_27 LNC BD - MECHANICAL (pg 215-223).pdf
PDF 8 MB Posted
- Solicitation number
- 36C78626B0027
About this file
This is a set of mechanical design drawings and schedules for the Leavenworth National Cemetery Gravesite Expansion project located at 150 Muncie Road, Leavenworth, Kansas 66048. The documents are bid documents prepared by Anderson Engineering of Minnesota, LLC for the U.S. Department of Veterans Affairs Office of Design and Construction Services, with project number 18704.
The mechanical scope includes HVAC systems, plumbing, and related infrastructure for the administrative building. Key mechanical systems specified include: one split system air handler (AHU-01/CU-01) with cooling capacity of 2,870 CFM and 115.8 MBH, one mini-split system (MS-1/CU-2) by Mitsubishi with 22.4 MBH cooling capacity, 15 variable air volume (VAV) terminal units ranging from 6 to 10 inches with airflow from 120 to 800 CFM, three exhaust fans (EF-1, EF-2, EF-3) with capacities of 100-400 CFM, and plumbing fixtures including water closets, lavatories, water heaters (including electric point-of-use models), and domestic hot water circulation systems. The documents specify mechanical equipment by manufacturer and model, including basis of design units with approved equal substitutions permitted. Demolition work is required for existing HVAC equipment, ductwork, and mechanical systems. The drawings include detailed construction standards referencing SMACNA guidelines, seismic restraint requirements per ASCE 7-10 and 2019 CBC, and coordination requirements with all trades. The contract documents require contractors to familiarize themselves with both drawings and specifications, verify existing conditions, coordinate with other trades, and ensure all work is complete, tested, and operational before project closeout.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHWS
CD
CDR
CWR
CWS
HWR
HWS
G
STM
(E)
CHWR Chilled-Water Return
Chilled-Water Supply
Condensate Drain
Steam Condensate Return
Condenser-Water Return
Condenser-Water Supply
Hot-Water Return
Hot-Water Supply
Natural Gas
Steam Supply
RL
RS
Refrigerant Liquid
Refrigerant Gas
2"
RD Refrigerant Discharge
Mechanical Piping Symbols
Keynote Symbol
Continuation Symbol
Sheet Number Where Detail is Placed
Detail Number on Sheet
Plan Revision Number
General Plan Symbols
Room Name / Number
Point Where New Connects To Existing
Existing Pipe To Remain
Area Being Demolished
Area Not In Contract
Pipe To Be Demolished
Above Ground Piping
Nominal Pipe Size
Below Ground Piping
Pipe Slope (When Applicable)
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN
THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE
USED IN THIS SET OF DRAWINGS.
LP Liquid Propane
1/8" / 12" SLOPE
24"x12"
24"/12"
18"Ø
General Exhaust Air
Outdoor Air
Building Relief Air
Return Air
Supply Air
Transfer Air
Grille, Register, Diffusers
Airflow
Catalog Throw Performance Neck Size / Module Size
Existing Duct To Remain
Oval Duct Size (Width / Height)
Sq. Duct Size (Width x Height)
HVAC Symbols
Rect. Supply Duct Rise / Drop
Mechanical Equipment
Round Duct Size (Diameter)
Duct To Be Demolished
Kitchen Exhaust Duct
Env. Tobacco Smoke
Equipment By Others (Refer To Other Disciplines)
Existing to Remain Equipment
Flue Gas Vent
Combustion Air
Ventilation Air
(E)AHU-2
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
CW COLD WATER
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GF GAS-FIRED
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
O/A OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
S/A SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
Abbreviations
Type (See Schedule)
Max NC Rating
Design Airflow Rate
RTU-1
10.0 ton
RTU-1
180000 Btu/h
180 CFH
3.7 GPM
VAV 1-2
Design Water Flow
Operating Weight
Heating Capacity
Nominal Cooling Capacity
Mechanical Devices
GWR
GWS
Geothermal-Water Return
Geothermal-Water Supply
Existing Relocated Equipment(R)AHU-3
AC AIR CONDITIONING UNIT
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CHWP CHILLED WATER PUMP
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HRU HEAT RECOVERY UNIT
PRV POWER ROOF VENTILATOR
RE RETURN/EXHAUST FAN
RTU ROOFTOP UNIT
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
Equipment Abbreviations
Damper Types
Laboratory Hood
Unit Identity
Valve Types
2" CHECK
2" BAL
3" CIRC
2" GATE
2" PRV
2" STRAIN
2" M-CNTRL
2" BV
1" GAS-CNTRL
Alternate Check Valve
1" REG
1" GAS COCK
1" PLUG
2" BFV
2" GLOBE
2" LOCK
4" 3-WAY CNTRL
2" QUICK
FLUE
C/A
S/A
V/A
O/A
R/A
L/A
T/A
E/A
KED
LH
ETS
Round Supply Duct Rise / Drop
Rect. Return Duct Rise / Drop
Round Return Duct Rise / Drop
Rect. Exhaust Duct Rise / Drop
Round Exhaust Duct Rise / Drop
(E)
EF-XX
500 CFM
AC-1
AFF:7'-0" Bottom of Equipment Height
Carbon Dioxide Detector
Carbon Monoxide Detector
Hydrogen Gas Detector
Hazardous Gas Detector
Nitrogen Dioxide Detector
Oxygen Gas Detector
Smoke Damper
Fire Damper
Comb. Fire/ Smoke Damper
Manual Damper
Motorized Damper
Backdraft Damper
Pipe Rise / Drop
Linear Diffuser
6"Ø
CD11 100
TYP. X 4
10"Ø/24x24 H6/9/1729
CD3 500
8"Ø/2s/4'-0"L
LD8 200
18"x10"
SG1 500
AFF:9'-0"
Neck Size Airflow
Airflow
Mounting Elevation (Centerline)
Nominal Duct Size
Airflow Neck Size/ Slot(s)/ Active Length
16"x16"
AFF:9'-0"
12"x12"/24x24
RG2 500
Airflow
Mounting Elevation (Centerline)
Nominal Duct Size
Airflow Neck Size / Module Size
Max NC Rating
Type Count for Space
Unit Identity
Gas Supply Input Rate
ET-1
379 lb
Humidity Sensor
Humidistat
Thermostat
Temp/ CO2 Sensor
Temp/ Humidity Sensor
Temperature Sensor
AHU-1
Ball Valve
Balancing Valve
Butterfly Valve
Check Valve
Circuit Setter
Gate Valve
Globe Valve
Locked Shield Valve
Pressure Reducing Valve
Quick Opening Valve
Fluid Strainer
Elec. Control Valve
3-Way Elec. Valve
Emergency Gas Shutoff
Plug Valve
Gas Shutoff Cock
Gas Regulator
2" CHECK
Throw Pattern
Room
Sidewall Supply Grille
Round Ceiling Diffuser
Square Ceiling Diffuser
Sidewall Return Grille
Ceiling Return
M501
1. CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH THE MECHANICAL AND PLUMBING DRAWINGS AND
THE SPECIFICATIONS. NEITHER THE DRAWINGS NOR THE SPECIFICATIONS SHALL BE COMPLETE
WITHOUT THE OTHER.
2. DRAWINGS ARE DIAGRAMMATIC. THE INTENT IS TO INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT. IT IS NOT INTENDED TO SPECIFY OR SHOW EVERY OFFSET, FITTING OR COMPONENT. HOWEVER, CONTRACT DOCUMENTS REQUIRE COMPONENTS AND MATERIALS WHETHER OR NOT INDICATED OR SPECIFICALLY SPECIFIED TO MAKE THE SYSTEMS BEING INSTALLED
COMPLETE, TESTED AND OPERATIONAL.
3. CONTRACTORS SHALL REFER TO ARCHITECTURAL SPECIFICATIONS AND DRAWINGS FOR DIMENSIONS AS WELL AS SPECIFICATIONS AND DRAWINGS OF OTHER DISCIPLINES AND FOR GENERAL INFORMATION
NECESSARY TO COMPLETE THE WORK.
4. ALL MATERIALS, EQUIPMENT AND METHOD OF INSTALLATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER’S RECOMMENDATIONS, THE REGULATIONS, CODES, ORDINANCES AND LAWS OF LOCAL, STATE AND OTHER AUTHORITIES HAVING LAWFUL JURISDICTION.
5. ALL PRODUCTS, OR PRE-APPROVED SUBSTITUTES, SHALL MEET THE SPECIFIED CRITERIA OF THE LISTED MANUFACTURER AND MODEL NUMBER IN THE MECHANICAL SCHEDULES. PRIOR TO COMMENCING WORK, CONTRACTOR SHALL SUBMIT A COPY OF SHOP DRAWINGS AND EQUIPMENT DATA FOR MATERIALS AND EQUIPMENT TO THE ENGINEER FOR REVIEW AND APPROVAL. REFER TO SPECIFICATION SECTION 01 33
23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, FOR MORE INFORMATION.
6. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER
BEFORE PROCEEDING WITH FABRICATION OR EQUIPMENT ORDERS.
7. WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER AND SHALL PRESENT A NEAT, RECTILINEAR
APPEARANCE WHEN COMPLETED. ZEMAXIMUM HEAD ROOM SHALL BE MAINTAINED AT ALL TIMES.
8. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE REASONABLE
ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER ACCESS.
9. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO COORDINATE
SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR EXPENSE TO OTHERS.
10. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL CHANGES
REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF DESIGN.
11. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING MOUNTED DEVICES, OTHER THAN
SPRINKLERS.
12. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS RESPONSIBLE FOR
PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND FINISH.
13. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE PANEL TYPE AND COLOR
WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING.
14. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE SEALED AIRTIGHT WITH
WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.
15. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL, PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO
ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS.
16. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL RELEVANT SPEC SECTIONS. SEAL
SLEEVE PERIMETER TO BE WATERTIGHT.
17. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND REQUIRED
SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS, PIPING, DUCTWORK, ETC.
18. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
19. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR STARTERS, SWITCHES, AND DISCONNECTS. THE MECHANICAL AND PLUMBING CONTRACTORS SHALL MAINTAIN ALL WORKING CLEARANCES PER CODE FOR THE ELECTRICAL EQUIPMENT. NO PIPING (OR DUCTWORK)
SHALL BE ROUTED OVER, UNDER OR ADJACENT TO ELECTRICAL EQUIPMENT. COORDINATE WITH
ELECTRICAL CONTRACTOR PRIOR TO ROUGH-IN. ANY CONFLICTS WILL RESULT IN THE PIPING (AND
DUCTWORK) BEING RELOCATED AT THE CONTRACTOR'S EXPENSE.
20. STRUCTURAL TO PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT. THIS CONTRACTOR SHALL COORDINATE FINAL EQUIPMENT SELECTION DIMENSIONS WITH THE STRUCTURAL ENGINEER AND COR IN WRITING.
21. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER NON- STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE
APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL GENERAL NOTES
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO
VENTILATION, PIPING, PLUMBING AND TEMPERATURE CONTROL.
A. A COPY OF "SEISMIC RESTRAINT MANUAL GUIDELINES FOR MECHANICAL SYSTEMS" BY SMACNA, ANSI/SMACNA 001-2008 SHALL BE PROVIDED BY THE CONTRACTOR AND KEPT ON THE JOB SITE AT ALL
TIMES.
B. ALL MECHANIC, PLUMBING, AND ELECTRICAL COMPONENTS SHALL BE ANCHORED OR BRACED TO
MEET THE FORCE AND DISPLACEMENT REQUIREMENTS PRESCRIBED IN THE 2019 CBC, SECTION
161A.1.18 THROUGH 161A.1.26 AND ASCE 7-10 CHAPTERS 13, 29, AND 30.
C. PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE FORCES AND DISPLACEMENTS PRESCRIBED IN ASCE 7-10 SECTION 13.3 AS DEFINED IN ASCE 7-10 SECTION 13.6.8, 13.6.7, AND 2019 CBC SECTION 1616A.1.23, 1616A.1.24, 1616A.1.25 AND 1616A.1.26.
SEISMIC MECHANICAL GENERAL NOTES
1. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO A TERMINAL AIR BOX (TAB) SHALL MATCH THE INLET SIZE UNLESS THE BRANCH IS GREATER THAN 6 FEET IN LENGTH, IN WHICH CASE THE
BRANCH DUCT SHALL BE SIZED AT A PRESSURE DROP OF 0.07"W.C. PER 100' OF DUCTWORK.
2. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO AN AIR TERMINAL SHALL MATCH THE
INLET SIZE.
3. TEMPERATURE SENSORS OR THERMOSTATS SHALL BE MOUNTED A MINIMUM OR 4'-8" ABOVE THE
FINISHED FLOOR.
4. ALIGN TEMPERATURE SENSORS OR THERMOSTATS WITH LIGHT SWITCHES WHEN IN CLOSE PROXIMITY
TO EACH OTHER.
5. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.
6. INSTALL, SUPPORT, AND BRACE ALL HVAC DUCTWORK AND ACCESSORIES PER "HVAC DUCT
CONSTRUCTION STANDARDS" BY SMACNA, ANSI/SMACNA 006-2006 AND "SEISMIC RESTRAINT MANUAL
GUIDELINES FOR MECHANICAL SYSTEMS" BY SMACNA, ANSI/SMACNA 001-2008.
7. INSULATE ALL SUPPLY AND RETURN AIR DUCTWORK AS REQUIRED BY THE NATIONAL, STATE OR LOCAL
ENERGY CODE, WHICHEVER IS MORE STRINGENT.
VENTILATION GENERAL NOTES
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS
BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS BEFORE STARTING
WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE REQUIRED TO BE
REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF WORK.
4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS. CONTRACTORS SHALL NOTIFY
THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. NOTIFY THE
GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO BIDDING.
6. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH NEW
EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL SYSTEMS TO ALLOW FOR INSTALLATION OF
NEW EQUIPMENT, PIPING, OR DUCTWORK.
7. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT REMAIN ACTIVE.
8. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY REASON. MAINTAIN
SERVICE TO ALL SYSTEMS AND COMPONENTS THAT ARE TO REMAIN UNTIL NEW SYSTEMS ARE
INSTALLED.
9. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY DRAINING SYSTEM. MAKE CHANGEOVER TO NEW
SYSTEMS WITH MINIMUM OUTAGE.
10. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT THAT HAS
BEEN REMOVED.
MECHANICAL RENOVATION NOTES
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.
HVAC SHEET LIST
SHEET
No. SHEET NAME
M001 MECHANICAL SYMBOLS, ABBREVIATIONS, GENERAL NOTES
MD101 MECHANICAL DEMOLITION LOWER LEVEL - HVAC
MD111 MECHANICAL DEMOLITION FIRST LEVEL - HVAC
MH101 MECHANICAL HVAC - LOWER LEVEL
MH111 MECHANICAL HVAC - FIRST LEVEL
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OPTIONAL BID #1
BID DOCUMENTS
C R e v it L o c a l_ F ile s
\1
M
E P
R s c o tt -f o rs b e rg .r v t
/1
/2
:3
:2
A
M
M001
MECHANICAL SYMBOLS, ABBREVIATIONS,
GENERAL NOTES
LEAVENWORTH NATIONAL CEMETERY
GRAVESITE EXPANSION
150 MUNCIE ROAD; LEAVENWORTH, KANSAS 66048
897CM3025
June 22, 2026 KJQ JT 18704
Revisions: Date:
Title Sheet Revision M-001
VA
F
O R
M
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18704Date:
IRRIGATION:
EC DESIGN
400 5th St West Des Moines, IA 50265
(515) 225-6265
COST ESTIMATING:GEOTECHNICAL:
TERRACON
15620 W 113th St Lenexa, KS 66219
(913) 202-7598
OCMI
2100 North Greenville Ave. #1150 Richardson, TX 75082
(469) 431-0571
TECHNOLOGY:
IMEG
900 E. Prima Ctr Pkwy #320 Scottsdale, AZ 85258
(480) 222-3789
U.S. Department of Veterans Affairs
Office of Design and Construction
Services
F
C
(E )1
2" x8
O
/A
(E )1
2" x8
O
/A
(E)16"x16" R/A UP
(E)18"x16" S/A UP
AHU-1
AHU-2
(E)14"x16" R/A
(E)12"x8" O/A (E)18"x12" O/A
(E)18"x12" O/A
(E)12"x8" O/A
14"x16" RA UP
(E)14"x16" R/A
(E)18"x16" S/A 2
3 54.1 5.13.1
D.1
UNEXCAVATED
H
G
E
D
1. CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH THE MECHANICAL AND PLUMBING DRAWINGS AND THE SPECIFICATIONS. NEITHER THE DRAWINGS NOR THE SPECIFICATIONS SHALL BE COMPLETE
WITHOUT THE OTHER.
2. DRAWINGS ARE DIAGRAMMATIC. THE INTENT IS TO INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT. IT IS NOT INTENDED TO SPECIFY OR SHOW EVERY OFFSET, FITTING OR COMPONENT. HOWEVER, CONTRACT DOCUMENTS REQUIRE COMPONENTS AND MATERIALS WHETHER OR NOT INDICATED OR SPECIFICALLY SPECIFIED TO MAKE THE SYSTEMS BEING INSTALLED
COMPLETE, TESTED AND OPERATIONAL.
3. CONTRACTORS SHALL REFER TO ARCHITECTURAL SPECIFICATIONS AND DRAWINGS FOR DIMENSIONS AS WELL AS SPECIFICATIONS AND DRAWINGS OF OTHER DISCIPLINES AND FOR GENERAL INFORMATION
NECESSARY TO COMPLETE THE WORK.
4. COMPLY WITH DIVISION 1 CONTINUITY OF SERVICES REQUIREMENTS.
5. DEMOLITION WORK REQUIRED BY THE WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO THE
FOLLOWING: DUCTWORK SYSTEMS: HEATING EQUIPMENT, VALVES, PIPING ETC. MECHANICAL
CONTRACTOR IS RESPONSIBLE TO VERIFY FULL EXTENT OF DEMOLITION REQUIRED PRIOR TO BIDDING.
FACILITY WILL BE AVAILABLE TO CONTRACTORS FOR ON-SITE INSPECTION. TIMES TO BE COORDINATED
WITH THE COR.
6. REMOVE ALL INACTIVE PIPES, SLEEVES, FASTENERS, HANGERS, DAMPERS, DUCTWORK, EQUIPMENT, FITTINGS, INSULATION & PIPE COVERINGS, METERS, GAUGES, VALVES, CONTROLS & CONTROL SYSTEMS, THERMOSTATS, CONTROL WIRING & AIR PIPING, TERMINAL UNITS, AND MISCELLANEOUS ITEMS
ASSOCIATED WITH EXISTING SYSTEMS OR PORTIONS THEREOF WHICH ARE NOT BEING REUSED.
7. MATERIAL AND EQUIPMENT SHOWN OR SPECIFIED TO BE REMOVED AND NOT SPECIFIED TO BE REINSTALLED OR TURNED OVER TO THE OWNER, SHALL BECOME THE CONTRACTOR’S PROPERTY AND
SHALL BE REMOVED FROM THE SITE.
8. SAW CUT OR CORE DRILL OPENINGS THRU FLOORS AND/OR WALLS AS REQUIRED TO ACCOMMODATE
NEW WORK.
HVAC DEMOLITION GENERAL NOTES
MECHANICAL DEMOLITION KEYED NOTES
REMOVE EXISTING AIR HANDLERS, ALL ASSOCIATED CONTROLS,
ACCESSORIES, DUCTWORK AND PIPING.
2 REMOVE DUCTWORK UP IN SHAFT.
REMOVE EXISTING OUTDOOR AIR GRILL OR LOUVER. PATCH WALL TO
MATCH EXISTING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OPTIONAL BID #1
BID DOCUMENTS
C R e v it L o c a l_ F ile s
\1
M
E P
R s c o tt -f o rs b e rg .r v t
/1
/2
:3
:3
A
M
MD101
MECHANICAL DEMOLITION LOWER LEVEL -
HVAC
LEAVENWORTH NATIONAL CEMETERY
GRAVESITE EXPANSION
150 MUNCIE ROAD; LEAVENWORTH, KANSAS 66048
897CM3025
June 22, 2026 KJQ JT 18704
1/4" = 1'-0"1
MECHANICAL DEMOLITION LOWER LEVEL - HVAC
0 4' 8'2'
TRUE
NORTH
PLAN
NORTH
Revisions: Date:
VA
F
O
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18704Date:
IRRIGATION:
EC DESIGN
400 5th St West Des Moines, IA 50265
(515) 225-6265
COST ESTIMATING:GEOTECHNICAL:
TERRACON
15620 W 113th St Lenexa, KS 66219
(913) 202-7598
OCMI
2100 North Greenville Ave. #1150 Richardson, TX 75082
(469) 431-0571
TECHNOLOGY:
IMEG
900 E. Prima Ctr Pkwy #320 Scottsdale, AZ 85258
(480) 222-3789
U.S. Department of Veterans Affairs
Office of Design and Construction
(E)18"x16" S/A
(E)16"x16" R/A
(E)16"x14" R/A
(E)12"x14" S/A(E)16"x14" R/A
(E)12"x12" S/A
3 54.1 5.13.1
D.1
(E )8
"x 6"
E /A
(E )8
"x 6"
E /A
(E)8"x6" E/A (E)8"x8" E/A
(E )8
"x 8"
E /A
(E)8"x8" E/A(E)12"Ø E/A
(E )6
"x 8"
E /A
(E)14"Ø E/A UP
H
G
E
D
1. CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH THE MECHANICAL AND PLUMBING DRAWINGS AND THE SPECIFICATIONS. NEITHER THE DRAWINGS NOR THE SPECIFICATIONS SHALL BE COMPLETE
WITHOUT THE OTHER.
2. DRAWINGS ARE DIAGRAMMATIC. THE INTENT IS TO INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT. IT IS NOT INTENDED TO SPECIFY OR SHOW EVERY OFFSET, FITTING OR COMPONENT. HOWEVER, CONTRACT DOCUMENTS REQUIRE COMPONENTS AND MATERIALS WHETHER OR NOT INDICATED OR SPECIFICALLY SPECIFIED TO MAKE THE SYSTEMS BEING INSTALLED
COMPLETE, TESTED AND OPERATIONAL.
3. CONTRACTORS SHALL REFER TO ARCHITECTURAL SPECIFICATIONS AND DRAWINGS FOR DIMENSIONS AS WELL AS SPECIFICATIONS AND DRAWINGS OF OTHER DISCIPLINES AND FOR GENERAL INFORMATION
NECESSARY TO COMPLETE THE WORK.
4. COMPLY WITH DIVISION 1 CONTINUITY OF SERVICES REQUIREMENTS.
5. DEMOLITION WORK REQUIRED BY THE WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO THE
FOLLOWING: DUCTWORK SYSTEMS: HEATING EQUIPMENT, VALVES, PIPING ETC. MECHANICAL
CONTRACTOR IS RESPONSIBLE TO VERIFY FULL EXTENT OF DEMOLITION REQUIRED PRIOR TO BIDDING.
FACILITY WILL BE AVAILABLE TO CONTRACTORS FOR ON-SITE INSPECTION. TIMES TO BE COORDINATED
WITH THE COR.
6. REMOVE ALL INACTIVE PIPES, SLEEVES, FASTENERS, HANGERS, DAMPERS, DUCTWORK, EQUIPMENT, FITTINGS, INSULATION & PIPE COVERINGS, METERS, GAUGES, VALVES, CONTROLS & CONTROL SYSTEMS, THERMOSTATS, CONTROL WIRING & AIR PIPING, TERMINAL UNITS, AND MISCELLANEOUS ITEMS
ASSOCIATED WITH EXISTING SYSTEMS OR PORTIONS THEREOF WHICH ARE NOT BEING REUSED.
7. MATERIAL AND EQUIPMENT SHOWN OR SPECIFIED TO BE REMOVED AND NOT SPECIFIED TO BE REINSTALLED OR TURNED OVER TO THE OWNER, SHALL BECOME THE CONTRACTOR’S PROPERTY AND
SHALL BE REMOVED FROM THE SITE.
8. SAW CUT OR CORE DRILL OPENINGS THRU FLOORS AND/OR WALLS AS REQUIRED TO ACCOMMODATE
NEW WORK.
HVAC DEMOLITION GENERAL NOTES
MECHANICAL DEMOLITION KEYED NOTES
REMOVE EXISTING EXHAUST FAN AND ALL ASSOCIATED CONTROLS AND
ACCESSORIES. EXISTING DUCTWORK AND GRILLES TO REMAIN. PREPARE
DUCTWORK FOR CONNECTION TO NEW FAN.
2 REMOVE DUCT DOWN IN SHAFT.
REMOVE SUPPLY AND RETURN MAIN DUCTS STACKED ON TOP OF EACH
OTHER.
REMOVE EXISTING CONDENSORS, ALL ASSOCIATED CONTROLS,
ACCESSORIES AND PIPING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OPTIONAL BID #1
BID DOCUMENTS
C R e v it L o c a l_ F ile s
\1
M
E P
R s c o tt -f o rs b e rg .r v t
/1
/2
:3
:3
A
M
MD111
MECHANICAL DEMOLITION FIRST LEVEL -
HVAC
LEAVENWORTH NATIONAL CEMETERY
GRAVESITE EXPANSION
150 MUNCIE ROAD; LEAVENWORTH, KANSAS 66048
897CM3025
June 22, 2026 KJQ JT 18704
1/4" = 1'-0"1
MECHANICAL DEMOLITION FIRST LEVEL - HVAC
0 4' 8'2'
TRUE
NORTH
PLAN
NORTH
Revisions: Date:
VA
F
O
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18704Date:
IRRIGATION:
EC DESIGN
400 5th St West Des Moines, IA 50265
(515) 225-6265
COST ESTIMATING:GEOTECHNICAL:
TERRACON
15620 W 113th St Lenexa, KS 66219
(913) 202-7598
OCMI
2100 North Greenville Ave. #1150 Richardson, TX 75082
(469) 431-0571
TECHNOLOGY:
IMEG
900 E. Prima Ctr Pkwy #320 Scottsdale, AZ 85258
(480) 222-3789
U.S. Department of Veterans Affairs
Office of Design and Construction
AHU-1
MS-1
22"x22" R/A UP
20"x20" S/A UP
8"x8" S/A 6"Ø S/A 10"x10" S/A
8"x6" S/A
8"x8" R/A
BASEMENT
B01
BASEMENT
B02
VAV-001VAV-002
8"x6" S/A
8" x6
S
/A
6" x4
S
/A 6" x4
S /A
6" x4
S
/A
1 2.1 3 54.1 5.13.12
D.1
6"x4"
SG1 75
6"x4"
SG1 75
22"x10"
RG2 225
6"x4"
SG1 150
6"x4"
SG1 150
6"x4"
SG1 150
6"x4"
SG1 75
6"x4"
RG2 75
6"x4"
RG2 75
"x
O A
14"x50" OA
"x
O A
50"x14" OA UP
48"x24"
LV-1
"x
S /A
50"x14" R/A
2" G
2" G
2" G
2" G
2 PSI NATURAL GAS DOWN FROM
GAS METER. SEE SHEET M111
FOR CONTINUATION.
3" G
3" G
3" G
HIGH PRESSURE NATURAL
GAS UP TO METER.
UNEXCAVATED
UNEXCAVATED
UNEXCAVATED
H
G
E
D
MECHANICAL PLAN KEYED NOTES
COORDINATE FINAL AIR HANDLER SELECTION WITH STRUCTURAL TO
PROVIDE A CONCRETE PAD WHICH IS 6 INCHES THICK AND EXTENDS 6
INCHES BEYOND THE EQUIPMENT LENGTH AND WIDTH. PROVIDE
VIBRATION INSOLATORS, SEE DETAILS.
2 TRANSFER AIR GRILLES.
EXTEND AND CONNECT NEW NATURAL GAS LINE TO EXISTING NATURAL
GAS MAIN. COORDINATE WITH CIVIL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OPTIONAL BID #1
BID DOCUMENTS
C R e v it L o c a l_ F ile s
\1
M
E P
R s c o tt -f o rs b e rg .r v t
/1
/2
:3
:4
A
M
MH101
MECHANICAL HVAC - LOWER LEVEL
LEAVENWORTH NATIONAL CEMETERY
GRAVESITE EXPANSION
150 MUNCIE ROAD; LEAVENWORTH, KANSAS 66048
897CM3025
June 22, 2026 KJQ JT 18704
1/4" = 1'-0"
MECHANICAL HVAC - LOWER LEVEL
0 4' 8'2'
TRUE
NORTH
PLAN
NORTH
Revisions: Date:
VA
F
O
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18704Date:
IRRIGATION:
EC DESIGN
400 5th St West Des Moines, IA 50265
(515) 225-6265
COST ESTIMATING:GEOTECHNICAL:
TERRACON
15620 W 113th St Lenexa, KS 66219
(913) 202-7598
OCMI
2100 North Greenville Ave. #1150 Richardson, TX 75082
(469) 431-0571
TECHNOLOGY:
IMEG
900 E. Prima Ctr Pkwy #320 Scottsdale, AZ 85258
(480) 222-3789
U.S. Department of Veterans Affairs
Office of Design and Construction
BREAK ROOM
PROGRAM ANALYST
BUDGET ANALYST
ASSISTANT DIRECTOR
DIRECTOR
STAFF MEN
114A
STAFF WOMEN
113A
WORKSTATIONS
OPERATIONAL CTR
MULTIPURPOSE ROOM
ADMIN OFFICER
LOBBY
HAC
MENS
WOMENS
STORAGE
"x
R /A
"x
8" S
/A
8" Ø
S /A
8" Ø
S /A
8" x1
0" S
/A
14"x16" R/A
14"x16" S/A
"x
R /A
"x
S /A
14"x14" R/A
14"x14" S/A
12"x12" S/A
"x
8" S
/A
6"Ø E/A 6"Ø E/A
VAV-120
VAV-117VAV-118
VAV-114
VAV-113
VAV-106
VAV-107
VAV-103
8"Ø/20x20
CD1 125
8"Ø/20x20
CD1 150
1 2.1 3 54.1 5.13.12
D.1
8"Ø/20x20
CD1 125
8"Ø/20x20
CD1 125
8"Ø/20x20
CD1 150
8"Ø/20x20
CD1 150
8"Ø/20x20
CD1 250
8"Ø/20x20
CD1 150
8"Ø/20x20
CD1 180
8"Ø/20x20
CD1 120
EF-2 EF-3
14"x12" R/A
8"Ø/20x20
CD1 150
8"Ø/20x20
CD1 125
8" x1
0" S
/A
6" x1
0" S
/A
12"x12" S/A
"x
S /A
12"x12" S/A
6"Ø/20x20
CD1 100
6"Ø/20x20
CD1 100
6"Ø/20x20
CD1 60
8"Ø/20x20
CD1 160
8"Ø/20x20
CD1 160
22"x22" R/A UP
20"x20" S/A UP
10"Ø/20x20
CD1 270
10"Ø/20x20
CD1 265
10"Ø/20x20
CD1 265
14"x14" R/A
EF-1
22"x22" R/A
20"x20" S/A
14"x14" S/A 14"x8" S/A
18"x10" R/A
10"x8" S/A
8"Ø S/A
6"Ø S/A
VAV-101
(E)12"Ø E/A (E)8"x8" E/A
(E )6
"x 8"
E /A
(E )8
"x 8"
E /A
(E)8"x8" E/A(E)8"x6" E/A
(E)14"Ø E/A UP
(E )8
"x 6"
E /A
(E )8
"x 6"
E /A
T
T
T T
T
T
T
T
T T
T T
T
2 2
STAIRS DN
CU-1
CU-2
SEE CIVIL OR LANDSCAPE
PLANS FOR INFORMATION
ON NEW PATIO.
8"Ø S/A6"Ø S/A
6"Ø S/A 8"Ø S/A
10"Ø S/A 6"Ø S/A 8"Ø S/A
10"x10" R/A
18"x12"
RG-01
VAV-121
18"x12"
RG-01
8"x6" R/A
8"x8" R/A
8"x6" R/A
VAV-119
R
IS
E
8"x6" R/A
18"x12"
RG-01
14"x16" S/A
6" Ø
S /A
6" Ø
S /A
6"Ø S/A 6"Ø S/A
6" Ø
S /A
6"Ø/20x20
CD1 75
6"Ø/20x20
CD1 75
18"x12"
RG-01
18"x12"
RG-01
18"x12"
RG-01
8" x6
R
/A
18"x12"
RG-01
18"x12"
RG-01
18"x12"
RG-01
VAV-108
18"x12"
RG-01
6"Ø
10"Ø
8"x8" R/A
VAV-104
6" Ø
6" Ø
H
G
E
B
A
D
MECHANICAL KEYNOTES
1. ROUTE SUPPLY BRANCH DUCTWORK UNDER RETURN AIR DUCT MAIN.
2. EXTEND EXHAUST DUCT UP THROUGH ROOF TO ROOF CAP. SEE DETAILS.
3. PROVIDE NEW DUCTWORK AND ROOF CAP FOR EXISTING EXHAUST DUCT
THROUGH ROOF FOR NEW ROOFING SYSTEM.
4. PROVIDE TEMPERATURE SENSORS OR THERMOSTATS WITH INSULATED BASE
ON OUTSIDE WALL.
5. CONNECT NEW EXHAUST FAN TO EXISTING DUCTWORK.
6. REFER TO SHEET M601 SINGLE DUCT AIR TERMINAL UNIT SCHEDULE FOR VAV
BOX SIZE, TYPICAL.
7. COORDINATE LOCATION OF NEW GAS METER WITH GAS UTILITY COMPANY.
METER OUTLET PRESSURE OF 2 PSI AT 100 CFH.
8. CONDENSING UNITS SHOWN FOR REFERENCE. FINAL LOCATION OF
CONDENSING UNIT SHALL BE COORDINATED WITH CIVIL AND COR.
X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OPTIONAL BID #1
BID DOCUMENTS
C R e v it L o c a l_ F ile s
\1
M
E P
R s c o tt -f o rs b e rg .r v t
/1
/2
:3
:4
A
M
MH111
MECHANICAL HVAC - FIRST LEVEL
LEAVENWORTH NATIONAL CEMETERY
GRAVESITE EXPANSION
150 MUNCIE ROAD; LEAVENWORTH, KANSAS 66048
897CM3025
June 22, 2026 KJQ JT 18704
1/4" = 1'-0"
MECHANICAL HVAC - FIRST LEVEL
0 4' 8'2'
TRUE
NORTH
PLAN
NORTH
Revisions: Date:
VA
F
O
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18704Date:
IRRIGATION:
EC DESIGN
400 5th St West Des Moines, IA 50265
(515) 225-6265
COST ESTIMATING:GEOTECHNICAL:
TERRACON
15620 W 113th St Lenexa, KS 66219
(913) 202-7598
OCMI
2100 North Greenville Ave. #1150 Richardson, TX 75082
(469) 431-0571
TECHNOLOGY:
IMEG
900 E. Prima Ctr Pkwy #320 Scottsdale, AZ 85258
(480) 222-3789
U.S. Department of Veterans Affairs
Office of Design and Construction
B
B
B
B
PROVIDE TRANSITION FROM
TERMINAL TO DUCTWORK
VAV OR CV
TERMINAL
PROVIDE A MINIMUM OF FOUR DUCT
DIAMETERS OF STRAIGHT DUCT
PROVIDE BALANCING DAMPER AT
EACH FLOOR TAKE-OFF
S U
P P
LY
D
U C
T M
A
IN
LINEAR SLOT, LINEAR BAR
OR FLOW BAR DIFFUSER
SUPPLY DUCT RISER
EQUAL LENGTH BRANCH DUCTS
TO SUPPLY AIR OUTLETS
SUPPLY DUCT BRANCH
RIGID DUCTFLEX DUCT
(5'-0" MAX)
SUPPLY
GRILLE/
REGISTER
SIZE BY CFM
PROPORTION
NOTES:
1. SEE TO HVAC FLOOR PLANS FOR DUCT SIZES
2. SEE TO SCHEDULES FOR GRILLES, REGISTERS, DIFFUSERS AND TERMINAL SIZES AND TYPES
3. PROVIDE A MANUAL TYPE BALANCING DAMPER FOR EACH SUPPLY OUTLET AND RETURN INLET
4. ALL DUCT RUNOUTS TO DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER NECK SIZE, UNLESS OTHERWISE NOTED
5. FLEX DUCT SHALL NOT BE ALLOWED ON RETURN OR EXHAUST DUCTWORK SYSTEMS
6. PROVIDE 12" AIR CUSHION AT THE END OF EACH SUPPLY MAIN AND BRANCH DUCT
7. INDIVIDUAL BRANCH BALANCING DAMPERS NOT REQUIRED FOR SUPPLY OR EXHAUST REGISTERS
CEILING
DIFFUSER
SUPPLY DUCT BRANCH
S U
P P
LY
D
U C
T M
A
IN
RETURN DUCT RISER
R E
T U
R N
D U
C T
M A
INRETURN
DUCT BRANCH
RETURN
GRILLE
CEILING
GRILLE
OPEN ENDED
RETURN AIR
BRANCH DUCT
PROVIDE 1-1/2 RADIUS ELBOWS
FOR ALL DUCTWORK SYSTEMS
WHEREVER SPACE ALLOWS
PROVIDE 90° ELBOWS WITH
TURNING VANES IF RADIUS
ELBOWS WILL NOT FIT
EXHAUST
REGISTER
E X
H A
U S
T D
U C
T M
A
IN
EXHAUST
DUCT BRANCH
EXHAUST DUCT
RISER
30° MIN
B
BB
B
B
B
B
B
B B
B
B
B
B B
B
B
1. RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A MINIMUM OF 3 TIMES THE DIAMETER OF INLET
2. A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0" [900mm].
3. A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10 FEET (3 METERS). FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A DUCT TRANSITION TO MAINTAIN THE DUCT STATIC PRESSURE DROP AT OR BELOW 0.2"/100' [1.64Pa/m].
4. FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm]. USE RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER THAN 45°.
5. COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE INSULATION W/VAPOR BARRIER FOR CONNECTING
DUCT SECTIONS.
NOTES:
SEE NOTE 1
SEE NOTE 2
SEE NOTE 3
SEE SPECIFICATIONS FOR CLAMPS
AND SEALANT, TYPICAL
VAV BOX. SEE NOTE 5.
REHEAT COIL
SOUND ATTENUATOR. SEE
EQUIPMENT SCHEDULE.
FLEXIBLE AIR DUCT
CONNECTOR. SEE DETAIL.
DIFFUSER, TYPICAL
SEE NOTE 4S
U
P P
LY
D
U C
T
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED CONNECTION
ON FAN SIDE
WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm]
NOMINAL WITH MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS ON
12" [300mm] CENTERS
RIVET ON 4"
[100mm]
CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
1" [25mm] FLANGE & HEM
ALTERNATE
POSITION OF BOLT
1 1/2" [40mm]
POCKET SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
[15mm] [15mm] [40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX.
INSTALLED. 6" [150mm]
NOMINAL WITH MATERIAL TAUT
FLANGED CONNECTION
ON FAN SIDE
WASHER
FLEXIBLE MATERIAL
AS SPECIFIED
1/2" 1/2" 1 1/2"
PROVIDE SUPPORTS
TO PREVENT SAG
BETWEEN HANGERS
DUCT COLLAR
CONNECTING
STRAP
DIFFUSER
SUPPLY DUCT
MAIN
MINIMUM OF ONE DUCT DIAMETER
OF STRAIGHT DUCT TO INLET OF
DIFFUSER, OR PROVIDE EQUALIZING
GRID AT DIFFUSER
CONICAL SPIN IN
WITH DAMPER
HARD DUCT
ELBOW
FLEXIBLE DUCT, MAX. 5'-0" LONG.
SECURE INSIDE LINER WITH METAL HOSE
CLAMP RETAINING STRAPS. SECURE
OUTSIDE JACKET WITHNYLON TIE STRAPS. SEE
DIFFUSER TAGS FOR DUCT SIZES.
FACTORY
DISCONNECT
CONDENSATE DRAIN
LINE. ROUTE TO CLOSEST
SANITARY SEWER W/
INDIRECT CONNECTION.
CEILING
FLOOR
CONDENSOR
EVAPORATOR ELECTRIC
POWER
T
R E
F R E
F
M
IN
6'
-0
A F
F
MIN. 0'-6" BELOW
CEILING
M
IN
. 5 '-0
A
F F
EXTERIOR WALL
REF
REF
EQUIPMENT
PAD
THERMOSTAT
m m
1" M
A X
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 -
SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
mm [IN] mm
[FT]
mm
[FT]
THRU 20
[THRU 3/4]
[7]
[5]
[1]
[7]
[6]
[1 1/4]
[7]
[7]
[1 1/2]
[9]
[8]
[2]
[10]
[8]
[2 1/2]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32]
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE
CHANNEL OR
50x50x6.4mm [2"X2"X1/4"]
ANGLE
15mm [1/2"] DIA. HANGER RODS WITH 900mm [36"]
MAX. SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
ADJUSTABLE CLEVIS HANGER TYPE 43 -
SEE SPECIFICATIONS
OPENING WITH REMOVABLE
BIRD SCREEN
ROOF CAP OF HEAVY
GAUGE G90 ALUMINUM
WEIGHTED GRAVITY DAMPER
WITH FOAM GASKET FOR
QUIET CLOSURE
ROOF
SHEATHING
MEMBRANE
DECK SCREWS
MINIMUM OF 2 DIAMETER
RADIAS ELBOW
HARD DUCT. INSTALL PER SMACNA
STANDARDS AND PROVIDE
INSULATION PER CODE
CEILING
EXHAUST
FAN
INTEGRATE MINIMUM 4" FLASHING
WITH ROOFING SHINGLES.
PROVIDE A CONTINUOUS BEAD OF
POLYURETHANE SEALANT.
EXTENSION COLLAR MUST
EXTEND (2) TWO TO (3) THREE
INCHES BELOW ROOF DECK
ATTIC SPACE
DRIVEN
EQUIPMENT
MOTORTYPICAL STRUCTURAL
STEEL MEMBER FOR
EQUIPMENT
TYPE"B"
WELDED STEEL BASE
NUMBER OF ISOLATION
UNITS AS REQUIRED
TYPICAL STRUCTURAL STEEL
MEMBER FOR EQUIPMENT
ALL WELDED STEEL
FRAMEWORK
SECTION A-A
STRUCTURAL
STEEL FRAME
SPRING
ISOLATOR
ANCHOR
BOLT
REINFORCING
BARS
SLEEVE
SHAFT
MOTORSHAFT
DRIVEN
EQUIPMENT
A
A
NUMBER OF ISOLATION
UNITS AS REQUIRED
TYPE "1"
CONCRETE INERTIA BASE
MAIN LEVEL
100'-0"
LOWER LEVEL
91'-7"
F
24"x48" OA
14"x50" R/A 18"x46" S/A
"x
S /A
"x
R /A
14"x50" OA
14"x50" OA
MIXING
BOX
FILTERS AND
COOLING COILS
HEATING COILS
AND SUPPLY FAN
AHU-1
VAV-001
LOUVER
EQUIPMENT PAD
10"x10"/---
RG2 450
EXTERIOR WALL
STRUCTURAL BEAM
FLOOR JOISTS
STAIRS DN
FLOOR
G E
EXISTING WALL FIELD
VERIFY CONSTRUCTION.
SHEET METAL WALL SLEEVE. EXTEND
SLEEVE TO AN APPROPRIATE LENGTH SUCH
THAT DUCT CONNECTION CAN BE MADE.
ANCHOR
SILICONE SEALANT. APPLY
CONTINUOUS BEAD AROUND
PERIMETER OF LOUVER.
ANGLE CLIP AROUND
INSIDE OF LOUVER
1/2"x1/2" GALVANIZED WIRE
MESH INSIDE OF LOUVER.
LOUVER (SEE PLANS
FOR SIZES)
SHEET METAL FLASHING
DUCTWORK TO
EQUIPMENT
PROVIDE BURGLAR BARS ON ALL
LOUVERS LARGER THAN 12"X12"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OPTIONAL BID #1
BID DOCUMENTS
C R e v it L o c a l_ F ile s
\1
M
E P
R s c o tt -f o rs b e rg .r v t
/1
/2
:3
:0
A
M
M501
MECHANICAL DETAILS
LEAVENWORTH NATIONAL CEMETERY
GRAVESITE EXPANSION
150 MUNCIE ROAD; LEAVENWORTH, KANSAS 66048
897CM3025
June 22, 2026 KJQ SEF 18704
NOT TO SCALE10
DUCTWORK INSTALLATION DIAGRAM
NOT TO SCALE6
VAV DUCT CONNECTIONS DETAIL
NOT TO SCALE3
FLEXIBLE DUCT CONNECTION DETAIL
NOT TO SCALE8
DIFFUSER FLEXIBLE DUCT CONNECTION DETAIL
NOT TO SCALE5
MINI-SPLIT SYSTEM DETAIL
NOT TO SCALE1
PIPE HANGERS
NOT TO SCALE9
EXHAUST FAN ROOF DISCHARGE DETAIL
NOT TO SCALE2
VIBRATION ISOLATION BASES
NOT TO SCALE4
AIR HANDLER SIDE VIEW DETAIL
NOT TO SCALE7
LOUVER ASSEMBLY DETAIL
Revisions: Date:
M-501
VA
F
O
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18704Date:
IRRIGATION:
EC DESIGN
400 5th St West Des Moines, IA 50265
(515) 225-6265
COST ESTIMATING:GEOTECHNICAL:
TERRACON
15620 W 113th St Lenexa, KS 66219
(913) 202-7598
OCMI
2100 North Greenville Ave. #1150 Richardson, TX 75082
(469) 431-0571
TECHNOLOGY:
IMEG
900 E. Prima Ctr Pkwy #320 Scottsdale, AZ 85258
(480) 222-3789
U.S. Department of Veterans Affairs
Office of Design and Construction
NOTE:
STRAP WATER HEATER TO WALL WITHIN UPPER ONE-THIRD
AND LOWER ONE-THIRD OF UNIT TO RESIST HORIZONTAL
DISPLACEMENT. MAINTAIN A MINIMUM 4" CLEARANCE
BETWEEN STRAPS AND UNIT CONTROLS.
ROUTE DRAINS TO
FLOOR DRAIN.
PROVIDE AIR GAP.
PIPE ANCHOR
H.W. CONNECTION
3/4" OVERFLOW
TO FLOOR DRAIN
3/4" T&P RELIEF
DISCHARGE ABOVE
BALL VALVE (TYP)
H.W. SUPPLY
3" DEEP DRAIN
PAN
3/4" DECK IN STEEL
FRAME MOUNTED A
MINIMUM OF 7'-6" AFF
WATER HEATER
SET AT 140° F
DRAIN VALVE
2" x 20 GAUGE STRAP, TYPICAL OF 2
ANCHOR STRAP
EXPANSION TANK
AS SCHEDULED
C.W. CONNECTION
L1-1/2 X L1-1/2"
SUPPORT ANGLE
C.W. SUPPLY
UNION (TYP)
WATER
HEATER
DRAIN VALVE
ROUTE RELIEF TO FD
TERMINATE 4" AFF
SHUT-OFF VALVE
UNION
RELIEF VALVE
AQUASTAT
CHECK VALVE
CIRCULATING PUMP
EXPANSION TANK
BALANCING VALVE
(TYPICAL EACH BRANCH)
CIRCULATING HOT
WATER BRANCH
FAUCET SEE
SPECIFICATIONS
LAMINAR FLOW
CONTROL DEVICE
OFFSET
WASTE
TRAP PARALLEL
TO WALL
LOOSE KEY
STOP
ESCUTCHEON
FINISHED FLOOR
[8 m m
] [200mm]
[2 m m
F O
R F
IX
T
U R
E H
E
IG
H T
S S
E E
A
C
H
IT
E C
T U
R A
L D
R A
W
IN
G S
NOTE:
PROVIDE PIPING COVER PER ADA FOR EXPOSED PIPING
8"
/4
WALL
NICKLE BRONZE ADJUSTABLE STRAINER
(FLUSH WITH FINISHED FLOOR)
CEMENT BED
TILE FLOOR
CONCRETE FILL
STRUCTURAL SLAB
FLASHING
CLAMP WITH
WEEP HOLES
THREADED, CAULKED OR
NO-HUB CONNECTION
WATERPROOF MEMBRANE - SLOPE
MEMBRANE LINER 2% TO DRAIN.
PROVIDE A METAL SUPPORT PLATE WHEN DRAIN
IS INSTALLED IN AN EXISTING FLOOR - CAULK
AROUND DRAIN PRIOR TO RE-GROUTING
CLAMP WATERPROOF MEMBRANE INSIDE OF
DRAIN BODY TO DRAIN TO WEEP HOLES
LOOSE GRAVEL AT WEEP HOLES
3mm to 6mm SIZE
PROVIDE PLUG AT
THIS
HUB IF PIPE DOES
NOT
CARRY THRU
VARIES AS REQUIRED
BY
PIPE INVERT
COVER PLATE
FLOW
FLOOR
WALL
CLEANOUT PLUG
30"
SEAL
HUB
PIPE
USE LONG SWEEP ELL AND 45
WHEN CO OCCURS AT END OF
LINE.
SPIGOT
WALL ACCESS COVER
AND FRAME
FLOOR
DIRT LEG
EQUIPMENT
SHUT-OFF
VALVE
PRESSURE REGULATOR PIPE
VENT OUTLET WITH
DOWNTURN ELBOW
UNION
G
DRAW THRU
BLOW THRU
2" [50mm]
PLUS X
1" [25mm]
MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE DRAIN
PAN PIPING SHALL BE RIGID COPPER TYPE L OR
TYPE M UNLESS NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
FLOOR DRAIN OR
FLOOR SINK
DRAIN PAN
[2 5m m
] DIELECTRIC FITTING
A B
1"
NOTES
A. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA
AND IS INDOORS AND DOES NOT PASS THROUGH RATED
BARRIERS.
B. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR
METALS ARE TO BE CONNECTED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OPTIONAL BID #1
BID DOCUMENTS
C R e v it L o c a l_ F ile s
\1
M
E P
R s c o tt -f o rs b e rg .r v t
/1
/2
:3
:0
A
M
M502
MECHANICAL DETAILS
LEAVENWORTH NATIONAL CEMETERY
GRAVESITE EXPANSION
150 MUNCIE ROAD; LEAVENWORTH, KANSAS 66048
897CM3025
June 22, 2026 KJQ SEF 18704
NOT TO SCALE7
WATER HEATER - PLATFORM MOUNTED
NOT TO SCALE6
WATER HEATER PIPING
DETAIL - SINGLE W/RECIRCULATION
NOT TO SCALE5
ADA LAVATORY DETAIL
NOT TO SCALE4
TYPE "C" FLOOR DRAIN DETAIL
NOT TO SCALE3
CLEAN OUT AND PLUGGED RISER
NOT TO SCALE2
WALL CLEAN OUT DETAIL
NOT TO SCALE8
GAS PIPING CONNECTION FOR EQUIPMENT DETAIL
NOT TO SCALE1
AIR HANDLING UNIT DRAIN TRAP DETAIL
Revisions: Date:
M-502
VA
F
O
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18704Date:
IRRIGATION:
EC DESIGN
400 5th St West Des Moines, IA 50265
(515) 225-6265
COST ESTIMATING:GEOTECHNICAL:
TERRACON
15620 W 113th St Lenexa, KS 66219
(913) 202-7598
OCMI
2100 North Greenville Ave. #1150 Richardson, TX 75082
(469) 431-0571
TECHNOLOGY:
IMEG
900 E. Prima Ctr Pkwy #320 Scottsdale, AZ 85258
(480) 222-3789
U.S. Department of Veterans Affairs
Office of Design and Construction
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OPTIONAL BID #1
BID DOCUMENTS
C R e v it L o c a l_ F ile s
\1
M
E P
R s c o tt -f o rs b e rg .r v t
/1
/2
:3
:0
A
M
M601
MECHANICAL SCHEDULES
LEAVENWORTH NATIONAL CEMETERY
GRAVESITE EXPANSION
150 MUNCIE ROAD; LEAVENWORTH, KANSAS 66048
897CM3025
June 22, 2026 KJQ SEF 18704
AHU-01/
CU-01
BASEMENT
ADMIN
BUILDING
SPLIT
SYSTEM
2870 [ 1400 ] 800 [ 380 ] 1.2 [ 300 ] 115.8 [ 400 ] 79.8 [ 23 ] 14.5 80 [ 27 ] 67 [ 19 ] [ 93 ] [ 34 ] 12.7 90 [ 26 ] 83.7 [ 25 ] 47 [ 8 ] 73.7 [ 23 ] NA 8 [ 6000 ] 2.3 [ 1700 ]
BASIS OF DESIGN:
AAON H3-CRB-8-0-442D; CFA-009-B-A-2
CFM [L/s] CFM [L/s] IN [Pa] MBH [kW] MBH [kW] °F [°C] °F [°C] °F [°C] MBH [kW] MBH [kW] °F [°C] °F [°C] HP [W] CONTROL MCA [W] CONTROL
Db Wb
MIN TOTAL
CAPACITY
MIN SENSIBLE
CAPACITY
MIN SEER
EAT
OSA DESIGN
TEMP
COMP KW
GAS MIN. INPUT MIN. NET OUTPUT
EAT
Db
LAT
Db
INDOOR FAN OUTDOOR UNIT FANMARK LOCATION
AREA AND/OR
BLDG SERVED
TYPE
TOTAL SUPPLY
AIR FLOW
MIN. OUTSIDE AIR
FLOW
EXT STATIC
PRESSURE
COOLING CAPACITY HEATING CAPACITY
AIR FILTER
MARK NO
ELECTRICAL DATA
REMARKS
SPLIT SYSTEM AIR CONDITIONER GAS/ELECTRIC SCHEDULE
VAV-121 BREAKROOM AHU-01 6"Ø 250 [ 120 ] 138 [ 65 ] NONE VAV
5 DEGREE
DEADBAND
1.5 120 1 BASIS OF DESIGN: TITUS DESV
VAV-120
PROGRAM
ANALYST
AHU-01 6"Ø 150 [ 71 ] 82 [ 39 ] NONE VAV
5 DEGREE
DEADBAND
1 120 1 BASIS OF DESIGN: TITUS DESV
VAV-119
BUDGET
ANALYST
AHU-01 6"Ø 150 [ 71 ] 82 [ 39 ] NONE VAV
5 DEGREE
DEADBAND
1 120 1 BASIS OF DESIGN: TITUS DESV
VAV-118 ASST DIRECTOR AHU-01 6"Ø 150 [ 71 ] 82 [ 39 ] NONE VAV
5 DEGREE
DEADBAND
1 120 1 BASIS OF DESIGN: TITUS DESV
VAV-117 DIRECTOR AHU-01 6"Ø 250 [ 120 ] 138 [ 65 ] NONE VAV
5 DEGREE
DEADBAND
1.5 120 1 BASIS OF DESIGN: TITUS DESV
VAV-114 MENS LOCKER AHU-01 6"Ø 330 [ 160 ] 150 [ 71 ] NONE VAV
5 DEGREE
DEADBAND
2 120 1 BASIS OF DESIGN: TITUS DESV
VAV-113
WOMENS
LOCKER
AHU-01 6"Ø 120 [ 57 ] 99 [ 47 ] NONE VAV
5 DEGREE
DEADBAND
1 120 1 BASIS OF DESIGN: TITUS DESV
VAV-108
MULTIPURPOSE
ROOM
AHU-01 6"Ø 300 [ 140 ] 165 [ 78 ] NONE VAV
5 DEGREE
DEADBAND
2 120 1 BASIS OF DESIGN: TITUS DESV
VAV-107 ADMIN OFFICER AHU-01 6"Ø 250 [ 120 ] 138 [ 65 ] NONE VAV
5 DEGREE
DEADBAND
1.5 120 1 BASIS OF DESIGN: TITUS DESV
VAV-106 WORKSTATIONS AHU-01 10"Ø 800 [ 380 ] 440 [ 210 ] NONE VAV
5 DEGREE
DEADBAND
6 208 1 BASIS OF DESIGN: TITUS DESV
VAV-104 WOMENS RR AHU-01 6"Ø 160 [ 76 ] 88 [ 42 ] NONE VAV
5 DEGREE
DEADBAND
1 120 1 BASIS OF DESIGN: TITUS DESV
VAV-103 MENS RR AHU-01 6"Ø 160 [ 76 ] 88 [ 42 ] NONE VAV
5 DEGREE
DEADBAND
1 120 1 BASIS OF DESIGN: TITUS DESV
VAV-101 LOBBY AHU-01 6"Ø 200 [ 94 ] 110 [ 52 ] NONE VAV
5 DEGREE
DEADBAND
1.5 120 1 BASIS OF DESIGN: TITUS DESV
VAV-002 B-02 AHU-01 6"Ø 300 [ 140 ] 150 [ 71 ] NONE VAV
5 DEGREE
DEADBAND
2 120 1 BASIS OF DESIGN: TITUS DESV
VAV-001 B-01 AHU-01 8"Ø 450 [ 210 ] 165 [ 78 ] NONE VAV
5 DEGREE
DEADBAND
2 120 1 BASIS OF DESIGN: TITUS DESV
CFM [L/s] CFM [L/s] KW VOLTAGE PHASE MCA MOP
MAX MINMARK
AREA AND/OR
ROOM SERVED
SYSTEM AIR
HANDLING
INLET SIZE
INCHES
AIR FLOW
ADDITIONAL
SOUND
ATTUNATION
REQUIRED
CONTROL
TYPE
CONTROL
SEQUENCE
REHEAT
REMARKS
SINGLE DUCT AIR TERMINAL UNIT SCHEDULE
REMARKS
1. SEE FLOOR PLANS FOR CFM AND NECK SIZE
2. SEE FLOOR PLAN FOR THROW PATTERN
3. PROVIDE SQUARE TO ROUND ADAPTER WHEN NEEDED
4. SEE DETAIL FOR DAMPER IN BRANCH DUCT SERVING DIFFUSER
SG1
SUPPLY
GRILLE
DUCT MOUNTED 6 x 4 [ 150 x 100 ] 25 MANUAL WHITE TITUS 300FL 1,3,4
CD1
LOUVERED
FACE
CEILING 24 x 24 [ 600 x 600 ] 19 MANUAL WHITE TITUS TMS 1, 2, 3, 4
IN x IN [mm x mm] MANUFACTURER MODEL
MARK TYPE MOUNTING
PANEL/FRAME SIZE
NC DAMPER FINISH
BASIS OF DESIGN
REMARKS
AIR DEVICE SCHEDULE (SUPPLY)
3. PROVIDE WITH CONDENSATE PUMP FOR INDOOR UNIT.
2. INCLUDE WIRELESS CONTROLLER.
1. MAKE AND MODEL NUMBER ARE FOR BASIS OF DESIGN INFORMATION. PROVIDE BASIS OF DESIGN UNIT OR APPROVED EQUAL
NOTES:
MS-1/
CU-2
BASEMENT ADMIN BUILDING
MINI SPLIT
SYSTEM
MITSUBISHI MSZ-GS24NA-U1 MUZ-GS24NA-U1 22.4 [ 76 ] 19.6 [ 6 ] R-454B 20.5 5 208 1 18 20 [ 107 ] 200 1,2,3
MBH [kW] MBH [kW]
VOLTAG
E
PHASE MCA MOP [W]
MAX POWER
INPUT W
MARK LOCATION
AREA AND/OR
BLDG SERVED
TYPE MANUFACTURER
INDOOR MODEL
(MS-1)
OUTDOOR MODEL
(CU-3)
COOLING CAPACITY
@95°F
HEATING CAPACITY
@5°F REFRIGERAN
T
SEER
SCCR
RATING Ka
ELECTRICAL DATA
REMARKS
MINI SPLIT SYSTEM AIR CONDITIONER SCHEDULE
REMARKS
1. SEE FLOOR PLANS FOR CFM AND NECK SIZE
2. PROVIDE SQUARE TO ROUND ADAPTER WHEN NEEDED
3. SEE PLANS FOR SIZES
4. COORDINATE COLOR(S) WITH ARCHITECTURE
RG-02 LOUVERED
SURFACE
OR DUCT
--- [ ] 13 NONE WHITE TITUS 350Z 1, 2, 3, 4
RG-01 EGGCRATE CEILING 24 x 24 [ 600 x 600 ] 13 NONE WHITE TITUS 50F 1, 2, 3, 4
IN x IN [mm x mm] MANUFACTURER MODEL
MARK TYPE MOUNTING
PANEL/ FRAME SIZE
NC DAMPER COLOR
BASIS OF DESIGN
REMARKS
AIR DEVICE SCHEDULE (RETURN)
NOTE
1. COLOR SELECTED BY ARCHITECT.
2. ALL LOUVERS SHALL VBE AMCA CERTIFIED FOR ALL PERFORMANCE AND WATER PENETRATION. MAX WATER PENTRATION SHALL BE LESS THAN 0.1 OZ/SQ FT FOR INTAKE LOUVERS.
3. MAKE AND MODEL NUMBER ARE FOR BASIS OF DESIGN INFORMATION. PROVIDE BASIS OF DESIGN OR AN APPROVED SUBSTITUTION.
LV-1 BASEMENT ADMINISTRATION GREENHECK EHH-401 2870 [ 1354 ] 0.038 [ 9 ] 48 [ 1219 ] 24 [ 610 ] 5.7 [ .53] CHANNEL ALUM.
BAKED
ENAMEL
BIRD SCREEN 1,2,3
MANUFACTURER MODEL CFM [L/s] IN WG [Pa]
WIDTH
IN
WIDTH
[MM]
HEIGHT
IN
HEIGHT
[MM]
SQ FT [SQ M]
MARK LOCATION BUILDING
BASIS OF DESIGN AIR FLOW PRESSURE DROP LOUVER SIZE FREE AREA
FRAME
STYLE
CONST FINISH ACCESSORIES NOTES
LOUVER SCHEDULE
REMARKS
1. PROVIDE BACKDRAFT DAMPERS, BIRD SCREEN
2. PROVIDE ROOF CURB ADAPTER
3. BASIS OF DESIGN IS GREENHECK MODEL G (VG MOTOR), APPROVED EQUAL IS ACCEPTABLE
1-EF3 TOILET EXHAUST 100 [ 47 ] 0.5 [ 130 ] INLINE BIW I N/A NA DIRECT 939 0.01 0.01 [ 13 ] 1 115 939 VARIABLE 1
1-EF2 TOILET EXHAUST 100 [ 47 ] 0.5 [ 130 ] INLINE BIW I NA NA DIRECT 939 0.01 0.01 [ 13 ] 1 115 939 VARIABLE 1
1-EF1 TOILET EXHAUST 400 [ 190 ] 0.75 [ 190 ]
DOWNBLAST
CENTRIFUGAL
BIW I N/A EC 1229 0.4 0.5 [ 370 ] 1 120 1750 VARIABLE 1,2,3
CFM [L/s] IN [Pa] IN [mm] BHP HP [W]
TYPE WHEEL CLASS
ARRANGEMENT,
ROTATION, AND
DISCHARGE
DIAMETER
MIN % EFF DRIVE
FAN MAX
RPM
NOMINAL POWER
PHASE VOLT RPM
SPEED
CONTROL
MARK
SYSTEM AND/OR
SERVICE
AIR FLOW TSP
FAN MOTOR ELECTRICAL
CONTROL
SEQUENCE
REMARKS
FAN SCHEDULE
Revisions: Date:
M-601
VA
F
O
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18704Date:
IRRIGATION:
EC DESIGN
400 5th St West Des Moines, IA 50265
(515) 225-6265
COST ESTIMATING:GEOTECHNICAL:
TERRACON
15620 W 113th St Lenexa, KS 66219
(913) 202-7598
OCMI
2100 North Greenville Ave. #1150 Richardson, TX 75082
(469) 431-0571
TECHNOLOGY:
IMEG
900 E. Prima Ctr Pkwy #320 Scottsdale, AZ 85258
(480) 222-3789
U.S. Department of Veterans Affairs
Office of Design and Construction
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Design and Construction
Services
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
OPTIONAL BID #1
BID DOCUMENTS
C R e v it L o c a l_ F ile s
\1
M
E P
R s c o tt -f o rs b e rg .r v t
/1
/2
:3
:1
A
M
M602
MECHANICAL SCHEDULES
LEAVENWORTH NATIONAL CEMETERY
GRAVESITE EXPANSION
150 MUNCIE ROAD; LEAVENWORTH, KANSAS 66048
897CM3025
June 22, 2026 KJQ SEF 18704
NOTE:
BASIS OF DESIGN: AO SMITH, EJC-10, EEMAX LAVADVANTAGE
WH-3
BREAKROOM
ADMIN BUILDING
DOMESTIC HOT
WATER
POINT OF USE 0 [ ] 0 [ ] NA 0 [ ] 1 8.3 --- 1 208
MOUNT IN CABINET WITH FACTORY DISCONNECT, IF
NEEDED
WH-2 BASEMENT ADMIN BUILDING
DOMESTIC HOT
WATER
SMALL TANK 10 [ 38 ] 8 [ 30 ] 60 100 [ 690 ] 1 1.6 1.6 1 120 ON PLATFORM AT MIN 4'-0" AFF
( E )WH-1
HAC
ADMIN BUILDING
DOMESTIC HOT
WATER
EXISTING
SMALL TANK
--- --- --- --- --- --- --- --- --- --- --- --- VERIFY LOCATION IN THE FIELD
GAL [L] GAL/HR [L/HR] PSIG [kPa] TOTAL kW kW PER
ELEMENT
PHASE VOLT
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM AND/OR
SERVICE
TYPE
STORAGE
CAPACITY
RECOVERY @
90°F [32°C] RISE
TIME TO
RECOVER
CONTENTS,
MINUTES
RELIEF VALVE
SETTING NO OF
ELEMENTS
ELECTIRCAL INPUT
REMARKS
ELECTRIC WATER HEATER SCHEDULE
REMARKS
1. BASIS OF DESIGN: B&G ECOCIRC 20-18, PROVIDE WITH CHECK-TROL VALVE, OR AN APPROVED EQUAL.
2. PROVIDE ALL VALVES AND CONTROLS
CP-01 BASEMENT
ADMIN
BUILDING
HOT WATER
RECIR
CIRCULATOR DOMESTIC WATER 2 [ ] 18 [ 290 ] 60 NA 120 [ 49 ] 1 70 FRAC [ 70 ] 1 120 1750 ECM 1, 2
GPM [L/s] FT [kPa] FT [kPa] °F [°C] HP [WATTS]
FLUID
FLOW HEAD NPSH AVAILABLE TEMPERATURE
SP. GR.
MIN. %
EFF
NOMINAL POWER
PHASE VOLT MAX RPM
SPEED
CONTROL
REMARKS
MARK LOCATION
AREA…
This is the start of the file's text. The full file is on GovTribe.