUMENTS.
E. THE NEW 1600A, 480Y/277V, 3-PHASE, 4-WIRE GENERATOR STANDBY SYSTEM AND EXISTING 725KW 480Y/277V GENERATOR MODIFICATIONS PERFORMED BY THE CONTRACTOR MUST PROVIDE COMPLIANCE WITH THE SHORT-CIRCUIT RATINGS AND COORDINATION OF OVERCURRENT PROTECTION REQUIREMENTS OF THE VA ELECTRICAL DESIGN MANUAL OF APPLICABLE NFPA CODES SUCH AS 2023 NFPA 70 AND NFPA 110.
F. A NEW WEATHERPROOF NEMA 3R 1600A, 3-PHASE, 4-POLE AUTOMATIC TRANSFER SWITCH IS REQUIRED TO TRANSFER THE ENTIRE 1600A 480Y/277V TO THE EXISTING 725KW 480Y/277V GENERATOR.
G. EIGHT (8) 480Y/277V LARGE ELECTRICAL TIME-DELAY MOTOR STARTERS MUST BE USED TO LOAD STEP THE TRANSFORMER (X12 FLA INRUSH CURRENTS) AND MOTORS (X6 FLA INRUSH CURRENTS) SO AS NOT TO OVERWHELM (STALL) THE GENERATOR WITH INRUSH LOAD CURRENTS. THE LARGE MULTIPLE 480Y/277V LARGE ELECTRICAL CONTACTORS AND/OR MOTOR STARTERS WILL HAVE TO BE SEQUENCED SO THAT THEY
DO NOT OPERATE AT THE SAME TIME. THE SEQUENCING CAN BE ACCOMPLISHED THROUGH A COMBINATION USE OF TIMERS AND AUXILIARY CONTACTS SO AS TO HAVE THE CORRECT ORDER AND TIME DELAY IN
STARTING UP THE VARIOUS BUILDING LOADS.
H. THIS IS A STANDBY EMERGENCY ELECTRICAL SYSTEM FOR THE MCLELLAN BUILDING 98 CBOC WHOSE DESIGN AND INSTALLATION MUST COMPLY WITH ALL THE APPLICABLE CODE REFERENCES NOTED IN THIS
DOCUMENT PENDING ANY VARIANCES.
I. BUILDING SWITCHBOARD ELECTRICAL POWER MUST BE PROVIDED TO THE GENERATOR TRAILER FOR BOTH THE GENERATOR TRAILER SUCH AS LIGHTING, RECEPTACLES AND HEATING ALONG WITH GENERATOR SUPPORT FOR BATTERY CHARGERS, HEATERS, MONITORING, CONTROLS AND NEW FUEL OIL SYSTEM SUPPLY AND RETURN PUMPS.
J. REMOTE MONITORING AND CONTROL OF THE GENERATOR AND AUTOMATIC TRANSFER SWITCH WILL ALSO BE REQUIRED FROM INSIDE THE BUILDINGS MAIN ELECTRICAL ROOM FOR MAINTAINING DAY TANK DIESEL
TANK LEVEL, BATTERY CHARGE, ETC… AND REMOTE CONTROL OF THE GENERATOR SYSTEM.
K. A NEW 125A, 120/208V ELECTRICAL PANEL (98-G1) IS SHOWN ON THE PLANS TO PROVIDE POWER TO LOCAL GENERATOR LOADS SUCH AS BATTERY CHARGES AND UPGRADED FUEL OILS SYSTEM PUMPS.
L. THE EXISTING 725KW 480Y/277V CATERPILLAR GENERATOR WILL REQUIRE MANUFACTURER’S RECOMMENDED SERVICING AND COMMISSIONING TO BRING IT TO PROPER OPERATIONAL PERFORMANCE.
CONTRACTOR SHALL RECONDITION EXISTING 725KW 480Y/277V CATERPILLAR GENERATOR AND GENERATOR TRAILER PER CATERPILLAR MANUFACTURER'S RECOMMENDATIONS. CONTRACTOR SHALL CONTACT CATERPILLAR TO OBTAIN THE RECONDITIONING RECOMMENDATIONS AND INCLUDE ALL COSTS OF THE RECONDITIONING AND RELOCATION IN BID.
M. CONTRACTOR MUST PREPARE A WORK PHASING PLAN TO TIE INTO THE GENERATOR BACKUP POWER BEFORE HAVING TO CUT OVER INTO THE UTILITY UTILITY POWER SUPPLY. THE CUT OVER INTO THE UTILITY POWER SUPPLY IS THE CRITICAL PATH THAT MUST BE ACCOMPLISHED OVER A WEEKEND. THE PHASING PLAN AND METHOD OF PROCEDURE HAS TO BE APPROVED BY VA ENGINEERING AND ALL AFFECTED UTILITIES PRIOR TO ANY OTHER WORK BEING PERFORMED. A SIMPLIFIED PHASING PLAN HAS BEEN PREPARED ON SHEET ES-100 TO HELP INITIATE THE TASK.
PROJECT NARRATIVE AND WORK SCOPE REQUIREMENTS:
TRANSFORMER
TRANSFORMER
POTENTIAL
TRANSFORMER
INTERNAL CUBICLE WIRING
TERMINAL
INTERCONNECTING WIRING
FUSE
(INDIVIDUAL)
CIRCUIT BREAKER
CABLE #
OUTDOOR, WEATHERPROOF, GROUND FAULT INTERRUPTER
RECEPTACLE, DUPLEX NEMA 5-20R
E,TKMP2
T GM
EXISTING UTILITY
TRANSFORMER
SECONDARY
FEEDERS LIMIT OF
REMOVALS (EST)
EXISTING UTILITY
TRANSFORMER
PRIMARY (EST)
EXISTING CONDENSER
SUPPLY AND RETURN
WATER PIPING (EST)
EXISTING
UTILITY GAS
SUPPLY PIPING (EST)
EXISTING GAS AND
CHEMICAL STORAGE
CONTAINER
REMOVE EXISTING
UTILITY
TRANSFORMER
SECONDARY
FEEDERS (EST) CWR CWR CWR CWR CWR CWR
CWS CWS CWS CWS CWSCWS
GAS GAS GAS GAS
G
AS
G
AS
E,TKMP2
T
GAS GAS GAS GAS
CWR CWR CWR CWR CWR CWR
CWS CWS CWS CWS CWS CWS
GM
EXISTING UTILITY
TRANSFORMER
SECONDARY
FEEDERS LIMIT OF
REMOVALS (EST)
EUG
EXISTING UTILITY
TRANSFORMER
PRIMARY (EST)
EXISTING CONDENSER
SUPPLY AND RETURN
WATER PIPING (EST)
EXISTING
UTILITY GAS
SUPPLY PIPING (EST)
EXISTING GAS AND
CHEMICAL STORAGE
CONTAINER
REMOVE EXISTING
UTILITY
TRANSFORMER
SECONDARY
FEEDERS (EST)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le P at h
6/
/2
:3 9:
P
M
CONSTRUCTION
DOCUMENTS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
06/21/2023Revisions: Date:
C-508-19-102
McCLELLAN VAMC, 5342 DUDLEY BLVD McCLELLAN PARK, CA 95652
NORTH ARROW
248 Copeland Street Quincy, MA 02169
(617) 481.6390
RELOCATION OF EXISTING 725kW GENERATOR TO McLELLAN VAMC
BUILDING 98
Office of Construction and Facilities Management
CONSULTANT
JPK AH
ELECTRICAL - SITE
SELECTIVE REMOVALS PLAN
SCALE:
ELECTRICAL - AS-BUILT SITE PLAN EXISTING UNDERGROUND UTILITIES NEAR UTILITY TRANSFORMER
1/32"=1'-0"
EDS100
SCALE:
ELECTRICAL - ENLARGED AS-BUILT SITE PLAN EXISTING UNDERGROUND DISTRIBUTION
1/8"=1'-0"
ESD100
NOTES
1. SEE ELECTRICAL PLANS ED-100 AND
E-100 FOR MORE DETAILS.
2. CONTRACTOR SHALL FIELD DETERMINE
ALL EXISTING UNDERGROUND UTILITIES.
UTILITIES SHOWN ON THIS PLAN HAVE
NOT BEEN FIELD VERIFIED, AND MUST
BE FIELD VERIFIED BY CONTRACTOR.
CONTRACTOR IS TO ASSUME THAT THE
UNDERGROUND UTILITIES SHOWN ON
THE DRAWINGS ARE NOT ACCURATE
AND IS RESPONSIBLE TO DETERMINE
EXACT LOCATION AND DEPTH.
SCALE:
ELECTRICAL - PHOTO OF BUILDING 98 UTILITY TRANSFORMER AND SHIPPING/RECEIVING DRIVEWAY
NONE
ES-100
SCALE:
ELECTRICAL - PHOTO OF BUILDING 98 UTILITY EXITING SHIPPING/RECEIVING DRIVEWAY
NONE
ES-100
SCALE:
ELECTRICAL - PHOTO OF BUILDING 98 UTILITY ENTERING SHIPPING/RECEIVING DRIVEWAY
NONE
ES-100
3. CONTRACTOR SHALL CONDUCT A
GROUND PENETRATING RADAR (GPR)
AND UTILITY LOCATOR SURVEY TO
MARK OUT UNDERGROUND UTILITIES.
NEW TRENCHING WORK SHALL AVOID
GAS LINES AND OTHER UTILITIES. EC
AND GC SHALL PROVIDE SHOP
DRAWING SUBMITTALS SHOWING
EXISTING UNDERGROUND UTILITIES
AND THEIR PLAN FOR THE TRENCHING
PRIOR TO ANY EXCAVATIONS.
