S02_Attachment - 00 00 00 Specification Cover.pdf

PDF 1 MB Posted

Attached to
Leavenworth National Cemetery, Gravesite Expansion
Solicitation number
36C78626B0027
Issued by

About this file

This is a bid specification document for the Leavenworth National Cemetery Gravesite Expansion project issued by the Department of Veterans Affairs (VA) National Cemetery Administration. The project encompasses gravesite expansion, renovation and expansion of the administrative building, Facilities Condition Assessment (FCA) deficiencies remediation, and a master plan update. The VA Contract Number is 36C78624N0910, the VA Project Number is 810CM3033, and the AE Project Number is 18125, with a bid submission date of June 22, 2026.

The project team includes Anderson Engineering of MN, LLC serving as the primary project management, landscape architecture, planning, civil engineering, land surveying, environmental, structural engineering, and electrical engineering firm. Specialized consultants include Terracon for geotechnical engineering, EC Design for irrigation, IMEG for technology services, and OCMI for cost estimating. Key VA contacts include Brian Ballweg (NCA Project Manager), Shane Hilts (NCA Contracting Officer), and Maribel Alvarez-Cabrera (NCA District Engineer). The Cemetery Director is Quincy M. McCall at Leavenworth National Cemetery in Leavenworth, Kansas. Professional licenses and certifications are current, with expiration dates ranging from April 2027 to June 2028 across structural, architectural, civil, geotechnical, interior, mechanical/plumbing, electrical, and irrigation disciplines.

View the file

Other files

File Type Posted
S06_36C78626B0027 Amend. 0002.pdf PDF
S02_Attachment - 18704_LNC_Addendum1_CivilSheets_CG100-CR117_20260916.pdf PDF
S02_Attachment - 18704_LNC_Addendum1_CivilSheets_CD100-CB501_20260916.pdf PDF
S04_Attachment - Site Visit Attendance Roster.pdf PDF
S02_Attachment - 18704_LNC_Addendum1_SurveySheets_V100-V113_20260916.pdf PDF
S02_Attachment - 00 01 10 Table of Contents.pdf PDF
S02_Attachment - Substitution Request - Leavenworth GSE.pdf PDF
S02_Attachment - 01 35 26 Safety Requirements.pdf PDF
_31 LNC BD - TECHNOLOGY pt3 FIRE ALARM (pg 241-247).pdf PDF
_11 LNC BD - GRADING DRAINAGE (pg 78-82).pdf PDF
_28 LNC BD - PLUMBING (pg 224-230).pdf PDF
_24 LNC BD - INTERIORS (pg 182-188).pdf PDF
_23 LNC BD - ARCH pt2 (pg 171-181).pdf PDF
_19 LNC BD - SIGNAGE FURNISHINGS pt2 (pg 126-138).pdf PDF
_16 LNC BD - ROADS pt2 (pg 106-113).pdf PDF
_05 LNC BD - DEMOLITION pt1 (pg 22-34).pdf PDF
_07 LNC BD - SITE (pg 41-49).pdf PDF
_02 LNC BD - EX CON pt1 (pg 3-16).pdf PDF
LNC Gravesite Expansion VOL1SPECS wGEOTECH - BD 06-22-2026.pdf PDF
S02_Attachment - Price Schedule Sheet.pdf PDF
_26 LNC BD - ELECTRICAL (pg 201-214).pdf PDF
_29 LNC BD - TECHNOLOGY pt1 (pg 231-235).pdf PDF
_25 LNC BD - STRUCTURAL (pg 189-200).pdf PDF
_21 LNC BD - IRR pt2 (pg 150-158).pdf PDF
_18 LNC BD - SIGNAGE FURNISHINGS pt1 (pg 118-125).pdf PDF
_12 LNC BD - EROSION CONTROL pt1 (pg 83-86).pdf PDF
_13 LNC BD - EROSION CONTROL pt2 (pg 87-90).pdf PDF
_17 LNC BD - ROADS pt3 (pg 114-117).pdf PDF
_04 LNC BD - GEOTECH (pg 18-21).pdf PDF
S02_Attachment - Wage Determination Heavy.pdf PDF
S02_Attachment - Wage Determination Building.pdf PDF
S02_Attachment - Limitations on Subcontracting Cert.docx DOCX document
S02_Attachment - DOL Payroll Form.pdf PDF
_20 LNC BD - PLANTING IRR pt1 (pg 139-149).pdf PDF
_14 LNC BD - EROSION CONTROL pt3 UTIL pt1 (pg 91-98).pdf PDF
_22 LNC BD - ARCH pt1 (pg 159-170).pdf PDF
_09 LNC BD - COLUMBARIUM 3 pt1 (pg 60-69).pdf PDF
_10 LNC BD - COLUMBARIUM 3 pt2 (pg 70-77).pdf PDF
LNC Gravesite Expansion VOL2SPECS wGEOTECH - BD 06-22-2026.pdf PDF
_08 LNC BD - BURIALS (pg 50-59).pdf PDF
_30 LNC BD - TECHNOLOGY pt2 (pg 236-240).pdf PDF
_03 LNC BD - EX CON pt2 (pg 17).pdf PDF
S02_Attachment - Statement of Work.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
_15 LNC BD - UTIL pt2 ROADS pt1 (pg 99-105).pdf PDF
_06 LNC BD - DEMO pt2 OPERATIONS (pg 35-40).pdf PDF
_27 LNC BD - MECHANICAL (pg 215-223).pdf PDF
_01 LNC BD - GENERAL (pg 1-2).pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
S02_36C78626B0027 Solicitation.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEAVENWORTH NATIONAL CEMETERY

GRAVESITE EXPANSION

SPECIFICATIONS

BID DOCUMENTS

AE COMM. #18704

VA PROJECT #897CM3025

June 22, 2026

13605 1st Ave. N.; #100 Plymouth, MN 55441 P 763.412.4000 F 763.412.4090 ae-mn.com A Service-Disabled Veteran-Owned Small Business

BID Submission | June 22, 2026 LEAVENWORTH NATIONAL CEMETERY Gravesite Expansion, Renovate/Expand Admin.

Bldg., FCA Deficiencies, Master Plan Update

VA Contract No.: 36C78624N0910 | VA Project No.: 810CM3033 | AE Project No.: 18125 Page 1

CLIENT / OWNER

Department of Veterans Affairs NCA Project Manager Contact: Brian Ballweg National Cemetery Administration

(910) 231-0075

Department of Veterans Affairs NCA Contracting Officer Contact: Shane Hilts National Cemetery Administration

(402) 714-8099

Department of Veterans Affairs NCA District Engineer Contact: Maribel Alvarez-Cabrera National Cemetery Administration 904 Asterfield Lane Deland, FL 32720

Department of Veterans Affairs NCA Director CDIS Contact: Michael Carcanague National Cemetery Administration 1414 Stallion Lane West Chester, PA 19380

Leavenworth National Cemetery NCA Cemetery Director Contact: Quincy M. McCall 150 Muncie Road Leavenworth, KS 66048

(913) 727-1376

PROJECT TEAM

PROJECT MANAGEMENT

LANDSCAPE ARCHITECTURE / PLANNING /

CIVIL ENGINEERING / LAND SURVEYING /

ENVIRONMENTAL / STRUCTURAL

ENGINEERING / ELECTRICAL ENGINEERING

Anderson Engineering of MN, LLC Contact: Joe Lucht 13605 1st Avenue North, Suite 100 Plymouth, MN 55441

(763) 412-4000

GEOTECHNICAL ENGINEERING

Terracon Contact: Tommy Mast 15620 W 113th St.

Lenexa, KS 66219

(913) 202-7598

IRRIGATION

EC Design Contact: Lisa Essy 400 5th St.

West Des Moines, IA 50265

(515) 225-6365

TECHNOLOGY

IMEG

Contact: Pete McGhee 9000 E. Pima Center Parkway; #320 Scottsdale, AZ 85258

(480) 222-3789

COST ESTIMATING

OCMI

Contact: Kyle Veater 2100 N. Greenville Ave.

Richardson, TX 75082

(469) 431-0571

BID Submission | June 22, 2026 LEAVENWORTH NATIONAL CEMETERY Gravesite Expansion, Renovate/Expand Admin.

Bldg., FCA Deficiencies, Master Plan Update

VA Contract No.: 36C78624N0910 | VA Project No.: 810CM3033 | AE Project No.: 18125 Page 2

[project manager/landscape]

[structural ]

COVERS: DIV 03 - 06

EXPIRES: 04/30/2028

[architecture ]

COVERS: DIV 07 and 08

EXPIRES: JUNE 2028

[civil ]

[geotechnical ]

[interiors ]

COVERS: DIV 09 – 12

EXPIRES: JUNE 2028

[mech/plumb ]

COVERS: DIV 22 AND 23

EXPIRES: APRIL 2027

[electrical ]

COVERS: DIV 26

EXPIRES: APRIL 2027

[irrigation ]

[technology ]

[fire protection]

[survey ]

File details come from the government source that posted it. Updated .