Scope of Work Summary: Leavenworth National Cemetery Gravesite Expansion

This is a Scope of Work (SOW) for an Invitation for Bid (IFB) issued by the Department of Veterans Affairs for construction services at Leavenworth National Cemetery, Kansas (Project 897CM3025). The contract consists of two primary line items: CLIN 0001 (Base Bid) for Gravesite Cemetery Expansion and CLIN 0002 (Option Bid Item 1) for Administration Building Renovations and Site Improvements. The Base Bid is divided into three phases including contractor laydown yard setup, road and drainage improvements, columbarium construction, parking lot installation, and gravesite expansion. The Option Bid comprises eight phases encompassing demolition of existing parking facilities, temporary staging setup, administration building improvements, cortege lane improvements, column repairs, fence replacements, and comprehensive road improvements throughout the cemetery.

General conditions require all work to be performed during standard business hours (8:00 am to 4:30 pm, Monday through Friday, excluding federal holidays). The contractor must coordinate with the Cemetery Director regarding parking, material storage, and temporary facilities; secure all necessary permits; conduct site surveys to locate utilities; implement erosion control and proper site drainage; perform daily and final cleanup; maintain proper landscaping; protect existing structures and vegetation; provide a one-year warranty; and submit daily progress reports with photographs to the Contracting Officer's Representative (COR). Post-award requirements include submittal of shop drawings and specifications for COR approval, maintenance of project record drawings documenting as-built conditions, and compliance with closeout procedures. The anticipated project completion is 18 months or 540 calendar days from the Notice to Proceed. A mandatory site meeting must be held prior to bid submission with participants including the contractor, contracting officer, COR, District Engineer, and Cemetery Director.

View the file

Other files

File Type Posted
S06_36C78626B0027 Amend. 0002.pdf PDF
S02_Attachment - 18704_LNC_Addendum1_CivilSheets_CG100-CR117_20260916.pdf PDF
S02_Attachment - 18704_LNC_Addendum1_CivilSheets_CD100-CB501_20260916.pdf PDF
S04_Attachment - Site Visit Attendance Roster.pdf PDF
S02_Attachment - 18704_LNC_Addendum1_SurveySheets_V100-V113_20260916.pdf PDF
S02_Attachment - 00 01 10 Table of Contents.pdf PDF
S02_Attachment - Substitution Request - Leavenworth GSE.pdf PDF
S02_Attachment - 00 00 00 Specification Cover.pdf PDF
S02_Attachment - 01 35 26 Safety Requirements.pdf PDF
_31 LNC BD - TECHNOLOGY pt3 FIRE ALARM (pg 241-247).pdf PDF
_11 LNC BD - GRADING DRAINAGE (pg 78-82).pdf PDF
_28 LNC BD - PLUMBING (pg 224-230).pdf PDF
_24 LNC BD - INTERIORS (pg 182-188).pdf PDF
_23 LNC BD - ARCH pt2 (pg 171-181).pdf PDF
_19 LNC BD - SIGNAGE FURNISHINGS pt2 (pg 126-138).pdf PDF
_16 LNC BD - ROADS pt2 (pg 106-113).pdf PDF
_05 LNC BD - DEMOLITION pt1 (pg 22-34).pdf PDF
_07 LNC BD - SITE (pg 41-49).pdf PDF
_02 LNC BD - EX CON pt1 (pg 3-16).pdf PDF
LNC Gravesite Expansion VOL1SPECS wGEOTECH - BD 06-22-2026.pdf PDF
S02_Attachment - Price Schedule Sheet.pdf PDF
_20 LNC BD - PLANTING IRR pt1 (pg 139-149).pdf PDF
_14 LNC BD - EROSION CONTROL pt3 UTIL pt1 (pg 91-98).pdf PDF
_22 LNC BD - ARCH pt1 (pg 159-170).pdf PDF
_09 LNC BD - COLUMBARIUM 3 pt1 (pg 60-69).pdf PDF
_10 LNC BD - COLUMBARIUM 3 pt2 (pg 70-77).pdf PDF
LNC Gravesite Expansion VOL2SPECS wGEOTECH - BD 06-22-2026.pdf PDF
_08 LNC BD - BURIALS (pg 50-59).pdf PDF
_30 LNC BD - TECHNOLOGY pt2 (pg 236-240).pdf PDF
_03 LNC BD - EX CON pt2 (pg 17).pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
_26 LNC BD - ELECTRICAL (pg 201-214).pdf PDF
_29 LNC BD - TECHNOLOGY pt1 (pg 231-235).pdf PDF
_25 LNC BD - STRUCTURAL (pg 189-200).pdf PDF
_21 LNC BD - IRR pt2 (pg 150-158).pdf PDF
_18 LNC BD - SIGNAGE FURNISHINGS pt1 (pg 118-125).pdf PDF
_12 LNC BD - EROSION CONTROL pt1 (pg 83-86).pdf PDF
_13 LNC BD - EROSION CONTROL pt2 (pg 87-90).pdf PDF
_17 LNC BD - ROADS pt3 (pg 114-117).pdf PDF
_04 LNC BD - GEOTECH (pg 18-21).pdf PDF
S02_Attachment - Wage Determination Heavy.pdf PDF
S02_Attachment - Wage Determination Building.pdf PDF
S02_Attachment - Limitations on Subcontracting Cert.docx DOCX document
S02_Attachment - DOL Payroll Form.pdf PDF
_15 LNC BD - UTIL pt2 ROADS pt1 (pg 99-105).pdf PDF
_06 LNC BD - DEMO pt2 OPERATIONS (pg 35-40).pdf PDF
_27 LNC BD - MECHANICAL (pg 215-223).pdf PDF
_01 LNC BD - GENERAL (pg 1-2).pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
S02_36C78626B0027 Solicitation.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

SCOPE OF WORK

FOR

LEAVENWORTH NATIONAL CEMETERY, KS

897CM3025 GRAVESITE EXPANSION

A. PART I – PROJECT OBJECTIVES

A1. Statement of Work

STATEMENT OF BID ITEM(S). Administered by the United States Department of Veterans Affairs. Major scope items include construction of the following items as described in this Scope of Work (SOW) and included within the construction documents. See CO100 for Phasing with Base Bid and Bid Options:

CLIN 0001 –BASE BID, GENERAL CONSTRUCTION: Gravesite Cemetery Expansion as shown on the drawings and specifications:

1. Phase 1 (Base Bid): Contractor Laydown Yard. Road and Drainage Improvements.

Columbarium ETO and Detention Pond.

2. Phase 2 (Base Bid): Install new parallel parking stalls, drives, and walkways. Road

Improvements. Columbarium Court. Gravesite Expansion.

3. Phase 3(Base Bid): Road Improvements.

CLIN 0002 –OPTION BID ITEM 1, GENERAL CONSTRUCTION: Administration Building Renovations and Site Improvements as shown on the drawings and specifications:

1. Phase 1 (Bid Option): Demo the existing northern parking lot. Install/set up temporary trailer staging and establish an interim parking lot. Parallel parking lot stalls (3) in front of the admin building to remain in use. Existing cortege to remain open until phase 6. Road & Drainage Improvements.

2. Phase 2 (Bid Option): Administration building improvements. Demo existing parallel parking stalls, drives, and walkways.

3. Phase 3 (Bid Option): Remove temporary trailers and interim parking lot. Construct the final parking lot. Chain-link fence improvement. Road Improvements

4. Phase 4 (Bid Option): Start construction on cortege lane improvements; finish along with phase 5 road improvements. Existing entrance feature improvements. Road improvements.

5. Phase 5 (Bid Option): Existing column repair and fence panel replacement.

Demolish the south drive and close off access. Rebuild the south drive to the admin and connections to the new cortege lanes. Interim cortege lanes to route/loop traffic through the new parking lot area north of the admin building.

6. Phase 6 (Bid Option): Demolish the existing north drive and close off access.

Rebuild the north drive connecting the existing road to the north, the new road to the south, and the new parking lot connections. Interim cortege lanes to route/loop traffic through new cortege lanes to the south. Road Improvements.

7. Phase 7 (Bid Option): Road Improvements.

8. Phase 8 (Bid Option): Road Improvements.

A.2 General Conditions

1. All work will be accomplished during normal business hours (8:00 am to 4:30 pm) Monday through Friday, except Federal Holidays.

2. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and review the scope of work to determine the extent of the work. The Contractor shall take the necessary precautions to avoid damages to existing items to remain in place, to be reused or to remain the property of the Cemetery. Any damaged items shall be repaired or replaced at the Contractors expense as directed by the Contracting Officer’s Representative

(COR).

3. Establish construction limits, install safety controls, and install construction fencing as approved by the COR.

4. SITE SURVEY: Locate and stake/flag all underground utilities.

5. SITE CLEARING: Remove grass and other vegetation or obstructions as required to permit grading of the site within the project limits. Dispose/haul away and dump trash, debris and waste to an approved disposal site.

6. EROSION CONTROL AND SITE DRAINAGE: Contractor shall provide erosion control measures to prevent erosion or displacement of soils and discharge of soil bearing water runoff or airborne dust.

7. SITE GRADING AND FINISHING: Perform grading within the limits of the project to the lines, grades, and elevations indicated and as specified. Thoroughly clean up the work area at the end of each day’s work and at completion of the project. Leave premises clean and free of waste, scrap, used equipment or other material intentionally or incidentally delivered to the site by Contractor or Contractor’s personnel.

8. LANDSCAPING: Provide both turf and seed grass sod as shown in the construction documents. The Contractor shall protect from damage all existing improvements, equipment, structures, facilities, grounds and utilities at or near the work site or adjacent property. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work.

9. Upon completion of contract, deliver work complete and undamaged. Existing materials, equipment, structures, facilities, grounds and disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in good condition as existed before commencing work.

10. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work.

Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the Contracting Officer and the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

11. Thoroughly clean up the work area at the end of each day’s work and at the completion of the project. Leave premises clean and free of waste, scraps, used equipment or other material intentionally or accidentally delivered to the site by the Contractor or Contractor’s personnel.

12. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs and grass) on or adjacent to the work site not to be removed and do not reasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

13. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be made known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

14. The Contractor shall coordinate with the Cemetery Director for parking, material storage, temporary buildings (e.g., storage trailers, office trailers, portable restroom facilities) and any other needs for the work.

A3. Other Requirements:

1. Contractor shall secure all necessary permits including any environmental permit required to meet compliance.

2. Contractor shall investigate all on-site conditions including all utilities prior to construction.

3. Contractor shall grade the site to maintain proper site drainage.

4. Contractor shall provide daily progress summary and electronic photos (minimum of 10 daily) to show construction progress through e-mail to the COR.

5. Contractor shall provide a certificate of warranty for material supplied and workmanship for a minimum of one year from the date of acceptance.

6. Contractor shall provide two copies of Operation and Maintenance Manuals, if required, at the final inspection.

7. Contractor shall perform daily clean up and final clean up.

8. Contractor shall dispose of all waste materials properly off site.

9. Seal concrete.

10. Protect existing roads and undisturbed infrastructures and environments.

11. Repair and restore all damages to be as good as the original conditions or better due to construction activities.

12. Prior to submitting any bid, a site meeting will be held and participants would include but not limited to the contractor, contracting officer and/or COR, District Engineer, and the

Cemetery Director. The purpose of the meeting would be to visit site locations, clarification of scope, and to thoroughly investigate the site to ensure a clear understanding of the project.

A4. Schedule

1. The anticipated completion of this project is 18 months or 540 calendar days after receipt of

Notice to Proceed.

A5. Definitions

1. Construction contract as defined by the Department of Veterans Affairs (VA) is the procurement by the Government, under one contract, with one firm or joint venture (JV) for construction services for a specific project.

2. Contracting Officer: The services to be performed under this contract are subject to the general supervision, direction, control and approval of the Contracting Officer. The Contracting Officer is the only person authorized to obligate the government, interpret or change the contract.

3. Project Manager / Contracting Officer’s Representative (COR): The COR is the Contracting Officer's authorized representative. The COR is responsible for protecting the Government's interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, approval of all submittals, samples, shop drawings, etc.

4. Contract: This term, as used herein, refers to the Contract(s) to perform the construction of the project.

5. Contractor: This term, as used herein, refers to the contractor under this contract.

A6. Location

1. LEAVENWORTH NATIONAL CEMETERY, 150 MUNCIE ROAD; LEAVENWORTH,

KS 66048

B. PART II – RESPONSIBILITIES OF THE DESIGN-BUILD TEAM

1. The section is not applicable for this IFB.

C. PART III - PROPOSAL REQUIREMENTS

1. The section is not applicable for this IFB.

D. PART IV - POST AWARD REQUIREMENTS

1. Construction Period Submittals

Shop drawings and submittals - The Contractor shall be responsible to ensure that the VA COR reviews shop drawings, detail drawings, schedules, descriptive literature and samples, and review the color, texture and suitability of materials for conformity with the contract documents. The COR shall recommend approval, disapproval, or other suitable disposition. The VA COR will have final approval authority.

Other submittals – The Contractor shall submit test results, certificates, manufacturer’s instructions, manufacturer’s field reports, etc. as required by the VA IFB specifications, to the VA COR.

Project record drawings - The Contractor will maintain a set of construction documents (field as-built drawings) to record actual construction changes during the construction process as required by the IFB specifications. The project record drawings will be available for review by the VA COR at all times.

2. Project Close-Out. The Contractor shall comply with the requirements in the “General Conditions”, and “General Requirements”, for submission of final IFB as-built drawings, manuals, and other documents as noted. Required as-built drawings and specifications will be submitted in the same format required for the construction documents.

3. Site Visits and Inspections. At the behest of the Contractor, the VA COR/inspector shall observe the construction, advise the contractor of any deviations or deficiencies or solutions to issues discussed.

- E N D OF SOW -