4. ALL WORK MUST BE COORDINATED
WITH VA TO AVOID INTERFERENCE WITH
LOADING DOCK.
5. PRIOR TO ANY NEW CONSTRUCTION
WORK CONTRACTOR SHALL SUBMIT A
PHASING PLAN TO CUT-OVER THE NEW
GENERATOR BACKUP SERVICE OVER A
WEEKEND. A SIMPLIFIED PHASING PLAN
TO ACHIEVE THIS GOAL HAS BEEN
PREPARED THAT THE CONTRACTOR
WILL MODIFY AND SUBMIT FOR
APPROVAL OF THE VETERANS AFFAIRS
ENGINEERING AT THE PROJECT
LOCATION ALONG WITH THE ELECTRIC
UTILITY AND ANY OTHER UTILITY
AFFECTED BY THIS WORK, SEE SHEET
ES-100. SUBMIT ALL APPROVALS TO THE
VETERANS AFFAIRS ENGINEERING AT
THE PROJECT LOCATION AS PART OF
THE AS-BUILT DOCUMENTATION.
KEYED NOTES
SURVEY AREA OF EXISTING UNDERGROUND
UTILITIES THAT CAN AFFECT THE NEW WORK,
SEE NOTE 4 ON THIS SHEET.
ESD100
UP
DEMO, EXISTING 1600A
UNDERGROUND
UTILITY FEEDERS;
SEE 2/E-100 FOR
CONTINUATION
T
E,TKMP2
5/ED100
PHOTO
M
REMOVE ALL EXISTING UTILITY METERING;
INCLUDING ALL INSTRUMENTS AND INSTRUMENT
METERING.
6/ED100
PHOTO
7/ED100
PHOTO
EXISTING UTILITY
TRANSFORMER
SECONDARY
FEEDERS LIMIT OF
REMOVALS
UP
APPROXIMATE
LOCATION
OF EXISTING 1600A
UNDERGROUND
UTILITY FEEDERS;
DEMO EXISTING
UTILITY FEEDERS.
E,HCP1
E,HCP2
3/ED100
PHOTO
4/ED100
PHOTO
1 E,98-L7
UP
UP
UP
DEMO, EXISTING 1600A
UNDERGROUND
UTILITY FEEDERS;
SEE 2/E-100 FOR
CONTINUATION
T
E,TKMP2
5/ED100
PHOTO
M
6/ED100
PHOTO
7/ED100
PHOTO
EXISTING UTILITY
TRANSFORMER
SECONDARY
FEEDERS LIMIT OF
REMOVALS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le P at h
6/
/2
:3 9:
P
M
CONSTRUCTION
DOCUMENTS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
06/21/2023Revisions: Date:
C-508-19-102
McCLELLAN VAMC, 5342 DUDLEY BLVD McCLELLAN PARK, CA 95652
NORTH ARROW
248 Copeland Street Quincy, MA 02169
(617) 481.6390
RELOCATION OF EXISTING 725kW GENERATOR TO McLELLAN VAMC
BUILDING 98
Office of Construction and Facilities Management
CONSULTANT
JPK AH
ELECTRICAL - BUILDING 98
SELECTIVE REMOVALS
POWER PLAN
SCALE:
ELECTRICAL - BUILDING 98 DEMO PLAN
1/8"=1'-0"
ED100
SCALE:
ELECTRICAL - BUILDING 98 PARTIAL BASEMENT
1/8"=1'-0"
E-100
SCALE:
ELECTRICAL - PHOTO OF BUILDING 98 PARTIAL EXISTING MSB
NONE
ED100
EXISTING UTILITY
FEEDER FROM
EXISTING UTILITY
TRANSFORMER
TO EXISTING MAIN
SWITCH BOARD
(MSB)
SCALE:
ELECTRICAL - PHOTO OF BUILDING 98 BASEMENT MAIN EL RM
NONE
ED100
SCALE:
ELECTRICAL - PHOTO OF BUILDING 98 UTILITY TRANSFORMER
NONE
ED100
REMOVE ALL
EXISTING UTILITY
METERING;
INCLUDING ALL
INSTRUMENTS AND
INSTRUMENT
METERING.
SCALE:
ELECTRICAL - KEY MAP OF BUILDING 98
1/64"=1'-0"
E-100
SCALE:
ELECTRICAL - PHOTO OF BUILDING 98 FROM UTILITY TRANSFORMER
NONE
ED100
SCALE:
ELECTRICAL - PHOTO OF BUILDING 98 FROM SHIPPING/RECEIVING
NONE
ED100
KEYED NOTES
CONTRACTOR SHALL REMOVE EXISTING
SERVICE ENTRANCE FEEDERS AND
OVERHEAD METAL PULLBOX INTO EXISTING
SWITCHBOARD MSB.
T
E,TKMP2
ER,GEN-98
GAS GAS GAS GAS
CWR CWR CWR CWR CWR CWR
CWS CWS CWS CWS CWS CWS
GM
EUG
EXISTING UTILITY
TRANSFORMER
PRIMARY (EST)
EXISTING CONDENSER
SUPPLY AND RETURN
WATER PIPING (EST)
EXISTING UTILITY
GAS SUPPLY
PIPING (EST)
EXISTING GAS AND
CHEMICAL STORAGE
CONTAINER
NEW,
CONCRETE
PULLBOX
NEW,
CONCRETE
PULLBOX
NEW CONCRETE PAD
RELOCATED GENERATOR
TRAILER
NEW FUEL TANK
4'
N,MSBD1PS
N,MSBD1MCB
N,ATS-98NEW,
CONCRETE
PULLBOX
NEW,
CONCRETE
PULLBOX
98-G1
98-GP1
NEW UNDERGROUND
DUCT BANK ENCASED
IN CONCRETE CONDUIT
RUNS. SEE SHEET E-100
FOR MORE DETAILED
INFORMATION.
NEW UNDERGROUND
DUCT BANK ENCASED
IN CONCRETE CONDUIT
RUNS. SEE SHEET E-100
FOR MORE DETAILED
INFORMATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le P at h
6/
/2
:3 9:
P
M
CONSTRUCTION
DOCUMENTS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
06/21/2023Revisions: Date:
C-508-19-102
McCLELLAN VAMC, 5342 DUDLEY BLVD McCLELLAN PARK, CA 95652
NORTH ARROW
248 Copeland Street Quincy, MA 02169
(617) 481.6390
RELOCATION OF EXISTING 725kW GENERATOR TO McLELLAN VAMC
BUILDING 98
Office of Construction and Facilities Management
CONSULTANT
JPK AH
ELECTRICAL - NEW WORK
SITE PLAN
SCALE:
ELECTRICAL - AS-BUILT SITE PLAN WITH EXISTING AND NEW ELECTRICAL WORK WITH UNDERGROUND UTILITIES AND NEW ELECTRICAL INSTALLATION
1/8"=1'-0"
ES-100
NOTES
1. CONTRACTOR SHALL CONDUCT A GROUND
PENETRATING RADAR (GPR) AND UTILITY LOCATOR
SURVEY TO MARK OUT UNDERGROUND UTILITIES.
NEW TRENCHING WORK SHALL AVOID GAS LINES AND
OTHER UTILITIES. EC AND GC SHALL PROVIDE SHOP
DRAWING SUBMITTALS SHOWING EXISTING
UNDERGROUND UTILITIES AND THEIR PLAN FOR THE
TRENCHING PRIOR TO ANY EXCAVATIONS.
SCALE: NONE
ES-100
SCALE:
ELECTRICAL - PHOTO OF GENERATOR TRAILER SHOWING WEATHER COVER OR GENERATOR TERMINALS.
NONE
ES-100
KEYED NOTES
ELECTRICAL CONTRACTOR SHALL
COORDINATE EXTENDING EXISTING UTILITY
SEPARATION WALL WITH GENERAL
CONTRACTOR, ALL OTHER TRADES, GAS AND
ELECTRIC UTILITIES TO PROVIDE THE CODE
REQUIRED SEPARATION BETWEEN GAS AND
ELECTRIC UTILITY EQUIPMENT. NATIONAL
ELECTRICAL SAFETY CODE REQUIRES AT
LEAST A 12" RADIAL DISTANCE BETWEEN
UTILITIES.
ES-100
ES-100
2. PRIOR TO ANY NEW CONSTRUCTION WORK
CONTRACTOR SHALL SUBMIT A PHASING PLAN TO
CUT-OVER THE NEW GENERATOR BACKUP SERVICE
OVER A WEEKEND. A SIMPLIFIED PHASING PLAN TO
ACHIEVE THIS GOAL HAS BEEN PREPARED THAT THE
CONTRACTOR WILL MODIFY AND SUBMIT FOR
APPROVAL OF THE VETERANS AFFAIRS ENGINEERING
AT THE PROJECT LOCATION ALONG WITH THE
ELECTRIC UTILITY AND ANY OTHER UTILITY AFFECTED
BY THIS WORK. SUBMIT ALL APPROVALS TO THE
VETERANS AFFAIRS ENGINEERING AT THE PROJECT
LOCATION AS PART OF THE AS-BUILT
DOCUMENTATION.
SIMPLIFIED WORK PHASING PLAN (SEE NOTE 2 ON THIS SHEET): INSTALLATION OF UNDERGROUND CONDUIT AND CABLE FOR GENERATOR BACKUP TO MATHER VAMC BUILDING 98
PROJECT OBJECTIVE:
THE OBJECTIVE OF THIS WORK PHASING PLAN IS TO GUIDE THE CONTRACTOR IN THE INSTALLATION OF NEW UNDERGROUND CONDUIT AND CABLE FOR THE AUTOMATIC TRANSFER SWITCH, METERING SWITCHBOARD, GENERATOR, AND EXISTING SWITCHBOARD. THE PLAN WILL OUTLINE THE NECESSARY STEPS TO BE TAKEN , INCLUDING THE USE OF UTILITY LOCATOR SURVEY EQUIPMENT AND GROUND PENETRATING RADAR TO ENSURE THE AVOIDANCE OF CONFLICTS WITH EXISTING UTILITIES AND CUT-OVER/TIE-INS OVER A WEEKEND (SEE PHASE 4).
