These are telecommunications site construction drawings issued for construction on June 27, 2025, for the EHRM Infrastructure Upgrades project at the VA Medical Center in Montrose, New York (2094 Albany Post Road). The project is being managed by the U.S. Department of Veterans Affairs Office of Construction and Facilities Management, with Triple C - The A/E Group serving as the Architect/Engineer of Record.
The drawings specify comprehensive telecommunications infrastructure upgrades including the installation of new fiber optic cabling (24-fiber OS2 single-mode cables) distributed via separate "A" and "B" redundant routes to ensure geographic diversity and system reliability. Key construction elements include: construction of 4-inch PVC conduit concrete duct banks per Detail E8; installation of concrete pullboxes (4'x4'x4' minimum) with Quazite locking covers; duct connections to existing manholes; pipe wall penetrations for headhouse crossings; and new cable tray installations for fiber distribution. The project encompasses connections to multiple buildings (B01 through B52) with a new Main Communications Room (MCR), utilizing both existing underground conduit infrastructure and new duct banks. Utility coordination is critical, with contractors required to hand-dig within five feet of known utilities and obtain independent utility location services prior to excavation. The construction keynotes detail specific requirements for fiber cable specifications, trench inspections, grounding and bonding procedures, and pavement restoration standards. Addendum #1 was issued on March 30, 2026, indicating design modifications during the construction document phase.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GA
S
G
AS
G
ASGAS
G
AS
GAS
G
AS
G
AS
G
ASC
SD
SS
SS
HP
S
HP
S
HPS
COMM
COMM
UGE
UGE
UGE
UGE
SS
SS
SS
SS
SS
SS
SS
SD
SD
SD
W
W
W
W
W
SD
SD
SD
SD
SD
G
AS
G
AS
G
AS
W
W
W
W
W
W
W
W
W
W
W
W
W
SS
SS
SS
SD
SD
SD
SD
SD
W
W
W
W W
W
W
W
W
W
W
SS
SS
SS
SS
SS
SSSS
SS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
COMM UGE
U G
E C
O M
M C
O M
M C
O M
M U
G E
U G
E U
G E
C O
M M
UGE
UGE
UGE
UGE
UGE
U G
E
U G
E U
G E
UGE
UGE
COMM
UGE
HPS
HPS
HPS
HP
S
HPS
HPS
HPS
HPS
HPS
HPSHP
S
HP
S
HP
S
HP
S
HPS
HPS
HPS
HPS
H
PS
HPS
HPSHP
S
SD
UGE
UGE
SD
SS
SS
SS
SS
SS
SS
SDSS
SDSS
SS
SS
SS
SS
SD
SD
UGE
UGE
UGE
UG
E
UG
E
U G
E
UGE
UGE
UGE
SD
SD
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
HPS
HPS
HPS
COM
M
CO
M
M
PIV
CO
CO
CO
GAS
GAS
GAS
G
AS
G
AS
G
AS
GAS
GAS
GAS GAS
GAS
GAS
GAS
GAS
SD
SD
SD
CO
COMM
COMM
SD
C O
M M
C O
M M
C O
M M
CO
M
M
C O
M M
C O
M M
COM
M
COMM
COMM
COMM
C O
M M
CO
M
M
CO
M
M
C O
M M
C O
M M
COMM
COMM
COMM
CO
M
M
CO
M
M
COMMCOMM
COM
M
COM
M
C O
M M
W
HPS
W
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
U G
E U
G E
U G
E U
G E
UG
E
UG
E
UG
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UGE
UGE
UGE
UGE
UG
E
UGE
UG
E
UGE
UGE
UGE
UG
E
U G
E U
G E
U G
E U
G E
U G
E
UG
E
UG
E
UG
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UGE
UG
E
UGE
UGE
UGE
UGEUGE
UGE
UG
E
UG
E
UGE
UGE
UGE
UGE
U G
E U
G E
U G
E U
G E
U G
E U
G E
UGE
UG
E
UG
E
UGE
UGEUG
E
UGE
UGE
UGE
U G
E
CO
MM
COMM
COMM
COMM
CO
M
M
C O
M M
C O
M M
GAS
GAS
G
AS
G
ASSD
SD
SD
SD
SD
SD
SD
W W
W W
W
SD
SD
SD
SD
SD
SD
SDSDSD
SDSD
SD
W
W
SD
U G
E
GAS
G
AS
G
AS
GAS
GAS
U G
E
GAS
GAS
GAS
GAS
GAS
UGE
UG
E
UG
E
UGE
UGE
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
U G
E
UGE
UGE
U G
E
UGE
U G
E U
G E
UGE
COMM
COMM
COMM
COMM
COMM
COMM
W
W
W
W
GAS
GAS
G
AS
G
AS
G
AS
W
W
W
COMM
COMM
COMM
C O
M M
COMM
COMM
COMM
CO
M
M
COMM
CO
M
M
C O
M M
C O
M M
COMM
COMM
COM
M
COM
M
COMM
CO
M
M
COMM
C O
M M
COMM
CO
M
M
UGE
U G
E
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
UGE
SD
SD
SS
SS
SS
SD
COMM
COMM
COMM-B
C O
M M
-B
CO
M
M
-B COMM-B
CO
M
M -B
COMM-B COMM-B
C O
M M
-B
C O
M M
-A
C O
M M
-A C
O M
M -A
CO
M
M -A
CO
M
M -A
C O
M M
-A
CO
M M
-A
CO
M
M -A
CO
M
M -A
COMM
COMM
COMM
COMM
COMM
CO
M
M
COMM
COMM-A
COMM-A
CO
M
M
CO
M
M -A
COMM-A
PB
PB
PB
ALBANY POST ROAD
FDR VETERANS HOSPITAL ROAD
FD
R
VE
TE
RA
NS
H
OS
PI
TA
L R
OA
D
ALBANY POST ROAD
FD
R
VE
TE
RA
NS
H
OS
PI
TA
L R
OA
D
FDR VETERANS HOSPITAL ROAD
FDR VETERANS HOSPITAL ROAD
PB
PB
COMM-B
SD
SD
SD
GAS
GAS
GAS
SS
W
W
SD
SD
W
COMM
COMM
COM
M
-B
COMM-BCO
M
M -B
CO
M
M -B
CO
M
M -B
COM
M
COMMCOMM
CO
M
M
C O
M M
COMM
COMM
COMM
COMM
C O
M M
COMM
COMM
COMM
COMM
UGE
C
SD
PIV
CO
M
M
CO
M
M
COMM
COMM-B
C
W
W
CO
M
M -A
COMM-A
STORM DRAIN
EX. MH#10
EX. MH#8
EX. MH#9
EX. MH#11
EX. MH#12
EX. MH#24
EX. MH#7
EX. MH#1
EX. MH#2
EX. MH#3
EX. MH#5
EX. MH#6
EX. MH#4
EX. MH#15
EX. MH#17
EX. MH#18
EX. MH#19
EX. MH#20
EX. MH#23
EX. MH#21
EX. MH#22
EX. MH#13
EX. MH#14
F1
TS101
F1
TS103
F1
TS102
F1
TS104
F1
TS105
F1
TS106
C5 .
T-605
C5 .
T-606
F5 .
T-606
C5 .
T-607
F1 .
T-607
F5 .
T-607
C1 .
T-608
C5 .
T-608
F1 .
T-608
C1 .
T-610
C5 .
T-610
F5 .
T-605
GS
C1 .
T-607
EX. TMH#24
F1 .
T-606
C1 .
T-606
113 11 3 114 116 117
115115
10110210
106107108109
111112
100100
105105
110 110
93 94 96
104 104 106106
107107 108 108
109 109
111 111 112 112
113 113
105110
108 107
117116
106106107
110 10
5 10 0 95 90
THH#2B
THH#3B
THH#1B
THH#12B
THH#9B
THH#1A
CLC-P1
EX. MH#16
EX. THH#2A
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
ISSUED FOR
CONSTRUCTION
06/27/2025
2094 Albany Post Road, Montrose, NY 10548
620-22-700
SITE
Revisions: Date:
STAMP
A/E:
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315)484-4958
EHRM INFRASTRUCTURE
UPGRADES
TELECOMMUNICATIONS SITE PLAN
OVERALL
TS100
K.STRUBLEM.PERKINS
F1 TELECOMMUNICATIONS SITE PLAN - OVERALL
1"=150'
PROJECT SCOPE OF WORK
This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.
Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.
CIVIL SHEET ABBREVIATIONS
ABBRV ABBREVIATION F/F FACE TO FACE SD STORM DRAIN
ABC AGGREGATE BASE COURSE FF EL FINISH FLOOR ELEVATION SDMH STORM DRAIN MANHOLE
AC ASPHALTIC CONCRETE FG FINISH GRADE SECT SECTION
ACP ASPHALTIC CONCRETE PAVING FH FIRE HYDRANT SF SQUARE FEET (FOOT)
ADA AMERICANS WITH DISIBILITIES ACT FL FLOW LINE SHLDR SHOULDER
AGGR AGGREGATE FM FORCED MAIN SEWER SMH STEAM MANHOLE
APPROX APPROXIMATE FOC FACE OF CURB SP EL SPOT ELEVATION
ASPH ASPHALT FT FEET OR FOOT SPEC SPECIFICATION
ASSY ASSEMBLY FTG FOOTING SQ YD SQUARE YARD
AVE AVENUE SS SANITARY SEWER
HC HANDICAP SSMH SANITARY SEWER MANHOLE
BC / BOC BACK OF CURB HCP HANDICAPPED ST STREET
BDRY BOUNDARY HDPE HIGH DENSITY POLYETHYLENE STLT STREETLIGHT
BITUM BITUMINOUS HNDRL HANDRAIL STA STATION
BLDG BUILDING HORIZ HORIZONTAL STD STANDARD
BLVD BOULEVARD STM STEAM
BM BENCHMARK ID INSIDE DIAMETER OR INSIDE
DIMENSION SURF SURFACE
BRG BEARING INFO INFORMATION SURV SURVEY
INV INVERT SW SIDEWALK
CB CATCH BASIN INV EL INVERT ELEVATION SWR SEWER
CFS CUBIC FEET PER SECOND SYM SYMBOL
CIP CAST IRON PIPE LAT LATITUED
CL CENTER LINE LF LINEAR FEET (FOOT) TAN TANGENT
CLASS CLASSIFICATION LOC LOCATION TC / TOC TOP OF CURB
CMP CORRUGATED METAL PIPE LP LOW POINT TD TRENCH DRAIN
CMU CONCRETE MASONRY UNIT LS LUMP SUM TE TOP ELEVATION
CO CLEAN OUT TEMP TEMPORARY
CONC CONCRETE MATL MATERIAL THK THICKNESS
CONSTR CONSTRUCTION MAX MAXIMUM THRU THROUGH
COORD COORDINATION MH MANHOLE TMH TOP OF MANHOLE
CORR CORRIDOR MIN MINIMUM TOC WALL TOP OF CONCRETE WALL
CU FT CUBIC FEET MISC MISCELLANEOUS TOF TOP OF FOOTING
CU YD / CY CUBIC YARD MON MONUMENT TOP TOP OF WALL
MTG MEETING TOPO TOPOGRAPHY
DA DRAINAGE AREA MULT MULTIPLE TOS TOP OF SLAB
DAT DATUM TYP TYPICAL
DEG DEGREE N NORTH
DEMO DEMOLITION NA NOT APPLICABLE UGND UNDERGROUND
DEPT DEPARTMENT NO NUMBER UNPV RD UNPAVED ROAD
DESCR DESCRIPTION NTS NOT TO SCALE UON UNLESS OTHERWISE NOTED
DET DETAIL UTIL UTILITY
DI DROP INLET OC ON CENTER
DIA DIAMETER VAR VARIES
DIFF DIFFERENCE PC POINT OF CURVATURE VC VERTICAL CURVE
DIM DIMENSION PCT PERCENT VERT VERTICAL
DIP DUCTILE IRON PIPE PI POINT OF INTERSECTION VIC VICINITY
DIR DIRECTION PL PROPERTY LINE VOL VOLUME
DIST DISTANCE PRKG PARKING
DWG DRAWING PROJ PROJECT W WEST
PROP PROPOSED W/ WITH
E EAST PSI POUNDS PER SQUARE INCH W/OUT WITHOUT
EA EACH PVC POLYVINYL CHLORIDE
EC EDGE OF CURB
EG EXISTING GRADE QTY QUANTITY
EL ELEVATION
ENGR ENGINEER R RADIUS
ENTR ENTRANCE RCB REINFORCED CONCRETE BOX
EP EDGE OF PAVEMENT RCP REINFORCED CONCRETE PIPE
EPA ENVIRONMENTAL PROTECTION AGENCY RD ROAD OR ROOF DRAIN
EQUIP EQUIPMENT REQD REQUIRED
ERD EXISTING ROOF DRAIN ROW RIGHT OF WAY
ES EDGE OF SHOULDER RT RIGHT
ESMT EASEMENT RW ROADWAY
EST ESTIMATE
EX / EXIST EXISTING
NOTE
1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER
ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.
GRAPHIC SCALE
1" = 150'
75' 150' 300'150'
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.
UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT HIS EXPENSE.
CONTRACTOR NOTE
GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY
TO THE VA.
TR
UE
N
OR
TH
EXCAVATION NOTE
CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.
LEGEND
EXISTING PROPOSED
A.C. PAVEMENT
CONCRETE PAVEMENT
SIDEWALK
EDGE OF PAVEMENT
BACK OF CURB
FENCE LINE
SCREEN WALL
RETAINING WALL
PROPERTY LINE
LIMITS OF CONSTRUCTION
BUILDING
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
TELECOMMUNICATIONS LINE (TELEPHONE)
TELECOMMUNICATIONS LINE (FIBER)
UNDERGROUND ELECTRICAL LINE
NATURAL GAS LINE
OVERHEAD ELECTRICAL LINE
HIGH PRESSURE STEAM LINE
ELECTRICAL VAULT
TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)
STORM DRAIN MANHOLE
STORM DRAIN DROP INLET
SANITARY SEWER MANHOLE
STEAM MANHOLE
CLEAN OUT
FIRE HYDRANT
WATER VALVE
STREETLIGHT
HANDHOLE/PULLBOX (W/ LOCKING COVER)
SIGN
TREE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)- "A" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -
SINGLE DUCT BANK SEPERATE CONDUIT
X X
W
SS
SD SD
T
COMM
UGE UGE
GAS GAS
OHE OHE
HPS
E E
T T
D D
S S
ST ST
C C
PB PB
COMM-A
COMM-B
COMM
1 - ADDENDUM #1 03/30/2026
HP
S
HP
S
HP
S
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
SS
SS
SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSD
SD
SD
SD
SD
SD
SD
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
UGE
UGE
UGE
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UGE
UGE
COMM
COMM
COMM
COMM
COMM
UG
E
C O
M M
C O
M M
C O
M M
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
H
PS
H
PS
H
PS
H
PS
H
PS
H
PS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HP
S
HP
S
HP
S
HP
S
HP
S
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SD
SD
SD
SD
SD
SS
SS
SS
SS
SD
SD
SD
SD
SD
SD
SD
SS
SS
SS
SS
SS
SS
SS
UGE
UGE
UGE
UGE
UGE
SS
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
U G
E
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C O
M M
CO
M
M
COM
M
COM
M
SD
SD
SD
SD
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
COMM
COMM
UG
E
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
COMMCOMM
COMM
COMMCOMM
COMM
COMM
COMM
COMM
W
W
W
W
W
W
HP
S
HPS
HPS
W
W
W
W W
W
UGEUGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
W
W
SD
SDSDSDSDSD
SD
SD
SD
SD
SD
SD
W
CO
M
M
CO
M
M
CO
M
M
COMM
COMM
COMM
COMM
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GAS
GAS
GAS
GAS
GAS
GAS
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UG
E
U G
E
UGE
UGE
UGE
UG
E
UG
E
UGE
UGE
UGE
W
COMM
COMM COMM COMM
C O
M M
C O
M M
C O
M M
CO
M
M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
M
M
CO
M
M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
M
M
COMM-B
C O
M M
-B C
O M
M -B
COMM-B COMM-B
COMM
COMM
COMMCOMM
COMM COMM
CO
M
M
COMM
COMM
COMM
COMM
COMM
COMM
COMM COMM
COMM
COMM
COMM
C O
M M
CO
M
M
CO
M
M
CO
M
M
COMM-A
COMM-A
COMM
COMM
COMM
COMM
PB
PB
ALBANY POST ROAD
ALBANY POST ROAD
FDR VETERANS HOSPITAL ROAD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
GAS
GAS
GAS
GAS
GAS
W
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
W
W
SS
SS
W
W
SD
SS
W
W
W
W
W
W
W
W
W
W
W
W
C O
M M
SD
SD
SD
SD
SD SD SD SD SD
SD
GAS
W
W
W
W
W
W
CO
M
M -B
CO
M
M -B
CO
M
M -B
UG
E
UG
E
UGE
CSD
SD
SD
W
W
W
COM
M
COM
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
COMM
COMM
COMM
COMM
C
W
W
W
W
W
W
W
W
COMM-A
CO
M
M -A
CO
M
M -A
STORM DRAIN
EX. MH#10
EX. MH#8
EX. MH#9
EX. MH#11
EX. MH#12
EX. MH#13
EX. MH#14
C5 .
T-605
C5 .
T-606
F5 .
T-605
F1 .
T-606
C1 .
T-606
107107
108 108
113 113
THH#2B
THH#3B
THH#1A
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
ISSUED FOR
CONSTRUCTION
06/27/2025
2094 Albany Post Road, Montrose, NY 10548
620-22-700
SITE
Revisions: Date:
STAMP
A/E:
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315)484-4958
EHRM INFRASTRUCTURE
UPGRADES
TELECOMMUNICATION SITE PLAN
ENLARGED VIEW
TS101
K.STRUBLEM.PERKINS
F1 TELECOMMUNICATIONS SITE PLAN - ENLARGED VIEW
1"=40'
MA
TC
HL
IN
E
SE
E
TS
2 F
OR
C
ON
TI
NU
AT
IO
N
GRAPHIC SCALE
1" = 40'
20' 40' 80'40'
MATCHLINE SEE TS103 FOR CONTINUATIONPROJECT SCOPE OF WORK
This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.
Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.
SE
E
SH
EE
T T S2
SEE SHEET TS201
CONSTRUCTION KEYNOTES
CONSTRUCT 4" PVC CONDUIT IN CONCRETE DUCT BANK PER DETAIL E8, SHEET TS501 SEE SHEET T-601,T-602 FOR NUMBER OF CONDUITS IN EACH SECTION OF DUCT BANK. TRENCH AND REPLACE -MATCH EXISTING. PROVIDE FIBER OPTIC CABLE PER SHEET T-601,T-602. SEE DETAILS B6,D9,E6,F6, SHEET TS501. TRENCH TO REMAIN OPEN UNTIL INSPECTION OF CONCRETE DUCT.
CONSTRUCT CONCRETE PULLBOX (4'x4'x4' MIN.) - SEE DETAILS C1, B6 SHEET TS501 WITH QUAZITE LOCKING COVER OR APPROVED EQUAL
SEE BUILDING 52 SHEET 52T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 31 SHEET 31T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 29 SHEET 29T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 28 SHEET 28T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 27 SHEET 27T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 26 SHEET 26T-101 FOR CONTINUATION,T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 20 SHEET 20T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 19 SHEET 19T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 18 SHEET 18T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 17 SHEET 17T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 16 SHEET 16T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 15 SHEET 15T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 14 SHEET 14T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 13 SHEET 13T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 12 SHEET 12T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 07 SHEET 07T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 06 SHEET 06T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 05 SHEET 05T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 04 SHEET 04T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 03 SHEET 03T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 02 SHEET 02T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 01 SHEET 01T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM
CONSTRUCT NEW FIBER IN EXISTING DUCT BANK
LOCKING COVER ON EXISTING MANHOLE SEE DETAIL E6,SHEET TS501.
CONSTRUCT COIL BOX CONNECTION - SEE DETAIL F1, SHEET TS502
SERVICE PROVIDER RUN FROM EXISTING DEMARK TO NEW MCR IN NEW CABLE TRAY. SEPARATE FROM
DISTRIBUTION CABLE TRAY.
31 CONSTRUCT NEW FIBER IN CABLE TRAY - SEE DETAIL F2, SHEET TS502.
32 CONSTRUCT 4" PVC PIPE WALL PENETRATION FOR NEW FIBER - SEE DETAIL E1, SHEET TS501.
CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN EXISTING DUCT BANK, SEPARATE CONDUIT
CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN NEW DUCT BANK, SEPARATE CONDUIT
NOTE
1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER
ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.
UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT HIS EXPENSE.
CONTRACTOR NOTE
GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY
TO THE VA.
NOTE
SEE SHEET TS100 FOR CIVIL ABBREVIATIONS LIST.
TR
UE
N
OR
TH
EXCAVATION NOTE
CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.
33 HEADHOUSE CROSSING - SEE SHEET TS502
LEGEND
EXISTING PROPOSED
A.C. PAVEMENT
CONCRETE PAVEMENT
SIDEWALK
EDGE OF PAVEMENT
BACK OF CURB
FENCE LINE
SCREEN WALL
RETAINING WALL
PROPERTY LINE
LIMITS OF CONSTRUCTION
BUILDING
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
TELECOMMUNICATIONS LINE (TELEPHONE)
TELECOMMUNICATIONS LINE (FIBER)
UNDERGROUND ELECTRICAL LINE
NATURAL GAS LINE
OVERHEAD ELECTRICAL LINE
HIGH PRESSURE STEAM LINE
ELECTRICAL VAULT
TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)
STORM DRAIN MANHOLE
STORM DRAIN DROP INLET
SANITARY SEWER MANHOLE
STEAM MANHOLE
CLEAN OUT
FIRE HYDRANT
WATER VALVE
STREETLIGHT
HANDHOLE/PULLBOX (W/ LOCKING COVER)
SIGN
TREE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "A" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -
SINGLE DUCT BANK SEPERATE CONDUIT
X X
W
SS
SD SD
T
COMM
UGE UGE
GAS GAS
OHE OHE
HPS
E E
T T
D D
S S
ST ST
C C
PB PB
COMM-A
COMM-B
COMM
HP
S
HP
S
HP
S
HP
S
HPS
HPS
HPS
HPS
HPS
HPS
HPS
SD
SD
W
W
W W
W
W
W W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
W W
W W
W W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SD
SD
SDSD
SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
U G
E U
G E
U G
E U
G E
U G
E U
G E
C O
M M
C O
M M
C O
M M
C O
M M
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
HPS
HPS
HPS
HPS
HPS
HPS
HPSHP
S
HP
S
HP
S
HP
S
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPSHPSHPS
SD
SS
SS
SS
SS
SS
SS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS
G
AS
SD
SD
SD
SD
SD
SD
CO
M
M
COM
M
COMM
COMM
COMM
COMM
COMM
COMM
C O
M M
COMM
COM
M
C O
M M
CO
M
M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
M
M C
O M
M
COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
CO
M
M
CO
M
M
CO
M
M
CO
M
MCOMM
UGE
UGE
UGE UGE UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
U G
E
U G
E U G
E U
G E
U G
E U
G E
U G
E U
G E
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGEUGEUGEUGEUGE
UGE
UGE
UGE
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSDSDSDSDSDSDSDSD
SD
SD
W
W
W
W
W
W
W
W
W
W
W
W
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
UGE
UGE
UGE
C O
M M
COMM
COMM
COMM
COMM
UGE
UGE
C O
M M
W
W
CO
M
M -B
CO
M
M -B
CO
M
M -B
COMM-B
COMM-B
COMM-B
COMM-B
COMM-B
COMM-B COMM-B COMM-B COMM-B COMM-B COMM-B
C O
M M
-B C
O M
M -B
C O
M M
-B C
O M
M -B
C O
M M
-B
COMM-B
COMM-B
CO
M
M -B
CO
M
M -B
CO
M
M -A
COM
M
-A
COMM-A
COMM-A
COMM-A
COMM-A
COMM-A
COMM-ACOMM-A
COMM-A
COMM-A
C O
M M
-A C
O M
M -A
COMM-A
COMM
C O
M M
-A
CO
M
M -A
CO
M
M -A
CO
M
M -A
CO
M
M -A
C O
M M
C O
M M
C O
M M
COMM
COMM
COMM
CO
M
M -A
CO
M
M -A
COMM-A
CO
M
M -A
COMM-A
FDR VETERANS HOSPITAL ROAD
FD
R
VE
TE
RA
NS
H
OS
PI
TA
L R
OA
D
PB
SS
SS
SS
SS
SS
SS
SS
COM
M
-B
COM
M
-B
COM
M
-B
COMM-B
COMM-B
COMM-B
COMM-B
COMM-BCOMM-BCO
M M
-B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
COM
M
COM
M
COM
M
COM
M
COMM
COMM
COMMCOMMCOMMCOMM
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
COMM
W
UGE
UGE
UGE
W
PIV
CO
M
M -A
EX. MH#7
EX. MH#1
EX. MH#2
EX. MH#5
EX. MH#15
F5 .
T-606
C1 .
T-607
106106107
THH#1B
EX. MH#16
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
ISSUED FOR
CONSTRUCTION
06/27/2025
2094 Albany Post Road, Montrose, NY 10548
620-22-700
SITE
Revisions: Date:
STAMP
A/E:
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315)484-4958
EHRM INFRASTRUCTURE
UPGRADES
TELECOMMUNICATIONS SITE PLAN
ENLARGED VIEW
TS102
K.STRUBLEM.PERKINS
F1 TELECOMMUNICATIONS SITE PLAN - ENLARGED VIEW
1"=40'
GRAPHIC SCALE
1" = 40'
20' 40' 80'40'
MA
TC
HL
IN
E
SE
E
TS
1 F
OR
C
ON
TI
NU
AT
IO
N
MATCHLINE SEE TS104 FOR CONTINUATION
PROJECT SCOPE OF WORK
This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.
Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.
SEE SHEET TS203
SE
E
SH
EE
T
TS
TR
UE
N
OR
TH
CONSTRUCTION KEYNOTES
CONSTRUCT 4" PVC CONDUIT IN CONCRETE DUCT BANK PER DETAIL E8, SHEET TS501 SEE SHEET T-601,T-602 FOR NUMBER OF CONDUITS IN EACH SECTION OF DUCT BANK. TRENCH AND REPLACE -MATCH EXISTING. PROVIDE FIBER OPTIC CABLE PER SHEET T-601,T-602. SEE DETAILS B6,D9,E6,F6, SHEET TS501. TRENCH TO REMAIN OPEN UNTIL INSPECTION OF CONCRETE DUCT.
CONSTRUCT CONCRETE PULLBOX (4'x4'x4' MIN.) - SEE DETAILS C1, B6 SHEET TS501 WITH QUAZITE LOCKING COVER OR APPROVED EQUAL
SEE BUILDING 52 SHEET 52T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 31 SHEET 31T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 29 SHEET 29T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 28 SHEET 28T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 27 SHEET 27T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 26 SHEET 26T-101 FOR CONTINUATION,T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 20 SHEET 20T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 19 SHEET 19T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 18 SHEET 18T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 17 SHEET 17T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 16 SHEET 16T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 15 SHEET 15T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 14 SHEET 14T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 13 SHEET 13T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 12 SHEET 12T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 07 SHEET 07T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 06 SHEET 06T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 05 SHEET 05T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 04 SHEET 04T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 03 SHEET 03T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 02 SHEET 02T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 01 SHEET 01T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM
CONSTRUCT NEW FIBER IN EXISTING DUCT BANK
LOCKING COVER ON EXISTING MANHOLE SEE DETAIL E6,SHEET TS501.
CONSTRUCT COIL BOX CONNECTION - SEE DETAIL F1, SHEET TS502
SERVICE PROVIDER RUN FROM EXISTING DEMARK TO NEW MCR IN NEW CABLE TRAY. SEPARATE FROM
DISTRIBUTION CABLE TRAY.
31 CONSTRUCT NEW FIBER IN CABLE TRAY - SEE DETAIL F2, SHEET TS502.
32 CONSTRUCT 4" PVC PIPE WALL PENETRATION FOR NEW FIBER - SEE DETAIL E1, SHEET TS501.
CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN EXISTING DUCT BANK, SEPARATE CONDUIT
CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN NEW DUCT BANK, SEPARATE CONDUIT
NOTE
1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER
ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.
UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT HIS EXPENSE.
CONTRACTOR NOTE
GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY
TO THE VA.
NOTE
SEE SHEET TS100 FOR CIVIL ABBREVIATIONS LIST.
EXCAVATION NOTE
CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.
33 HEADHOUSE CROSSING - SEE SHEET TS502
LEGEND
EXISTING PROPOSED
A.C. PAVEMENT
CONCRETE PAVEMENT
SIDEWALK
EDGE OF PAVEMENT
BACK OF CURB
FENCE LINE
SCREEN WALL
RETAINING WALL
PROPERTY LINE
LIMITS OF CONSTRUCTION
BUILDING
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
TELECOMMUNICATIONS LINE (TELEPHONE)
TELECOMMUNICATIONS LINE (FIBER)
UNDERGROUND ELECTRICAL LINE
NATURAL GAS LINE
OVERHEAD ELECTRICAL LINE
HIGH PRESSURE STEAM LINE
ELECTRICAL VAULT
TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)
STORM DRAIN MANHOLE
STORM DRAIN DROP INLET
SANITARY SEWER MANHOLE
STEAM MANHOLE
CLEAN OUT
FIRE HYDRANT
WATER VALVE
STREETLIGHT
HANDHOLE/PULLBOX (W/ LOCKING COVER)
SIGN
TREE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "A" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -
SINGLE DUCT BANK SEPERATE CONDUIT
X X
W
SS
SD SD
T
COMM
UGE UGE
GAS GAS
OHE OHE
HPS
E E
T T
D D
S S
ST ST
C C
PB PB
COMM-A
COMM-B
COMM
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
C
SD
SD
SD
SD
SD
SD
SD
SS
SS
SS
SS
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
W
W
W
SD
SD
SD
SS
SD
SD
SD
SD
SD
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
U G
E U
G E
U G
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HP
S
HP
S
HP
S
COMM
COMM
CO
M
M
C O
M M
C O
M M
SD
SD
SD
PIV
CO
CO
CO
SD
SD
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
AS
G
AS
G
AS
GAS
GAS
GAS
GAS
G
AS
G
AS
W
W
SD
SD
SD
SD
SD
CO
M M
CO
M
M
COMM
COMM
COMM
CO
SD
SD
UGE
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
C O
M M
U G
E U
G E
U G
E U
G E
G
AS
G
AS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UGE
UGE
U G
E
UG
E
UGE
UGE
UGE
UG
E
W
W
W
W
W
W
W
W
W
W
UGE
UGE
UGE
SD
SD
SD
SD
C O
M M
C O
M M
C O
M M
COMM-A
FDR VETERANS HOSPITAL ROAD
COMM-B
COMM-B
COMM-B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
COMM
COMM
CO
M
M
C O
M M
C O
M M
COMM-B
COMM-B
COMM-B
COMM-B
CO
M
M -A
CO
M
M -A
COMM-A
COMM-A
COMM-A
CO
M
M -A
EX. MH#24
C5 .
T-610
5 32
113 11
CLC-P1
EX. THH#2A
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
ISSUED FOR
CONSTRUCTION
06/27/2025
2094 Albany Post Road, Montrose, NY 10548
620-22-700
SITE
Revisions: Date:
STAMP
A/E:
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315)484-4958
EHRM INFRASTRUCTURE
UPGRADES
TELECOMMUNICATIONS SITE PLAN
ENLARGED VIEW
TS103
K.STRUBLEM.PERKINS
F1 TELECOMMUNICATIONS SITE PLAN - ENLARGED VIEW
1"=40'
GRAPHIC SCALE
1" = 40'
20' 40' 80'40'
MA
TC
HL
IN
E
SE
E
TS
4 F
OR
C
ON
TI
NU
AT
IO
N
MATCHLINE SEE TS101 FOR CONTINUATION
PROJECT SCOPE OF WORK
This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.
Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.
TR
UE
N
OR
TH
CONSTRUCTION KEYNOTES
CONSTRUCT 4" PVC CONDUIT IN CONCRETE DUCT BANK PER DETAIL E8, SHEET TS501 SEE SHEET T-601,T-602 FOR NUMBER OF CONDUITS IN EACH SECTION OF DUCT BANK. TRENCH AND REPLACE -MATCH EXISTING. PROVIDE FIBER OPTIC CABLE PER SHEET T-601,T-602. SEE DETAILS B6,D9,E6,F6, SHEET TS501. TRENCH TO REMAIN OPEN UNTIL INSPECTION OF CONCRETE DUCT.
CONSTRUCT CONCRETE PULLBOX (4'x4'x4' MIN.) - SEE DETAILS C1, B6 SHEET TS501 WITH QUAZITE LOCKING COVER OR APPROVED EQUAL
SEE BUILDING 52 SHEET 52T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 31 SHEET 31T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 29 SHEET 29T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 28 SHEET 28T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 27 SHEET 27T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 26 SHEET 26T-101 FOR CONTINUATION,T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 20 SHEET 20T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 19 SHEET 19T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 18 SHEET 18T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 17 SHEET 17T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 16 SHEET 16T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 15 SHEET 15T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 14 SHEET 14T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 13 SHEET 13T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 12 SHEET 12T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 07 SHEET 07T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 06 SHEET 06T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 05 SHEET 05T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 04 SHEET 04T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 03 SHEET 03T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 02 SHEET 02T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 01 SHEET 01T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM
CONSTRUCT NEW FIBER IN EXISTING DUCT BANK
LOCKING COVER ON EXISTING MANHOLE SEE DETAIL E6,SHEET TS501.
CONSTRUCT COIL BOX CONNECTION - SEE DETAIL F1, SHEET TS502
SERVICE PROVIDER RUN FROM EXISTING DEMARK TO NEW MCR IN NEW CABLE TRAY. SEPARATE FROM
DISTRIBUTION CABLE TRAY.
31 CONSTRUCT NEW FIBER IN CABLE TRAY - SEE DETAIL F2, SHEET TS502.
32 CONSTRUCT 4" PVC PIPE WALL PENETRATION FOR NEW FIBER - SEE DETAIL E1, SHEET TS501.
CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN EXISTING DUCT BANK, SEPARATE CONDUIT
CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN NEW DUCT BANK, SEPARATE CONDUIT
NOTE
1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER
ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.
UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT HIS EXPENSE.
CONTRACTOR NOTE
GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY
TO THE VA.
NOTE
SEE SHEET TS100 FOR CIVIL ABBREVIATIONS LIST.
EXCAVATION NOTE
CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.
33 HEADHOUSE CROSSING - SEE SHEET TS502
LEGEND
EXISTING PROPOSED
A.C. PAVEMENT
CONCRETE PAVEMENT
SIDEWALK
EDGE OF PAVEMENT
BACK OF CURB
FENCE LINE
SCREEN WALL
RETAINING WALL
PROPERTY LINE
LIMITS OF CONSTRUCTION
BUILDING
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
TELECOMMUNICATIONS LINE (TELEPHONE)
TELECOMMUNICATIONS LINE (FIBER)
UNDERGROUND ELECTRICAL LINE
NATURAL GAS LINE
OVERHEAD ELECTRICAL LINE
HIGH PRESSURE STEAM LINE
ELECTRICAL VAULT
TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)
STORM DRAIN MANHOLE
STORM DRAIN DROP INLET
SANITARY SEWER MANHOLE
STEAM MANHOLE
CLEAN OUT
FIRE HYDRANT
WATER VALVE
STREETLIGHT
HANDHOLE/PULLBOX (W/ LOCKING COVER)
SIGN
TREE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "A" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -
SINGLE DUCT BANK SEPERATE CONDUIT
X X
W
SS
SD SD
T
COMM
UGE UGE
GAS GAS
OHE OHE
HPS
E E
T T
D D
S S
ST ST
C C
PB PB
COMM-A
COMM-B
COMM
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
AS
G
AS
G
AS
GAS
GAS
GAS GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
GAS
SS
SS
SS
SS
SS
SS
SS
SS
SS
HP
S
HP
S
HP
S
HPS
HPS
UGE
UGE
UGE
UGE
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SS
SS
SS
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSD
SD
SD
SD
SD
SD
SD
W W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSDSDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
UGE
UGE
UGE
UGE
C
O M
M
U G
E U
G E
U G
E U
G E
U G
E U
G E
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
C O
M M
C O
M M
UGE
UGE
UGE
UGE
UGE
HPS
HPS
HPS HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
H
PS
H
PS
H
PS
HPS
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
HP
S
H
PS
H
PS
HPS
HPS
HPS
HPS
HPS
HPS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
UGE
UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UGE
W
W
W
W
W
W
W
HPS
HPS
HPS
HPS
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
CO
M
M
COMM
COMM
COMM
COMM
COMM
C O
M M
COMM
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
COMM
COM
M
COM
M
COM
M
U G
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UG
E
UG
E
UG
E
UG
E
U G
E
UG
E
UG
E
UG
E
U G
E
U G
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
U G
E
U G
E
U G
E
U G
E
U G
E U
G E
U G
E U
G E
U G
E
U G
E
U G
E U
G E
U G
E U
G E
U G
E
UG
E U
G E
U G
E
W W W
W
W
W
W
W
W
WW
W
W
W
W
SD
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
SS
SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMM
CO
M
M
COMM
COMM
COMM
COMM
COM
M
COM
M
CO
M
M
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UGE
SD
SD
SD
COMM-B
COMM-B
COMM-B
COMM-B
COMM-B
COMM-B
COMM-B
C O
M M
-B C
O M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
COMM-B
C
O M
M -B
C O
M M
-B
CO
M M
-B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
COMM-A
COMM-A
C O
M M
-A C
O M
M -A
C O
M M
-A C
O M
M -A
C O
M M
-A C
O M
M -A
CO
M
M -A
CO
M
M -A
CO
M
M -A
CO
M
M -A
CO
M
M -A
COMM-A
COMM-A
C O
M M
-A C
O M
M -A
C O
M M
-A C
O M
M -A
C O
M M
-A
CO
M
M
-AC
O M
M -A
COMM-A
CO
M
M -A
CO
M
M -A
CO
M
M -A
COMM-ACO
M
M -A
CO
M
M -A
COMM-A
CO
M
M -A
CO
M
M -A
CO
M
M -A
COMM-A
COMM-A
C O
M M
-A
C O
M M
-A C
O M
M -A
COMM
COMM-B
COMM-B
COMM-B
COMM-B
COMM-B
COMM-B
EX. MH#3
EX. MH#6
EX. MH#4 EX. MH#17
EX. MH#18
EX. MH#20
C5 .
T-607
F1 .
T-607
C1 .
T-608
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
ISSUED FOR
CONSTRUCTION
06/27/2025
2094 Albany Post Road, Montrose, NY 10548
620-22-700
SITE
Revisions: Date:
STAMP
A/E:
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315)484-4958
EHRM INFRASTRUCTURE
UPGRADES
TELECOMMUNICATIONS SITE PLAN
ENLARGED VIEW
TS104
K.STRUBLEM.PERKINS
F1 TELECOMMUNICATIONS SITE PLAN - ENLARGED VIEW
1"=40'
GRAPHIC SCALE
1" = 40'
20' 40' 80'40'
MA
TC
HL
IN
E
SE
E
TS
3 F
OR
C
ON
TI
NU
AT
IO
N
MATCHLINE SEE TS105 FOR CONTINUATION
MATCHLINE SEE TS102 FOR CONTINUATION
PROJECT SCOPE OF WORK
This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.
Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.
TR
UE
N
OR
TH
CONSTRUCTION KEYNOTES
CONSTRUCT 4" PVC CONDUIT IN CONCRETE DUCT BANK PER DETAIL E8, SHEET TS501 SEE SHEET T-601,T-602 FOR NUMBER OF CONDUITS IN EACH SECTION OF DUCT BANK. TRENCH AND REPLACE -MATCH EXISTING. PROVIDE FIBER OPTIC CABLE PER SHEET T-601,T-602. SEE DETAILS B6,D9,E6,F6, SHEET TS501. TRENCH TO REMAIN OPEN UNTIL INSPECTION OF CONCRETE DUCT.
CONSTRUCT CONCRETE PULLBOX (4'x4'x4' MIN.) - SEE DETAILS C1, B6 SHEET TS501 WITH QUAZITE LOCKING COVER OR APPROVED EQUAL
SEE BUILDING 52 SHEET 52T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 31 SHEET 31T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 29 SHEET 29T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 28 SHEET 28T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 27 SHEET 27T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 26 SHEET 26T-101 FOR CONTINUATION,T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 20 SHEET 20T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 19 SHEET 19T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 18 SHEET 18T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 17 SHEET 17T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 16 SHEET 16T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 15 SHEET 15T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 14 SHEET 14T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 13 SHEET 13T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 12 SHEET 12T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 07 SHEET 07T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 06 SHEET 06T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 05 SHEET 05T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 04 SHEET 04T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 03 SHEET 03T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 02 SHEET 02T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 01 SHEET 01T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM
CONSTRUCT NEW FIBER IN EXISTING DUCT BANK
LOCKING COVER ON EXISTING MANHOLE SEE DETAIL E6,SHEET TS501.
CONSTRUCT COIL BOX CONNECTION - SEE DETAIL F1, SHEET TS502
SERVICE PROVIDER RUN FROM EXISTING DEMARK TO NEW MCR IN NEW CABLE TRAY. SEPARATE FROM
DISTRIBUTION CABLE TRAY.
31 CONSTRUCT NEW FIBER IN CABLE TRAY - SEE DETAIL F2, SHEET TS502.
32 CONSTRUCT 4" PVC PIPE WALL PENETRATION FOR NEW FIBER - SEE DETAIL E1, SHEET TS501.
CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN EXISTING DUCT BANK, SEPARATE CONDUIT
CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN NEW DUCT BANK, SEPARATE CONDUIT
NOTE
1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER
ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.
UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT HIS EXPENSE.
CONTRACTOR NOTE
GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY
TO THE VA.
NOTE
SEE SHEET TS100 FOR CIVIL ABBREVIATIONS LIST.
EXCAVATION NOTE
CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.
33 HEADHOUSE CROSSING - SEE SHEET TS502
LEGEND
EXISTING PROPOSED
A.C. PAVEMENT
CONCRETE PAVEMENT
SIDEWALK
EDGE OF PAVEMENT
BACK OF CURB
FENCE LINE
SCREEN WALL
RETAINING WALL
PROPERTY LINE
LIMITS OF CONSTRUCTION
BUILDING
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
TELECOMMUNICATIONS LINE (TELEPHONE)
TELECOMMUNICATIONS LINE (FIBER)
UNDERGROUND ELECTRICAL LINE
NATURAL GAS LINE
OVERHEAD ELECTRICAL LINE
HIGH PRESSURE STEAM LINE
ELECTRICAL VAULT
TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)
STORM DRAIN MANHOLE
STORM DRAIN DROP INLET
SANITARY SEWER MANHOLE
STEAM MANHOLE
CLEAN OUT
FIRE HYDRANT
WATER VALVE
STREETLIGHT
HANDHOLE/PULLBOX (W/ LOCKING COVER)
SIGN
TREE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "A" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -
SINGLE DUCT BANK SEPERATE CONDUIT
X X
W
SS
SD SD
T
COMM
UGE UGE
GAS GAS
OHE OHE
HPS
E E
T T
D D
S S
ST ST
C C
PB PB
COMM-A
COMM-B
COMM
G
AS
G
AS
GA
S
GA
S
GA
S
G
AS
G
AS
G
AS
G
AS
G
AS
GAS
GAS
GAS
GAS
GAS GAS
GAS
W
W
SS
SS
SS SS SS SS SS
SS
SS
SS
SS
SSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SS
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SD
SD
SD
SD
SD
SD
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HPS
HP
S
HP
S
HP
S
HPS
HPS
HPS
HPS
HP
S
HP
S
HP
S
HP
S
C O
M M
C O
M M
C O
M M
CO
M
M UG
E
UG
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
U G
E U
G
EUGE
UGE
UGE
UGE UGE
UG
E
UG
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UG
E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UG
E
UG
E
UG
E
UGE
UGE
U G
E U
G E
COMM
COMM
CO
MM
CO
MM
CO
M
M SD
SD
SD
SD
SD
SD
SD
SD
SD
W
W
W
W
W
W
G
AS
G
AS
G
AS
G
AS
SD
SD
SD
SD
SD
SD
SD
UGE
UGE
UGE
UGE
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
U G
E U
G E
UG
E
UGE
UGE
U G
E U
G E
U G
E U
G E
UG
E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M
M COMM
COMM
CO
M
M
CO
M
M
C O
M M
COM
M
COMM
COMM
COMM
COMM
COMM
CO
M
M
CO
M
M
CO
M
M
COMM
CO
M
M
CO
M
M
COMM
CO
M
M
COMM
C O
M M
C O
M M
COMM
CO
M
M
CO
M
M
CO
M
M
CO
M
M C
O M
M C
O M
M C
O M
M C
O M
M
C O
M M
CO
M
M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
M
M
COM
M
COM
M
COM
M
CO
M
M
CO
M
M
COMM
COMM
COMM
COMM
C O
M M
COM
M
CO
M
M
COMM
COMM
CO
M
M
COM
M
COM
M
C O
M M
COMM
COMM
COMM
COMM
CO
M
M
C O
M M
C O
M M
CO
M
M
CO
M
M
COMM
COMM
UGE
UGE
UGE
UGE
UGE
UGE
UGE
U
G E
U G
E
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
U G
E U
G E
UG
E
UG
E
U G
E
UGE
UGE
UGE
U G
E U
G E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE U
G E
U G
E
UGE
UGE
UGE
UGE
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SD
SD
COMM-B
COMM-B
CO
M
M -B
C O
M M
-A
CO
M
M -A
C O
M M
-A C
O M
M -A
CO
M
M -A
CO
M
M -A
CO
M
M -A
CO
M
M -A
COMM-A
COMM-A
COMM-A
COMM-A
C O
M M
-A
COMM-A
COMM-A
COMM-A
COMM-A
COMM-A
CO
M
M
CO
M
M
CO
M
M
COMM
CO
M
M
CO
M
M
COMM
CO
M
M -A
COMM-A
COMM-A
COMM-A
PB
FD
R
VE
TE
RA
NS
H
OS
PI
TA
L R
OA
D
PB
HPS
HPS
W
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COM
M
CO
M
M
COMM
C O
M M
-A C
O M
M -A
CO
M
M
CO
M
M C
O M
M
COMM
COMM
COMM
COMM
CO
M
M
COMM
COMM
CO
M
M
CO
M
M C
O M
M
COMM
COMM
COMM
COMM
CO
M
M
COMM
COMM
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
CO
M
M -B
EX. MH#19
EX. MH#23
EX. MH#21
EX. MH#22
F5 .
T-607
C5 .
T-608
F1 .
T-608
C1 .
T-610
EX. TMH#24
29 14
26 24
THH#12B
THH#9B
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
ISSUED FOR
CONSTRUCTION
06/27/2025
2094 Albany Post Road, Montrose, NY 10548
620-22-700
SITE
Revisions: Date:
STAMP
A/E:
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315)484-4958
EHRM INFRASTRUCTURE
UPGRADES
TELECOMMUNICATIONS SITE PLAN
ENLARGED VIEW
TS105
K.STRUBLEM.PERKINS
F1 TELECOMMUNICATIONS SITE PLAN - ENLARGED VIEW
1"=40'
GRAPHIC SCALE
1" = 40'
20' 40' 80'40'
MATCHLINE SEE TS106 FOR CONTINUATION
MATCHLINE SEE TS104 FOR CONTINUATION
PROJECT SCOPE OF WORK
This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.
Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.
SEE SHEET TS202
SE
E S
HE
ET
TS
SEE SHEET TS204
SEE SHEET TS204
FIBER PATH "A" IN NEW CONDUIT
TR
UE
N
OR
TH
CONSTRUCTION KEYNOTES
CONSTRUCT 4" PVC CONDUIT IN CONCRETE DUCT BANK PER DETAIL E8, SHEET TS501 SEE SHEET T-601,T-602 FOR NUMBER OF CONDUITS IN EACH SECTION OF DUCT BANK. TRENCH AND REPLACE -MATCH EXISTING. PROVIDE FIBER OPTIC CABLE PER SHEET T-601,T-602. SEE DETAILS B6,D9,E6,F6, SHEET TS501. TRENCH TO REMAIN OPEN UNTIL INSPECTION OF CONCRETE DUCT.
CONSTRUCT CONCRETE PULLBOX (4'x4'x4' MIN.) - SEE DETAILS C1, B6 SHEET TS501 WITH QUAZITE LOCKING COVER OR APPROVED EQUAL
SEE BUILDING 52 SHEET 52T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 31 SHEET 31T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 29 SHEET 29T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 28 SHEET 28T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 27 SHEET 27T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 26 SHEET 26T-101 FOR CONTINUATION,T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 20 SHEET 20T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 19 SHEET 19T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 18 SHEET 18T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 17 SHEET 17T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 16 SHEET 16T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 15 SHEET 15T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 14 SHEET 14T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 13 SHEET 13T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 12 SHEET 12T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 07 SHEET 07T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 06 SHEET 06T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 05 SHEET 05T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 04 SHEET 04T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 03 SHEET 03T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 02 SHEET 02T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 01 SHEET 01T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM
CONSTRUCT NEW FIBER IN EXISTING DUCT BANK
LOCKING COVER ON EXISTING MANHOLE SEE DETAIL E6,SHEET TS501.
CONSTRUCT COIL BOX CONNECTION - SEE DETAIL F1, SHEET TS502
SERVICE PROVIDER RUN FROM EXISTING DEMARK TO NEW MCR IN NEW CABLE TRAY. SEPARATE FROM
DISTRIBUTION CABLE TRAY.
31 CONSTRUCT NEW FIBER IN CABLE TRAY - SEE DETAIL F2, SHEET TS502.
32 CONSTRUCT 4" PVC PIPE WALL PENETRATION FOR NEW FIBER - SEE DETAIL E1, SHEET TS501.
CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN EXISTING DUCT BANK, SEPARATE CONDUIT
CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN NEW DUCT BANK, SEPARATE CONDUIT
NOTE
1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER
ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.
UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE
CONTRACTOR AT HIS EXPENSE.
CONTRACTOR NOTE
GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY
TO THE VA.
NOTE
SEE SHEET TS100 FOR CIVIL ABBREVIATIONS LIST.
EXCAVATION NOTE
CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.
33 HEADHOUSE CROSSING - SEE SHEET TS502
LEGEND
EXISTING PROPOSED
A.C. PAVEMENT
CONCRETE PAVEMENT
SIDEWALK
EDGE OF PAVEMENT
BACK OF CURB
FENCE LINE
SCREEN WALL
RETAINING WALL
PROPERTY LINE
LIMITS OF CONSTRUCTION
BUILDING
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
TELECOMMUNICATIONS LINE (TELEPHONE)
TELECOMMUNICATIONS LINE (FIBER)
UNDERGROUND ELECTRICAL LINE
NATURAL GAS LINE
OVERHEAD ELECTRICAL LINE
HIGH PRESSURE STEAM LINE
ELECTRICAL VAULT
TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)
STORM DRAIN MANHOLE
STORM DRAIN DROP INLET
SANITARY SEWER MANHOLE
STEAM MANHOLE
CLEAN OUT
FIRE HYDRANT
WATER VALVE
STREETLIGHT
HANDHOLE/PULLBOX (W/ LOCKING COVER)
SIGN
TREE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "A" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE
NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -
SINGLE DUCT BANK SEPERATE CONDUIT
X X
W
SS
SD SD
T
COMM
UGE UGE
GAS GAS
OHE OHE
HPS
E E
T T
D D
S S
ST ST
C C
PB PB
COMM-A
COMM-B
COMM
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UGEUGE
UGE
UGE
UG
E
UGE
UG
E
U G
E
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE UGEUGE
UGE
UGEUGE
UGE
UGE
U G
E U
G E
U G
E
UGE
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
CO
M
M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M
CO
M
M C
O M
M C
O M
M C
O M
M C
O M
M
C O
M M
C O
M M
C O
M M
C O
M M
CO
M
M
CO
M
M
CO
M
M
G
AS
G
AS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
G
AS
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
COMM
COMM
CO
M
M
CO
M
M
COMM
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
COMM
COMM
COM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .