This document is an architectural and engineering addendum containing design drawings and construction specifications for infrastructure upgrades at the Franklin Delano Roosevelt VA Hospital in Montrose, New York (Project 620-22-700). The project involves electronic health record modernization (EHRM) infrastructure upgrades classified as a Category D large-scale construction activity requiring Category III infection control precautions. The work scope includes renovation of existing business occupancy areas totaling 9,885 square feet on the first level, with specific focus on telecommunications room infrastructure (Room 16A, 54 SF), transformer room upgrades (Room 23, 145 SF), and related electrical and mechanical systems modifications.
The construction must comply with stringent infection control risk assessment (ICRA) protocols including installation of temporary one-hour fire-rated barriers, negative air pressure containment at 0.01 inches of water gauge maintained 24/7 with HEPA filtration, and anteroom requirements with sticky mat stations. Critical infrastructure requirements include new wall-mounted telecommunications enclosure cabinets, Johnson Controls iSTAR Edge G2 IP-based access control panels, lifesafety power (LSP) unified enclosures with minimum four-hour backup batteries, new redundant L5-30 20A outlets with integrated surge protection devices, and fiber optic cabling with dedicated four-inch speed conduit sleeves. The project must maintain fire protection systems, exit lighting, and all life safety measures throughout construction while managing demolition debris removal through identified routes, and requires coordination with the Contracting Officer Representative (COR), VA Safety Group, and Infection Control personnel prior to barrier removal and project closeout.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.B
.rv t 3/
/2
8:
:4
PM
19G-001
DRAWING INDEX 620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
- DRAWING INDEX -
SHEET NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% DD ISSUED FOR CONSTRUCTION
GENERAL
19G-000 COVER SHEET Yes Yes Yes Yes 19G-001 DRAWING INDEX Yes Yes Yes Yes 19G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 19G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes
ICRA & LIFE SAFETY
19GI300 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL No No Yes Yes
ARCHITECTURAL
19A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No No Yes Yes 19A-401 ARCHITECTURAL ENLARGED VIEWS - BASEMENT & FIRST LEVELS No No Yes Yes
ELECTRICAL
19E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 19E-101 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes 19E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 19E-601 ELECTRICAL ONE-LINE DIAGRAMS No No Yes Yes 19E-701 ELECTRICAL SCHEDULES No No Yes Yes 19E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 19E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes
TELECOMMUNICATION
19T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 19T-101 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes 19T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 19T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 19T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 19T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 19T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes 19T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
REFERENCE
19R-900 PHOTO REFERENCES No Yes Yes Yes Grand total: 23
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
19G-011 REMOVED FROM
CONSTRUCTION DOCUMENTS
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IPC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: BUSINESS Occupancy per Chapter 39
39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply
39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11
BUILDING OCCUPANCY TYPE:
EXISTING - BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.
39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
BUSINESS OCCUPANCY; PROTECTED = 300'-0"
OCCUPANT LOAD:
39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
39.2.3 Capacity of Means of Egress.
39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).
39.2.4 Number of Means of Egress.
39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6
1) the number of means of egress shall be in accordance with section 7.4
2) not less than two separate exits shall be provided on every story.
3) Not less than two separate exits shall be accessible from every part of every story.
39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.
PROTECTION OF VERTICAL OPENINGS:
39.3.1 Protection of Vertical Openings.
39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
39.3.2 Protection from Hazards.
39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7
39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material
The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.
39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
9885 SF
EXISTING BUSINESS -
TELECOM
ROOM
16A16A
STEAM
CLOSET
16B16B
BED
BUNK 05
CHIEF
OFFICE
01A01A
BUNK 06
BUNK 03
BUNK 04
AMBULANCE
BAY
LAUNDRY
& UTILITY
ROOM
0909 FIRE
DEPT.
GARAGE
COMMUNITY
ROOM
STORAGE
BUNK 08
BUNK 07
COMM.
RM.
0101 BUNK 02
BUNK 01
KITCHEN
MECHANICAL
REPAIRS
M & R
GARAGE
TRANSFORMER
ROOM
E1 ▬ 38'
FIRE
SUPP. CL.
16C16C
MIN
5'-0" CLR
TEMPORARY WALL TO EXTEND
AND BE SEALED TO DECK /
FLOOR ABOVE WHEN RATED
ENCLOSURE REQUIRED
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
FI
NI
SH
ED
F
LO
OR
T O
UN
DE
RS
ID
E
OF
S
TR
UC
TU
RE
VE
RI
FY
F
LO
OR
T
O
FL
OO
R
HE
IG
HT
RENOVATED SPRINKLER
SYSTEM
WEEKLY CHANGED
OR MORE AS
NEEDED PRE-FILTER
FLEX DUCTMONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR
UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
PRESSURE INDICATOR SHALL BE AT
0.03 OR GREATER USING A DIGITAL
MANOMETER WITH DATA LOGGING. IF
NOT VERIFY ALL OPENING SUCH AS
DOOR ARE CLOSED AND/OR CHANGE
NEGATIVE AIR PRE-FILTER. DO NOT USE
A "BALL IN THE WALL" OR ANALOG
OTHER PRESSURE INDICATOR.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
OTAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
PUBLIC AREA
CONSTRUCTION AREA
ANTE ROOM
HARD BARRIER ALL THE WAY TO
DECK ABOVE
SIZE ANTE ROOM TO PROVIDE
SPACE FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS' PPE
AND CLEANING, INCLUDING A HEPA
CLOTHING VACUUM
ROUTE DUCT TO EXTERIOR - SEE
PLANS FOR PROPOSED ROUTES -
CONFIRM ROUTE WITH ON-SITE
STAFF PRIOR TO INSTALLATION.
DISCHARGE AT A DISTANCE OF 25
FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. DO NOT
DIRECT EXHAUST INTO ANY
BUILDING SHARED EXHAUST
SYSTEM.
ANTE ROOM FAN
DOOR TO BE SELF-CLOSING AND
SELF-LATCHING - 45 MIN. FIRE
RATING PER NFPA
A5
19GI300
1/4" = 1'-0"D5 TYPICAL CONSTRUCTION LAYOUT- CLASS IV
1/2" = 1'-0"A5 CROSS SECTION A'-A'- CLASS IV
NTSF1 TYPICAL ICRA PRODUCTS
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t 3/
/2
6:
:1
PM
19GI300
INTERIM LIFE SAFETY & INFECTION CONTROL
PLAN - FIRST LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS
DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE
(COR).
COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH
OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH
THE COR. ALL INTERIOR DOORS THAT LEAD TO THE
CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.
OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING
WORK.
THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL
BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION
AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM
CLEANER PRIOR TO LEAVING THE SITE.
FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR
OCCUPIED AREAS ON THE FLOOR.
PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;
REVIEW WITH COR AND VA SAFETY GROUP.
MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT
ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION
UNITS.
CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE
OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR
EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE
CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN
CONSTRUCTION AREA TO PREVENT CONTAMINATION OF
EXISTING DUCT SYSTEM.
REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND
VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION
AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION
AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".
GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP
A CURRENT HOT WORK PERMIT ON SITE.
TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE
SURE THEY REMAIN EFFECTIVE.
MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL
DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR
CONTAINERS.
SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES
AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN
DUST PROTECTION AND NEGATIVE AIR PRESSURE.
MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,
WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR
CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED
AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA
SHALL BE CLEANED IMMEDIATELY.
AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA
WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,
REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH
OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER
REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.
CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL
PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
INFECTION CONTROL RISK
ASSESSMENT:
TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE
ACTIVITY CATEGORY
IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT
CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP
CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK
CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR
MAINTENANCE
CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR
MAINTENANCE
THIS PROJECT: CATEGORY D
TABLE 2: AFFECTED AREA ASSESSMENT
TABLE 3: PATIENT RISK CATEGORY
IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN
TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH
THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT
RISK CATEGORY FOR THE ACTIVITY.
LOW RISK: NON-PATIENT CARE AREAS
MEDIUM RISK: PATIENT CARE SUPPORT AREAS
HIGH RISK: PATIENT CARE AREAS
HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY
COMPROMISED PATIENT CARE AREAS
THIS PROJECT: LOW RISK
CL
AS
S
II
Construction Activity Category
RISK GROUP
LOW RISK
MEDIUM RISK
HIGH RISK
HIGHEST RISK
I II II III
I II III IV
I II IV IV
II III IV IV
A
STEP 1:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 2:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 3:
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 4:
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 5:
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 6:
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 7:
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 8:
DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE
WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?
(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN
AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)
STEP 9:
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 10:
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH
THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
Affected Area Assessment
AREA
Activity Area Area Above Area Below Adjacent Area
TR
SEE PLAN
SVC TYPE POC POC CONTACT INFO
SEE PLAN
SEE PLAN
Walter Hoffman (914) 208-6275
MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED
CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO
FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF
INFECTION CONTROL ACTIVITIES REQUIRED.
THIS PROJECT: CATEGORY III
TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL
PRECAUTIONS
B C D
TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES
BY LEVEL OF PRECAUTIONS
NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)
TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES
REQUIRED UPON COMPLETION OF THE ACTIVITY
1.
2.
1.
2.
A.
B.
C.
D.
E.
1.
2.
1.
2.
3.
1.
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures
Work Area Cleaning:
Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces
Removal of Critical Barriers:
Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
Carefully remove screws and painter tape.
If dust will be generated during screw removal, use hand-held HEPA vacuum.
Drywall cutting is prohibited during removal process Clean all stud tracks with HEPA vacuum before removing outer hard barrier Use a plastic barrier to enclose area if dust could be generated
Negative Air Requirements:
The use of negative air must be designated to remove contaminants from the work area Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC Systems:
Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed Verify that HVAC systems are clean and operational.
Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications
Water Systems:
Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA directive 1061.
CL
AS
S
III
IV
13.
14.
15.
16.
17.
18.
Ensure availability of equipment for cleaning hands Construct and complete critical barriers meeting NFPA 241 requirements.
Barriers must extend to the ceiling or if ceiling tile is removed, to deck above All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type) Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A of this document.
These control measures must be maintained continuously 24/7 for the duration of the project. HEPA filtered exhaust if discharged directly to the outdoors must be at a istance of 25 feet or greater from entrances, air intakes and operable windows. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable
4.
5.
6.
7.
8.
9.
10.
11.
12.
Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system)Ensure worker clothing is clean and free of visible dust before leaving the work area Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system Seal doors to prevent dust migration Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats just be changed routinely and when visibly soiled.
Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily
1.
2.
3.
Perform work activity in a manner that does not create dust Immediately replace ceiling tile, close access panels, etc. upon completion.
Any materials and equipment being brought into the facility must be free of contaminants and loose material
19.
20.
21.
22.
Barriers must be hard barriers unless temporary to install final barrier.
Containment must include an anteroom to ensure pressure control.
Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable Workers must wear shoe covers or have a method to clean shoes in anteroom. Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
CL
AS
S I
CL
AS
S
III
CL
AS
S
IV
YES
N/A
N/A
N/A
N/A
AFTER-HOURS WORK TO BE COORDINATED WITH VA COR
COORDINATE WITH VA COR ON PATIENT CARE FLOORS
TEMPORARY WALLS TO BE 1-HR RATED - PREFABRICATED
WALLS / DOOR PREFERRED
TECHNOLOGY AND ELECTRICAL FOCUSED WORK -
MINIMAL PLUMBING OR MECHANICAL IMPACT
MINOR INTERIOR RENOVATION IN EXISTING BUSINESS
OCCUPANCY AREAS - SEE PLAN
Walter Hoffman (914) 208-6275 Walter Hoffman (914) 208-6275 Walter Hoffman (914) 208-6275
3/32" = 1'-0"F3 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL
PATH OF TRAVEL SCHEDULE - FIRST LEVEL
Mark From Room To Room Type of Travel Path Length
LEVEL 1
(P-o-T) Distance to Exits
E1 TELECOM ROOM 16A (P-o-T) Distance to Exits 38' - 0"
1 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
2 DEBRIS REMOVAL PATH TO EXTERIOR -
COORDINATE REMOVAL OF MATERIALS ON THIS
FLOOR WITH ASBESTOS REPORT AND PLAN
3 SOLID GRAY HATCH DENOTES LIMITED WORK AREA
- SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
4 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
5 COORDINATE TEMPORARY HEPA EXHAUST
ROUTING OUT OF BUILDING - MAINTAIN 25 FEET
MINIMUM FROM INTAKES, OPERABLE WINDOWS,
AND ENTRANCES. PROVIDE BLOCK-OFF PANELS IN
EXISTING WINDOWS FOR DISCHARGE, TYP.
6 TEMPORARY CONSTRUCTION BARRIER
7 ANTEROOM - SEE INFECTION CONTROL & INTERIM
LIFE SAFETY DETAILS
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
FIRST LEVEL EXISTING BUSINESS 9885 SF B Business 150 SF 0 66
NOTE:
DEBRIS REMOVAL:
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
CONTRACTOR TO PROVIDE DUMPSTER 35' MINIMUM FROM ANY
BUILDING. DUMPSTER AND ANY LAY-DOWN AREA ARE TO BE
ENCLOSED BY 6'-0" HIGH TEMPORARY CONSTRUCTION FENCING.
PROVIDE TRASH CART FOR REMOVAL OF WASTE FROM JOB SITE
AREAS DAILY.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
J
J
EL
CR
DCRX
FIRE DEPT. GARAGE
MECHANICAL REPAIRS
TRANSFORMER ROOM
COMMUNITY ROOM
STORAGE
COMM. RM.
BUNK 08
BUNK 07
CORRIDOR C
C03
BUNK 02
CORRIDOR A
C01
KITCHEN
W. SHOWER
CORRIDOR B
C02
M. SHOWER
M. TOILET
BUNK 03
BUNK 04
BUNK 06
CORRIDOR E
C05
CHIEF OFFICE
01A
FIRE SUPP. CL.
16C
BED
STEAM CLOSET
16B
TELECOM ROOM
16A
54 SF CORRIDOR D
C04
BUNK 05
BUNK 01
W. TOILET
LAUNDRY & UTILITY ROOM
AMBULANCE BAY
M & R GARAGE
19E-101 C3
19E-101 C7
B-19-9A-N
TELECOM ROOM
16A
54 SF
B1 9-
GR
OU
ND
S-
R-
B-
-9
A- N-
TYP.
CORRIDOR D
C04
BED
STEAM CLOSET
16B
B19-GROUNDS-R- 32
TRANSFORMER
ROOM
145 SF
B-19-EDPB
6 9
M & R GARAGE
TYP.
7B19-GROUNDS-R
SCALE: 1/8" = 1'-0"F4 ELECTRICAL PLAN - FIRST LEVEL
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.B
.rv t 3/
/2
8:
:4
PM
19E-101
ELECTRICAL PLAN - FIRST LEVEL 620-22-700
06/27/2025 M. Perkins J. Castenir
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
SCALE: 1/2" = 1'-0"C7
ELECTRICAL ENLARGED PLAN - FIRST
LEVEL - RM16A - NEW
SCALE: 1/2" = 1'-0"C3
ELECTRICAL ENLARGED PLAN - FIRST
LEVEL - RM23 - EXISTING
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
PROVIDE NEW 16" x 4" BONDING BAR, SET OF INSULATORS STAND-OFF
BRACKETS, AND STAINLESS STEEL SCREWS. PROVIDE ALL GROUNDING CABLE
AND CONNECTORS AND INSTALL PER TYPICAL DETAIL ON T-500 SERIES SHEETS.
PROVIDE NEW WALL MOUNTED TELECOMMUNICATION ENCLOSURE CABINET,
WITH LOCKABLE FRONT DOOR AND SWING-OUT REAR ACCESS TO EQUIPMENT.
PROVIDE AND INSTALL NEW JOHNSON CONTROLS iSTAR EDGE G2 IP-BASED
ACCESS CONTROL PANEL. PROVIDE LIFESAFETY POWER (LSP) PSX UNIFIED
ENCLOSURE WITH INTEGRATED BACKUP BATTERIES PROVIDING A MINIMUM OF 4
HOURS OF STANDBY POWER. PROVIDE A DEDICATED 20A, 120VAC CIRCUIT IN
ACCORDANCE WITH NEC AND MANUFACTURER ’S RECOMMENDATIONS.
COORDINATE FINAL PROGRAMMING AND INTEGRATION WITH THE C •CURE 9000
EVENT MANAGEMENT SYSTEM.
NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE FOR ADDITIONAL
INFORMATION.
PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. FIPS, FICAM AND
HSPD12 COMPLIANT AVIGILON ACM SYSTEM, CARD READER WITH PINPAD CARD,
PIV READY.
PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE
THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD
RENOVATION.
EXISTING EQUIPMENT TO REMAIN, PROTECT IN PLACE.
PROVIDE NEW CIRCUIT BREAKERS AND FEEDERS SERVICING NEW TELECOM
EQUIPMENT. REFER TO SHEETS E-601 & E-701 FOR SIZING
EXISTING PANELBOARD TO REMAIN, PROTECT IN PLACE.
EXISTING LIGHT FIXTURE TO REMAIN, PROTECT IN PLACE.
FIBER TO HAVE NEW DEDICATED 4” SPEED CONDUIT SLEEVE THROUGH WALL
ABOVE CEILING GRID FOR HORIZONTAL VOICE/DATA CABLING OR FIBER WITH
PLASTIC BUSHINGS ON BOTH ENDS TO PROTECT CABLES. FIRE CAULK
PENETRATION PER SPECIFICATIONS.PROVIDE WITH (3) SLEEVE GANG PLATE AT
EACH OF THE (2) LOCATIONS, EACH TR PROVIDE WITH (3) SLEEVE GANG PLATE
AT EACH OF THE (2) LOCATIONS, EACH TR, AS PER SPECIFICATIONS.
NEW A/B REDUNDANT L5-30 20A OUTLETS WITH INTEGRATED TYPE 3 SPD
DEVICES.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION
WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM
THOSE INDICATED.
MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.
CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS
WITH VA COR PRIOR TO ROUGH-IN.
PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED
OUTDOORS
SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL
SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-701.
COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH
EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.
LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING
PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.
UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.
NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE
OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.
CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH
EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.
CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN
PLENUM SPACES.
REFER TO E-901 FOR CUTSHEETS.
COMPLY WITH NEC 220.87 FOR ALL 30-DAY LOAD MEASUREMENTS OF
PANELBOARDS.
LOCATE DISCONNECT SWITCHES TO MAINTAIN WORKING CLEARANCES
PER NEC 110.26.
CONTRACTOR SHALL LABEL ALL JUNCTION BOX COVERS WITH THE CIRCUITS
CONTAINED AND SOURCE PANEL IDENTIFIED.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
CR
WALL
1"EMT CONDUIT
JUNCTION BOX
8'-6" AFF
CABLE TRAY TO
TELECOMMUNICATIONS
RACK
46"
ALL CABLES TO ACCESS CONTROL PANEL
4"Hx4"x2"D IN ACCESSIBLE CEILING
3/4"C
3/4"C
CEILING
LINE
DOOR
CONTACT
FINISHED
FLOOR
DOOR
DOOR FRAME
ELECTRIFIED
TRANSFER
HINGE
CORE DOOR FOR
SECURITY LOCK
5S SQ. BOX WITH SINGLE
GANG TRIM RING. MAINTAIN
FIRE RATING OF WALL
ASSEMBLY.
PUBLIC SIDE SHOWN
CONDUIT
ELECTRIC
DOOR
LOCKING
HARDWARE
REX MOTION DETECTOR
(SECURE SIDE)
PUBLIC
SIDE
5S
1.
2.
3.
4.
5.
6.
NOTES:
COORDINATE LOCKING HARDWARE
PROVIDED UNDER OTHER SECTIONS
WITH THE ELECTRONIC SECURITY
DEVICES AND CONTROL PROVIDED
HERE.
DETAILS ARE FOR REFERENCE ONLY.
SEE FLOOR PLANS FOR LEFT OR RIGHT
HAND PLACEMENT OF DEVICES.
FOR NEW DOORS, PREP THE FRAME AND
DOOR FOR SECURITY DEVICES AT THE
FACTORY BEFORE THE LABEL IS APPLIED.
EXISTING DOORS SHALL BE RECERTIFIED
AS REQUIRED.
SECURITY JUNCTION BOX SHALL BE
TAMPERED, HINGED AND LOCKABLE.
REX MOUNTED ON THE SECURE SIDE OF
THE DOOR.
EGRESS DOOR SHALL BE READILY
OPENABLE FROM THE EGRESS SIDE
SECTION VIEW FRONT VIEW
DOOR FRAME
VERTICAL
DOOR
DOOR
CONTACT
MAGNET
DOOR
CONTACT
SWITCH
REX SENSOR
CONDUIT TO SJB
SINGLE
GANG BOX
MOUNTED
HORIZONTAL
EXTEND
CONDUIT 6"
BELOW BOX
DOOR
CONTACT
CONCEALED
DOOR
FRAME
REX MOTION
DETECTOR
WALL STUD
REX AND DOOR CONTACT ENLARGED DETAIL
PB IC
FLOOR
DOOR
CL
12"
48"
AFF
80"
MIN
FIRE ALARM NOTIFIER
(STROBE/HORN/SPEAKER)
NOTES:
1. HEIGHTS SHOWN ARE TYPICAL TO CENTER OF BACKBOX / DEVICE UNLESS NOTED OTHERWISE.
2. DEVICES ABOVE DOORS SHALL BE CENTERED BETWEEN TOP OF DOOR TRIM AND CEILING LINE.
3. MOUNTING HEIGHTS SHOWN ON ARCHITECTURAL ELEVATIONS SHALL GOVERN OVER THOSE SHOWN ABOVE.
4. ALL ELEVATIONS ARE TO CENTER LINE OF DEVICE, UNLESS OTHERWISE NOTED.
5. REFER TO EQUIPMENT ELEVATION DRAWINGS FOR COORDINATION WITH CASEWORK.
6. MOUNT MANUAL MOTOR STARTER ADJACENT TO OR ON UNIT.
96"
MAX
6" MIN
LIGHT SWITCH (OR OCCUPANCY SENSOR/SWITCH)
PUSHBUTTON (DOOR ACTUATOR)
WALL PHONE JACK
INTERCOM
18"
AFF
VOICE/DATA OUTLET
POWER OUTLET
J
AUDIO-VISUAL INPUT JACK
J
AUDIO-VISUAL
CONTROL KEYPAD
CR
SECURITY CARD READER
4"
MAX
4"
MAX
UNDERSIDE OF
STRUCTURE
FIRE PROTECTION ZONE, BENEATH DECK
LIGHTING ZONE OR CEILING (9'-0")
CABLING ZONE TRAYS 6" ABOVE
DOOR
CABLE TRAY HVAC ZONE, LOCATION ON PLAN
T
THERMOSTAT
6" MIN
DISCONNECT
SWITCHES
M
MOTOR STARTER
PANELBOARDS &
CABINETS
INDIVIDUAL CIRCUIT BREAKERS
CK
CLOCK OUTLETS
NC
NURSE CALL
STATION
NURSE CALL DOME LIGHTS
DM
DIMMERS
FIRE ALARM - PULL STATIONS
FX
F
FIREMAN WALL PHONE JACK 90"
AFF
96"
AFF
66"
AFF
72"
AFF TO TOP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.G en er al .S he et s.
rv t
-0 3-
2:
:5
19E-501
ELECTRICAL DETAILS 620-22-700
06/27/2025 M. Perkins J. Castenir
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
NOT TO SCALE
F8 CARD READER - ELECTRIC LOCK
NOT TO SCALE
F7 CAMERA INTERIOR WALL MOUNTING
NOT TO SCALE
F3 ELECTRICAL COMPONENT MOUNTING HEIGHTS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.G en er al .S he et s.
rv t
-0 3-
2:
:1
19E-901
ELECTRICAL CUTSHEETS & BASIS OF DESIGN 620-22-700
06/27/2025 M. Perkins J. Castenir
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
4 35 ED UHL ELL14
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.G en er al .S he et s.
rv t
-0 3-
2:
:2
19E-902
ELECTRICAL CUTSHEETS & BASIS OF DESIGN 620-22-700
06/27/2025 M. Perkins J. Castenir
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
| GENERAL |
| 19G-001 - DRAWING INDEX |
| ICRA & LIFE SAFETY |
| 19GI300 - INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL |
| ELECTRICAL |
| 19E-101 - ELECTRICAL PLAN - FIRST LEVEL |
| 19E-501 - ELECTRICAL DETAILS |
| 19E-901 - ELECTRICAL CUTSHEETS & BASIS OF DESIGN |
| 19E-902 - ELECTRICAL CUTSHEETS & BASIS OF DESIGN |