PHASE 1: PREPARATORY STEPS
1.1) OBTAIN NECESSARY PERMITS: ENSURE ALL REQUIRED PERMITS AND APPROVALS ARE OBTAINED FROM THE RELEVANT AUTHORITIES AND UTILITIES TO PROCEED WITH THE INSTALLATION WORK.
1.2) REVIEW EXISTING UTILITY PLANS: OBTAIN EXISTING UTILITY PLANS AND CONDUCT A THOROUGH REVIEW TO IDENTIFY THE LOCATION OF EXISTING UTILITIES, SUCH AS POWER LINES, GAS LINES, WATER
LINES, AND TELECOMMUNICATION CABLES.
1.3) UTILITY LOCATOR SURVEY EQUIPMENT: ACQUIRE UTILITY LOCATOR SURVEY EQUIPMENT CAPABLE OF IDENTIFYING THE PRECISE LOCATION OF EXISTING UTILITIES. TRAIN THE RELEVANT PERSONNEL IN
THE PROPER USE OF THIS EQUIPMENT.
1.4) GROUND PENETRATING RADAR: SECURE GROUND PENETRATING RADAR EQUIPMENT TO ASSIST IN IDENTIFYING UNDERGROUND UTILITIES AND POTENTIAL CONFLICTS. TRAIN THE DESIGNATED TEAM
MEMBERS IN OPERATING THE RADAR EFFECTIVELY. PREPARE DETAILED SURVEY PLANS OF ALL DISCOVERED UNDERGROUND UTILITIES AND DISTRIBUTION.
PHASE 2: UTILITY LOCATING AND PLANNING
2.1) MARKING EXISTING UTILITIES: DEPLOY THE UTILITY LOCATOR SURVEY EQUIPMENT TO MARK THE PRECISE LOCATIONS OF EXISTING UTILITIES. USE APPROPRIATE MARKINGS, SUCH AS FLAGS AND PAINT, TO CLEARLY INDICATE THE UNDERGROUND UTILITIES' PATHS.
2.2) GROUND PENETRATING RADAR ASSESSMENT: CONDUCT A COMPREHENSIVE ASSESSMENT OF THE DESIGNATED INSTALLATION AREA USING GROUND PENETRATING RADAR TO IDENTIFY ANY ADDITIONAL
UTILITIES THAT MAY NOT BE COVERED BY EXISTING UTILITY PLANS.
2.3) CONFLICT IDENTIFICATION: ANALYZE THE UTILITY LOCATOR SURVEY AND GROUND PENETRATING RADAR DATA TO IDENTIFY POTENTIAL CONFLICTS BETWEEN THE PROPOSED INSTALLATION AND EXISTING
UTILITIES. MARK ANY AREAS OF CONCERN FOR FURTHER EVALUATION.
2.4) PLAN ADJUSTMENT: BASED ON THE IDENTIFIED CONFLICTS, ADJUST THE INSTALLATION PLAN AS NECESSARY. CONSIDER REROUTING THE CONDUIT AND CABLE PATHS TO AVOID CONFLICTS OR CONSULT
WITH UTILITY PROVIDERS FOR ALTERNATIVE SOLUTIONS.
PHASE 3: INSTALLATION
3.1) RECONDITION GENERATOR: CONTRACTOR SHALL RECONDITION GENERATOR AND GENERATOR TRAILER PER GENERATOR MANUFACTURERS RECOMMENDATIONS PRIOR TO PLACING IN SERVICE.
3.2) EXCAVATION AND TRENCHING: BEGIN EXCAVATION AND TRENCHING ACTIVITIES ACCORDING TO THE ADJUSTED INSTALLATION PLAN. ENSURE COMPLIANCE WITH LOCAL REGULATIONS AND SAFETY
STANDARDS DURING ALL EXCAVATION ACTIVITIES.
3.3) CONDUIT AND CABLE INSTALLATION: INSTALL THE NEW UNDERGROUND CONDUIT AND CABLE IN ACCORDANCE WITH THE APPROVED PLAN. IMPLEMENT APPROPRIATE GROUNDING TECHNIQUES AND CABLE
MANAGEMENT PRACTICES.
3.4) CONNECTION TO AUTOMATIC TRANSFER SWITCH, METERING SWITCHBOARD, AND GENERATOR: MAKE THE NECESSARY CONNECTIONS TO INTEGRATE THE NEW COMPONENTS WITH THE EXISTING
INFRASTRUCTURE. TEST THE CONNECTIONS FOR FUNCTIONALITY AND SAFETY.
3.5) VERIFICATION AND TESTING: CONDUCT THOROUGH TESTING AND VERIFICATION OF THE INSTALLED SYSTEM TO ENSURE IT OPERATES AS INTENDED. PERFORM INSULATION TESTS, CONTINUITY CHECKS, AND ANY OTHER REQUIRED TESTS TO VALIDATE THE INSTALLATION.
PHASE 4: ELECTRICAL SERVICE CUT-OVER AND MSB TIE-INS OVER A WEEKEND
4.1) OVER A WEEKEND INTERCEPT AND CUT-OVER EXISTING TRANSFORMER SECONDARY ONTO NEW ATS NORMAL POWER CONNECTION AND REMOVE EXISTING SWITCHBOARD TRANSFORMER CABLES AND
TIE INTO NEW ATS LOAD SIDE CABLES INTO EXISTING MAIN SWITCHBOARD (MSB).
DOCUMENTATION: DOCUMENT THE AS-BUILT DRAWINGS, INCLUDING THE PRECISE LOCATION OF THE INSTALLED CONDUIT AND CABLE, ALONG WITH ALL SURVEYED UNDERGROUND UTILITIES AND ANY RELEVANT SPECIFICATIONS, TEST RESULTS, AND SAFETY MEASURES IMPLEMENTED DURING THE INSTALLATION PROCESS.
PHASE 5: SITE CLEANUP AND COMPLETION
5.1) SITE RESTORATION: RESTORE THE EXCAVATION SITES TO THEIR ORIGINAL CONDITION, INCLUDING BACKFILLING AND COMPACTION OF SOIL, AS WELL AS REPAIRING ANY LANDSCAPING OR SURFACES
AFFECTED BY THE INSTALLATION WORK.
5.2) WASTE DISPOSAL: PROPERLY DISPOSE OF ANY WASTE MATERIALS GENERATED DURING THE INSTALLATION PROCESS, ENSURING COMPLIANCE WITH ENVIRONMENTAL REGULATIONS AND GUIDELINES.
5.3) FINAL INSPECTION: SCHEDULE A FINAL INSPECTION WITH THE RELEVANT AUTHORITIES OR CLIENTS TO ENSURE THE INSTALLATION MEETS ALL REQUIRED STANDARDS AND SPECIFICATIONS.
5.4) PROJECT HANDOVER: PROVIDE THE NECESSARY DOCUMENTATION, INCLUDING AS-BUILT DRAWINGS, TEST REPORTS, AND INSPECTION CERTIFICATES, TO THE CLIENT OR PROJECT OWNER FOR THEIR
RECORDS.
BY FOLLOWING THIS WORK PHASING PLAN, THE CONTRACTOR CAN EFFICIENTLY INSTALL THE NEW UNDERGROUND CONDUIT AND CABLE WHILE UTILIZING UTILITY LOCATOR SURVEY EQUIPMENT AND GROUND PENETRATING RADAR. PROVIDE ALL GENERATOR RECONDITIONING TESTS AND REPORTS TO THE VA AS PART OF THE AS-BUILT DOCUMENTATION.
3. CONTRACTOR SHALL RECONDITION GENERATOR
AND GENERATOR TRAILER PER GENERATOR
MANUFACTURERS RECOMMENDATIONS PRIOR TO
PLACING IN SERVICE. CONTRACTOR SHALL PERFORM
CIRCUIT BREAKER, CABLE, CABLE RACEWAY AND
GENERATOR TESTS PER ANSI/NETA MTS-2019
STANDARD FOR MAINTENANCE TESTING PRIOR TO
REUSE GENERATOR FOR BUILDING 98 AS AN
EMERGENCY POWER SUPPLY.
ELECTRICAL - PHOTO OF GENERATOR TERMINALS
THAT ARE UNDERNEATH THE WEATHER COVER
SCALE: NONE
ES-100
ELECTRICAL - NEW LOCATION FOR THE NEW
1600A ATS AND SMUD METERING SWITCHBOARD4. CONTRACTOR SHALL USE WATERTIGHT STEEL RIGID
METAL CONDUIT AND XHHW-2 COPPER CONDUCTOR
FROM UTILITY TRANSFORMER TO NEW SMUD UTILITY
COMPLIANT SIEMENS SB1 1600A NEMA 3R METERING
SWITCHBOARD. BURY CONDUITS 36" BELOW GRADE IN
CONCRETE DUCT BANK WITH ELECTRICAL WARNING
TAPE. SEE ONE-LINE DIAGRAM FOR COPPER 600V
XHHW-2 CONDUCTOR SIZES AND QUANTITIES.
5. ALL HORIZONTAL CONDUIT RUNS SHOW ARE NEW 4"
DIAMETER CONDUITS 36" BELOW GRADE IN CONCRETE
DUCT BANK WITH ELECTRICAL WARNING TAPE.
6. SACRAMENTO MUNICIPAL UTILITY DISTRICT (SMUD)
UNDERGROUND CONDUIT INSTALLATION
REQUIREMENTS ARE FROM THE UTILITY
TRANSFORMER TO NEW SMUD COMPLIANT METERING
SWITCHBOARD. THERE AFTER WATER TIGHT
SCHEDULE 40 PVC CONDUIT IN CEMENT ENCASED
DUCT BANK MAY BE USED INSTEAD OF RIGID METAL
CONDUIT. CEMENT DUCT BANK SHALL BE BURIED 36"
BELOW GRADE WITH ELECTRICAL WARNING TAPE
ABOVE. SEE ONE-LINE DIAGRAM FOR COPPER 600V
XHHW-2 CONDUCTOR SIZES AND QUANTITIES.
7. CONDUIT LAYOUT IS SHOWN DIAGRAMMATICALLY FOR
QUANTIFYING CONDUIT AND CONDUCTOR QUANTITIES.
ACTUAL INSTALLATION SHALL BE VERTICALLY STACKED
CONDUITS AND CONDUCTORS THAT ARE ROUTED
THROUGH THE ELECTRICAL DISTRIBUTION OPENINGS.
DELEGATED DESIGN DIRECTIVE FOR SEISMIC, WIND, LIVE AND DEAD LOAD BRACING OF PROJECTS ELECTRICAL EQUIPMENT AND ALL ASSOCIATED DISTRIBUTION
PROJECT TITLE: ELECTRICAL INSTALLATION COMPLIANCE WITH JULY 1, 2023 VA SEISMIC DESIGN REQUIREMENTS H-18-8 MANUAL, 2017 ASCE 41 AND 2022 ASCE 7 SEISMIC AND WIND BRACING REQUIREMENTS (SEE SPECIFICATION 130541 FOR ADDITIONAL INFORMATION)
1. SCOPE OF WORK
THE CONTRACTOR IS TO PERFORM THE INSTALLATION OF THE EQUIPMENT AND SYSTEMS SHOWN AS NEW WORK IN THIS PROJECT SUCH AS BUT NOT LIMITED TO:
● OUTDOOR NEMA 3R 1600A, 480/277V UTILITY METERING SWITCHBOARD (N,SWBD-98)
● 1600A 4-POLE 480/277V AUTOMATIC TRANSFER SWITCH (N,ATS-98)
● NEW OUTDOOR NEMA 3R 225A 120/208V ELECTRICAL PANEL (98-G1)
● RELOCATED 725KW 480/277V GENERATOR (ER,GEN-98)
● GENERATOR AND FUEL OIL SYSTEM REMOTE CONTROL AND MONITORING PANELS 98-GP1 AND 98-GP2 IN NEMA 3R ENCLOSURES
● NEW JOHNSON CONTROLS, INC. (JCI) METASYS CONTROL PANEL FOR BUILDING AUTOMATION SYSTEM (BAS) INTEGRATION
● UTILITY/GENERATOR SUB METERING PANEL 98-RM
● NEW 480V TO 120/208V CEILING/WALL HUNG 30kVA TRANSFORMER T-G
● STAGGERED GENERATOR LOADING MOTOR STARTERS 1 THROUGH 8
THE CONTRACTOR IS ALSO RESPONSIBLE FOR THE INSTALLATION OF ALL ASSOCIATED ELECTRICAL POWER, INSTRUMENTATION, AND CONTROL DISTRIBUTION CONDUIT AND WIRING.
ALL INSTALLATIONS ARE TO BE EXECUTED IN COMPLIANCE WITH 2023 VA SEISMIC DESIGN REQUIREMENTS H-18-8 MANUAL, 2017 ASCE 41 AND 2022 ASCE 7 SEISMIC AND WIND BRACING REQUIREMENTS.
2. DESIGN RESPONSIBILITY
THE DESIGN, DETAILING, AND DOCUMENTATION OF SEISMIC AND WIND BRACING FOR THE EQUIPMENT AND THE ASSOCIATED CONDUIT AND WIRING FALL UNDER THE RESPONSIBILITY OF THE CONTRACTOR AS A DELEGATED DESIGN TASK. THE CONTRACTOR SHALL ENGAGE A STRUCTURAL ENGINEER, LICENSED IN THE STATE WHERE THE WORK IS PERFORMED (CALIFORNIA), TO COMPLETE THE DELEGATED DESIGN.
3. SEISMIC AND WIND LOAD DESIGN
THE STRUCTURAL ENGINEER SHALL DESIGN THE SUPPORTS AND BRACING FOR THE EQUIPMENT, AS WELL AS THE CONDUIT AND WIRING, TO RESIST SEISMIC AND WIND FORCES IN ACCORDANCE WITH THE 2023 VA SEISMIC DESIGN REQUIREMENTS H-18-8 MANUAL AND 2022 ASCE 7. THIS INCLUDES THE DESIGN OF ANCHORAGE FOR THE EQUIPMENT, CONDUIT, WIRING, AND THEIR SUPPORT SYSTEMS TO THE STRUCTURE.
4. ELECTRICAL CONNECTIONS
ALL ELECTRICAL CONNECTIONS ARE TO BE TERMINATED WITH LIQUID-TIGHT FLEXIBLE METAL CONDUIT WITH AT LEAST 6 INCHES OF SLACK TO PROVIDE SEISMIC DISPLACEMENT FLEXIBILITY WITHOUT FAILURE. FLEXIBLE CONNECTIONS SHALL ALSO BE PROVIDED TO PULL AND JUNCTION BOXES.
5. DOCUMENTATION
THE CONTRACTOR SHALL PROVIDE THE FOLLOWING DOCUMENTATION:
● DETAILED CALCULATIONS DEMONSTRATING THAT THE PROPOSED SUPPORT AND BRACING SYSTEM COMPLIES WITH THE VA SEISMIC DESIGN REQUIREMENTS AND ASCE 7.
● DETAILED DRAWINGS SHOWING THE LAYOUT OF THE EQUIPMENT, THE DESIGN OF THE SUPPORT AND BRACING SYSTEM, THE ROUTING OF THE CONDUIT AND WIRING, AND THE CONNECTION DETAILS BETWEEN THE SUPPORT SYSTEMS AND THE STRUCTURE.
● QUALITY ASSURANCE
● THE CONTRACTOR IS RESPONSIBLE FOR THE QUALITY OF THE DELEGATED DESIGN. THE CONTRACTOR SHALL REVIEW AND APPROVE THE DESIGN DOCUMENTATION PRIOR TO SUBMISSION.
6. SUBMISSION
THE CONTRACTOR SHALL SUBMIT THE DESIGN DOCUMENTATION TO THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL.
7. INSTALLATION
THE CONTRACTOR SHALL INSTALL THE EQUIPMENT, CONDUIT, AND WIRING IN ACCORDANCE WITH THE APPROVED DESIGN DOCUMENTATION.
8. ALL NEW WORK SHALL BE SEISMICALLY BRACED AND
ALLOW FOR SEISMIC DISPLACEMENT PRE DELEGATED
DESIGN REQUIREMENTS NOTED ON THIS SHEET.
9. ALL ELECTRICAL CONNECTIONS SHALL BE WITH
LIQUID-TIGHT FLEXIBLE METAL CONDUIT AND ALL
CONDUCTOR TERMINATIONS SHALL HAVE AT LEAST 6"
OF SLACK FOR SEISMIC DISPLACEMENT.
NEW UNDERGROUND 1600A EMERGENCY ELECTRICAL FEEDER
4//4#600-CU,1#3/0-CU G IN 4"C RUN 24" UNDERGROUND
OUTDOORS IN CEMENT ENCASED ELECTRICAL DUCT BANK
WITH ELECTRICAL WARNING TAPE 12" ABOVE; ALSO SHOWN IS A
2" CONDUIT FOR ATS AND GENERATOR REMOTE MONITORING AND
A 4" CONDUIT FOR THE NEW ELECTRICAL PANEL IN THE GENERATOR
TRAILER.
NEW UNDERGROUND
CONDUCTOR
AND CONDUIT, SEE
ELECTRICAL ONE-LINE
DIAGRAM
UP
NEW SIEMENS SB1
SMUD COMPLIANT
METERING SWITCHBOARD
T
E,TKMP2
NEW,
CONCRETE
PULLBOX
ER,GEN-98
EXISTING GAS AND
CHEMICAL STORAGE
CONTAINER
NEW,
CONCRETE
PULLBOX
N,MSBD1PS
N,MSBD1MCB
NEW,
CONCRETE
PULLBOX
NEW,
CONCRETE
PULLBOX
N,ATS-98
NEW CONCRETE PAD
RELOCATED GENERATOR
TRAILER
NEW FUEL TANK
4'
AUTOMATIC FUEL OIL TRANSFER PUMP SKID
1HP,208/120V2P3W
SIMPLEX RETURN PUMP
1/3HP,208/120V2P3W
NEW UNDERGROUND
CONDUCTOR
AND CONDUIT, SEE
ELECTRICAL ONE-LINE
DIAGRAM
ATS-98 BATTERY CHARGER
1KVA,120V1P2W
GEN-98 BATTERY CHARGER
1KVA,120V1P2W
FUEL OIL LEAK DETECTION
0.1KVA,120V1P2W
AUTOMATIC FUEL OIL FILTRATION SET
1/2HP,120V1P2W
10 98-G1
98-G1-2,4
98-G1-1,3
98-GP1 98-G1-99
98-G1-7
NEW UNDERGROUND
CONDUCTOR
AND CONDUIT, SEE
ELECTRICAL ONE-LINE
DIAGRAM
N,98-RM-METERS
1KVA,120V1P2W
98-G1-11 #10
98-G1-5 #10
GFCI
98-G1-13 #10
GFCI
98-G1-6
98-G1-15
UP
APPROXIMATE
LOCATION
OF NEW 1600A
UNDERGROUND
UTILITY FEEDERS
INTO EXISTING 1600A
SWITCHBOARD,
98-PG1 POWER, ALARM
AND CONTROL
WIRING.
