This document is a comprehensive Drawing Index and set of architectural construction drawings for a federal infrastructure upgrade project at a residential board and care facility. The project includes renovation work across basement, first, second, and third levels of an existing 8,234 square foot residential facility, with work issued for construction in full compliance with 2024 NFPA 101 Life Safety Code, 2025 NFPA 72 Fire Alarm Code, 2025 NFPA 13 Sprinkler Systems standards, 2026 National Electrical Code, and applicable Virginia seismic design requirements.

The 50-sheet drawing set encompasses general architectural notes, infection control and life safety interim measures, hazardous material abatement plans, architectural details including partition and framing specifications, interior finishes, fire protection systems, mechanical plans and schedules, electrical systems with one-line diagrams and schedules, and comprehensive telecommunications infrastructure including cable tray layouts, riser diagrams, rack elevations, and fiber optic specifications. Key project requirements include maintaining Category IV infection control precautions with dust containment barriers, negative air pressure, and HEPA filtration; implementing temporary construction barriers and anteroom decontamination; coordinating hazardous material removal for confirmed asbestos in pipe insulation and lead-based paint; and providing new telecom rooms meeting VA physical security standards with Johnson Controls iSTAR Edge G2 access control panels, new 4-post equipment racks, Category 6A cabling infrastructure, and Avigilon IP-addressable security camera systems. The project maintains occupied space operations on the first floor throughout construction with phased work coordination required with the Contracting Officer Representative.

View the file

Other files

File Type Posted
Amendment 5 - 36C77626R0033 0005.pdf PDF
5-4 - RFI TRACKING SHEET.pdf PDF
Amend 5 - B01.20260330.pdf PDF
Amend 5 - B16.20260330.pdf PDF
Amend 5 - B19.20260330.pdf PDF
Amend 5 - B29.20260330.pdf PDF
Amend 5 - B52.20260330.pdf PDF
Amend 5 - SITE.20260330.pdf PDF
Original attachments 1-12.zip ZIP file
ATTACHMENT 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
ATTACHMENT 8 - 01 00 00.G - Appendix G - GPRS Triple C Montrose Full Report.pdf PDF
ATTACHMENT 16 - Montrose.EHRM.Addendum.01.B04.20260330.pdf PDF
ATTACHMENT 21 - Montrose.EHRM.Addendum.01.B13.20260330.pdf PDF
ATTACHMENT 24 - Montrose.EHRM.Addendum.01.B16.20260330.pdf PDF
ATTACHMENT 27 - Montrose.EHRM.Addendum.01.B20.20260330.pdf PDF
ATTACHMENT 28 - Montrose.EHRM.Addendum.01.B26.20260330.pdf PDF
ATTACHMENT 28A - Montrose.EHRM.Addendum.01.B27.20260330.pdf PDF
ATTACHMENT 33A - 00 41 13.10 - Construction Estimate Breakdown Template.xlsx XLSX spreadsheet
RFI TRACKING SHEET - SOLICITATION 36C77626R0033.pdf PDF
ATTACHMENT 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260410.pdf PDF
ATTACHMENT 5 - 01 00 00.D - Appendix D - SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
ATTACHMENT 11 - 01 00 00.I - Appendix I - K9245005 VAMC EHRM Montrose NY GeoReport 4.12.2024.pdf PDF
ATTACHMENT 12A - Summary.Log.Add01_20260410.pdf PDF
ATTACHMENT 13 - Montrose.EHRM.Addendum.01.B01.20260330.pdf PDF
ATTACHMENT 14 - Montrose.EHRM.Addendum.01.B02.20260330.pdf PDF
ATTACHMENT 22 - Montrose.EHRM.Addendum.01.B14.20260330.pdf PDF
ATTACHMENT 25 - Montrose.EHRM.Addendum.01.B17.20260330.pdf PDF
ATTACHMENT 26A - Montrose.EHRM.Addendum.01.B19.20260330.pdf PDF
Amendment 2 - 36C77626R0033 0002.pdf PDF
Site visit sign-in sheet 3-23-26.pdf PDF
Attachment 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260205.pdf PDF
Attachment 6 - 01 00 00.E - Appendix E - VHA ICRA-1.3 - Dec 9 2024.pdf PDF
Attachment 7 - 01 00 00.F - Appendix F - VHA PCRA 2024 1.1 Final.Template Fillable.pdf PDF
Attachment 8 - 01 00 00.G - Appendix G - GPRS Triple C Montrose Full Report.pdf PDF
Attachment 9 - 01 00 00.H - Appendix H - J2237038 Montrose ACM Ld Pnt InspRpt Final 8-21-2023.pdf PDF
Attachment 12 - Additional Security Badging Requirements rev 2.pdf PDF
Attachment 13 - Drawing B01 20250627.pdf PDF
Attachment 31 - Drawing B31 20250627.pdf PDF
Attachment 33 - Drawing Site 20250627.pdf PDF
RFP - 36C77626R0033.pdf PDF
Attachment 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
Attachment 4 - 01 00 00.C - Appendix C1 SOP 138-22HV CONST STD PROCEDURES QA FOR PROJECTS.pdf PDF
Attachment 5 - 01 00 00.D - Appendix D1 SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
Attachment 16 - Drawing B04 20250627.pdf PDF
Attachment 18 - Drawing B06 20250627.pdf PDF
Attachment 22 - Drawing B14 20250627.pdf PDF
Attachment 27 - Drawing B20 20250627.pdf PDF
Attachment 29 - Drawing B28 20250627.pdf PDF
Attachment 32 - Drawing B52 20250627.pdf PDF
Attachment 36 - Division Cost Breakdown.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .M

EP

.B

.rv t 3/

/2

:4

6:

P M

52G-001

DRAWING INDEX 620-22-700

04/27/2025 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

- DRAWING INDEX -

SHEET

NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION

GENERAL

52G-000 COVER SHEET Yes Yes Yes Yes 52G-001 DRAWING INDEX Yes Yes Yes Yes 52G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 52G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes

ICRA & LIFE SAFETY

52GI300 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL No Yes Yes Yes 52GI301 INTERIM LIFE SAFETY & INFECTION CONTROL DETAILS No Yes Yes Yes

HAZARDOUS

52H-101 HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL No Yes Yes

ARCHITECTURAL

52A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 52A-400 ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL No Yes Yes Yes 52A-401 ARCHITECTURAL ENLARGED VIEWS - EXTERIOR ELEVATION No No Yes Yes 52A-501 ARCHITECTURAL ROOF PLAN & DETAILS No Yes Yes Yes 52A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 52A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 52A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes

INTERIORS

52IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes

FIRE PROTECTION

52FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 52FX100 FIRE PROTECTION PLAN - FIRST LEVEL No Yes Yes Yes 52FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

MECHANICAL

52M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 52M-100 MECHANICAL PLANS - FIRST LEVEL No Yes Yes Yes 52M-501 MECHANICAL DETAILS No Yes Yes Yes 52M-701 MECHANICAL SCHEDULES No Yes Yes Yes 52M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 52M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 52M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 52M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

ELECTRICAL

52E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 52E-100 ELECTRICAL PLAN - BASEMENT & FIRST LEVEL No Yes Yes Yes 52E-101 ELECTRICAL PLAN - SECOND & THIRD LEVEL No Yes Yes Yes 52E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 52E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 52E-601 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes 52E-701 ELECTRICAL SCHEDULES No Yes Yes Yes 52E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 52E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes

TELECOMMUNICATION

52T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 52T-100 TELECOMMUNICATION PLAN - BASEMENT & FIRST LEVEL Yes Yes Yes Yes 52T-101 TELECOMMUNICATION PLAN - SECOND & THIRD LEVEL Yes Yes Yes Yes 52T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 52T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 52T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 52T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 52T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 52T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 52T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes 52T-701 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 52T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 52T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 52T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes

REFERENCE

52R-900 PHOTO REFERENCES No Yes Yes Yes Grand total: 50

# Revisions: Date:

1 ADDENDUM #1 03/30/2026

52G-011 REMOVED FROM

CONSTRUCTION DOCUMENTS

sagar Text Box

8234 SF

EXISTING RESIDENTIAL -

3 4

TELECOM

ROOM

120120

VESTIBULE

101A101A

CORIDOR

151Z151ZCORRIDOR

147Z147Z

E2 ▬ 59.3'

4'- 0"

E1 ▬ 146.8' E3 ▬ 147.8'

FEC

9 9

BEDROOM

109109 BEDROOM

108108

BEDROOM

107107

BEDROOM

110110

BEDROOM

111111

BEDROOM

112112

SHOWER

106A106A

MEN TLT

106106

BEDROOM

105105

BEDROOM

104104

BEDROOM

113113

STAIR

HALL B

114114

BEDROOM

115115

BEDROOM

116116

BEDROOM

117117

BEDROOM

103103

SOCIAL

ROOM

102102

BEDROOM

118118 OFFICE

119119

FEMALE

TLT

123123

OFFICE

121121 TELE

122122

ELEVATOR

EV1EV1 OFFICE

125125

VISITORS

LOUNGE

126126

BEDROOM

128128

GENERAL

STORAGE

129129

BEDROOM

130130

COPY/

STG RM

145145

STAFF

LOUNGE

144144

OFFICE

143143

EXAM

ROOM

142142

FEMALE

TLT

141141

SHOWER

ROOM

141A141A

KITCHEN

131131

STAIR

HALL A

132132

OFFICE

133133

OFFICE

134134

OFFICE

135135

OFFICE

136136

OFFICE

137137

OFFICE

138138

MIN

3'-0" CLR

MIN

3'-0" CLR

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

LIFE SAFETY SYMBOLS

PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES

REFER TO SCHEDULE)

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL

FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD

FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF

NFPA 5000 AND NFPA 900

2024 INTERNATIONAL MECHANICAL CODE (IPC)

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8

2026 NATIONAL ELECTRICAL CODE (NEC)

2024 INTERNATIONAL PLUMBING CODE (IPC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION

(AISC)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE

170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025

SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2024

2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED

BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE

STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS (4 FLOORS)

(INCL. MECHANICAL SHAFTS) 1 HOUR (1 - 3 FLOORS)

MEDICAL GAS / HAZARDOUS 1 HOUR

STORAGE

CLASSIFICATION OF OCCUPANCY:

EXISTING: RESIDENTIAL BOARD AND CARE Occupancy per Chapter 33 and BUSINESS Occupancy per Chapter 39

BUILDING OCCUPANCY TYPE:

PRIMARY - EXISTING RESIDENTIAL BOARD AND CARE, LARGE

SECONDARY - EXISTING BUSINESS OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Board and Care and Business

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

33.3.2.5.2 COMMON PATH OF TRAVEL 75 FT

33.3.2.5.4 DEAD END 30 FT

33.3.2.6 TRAVEL DISTANCE FROM ANY 250 FT

POINT IN ROOM TO EXIT

OCCUPANT LOAD:

33.1.4 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

MEANS OF EGRESS:

33.3.2 Capacity of Means of Egress.

33.3.2.3.3 The clear width of any corridor or passageway required for exit access shall not be less than 60 in. (1525 mm).

PROTECTION OF VERTICAL OPENINGS:

33.3.3.1 Protection of Vertical Openings.

33.3.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

33.3.3.2 Protection from Hazards.

33.3.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 9.7.1.1(1)

33.3.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7:

(1) Boilder and fuel-fired heater rooms

(2) Laundries

(3) Repair Shops

(4) Rooms or spaces used for storage of combustible supplies and equipment in quantities deemed hazardous by the AHJ.

33.3.3.5.7 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

SUBDIVISION OF BUILDING SPACES:

33.3.3.7 SUBDIVISION OF BUILDING SPACES

33.3.3.7.1 EVERY STORY SHALL BE DIVIDED INTO NOT LESS THAN

TWO SMOKE COMPARTMENTS.

33.3.3.7.3 THE TRAVEL DISTANCE FROM ANY POINT TO REACH A

DOOR IN THE REQUIRED SMOKE BARRIER SHALL NOT EXCEED

200 FT.

33.3.3.7.9 SMOKE BARRIERS IN ACCORDANCE WITH SECTION 8.5

SHALL HAVE A MINIMUM 1-HOUR FIRE RESISTANCE RATING.

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

X - XX'

# ICRA SYMBOLSKEYNOTES

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t

-0 3-

7:

:5

52GI300

INTERIM LIFE SAFETY & INFECTION CONTROL

PLAN - FIRST LEVEL

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1/8" = 1'-0"F1 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL

NOTE:

COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH

ASBESTOS REPORT AND PLAN.

CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF

MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA

PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO

REMOVAL OF ANY MATERIALS.

SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING

CONSTRUCTION.

AREA OCCUPANCIES

Name Area

Occupancy Requirements Occupancy

(IBC) Occupancy (NFPA) OLF Fixed Seats OL

LEVEL 1

EXISTING RESIDENTIAL 8,234.13 SF R4 Residential Board &

Care

200 SF 0 42

PATH OF TRAVEL SCHEDULE - FIRST LEVEL

Mark From Room To Room Type of Travel Path Length

LEVEL 1

(P-o-T) Distance to Exits

E1 BEDROOM 109 VESTIBULE 101A (P-o-T) Distance to Exits 146' - 9" E2 TELECOM ROOM 120 VESTIBULE 101A (P-o-T) Distance to Exits 59' - 3" E3 OFFICE 137 VESTIBULE 101A (P-o-T) Distance to Exits 147' - 9"

1 TEMPORARY CONSTRUCTION BARRIER

2 ANTEROOM - SEE INTERIM INFECTION CONTROL

AND LIFE SAFETY DETAILS

3 TEMPORARY CONSTRUCTION BARRIER DOOR

WITH CLOSER AND LATCH AND WALK OFF MATS

4 DEBRIS REMOVAL PATH TO EXTERIOR

5 REMOVE EXISTING WINDOW, AC UNIT AND

METAL SUPPORT FRAME. PROVIDE TEMPORARY

INFILL.

6 SOLID GRAY HATCH DENOTES LIMITED WORK

AREA - SEE MEP AND TELECOM DRAWINGS FOR

CABLING SCOPE, TYP.

7 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT

ALL TIMES

8 COORDINATE TEMPORARY HEPA EXHAUST

ROUTING OUT OF BUILDING - MAINTAIN 25 FEET

MINIMUM FROM INTAKES, OPERABLE WINDOWS,

AND ENTRANCES. PROVIDE BLOCK-OFF PANELS

IN EXISTING WINDOWS FOR DISCHARGE, TYP.

9 ENTRANCE TO BE CLOSED DURING DEMOLITION

AND CONSTRUCTION - PROVIDE TEMPORARY

SIGNAGE

10 EXIT TO BE CLOSED DURING CONSTRUCTION -

PROVIDE SIGNAGE DIRECTING OCCUPANTS TO

NEXT CLOSEST EXIT

# Revisions: Date:

1 ADDENDUM #1 03/30/2026

TEMPORARY WALL TO EXTEND

AND BE SEALED TO DECK /

FLOOR ABOVE WHEN RATED

ENCLOSURE REQUIRED

FLOOR LINE

CEILING SYSTEM AS

SCHEDULED

EXISTING STRUCTURE

FI

NI

SH

ED

F

LO

OR

T O

UN

DE

RS

ID

E

OF

S

TR

UC

TU

RE

VE

RI

FY

F

LO

OR

T

O

FL

OO

R

HE

IG

HT

RENOVATED SPRINKLER

SYSTEM

WEEKLY CHANGED

OR MORE AS

NEEDED PRE-FILTER

FLEX DUCTMONTHLY CHANGED

HEPA FILTER

HEPA NEGATIVE AIR

UNIT

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

PRESSURE INDICATOR SHALL BE AT

0.03 OR GREATER USING A DIGITAL

MANOMETER WITH DATA LOGGING. IF

NOT VERIFY ALL OPENING SUCH AS

DOOR ARE CLOSED AND/OR CHANGE

NEGATIVE AIR PRE-FILTER. DO NOT USE

A "BALL IN THE WALL" OR ANALOG

OTHER PRESSURE INDICATOR.

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN NOT

RUNNING TO KEEP

DUST OUT.

A

V

OTAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

PUBLIC AREA

CONSTRUCTION AREA

ANTE ROOM

HARD BARRIER ALL THE WAY TO

DECK ABOVE

SIZE ANTE ROOM TO PROVIDE

SPACE FOR EQUIPMENT STAGING,

CART CLEANING, WORKERS' PPE

AND CLEANING, INCLUDING A HEPA

CLOTHING VACUUM

ROUTE DUCT TO EXTERIOR - SEE

PLANS FOR PROPOSED ROUTES -

CONFIRM ROUTE WITH ON-SITE

STAFF PRIOR TO INSTALLATION.

DISCHARGE AT A DISTANCE OF 25

FEET OR GREATER FROM

ENTRANCES, AIR INTAKES AND

OPERABLE WINDOWS. DO NOT

DIRECT EXHAUST INTO ANY

BUILDING SHARED EXHAUST

SYSTEM.

ANTE ROOM FAN

DOOR TO BE SELF-CLOSING AND

SELF-LATCHING - 45 MIN. FIRE

RATING PER NFPA

D7

52GI301

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

1/4" = 1'-0"F7 TYPICAL CONSTRUCTION LAYOUT- CLASS IV

1/2" = 1'-0"D7 CROSS SECTION A'-A'- CLASS IV

NTSF2 TYPICAL ICRA PRODUCTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t 3/

/2

5:

:2

PM

52GI301

INTERIM LIFE SAFETY & INFECTION CONTROL

DETAILS

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS

DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE

(COR).

COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH

OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH

THE COR. ALL INTERIOR DOORS THAT LEAD TO THE

CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.

OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING

WORK.

THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL

BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.

CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION

AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS

THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM

CLEANER PRIOR TO LEAVING THE SITE.

FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR

OCCUPIED AREAS ON THE FLOOR.

PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;

REVIEW WITH COR AND VA SAFETY GROUP.

MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT

ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT

DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION

UNITS.

CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE

OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR

EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE

CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN

CONSTRUCTION AREA TO PREVENT CONTAMINATION OF

EXISTING DUCT SYSTEM.

REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND

VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION

AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION

AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".

GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP

A CURRENT HOT WORK PERMIT ON SITE.

TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE

SURE THEY REMAIN EFFECTIVE.

MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL

DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR

CONTAINERS.

SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES

AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN

DUST PROTECTION AND NEGATIVE AIR PRESSURE.

MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,

WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR

CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED

AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA

SHALL BE CLEANED IMMEDIATELY.

AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA

WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,

REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH

OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER

REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.

CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

ICRA SYMBOL LEGENDINFECTION CONTROL RISK

ASSESSMENT:

TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE

ACTIVITY CATEGORY

IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT

CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP

CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK

CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR

MAINTENANCE

CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR

MAINTENANCE

THIS PROJECT: CATEGORY D

TABLE 2: AFFECTED AREA ASSESSMENT

TABLE 3: PATIENT RISK CATEGORY

IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN

TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH

THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT

RISK CATEGORY FOR THE ACTIVITY.

LOW RISK: NON-PATIENT CARE AREAS

MEDIUM RISK: PATIENT CARE SUPPORT AREAS

HIGH RISK: PATIENT CARE AREAS

HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY

COMPROMISED PATIENT CARE AREAS

THIS PROJECT: HIGH RISK

CL

AS

S

II

Construction Activity Category

RISK GROUP

LOW RISK

MEDIUM RISK

HIGH RISK

HIGHEST RISK

I II II III

I II III IV

I II IV IV

II III IV IV

A

STEP 1:

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT

ROOMS, MEDICATION ROOM, AND SO ON.

STEP 2:

IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND

ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE

OUTAGES.

STEP 3:

IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 4:

CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A

RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR

EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 5:

WORK HOURS: CAN OR WILL THE WORK BE DONE DURING

NON-PATIENT-CARE HOURS?

STEP 6:

DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 7:

DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE

OF HAND-WASHING SINKS?

STEP 8:

DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE

WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?

(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN

AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)

STEP 9:

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED

UTILITY ROOMS?

STEP 10:

PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH

THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,

HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

Affected Area Assessment

AREA

Activity Area Area Above Area Below Adjacent Area

TR

SEE PLAN

SVC TYPE POC POC CONTACT INFO

SEE PLAN

SEE PLAN

Walter Hoffman (914) 208-6275

MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED

CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO

FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF

INFECTION CONTROL ACTIVITIES REQUIRED.

THIS PROJECT: CATEGORY IV

TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL

PRECAUTIONS

B C D

TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES

BY LEVEL OF PRECAUTIONS

NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)

TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES

REQUIRED UPON COMPLETION OF THE ACTIVITY

1.

2.

1.

2.

A.

B.

C.

D.

E.

1.

2.

1.

2.

3.

1.

Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures

Work Area Cleaning:

Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces

Removal of Critical Barriers:

Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

Carefully remove screws and painter tape.

If dust will be generated during screw removal, use hand-held HEPA vacuum.

Drywall cutting is prohibited during removal process Clean all stud tracks with HEPA vacuum before removing outer hard barrier Use a plastic barrier to enclose area if dust could be generated

Negative Air Requirements:

The use of negative air must be designated to remove contaminants from the work area Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC Systems:

Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed Verify that HVAC systems are clean and operational.

Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications

Water Systems:

Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA directive 1061.

CL

AS

S

III

IV

13.

14.

15.

16.

17.

18.

Ensure availability of equipment for cleaning hands Construct and complete critical barriers meeting NFPA 241 requirements.

Barriers must extend to the ceiling or if ceiling tile is removed, to deck above All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.

Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type) Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A of this document.

These control measures must be maintained continuously 24/7 for the duration of the project. HEPA filtered exhaust if discharged directly to the outdoors must be at a istance of 25 feet or greater from entrances, air intakes and operable windows. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable

4.

5.

6.

7.

8.

9.

10.

11.

12.

Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system)Ensure worker clothing is clean and free of visible dust before leaving the work area Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system Seal doors to prevent dust migration Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.

Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats just be changed routinely and when visibly soiled.

Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily

1.

2.

3.

Perform work activity in a manner that does not create dust Immediately replace ceiling tile, close access panels, etc. upon completion.

Any materials and equipment being brought into the facility must be free of contaminants and loose material

19.

20.

21.

22.

Barriers must be hard barriers unless temporary to install final barrier.

Containment must include an anteroom to ensure pressure control.

Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.

Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable Workers must wear shoe covers or have a method to clean shoes in anteroom. Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.

CL

AS

S I

CL

AS

S

III

CL

AS

S

IV

YES

N/A

N/A

N/A

N/A

AFTER-HOURS WORK TO BE COORDINATED WITH VA COR

COORDINATE WITH VA COR ON PATIENT CARE FLOORS

TEMPORARY WALLS TO BE 1-HR RATED - PREFABRICATED

WALLS / DOOR PREFERRED

TECHNOLOGY AND ELECTRICAL FOCUSED WORK -

MINIMAL PLUMBING OR MECHANICAL IMPACT

MINOR INTERIOR RENOVATION IN EXISTING BUSINESS

OCCUPANCY AREAS - SEE PLAN

Walter Hoffman (914) 208-6275 Walter Hoffman (914) 208-6275 Walter Hoffman (914) 208-6275

1 ADDENDUM #1 03/27/202603/30/2026

DN

UP

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES

ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT

SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF NEW YORK AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, STATE OF NEW YORK DEPARTMENT OF PUBLIC HEALTH, AND THE STATE OF NEW YORK DEPARTMENT OF

ENVIRONMENTAL CONSERVATION

CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134

CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.

CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM

DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS (SHEETS GI201-GI203) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. COORDINATE USAGE OF STAIRS VS USAGE OF CHUTE FOR DISPOSAL OF REMOVED HAZARDOUS MATERIAL ON THE

FIRST FLOOR.THE ABATEMENT CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN

ACCORDANCE WITH APPLICABLE REGULATIONS. WHERE OVERLAPS OCCUR, THE MOST STRINGENT

REQUIREMENTS APPLY.

THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A NYS LICENSED

ASBESTOS ABATEMENT CONTRACTOR.

THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A NYS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS

SHALL BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.

CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL

CONTRACTOR, AND THE COR.

CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR

ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR

ASBESTOS EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE

ENVIRONMENT.

THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.

CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED

MATERIALS AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT

DOCUMENTS. THE OWNER OR THEIR REPRESENTATIVE SHALL NOT BE RESPONSIBLE FOR LOST,

DAMAGED OR STOLEN ITEMS.

CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE

NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.

CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE

LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, NYSDPH, AND THE NYSDEC.

CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.

ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS

BY THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.

THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION

MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.

SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE

PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS

SHOWING THE NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.

PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES.

THE GROUND FLOOR IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG

METHODS ON THE GROUND FLOOR TO MINIMIZE IMPACT ON BUILDING OPERATIONS.

CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD

ABATEMENT REQUIREMENTS, AND THE COR.

CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR.

ALL OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.

WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.

THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL BE RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM

ON HVAC EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.

CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS.

COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED

TO THE OWNER WITHIN 35 DAYS OF WASTE LEAVING THE SITE.

CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, SPECIFIC ORIGINAL FLOORING MATERIALS, AND IN TRANSITE PANELS AT RADIATORS BELOW WINDOWS. NO ASBESTOS CONTENT HAS BEEN IDENTIFIED IN SAMPLING OF CIELING TILES, DRYWALL, JOINT COMPOUND, SKIM COAT, FIBERBOARD, FIRESTOP, COVE BASE, MASONRY WINDOW CAULK, BATHROOM CAULK, TILE GROUT, TILE GLUE, CERAMIC TILES, OR SPECIFIC FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY.

SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION.

UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR ANALYZE BULK SAMPLES OF

SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.

ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY

BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

COORDINATE WITH INDUSTRIAL HYGENIST FOR REVIEW OF MONITORING, AND FINAL CONFIRMATION OF

ABATED AREAS, REFER TO SPEC SECTION 02 82 13.13

KEYNOTES#

ABCDEFIJM

GHKL

N

BEDROOM

110110

BEDROOM

109109

BEDROOM

108108

BEDROOM

107107

BEDROOM

111111

BEDROOM

112112

ELEC CL.

153153

BEDROOM

113113

STAIR

HALL B

114114

BEDROOM

115115

BEDROOM

116116

BEDROOM

117117

BEDROOM

118118

OFFICE

119119

TELECOM

ROOM

127 SF

CL.

106D106D

UTILITY

CL.

106C106C

CL.

106B106B

MEN TLT

106106

BEDROOM

105105

BEDROOM

104104

BEDROOM

103103

F.A. CL.

SOCIAL

ROOM

102102

VESTIBULE

101A101A

TELE

122122

CORRIDOR

148Z148Z

OFFICE

121121

FEMALE

TLT

123123

GENERAL

STORAGE

129129

VISITORS

LOUNGE

126126

STAIR

HALL A

132132

OFFICE

134134

OFFICE

133133

KITCHEN

131131

BEDROOM

130130

ELEVATOR

EV1EV1 OFFICE

125125

STAFF

LOUNGE

144144

OFFICE

143143

COPY/

STG RM

145145

ELEC. CL.

154154

OFFICE

137137

OFFICE

138138

EXAM

ROOM

142142

EMS CL.

140140

FEMALE

TLT

141141

CLOSET

140A140A

OFFICE

136136

OFFICE

139139

CORRIDOR

150Z150Z

OFFICE

135135SHOWER

106A106A

CORRIDOR

147Z147Z

ELEVATOR

LOBBY

149Z149Z

LOBBY

101101

SHOWER

ROOM

141A141A

RECEPTION

146146

CORIDOR

151Z151Z

BEDROOM

128128

YELLOW, GREEN & BLACK MASTIC

WITH NON-ACM VFT

TP

SAMPLE

HA 250

NOTE: REFER TO INTERIM LIFE SAFETY

AND INFECTION CONTROL SHEETS FOR

PROPOSED CRITICAL BARRIER

LOCATIONS - COORDINATE FINAL

LOCATIONS WITH COR

52A-401 F2

52A-400 F5

QUANTITIES - ACM /LEAD MATERIALSLEGEND

130 SF ± .32% CHRYSOTILE

130 SF ± TOTAL FLOOR FINISH MATERIAL TO BE

ABATED THIS FLOOR

TRANSITE PANELS

REMOVAL PATH

TP

SAMPLE

HA ##

SAMPLE LOCATION

ASBESTOS /

LEAD PAINT

NOT ALL SAMPLE LOCATIONS SHOWN FOR CLARITY. ONLY

POSITIVE OR POSITIVE STOP SAMPLES ARE LOCATED.

SAMPLE NUMBER PER SURVEY REPORT FROM TERRACON.

REFER TO SURVEY REPORT FOR SPECIFIC SAMPLE

INFORMATION

PATH INDICATED IS PROVIDED FOR INTENT ONLY.

COORDINATE FINAL REMOVAL PATHWAYS, PHASING, AND

METHODS WITH GENERAL CONTRACTOR AND COR.

0 SF ± CONFIRMED LEAD-CONTAINING PAINT

(0.2% BY WEIGHT) THIS FLOOR

SAMPLE

PNT ##

100 SF ± TRANSITE PANELS, MASTIC AND CAULKING

(AT WINDOWS) TO BE ABATED THIS

FLOOR.

60 LF ± PIPE FITTINGS, INSULATION AND MASTIC TO

BE COMPLETELY ABATED AND REMOVED.

PATH OF REMOVAL

TO EXTERIOR

PROVIDE DUMPSTER 35' MINIMUM AWAY

FROM ANY BUILDING, AND 6'-0" HIGH

TEMPORARY CONSTRUCTION FENCE

AND GATE AROUND DUMPSTER AND ANY

LAY-DOWN AREA. TO BE LOCKED AT ALL

TIMES, PROVIDE COR WITH KEY.

COORDINATE FINAL LOCATION WITH COR

PROVIDE CART FOR DAILY

WASTE REMOVAL

COORDINATE FINAL

LOCATION WITH COR

EXITS WILL BE IN USE DURING

CONSTRUCTION. COORDINATE

ANY CONSTRUCTION ACTIVITY

TO ENSURE EXIT ACCESS IS

NOT IMPEDED.

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t 3/

/2

5:

:2

PM

52H-101

HAZARDOUS MATERIAL ABATEMENT PLAN -

FIRST LEVEL

620-22-700

06/27/2025 M. Perkins C. Raynes

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1/8" = 1'-0"F1 HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL 1 ABATE TRANSITE PANELS ON RADIATOR BELOW WINDOW.

2 ABATE FLOOR TILE AND MASTIC IN AREAS AS INDICATED. SEE LEGEND BELOW. TREAT ANY REMOVED

NON-ACM TILE COVERING (IN DIRECT CONTACT) WITH ACM FLOORING TO BE CONTAMINATED FOR THE

PURPOSES OF DEMOLITION AND REMOVAL REQUIREMENTS.

3 PRIOR TO DEMO PROVIDE CONTAINMENT BARRIER AND PERSONNEL DECONTAMINATION FACILITY PER 02 82 11 DURING ABATEMENT WORK. COORDINATE TIMING WITH COR (48 HR MAX) TO MINIMIZE DISRUPTION

TO OCCUPIED SPACES.

3/4" = 1'-0"F6 SITE DIAGRAM - BUILDING 52

1.

2.

3.

4.

5.

ABATEMENT / ICRA NOTES:

ABATEMENT SCOPE INCLUDES DEMO WORK AS REQUIRED TO ACCESS ACM.

CONTRACTOR TO FIELD VERIFY QUANTITIES.

CONTRACTOR TO AVOID DISRUPTION OF PIPE INSULATION LOCATIONS. PROVIDE COORDINATION

DRAWINGS TO LOCATE ANY ACM CONTAINING ITEMS IN CHASES OR PLENUMS THAT CANNOT BE

AVOIDED.

REFER TO ACM REPORTS IN SPECIFICATIONS.

ICRA EVALUATIONS AND REQUIREMENTS TO BE COORDINATED THRU THE COR. REFER TO INTERIM

LIFE SAFETY AND INFECTION CONTROL SHEETS.

SUMMARY OF ABATEMENT & INFECTION CONTROL REQUIREMENTS

UP

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A1

A.

B.

C.

D.

E.

F.

G.

H.

I.

SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES

INFORMATION.

SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

NEW TELECOM ROOMS SHALL COMPLY WITH THE LATEST VA

PHYSICAL SECURITY STANDARDS, AND CAMPUS STANDARDS.

SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.

SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.

SEE TYPICAL CEILING DETAILS ON SHEET A-531

PROVIDE TEMPORARY AIR TIGHT BARRIER AROUND WORK AREA

DURING ANY ACTIVITIES WHICH PRODUCE DUST, TYPICAL.

MAINTAIN CLEAR EXIT PATHS AND STAIRS AT ALL TIMES.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

NO SCOPE

2"

1/2" 1/2"VARIES

SEE PLAN

WALL - SEE PLAN

FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND,

TYP.

HOLLOW METAL

FRAME

1/ 2"

VA

R

IE

S

SE

E

PL

AN

1/ 2"

UNO

4" 2"

ADJACENT WALL

WHERE OCCURS

SEALANT - EA SIDE &

ALL AROUND, TYP.

HOLLOW METAL FRAME

WALL - SEE PLAN

FOR TYPE

E1

TYPICAL FRAME

H

EI

G H

T

2" WIDTH 2"

E3

FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS

F

FLUSH

52A-401 F2

52A-400

E8TELECOM

ROOM

120120

52A-400 F5

CORIDOR

151Z151Z

52A-400 F3

CORRIDOR

147Z147Z

TELECOM

ROOM

127 SF

B

B

B

B

B

B

EXTG VIF

9'-2"

EX

TG

V

IF

'-2

1/ 2"

6 1/2"

(EXTG V.I.F.)

4'-0"

OFFICE

119119

OFFICE

121121

CORRIDOR

148Z148Z

SOCIAL

ROOM

102102BEDROOM

103103

B1 52A-511

3'-4" 2"

OFFICE

119119 OFFICE

121121

SOCIAL

ROOM

102102BEDROOM

103103

F.A. CL.

CORRIDOR

148Z148Z

TELECOM

ROOM

127 SF

OFFICE

120120

OFFICE

120120

ACOUSTICAL OR RATED

FLEXIBLE SEALANT

FLOOR LINE

ADD ONE LAYER OF 5/8" GWB,

ONE-SIDE WITH APPROVED UL

SETTING COMPOUND BETWEEN

LAYERS AND FASTENED TO

WALL AS REQUIRED, AT

EXISTING GWB WALL

ASSEMBLIES

EXISTING STRUCTURAL DECK

EXISTING METAL STUDS AND

BATT INSULATION TO REMAIN

A/C GRADE, 3/4" FIRE-TREATED

PLYWOOD TO 9'-0" ABOVE FINISHED

FLOOR, ADHERED TO CONCRETE AT

EXISTING CONCRETE WALL

ASSEMBLIES

BOTTOM OF PLYWOOD

TO BE AT 12" AFF

UL DESIGN V497

1-HOUR PARTITION RATED FROM BOTH SIDES

EXISTING GWB OR

CONCRETE WALL

ASSEMBLY, WHERE OCCURS

SIDE OF

EXISTING

ROOM OR

CORRIDOR TO

REMAIN

52A-512 D5

52A-512 B5

J2

J2

4'-4"

VIF

10"

TYP.

CORIDOR

151Z151Z

OFFICE

137137

OFFICE

138138

OFFICE

139139

OFFICE

136136

LINE OF

STRUCTURE

LINE OF

STRUCTURE

09 29 00

SOUND ATTENUATION BATTS

(SAB), WHERE OCCURS

NOTE:

IF PARTITION TYPE IS USED IN A

CHASE WALL CONDITION, PROVIDE

CROSS BRACING GUSSETS AT 48"

O.C. MAX VERTICALLY. FABRICATED

FROM 6" MTL STUDS.

6”

09 29 00

5/8" GWB

09 29 00

SAB RETAINER STRAP

WHERE SAB OCCURS

CEILING

07 92 00

SEALANT

09 22 16

METAL STUDS

52A-512 B5

52A-512 D5

TYP.

VIF

1'-0" 4'-2"

BEDROOM

109109

VI

F

2'- 6"J2

J2

BEDROOM

108108

CORRIDOR

147Z147Z

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t 3/

/2

5:

:3

PM

52A-400

ARCHITECTURAL ENLARGED VIEWS - FIRST

LEVEL

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

3" = 1'-0"E1 HOLLOW METAL HEAD DETAIL

3" = 1'-0"D1 HOLLOW METAL JAMB DETAIL

1/4" = 1'-0"F1 DOOR AND FRAME TYPES ELEVATIONS

1 REMOVE EXISTING DOOR AND FRAME.

2 REMOVE EXISTING FLOORING AND WALL BASE.

3 ACCESS DOOR PER SPECIFICATION, COR TO CONFIRM LOCATION

AND MOUNTING HEIGHT.

4 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C

FIRE EXTINGUISHER LOCATED NO GREATER THAN 75 FEET AWAY

FROM THE NEW TR. CONTRACTOR SHALL BID A NEW FEC FOR EACH

TR IN THE SCOPE OF WORK. SEE SPECIFICATION 10 44 13.

5 NEW INFILL AT EXTERIOR. NEW WALL TO MATCH EXISTING.

6 EXISTING CEILING TO REMAIN.

7 TELECOM ROOM TO BE OPEN TO DECK ABOVE.

8 REMOVE EXISTING ACOUSTICAL CEILING AND LIGHTS. MODIFY

AND/OR PROVIDE ADDITIONAL SUPPORTS AS REQUIRED FOR

EXISTING CEILING ITEMS TO REMAIN.

9 NEW DOOR. SEE DOOR SCHEDULE AND SPECIFICATIONS FOR

ADDITIONAL INFORMATION. COORDINATE DOOR AND FRAME WITH

ACCESS CONTROL HARDWARE.

10 REMOVE PORTION OF WALL AS SHOWN GRAPHICALLY

11 REMOVE EXISTING WINDOW, AC UNIT AND METAL SUPPORT FRAME.

PROVIDE TEMPORARY INFILL.

12 REMOVE EXISTING FLOORING AND WALL BASE.

13 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW WALL

IN ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE WALL SPAN

OR APPROPRIATE TRANSITION LOCATION AS APPROVED BY THE

COR.

1/32" = 1'-0"F7 FIRST LEVEL REFERENCE PLAN

1/4" = 1'-0"E8

ARCHITECTURAL ENLARGED FLOOR PLAN -

FIRST LEVEL - ROOM 120 - NEW

1/4" = 1'-0"E6

ARCHITECTURAL ENLARGED FLOOR PLAN -

FIRST LEVEL- ROOM 120 - DEMO

1/4" = 1'-0"C6

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - ROOM 120 - DEMO

1/4" = 1'-0"C8

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - ROOM 120 - NEW

NOTE: 2-HOUR PARTITION RATED WALLS: UL V438, U411

(TYPE B) TYPICAL PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

B 2 1/2" 3/4" 45

DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL FIRE

RATING

HARDWARE

NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL

LEVEL 1 120 TELECOM

ROOM

120 3' - 0" 7' - 0" 1 3/4" F WD WD NONE 3/8" 1 HM P-2 E1/ 52A-400 E3/ 52A-400 - - HW-SH-3F SEE SPEC 1

1. SEE SPECIFICATION 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.

DOOR HARDWARE LEGEND

HW-SH-3F Secured Access Door - Storeroom Locking (F07 Lockset) with Closer, Overhead Stop, Alarm Contact, Card Reader

1/2" = 1'-0"F5 FIRST LEVEL CHASE - CORRIDOR - ROOM 151Z

(TYPE J) NON-RATED PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

J2 2 1/2" 3 1/8" -

ACCESS DOOR SCHEDULE

LEVEL ROOM NAME ROOM NUMBER DESCRIPTION TYPE

LEVEL 1 CORIDOR 151Z Drywall Access Door Removable Door - Screwdriver Cam Latch 1'. 24"X24" SIZE LEVEL 1 CORRIDOR 147Z Drywall Access Door Removable Door - Screwdriver Cam Latch 1'. 24"X24" SIZE

1/2" = 1'-0"F3 FIRST LEVEL CHASE - CORRIDOR - ROOM 147Z

25 GA MIN MTL

TRACK

CLIP ANGLE

1" X 20 GA MTL STRAP AT 3'-6"

O.C., EACH SIDE

25 GA MIN MTL TRACK AT

FLOOR

DOUBLE 20 GA MTL STUDS AT

BOTH JAMBS

TYPE A

CONT16 GA 6" WIDE

MTL BACK-UP

STRAP

MO

UN

TI

NG

H

EI

GH

TS

RE

F

TY

PI

CA

L

TYPE B

20 GA MTL RUNNER

TRACK - CLIP

FLANGES TO FIT

OVER STUDS

6" MIN, DEEPER

IF REQUIRED

MO

UN

TI

NG

H

EI

GH

TS

RE

F

TY

PI

CA

L

TYPE C

MO

UN

TI

NG

H

EI

GH

TS

RE

F

TY

PI

CA

L

8" MIN, DEEPER

IF REQUIRED

MIN 20 GA MTL STUDS

FACING OPPOSITE

DIRECTIONS TO ALLOW

MOUNTING PLATE

ATTACHMENT

14 GA STL RUNNER

TRACK-CLIP FLANGES

AND FOLD WEB TO FORM

ATTACHMENT FLANGE

PROVIDE DIAGONAL BRACING (AT 45° TYP) OF

TOP TRACK AT 48" OC MAX BETWEEN FULL

HEIGHT STUDS

DOOR

OPENING

DOOR

OPENING

DOUBLE DOOR OPENING

BELOW CEILING

OPENING

LARGE BELOW CEILING

OPENING

ABOVE CEILING OPENING

LARGE ABOVE CEILING

OPENING

MOUNTING DETAIL

TYPE B

DOUBLE STUDS

DOUBLE

STUDS

DOUBLE STUDS DOUBLE STUDS

DOUBLE STUDS

4' - 6" MAX 8' - 6" MAX 4' - 6" MAX 8' - 6" MAX

ALL STUDS ARE TO BE 20 GAUGE

IF GREATER THAN 8' - 6"

8' - 6" MAX 8' - 6" MAX

4' - 6" MAX

25 GA MIN BOTTOM TRACK (TYP)

FLOOR LINE

20 GA MTL TOP TRACK

(TYP UNO)

CEILING LINE

UNDERSIDE OF SLAB, FLOOR OR

ROOF DECK

2" WIDE 20 GA METAL

STRAP

OPENING ABOVE CEILING WHICH

INTERRUPTS LOWER OPENING JAMB

STUDS

STONE VENEER WALLS

16 GA MIN STUDS AT 20 GA MIN STUDS AT

WALL MOUNTED

ARCHITECTURAL

CABINETS/MILLWORK/

ATTACHED SHELVING

DOOR

OPENING

E8 52A-511

E8 52A-511

F8 52A-511

F8 52A-511

D8 52A-511

D8 52A-511

E8 52A-511

E8 52A-511

F8 52A-511

C8 52A-511

C8 52A-511

C8 52A-511

C8 52A-511

C8 52A-511

C8 52A-511

B8 52A-511

E8 52A-511

SEE: (D4/52A-511)

1.

2.

3.

4.

5.

6.

7.

NOTES:

ALL STUDS ARE SPACED 16"

OC MAXIMUM.

ALL STUDS SHALL BE "C"

STUDS WITH 1/4" RETURN

FLANGE MINIMUM.

INDICATES SHELVING

OR CABINETRY.

INDICATES STONE.

DOUBLE STUDS AT SIDES OF

OPENING SHALL NOT BE CUT

FOR DUCTWORK OR ANY

OTHER MECHANICAL

SYSTEMS.

REFER TO C3 / A-522 FOR

MOUNTING TYPE DETAILS.

PROVIDE PARTITION BRACING

AT ALL ASSEMBLIES OVER

15'-0" IN HEIGHT, U.N.O.

EXTERIOR

SHEATHING

SECOND LAYER OF GWB

WHERE INDICATED BY

PARTITION TYPE

RATED PARTITION AS

INDICATED ON PLAN, EXTEND

GWB TO INTERIOR FACE OF

EXTERIOR SHEATHING

INTERSECTION AT RATED

PARTITION AND EXTERIOR WALL

CONCRETE WALL

OR COLUMN

SEALANT

FURRING PARTITION

AS INDICATED ON PLAN

RATED PARTITION AS INDICATED

ON PLAN

INTERSECTION OF RATED

PARTITION AND CONCRETE

INTERSECTION AT RATED

PARTITION AND CONCRETE

LOWER PRIORITY

PARTITION

HIGHER PRIORITY

PARTITION

INTERSECTION OF CROSS

CORRIDOR DOOR IN RATED

PARTITION

MI

N3"

CONCRETE WALL OR

COLUMN

SEALANT

FURRING PARTITION

AS INDICATED ON PLAN

RATED PARTITION AS

INDICATED ON PLAN

MI

N3"

2 5/8"

SECOND LAYER OF GWB WHERE INDICATED

BY PARTITION TYPE

WALL PRIORITY NOTES:

1. WHERE WALLS OF DIFFERENT FUNCTIONS/ RATINGS INTERSECT: WALLS OF

HIGHER PRIORITY SHALL BE CONTINUOUS.

2. LOWER PRIORITY WALLS SHALL "ABUT" AND BE "SEALED TO" HIGHER PRIORITY

WALLS, BUT SHALL NOT INTERRUPT CONTINUITY OF THE HIGHER PRIORITY WALL.

2"2"

PROVIDE GAP TO

FLANKING WALL STUD TO

ALLOW SPACE FOR GWB

TO PASS

PROVIDE GAP TO

FLANKING WALL STUD TO

ALLOW SPACE FOR GWB

TO PASS

2" 2"

2"PROVIDE GAP TO

FLANKING WALL STUD TO

ALLOW SPACE FOR GWB

TO PASS

2"

SECOND LAYER OF GWB WHERE

INDICATED BY PARTITION TYPE

INTERSECTION AT VARIOUS

WALL PRIORITY

CONFIGURATIONS

LOWER PRIORITY PARTITION

HIGHER PRIORITY PARTITION

(MAINTAIN CONTINUITY

PROVIDE GAP TO FLANKING WALL STUD

TO ALLOW SPACE FOR GWB TO PASS

2"

PROVIDE GAP TO

FLANKING WALL STUD TO

ALLOW SPACE FOR GWB

TO PASS2"

LOWER PRIORITY PARTITION

HOLLOW METAL FRAME

PROVIDE FIRE SEALANT

AT INTERFACE

PARTITION AS SCHEDULED

SOUND ATTENUATION BLANKET

COMPRESSED TO FILL OPENING

AT SOUND RATED PARTITION

L-BEAD

SEALANT BOTH SIDE, REF SPECS FOR

TYPE

CONTROL JOINT

GWB SUSPENDED

CEILING SYSTEM

PARTITION AS

SCHEDULED

CONTROL JOINT,

BOTH SIDES

CONTROL JOINT IN

GWB PARTITION

1/2" MAX

1HR FIRE

RATED

WHI-647-3024

MAX

24'-0”

PARTITION AS

SCHEDULED

CONTROL JOINT,

BOTH SIDES

CONTROL JOINT IN 1 HR

FIRE RATED PARTITION

1/2" MAX

MAX

24'-0”

1 1/2"

2 LAYERS OF 5/8" GWB

2HR FIRE

RATED

WHI-651-0318.1

PARTITION AS

SCHEDULED

CONTROL JOINT,

BOTH SIDES

CONTROL JOINT IN 2 HR

FIRE RATED PARTITION

1/2" MAX

MAX

24'-0”

1 1/2"

2 LAYERS OF 5/8" GWB

MAX

24'-0”MA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .