ATTACHMENT 33 - Montrose.EHRM.Addendum.01.Site.20260330.pdf

PDF 12 MB Posted

Attached to
Z2DA--620-22-700 Electronic Health Record Modernization Infrastructure Upgrades - Franklin Delano Roosevelt VA Hospital, Montrose, NY
Solicitation number
RFP-36C77626R0033
Issued by

About this file

These are telecommunications site construction drawings issued for construction on June 27, 2025, for the EHRM Infrastructure Upgrades project at the VA Medical Center in Montrose, New York (2094 Albany Post Road). The project is being managed by the U.S. Department of Veterans Affairs Office of Construction and Facilities Management, with Triple C - The A/E Group serving as the Architect/Engineer of Record.

The drawings specify comprehensive telecommunications infrastructure upgrades including the installation of new fiber optic cabling (24-fiber OS2 single-mode cables) distributed via separate "A" and "B" redundant routes to ensure geographic diversity and system reliability. Key construction elements include: construction of 4-inch PVC conduit concrete duct banks per Detail E8; installation of concrete pullboxes (4'x4'x4' minimum) with Quazite locking covers; duct connections to existing manholes; pipe wall penetrations for headhouse crossings; and new cable tray installations for fiber distribution. The project encompasses connections to multiple buildings (B01 through B52) with a new Main Communications Room (MCR), utilizing both existing underground conduit infrastructure and new duct banks. Utility coordination is critical, with contractors required to hand-dig within five feet of known utilities and obtain independent utility location services prior to excavation. The construction keynotes detail specific requirements for fiber cable specifications, trench inspections, grounding and bonding procedures, and pavement restoration standards. Addendum #1 was issued on March 30, 2026, indicating design modifications during the construction document phase.

View the file

Other files

File Type Posted
Amend 5 - B04.20260330.pdf PDF
Amend 5 - B14.20260330.pdf PDF
Amend 5 - B15.20260330.pdf PDF
Amend 5 - B17.20260330.pdf PDF
Amend 5 - B20.20260330.pdf PDF
Amend 5 - B28.20260330.pdf PDF
Amendment 4 - 36C77626R0033 0004.pdf PDF
Clause 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
RFI TRACKING SHEET - SOLICITATION 36C77626R0033.pdf PDF
ATTACHMENT 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260410.pdf PDF
ATTACHMENT 5 - 01 00 00.D - Appendix D - SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
ATTACHMENT 11 - 01 00 00.I - Appendix I - K9245005 VAMC EHRM Montrose NY GeoReport 4.12.2024.pdf PDF
ATTACHMENT 12A - Summary.Log.Add01_20260410.pdf PDF
ATTACHMENT 13 - Montrose.EHRM.Addendum.01.B01.20260330.pdf PDF
ATTACHMENT 14 - Montrose.EHRM.Addendum.01.B02.20260330.pdf PDF
ATTACHMENT 22 - Montrose.EHRM.Addendum.01.B14.20260330.pdf PDF
ATTACHMENT 25 - Montrose.EHRM.Addendum.01.B17.20260330.pdf PDF
ATTACHMENT 26A - Montrose.EHRM.Addendum.01.B19.20260330.pdf PDF
ATTACHMENT 30 - Montrose.EHRM.Addendum.01.B29.20260330.pdf PDF
ATTACHMENT 31 - Montrose.EHRM.Addendum.01.B31.20260330.pdf PDF
ATTACHMENT 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
ATTACHMENT 8 - 01 00 00.G - Appendix G - GPRS Triple C Montrose Full Report.pdf PDF
ATTACHMENT 16 - Montrose.EHRM.Addendum.01.B04.20260330.pdf PDF
ATTACHMENT 21 - Montrose.EHRM.Addendum.01.B13.20260330.pdf PDF
ATTACHMENT 24 - Montrose.EHRM.Addendum.01.B16.20260330.pdf PDF
ATTACHMENT 27 - Montrose.EHRM.Addendum.01.B20.20260330.pdf PDF
ATTACHMENT 28 - Montrose.EHRM.Addendum.01.B26.20260330.pdf PDF
ATTACHMENT 28A - Montrose.EHRM.Addendum.01.B27.20260330.pdf PDF
Amendment 2 - 36C77626R0033 0002.pdf PDF
Site visit sign-in sheet 3-23-26.pdf PDF
RFP - 36C77626R0033.pdf PDF
Attachment 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
Attachment 4 - 01 00 00.C - Appendix C1 SOP 138-22HV CONST STD PROCEDURES QA FOR PROJECTS.pdf PDF
Attachment 5 - 01 00 00.D - Appendix D1 SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
Attachment 16 - Drawing B04 20250627.pdf PDF
Attachment 18 - Drawing B06 20250627.pdf PDF
Attachment 22 - Drawing B14 20250627.pdf PDF
Attachment 27 - Drawing B20 20250627.pdf PDF
Attachment 29 - Drawing B28 20250627.pdf PDF
Attachment 32 - Drawing B52 20250627.pdf PDF
Attachment 36 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260205.pdf PDF
Attachment 6 - 01 00 00.E - Appendix E - VHA ICRA-1.3 - Dec 9 2024.pdf PDF
Attachment 7 - 01 00 00.F - Appendix F - VHA PCRA 2024 1.1 Final.Template Fillable.pdf PDF
Attachment 8 - 01 00 00.G - Appendix G - GPRS Triple C Montrose Full Report.pdf PDF
Attachment 9 - 01 00 00.H - Appendix H - J2237038 Montrose ACM Ld Pnt InspRpt Final 8-21-2023.pdf PDF
Attachment 12 - Additional Security Badging Requirements rev 2.pdf PDF
Attachment 13 - Drawing B01 20250627.pdf PDF
Attachment 31 - Drawing B31 20250627.pdf PDF
Attachment 33 - Drawing Site 20250627.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GA

S

G

AS

G

ASGAS

G

AS

GAS

G

AS

G

AS

G

ASC

SD

SS

SS

HP

S

HP

S

HPS

COMM

COMM

UGE

UGE

UGE

UGE

SS

SS

SS

SS

SS

SS

SS

SD

SD

SD

W

W

W

W

W

SD

SD

SD

SD

SD

G

AS

G

AS

G

AS

W

W

W

W

W

W

W

W

W

W

W

W

W

SS

SS

SS

SD

SD

SD

SD

SD

W

W

W

W W

W

W

W

W

W

W

SS

SS

SS

SS

SS

SSSS

SS

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

COMM UGE

U G

E C

O M

M C

O M

M C

O M

M U

G E

U G

E U

G E

C O

M M

UGE

UGE

UGE

UGE

UGE

U G

E

U G

E U

G E

UGE

UGE

COMM

UGE

HPS

HPS

HPS

HP

S

HPS

HPS

HPS

HPS

HPS

HPSHP

S

HP

S

HP

S

HP

S

HPS

HPS

HPS

HPS

H

PS

HPS

HPSHP

S

SD

UGE

UGE

SD

SS

SS

SS

SS

SS

SS

SDSS

SDSS

SS

SS

SS

SS

SD

SD

UGE

UGE

UGE

UG

E

UG

E

U G

E

UGE

UGE

UGE

SD

SD

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

HPS

HPS

HPS

COM

M

CO

M

M

PIV

CO

CO

CO

GAS

GAS

GAS

G

AS

G

AS

G

AS

GAS

GAS

GAS GAS

GAS

GAS

GAS

GAS

SD

SD

SD

CO

COMM

COMM

SD

C O

M M

C O

M M

C O

M M

CO

M

M

C O

M M

C O

M M

COM

M

COMM

COMM

COMM

C O

M M

CO

M

M

CO

M

M

C O

M M

C O

M M

COMM

COMM

COMM

CO

M

M

CO

M

M

COMMCOMM

COM

M

COM

M

C O

M M

W

HPS

W

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

UGE

UGE

UGE

UGE

UGE UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

U G

E U

G E

U G

E U

G E

UG

E

UG

E

UG

E

U G

E U

G E

U G

E U

G E

U G

E U

G E

UGE

UGE

UGE

UGE

UG

E

UGE

UG

E

UGE

UGE

UGE

UG

E

U G

E U

G E

U G

E U

G E

U G

E

UG

E

UG

E

UG

E

U G

E U

G E

U G

E U

G E

U G

E U

G E

UGE

UG

E

UGE

UGE

UGE

UGEUGE

UGE

UG

E

UG

E

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

U G

E U

G E

UGE

UG

E

UG

E

UGE

UGEUG

E

UGE

UGE

UGE

U G

E

CO

MM

COMM

COMM

COMM

CO

M

M

C O

M M

C O

M M

GAS

GAS

G

AS

G

ASSD

SD

SD

SD

SD

SD

SD

W W

W W

W

SD

SD

SD

SD

SD

SD

SDSDSD

SDSD

SD

W

W

SD

U G

E

GAS

G

AS

G

AS

GAS

GAS

U G

E

GAS

GAS

GAS

GAS

GAS

UGE

UG

E

UG

E

UGE

UGE

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UG

E

UG

E

U G

E

UGE

UGE

U G

E

UGE

U G

E U

G E

UGE

COMM

COMM

COMM

COMM

COMM

COMM

W

W

W

W

GAS

GAS

G

AS

G

AS

G

AS

W

W

W

COMM

COMM

COMM

C O

M M

COMM

COMM

COMM

CO

M

M

COMM

CO

M

M

C O

M M

C O

M M

COMM

COMM

COM

M

COM

M

COMM

CO

M

M

COMM

C O

M M

COMM

CO

M

M

UGE

U G

E

UGE

UGE

UG

E

UGE

UGE

UGE

UGE

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

UGE

SD

SD

SS

SS

SS

SD

COMM

COMM

COMM-B

C O

M M

-B

CO

M

M

-B COMM-B

CO

M

M -B

COMM-B COMM-B

C O

M M

-B

C O

M M

-A

C O

M M

-A C

O M

M -A

CO

M

M -A

CO

M

M -A

C O

M M

-A

CO

M M

-A

CO

M

M -A

CO

M

M -A

COMM

COMM

COMM

COMM

COMM

CO

M

M

COMM

COMM-A

COMM-A

CO

M

M

CO

M

M -A

COMM-A

PB

PB

PB

ALBANY POST ROAD

FDR VETERANS HOSPITAL ROAD

FD

R

VE

TE

RA

NS

H

OS

PI

TA

L R

OA

D

ALBANY POST ROAD

FD

R

VE

TE

RA

NS

H

OS

PI

TA

L R

OA

D

FDR VETERANS HOSPITAL ROAD

FDR VETERANS HOSPITAL ROAD

PB

PB

COMM-B

SD

SD

SD

GAS

GAS

GAS

SS

W

W

SD

SD

W

COMM

COMM

COM

M

-B

COMM-BCO

M

M -B

CO

M

M -B

CO

M

M -B

COM

M

COMMCOMM

CO

M

M

C O

M M

COMM

COMM

COMM

COMM

C O

M M

COMM

COMM

COMM

COMM

UGE

C

SD

PIV

CO

M

M

CO

M

M

COMM

COMM-B

C

W

W

CO

M

M -A

COMM-A

STORM DRAIN

EX. MH#10

EX. MH#8

EX. MH#9

EX. MH#11

EX. MH#12

EX. MH#24

EX. MH#7

EX. MH#1

EX. MH#2

EX. MH#3

EX. MH#5

EX. MH#6

EX. MH#4

EX. MH#15

EX. MH#17

EX. MH#18

EX. MH#19

EX. MH#20

EX. MH#23

EX. MH#21

EX. MH#22

EX. MH#13

EX. MH#14

F1

TS101

F1

TS103

F1

TS102

F1

TS104

F1

TS105

F1

TS106

C5 .

T-605

C5 .

T-606

F5 .

T-606

C5 .

T-607

F1 .

T-607

F5 .

T-607

C1 .

T-608

C5 .

T-608

F1 .

T-608

C1 .

T-610

C5 .

T-610

F5 .

T-605

GS

C1 .

T-607

EX. TMH#24

F1 .

T-606

C1 .

T-606

113 11 3 114 116 117

115115

10110210

106107108109

111112

100100

105105

110 110

93 94 96

104 104 106106

107107 108 108

109 109

111 111 112 112

113 113

105110

108 107

117116

106106107

110 10

5 10 0 95 90

THH#2B

THH#3B

THH#1B

THH#12B

THH#9B

THH#1A

CLC-P1

EX. MH#16

EX. THH#2A

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

ISSUED FOR

CONSTRUCTION

06/27/2025

2094 Albany Post Road, Montrose, NY 10548

620-22-700

SITE

Revisions: Date:

STAMP

A/E:

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315)484-4958

EHRM INFRASTRUCTURE

UPGRADES

TELECOMMUNICATIONS SITE PLAN

OVERALL

TS100

K.STRUBLEM.PERKINS

F1 TELECOMMUNICATIONS SITE PLAN - OVERALL

1"=150'

PROJECT SCOPE OF WORK

This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.

Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.

CIVIL SHEET ABBREVIATIONS

ABBRV ABBREVIATION F/F FACE TO FACE SD STORM DRAIN

ABC AGGREGATE BASE COURSE FF EL FINISH FLOOR ELEVATION SDMH STORM DRAIN MANHOLE

AC ASPHALTIC CONCRETE FG FINISH GRADE SECT SECTION

ACP ASPHALTIC CONCRETE PAVING FH FIRE HYDRANT SF SQUARE FEET (FOOT)

ADA AMERICANS WITH DISIBILITIES ACT FL FLOW LINE SHLDR SHOULDER

AGGR AGGREGATE FM FORCED MAIN SEWER SMH STEAM MANHOLE

APPROX APPROXIMATE FOC FACE OF CURB SP EL SPOT ELEVATION

ASPH ASPHALT FT FEET OR FOOT SPEC SPECIFICATION

ASSY ASSEMBLY FTG FOOTING SQ YD SQUARE YARD

AVE AVENUE SS SANITARY SEWER

HC HANDICAP SSMH SANITARY SEWER MANHOLE

BC / BOC BACK OF CURB HCP HANDICAPPED ST STREET

BDRY BOUNDARY HDPE HIGH DENSITY POLYETHYLENE STLT STREETLIGHT

BITUM BITUMINOUS HNDRL HANDRAIL STA STATION

BLDG BUILDING HORIZ HORIZONTAL STD STANDARD

BLVD BOULEVARD STM STEAM

BM BENCHMARK ID INSIDE DIAMETER OR INSIDE

DIMENSION SURF SURFACE

BRG BEARING INFO INFORMATION SURV SURVEY

INV INVERT SW SIDEWALK

CB CATCH BASIN INV EL INVERT ELEVATION SWR SEWER

CFS CUBIC FEET PER SECOND SYM SYMBOL

CIP CAST IRON PIPE LAT LATITUED

CL CENTER LINE LF LINEAR FEET (FOOT) TAN TANGENT

CLASS CLASSIFICATION LOC LOCATION TC / TOC TOP OF CURB

CMP CORRUGATED METAL PIPE LP LOW POINT TD TRENCH DRAIN

CMU CONCRETE MASONRY UNIT LS LUMP SUM TE TOP ELEVATION

CO CLEAN OUT TEMP TEMPORARY

CONC CONCRETE MATL MATERIAL THK THICKNESS

CONSTR CONSTRUCTION MAX MAXIMUM THRU THROUGH

COORD COORDINATION MH MANHOLE TMH TOP OF MANHOLE

CORR CORRIDOR MIN MINIMUM TOC WALL TOP OF CONCRETE WALL

CU FT CUBIC FEET MISC MISCELLANEOUS TOF TOP OF FOOTING

CU YD / CY CUBIC YARD MON MONUMENT TOP TOP OF WALL

MTG MEETING TOPO TOPOGRAPHY

DA DRAINAGE AREA MULT MULTIPLE TOS TOP OF SLAB

DAT DATUM TYP TYPICAL

DEG DEGREE N NORTH

DEMO DEMOLITION NA NOT APPLICABLE UGND UNDERGROUND

DEPT DEPARTMENT NO NUMBER UNPV RD UNPAVED ROAD

DESCR DESCRIPTION NTS NOT TO SCALE UON UNLESS OTHERWISE NOTED

DET DETAIL UTIL UTILITY

DI DROP INLET OC ON CENTER

DIA DIAMETER VAR VARIES

DIFF DIFFERENCE PC POINT OF CURVATURE VC VERTICAL CURVE

DIM DIMENSION PCT PERCENT VERT VERTICAL

DIP DUCTILE IRON PIPE PI POINT OF INTERSECTION VIC VICINITY

DIR DIRECTION PL PROPERTY LINE VOL VOLUME

DIST DISTANCE PRKG PARKING

DWG DRAWING PROJ PROJECT W WEST

PROP PROPOSED W/ WITH

E EAST PSI POUNDS PER SQUARE INCH W/OUT WITHOUT

EA EACH PVC POLYVINYL CHLORIDE

EC EDGE OF CURB

EG EXISTING GRADE QTY QUANTITY

EL ELEVATION

ENGR ENGINEER R RADIUS

ENTR ENTRANCE RCB REINFORCED CONCRETE BOX

EP EDGE OF PAVEMENT RCP REINFORCED CONCRETE PIPE

EPA ENVIRONMENTAL PROTECTION AGENCY RD ROAD OR ROOF DRAIN

EQUIP EQUIPMENT REQD REQUIRED

ERD EXISTING ROOF DRAIN ROW RIGHT OF WAY

ES EDGE OF SHOULDER RT RIGHT

ESMT EASEMENT RW ROADWAY

EST ESTIMATE

EX / EXIST EXISTING

NOTE

1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER

ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.

GRAPHIC SCALE

1" = 150'

75' 150' 300'150'

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.

UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE

CONTRACTOR AT HIS EXPENSE.

CONTRACTOR NOTE

GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY

TO THE VA.

TR

UE

N

OR

TH

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

LEGEND

EXISTING PROPOSED

A.C. PAVEMENT

CONCRETE PAVEMENT

SIDEWALK

EDGE OF PAVEMENT

BACK OF CURB

FENCE LINE

SCREEN WALL

RETAINING WALL

PROPERTY LINE

LIMITS OF CONSTRUCTION

BUILDING

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

TELECOMMUNICATIONS LINE (TELEPHONE)

TELECOMMUNICATIONS LINE (FIBER)

UNDERGROUND ELECTRICAL LINE

NATURAL GAS LINE

OVERHEAD ELECTRICAL LINE

HIGH PRESSURE STEAM LINE

ELECTRICAL VAULT

TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)

STORM DRAIN MANHOLE

STORM DRAIN DROP INLET

SANITARY SEWER MANHOLE

STEAM MANHOLE

CLEAN OUT

FIRE HYDRANT

WATER VALVE

STREETLIGHT

HANDHOLE/PULLBOX (W/ LOCKING COVER)

SIGN

TREE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)- "A" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -

SINGLE DUCT BANK SEPERATE CONDUIT

X X

W

SS

SD SD

T

COMM

UGE UGE

GAS GAS

OHE OHE

HPS

E E

T T

D D

S S

ST ST

C C

PB PB

COMM-A

COMM-B

COMM

1 - ADDENDUM #1 03/30/2026

HP

S

HP

S

HP

S

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

SS

SS

SS SS SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSDSD

SD

SD

SD

SD

SD

SD

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

UGE

UGE

UGE

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E

U G

E U

G E

U G

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UG

E

UGE

UGE

COMM

COMM

COMM

COMM

COMM

UG

E

C O

M M

C O

M M

C O

M M

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

H

PS

H

PS

H

PS

H

PS

H

PS

H

PS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HP

S

HP

S

HP

S

HP

S

HP

S

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SD

SD

SD

SD

SD

SS

SS

SS

SS

SD

SD

SD

SD

SD

SD

SD

SS

SS

SS

SS

SS

SS

SS

UGE

UGE

UGE

UGE

UGE

SS

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

U G

E

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

C O

M M

CO

M

M

COM

M

COM

M

SD

SD

SD

SD

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

COMM

COMM

UG

E

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

COMMCOMM

COMM

COMMCOMM

COMM

COMM

COMM

COMM

W

W

W

W

W

W

HP

S

HPS

HPS

W

W

W

W W

W

UGEUGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE UGE UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

W

W

SD

SDSDSDSDSD

SD

SD

SD

SD

SD

SD

W

CO

M

M

CO

M

M

CO

M

M

COMM

COMM

COMM

COMM

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

GAS

GAS

GAS

GAS

GAS

GAS

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UGE

UG

E

U G

E

UGE

UGE

UGE

UG

E

UG

E

UGE

UGE

UGE

W

COMM

COMM COMM COMM

C O

M M

C O

M M

C O

M M

CO

M

M

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

CO

M

M

CO

M

M

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

CO

M

M

COMM-B

C O

M M

-B C

O M

M -B

COMM-B COMM-B

COMM

COMM

COMMCOMM

COMM COMM

CO

M

M

COMM

COMM

COMM

COMM

COMM

COMM

COMM COMM

COMM

COMM

COMM

C O

M M

CO

M

M

CO

M

M

CO

M

M

COMM-A

COMM-A

COMM

COMM

COMM

COMM

PB

PB

ALBANY POST ROAD

ALBANY POST ROAD

FDR VETERANS HOSPITAL ROAD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

GAS

GAS

GAS

GAS

GAS

W

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

W

W

SS

SS

W

W

SD

SS

W

W

W

W

W

W

W

W

W

W

W

W

C O

M M

SD

SD

SD

SD

SD SD SD SD SD

SD

GAS

W

W

W

W

W

W

CO

M

M -B

CO

M

M -B

CO

M

M -B

UG

E

UG

E

UGE

CSD

SD

SD

W

W

W

COM

M

COM

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

COMM

COMM

COMM

COMM

C

W

W

W

W

W

W

W

W

COMM-A

CO

M

M -A

CO

M

M -A

STORM DRAIN

EX. MH#10

EX. MH#8

EX. MH#9

EX. MH#11

EX. MH#12

EX. MH#13

EX. MH#14

C5 .

T-605

C5 .

T-606

F5 .

T-605

F1 .

T-606

C1 .

T-606

107107

108 108

113 113

THH#2B

THH#3B

THH#1A

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

ISSUED FOR

CONSTRUCTION

06/27/2025

2094 Albany Post Road, Montrose, NY 10548

620-22-700

SITE

Revisions: Date:

STAMP

A/E:

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315)484-4958

EHRM INFRASTRUCTURE

UPGRADES

TELECOMMUNICATION SITE PLAN

ENLARGED VIEW

TS101

K.STRUBLEM.PERKINS

F1 TELECOMMUNICATIONS SITE PLAN - ENLARGED VIEW

1"=40'

MA

TC

HL

IN

E

SE

E

TS

2 F

OR

C

ON

TI

NU

AT

IO

N

GRAPHIC SCALE

1" = 40'

20' 40' 80'40'

MATCHLINE SEE TS103 FOR CONTINUATIONPROJECT SCOPE OF WORK

This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.

Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.

SE

E

SH

EE

T T S2

SEE SHEET TS201

CONSTRUCTION KEYNOTES

CONSTRUCT 4" PVC CONDUIT IN CONCRETE DUCT BANK PER DETAIL E8, SHEET TS501 SEE SHEET T-601,T-602 FOR NUMBER OF CONDUITS IN EACH SECTION OF DUCT BANK. TRENCH AND REPLACE -MATCH EXISTING. PROVIDE FIBER OPTIC CABLE PER SHEET T-601,T-602. SEE DETAILS B6,D9,E6,F6, SHEET TS501. TRENCH TO REMAIN OPEN UNTIL INSPECTION OF CONCRETE DUCT.

CONSTRUCT CONCRETE PULLBOX (4'x4'x4' MIN.) - SEE DETAILS C1, B6 SHEET TS501 WITH QUAZITE LOCKING COVER OR APPROVED EQUAL

SEE BUILDING 52 SHEET 52T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 31 SHEET 31T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 29 SHEET 29T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 28 SHEET 28T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 27 SHEET 27T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 26 SHEET 26T-101 FOR CONTINUATION,T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 20 SHEET 20T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 19 SHEET 19T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 18 SHEET 18T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 17 SHEET 17T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 16 SHEET 16T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 15 SHEET 15T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 14 SHEET 14T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 13 SHEET 13T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 12 SHEET 12T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 07 SHEET 07T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 06 SHEET 06T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 05 SHEET 05T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 04 SHEET 04T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 03 SHEET 03T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 02 SHEET 02T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 01 SHEET 01T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM

CONSTRUCT NEW FIBER IN EXISTING DUCT BANK

LOCKING COVER ON EXISTING MANHOLE SEE DETAIL E6,SHEET TS501.

CONSTRUCT COIL BOX CONNECTION - SEE DETAIL F1, SHEET TS502

SERVICE PROVIDER RUN FROM EXISTING DEMARK TO NEW MCR IN NEW CABLE TRAY. SEPARATE FROM

DISTRIBUTION CABLE TRAY.

31 CONSTRUCT NEW FIBER IN CABLE TRAY - SEE DETAIL F2, SHEET TS502.

32 CONSTRUCT 4" PVC PIPE WALL PENETRATION FOR NEW FIBER - SEE DETAIL E1, SHEET TS501.

CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN EXISTING DUCT BANK, SEPARATE CONDUIT

CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN NEW DUCT BANK, SEPARATE CONDUIT

NOTE

1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER

ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.

UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE

CONTRACTOR AT HIS EXPENSE.

CONTRACTOR NOTE

GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY

TO THE VA.

NOTE

SEE SHEET TS100 FOR CIVIL ABBREVIATIONS LIST.

TR

UE

N

OR

TH

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

33 HEADHOUSE CROSSING - SEE SHEET TS502

LEGEND

EXISTING PROPOSED

A.C. PAVEMENT

CONCRETE PAVEMENT

SIDEWALK

EDGE OF PAVEMENT

BACK OF CURB

FENCE LINE

SCREEN WALL

RETAINING WALL

PROPERTY LINE

LIMITS OF CONSTRUCTION

BUILDING

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

TELECOMMUNICATIONS LINE (TELEPHONE)

TELECOMMUNICATIONS LINE (FIBER)

UNDERGROUND ELECTRICAL LINE

NATURAL GAS LINE

OVERHEAD ELECTRICAL LINE

HIGH PRESSURE STEAM LINE

ELECTRICAL VAULT

TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)

STORM DRAIN MANHOLE

STORM DRAIN DROP INLET

SANITARY SEWER MANHOLE

STEAM MANHOLE

CLEAN OUT

FIRE HYDRANT

WATER VALVE

STREETLIGHT

HANDHOLE/PULLBOX (W/ LOCKING COVER)

SIGN

TREE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "A" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -

SINGLE DUCT BANK SEPERATE CONDUIT

X X

W

SS

SD SD

T

COMM

UGE UGE

GAS GAS

OHE OHE

HPS

E E

T T

D D

S S

ST ST

C C

PB PB

COMM-A

COMM-B

COMM

HP

S

HP

S

HP

S

HP

S

HPS

HPS

HPS

HPS

HPS

HPS

HPS

SD

SD

W

W

W W

W

W

W W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WW

W W

W W

W W

W

W

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SD

SD

SDSD

SD SD SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

U G

E U

G E

U G

E U

G E

U G

E U

G E

C O

M M

C O

M M

C O

M M

C O

M M

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

HPS

HPS

HPS

HPS

HPS

HPS

HPSHP

S

HP

S

HP

S

HP

S

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPSHPSHPS

SD

SS

SS

SS

SS

SS

SS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS GAS

G

AS

SD

SD

SD

SD

SD

SD

CO

M

M

COM

M

COMM

COMM

COMM

COMM

COMM

COMM

C O

M M

COMM

COM

M

C O

M M

CO

M

M

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

CO

M

M C

O M

M

COMM

COMM

COMM

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

COMM

COMM

COMM

COMM

CO

M

M

CO

M

M

CO

M

M

CO

M

MCOMM

UGE

UGE

UGE UGE UGE UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

U G

E

U G

E U G

E U

G E

U G

E U

G E

U G

E U

G E

UGE

UGE

UGE

UGE

UG

E

UG

E

UG

E

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGEUGEUGEUGEUGE

UGE

UGE

UGE

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSDSDSDSDSDSDSDSDSD

SD

SD

W

W

W

W

W

W

W

W

W

W

W

W

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E

UGE

UGE

UGE

C O

M M

COMM

COMM

COMM

COMM

UGE

UGE

C O

M M

W

W

CO

M

M -B

CO

M

M -B

CO

M

M -B

COMM-B

COMM-B

COMM-B

COMM-B

COMM-B

COMM-B COMM-B COMM-B COMM-B COMM-B COMM-B

C O

M M

-B C

O M

M -B

C O

M M

-B C

O M

M -B

C O

M M

-B

COMM-B

COMM-B

CO

M

M -B

CO

M

M -B

CO

M

M -A

COM

M

-A

COMM-A

COMM-A

COMM-A

COMM-A

COMM-A

COMM-ACOMM-A

COMM-A

COMM-A

C O

M M

-A C

O M

M -A

COMM-A

COMM

C O

M M

-A

CO

M

M -A

CO

M

M -A

CO

M

M -A

CO

M

M -A

C O

M M

C O

M M

C O

M M

COMM

COMM

COMM

CO

M

M -A

CO

M

M -A

COMM-A

CO

M

M -A

COMM-A

FDR VETERANS HOSPITAL ROAD

FD

R

VE

TE

RA

NS

H

OS

PI

TA

L R

OA

D

PB

SS

SS

SS

SS

SS

SS

SS

COM

M

-B

COM

M

-B

COM

M

-B

COMM-B

COMM-B

COMM-B

COMM-B

COMM-BCOMM-BCO

M M

-B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

COM

M

COM

M

COM

M

COM

M

COMM

COMM

COMMCOMMCOMMCOMM

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

COMM

W

UGE

UGE

UGE

W

PIV

CO

M

M -A

EX. MH#7

EX. MH#1

EX. MH#2

EX. MH#5

EX. MH#15

F5 .

T-606

C1 .

T-607

106106107

THH#1B

EX. MH#16

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

ISSUED FOR

CONSTRUCTION

06/27/2025

2094 Albany Post Road, Montrose, NY 10548

620-22-700

SITE

Revisions: Date:

STAMP

A/E:

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315)484-4958

EHRM INFRASTRUCTURE

UPGRADES

TELECOMMUNICATIONS SITE PLAN

ENLARGED VIEW

TS102

K.STRUBLEM.PERKINS

F1 TELECOMMUNICATIONS SITE PLAN - ENLARGED VIEW

1"=40'

GRAPHIC SCALE

1" = 40'

20' 40' 80'40'

MA

TC

HL

IN

E

SE

E

TS

1 F

OR

C

ON

TI

NU

AT

IO

N

MATCHLINE SEE TS104 FOR CONTINUATION

PROJECT SCOPE OF WORK

This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.

Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.

SEE SHEET TS203

SE

E

SH

EE

T

TS

TR

UE

N

OR

TH

CONSTRUCTION KEYNOTES

CONSTRUCT 4" PVC CONDUIT IN CONCRETE DUCT BANK PER DETAIL E8, SHEET TS501 SEE SHEET T-601,T-602 FOR NUMBER OF CONDUITS IN EACH SECTION OF DUCT BANK. TRENCH AND REPLACE -MATCH EXISTING. PROVIDE FIBER OPTIC CABLE PER SHEET T-601,T-602. SEE DETAILS B6,D9,E6,F6, SHEET TS501. TRENCH TO REMAIN OPEN UNTIL INSPECTION OF CONCRETE DUCT.

CONSTRUCT CONCRETE PULLBOX (4'x4'x4' MIN.) - SEE DETAILS C1, B6 SHEET TS501 WITH QUAZITE LOCKING COVER OR APPROVED EQUAL

SEE BUILDING 52 SHEET 52T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 31 SHEET 31T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 29 SHEET 29T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 28 SHEET 28T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 27 SHEET 27T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 26 SHEET 26T-101 FOR CONTINUATION,T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 20 SHEET 20T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 19 SHEET 19T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 18 SHEET 18T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 17 SHEET 17T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 16 SHEET 16T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 15 SHEET 15T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 14 SHEET 14T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 13 SHEET 13T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 12 SHEET 12T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 07 SHEET 07T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 06 SHEET 06T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 05 SHEET 05T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 04 SHEET 04T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 03 SHEET 03T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 02 SHEET 02T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 01 SHEET 01T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM

CONSTRUCT NEW FIBER IN EXISTING DUCT BANK

LOCKING COVER ON EXISTING MANHOLE SEE DETAIL E6,SHEET TS501.

CONSTRUCT COIL BOX CONNECTION - SEE DETAIL F1, SHEET TS502

SERVICE PROVIDER RUN FROM EXISTING DEMARK TO NEW MCR IN NEW CABLE TRAY. SEPARATE FROM

DISTRIBUTION CABLE TRAY.

31 CONSTRUCT NEW FIBER IN CABLE TRAY - SEE DETAIL F2, SHEET TS502.

32 CONSTRUCT 4" PVC PIPE WALL PENETRATION FOR NEW FIBER - SEE DETAIL E1, SHEET TS501.

CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN EXISTING DUCT BANK, SEPARATE CONDUIT

CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN NEW DUCT BANK, SEPARATE CONDUIT

NOTE

1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER

ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.

UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE

CONTRACTOR AT HIS EXPENSE.

CONTRACTOR NOTE

GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY

TO THE VA.

NOTE

SEE SHEET TS100 FOR CIVIL ABBREVIATIONS LIST.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

33 HEADHOUSE CROSSING - SEE SHEET TS502

LEGEND

EXISTING PROPOSED

A.C. PAVEMENT

CONCRETE PAVEMENT

SIDEWALK

EDGE OF PAVEMENT

BACK OF CURB

FENCE LINE

SCREEN WALL

RETAINING WALL

PROPERTY LINE

LIMITS OF CONSTRUCTION

BUILDING

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

TELECOMMUNICATIONS LINE (TELEPHONE)

TELECOMMUNICATIONS LINE (FIBER)

UNDERGROUND ELECTRICAL LINE

NATURAL GAS LINE

OVERHEAD ELECTRICAL LINE

HIGH PRESSURE STEAM LINE

ELECTRICAL VAULT

TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)

STORM DRAIN MANHOLE

STORM DRAIN DROP INLET

SANITARY SEWER MANHOLE

STEAM MANHOLE

CLEAN OUT

FIRE HYDRANT

WATER VALVE

STREETLIGHT

HANDHOLE/PULLBOX (W/ LOCKING COVER)

SIGN

TREE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "A" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -

SINGLE DUCT BANK SEPERATE CONDUIT

X X

W

SS

SD SD

T

COMM

UGE UGE

GAS GAS

OHE OHE

HPS

E E

T T

D D

S S

ST ST

C C

PB PB

COMM-A

COMM-B

COMM

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

C

SD

SD

SD

SD

SD

SD

SD

SS

SS

SS

SS

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

W

W

W

SD

SD

SD

SS

SD

SD

SD

SD

SD

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HP

S

HP

S

HP

S

COMM

COMM

CO

M

M

C O

M M

C O

M M

SD

SD

SD

PIV

CO

CO

CO

SD

SD

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

G

AS

G

AS

G

AS

GAS

GAS

GAS

GAS

G

AS

G

AS

W

W

SD

SD

SD

SD

SD

CO

M M

CO

M

M

COMM

COMM

COMM

CO

SD

SD

UGE

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

C O

M M

C O

M M

C O

M M

C O

M M

U G

E U

G E

U G

E U

G E

G

AS

G

AS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

UGE

UGE

U G

E

UG

E

UGE

UGE

UGE

UG

E

W

W

W

W

W

W

W

W

W

W

UGE

UGE

UGE

SD

SD

SD

SD

C O

M M

C O

M M

C O

M M

COMM-A

FDR VETERANS HOSPITAL ROAD

COMM-B

COMM-B

COMM-B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

COMM

COMM

CO

M

M

C O

M M

C O

M M

COMM-B

COMM-B

COMM-B

COMM-B

CO

M

M -A

CO

M

M -A

COMM-A

COMM-A

COMM-A

CO

M

M -A

EX. MH#24

C5 .

T-610

5 32

113 11

CLC-P1

EX. THH#2A

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

ISSUED FOR

CONSTRUCTION

06/27/2025

2094 Albany Post Road, Montrose, NY 10548

620-22-700

SITE

Revisions: Date:

STAMP

A/E:

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315)484-4958

EHRM INFRASTRUCTURE

UPGRADES

TELECOMMUNICATIONS SITE PLAN

ENLARGED VIEW

TS103

K.STRUBLEM.PERKINS

F1 TELECOMMUNICATIONS SITE PLAN - ENLARGED VIEW

1"=40'

GRAPHIC SCALE

1" = 40'

20' 40' 80'40'

MA

TC

HL

IN

E

SE

E

TS

4 F

OR

C

ON

TI

NU

AT

IO

N

MATCHLINE SEE TS101 FOR CONTINUATION

PROJECT SCOPE OF WORK

This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.

Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.

