S02_Attachment - 00 01 10 Table of Contents.pdf
PDF 159 KB Posted
- Solicitation number
- 36C78626B0027
About this file
This document is a Table of Contents for Department of Veterans Affairs (VA) VHA Master Specifications for the Leavenworth National Cemetery project (VA Project No. 897CM3025), which involves gravesite expansion, renovation/expansion of administrative building, FCA deficiencies remediation, and master plan updates. The specifications are organized into 33 divisions covering specialized construction and facility work, with an effective date of November 1, 2025.
The master specifications encompass comprehensive construction and renovation requirements across multiple disciplines. Division 00 covers special sections including project schedules for small design/bid/build projects, shop drawings, safety requirements, quality control, and construction waste management. Division 01 addresses general requirements including temporary facilities, environmental controls, and sustainable construction. Divisions 02-33 detail specific trades and systems including demolition, concrete, masonry, metals, wood/composites, thermal and moisture protection, openings, finishes, specialties, furnishings, plumbing, HVAC, electrical systems, communications, electronic safety and security, earthwork, exterior improvements, and utilities. Specialized sections address cast-in-place concrete, precast columbarium units, columbarium niche covers, and fire detection/alarm systems relevant to cemetery operations. A geotechnical report dated February 2026 is also referenced. Each specification section includes specific revision dates ranging from 2011 through 2026, indicating ongoing updates and compliance with current standards and VA requirements for federal cemetery renovation and expansion projects.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Leavenworth National Cemetery __ ( VA Project No. 897CM3025 ) Gravesite Expansion, Renovate/Expand Admin.
Bldg., FCA Deficiencies, Master Plan Update
11-01-2025
TABLE OF CONTENTS
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 00 00 Specification Cover 00 01 10 Table of Contents 11-25 00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 02 General Requirements Minor 10-23 01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) 12-25 01 33 23 Shop Drawings, Product Data, and Samples 06-25
01 35 26 Safety Requirements 05-24 01 42 19 Reference Standards 11-20 01 43 39 Mockup Requirements 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 50 00 Temporary Facilities 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 12-23 02 41 00 Demolition and Site Clearing 08-17 02 83 33.13 Lead Based Paint Removal & Disposal 01-21 02 85 00 Mold Remediation 05-26
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21 03 48 24 Precast Columbarium Units
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21 04 05 13 Masonry Mortaring 10-17 04 43 00 Natural Stone Veneer 04 73 00 Columbarium Niche Covers
DIVISION 05 – METALS
00 01 10-2
SECTION NO DIVISION AND SECTION TITLES DATE
05 12 00 Structural Steel Framing 11-18 05 50 00 Metal Fabrications
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-21 07 13 52 Modified Bituminous Sheet Waterproofing 01-21 07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21 07 40 00 Roofing and Soffit Panels 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 06-25 08 41 13 Aluminum-Framed Storefronts 01-21 08 71 00 Door Hardware 03-24 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 29 00 Gypsum Board 04-20 09 30 00 Specialty Moldings and Trims 01-26 09 30 13 Ceramic/Porcelain Tiling 11-25 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 05-18 09 65 36.13 Static-Dissipative Resilient Flooring 11-25 09 72 16 Vinyl-Coated Fabric Wall Covering 01-21 09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00.10 Exterior Signage 01-21 10 14 00.20 Interior Signage 10 21 13 Toilet Compartments 01-21 10 26 00 Wall Protection 01-21
00 01 10-3
SECTION NO DIVISION AND SECTION TITLES DATE
10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18 10 51 13 Metal Lockers 11-25
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08-17 12 32 00 Manufactured Wood Casework 01-21 12 36 00 Countertops 12-23
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23 22 05 12 General Motor Requirements for Plumbing Equipment 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 05-21 22 11 23 Domestic Water Pumps 01-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-20 22 40 00 Plumbing Fixtures 05-24
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 03-23
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 09 23 Direct-Digital Control System for HVAC 03-23 23 11 23 Facility Natural-Gas Piping 04-20 23 23 00 Refrigerant Piping 03-24 23 31 00 HVAC Ducts and Casings 03-23 23 34 00 HVAC Fans 03-23 23 36 00 Air Terminal Units 03-23 23 37 00 Air Outlets and Inlets 03-23 23 40 00 HVAC Air Cleaning Devices 03-23 23 73 00 Indoor Central-Station Air-Handling Units 03-23 23 81 23 Computer-Room Air-Conditioners 03-24
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22 26 05 13 Medium-Voltage Cables 06-25 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22
00 01 10-4
SECTION NO DIVISION AND SECTION TITLES DATE
26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 05 41 Underground Electrical Construction 06-25 26 05 73 Overcurrent Protective Device Coordination Study 11-22 26 08 00 Commissioning of Electrical Systems 11-22 26 09 23 Lighting Controls 11-22 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 11-25 26 24 16 Panelboards 11-22 26 29 11 Motor Controllers 11-22 26 29 21 Enclosed Switches and Circuit Breakers 11-22 26 41 00 Facility Lightning Protection 11-22 26 43 13 Surge Protective Devices 11-22 26 51 00 Interior Lighting 03-24 26 56 00 Exterior Lighting 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Conduits and Backboxes for Communications Systems 12-22 27 05 53 Identification for Communications Systems 12-22 27 10 00 Structured Cabling 12-22 27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 12-22 27 11 19 Communications Termination Blocks and Patch Panels 12-22 27 11 26 Communications Rack Mounted Power Protection and Power
Strips 12-22
27 13 13.13 Communications Copper Cable Splicing and Terminations 12-22 27 13 23 Communications Optical Fiber Backbone Cabling 12-22 27 15 13 Communications Copper Horizontal Cabling 12-22 27 16 19 Communications Patch Cords, Station Cords, and Cross
Connect Wire 12-22
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
09-11
28 13 00 Physical Access Control System 10-11 28 13 16 Physical Access Control System and Database Management 09-11 28 16 00 Intrusion and Detection System 10-11 28 23 00 Video Surveillance 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12 31 23 19 Dewatering 10-12
00 01 10-5
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 17 23 Pavement Markings 08-16 32 31 13 Chain Link Fences and Gates 06-18 32 31 19 Decorative Metal Fences and Gates 08-16 32 33 00 Site Furnishings 32 84 00 Planting Irrigation 08-16 32 90 00 Planting 08-16
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 03-17 33 40 00 Storm Sewer Utilities 12-17 33 46 13 Foundation Drainage 10-11
GEOTECHNICAL
Report Geotechnical Report 02-26
File details come from the government source that posted it. Updated .