METAL
PULL-
BOXT
T-G
METAL
PULL-
BOX
98-GP28 9
N,JCI CP 13
98-RM14
MS#1
MS#2
MS#3 MS#4
MS#7
MS#5
MS#6
MS#8
PROVIDE A WATERTIGHT SEAL
TO THE PREVIOUS SERVICE ENTRANCE
AND A NEW SWITCHBOARD METAL
RACEWAY ENTRANCE INTO THE EXISTING
MSB SWITCHBOARD THROUGH THE NEW
METAL PULL-BOX SHOWN ON PLAN.
CONTRACTOR SHALL PROVIDE
A WATERTIGHT SEAL FOR ALL
CONDUIT PENETRATIONS
INTO BUILDING.
E,98-L7
E,98-L7-1917
E,98-L7-2117
E,HCP2
E,HCP1
CIRCUIT DESCRIPTION
LOAD
KVABKR
CKT
#KVA CIRCUIT DESCRIPTIONBKR#
LOADCKT
NOTE
NEUTRAL
BUS AMPS
VOLTSPanel AIC
MAIN BKR
LUGSFED FROM
MOUNTING
ROOM
STANDARD
10,000
208Y/120V 3P 4W
NEMA 3R ENCLOSURE MOUNTED ON STRUCTURAL STEEL STANCHION SUPPORTS
SURFACE98-G1 T-G 100%
a 21 20/2 20/21.92 0.864 b 43 | | c 1.181 20/120/15 6 a 87 20/1 20/31 0 b 109 20/1 |0.1 c1 |20/111 12 a 1413 20/1 20/10.18 0 b 1615 20/1 20/10.18 0 c 00 20/120/117 18 a 2019 20/1 20/10 0 b 2221 20/1 20/10 0 c 00 20/120/123 24 a 2625 20/1 20/10 0 b 2827 20/1 20/10 0 c 00 20/120/129 30 a 3231 20/1 20/10 0 b 3433 20/1 20/10 0 c 00 20/120/135 36 a 3837 20/1 20/10 0 b 4039 20/1 20/10 0 c 00 20/120/141 42
CONN
KVA
CONN
KVA
CALC
KVA
CALC
KVA
LARGEST MOTOR 1.92 0.48 (25%)
MOTORS 2.78 2.78 (100%)
RECEPTACLES 0.36 0.36 (50%>10)
NONCONTINUOUS 4.28 4.28 (100%)
TOTAL LOAD 7.9
BALANCED 3-PHASE LOAD 21.9 A
PHASE A 105%
PHASE B 72%
PHASE C 123%
AUTOMATIC FUEL OIL TRANSFER
PUMP SKID
ATS-98 BATTERY CHARGER
GEN-98 BATTERY CHARGER
FUEL OIL LEAK DETECTION
N,98-RM-METERS
GFCI RECEP.
GFCI RECEP.
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SIMPLEX RETURN PUMP
AUTOMATIC FUEL OIL FILTRATION
SET
GFCI CB; SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
FEEDER RACEWAY AND CONDUCTORS
NOTE
VOLTSROOM
CBCIRCUIT DESCRIPTION
LOAD KVA
CKT BREAKER
TRIP/POLES A
KVA
KW
PF
480Y/277V 3P 4W
CATERPILLAR,D150 C7.1,150kW Diesel Gen Set in Acoustical WP Enclosure
ER,GEN-98
906.25
0.8
(4)4"C,3#600kcmil,#600kcmil N,#4/0G2691600/31 269 269
TOTAL CONNECTED KVA BY PHASE 269269269
CONN KVA CONN KVA CALC KVACALC KVA
LARGEST MOTOR 150 37.5 (25%) MOTORS 153 153 (100%)
NONCONTINUOUS 654 654 (100%)
TOTAL LOAD 845
BALANCED 3-PHASE LOAD 1,020 A
TRANSFER SWITCH N,ATS-98
FEEDER RACEWAY AND CONDUCTORS
NOTE
VOLTS
FED FROM
MOUNTING
ROOM
CBCIRCUIT DESCRIPTION
LOAD KVA
CKT BREAKER
TRIP/POLES A
SIZE
AIC480Y/277V 3P 4W
EATON 1600A Service Entrance NEMA 3R ATS BIV9MGF31600XSU OR APPROVED EQUAL
SURFACE
N,ATS-98
E,TKMP2
65,000
ER,GEN-98
(4)4"C,3#600kcmil,#600kcmil N,#4/0G2691600/31 269 269
TOTAL CONNECTED KVA BY PHASE 269269269
CONN KVA CONN KVA CALC KVACALC KVA
LARGEST MOTOR 150 37.5 (25%) MOTORS 153 153 (100%)
NONCONTINUOUS 653 653 (100%)
TOTAL LOAD 844
BALANCED 3-PHASE LOAD 1,010 A
SWITCHBOARD E,MSB98
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le P at h
6/
/2
:3 9:
P
M
CONSTRUCTION
DOCUMENTS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
06/21/2023Revisions: Date:
C-508-19-102
McCLELLAN VAMC, 5342 DUDLEY BLVD McCLELLAN PARK, CA 95652
NORTH ARROW
248 Copeland Street Quincy, MA 02169
(617) 481.6390
RELOCATION OF EXISTING 725kW GENERATOR TO McLELLAN VAMC
BUILDING 98
Office of Construction and Facilities Management
CONSULTANT
JPK AH
SCALE:
ELECTRICAL - BUILDING 98 NEW WORK PLAN
1/8"=1'-0"
E-100
SCALE:
ELECTRICAL - BUILDING 98 BASEMENT NEW WORK PLAN
1/8"=1'-0"
E-100
KEYED NOTES
NEW UNDERGROUND ELECTRICAL CONDUITS
TO NEW 1600A ATS-98 AND GENERATOR
ER,GEN-98.
2 CONTRACTOR SHALL RELOCATE EXISTING
UTILITY METERING OFF TRANSFORMER
ENCLOSURE AND ONTO NEW SERVICE
ENTRANCE RATED SIEMENS SB1, 480Y/277V,
NEMA 3R, 2000A SWITCHBOARD; COORDINATE
EXACT LOCATION WITH SMUD ELECTRIC
UTILITY AND VA COR. COORDINATE ALL
INSTRUMENT WIRING, VOLTAGE AND
CURRENT INSTRUMENT TRANSFORMER
REQUIREMENTS WITH SMUD ELECTRIC
UTILITY.
3 CONTRACTOR SHALL INSTALL CONCRETE PAD
(SEE STRUCTURAL PLANS AND COORDINATE
WITH GC) THAT IS A MINIMUM OF 4" HEIGHT
ABOVE GROUND AND THAT EXTENDS 4"
BEYOND THE FOOTPRINT OF THE EQUIPMENT.
PROVIDE 10' STAINLESS STEEL 58" DIAMETER
GROUND RODS AT EACH CORNER AND
INTERCONNECT GROUND RODS WITH #4/0-Cu
BARE GROUND CONDUCTOR. BOND #4
GROUND CONDUCTOR TO ELECTRICAL
EQUIPMENT ENCLOSURE AND INTERNAL
GROUND TERMINATION ALONG WITH FEEDER
GROUNDS.
SCALE:
ELECTRICAL - PHOTO OF EXISTING SACRAMENTO 725kW 480Y/277V GENERATOR
NONE; SEE KEYED NOTE 4 ON THIS SHEET.
E-100
ELECTRICAL - BUILDING 98
NEW WORK POWER PLAN
4 CONTRACTOR SHALL RELOCATE EXISTING
725kW 480Y/277V GENERATOR LOCATED AT
VA MATHER VAMC TO NEW LOCATION.
CONTRACTOR SHALL PROVIDE GENERATOR
MANUFACTURER'S CORRECTIVE AND
PREVENTATIVE MAINTENANCE TO BRING NEW
GENERATOR INTO SERVICE AND COMPLIANCE
WITH NFPA 110 REQUIREMENTS AS A
STANDBY GENERATOR SYSTEM.
CONTRACTOR SHALL COMMISSION
RELOCATED GENERATOR WITH NEW 1600A
AUTOMATIC TRANSFER SWITCH FOR PROPER
OPERATION.
5 CONTRACTOR SHALL PROVIDE EXTRA
CONDUIT AND CONDUCTOR:
1. POWER WITH 125A FEEDER FOR NEW
GENERATOR TRAILER 208Y/120V,
30-POLE,125A ELECTRICAL PANEL FOR
GENERATOR BATTERY CHARGING,
GENERATOR TRAILER HEATER,
GENERATOR TRAILER LIGHTS AND
RECEPTACLES.
2. CONTROLS AND MONITOR WIRING FOR
NEW AUTOMATIC TRANSFER SWITCH
AND GENERATOR, SUCH AS
GENERATOR TANK LEVEL, BATTERY
CHARGE, ETC...
6 CONTRACTOR SHALL PROVIDE, INSTALL AND
SECURE TO TRAILER WEATHERPROOF STEEL
STAIRS (COORDINATE WITH STRUCTURAL
DRAWINGS) WITH LANDING AND HANDRAILS
FOR ACCESS INTO AND OUT OF RELOCATED
GENERATOR TRAILER.
7 CONTRACTOR SHALL PROVIDE, INSTALL AND
SECURE TO GROUND WEATHERPROOF STEEL
BOLLARDS (SEE STRUCTURAL PLANS) TO
PROTECT RELOCATED GENERATOR TRAILER
FROM VEHICULAR TRAFFIC.
8 CONTRACTOR SHALL PROVIDE AND INSTALL
JCI CONTROLS AND MONITOR PANELS FOR
NEW AUTOMATIC TRANSFER SWITCH AND
GENERATOR, TO MONITOR GENERATOR
TANK LEVEL, BATTERY CHARGE, ETC...
ALONG WITH REMOTE TESTING OF
GENERATOR SYSTEM. POWER FROM PANEL
L7 IN MAIN ELECTRICAL ROOM.
9 TO GENERATOR AND FUEL OIL SYSTEM
REMOTE CONTROL AND MONITORING PANELS
98-GP1 AND 98-GP2 IN NEMA 3R ENCLOSURES;
COORDINATE WITH GENERATOR AND FUEL
OIL SYSTEM MANUFACTURER FOR ALL
STANDARD GENERATOR AND FUEL OIL
REMOTE MONITORING REQUIREMENTS AND
NFPA 110 COMPLIANCE.
10 PROPOSED NEW 98-PG1 ELECTRICAL PANEL
INSTALLATION LOCATION. FIELD DETERMINE
BEST LOCATION FOR NEW 98-PG1
ELECTRICAL PANEL INSTALLATION.
11 CONTRACTOR SHALL PROVIDE, INSTALL AND
SECURE TO TRAILER WEATHERPROOF
ENCLOSURE TO PROTECT THE ELECTRICAL
TERMINATIONS AT THE GENERATOR
TERMINALS UNDERNEATH THE TRAILER'S
WEATHER COVER. USE LIQUID-TIGHT
FLEXIBLE METAL CONDUIT AT EQUIPMENT
CONNECTIONS WITH AT LEAST 6" OF SLACK
AT CONDUCTOR TERMINATIONS.
12 CONTRACTOR SHALL PROVIDE, INSTALL AND
SECURE TO EXISTING MSB NEW METAL
ENCLOSURE TO PULL NEW 1600A
CONDUCTORS INTO EXISTING MSB.
E-100
1600A MCCB
With Line
Through Bus Conduit Area Top or Bottom
3"
3"
40" 38" 28"
Unit Space
90"
Main
SCALE:
CERTIFIED SEISMIC RATED METERING SWITCHBOARD APPROVED BY SMUD
NONE
E-100
3"3"
2.5"
2.5"
13 NEW JOHNSON CONTROLS, INC. (JCI)
METASYS CONTROL PANEL FOR BUILDING
AUTOMATION SYSTEM (BAS) INTEGRATION.
SEE ONE-LINE DIAGRAM ON SHEET E-200 AND
SHEET E-302 FOR ADDITIONAL INFORMATION.
14 CONTRACTOR SHALL PROVIDE SUB-METERING OF THE
GENERATOR POWER OUTPUT TO MEASURE VOLTS,
AMPS, FREQUENCY, KWh, AND PEAK DEMAND.
SUB-METER SHALL BE ABLE TO STORE KWh, AND PEAK
DEMAND FOR A PERIOD OF 24-MONTHS AT INTERVALS
NOT EXCEEDING FIFTEEN (15) MINUTES APART. SEE
ADVANCED UTILITY METERING SYSTEM SPECIFICATION
25 10 10 FOR SUB-METERING PERFORMANCE
REQUIREMENTS. BASIS OF DESIGN EATON POWER
XPERT METER 3000 OR EQUAL. PROVIDE WITH
SEPARATE 2" CONDUIT AND FOUR (4) CAT 6A
NETWORK CABLES WITH INSULATION LISTED FOR WET
LOCATION BACK TO BUILDING 98-RM FOR REMOTE
MONITORING BY BUILDING AUTOMATION SYSTEM
(BAS). CONFIGURE COMMUNICATION PROTOCOLS
FOR BAS TO REMOTELY MONITOR ALL MEASURED
PARAMETERS OF VOLTAGE, CURRENT, AND POWER
AND THEIR STORED VALUES FROM THE
EXISTING BAS. 2" CONDUIT MUST BE RUN AT LEAST AT
A 12" RADIAL DISTANCE APART FROM ANY OTHER
CONDUIT.
NOTES
1. CONTRACTOR SHALL CONDUCT A GROUND
PENETRATING RADAR (GPR) AND UTILITY LOCATOR
SURVEY TO MARK OUT UNDERGROUND UTILITIES.
NEW TRENCHING WORK SHALL AVOID GAS LINES AND
OTHER UTILITIES. EC AND GC SHALL PROVIDE SHOP
DRAWING SUBMITTALS SHOWING EXISTING
UNDERGROUND UTILITIES AND THEIR PLAN FOR THE
TRENCHING PRIOR TO ANY EXCAVATIONS.
2. PRIOR TO ANY NEW CONSTRUCTION WORK
CONTRACTOR SHALL SUBMIT A PHASING PLAN TO
CUT-OVER THE NEW GENERATOR BACKUP SERVICE
OVER A WEEKEND. A SIMPLIFIED PHASING PLAN TO
ACHIEVE THIS GOAL HAS BEEN PREPARED THAT THE
CONTRACTOR WILL MODIFY AND SUBMIT FOR
APPROVAL OF THE VETERANS AFFAIRS ENGINEERING
AT THE PROJECT LOCATION ALONG WITH THE
ELECTRIC UTILITY AND ANY OTHER UTILITY AFFECTED
BY THIS WORK. SUBMIT ALL APPROVALS TO THE
VETERANS AFFAIRS ENGINEERING AT THE PROJECT
LOCATION AS PART OF THE AS-BUILT
DOCUMENTATION.
3. ALL HORIZONTAL CONDUIT RUNS SHOW OUTSIDE OF
BASEMENT ARE NEW 4" DIAMETER CONDUITS 36"
BELOW GRADE IN CONCRETE DUCT BANK WITH
ELECTRICAL WARNING TAPE. ALL HORIZONTAL
CONDUIT RUNS SHOW INSIDE OF BASEMENT ARE 4"
DIAMETER WATER TIGHT STEEL RIGID METAL CONDUIT.
SEE ONE-LINE DIAGRAM FOR COPPER 600V XHHW-2
CONDUCTOR SIZES AND QUANTITIES.
NOTES:
1. SINCE THE METERING SWITCHBOARD WILL BE
INSTALLED FACING OPPOSITE OF THE BUILDING
THE PULL SECTION MUST BE CONFIGURED ON
THE RIGHT SIDE AND THE MAIN CIRCUIT
BREAKER AND METERING SECTION MUST BE
CONFIGURED ON THE LEFT SIDE FACING FRONT.
2. THE DIAGRAM SHOWN ON THIS PLAN SHOWS
THE SWITCHBOARD FROM THE BACK SIDE. FOR
THE FRONT-SIDE VIEW THE SECTIONS ARE
MIRRORED FROM FRONT TO BACK TO MATCH
THE LAYOUT PLAN FOR ACTUAL EQUIPMENT
FEEDER INTERCONNECTIONS.
(OR APPROVED EQUAL BY SMUD, VA AND ENGINEER)
4. PROPOSED LOCATIONS OF NEW TIME-DELAY MOTOR
STARTERS MS#1, MS#2, MS#3, MS#4, MS#5, MS#6, MS#7,
AND MS#8 ARE INITIAL PLACEMENTS THAT WILL BE
MODIFIED BY THE CONTRACTOR WITH VA ENGINEERING
APPROVAL TO BEST SUITE THE INSTALLATION FOR LOAD
STEPPING THE GENERATOR BACKUP SYSTEM.
CONTRACTOR SHALL PROVIDE ALL ADDITIONAL
NECESSARY CONDUIT, CONDUCTOR, JUNCTION BOXES,
RACEWAY FITTINGS, ETC... MATERIALS FOR
CONNECTING THE NEW TIME-DELAY MOTOR STARTERS
INTO THE EXISTING FEEDERS FOR LOAD STEPPING THE
EXISTING LOADS ON THE GENERATOR BACKUP SYSTEM.
SEE ONE-LINE DIAGRAM ON SHEET E-200 FOR
ADDITIONAL INFORMATION. PERFORM FIELD VISIT TO
INCLUDE ALL VISIBLE WORK PRIOR TO SUBMITTING BID.
15 PROPOSED LOCATIONS OF NEW TIME-DELAY
MOTOR STARTERS MS#1, MS#2, MS#3, MS#4,
MS#5, MS#6, MS#7, AND MS#8 ARE INITIAL
PLACEMENTS THAT WILL BE MODIFIED BY THE
CONTRACTOR WITH VA ENGINEERING
APPROVAL TO BEST SUITE THE INSTALLATION
FOR LOAD STEPPING THE GENERATOR
BACKUP SYSTEM. CONTRACTOR SHALL
PROVIDE ALL ADDITIONAL NECESSARY
CONDUIT, CONDUCTOR, JUNCTION BOXES,
RACEWAY FITTINGS, ETC... MATERIALS FOR
CONNECTING THE NEW TIME-DELAY MOTOR
STARTERS INTO THE EXISTING FEEDERS FOR
LOAD STEPPING THE EXISTING LOADS ON THE
GENERATOR BACKUP SYSTEM. SEE ONE-LINE
DIAGRAM ON SHEET E-200 FOR ADDITIONAL
INFORMATION. PERFORM FIELD VISIT TO
INCLUDE ALL WORK PRIOR TO SUBMITTING
BID.
5. ELECTRICAL PLANS DO NOT SHOW THE CONDUIT RUNS
OF BRANCH CIRCUIT ELECTRICAL HOME RUNS SHOWN
ON PLANS .
6. ALL ELECTRICAL EQUIPMENT AND DISTRIBUTION SHALL
BE SEISMICALLY BRACED PER DELEGATED DESIGN OF
WIND AND SEISMIC LOADS. ALL ELECTRICAL
CONNECTIONS SHALL BE WITH LIQUID-TIGHT FLEXIBLE
METAL CONDUIT AND ALL CONDUCTOR TERMINATIONS
SHALL HAVE AT LEAST 6" OF SLACK FOR SEISMIC
DISPLACEMENT.
16 FOUR (4) CAT6 DIRECT BURIAL ETHERNET
CABLES, SHIELDED
EACH CABLE SHALL HAVE
23AWG 4-PAIR, SOLID BARE COPPER
CONDUCTORS
HDPE INSULATION
OVERALL ALUMINUM FOIL SHIELD - F/UTP
BANDWIDTH TESTED UP TO 550 MHZ
SUPPORT POE++ (802.3BT) 4PPOE, UP TO
100W
CETLUS CERTIFIED, ROHS-3 COMPLIANT
17 CONTRACTOR SHALL INSTALL NEW 20A, 120V,
1-POLE CIRCUIT BREAKER TO MATCH
EXISTING TO POWER NEW ELECTRICAL LOAD.
ELECTRICAL - BACK VIEW OF SIEMENS SB1 1600A MCCB SWITCHBOARD
UTILITY
TKMP2 SOLAR
TX-01084782
1000 KVA
PRI 12470V
SEC 480/277V
METER: #
31 010 270
800A
BLDG 98
BASEMENT
MECH ROOM
98-BZ-NHS-01
[MSB]
MCB
1600A
15A
TRANSFORMER
T-4 50A
T-98-1Z-NT-FA
[T-6]
5KVA
PRI 480V
SEC 240V
BLDG 98
BASEMENT
MECH ROOM
FIRE ALARM
BLDG 98
BASEMENT
MECH RM
98-BZ-NLP-02
[L7]
NORMAL
208/120V 100A 3ɸ 4W
BOILER B-1
30A 1P
HWP-1
20A 1P
FC-1, FC-2,
FC-3
20A 1P
EX-FAN
20A 1P
MCB
100A
CHILLER
T-98-BZ-NLP-02
[T-4]
30KVA
PRI 480V
SEC 208/120V
BLDG 98
BASEMENT
MECH ROOM
CONTINUES
TO 1/E-109
98-1Z-NHD-05
[H2]
UDC
BLDG 98
2ND FLOOR
RM 2T09A
30A
98-2Z-NHP-15
[H3]
NORMAL
480/277V
100A MLO 3ɸ 4W
T-5
SUBFEED
45A
VRFZ-1B
B-1 HWP-1 FC-1, FC-2
FC-3
BLDG 98
1ST FLOOR
RM 1E09
98-1Z-NHD-03
[XRH]
NORMAL
480/277V
400A MLO 3ɸ 4W
CARESTREAM
X-RAY
100A
XRP
70A
X-RAY
150A
BLDG 98
2ND FLOOR
RM 2S13A
98-2Z-NLP-16
[CP1]
NORMAL
208/120V 100A 3ɸ 4W
T-98-1Z-NLP-04
[T-7]
45KVA
PRI 480V
SEC 208/120V
BLDG 98
FIRST FLOOR
RM E109
CARE
STREAM
UPS
98-1Z-NLP-04
[XRP]
CARESTREAM
X-RAY
RM 1E11
NORMAL
208/120V
MCB 150A
3ɸ 4W
BLDG 98
1ST FLOOR
RM E109
X-RAY
RM 1E15
BLDG 98
2ND FLOOR
RM 2S09B
98-2Z-NLP-17
[CP2]
NORMAL
208/120V
225A MLO 3ɸ 4W
SERVER
UPS
2S13A 20A 2P
SERVER
UPS
2S13A 20A 2P
UPS UPS
BLDG 98
2ND FLOOR
RM 2S13A
BLDG 98
2ND FLOOR
RM 2S13A
PHILLIPS
UPS
EXHAUST
FAN 1B
RETURN
FAN 1
SUPPLY
FAN 1
100A
SPARE
15A
CPI-1
60A
MCB
100A
CPI-2
100A
EXHAUST
FAN 1B
3A
SPARE
7A
RETURN
FAN 1
15A
SUPPLY
FAN 1
50A
ELEVATOR
100A
DOOR
OPERATOR
20A
RETURN
FAN 2
15A
VRF-1 VRF-2
EX-FAN
T-98-2Z-NLP-16
[T-5]
30KVA
PRI 480V
SEC 208/120V
BLDG 98
SECOND FLOOR
RM 2S13A
30A
SP-1 SE-1
CONTINUES TO
2/E-104
COOLING TOWER
BLDG 92
BLDG 98
2ND FLOOR
RM 2A03A
98-2Z-NHM-31
[MCC-2]
NORMAL
480V
600A MLO 3ɸ 3W
SUPPLY
FAN 2
50A
VRFZ-1A
CONTINUES
TO 2/E-109
98-1Z-NLD-19
[P1]
SUPPLY
FAN 4
SUPPLY
FAN 3
EXHAUST
FAN 5
EXHAUST
FAN 4A
EXHAUST
FAN 4B
RETURN
FAN 3
RETURN
FAN 4
BLDG 98
2ND FLOOR
RM 2T09
98-2Z-NLP-30
[PM]
NORMAL
208/120V 150A 3ɸ 4W
VRF-1
90A 2P
VRF-2
90A 2P
MCB
150A
TRAILER
100A
HW PUMP COND
WATER
PUMP
CHILLED
WATER
PUMP
VFD
30A
BLDG 98
1ST FLOOR
RM 1H28
98-1Z-NHP-18
[H1]
NORMAL
480/277V
225A MLO 3ɸ 4W
P1 175A
SUPPLY
FAN 4
100A
SUPPLY
FAN 3
50A
EXHAUST
FAN 5
3A
VRF2 1B
50A
VRF2 1A
20A
EXHAUST
FAN 4A
7A
EXHAUST
FAN 4B (0FF)
3A
RETURN
FAN 3
30A
RETURN
FAN 4
30A
PANEL XRH
300A
CHILLER
600A
PANEL H2
400A
PANEL H3
100A
PANEL H1
225A
MCC-1
250A
MCC-2
150A
MCC-3
150A
PANEL H4
100A
RECEPTACLE
200A
PV SUPPLY
400AF/350AT
NORMAL
480/277V
1600A 3ɸ 4W
BLDG 98
2ND FLOOR
RM 2T09
98-2Z-NHM-29
[MCC-1]
NORMAL
480V 600A 3ɸ 3W
TRANSFORMER
T-8 70A
98-2Z-NHP-33
[H4]
NORMAL
480/277V
100A MLO
3ɸ 4W
T-98-2Z-NLP-30
[T-8]
45KVA
PRI 480V
SEC 208/120V
BLDG 98
2ND FLOOR
2T09
SPARE
30A
SPARE
30A
SP-1
20A
SE-1
20A
COOLING
TOWER
100A
HW PUMP
7A
SPARE
15A
COND WATER
PUMP
50A
BLDG 98
2ND FLOOR
RM 2N05 BLDG 98
BASEMENT
MECH RM
98-BZ-NHM-32
[MCC-3]
NORMAL
480V
600A MLO 3ɸ 3W
CHILLED
WATER PUMP
30A
LOCKED OUT
(OFF)
DOOR
OPERATOR
RETURN
FAN 2
SUPPLY
FAN 2
ELEVATOR
0A
A
0A
480Y/277V
N,ATS-98
480Y/277V 906.25
ER,GEN-98
(4)4"C, 3#600kcmil, #600kcmil N, #4/0G
HOA N, TD
SIZE #
MS
LEGEND
CONTRACTOR SHALL ADD NEW TIME DELAY 480V MOTOR STARTERS WITH LOAD-BREAK
DISCONNECT SWITCH, AND LIGHT INDICATING HAND-OFF-AUTO (HOA) SWITCH IN NEMA 3R
ENCLOSURE TO LOAD STEP THE NEW GENERATOR; ALTERNATE SOLUTION IS TO PROGRAM
THE MECHANICAL EQUIPMENT CONTROLS WITH AN ADJUSTABLE TIME DELAY TO START THE
MECHANICAL EQUIPMENT. COORDINATE EXACT LOCATION OF ALL NEMA STARTERS IN FIELD
WITH VA ENGINEERING. MOTORS HAVE 6X INRUSH AND TRANSFORMERS 12X INRUSH
CURRENTS OF THEIR FLA. MOTOR STARTER POSITION SHALL BE ILLUMINATED OPEN OR
CLOSED ON FRONT PANEL OF MOTOR STARTER ENCLOSURE.
CONTRACTOR SHALL PROVIDE NEW ELECTRICAL SYSTEM
GROUND AT NEW NORMAL SERVICE ENTRANCE FIRST
DISCONNECTING MEANS COMPOSED OF THREE (3) TEN
FOOT STAINLESS STEEL GROUND RODS NO LESS THAN 58"
DIAMETER WITH #4/0-CU GND RUN IN 1" IMC. PROVIDE
SECONDARY #4/0-CU GND IN 1" IMC TO WATER SERVICE
ENTRANCE AND BOND TO COPPER PIPE. CONTRACTOR
SHALL PROVIDE NEUTRAL-TO-GROUND BOND AT FIRST
DISCONNECTION MEANS, AND REMOVE ALL DOWNSTREAM
NEUTRAL-TO-GROUND BONDS AS REQUIRED BY NFPA 70.
HOA N,TIME DELAY
SIZE 7
MS#7
HOA HOA
HOA
A, 4-POLE
kVA
NEMA 3R
SIEMENS SB1 SWITCHBOARD
480Y/277V,3P,4W
1600A, NEMA 3R
UTILITY METERING
EUSERC Metering
1600A
PU
LL
S
EC
TI
O
N
SIEMENS
HPXD6
SMUD REQUIRED
HOA
HOA N,TIME DELAY
SIZE 3
MS#5
HOA N,TIME
DELAY
SIZE 6
MS#6
HOA N,TIME
DELAY
SIZE 4
MS#8
4 4 4
RELOCATE EXISTING
CTE
CTE CTE
CTE
CTE
CTE
CTE
CTE
CTE
CTE
CTE
CTE
CTE
CTE
CTE
CTE CTE
NEW WORK
NEW WORK
NEW WORK NEW WORK
NEW WORK
50A 98-G1
208Y/120V
NEW,NEMA 3R
ELECTRICAL
125A PANEL G1
ER,GENERATOR TRAILER
N,REMOTE
ATS AND
GENERATOR
CONTROLS
WITH
MONITORING
NEW, NEMA 3R
GENERATOR
CONTROLS
AND
MONITORING
PANEL
J
NEW CB
NEW T-G
30kVA PRI 480V
SEC
208/120V
BLDG 98
BASEMENT
ELEC RM
3#6-Cu, 1#6-CU G
IN 3 /4"C
3#1/0-Cu, 1#1/0-Cu N, 1#6-Cu G
IN 4"C
2500AF
1500AT
TO BAS
65 kAIC
65 kAIC
POLYPHASE MOTORS
MAXIMUM ELECTRICAL MOTOR HORSEPOWER FOR DIFFERENT NEMA STARTERS FOR
THREE PHASE MOTORS CAN BE FOUND IN THE TABLE BELOW: MAXIMUM
HORSEPOWER (HP)
NEMA SIZE NEMA CONTINUOUS AMP RATING FOR FULL VOLTAGE STARTING
# 460V 00 9 0 18 1 27 2 45 3 90 4 135 5 270 6 540 7 810
N, TD
SIZE 4
MS#1
N, TD
SIZE 3
MS#2
N, TD
SIZE 3
MS#3
N, TD
SIZE 5
MS#4
NEW WORK
SPD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
Fi le P at h
6/
/2
:3 9:
P
M
CONSTRUCTION
DOCUMENTS
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
06/21/2023Revisions: Date:
C-508-19-102
McCLELLAN VAMC, 5342 DUDLEY BLVD McCLELLAN PARK, CA 95652
NORTH ARROW
248 Copeland Street Quincy, MA 02169
(617) 481.6390
RELOCATION OF EXISTING 725kW GENERATOR TO McLELLAN VAMC
BUILDING 98
Office of Construction and Facilities Management
CONSULTANT
JPK AH
ELECTRICAL - BUILDING 98
ONE-LINE DIAGRAM
SCALE:
ELECTRICAL - BUILDING 98 ONE-LINE DIAGRAM
NONE
E-200
KEYED NOTES
CONTRACTOR SHALL DISCONNECT UTILITY
SERVICE TO MAIN SWITCHBOARD AND ROUTE
THRU NEW SERVICE ENTRANCE RATED 1,600A
480Y/277V 4-POLE ATS.
2 CONTRACTOR SHALL RELOCATE EXISTING
UTILITY METERING OFF TRANSFORMER
ENCLOSURE ONTO NEW SIEMENS SB1
480Y/277V,3-PHASE,4-WIRE,1600A NEMA 3R
SWITCHBOARD. COORDINATE ALL
INSTRUMENT WIRING, VOLTAGE AND
CURRENT INSTRUMENT TRANSFORMER
REQUIREMENTS WITH SMUD ELECTRIC
UTILITY AND SIEMENS.
3 CONTRACTOR SHALL INSTALL ALL NEW
POWER CABLES TO MEET ALL EQUIPMENT
ENVIRONMENTAL AND ELECTRICAL RATINGS
ALONG WITH ALL SMUD UTILITY AND VA
ELECTRICAL INSTALLATION REQUIREMENTS.
INSTALL IN CONCRETE DUCT-BANK BURIED
36" OR MORE DEEP WITH ELECTRICAL
WARNING TAPE.
4 NEW MULTIPLE 480Y/277V LARGE ELECTRICAL
CONTACTORS AND/OR FULL VOLTAGE MOTOR
STARTERS MUST BE USED TO LOAD STEP THE
TRANSFORMER (X12 FLA INRUSH CURRENTS) AND
MOTORS (X6 FLA INRUSH CURRENTS) SO AS NOT TO
OVERWHELM THE GENERATOR WITH INRUSH LOAD
CURRENTS. THE LARGE MULTIPLE 480Y/277V LARGE
ELECTRICAL CONTACTORS WILL HAVE TO BE
SEQUENCED SO THAT THEY DO NOT OPERATE AT THE
SAME TIME. THE SEQUENCING CAN BE
ACCOMPLISHED THROUGH A COMBINATION USE OF
TIMERS AND AUXILIARY CONTACTS SO AS TO HAVE
THE CORRECT ORDER AND TIME DELAY IN STARTING
UP THE VARIOUS BUILDING LOADS.
GENERAL NOTES
1. ALL ONE-LINE DIAGRAM COMPONENTS ARE EXISTING,
UNLESS NOTED OTHERWISE. EXISTING ELECTRICAL
DISTRIBUTION IS SHOWN WITH THINNER AND LIGHTER
TEXT AND DRAWING LINES.
2. NEW WORK IS SHOWN WITH THICKER AND DARKER
TEXT AND DRAWING LINES.
3. ALL NEW CONDUCTORS ARE COPPER WITH XHHW-2
INSULATION.
4. ALL NEW TERMINALS SHALL BE RATED AT 75°C.
5. ALL NEW CIRCUIT BREAKERS, FUSES, DISCONNECTS,
MOTOR STARTERS, SWITCHES, AND CONTACTORS ARE
3-POLE, 480V, UNLESS NOTED OTHERWISE.
6. ALL NEW OVER-CURRENT PROTECTION DEVICES
SHALL MEET THE MAXIMUM AVAILABLE SHORT-CIRCUIT
CURRENT OF THE ELECTRICAL SYSTEM LOCATION
WHERE IT IS IMPLEMENTED AND SHALL BE
SELECTIVELY COORDINATED WITH BOTH UPSTREAM
AND DOWNSTREAM ELECTRICAL DISTRIBUTION.
PERFORM ARC-FLASH CALCULATIONS AND PROVIDE
ARC-FLASH PERMANENT LABELS FOR ALL NEW
ELECTRICAL SWITCHGEAR.
7. ALL NOTED EQUIPMENT THAT IS SPECIFIED OR NOTED
AS BASIS OF DESIGN MAY HAVE "OR APPROVED
EQUAL".
8. ALL ELECTRICAL EQUIPMENT AND DISTRIBUTION SHALL
BE SEISMICALLY BRACED PER DELEGATED DESIGN OF
WIND AND SEISMIC LOADS. ALL ELECTRICAL
CONNECTIONS SHALL BE WITH LIQUID-TIGHT FLEXIBLE
METAL CONDUIT AND ALL CONDUCTOR TERMINATIONS
SHALL HAVE AT LEAST 6" OF SLACK FOR SEISMIC
DISPLACEMENT.
9. ALL NEW ELECTRICAL EQUIPMENT SHALL HAVE
SEISMIC CERTIFICATIONS AS REQUIRED BY THE JULY 1,
2023 VA SEISMIC DESIGN REQUIREMENTS MANUAL
H-18-8.
5 NEW GENERATOR CONTROLS AND MONITORING
PANEL WILL REQUIRE A MULTI-CONDUCTOR CABLE
FOR REMOTE MONITORING OF THE NEW ATS-98 AND
ER,GEN98 AND NEW FUEL OIL SYSTEM.
CONTRACTOR SHALL PROVIDE AND INSTALL TWO (2)
OKO-MARINE CABLES; 600 VOLT
INSTRUMENTATION/SIGNAL CABLE CABLE( #14 AWG
36 PAIRS, 80MIL JACKET…267-40-3536) IN 4" PVC
CONDUIT BURIED 36" BELOW GRADE WITH
ELECTRICAL WARNING TAPE. CONTRACTOR SHALL RUN
A #6-Cu GREEN XHHW-2 GROUNDING CONDUCTOR
WITH THESE CABLES FOR ALL GROUNDING
REQUIREMENTS. PROVIDE AND INSTALL TWO CAT 6A
CABLES FROM ATS GENERATOR AND UTILITY POWER
SUB-METERING TO BUILDING JCI CONTROLLER AND
REMOTE METERING PANEL 98-RM SHOWN ON
LAYOUT PLANS.
6 CUTTLER HAMMER PCCF 2500AF AMPERE FRAME
WITH ADJUSTABLE PC2500 2500A PLUG AT 50%, 60%,
70%, 80%, 90%, AND 100%. SHORT-TIME PICKUP IS
ADUSTABLE AT 2,3,4,5,6,7,AND 8 X (TIMES) THE 2500A
FRAME MAGNETIC TRIP CURRENT, PRESENTLY SET AT
8X 2500A OR 20000A.
1. SET PC2500 2500A PLUG AT 60% OR 1500AT
THERMAL-OVERLOAD.
2. PERFORM SHORT-CIRCUIT, ARC-FLASH AND
OVER-CURRENT PROTECTION
SYNCHRONIZATION COORDINATION STUDY TO
MEET THE DECEMBER 1, 2019 VA ELECTRICAL
DESIGN MANUAL AND 2023 EDITION OF NFPA
70 FOR ANY CHANGES TO THE SHORT-TIME
PICKUP PRESENTLY SET AT 8X 2500A OR
20000A.
7 CONTRACTOR SHALL DISCONNECT EXISTING MAIN
SWITCHBOARD NEUTRAL TO…
This is the start of the file's text. The full file is on GovTribe.