TR

UE

N

OR

TH

CONSTRUCTION KEYNOTES

CONSTRUCT 4" PVC CONDUIT IN CONCRETE DUCT BANK PER DETAIL E8, SHEET TS501 SEE SHEET T-601,T-602 FOR NUMBER OF CONDUITS IN EACH SECTION OF DUCT BANK. TRENCH AND REPLACE -MATCH EXISTING. PROVIDE FIBER OPTIC CABLE PER SHEET T-601,T-602. SEE DETAILS B6,D9,E6,F6, SHEET TS501. TRENCH TO REMAIN OPEN UNTIL INSPECTION OF CONCRETE DUCT.

CONSTRUCT CONCRETE PULLBOX (4'x4'x4' MIN.) - SEE DETAILS C1, B6 SHEET TS501 WITH QUAZITE LOCKING COVER OR APPROVED EQUAL

SEE BUILDING 52 SHEET 52T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 31 SHEET 31T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 29 SHEET 29T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 28 SHEET 28T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 27 SHEET 27T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 26 SHEET 26T-101 FOR CONTINUATION,T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 20 SHEET 20T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 19 SHEET 19T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 18 SHEET 18T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 17 SHEET 17T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 16 SHEET 16T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 15 SHEET 15T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 14 SHEET 14T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 13 SHEET 13T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 12 SHEET 12T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 07 SHEET 07T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 06 SHEET 06T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 05 SHEET 05T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 04 SHEET 04T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 03 SHEET 03T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 02 SHEET 02T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 01 SHEET 01T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM

CONSTRUCT NEW FIBER IN EXISTING DUCT BANK

LOCKING COVER ON EXISTING MANHOLE SEE DETAIL E6,SHEET TS501.

CONSTRUCT COIL BOX CONNECTION - SEE DETAIL F1, SHEET TS502

SERVICE PROVIDER RUN FROM EXISTING DEMARK TO NEW MCR IN NEW CABLE TRAY. SEPARATE FROM

DISTRIBUTION CABLE TRAY.

31 CONSTRUCT NEW FIBER IN CABLE TRAY - SEE DETAIL F2, SHEET TS502.

32 CONSTRUCT 4" PVC PIPE WALL PENETRATION FOR NEW FIBER - SEE DETAIL E1, SHEET TS501.

CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN EXISTING DUCT BANK, SEPARATE CONDUIT

CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN NEW DUCT BANK, SEPARATE CONDUIT

NOTE

1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER

ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.

UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE

CONTRACTOR AT HIS EXPENSE.

CONTRACTOR NOTE

GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY

TO THE VA.

NOTE

SEE SHEET TS100 FOR CIVIL ABBREVIATIONS LIST.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

33 HEADHOUSE CROSSING - SEE SHEET TS502

LEGEND

EXISTING PROPOSED

A.C. PAVEMENT

CONCRETE PAVEMENT

SIDEWALK

EDGE OF PAVEMENT

BACK OF CURB

FENCE LINE

SCREEN WALL

RETAINING WALL

PROPERTY LINE

LIMITS OF CONSTRUCTION

BUILDING

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

TELECOMMUNICATIONS LINE (TELEPHONE)

TELECOMMUNICATIONS LINE (FIBER)

UNDERGROUND ELECTRICAL LINE

NATURAL GAS LINE

OVERHEAD ELECTRICAL LINE

HIGH PRESSURE STEAM LINE

ELECTRICAL VAULT

TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)

STORM DRAIN MANHOLE

STORM DRAIN DROP INLET

SANITARY SEWER MANHOLE

STEAM MANHOLE

CLEAN OUT

FIRE HYDRANT

WATER VALVE

STREETLIGHT

HANDHOLE/PULLBOX (W/ LOCKING COVER)

SIGN

TREE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "A" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -

SINGLE DUCT BANK SEPERATE CONDUIT

X X

W

SS

SD SD

T

COMM

UGE UGE

GAS GAS

OHE OHE

HPS

E E

T T

D D

S S

ST ST

C C

PB PB

COMM-A

COMM-B

COMM

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

G

AS

G

AS

G

AS

GAS

GAS

GAS GAS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

GAS

SS

SS

SS

SS

SS

SS

SS

SS

SS

HP

S

HP

S

HP

S

HPS

HPS

UGE

UGE

UGE

UGE

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

SS

SS

SS

SD

SD

SD

SD

SD

SD

SD

SD

SDSDSD

SD

SD

SD

SD

SD

SD

W W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSDSDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

UGE

UGE

UGE

UGE

C

O M

M

U G

E U

G E

U G

E U

G E

U G

E U

G E

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E

C O

M M

C O

M M

UGE

UGE

UGE

UGE

UGE

HPS

HPS

HPS HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

H

PS

H

PS

H

PS

HPS

HP

S

HP

S

HP

S

HP

S

HP

S

HP

S

HP

S

HP

S

HP

S

HP

S

HP

S

HP

S

H

PS

H

PS

HPS

HPS

HPS

HPS

HPS

HPS

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

UGE

UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UGE

W

W

W

W

W

W

W

HPS

HPS

HPS

HPS

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

CO

M

M

COMM

COMM

COMM

COMM

COMM

C O

M M

COMM

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

COMM

COM

M

COM

M

COM

M

U G

E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

UG

E

UG

E

UG

E

UG

E

U G

E

UG

E

UG

E

UG

E

U G

E

U G

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

U G

E

U G

E

U G

E

U G

E

U G

E U

G E

U G

E U

G E

U G

E

U G

E

U G

E U

G E

U G

E U

G E

U G

E

UG

E U

G E

U G

E

W W W

W

W

W

W

W

W

WW

W

W

W

W

SD

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

SS

SS

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

C O

M M

C O

M M

C O

M M

C O

M M

COMM

COMM

CO

M

M

COMM

COMM

COMM

COMM

COM

M

COM

M

CO

M

M

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UGE

SD

SD

SD

COMM-B

COMM-B

COMM-B

COMM-B

COMM-B

COMM-B

COMM-B

C O

M M

-B C

O M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

COMM-B

C

O M

M -B

C O

M M

-B

CO

M M

-B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

COMM-A

COMM-A

C O

M M

-A C

O M

M -A

C O

M M

-A C

O M

M -A

C O

M M

-A C

O M

M -A

CO

M

M -A

CO

M

M -A

CO

M

M -A

CO

M

M -A

CO

M

M -A

COMM-A

COMM-A

C O

M M

-A C

O M

M -A

C O

M M

-A C

O M

M -A

C O

M M

-A

CO

M

M

-AC

O M

M -A

COMM-A

CO

M

M -A

CO

M

M -A

CO

M

M -A

COMM-ACO

M

M -A

CO

M

M -A

COMM-A

CO

M

M -A

CO

M

M -A

CO

M

M -A

COMM-A

COMM-A

C O

M M

-A

C O

M M

-A C

O M

M -A

COMM

COMM-B

COMM-B

COMM-B

COMM-B

COMM-B

COMM-B

EX. MH#3

EX. MH#6

EX. MH#4 EX. MH#17

EX. MH#18

EX. MH#20

C5 .

T-607

F1 .

T-607

C1 .

T-608

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

ISSUED FOR

CONSTRUCTION

06/27/2025

2094 Albany Post Road, Montrose, NY 10548

620-22-700

SITE

Revisions: Date:

STAMP

A/E:

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315)484-4958

EHRM INFRASTRUCTURE

UPGRADES

TELECOMMUNICATIONS SITE PLAN

ENLARGED VIEW

TS104

K.STRUBLEM.PERKINS

F1 TELECOMMUNICATIONS SITE PLAN - ENLARGED VIEW

1"=40'

GRAPHIC SCALE

1" = 40'

20' 40' 80'40'

MA

TC

HL

IN

E

SE

E

TS

3 F

OR

C

ON

TI

NU

AT

IO

N

MATCHLINE SEE TS105 FOR CONTINUATION

MATCHLINE SEE TS102 FOR CONTINUATION

PROJECT SCOPE OF WORK

This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.

Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.

TR

UE

N

OR

TH

CONSTRUCTION KEYNOTES

CONSTRUCT 4" PVC CONDUIT IN CONCRETE DUCT BANK PER DETAIL E8, SHEET TS501 SEE SHEET T-601,T-602 FOR NUMBER OF CONDUITS IN EACH SECTION OF DUCT BANK. TRENCH AND REPLACE -MATCH EXISTING. PROVIDE FIBER OPTIC CABLE PER SHEET T-601,T-602. SEE DETAILS B6,D9,E6,F6, SHEET TS501. TRENCH TO REMAIN OPEN UNTIL INSPECTION OF CONCRETE DUCT.

CONSTRUCT CONCRETE PULLBOX (4'x4'x4' MIN.) - SEE DETAILS C1, B6 SHEET TS501 WITH QUAZITE LOCKING COVER OR APPROVED EQUAL

SEE BUILDING 52 SHEET 52T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 31 SHEET 31T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 29 SHEET 29T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 28 SHEET 28T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 27 SHEET 27T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 26 SHEET 26T-101 FOR CONTINUATION,T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 20 SHEET 20T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 19 SHEET 19T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 18 SHEET 18T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 17 SHEET 17T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 16 SHEET 16T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 15 SHEET 15T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 14 SHEET 14T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 13 SHEET 13T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 12 SHEET 12T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 07 SHEET 07T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 06 SHEET 06T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 05 SHEET 05T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 04 SHEET 04T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 03 SHEET 03T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 02 SHEET 02T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 01 SHEET 01T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM

CONSTRUCT NEW FIBER IN EXISTING DUCT BANK

LOCKING COVER ON EXISTING MANHOLE SEE DETAIL E6,SHEET TS501.

CONSTRUCT COIL BOX CONNECTION - SEE DETAIL F1, SHEET TS502

SERVICE PROVIDER RUN FROM EXISTING DEMARK TO NEW MCR IN NEW CABLE TRAY. SEPARATE FROM

DISTRIBUTION CABLE TRAY.

31 CONSTRUCT NEW FIBER IN CABLE TRAY - SEE DETAIL F2, SHEET TS502.

32 CONSTRUCT 4" PVC PIPE WALL PENETRATION FOR NEW FIBER - SEE DETAIL E1, SHEET TS501.

CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN EXISTING DUCT BANK, SEPARATE CONDUIT

CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN NEW DUCT BANK, SEPARATE CONDUIT

NOTE

1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER

ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.

UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE

CONTRACTOR AT HIS EXPENSE.

CONTRACTOR NOTE

GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY

TO THE VA.

NOTE

SEE SHEET TS100 FOR CIVIL ABBREVIATIONS LIST.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

33 HEADHOUSE CROSSING - SEE SHEET TS502

LEGEND

EXISTING PROPOSED

A.C. PAVEMENT

CONCRETE PAVEMENT

SIDEWALK

EDGE OF PAVEMENT

BACK OF CURB

FENCE LINE

SCREEN WALL

RETAINING WALL

PROPERTY LINE

LIMITS OF CONSTRUCTION

BUILDING

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

TELECOMMUNICATIONS LINE (TELEPHONE)

TELECOMMUNICATIONS LINE (FIBER)

UNDERGROUND ELECTRICAL LINE

NATURAL GAS LINE

OVERHEAD ELECTRICAL LINE

HIGH PRESSURE STEAM LINE

ELECTRICAL VAULT

TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)

STORM DRAIN MANHOLE

STORM DRAIN DROP INLET

SANITARY SEWER MANHOLE

STEAM MANHOLE

CLEAN OUT

FIRE HYDRANT

WATER VALVE

STREETLIGHT

HANDHOLE/PULLBOX (W/ LOCKING COVER)

SIGN

TREE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "A" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -

SINGLE DUCT BANK SEPERATE CONDUIT

X X

W

SS

SD SD

T

COMM

UGE UGE

GAS GAS

OHE OHE

HPS

E E

T T

D D

S S

ST ST

C C

PB PB

COMM-A

COMM-B

COMM

G

AS

G

AS

GA

S

GA

S

GA

S

G

AS

G

AS

G

AS

G

AS

G

AS

GAS

GAS

GAS

GAS

GAS GAS

GAS

W

W

SS

SS

SS SS SS SS SS

SS

SS

SS

SS

SSSS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SS

SD

SD

SD

SD

SD

SD

SD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SD

SD

SD

SD

SD

SD

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HPS

HP

S

HP

S

HP

S

HPS

HPS

HPS

HPS

HP

S

HP

S

HP

S

HP

S

C O

M M

C O

M M

C O

M M

CO

M

M UG

E

UG

E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E

U G

E U

G

EUGE

UGE

UGE

UGE UGE

UG

E

UG

E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

UG

E

UG

E

UG

E

UG

E

UGE

UGE

UG

E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

UG

E

UG

E

UG

E

UGE

UGE

U G

E U

G E

COMM

COMM

CO

MM

CO

MM

CO

M

M SD

SD

SD

SD

SD

SD

SD

SD

SD

W

W

W

W

W

W

G

AS

G

AS

G

AS

G

AS

SD

SD

SD

SD

SD

SD

SD

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UG

E

UG

E

UGE

UGE

UGE

UGE UGE

UGE

UG

E

UG

E

UG

E

UG

E

UG

E

U G

E U

G E

UG

E

UGE

UGE

U G

E U

G E

U G

E U

G E

UG

E

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

COMM

COMM

COMM

COMM

COMM

C O

M M

C O

M

M COMM

COMM

CO

M

M

CO

M

M

C O

M M

COM

M

COMM

COMM

COMM

COMM

COMM

CO

M

M

CO

M

M

CO

M

M

COMM

CO

M

M

CO

M

M

COMM

CO

M

M

COMM

C O

M M

C O

M M

COMM

CO

M

M

CO

M

M

CO

M

M

CO

M

M C

O M

M C

O M

M C

O M

M C

O M

M

C O

M M

CO

M

M

C O

M M

COMM

COMM

COMM

COMM

COMM

COMM

COMM

CO

M

M

COM

M

COM

M

COM

M

CO

M

M

CO

M

M

COMM

COMM

COMM

COMM

C O

M M

COM

M

CO

M

M

COMM

COMM

CO

M

M

COM

M

COM

M

C O

M M

COMM

COMM

COMM

COMM

CO

M

M

C O

M M

C O

M M

CO

M

M

CO

M

M

COMM

COMM

UGE

UGE

UGE

UGE

UGE

UGE

UGE

U

G E

U G

E

UGE

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

U G

E U

G E

UG

E

UG

E

U G

E

UGE

UGE

UGE

U G

E U

G E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

U G

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE U

G E

U G

E

UGE

UGE

UGE

UGE

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SD

SD

COMM-B

COMM-B

CO

M

M -B

C O

M M

-A

CO

M

M -A

C O

M M

-A C

O M

M -A

CO

M

M -A

CO

M

M -A

CO

M

M -A

CO

M

M -A

COMM-A

COMM-A

COMM-A

COMM-A

C O

M M

-A

COMM-A

COMM-A

COMM-A

COMM-A

COMM-A

CO

M

M

CO

M

M

CO

M

M

COMM

CO

M

M

CO

M

M

COMM

CO

M

M -A

COMM-A

COMM-A

COMM-A

PB

FD

R

VE

TE

RA

NS

H

OS

PI

TA

L R

OA

D

PB

HPS

HPS

W

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COM

M

CO

M

M

COMM

C O

M M

-A C

O M

M -A

CO

M

M

CO

M

M C

O M

M

COMM

COMM

COMM

COMM

CO

M

M

COMM

COMM

CO

M

M

CO

M

M C

O M

M

COMM

COMM

COMM

COMM

CO

M

M

COMM

COMM

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

CO

M

M -B

EX. MH#19

EX. MH#23

EX. MH#21

EX. MH#22

F5 .

T-607

C5 .

T-608

F1 .

T-608

C1 .

T-610

EX. TMH#24

29 14

26 24

THH#12B

THH#9B

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

ISSUED FOR

CONSTRUCTION

06/27/2025

2094 Albany Post Road, Montrose, NY 10548

620-22-700

SITE

Revisions: Date:

STAMP

A/E:

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315)484-4958

EHRM INFRASTRUCTURE

UPGRADES

TELECOMMUNICATIONS SITE PLAN

ENLARGED VIEW

TS105

K.STRUBLEM.PERKINS

F1 TELECOMMUNICATIONS SITE PLAN - ENLARGED VIEW

1"=40'

GRAPHIC SCALE

1" = 40'

20' 40' 80'40'

MATCHLINE SEE TS106 FOR CONTINUATION

MATCHLINE SEE TS104 FOR CONTINUATION

PROJECT SCOPE OF WORK

This project provides complete recabling within multiple buildings at the VA Hudson Valley Heath Care System.

Multiple buildings on campus including Buildings 1, 2, 3, 4, 5, 6, 7, 12, 13, 14, 15, 16, 17, 18, 19, 20, 26, 27, 28, 29, 31, 52, GS and also site infrastructure upgrades. See main project cover sheet for building priority.

SEE SHEET TS202

SE

E S

HE

ET

TS

SEE SHEET TS204

SEE SHEET TS204

FIBER PATH "A" IN NEW CONDUIT

TR

UE

N

OR

TH

CONSTRUCTION KEYNOTES

CONSTRUCT 4" PVC CONDUIT IN CONCRETE DUCT BANK PER DETAIL E8, SHEET TS501 SEE SHEET T-601,T-602 FOR NUMBER OF CONDUITS IN EACH SECTION OF DUCT BANK. TRENCH AND REPLACE -MATCH EXISTING. PROVIDE FIBER OPTIC CABLE PER SHEET T-601,T-602. SEE DETAILS B6,D9,E6,F6, SHEET TS501. TRENCH TO REMAIN OPEN UNTIL INSPECTION OF CONCRETE DUCT.

CONSTRUCT CONCRETE PULLBOX (4'x4'x4' MIN.) - SEE DETAILS C1, B6 SHEET TS501 WITH QUAZITE LOCKING COVER OR APPROVED EQUAL

SEE BUILDING 52 SHEET 52T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 31 SHEET 31T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 29 SHEET 29T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 28 SHEET 28T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 27 SHEET 27T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 26 SHEET 26T-101 FOR CONTINUATION,T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 20 SHEET 20T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 19 SHEET 19T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 18 SHEET 18T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 17 SHEET 17T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 16 SHEET 16T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 15 SHEET 15T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 14 SHEET 14T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 13 SHEET 13T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 12 SHEET 12T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 07 SHEET 07T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 06 SHEET 06T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 05 SHEET 05T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 04 SHEET 04T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 03 SHEET 03T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 02 SHEET 02T-101 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM SEE BUILDING 01 SHEET 01T-100 FOR CONTINUATION, T-601 AND T-602 FOR FIBER RISER DIAGRAM

CONSTRUCT NEW FIBER IN EXISTING DUCT BANK

LOCKING COVER ON EXISTING MANHOLE SEE DETAIL E6,SHEET TS501.

CONSTRUCT COIL BOX CONNECTION - SEE DETAIL F1, SHEET TS502

SERVICE PROVIDER RUN FROM EXISTING DEMARK TO NEW MCR IN NEW CABLE TRAY. SEPARATE FROM

DISTRIBUTION CABLE TRAY.

31 CONSTRUCT NEW FIBER IN CABLE TRAY - SEE DETAIL F2, SHEET TS502.

32 CONSTRUCT 4" PVC PIPE WALL PENETRATION FOR NEW FIBER - SEE DETAIL E1, SHEET TS501.

CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN EXISTING DUCT BANK, SEPARATE CONDUIT

CONSTRUCT NEW MAIN AND REDUNDANT FIBER IN NEW DUCT BANK, SEPARATE CONDUIT

NOTE

1. FIBER HOME RUNS FROM EACH BUILDING TO MCR. PROVIDE 100' EXTRA SLACK EACH FIBER OPTIC CABLE FOR FUTURE EXTENSION TO NEW SERVER

ROOM. SEE BUILDING PLANS FOR CONNECTION TO BUILDING.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION.

UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED BY THE

CONTRACTOR AT HIS EXPENSE.

CONTRACTOR NOTE

GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY

TO THE VA.

NOTE

SEE SHEET TS100 FOR CIVIL ABBREVIATIONS LIST.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

33 HEADHOUSE CROSSING - SEE SHEET TS502

LEGEND

EXISTING PROPOSED

A.C. PAVEMENT

CONCRETE PAVEMENT

SIDEWALK

EDGE OF PAVEMENT

BACK OF CURB

FENCE LINE

SCREEN WALL

RETAINING WALL

PROPERTY LINE

LIMITS OF CONSTRUCTION

BUILDING

WATERLINE

SANITARY SEWER LINE

STORM DRAIN LINE

TELECOMMUNICATIONS LINE (TELEPHONE)

TELECOMMUNICATIONS LINE (FIBER)

UNDERGROUND ELECTRICAL LINE

NATURAL GAS LINE

OVERHEAD ELECTRICAL LINE

HIGH PRESSURE STEAM LINE

ELECTRICAL VAULT

TELECOMMUNICATIONS VAULT (W/ LOCKING MANHOLE COVER)

STORM DRAIN MANHOLE

STORM DRAIN DROP INLET

SANITARY SEWER MANHOLE

STEAM MANHOLE

CLEAN OUT

FIRE HYDRANT

WATER VALVE

STREETLIGHT

HANDHOLE/PULLBOX (W/ LOCKING COVER)

SIGN

TREE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "A" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING) - "B" ROUTE

NEW FIBER (24F OS2 TO EACH TR IN EACH BUILDING)"A" & "B" ROUTE -

SINGLE DUCT BANK SEPERATE CONDUIT

X X

W

SS

SD SD

T

COMM

UGE UGE

GAS GAS

OHE OHE

HPS

E E

T T

D D

S S

ST ST

C C

PB PB

COMM-A

COMM-B

COMM

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UGEUGE

UGE

UGE

UG

E

UGE

UG

E

U G

E

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UGE UGEUGE

UGE

UGEUGE

UGE

UGE

U G

E U

G E

U G

E

UGE

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

CO

M

M

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M C

O M

M C

O M

M C

O M

M C

O M

M

C O

M M

C O

M M

C O

M M

C O

M M

CO

M

M

CO

M

M

CO

M

M

G

AS

G

AS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

G

AS

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

COMM

COMM

CO

M

M

CO

M

M

COMM

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UG

E

UG

E

UG

E

UGE

UGE

UGE

COMM

COMM

COM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .