ATTACHMENT 32 - Montrose.EHRM.Addendum.01.B52.20260330.pdf
PDF 15 MB Posted
- Solicitation number
- RFP-36C77626R0033
About this file
This document is a comprehensive Drawing Index and set of architectural construction drawings for a federal infrastructure upgrade project at a residential board and care facility. The project includes renovation work across basement, first, second, and third levels of an existing 8,234 square foot residential facility, with work issued for construction in full compliance with 2024 NFPA 101 Life Safety Code, 2025 NFPA 72 Fire Alarm Code, 2025 NFPA 13 Sprinkler Systems standards, 2026 National Electrical Code, and applicable Virginia seismic design requirements.
The 50-sheet drawing set encompasses general architectural notes, infection control and life safety interim measures, hazardous material abatement plans, architectural details including partition and framing specifications, interior finishes, fire protection systems, mechanical plans and schedules, electrical systems with one-line diagrams and schedules, and comprehensive telecommunications infrastructure including cable tray layouts, riser diagrams, rack elevations, and fiber optic specifications. Key project requirements include maintaining Category IV infection control precautions with dust containment barriers, negative air pressure, and HEPA filtration; implementing temporary construction barriers and anteroom decontamination; coordinating hazardous material removal for confirmed asbestos in pipe insulation and lead-based paint; and providing new telecom rooms meeting VA physical security standards with Johnson Controls iSTAR Edge G2 access control panels, new 4-post equipment racks, Category 6A cabling infrastructure, and Avigilon IP-addressable security camera systems. The project maintains occupied space operations on the first floor throughout construction with phased work coordination required with the Contracting Officer Representative.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.B
.rv t 3/
/2
:4
6:
P M
52G-001
DRAWING INDEX 620-22-700
04/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION
GENERAL
52G-000 COVER SHEET Yes Yes Yes Yes 52G-001 DRAWING INDEX Yes Yes Yes Yes 52G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 52G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes
ICRA & LIFE SAFETY
52GI300 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL No Yes Yes Yes 52GI301 INTERIM LIFE SAFETY & INFECTION CONTROL DETAILS No Yes Yes Yes
HAZARDOUS
52H-101 HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL No Yes Yes
ARCHITECTURAL
52A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 52A-400 ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL No Yes Yes Yes 52A-401 ARCHITECTURAL ENLARGED VIEWS - EXTERIOR ELEVATION No No Yes Yes 52A-501 ARCHITECTURAL ROOF PLAN & DETAILS No Yes Yes Yes 52A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 52A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 52A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes
INTERIORS
52IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes
FIRE PROTECTION
52FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 52FX100 FIRE PROTECTION PLAN - FIRST LEVEL No Yes Yes Yes 52FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
MECHANICAL
52M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 52M-100 MECHANICAL PLANS - FIRST LEVEL No Yes Yes Yes 52M-501 MECHANICAL DETAILS No Yes Yes Yes 52M-701 MECHANICAL SCHEDULES No Yes Yes Yes 52M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 52M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 52M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 52M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
ELECTRICAL
52E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 52E-100 ELECTRICAL PLAN - BASEMENT & FIRST LEVEL No Yes Yes Yes 52E-101 ELECTRICAL PLAN - SECOND & THIRD LEVEL No Yes Yes Yes 52E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 52E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 52E-601 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes 52E-701 ELECTRICAL SCHEDULES No Yes Yes Yes 52E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 52E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes
TELECOMMUNICATION
52T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 52T-100 TELECOMMUNICATION PLAN - BASEMENT & FIRST LEVEL Yes Yes Yes Yes 52T-101 TELECOMMUNICATION PLAN - SECOND & THIRD LEVEL Yes Yes Yes Yes 52T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 52T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 52T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 52T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 52T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 52T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 52T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes 52T-701 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 52T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 52T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 52T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes
REFERENCE
52R-900 PHOTO REFERENCES No Yes Yes Yes Grand total: 50
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
52G-011 REMOVED FROM
CONSTRUCTION DOCUMENTS
sagar Text Box
8234 SF
EXISTING RESIDENTIAL -
3 4
TELECOM
ROOM
120120
VESTIBULE
101A101A
CORIDOR
151Z151ZCORRIDOR
147Z147Z
E2 ▬ 59.3'
4'- 0"
E1 ▬ 146.8' E3 ▬ 147.8'
FEC
9 9
BEDROOM
109109 BEDROOM
108108
BEDROOM
107107
BEDROOM
110110
BEDROOM
111111
BEDROOM
112112
SHOWER
106A106A
MEN TLT
106106
BEDROOM
105105
BEDROOM
104104
BEDROOM
113113
STAIR
HALL B
114114
BEDROOM
115115
BEDROOM
116116
BEDROOM
117117
BEDROOM
103103
SOCIAL
ROOM
102102
BEDROOM
118118 OFFICE
119119
FEMALE
TLT
123123
OFFICE
121121 TELE
122122
ELEVATOR
EV1EV1 OFFICE
125125
VISITORS
LOUNGE
126126
BEDROOM
128128
GENERAL
STORAGE
129129
BEDROOM
130130
COPY/
STG RM
145145
STAFF
LOUNGE
144144
OFFICE
143143
EXAM
ROOM
142142
FEMALE
TLT
141141
SHOWER
ROOM
141A141A
KITCHEN
131131
STAIR
HALL A
132132
OFFICE
133133
OFFICE
134134
OFFICE
135135
OFFICE
136136
OFFICE
137137
OFFICE
138138
MIN
3'-0" CLR
MIN
3'-0" CLR
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IPC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS (4 FLOORS)
(INCL. MECHANICAL SHAFTS) 1 HOUR (1 - 3 FLOORS)
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: RESIDENTIAL BOARD AND CARE Occupancy per Chapter 33 and BUSINESS Occupancy per Chapter 39
BUILDING OCCUPANCY TYPE:
PRIMARY - EXISTING RESIDENTIAL BOARD AND CARE, LARGE
SECONDARY - EXISTING BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Board and Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
33.3.2.5.2 COMMON PATH OF TRAVEL 75 FT
33.3.2.5.4 DEAD END 30 FT
33.3.2.6 TRAVEL DISTANCE FROM ANY 250 FT
POINT IN ROOM TO EXIT
OCCUPANT LOAD:
