S06_36C78626B0027 Amend. 0002.pdf

PDF 171 KB Posted

Attached to
Leavenworth National Cemetery, Gravesite Expansion
Solicitation number
36C78626B0027
Issued by

About this file

This is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) issued by the Department of Veterans Affairs, National Cemetery Administration, Contracting Services office located in Triangle, Virginia.

The amendment number 0002, effective September 22, 2026, modifies solicitation 36C78626B0027, which was originally dated August 27, 2026. The amendment's purpose is to provide an updated list of answers to requests for information (RFI) submitted by offerors. The attachment titled "S02_Attachment – RFI Responses – Updated 9.22.2026" contains the complete RFI responses. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation by completing the required items and returning copies of the amendment, acknowledging receipt on each copy of their offer submitted, or submitting a separate letter or electronic communication that references both the solicitation and amendment numbers. Failure to provide timely acknowledgment may result in rejection of the offer.

View the file

Other files

File Type Posted
S05_Attachment - RFI Responses - Updated 9.22.2026.pdf PDF
S02_Attachment - 18704_LNC_Addendum1_SurveySheets_V100-V113_20260916.pdf PDF
S02_Attachment - 00 01 10 Table of Contents.pdf PDF
S02_Attachment - Substitution Request - Leavenworth GSE.pdf PDF
S02_Attachment - 00 00 00 Specification Cover.pdf PDF
S02_Attachment - 01 35 26 Safety Requirements.pdf PDF
S02_Attachment - AE Addendum 01 Cover.pdf PDF
S06_36C78626B0027 Amend. 0001.pdf PDF
S05_Attachment - RFI Responses.pdf PDF
_20 LNC BD - PLANTING IRR pt1 (pg 139-149).pdf PDF
_14 LNC BD - EROSION CONTROL pt3 UTIL pt1 (pg 91-98).pdf PDF
_22 LNC BD - ARCH pt1 (pg 159-170).pdf PDF
_09 LNC BD - COLUMBARIUM 3 pt1 (pg 60-69).pdf PDF
_10 LNC BD - COLUMBARIUM 3 pt2 (pg 70-77).pdf PDF
LNC Gravesite Expansion VOL2SPECS wGEOTECH - BD 06-22-2026.pdf PDF
_08 LNC BD - BURIALS (pg 50-59).pdf PDF
_30 LNC BD - TECHNOLOGY pt2 (pg 236-240).pdf PDF
_03 LNC BD - EX CON pt2 (pg 17).pdf PDF
S02_Attachment - Statement of Work.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
_26 LNC BD - ELECTRICAL (pg 201-214).pdf PDF
_29 LNC BD - TECHNOLOGY pt1 (pg 231-235).pdf PDF
_25 LNC BD - STRUCTURAL (pg 189-200).pdf PDF
_21 LNC BD - IRR pt2 (pg 150-158).pdf PDF
_18 LNC BD - SIGNAGE FURNISHINGS pt1 (pg 118-125).pdf PDF
_12 LNC BD - EROSION CONTROL pt1 (pg 83-86).pdf PDF
_13 LNC BD - EROSION CONTROL pt2 (pg 87-90).pdf PDF
_17 LNC BD - ROADS pt3 (pg 114-117).pdf PDF
_04 LNC BD - GEOTECH (pg 18-21).pdf PDF
S02_Attachment - Wage Determination Heavy.pdf PDF
S02_Attachment - Wage Determination Building.pdf PDF
S02_Attachment - Limitations on Subcontracting Cert.docx DOCX document
S02_Attachment - DOL Payroll Form.pdf PDF
_15 LNC BD - UTIL pt2 ROADS pt1 (pg 99-105).pdf PDF
_06 LNC BD - DEMO pt2 OPERATIONS (pg 35-40).pdf PDF
_27 LNC BD - MECHANICAL (pg 215-223).pdf PDF
_01 LNC BD - GENERAL (pg 1-2).pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
S02_36C78626B0027 Solicitation.pdf PDF
_31 LNC BD - TECHNOLOGY pt3 FIRE ALARM (pg 241-247).pdf PDF
_11 LNC BD - GRADING DRAINAGE (pg 78-82).pdf PDF
_28 LNC BD - PLUMBING (pg 224-230).pdf PDF
_24 LNC BD - INTERIORS (pg 182-188).pdf PDF
_23 LNC BD - ARCH pt2 (pg 171-181).pdf PDF
_19 LNC BD - SIGNAGE FURNISHINGS pt2 (pg 126-138).pdf PDF
_16 LNC BD - ROADS pt2 (pg 106-113).pdf PDF
_05 LNC BD - DEMOLITION pt1 (pg 22-34).pdf PDF
_07 LNC BD - SITE (pg 41-49).pdf PDF
_02 LNC BD - EX CON pt1 (pg 3-16).pdf PDF
LNC Gravesite Expansion VOL1SPECS wGEOTECH - BD 06-22-2026.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 1

0002 09-22-2026

897CM3025

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

To all Offerors/Bidders

36C78626B0027

08/27/2026

X

X x

The purpose of this amendment is to provide an updated list of answers to requests for information (RFI).

See attached: S02_Attachment – RFI Responses – Updated 9.22.2026

File details come from the government source that posted it. Updated .