33.1.4 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
33.3.2 Capacity of Means of Egress.
33.3.2.3.3 The clear width of any corridor or passageway required for exit access shall not be less than 60 in. (1525 mm).
PROTECTION OF VERTICAL OPENINGS:
33.3.3.1 Protection of Vertical Openings.
33.3.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
33.3.3.2 Protection from Hazards.
33.3.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 9.7.1.1(1)
33.3.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7:
(1) Boilder and fuel-fired heater rooms
(2) Laundries
(3) Repair Shops
(4) Rooms or spaces used for storage of combustible supplies and equipment in quantities deemed hazardous by the AHJ.
33.3.3.5.7 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
SUBDIVISION OF BUILDING SPACES:
33.3.3.7 SUBDIVISION OF BUILDING SPACES
33.3.3.7.1 EVERY STORY SHALL BE DIVIDED INTO NOT LESS THAN
TWO SMOKE COMPARTMENTS.
33.3.3.7.3 THE TRAVEL DISTANCE FROM ANY POINT TO REACH A
DOOR IN THE REQUIRED SMOKE BARRIER SHALL NOT EXCEED
200 FT.
33.3.3.7.9 SMOKE BARRIERS IN ACCORDANCE WITH SECTION 8.5
SHALL HAVE A MINIMUM 1-HOUR FIRE RESISTANCE RATING.
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
7:
:5
52GI300
INTERIM LIFE SAFETY & INFECTION CONTROL
PLAN - FIRST LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0"F1 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL
NOTE:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
AREA OCCUPANCIES
Name Area
Occupancy Requirements Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats OL
LEVEL 1
EXISTING RESIDENTIAL 8,234.13 SF R4 Residential Board &
Care
200 SF 0 42
PATH OF TRAVEL SCHEDULE - FIRST LEVEL
Mark From Room To Room Type of Travel Path Length
LEVEL 1
(P-o-T) Distance to Exits
E1 BEDROOM 109 VESTIBULE 101A (P-o-T) Distance to Exits 146' - 9" E2 TELECOM ROOM 120 VESTIBULE 101A (P-o-T) Distance to Exits 59' - 3" E3 OFFICE 137 VESTIBULE 101A (P-o-T) Distance to Exits 147' - 9"
1 TEMPORARY CONSTRUCTION BARRIER
2 ANTEROOM - SEE INTERIM INFECTION CONTROL
AND LIFE SAFETY DETAILS
3 TEMPORARY CONSTRUCTION BARRIER DOOR
WITH CLOSER AND LATCH AND WALK OFF MATS
4 DEBRIS REMOVAL PATH TO EXTERIOR
5 REMOVE EXISTING WINDOW, AC UNIT AND
METAL SUPPORT FRAME. PROVIDE TEMPORARY
INFILL.
6 SOLID GRAY HATCH DENOTES LIMITED WORK
AREA - SEE MEP AND TELECOM DRAWINGS FOR
CABLING SCOPE, TYP.
7 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT
ALL TIMES
8 COORDINATE TEMPORARY HEPA EXHAUST
ROUTING OUT OF BUILDING - MAINTAIN 25 FEET
MINIMUM FROM INTAKES, OPERABLE WINDOWS,
AND ENTRANCES. PROVIDE BLOCK-OFF PANELS
IN EXISTING WINDOWS FOR DISCHARGE, TYP.
9 ENTRANCE TO BE CLOSED DURING DEMOLITION
AND CONSTRUCTION - PROVIDE TEMPORARY
SIGNAGE
10 EXIT TO BE CLOSED DURING CONSTRUCTION -
PROVIDE SIGNAGE DIRECTING OCCUPANTS TO
NEXT CLOSEST EXIT
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
TEMPORARY WALL TO EXTEND
AND BE SEALED TO DECK /
FLOOR ABOVE WHEN RATED
ENCLOSURE REQUIRED
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
FI
NI
SH
ED
F
LO
OR
T O
UN
DE
RS
ID
E
OF
S
TR
UC
TU
RE
VE
RI
FY
F
LO
OR
T
O
FL
OO
R
HE
IG
HT
RENOVATED SPRINKLER
SYSTEM
WEEKLY CHANGED
OR MORE AS
NEEDED PRE-FILTER
FLEX DUCTMONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR
UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
PRESSURE INDICATOR SHALL BE AT
0.03 OR GREATER USING A DIGITAL
MANOMETER WITH DATA LOGGING. IF
NOT VERIFY ALL OPENING SUCH AS
DOOR ARE CLOSED AND/OR CHANGE
NEGATIVE AIR PRE-FILTER. DO NOT USE
A "BALL IN THE WALL" OR ANALOG
OTHER PRESSURE INDICATOR.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
OTAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
PUBLIC AREA
CONSTRUCTION AREA
ANTE ROOM
HARD BARRIER ALL THE WAY TO
DECK ABOVE
SIZE ANTE ROOM TO PROVIDE
SPACE FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS' PPE
AND CLEANING, INCLUDING A HEPA
CLOTHING VACUUM
ROUTE DUCT TO EXTERIOR - SEE
PLANS FOR PROPOSED ROUTES -
CONFIRM ROUTE WITH ON-SITE
STAFF PRIOR TO INSTALLATION.
DISCHARGE AT A DISTANCE OF 25
FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. DO NOT
DIRECT EXHAUST INTO ANY
BUILDING SHARED EXHAUST
SYSTEM.
ANTE ROOM FAN
DOOR TO BE SELF-CLOSING AND
SELF-LATCHING - 45 MIN. FIRE
RATING PER NFPA
D7
52GI301
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
1/4" = 1'-0"F7 TYPICAL CONSTRUCTION LAYOUT- CLASS IV
1/2" = 1'-0"D7 CROSS SECTION A'-A'- CLASS IV
NTSF2 TYPICAL ICRA PRODUCTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t 3/
/2
5:
:2
PM
52GI301
INTERIM LIFE SAFETY & INFECTION CONTROL
DETAILS
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS
DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE
(COR).
COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH
OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH
THE COR. ALL INTERIOR DOORS THAT LEAD TO THE
CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.
OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING
WORK.
THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL
BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION
AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM
CLEANER PRIOR TO LEAVING THE SITE.
FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR
OCCUPIED AREAS ON THE FLOOR.
PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;
REVIEW WITH COR AND VA SAFETY GROUP.
MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT
ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION
UNITS.
CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE
OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR
EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE
CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN
CONSTRUCTION AREA TO PREVENT CONTAMINATION OF
EXISTING DUCT SYSTEM.
REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND
VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION
AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION
AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".
GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP
A CURRENT HOT WORK PERMIT ON SITE.
TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE
SURE THEY REMAIN EFFECTIVE.
MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL
DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR
CONTAINERS.
SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES
AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN
DUST PROTECTION AND NEGATIVE AIR PRESSURE.
MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,
WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR
CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED
AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA
SHALL BE CLEANED IMMEDIATELY.
AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA
WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,
REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH
OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER
REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.
CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL
PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
ICRA SYMBOL LEGENDINFECTION CONTROL RISK
ASSESSMENT:
TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE
ACTIVITY CATEGORY
IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT
CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP
CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK
CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR
MAINTENANCE
CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR
MAINTENANCE
THIS PROJECT: CATEGORY D
TABLE 2: AFFECTED AREA ASSESSMENT
TABLE 3: PATIENT RISK CATEGORY
IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN
TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH
THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT
RISK CATEGORY FOR THE ACTIVITY.
LOW RISK: NON-PATIENT CARE AREAS
MEDIUM RISK: PATIENT CARE SUPPORT AREAS
HIGH RISK: PATIENT CARE AREAS
HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY
COMPROMISED PATIENT CARE AREAS
THIS PROJECT: HIGH RISK
CL
AS
S
II
Construction Activity Category
RISK GROUP
LOW RISK
MEDIUM RISK
HIGH RISK
HIGHEST RISK
I II II III
I II III IV
I II IV IV
II III IV IV
A
STEP 1:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 2:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 3:
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 4:
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 5:
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 6:
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 7:
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 8:
DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE
WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?
(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN
AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)
STEP 9:
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 10:
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH
THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
Affected Area Assessment
AREA
Activity Area Area Above Area Below Adjacent Area
TR
SEE PLAN
SVC TYPE POC POC CONTACT INFO
SEE PLAN
SEE PLAN
Walter Hoffman (914) 208-6275
MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED
CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO
FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF
INFECTION CONTROL ACTIVITIES REQUIRED.
THIS PROJECT: CATEGORY IV
TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL
PRECAUTIONS
B C D
TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES
BY LEVEL OF PRECAUTIONS
NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)
TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES
REQUIRED UPON COMPLETION OF THE ACTIVITY
1.
2.
1.
2.
A.
B.
C.
D.
E.
1.
2.
1.
2.
3.
1.
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures
Work Area Cleaning:
Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces
Removal of Critical Barriers:
Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
Carefully remove screws and painter tape.
If dust will be generated during screw removal, use hand-held HEPA vacuum.
Drywall cutting is prohibited during removal process Clean all stud tracks with HEPA vacuum before removing outer hard barrier Use a plastic barrier to enclose area if dust could be generated
Negative Air Requirements:
The use of negative air must be designated to remove contaminants from the work area Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC Systems:
Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed Verify that HVAC systems are clean and operational.
Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications
Water Systems:
Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA directive 1061.
CL
AS
S
III
IV
13.
14.
15.
16.
17.
18.
Ensure availability of equipment for cleaning hands Construct and complete critical barriers meeting NFPA 241 requirements.
Barriers must extend to the ceiling or if ceiling tile is removed, to deck above All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type) Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A of this document.
These control measures must be maintained continuously 24/7 for the duration of the project. HEPA filtered exhaust if discharged directly to the outdoors must be at a istance of 25 feet or greater from entrances, air intakes and operable windows. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable
4.
5.
6.
7.
8.
9.
10.
11.
12.
Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system)Ensure worker clothing is clean and free of visible dust before leaving the work area Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system Seal doors to prevent dust migration Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats just be changed routinely and when visibly soiled.
Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily
1.
2.
3.
Perform work activity in a manner that does not create dust Immediately replace ceiling tile, close access panels, etc. upon completion.
Any materials and equipment being brought into the facility must be free of contaminants and loose material
19.
20.
21.
22.
Barriers must be hard barriers unless temporary to install final barrier.
Containment must include an anteroom to ensure pressure control.
Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable Workers must wear shoe covers or have a method to clean shoes in anteroom. Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
CL
AS
S I
CL
AS
S
III
CL
AS
S
IV
YES
N/A
N/A
N/A
N/A
AFTER-HOURS WORK TO BE COORDINATED WITH VA COR
COORDINATE WITH VA COR ON PATIENT CARE FLOORS
TEMPORARY WALLS TO BE 1-HR RATED - PREFABRICATED
WALLS / DOOR PREFERRED
TECHNOLOGY AND ELECTRICAL FOCUSED WORK -
MINIMAL PLUMBING OR MECHANICAL IMPACT
MINOR INTERIOR RENOVATION IN EXISTING BUSINESS
OCCUPANCY AREAS - SEE PLAN
Walter Hoffman (914) 208-6275 Walter Hoffman (914) 208-6275 Walter Hoffman (914) 208-6275
1 ADDENDUM #1 03/27/202603/30/2026
DN
UP
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES
ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF NEW YORK AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, STATE OF NEW YORK DEPARTMENT OF PUBLIC HEALTH, AND THE STATE OF NEW YORK DEPARTMENT OF
ENVIRONMENTAL CONSERVATION
CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134
CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.
CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM
DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS (SHEETS GI201-GI203) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. COORDINATE USAGE OF STAIRS VS USAGE OF CHUTE FOR DISPOSAL OF REMOVED HAZARDOUS MATERIAL ON THE
FIRST FLOOR.THE ABATEMENT CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN
ACCORDANCE WITH APPLICABLE REGULATIONS. WHERE OVERLAPS OCCUR, THE MOST STRINGENT
REQUIREMENTS APPLY.
THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A NYS LICENSED
ASBESTOS ABATEMENT CONTRACTOR.
THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A NYS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS
SHALL BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.
CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL
CONTRACTOR, AND THE COR.
CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR
ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR
ASBESTOS EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE
ENVIRONMENT.
THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.
CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED
MATERIALS AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT
DOCUMENTS. THE OWNER OR THEIR REPRESENTATIVE SHALL NOT BE RESPONSIBLE FOR LOST,
DAMAGED OR STOLEN ITEMS.
CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE
NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.
CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE
LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, NYSDPH, AND THE NYSDEC.
CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.
ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS
BY THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.
THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION
MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.
SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE
PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS
SHOWING THE NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.
PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES.
THE GROUND FLOOR IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG
METHODS ON THE GROUND FLOOR TO MINIMIZE IMPACT ON BUILDING OPERATIONS.
CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD
ABATEMENT REQUIREMENTS, AND THE COR.
CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR.
ALL OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.
WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.
THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL BE RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM
ON HVAC EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.
CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS.
COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED
TO THE OWNER WITHIN 35 DAYS OF WASTE LEAVING THE SITE.
CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, SPECIFIC ORIGINAL FLOORING MATERIALS, AND IN TRANSITE PANELS AT RADIATORS BELOW WINDOWS. NO ASBESTOS CONTENT HAS BEEN IDENTIFIED IN SAMPLING OF CIELING TILES, DRYWALL, JOINT COMPOUND, SKIM COAT, FIBERBOARD, FIRESTOP, COVE BASE, MASONRY WINDOW CAULK, BATHROOM CAULK, TILE GROUT, TILE GLUE, CERAMIC TILES, OR SPECIFIC FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY.
SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION.
UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR ANALYZE BULK SAMPLES OF
SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.
ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY
BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
COORDINATE WITH INDUSTRIAL HYGENIST FOR REVIEW OF MONITORING, AND FINAL CONFIRMATION OF
ABATED AREAS, REFER TO SPEC SECTION 02 82 13.13
KEYNOTES#
ABCDEFIJM
GHKL
N
BEDROOM
110110
BEDROOM
109109
BEDROOM
108108
BEDROOM
107107
BEDROOM
111111
BEDROOM
112112
ELEC CL.
153153
BEDROOM
113113
STAIR
HALL B
114114
BEDROOM
115115
BEDROOM
116116
BEDROOM
117117
BEDROOM
118118
OFFICE
119119
TELECOM
ROOM
127 SF
CL.
106D106D
UTILITY
CL.
106C106C
CL.
106B106B
MEN TLT
106106
BEDROOM
105105
BEDROOM
104104
BEDROOM
103103
F.A. CL.
SOCIAL
ROOM
102102
VESTIBULE
101A101A
TELE
122122
CORRIDOR
148Z148Z
OFFICE
121121
FEMALE
TLT
123123
GENERAL
STORAGE
129129
VISITORS
LOUNGE
126126
STAIR
HALL A
132132
OFFICE
134134
OFFICE
133133
KITCHEN
131131
BEDROOM
130130
ELEVATOR
EV1EV1 OFFICE
125125
STAFF
LOUNGE
144144
OFFICE
143143
COPY/
STG RM
145145
ELEC. CL.
154154
OFFICE
137137
OFFICE
138138
EXAM
ROOM
142142
EMS CL.
140140
FEMALE
TLT
141141
CLOSET
140A140A
OFFICE
136136
OFFICE
139139
CORRIDOR
150Z150Z
OFFICE
135135SHOWER
106A106A
CORRIDOR
147Z147Z
ELEVATOR
LOBBY
149Z149Z
LOBBY
101101
SHOWER
ROOM
141A141A
RECEPTION
146146
CORIDOR
151Z151Z
BEDROOM
128128
YELLOW, GREEN & BLACK MASTIC
WITH NON-ACM VFT
TP
SAMPLE
HA 250
NOTE: REFER TO INTERIM LIFE SAFETY
AND INFECTION CONTROL SHEETS FOR
PROPOSED CRITICAL BARRIER
LOCATIONS - COORDINATE FINAL
LOCATIONS WITH COR
52A-401 F2
52A-400 F5
QUANTITIES - ACM /LEAD MATERIALSLEGEND
130 SF ± .32% CHRYSOTILE
130 SF ± TOTAL FLOOR FINISH MATERIAL TO BE
ABATED THIS FLOOR
TRANSITE PANELS
REMOVAL PATH
TP
SAMPLE
HA ##
SAMPLE LOCATION
ASBESTOS /
LEAD PAINT
NOT ALL SAMPLE LOCATIONS SHOWN FOR CLARITY. ONLY
POSITIVE OR POSITIVE STOP SAMPLES ARE LOCATED.
SAMPLE NUMBER PER SURVEY REPORT FROM TERRACON.
REFER TO SURVEY REPORT FOR SPECIFIC SAMPLE
INFORMATION
PATH INDICATED IS PROVIDED FOR INTENT ONLY.
COORDINATE FINAL REMOVAL PATHWAYS, PHASING, AND
METHODS WITH GENERAL CONTRACTOR AND COR.
0 SF ± CONFIRMED LEAD-CONTAINING PAINT
(0.2% BY WEIGHT) THIS FLOOR
SAMPLE
PNT ##
100 SF ± TRANSITE PANELS, MASTIC AND CAULKING
(AT WINDOWS) TO BE ABATED THIS
FLOOR.
60 LF ± PIPE FITTINGS, INSULATION AND MASTIC TO
BE COMPLETELY ABATED AND REMOVED.
PATH OF REMOVAL
TO EXTERIOR
PROVIDE DUMPSTER 35' MINIMUM AWAY
FROM ANY BUILDING, AND 6'-0" HIGH
TEMPORARY CONSTRUCTION FENCE
AND GATE AROUND DUMPSTER AND ANY
LAY-DOWN AREA. TO BE LOCKED AT ALL
TIMES, PROVIDE COR WITH KEY.
COORDINATE FINAL LOCATION WITH COR
PROVIDE CART FOR DAILY
WASTE REMOVAL
COORDINATE FINAL
LOCATION WITH COR
EXITS WILL BE IN USE DURING
CONSTRUCTION. COORDINATE
ANY CONSTRUCTION ACTIVITY
TO ENSURE EXIT ACCESS IS
NOT IMPEDED.
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t 3/
/2
5:
:2
PM
52H-101
HAZARDOUS MATERIAL ABATEMENT PLAN -
FIRST LEVEL
620-22-700
06/27/2025 M. Perkins C. Raynes
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0"F1 HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL 1 ABATE TRANSITE PANELS ON RADIATOR BELOW WINDOW.
2 ABATE FLOOR TILE AND MASTIC IN AREAS AS INDICATED. SEE LEGEND BELOW. TREAT ANY REMOVED
NON-ACM TILE COVERING (IN DIRECT CONTACT) WITH ACM FLOORING TO BE CONTAMINATED FOR THE
PURPOSES OF DEMOLITION AND REMOVAL REQUIREMENTS.
3 PRIOR TO DEMO PROVIDE CONTAINMENT BARRIER AND PERSONNEL DECONTAMINATION FACILITY PER 02 82 11 DURING ABATEMENT WORK. COORDINATE TIMING WITH COR (48 HR MAX) TO MINIMIZE DISRUPTION
TO OCCUPIED SPACES.
3/4" = 1'-0"F6 SITE DIAGRAM - BUILDING 52
1.
2.
3.
4.
5.
ABATEMENT / ICRA NOTES:
ABATEMENT SCOPE INCLUDES DEMO WORK AS REQUIRED TO ACCESS ACM.
CONTRACTOR TO FIELD VERIFY QUANTITIES.
CONTRACTOR TO AVOID DISRUPTION OF PIPE INSULATION LOCATIONS. PROVIDE COORDINATION
DRAWINGS TO LOCATE ANY ACM CONTAINING ITEMS IN CHASES OR PLENUMS THAT CANNOT BE
AVOIDED.
REFER TO ACM REPORTS IN SPECIFICATIONS.
ICRA EVALUATIONS AND REQUIREMENTS TO BE COORDINATED THRU THE COR. REFER TO INTERIM
LIFE SAFETY AND INFECTION CONTROL SHEETS.
SUMMARY OF ABATEMENT & INFECTION CONTROL REQUIREMENTS
UP
SHEET SYMBOL LEGEND
KEYNOTES
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A1
A.
B.
C.
D.
E.
F.
G.
H.
I.
SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
NEW TELECOM ROOMS SHALL COMPLY WITH THE LATEST VA
PHYSICAL SECURITY STANDARDS, AND CAMPUS STANDARDS.
SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
SEE TYPICAL CEILING DETAILS ON SHEET A-531
PROVIDE TEMPORARY AIR TIGHT BARRIER AROUND WORK AREA
DURING ANY ACTIVITIES WHICH PRODUCE DUST, TYPICAL.
MAINTAIN CLEAR EXIT PATHS AND STAIRS AT ALL TIMES.
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
NO SCOPE
2"
1/2" 1/2"VARIES
SEE PLAN
WALL - SEE PLAN
FOR TYPE
SEALANT - EA. SIDE
& ALL AROUND,
TYP.
HOLLOW METAL
FRAME
1/ 2"
VA
R
IE
S
SE
E
PL
AN
1/ 2"
UNO
4" 2"
ADJACENT WALL
WHERE OCCURS
SEALANT - EA SIDE &
ALL AROUND, TYP.
HOLLOW METAL FRAME
WALL - SEE PLAN
FOR TYPE
E1
TYPICAL FRAME
H
EI
G H
T
2" WIDTH 2"
E3
FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS
F
FLUSH
52A-401 F2
52A-400
E8TELECOM
ROOM
120120
52A-400 F5
CORIDOR
151Z151Z
52A-400 F3
CORRIDOR
147Z147Z
TELECOM
ROOM
127 SF
B
B
B
B
B
B
EXTG VIF
9'-2"
EX
TG
V
IF
'-2
1/ 2"
6 1/2"
(EXTG V.I.F.)
4'-0"
OFFICE
119119
OFFICE
121121
CORRIDOR
148Z148Z
SOCIAL
ROOM
102102BEDROOM
103103
B1 52A-511
3'-4" 2"
OFFICE
119119 OFFICE
121121
SOCIAL
ROOM
102102BEDROOM
103103
F.A. CL.
CORRIDOR
148Z148Z
TELECOM
ROOM
127 SF
OFFICE
120120
OFFICE
120120
ACOUSTICAL OR RATED
FLEXIBLE SEALANT
FLOOR LINE
ADD ONE LAYER OF 5/8" GWB,
ONE-SIDE WITH APPROVED UL
SETTING COMPOUND BETWEEN
LAYERS AND FASTENED TO
WALL AS REQUIRED, AT
EXISTING GWB WALL
ASSEMBLIES
EXISTING STRUCTURAL DECK
EXISTING METAL STUDS AND
BATT INSULATION TO REMAIN
A/C GRADE, 3/4" FIRE-TREATED
PLYWOOD TO 9'-0" ABOVE FINISHED
FLOOR, ADHERED TO CONCRETE AT
EXISTING CONCRETE WALL
ASSEMBLIES
BOTTOM OF PLYWOOD
TO BE AT 12" AFF
UL DESIGN V497
1-HOUR PARTITION RATED FROM BOTH SIDES
EXISTING GWB OR
CONCRETE WALL
ASSEMBLY, WHERE OCCURS
SIDE OF
EXISTING
ROOM OR
CORRIDOR TO
REMAIN
52A-512 D5
52A-512 B5
J2
J2
4'-4"
VIF
10"
TYP.
CORIDOR
151Z151Z
OFFICE
137137
OFFICE
138138
OFFICE
139139
OFFICE
136136
LINE OF
STRUCTURE
LINE OF
STRUCTURE
09 29 00
SOUND ATTENUATION BATTS
(SAB), WHERE OCCURS
NOTE:
IF PARTITION TYPE IS USED IN A
CHASE WALL CONDITION, PROVIDE
CROSS BRACING GUSSETS AT 48"
O.C. MAX VERTICALLY. FABRICATED
FROM 6" MTL STUDS.
6”
09 29 00
5/8" GWB
09 29 00
SAB RETAINER STRAP
WHERE SAB OCCURS
CEILING
07 92 00
SEALANT
09 22 16
METAL STUDS
52A-512 B5
52A-512 D5
TYP.
VIF
1'-0" 4'-2"
BEDROOM
109109
VI
F
2'- 6"J2
J2
BEDROOM
108108
CORRIDOR
147Z147Z
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t 3/
/2
5:
:3
PM
52A-400
ARCHITECTURAL ENLARGED VIEWS - FIRST
LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
3" = 1'-0"E1 HOLLOW METAL HEAD DETAIL
3" = 1'-0"D1 HOLLOW METAL JAMB DETAIL
1/4" = 1'-0"F1 DOOR AND FRAME TYPES ELEVATIONS
1 REMOVE EXISTING DOOR AND FRAME.
2 REMOVE EXISTING FLOORING AND WALL BASE.
3 ACCESS DOOR PER SPECIFICATION, COR TO CONFIRM LOCATION
AND MOUNTING HEIGHT.
4 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C
FIRE EXTINGUISHER LOCATED NO GREATER THAN 75 FEET AWAY
FROM THE NEW TR. CONTRACTOR SHALL BID A NEW FEC FOR EACH
TR IN THE SCOPE OF WORK. SEE SPECIFICATION 10 44 13.
5 NEW INFILL AT EXTERIOR. NEW WALL TO MATCH EXISTING.
6 EXISTING CEILING TO REMAIN.
7 TELECOM ROOM TO BE OPEN TO DECK ABOVE.
8 REMOVE EXISTING ACOUSTICAL CEILING AND LIGHTS. MODIFY
AND/OR PROVIDE ADDITIONAL SUPPORTS AS REQUIRED FOR
EXISTING CEILING ITEMS TO REMAIN.
9 NEW DOOR. SEE DOOR SCHEDULE AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION. COORDINATE DOOR AND FRAME WITH
ACCESS CONTROL HARDWARE.
10 REMOVE PORTION OF WALL AS SHOWN GRAPHICALLY
11 REMOVE EXISTING WINDOW, AC UNIT AND METAL SUPPORT FRAME.
PROVIDE TEMPORARY INFILL.
12 REMOVE EXISTING FLOORING AND WALL BASE.
13 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW WALL
IN ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE WALL SPAN
OR APPROPRIATE TRANSITION LOCATION AS APPROVED BY THE
COR.
1/32" = 1'-0"F7 FIRST LEVEL REFERENCE PLAN
1/4" = 1'-0"E8
ARCHITECTURAL ENLARGED FLOOR PLAN -
FIRST LEVEL - ROOM 120 - NEW
1/4" = 1'-0"E6
ARCHITECTURAL ENLARGED FLOOR PLAN -
FIRST LEVEL- ROOM 120 - DEMO
1/4" = 1'-0"C6
ARCHITECTURAL REFLECTED CEILING PLAN -
FIRST LEVEL - ROOM 120 - DEMO
1/4" = 1'-0"C8
ARCHITECTURAL REFLECTED CEILING PLAN -
FIRST LEVEL - ROOM 120 - NEW
NOTE: 2-HOUR PARTITION RATED WALLS: UL V438, U411
(TYPE B) TYPICAL PARTITION
MARK STUD WIDTH PRTN WIDTH DESIGN STC
B 2 1/2" 3/4" 45
DOOR AND FRAME SCHEDULE
IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL FIRE
RATING
HARDWARE
NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL
LEVEL 1 120 TELECOM
ROOM
120 3' - 0" 7' - 0" 1 3/4" F WD WD NONE 3/8" 1 HM P-2 E1/ 52A-400 E3/ 52A-400 - - HW-SH-3F SEE SPEC 1
1. SEE SPECIFICATION 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.
DOOR HARDWARE LEGEND
HW-SH-3F Secured Access Door - Storeroom Locking (F07 Lockset) with Closer, Overhead Stop, Alarm Contact, Card Reader
1/2" = 1'-0"F5 FIRST LEVEL CHASE - CORRIDOR - ROOM 151Z
(TYPE J) NON-RATED PARTITION
MARK STUD WIDTH PRTN WIDTH DESIGN STC
J2 2 1/2" 3 1/8" -
ACCESS DOOR SCHEDULE
LEVEL ROOM NAME ROOM NUMBER DESCRIPTION TYPE
LEVEL 1 CORIDOR 151Z Drywall Access Door Removable Door - Screwdriver Cam Latch 1'. 24"X24" SIZE LEVEL 1 CORRIDOR 147Z Drywall Access Door Removable Door - Screwdriver Cam Latch 1'. 24"X24" SIZE
1/2" = 1'-0"F3 FIRST LEVEL CHASE - CORRIDOR - ROOM 147Z
25 GA MIN MTL
TRACK
CLIP ANGLE
1" X 20 GA MTL STRAP AT 3'-6"
O.C., EACH SIDE
25 GA MIN MTL TRACK AT
FLOOR
DOUBLE 20 GA MTL STUDS AT
BOTH JAMBS
TYPE A
CONT16 GA 6" WIDE
MTL BACK-UP
STRAP
MO
UN
TI
NG
H
EI
GH
TS
RE
F
TY
PI
CA
L
TYPE B
20 GA MTL RUNNER
TRACK - CLIP
FLANGES TO FIT
OVER STUDS
6" MIN, DEEPER
IF REQUIRED
MO
UN
TI
NG
H
EI
GH
TS
RE
F
TY
PI
CA
L
TYPE C
MO
UN
TI
NG
H
EI
GH
TS
RE
F
TY
PI
CA
L
8" MIN, DEEPER
IF REQUIRED
MIN 20 GA MTL STUDS
FACING OPPOSITE
DIRECTIONS TO ALLOW
MOUNTING PLATE
ATTACHMENT
14 GA STL RUNNER
TRACK-CLIP FLANGES
AND FOLD WEB TO FORM
ATTACHMENT FLANGE
PROVIDE DIAGONAL BRACING (AT 45° TYP) OF
TOP TRACK AT 48" OC MAX BETWEEN FULL
HEIGHT STUDS
DOOR
OPENING
DOOR
OPENING
DOUBLE DOOR OPENING
BELOW CEILING
OPENING
LARGE BELOW CEILING
OPENING
ABOVE CEILING OPENING
LARGE ABOVE CEILING
OPENING
MOUNTING DETAIL
TYPE B
DOUBLE STUDS
DOUBLE
STUDS
DOUBLE STUDS DOUBLE STUDS
DOUBLE STUDS
4' - 6" MAX 8' - 6" MAX 4' - 6" MAX 8' - 6" MAX
ALL STUDS ARE TO BE 20 GAUGE
IF GREATER THAN 8' - 6"
8' - 6" MAX 8' - 6" MAX
4' - 6" MAX
25 GA MIN BOTTOM TRACK (TYP)
FLOOR LINE
20 GA MTL TOP TRACK
(TYP UNO)
CEILING LINE
UNDERSIDE OF SLAB, FLOOR OR
ROOF DECK
2" WIDE 20 GA METAL
STRAP
OPENING ABOVE CEILING WHICH
INTERRUPTS LOWER OPENING JAMB
STUDS
STONE VENEER WALLS
16 GA MIN STUDS AT 20 GA MIN STUDS AT
WALL MOUNTED
ARCHITECTURAL
CABINETS/MILLWORK/
ATTACHED SHELVING
DOOR
OPENING
E8 52A-511
E8 52A-511
F8 52A-511
F8 52A-511
D8 52A-511
D8 52A-511
E8 52A-511
E8 52A-511
F8 52A-511
C8 52A-511
C8 52A-511
C8 52A-511
C8 52A-511
C8 52A-511
C8 52A-511
B8 52A-511
E8 52A-511
SEE: (D4/52A-511)
1.
2.
3.
4.
5.
6.
7.
NOTES:
ALL STUDS ARE SPACED 16"
OC MAXIMUM.
ALL STUDS SHALL BE "C"
STUDS WITH 1/4" RETURN
FLANGE MINIMUM.
INDICATES SHELVING
OR CABINETRY.
INDICATES STONE.
DOUBLE STUDS AT SIDES OF
OPENING SHALL NOT BE CUT
FOR DUCTWORK OR ANY
OTHER MECHANICAL
SYSTEMS.
REFER TO C3 / A-522 FOR
MOUNTING TYPE DETAILS.
PROVIDE PARTITION BRACING
AT ALL ASSEMBLIES OVER
15'-0" IN HEIGHT, U.N.O.
EXTERIOR
SHEATHING
SECOND LAYER OF GWB
WHERE INDICATED BY
PARTITION TYPE
RATED PARTITION AS
INDICATED ON PLAN, EXTEND
GWB TO INTERIOR FACE OF
EXTERIOR SHEATHING
INTERSECTION AT RATED
PARTITION AND EXTERIOR WALL
CONCRETE WALL
OR COLUMN
SEALANT
FURRING PARTITION
AS INDICATED ON PLAN
RATED PARTITION AS INDICATED
ON PLAN
INTERSECTION OF RATED
PARTITION AND CONCRETE
INTERSECTION AT RATED
PARTITION AND CONCRETE
LOWER PRIORITY
PARTITION
HIGHER PRIORITY
PARTITION
INTERSECTION OF CROSS
CORRIDOR DOOR IN RATED
PARTITION
MI
N3"
CONCRETE WALL OR
COLUMN
SEALANT
FURRING PARTITION
AS INDICATED ON PLAN
RATED PARTITION AS
INDICATED ON PLAN
MI
N3"
2 5/8"
SECOND LAYER OF GWB WHERE INDICATED
BY PARTITION TYPE
WALL PRIORITY NOTES:
1. WHERE WALLS OF DIFFERENT FUNCTIONS/ RATINGS INTERSECT: WALLS OF
HIGHER PRIORITY SHALL BE CONTINUOUS.
2. LOWER PRIORITY WALLS SHALL "ABUT" AND BE "SEALED TO" HIGHER PRIORITY
WALLS, BUT SHALL NOT INTERRUPT CONTINUITY OF THE HIGHER PRIORITY WALL.
2"2"
PROVIDE GAP TO
FLANKING WALL STUD TO
ALLOW SPACE FOR GWB
TO PASS
PROVIDE GAP TO
FLANKING WALL STUD TO
ALLOW SPACE FOR GWB
TO PASS
2" 2"
2"PROVIDE GAP TO
FLANKING WALL STUD TO
ALLOW SPACE FOR GWB
TO PASS
2"
SECOND LAYER OF GWB WHERE
INDICATED BY PARTITION TYPE
INTERSECTION AT VARIOUS
WALL PRIORITY
CONFIGURATIONS
LOWER PRIORITY PARTITION
HIGHER PRIORITY PARTITION
(MAINTAIN CONTINUITY
PROVIDE GAP TO FLANKING WALL STUD
TO ALLOW SPACE FOR GWB TO PASS
2"
PROVIDE GAP TO
FLANKING WALL STUD TO
ALLOW SPACE FOR GWB
TO PASS2"
LOWER PRIORITY PARTITION
HOLLOW METAL FRAME
PROVIDE FIRE SEALANT
AT INTERFACE
PARTITION AS SCHEDULED
SOUND ATTENUATION BLANKET
COMPRESSED TO FILL OPENING
AT SOUND RATED PARTITION
L-BEAD
SEALANT BOTH SIDE, REF SPECS FOR
TYPE
CONTROL JOINT
GWB SUSPENDED
CEILING SYSTEM
PARTITION AS
SCHEDULED
CONTROL JOINT,
BOTH SIDES
CONTROL JOINT IN
GWB PARTITION
1/2" MAX
1HR FIRE
RATED
WHI-647-3024
MAX
24'-0”
PARTITION AS
SCHEDULED
CONTROL JOINT,
BOTH SIDES
CONTROL JOINT IN 1 HR
FIRE RATED PARTITION
1/2" MAX
MAX
24'-0”
1 1/2"
2 LAYERS OF 5/8" GWB
2HR FIRE
RATED
WHI-651-0318.1
PARTITION AS
SCHEDULED
CONTROL JOINT,
BOTH SIDES
CONTROL JOINT IN 2 HR
FIRE RATED PARTITION
1/2" MAX
MAX
24'-0”
1 1/2"
2 LAYERS OF 5/8" GWB
MAX
24'-0”MA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .