ATTACHMENT 21 - Montrose.EHRM.Addendum.01.B13.20260330.pdf
PDF 24 MB Posted
- Solicitation number
- RFP-36C77626R0033
About this file
This is a comprehensive set of construction design documents (Addendum #1 dated 03/30/2026) for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at Franklin Delano Roosevelt VA Hospital in Montrose, NY. The documents include architectural, electrical, telecommunications, life safety, and infection control plans for Building 13 renovation work across multiple levels.
The project scope encompasses infrastructure upgrades to two telecom rooms (Room 102 on the first level and Room 202 on the second level), each approximately 105-110 square feet, along with associated electrical, mechanical, and telecommunications systems installation. Key requirements include: fire-rated wall construction (1-2 hour ratings depending on application), new electrical panels with normal and emergency power distribution, uninterruptible power supply (UPS) systems rated at 5KW for 208V service, Category 6A cabling infrastructure throughout both floors (279 total data ports across all areas), new IP-based access control systems (Johnson Controls iSTAR Edge G2), Avigilon IP-addressable security cameras, and comprehensive cable tray and conduit systems. Construction must maintain operational life safety systems, elevator service, and stair accessibility at all times. The project requires strict infection control and interim life safety measures (ICRA Class IV) including construction barriers, negative air pressure systems with HEPA filtration, anteroom requirements, and debris removal protocols through designated routes with asbestos abatement coordination. All work must comply with 2024-2026 building codes including NFPA 101 Life Safety Code, 2026 National Electrical Code, and VA-specific standards. Contractor responsibilities include 30-day load measurements on panelboards, fire stopping all penetrations, coordination with existing equipment protection, and provision of laminated final documentation within telecom rooms.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.B
.rv t 3/
/2
:3
5:
P M
13G-001
DRAWING INDEX 620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION
GENERAL
13G-000 COVER SHEET Yes Yes Yes Yes 13G-001 DRAWING INDEX Yes Yes Yes Yes 13G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 13G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes
ICRA & LIFE SAFETY
13GI300 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL Yes Yes Yes Yes 13GI301 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - SECOND LEVEL Yes Yes Yes Yes 13GI302 INTERIM LIFE SAFETY & INFECTION CONTROL DETAILS Yes Yes Yes Yes
ARCHITECTURAL
13A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 13A-400 ARCHITECTURAL ENLARGED VIEWS - FIRST & SECOND LEVELS Yes Yes Yes Yes 13A-401 ARCHITECTURAL EXTERIOR ELEVATIONS No Yes Yes Yes 13A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 13A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 13A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes
INTERIORS
13IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes
FIRE PROTECTION
13FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 13FX102F FIRE PROTECTION PLAN - FIRST LEVEL No Yes Yes Yes 13FX103F FIRE PROTECTION PLAN - SECOND LEVEL No Yes Yes Yes 13FX401 FIRE PROTECTION ENLARGED PLANS No Yes Yes Yes 13FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
PLUMBING
13P-001 PLUMBING ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 13PD103F PLUMBING PLAN - SECOND LEVEL No Yes Yes Yes
MECHANICAL
13M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 13M-101 MECHANICAL PLAN - GROUND LEVEL No Yes Yes Yes 13M-102F MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes 13M-103F MECHANICAL PLAN - SECOND LEVEL No Yes Yes Yes 13M-401 MECHANICAL ENLARGED PLANS No Yes Yes Yes 13M-501 MECHANICAL DETAILS No Yes Yes Yes 13M-701 MECHANICAL SCHEDULES No Yes Yes Yes 13M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 13M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 13M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 13M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
ELECTRICAL
13E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 13E-101 ELECTRICAL PLAN - GROUND LEVEL No Yes Yes Yes 13E-102F ELECTRICAL PLAN - FIRST LEVEL - FUTURE No Yes Yes Yes 13E-103F ELECTRICAL PLAN - SECOND LEVEL - FUTURE No Yes Yes Yes 13E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 13E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 13E-601 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes 13E-701 ELECTRICAL SCHEDULES No Yes Yes Yes 13E-702 ELECTRICAL SCHEDULES No Yes Yes Yes 13E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 13E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes
TELECOMMUNICATION
13T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 13T-101 TELECOMMUNICATION PLAN - GROUND LEVEL Yes Yes Yes Yes 13T-102F TELECOMMUNICATION PLAN - FIRST LEVEL - FUTURE Yes Yes Yes Yes 13T-103F TELECOMMUNICATION PLAN - SECOND LEVEL - FUTURE Yes Yes Yes Yes 13T-401 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes 13T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 13T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 13T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 13T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 13T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 13T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 13T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes 13T-700 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 13T-701 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 13T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 13T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 13T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes
REFERENCE
13R-900 PHOTO REFERENCES No Yes Yes Yes Grand total: 61
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
13G-011 REMOVED FROM
CONSTRUCTION DOCUMENTS
Ranjan Text Box
UP
DN
SD
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IPC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS (4 FLOORS)
(INCL. MECHANICAL SHAFTS) 1 HOUR (1 - 3 FLOORS)
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: RESIDENTIAL BOARD AND CARE Occupancy per Chapter 33 and BUSINESS Occupancy per Chapter 39
BUILDING OCCUPANCY TYPE:
PRIMARY - EXISTING RESIDENTIAL BOARD AND CARE, LARGE
SECONDARY - EXISTING BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Board and Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
33.3.2.5.2 COMMON PATH OF TRAVEL 75 FT
33.3.2.5.4 DEAD END 30 FT
33.3.2.6 TRAVEL DISTANCE FROM ANY 250 FT
POINT IN ROOM TO EXIT
OCCUPANT LOAD:
33.1.4 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
33.3.2 Capacity of Means of Egress.
33.3.2.3.3 The clear width of any corridor or passageway required for exit access shall not be less than 60 in. (1525 mm).
PROTECTION OF VERTICAL OPENINGS:
33.3.3.1 Protection of Vertical Openings.
33.3.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
33.3.3.2 Protection from Hazards.
33.3.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 9.7.1.1(1)
33.3.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7:
(1) Boilder and fuel-fired heater rooms
(2) Laundries
(3) Repair Shops
(4) Rooms or spaces used for storage of combustible supplies and equipment in quantities deemed hazardous by the AHJ.
33.3.3.5.7 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
SUBDIVISION OF BUILDING SPACES:
33.3.3.7 SUBDIVISION OF BUILDING SPACES
33.3.3.7.1 EVERY STORY SHALL BE DIVIDED INTO NOT LESS THAN
TWO SMOKE COMPARTMENTS.
33.3.3.7.3 THE TRAVEL DISTANCE FROM ANY POINT TO REACH A
DOOR IN THE REQUIRED SMOKE BARRIER SHALL NOT EXCEED
200 FT.
33.3.3.7.9 SMOKE BARRIERS IN ACCORDANCE WITH SECTION 8.5
SHALL HAVE A MINIMUM 1-HOUR FIRE RESISTANCE RATING.
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
FEC
17352 SF
EXISTING RESIDENTIAL -
E1 ▬ 28.1'
6 7
3 3A
TELECOM
ROOM
102102
CENTER
STAIR
101C101C
ELEVATOR
VESTIBULE
166Z166Z
ELEVATOR
144144
ELEVATOR
109109
ELEC
ROOM
101101
UDS TLT
165165
CORRIDOR
167Z167Z
TREATMENT
ROOM
103103
STORAGE
103A103A
RESIDENT
ROOM 1
118118
RESIDENT
ROOM 2
120120
TLT 14
105A105A
TLT 13
107A107A
RESIDENT
ROOM 13
107107
RESIDENT
ROOM 14
105105
RESIDENT
ROOM 15
104104
TLT 15
104A104A
SPS
CLOSET
163163
RESIDENT
ROOM 12
108108
RESIDENT
ROOM 11
109109
TLT 1
118A118A
TLT 2
120A120A
TLT 11
109A109A
TLT 12
108A108A
RESIDENT
ROOM 3
122122
RESIDENT
ROOM 4
117117
RESIDENT
ROOM 5
116116
RESIDENT
ROOM 6
123123
TLT 4
117A117A
TLT 3
122A122A
TLT 5
116A116A
TLT 6
123A123A
NURSE
STATION
128128
BARIATRIC
RESIDENT
RM 7
114114
TLT 7
114A114A
TLT 8
112A112A
BARIATRIC
RESIDENT
RM 8
112112
RESIDENT
ROOM 9
111111
TLT 9
111A111A
RESIDENT
ROOM 10
110110
TLT 10
110A110A
GROUP
ROOM 1
130130
GROUP
ROOM 2
156156
GROUP
ROOM 3
142142
STAFF
BREAK
ROOM
140140
PUBLIC
TLT
164164
PUBLIC
TOILET
125125
SOILED
LINEN
124124
BREAK
OUT
SPACE
159159
CORRIDOR
171Z171Z
OFFICE 3
154154
OFFICE 4
158158
SOUTH
STAIR
121121
NORTH
STAIR
139139
CLEAN
LINEN
115115
MED
ROOM
128A128A
CORRIDOR
169Z169Z
REFRIGERATOR
COVE
130A130A
NURSE
STATION 2
113113
KITCHENETTE
130B130B
TLT 16
126A126ARESIDENT
ROOM 16
126126
RESIDENT
ROOM 17
127127
TLT 17
127A127A
TLT 19
161A161A
RESIDENT
ROOM 19
160160
RESIDENT
ROOM 18
162162
TLT 18
162A162A
CLEAN
SUPPLIES
152152
TLT 20
134A134A RESIDENT
ROOM 20
134134
RESIDENT
ROOM 21
133133
TLT 21
133A133A
RESIDENT
ROOM 22
132132
TLT 22
132A132A
TLT 23
131A131A
RESIDENT
ROOM 23
131131
RESIDENT
ROOM 24
129129
OFFICE 5
153153
OFFICE 8
136136
OFFICE 9
137137
OFFICE 11
144144
OFFICE 7
146146
OFFICE 13
141141 OFFICE 12
143143
OFFICE 1
157157
OFFICE 2
155155
LAUNDRY
106106
PUBLIC
TLT 1
149149
PUBLIC
TLT 2
150150
ELECTRICAL
ROOM
135135
CORRIDOR
175Z175Z
CORRIDOR
173Z173Z
CORRIDOR
174Z174Z
RESIDENT
CORRIDOR
170Z170Z
RESIDENT
CORRIDOR
168Z168Z
CONFERENCE
ROOM
148148
OFFICE 10
145145
OFFICE 6
147147
EMS
CLOSET
151151
CORRIDOR
188188
TLT 24
129A129A
CORRIDOR
172Z172Z
NORTHWEST
STAIR
138138
SOUTHWEST
STAIR
119119
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t 3/
/2
5:
:4
PM
13GI300
INTERIM LIFE SAFETY & INFECTION CONTROL
PLAN - FIRST LEVEL
620-22-700
06/27/2025 M.PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0"F1 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL
1 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
2 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES
FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO BE
USED FOR ANY CONSTRUCTION ACTIVITY.
3 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL
TIMES
A
ONE ELEVATOR TO BE DESIGNATED FOR CONTRACTOR
USE. CONTRACTOR TO PROTECT / REPAIR ALL FINISHES
AND FOLLOW PROPER ICRA REMOVAL PROTOCOLS FOR
ANY MATERIALS REMOVED FROM SITE THROUGH
ELEVATOR
4 DEBRIS REMOVAL PATH TO EXTERIOR - COORDINATE
REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN
5 REMOVE EXISTING WINDOW, AC UNIT AND METAL
SUPPORT FRAME. PROVIDE TEMPORARY INFILL.
6 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -
SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
7 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
8 COORDINATE TEMPORARY HEPA EXHAUST ROUTING
OUT OF BUILDING - MAINTAIN 25 FEET MINIMUM FROM
INTAKES, OPERABLE WINDOWS, AND ENTRANCES.
PROVIDE BLOCK-OFF PANELS IN EXISTING WINDOWS
FOR DISCHARGE, TYP.
9 TEMPORARY CONSTRUCTION BARRIER
10 ANTEROOM - SEE INFECTION CONTROL & INTERIM LIFE
SAFETY DETAILS
PATH OF TRAVEL SCHEDULE - FIRST LEVEL
Mark From Room To Room Type of Travel Path Length
FIRST FLOOR
(P-o-T) Distance to Exits
E1 TELECOM ROOM 102 CENTER STAIR 101C (P-o-T) Distance to Exits 28' - 1"
NOTE:
DEBRIS REMOVAL:
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
FIRST LEVEL EXISTING RESIDENTIAL 17352 SF R4 Residential Board & Care
200 SF 0 87
# Revisions: Date:
1 ADDENDUM #1 03/27/202603/30/2026
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IPC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS (4 FLOORS)
(INCL. MECHANICAL SHAFTS) 1 HOUR (1 - 3 FLOORS)
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: RESIDENTIAL BOARD AND CARE Occupancy per Chapter 33 and BUSINESS Occupancy per Chapter 39
BUILDING OCCUPANCY TYPE:
PRIMARY - EXISTING RESIDENTIAL BOARD AND CARE, LARGE
SECONDARY - EXISTING BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Board and Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
33.3.2.5.2 COMMON PATH OF TRAVEL 75 FT
33.3.2.5.4 DEAD END 30 FT
33.3.2.6 TRAVEL DISTANCE FROM ANY 250 FT
POINT IN ROOM TO EXIT
OCCUPANT LOAD:
33.1.4 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
33.3.2 Capacity of Means of Egress.
33.3.2.3.3 The clear width of any corridor or passageway required for exit access shall not be less than 60 in. (1525 mm).
PROTECTION OF VERTICAL OPENINGS:
33.3.3.1 Protection of Vertical Openings.
33.3.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
33.3.3.2 Protection from Hazards.
33.3.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 9.7.1.1(1)
33.3.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7:
(1) Boilder and fuel-fired heater rooms
(2) Laundries
(3) Repair Shops
(4) Rooms or spaces used for storage of combustible supplies and equipment in quantities deemed hazardous by the AHJ.
33.3.3.5.7 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
SUBDIVISION OF BUILDING SPACES:
33.3.3.7 SUBDIVISION OF BUILDING SPACES
33.3.3.7.1 EVERY STORY SHALL BE DIVIDED INTO NOT LESS THAN
TWO SMOKE COMPARTMENTS.
33.3.3.7.3 THE TRAVEL DISTANCE FROM ANY POINT TO REACH A
DOOR IN THE REQUIRED SMOKE BARRIER SHALL NOT EXCEED
200 FT.
33.3.3.7.9 SMOKE BARRIERS IN ACCORDANCE WITH SECTION 8.5
SHALL HAVE A MINIMUM 1-HOUR FIRE RESISTANCE RATING.
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
FEC
17064 SF
EXISTING RESIDENTIAL -
TELECOM
ROOM
202202
ELECTRICAL
ROOM
201201
ELEVATOR
002002
ELEVATOR
001001
PUBLIC
TOILET
203203
PATIENT
BATH
204A204A
NORTH
STAIR
240240
CORRIDOR
200C5200C5
E1 ▬ 112.7'
PATIENT
BED
204204
TREATMENT
ROOM
267267
STORAGE
267A267A
PATIENT
BED
205205
ELEVATOR
LOBBY
200200
3 3A
SOUTH
STAIR
227227
NORTHWEST
STAIR
247247
PATIENT
BATH
210A210A
PATIENT
BED
220220
PATIENT
BED
219219
PATIENT
BATH
220A220A
PATIENT
BATH
218A218A
PATIENT
BATH
219A219A
PATIENT
BED
218218
PATIENT
BATH
217A217A
PATIENT
BATH
215A215A
CLEAN
SUPPLY
216216
PATIENT
BED
217217
PATIENT
BED
215215
PATIENT
BED
214214
PATIENT
BATH
214A214A
PATIENT
BED
212212
PATIENT
BATH
212A212A
PATIENT
BED
211211
PATIENT
BATH
211A211A
PATIENT
BATH
209A209A
LAUNDRY
207207
PATIENT
BED
210210
CORRIDOR
200C3200C3
PATIENT
BATH
224A224A
PATIENT
BED
224224
STAIR
PATIENT
BATH
223A223A
PATIENT
BATH
225A225A
PATIENT
BED
223223
PATIENT
BATH
222A222A
PATIENT
BED
222222
PATIENT
BATH
228A228A
PATIENT
BED
228228
PATIENT
BATH
229A229A
PATIENT
BED
229229
MED RM
231A231A
NURSE
STATION
231231
NURSE'S
OFFICE
232232
PATIENT
BATH
233A233A
PATIENT
BED
233233
PATIENT
BATH
234A234A
PATIENT
BATH
237A237A
FEMALE
PATIENT
LOUNGE
236236
HALLWAY
200C6200C6
PATIENT
BED
235235
PATIENT
BED
234234
PATIENT
BATH
235A235A
PATIENT
BED
237237
PATIENT
BATH
238A238A
PATIENT
BATH
239A239A
PATIENT
BED ADA
239239
PUBLIC
TOILET
241241
TELEHEALTH
242242
EVS
243243
CLEAN
LINEN
245245
SOILED
LINEN
246246
OFFICE
249249
STAFF
TLT
248248
GROUP
RM 1
250250
CORRIDOR
200C9200C9
OFFICE
251251
STAFF
TLT
252252
STAFF
LOUNGE
253253
OFFICE
254254
GROUP
RM 2
255255
DAY
ROOM
256256
PATIENT
BATH
257A257A
PATIENT
BED
257257
OFFICE
260260
OFFICE
258258
OFFICE
259259
STORAGE
261A261A
OFFICE
262262
OFFICE
263263
PATIENT
BATH
264A264A
PATIENT
BED
264264
PATIENT
BATH
266A266A
PATIENT
BED
266266
CLOSET
CLOSET
PATIENT
BATH
205A205A
CORRIDOR
200C4200C4
PATIENT
BATH
206A206A
PATIENT
BED
206206
PATIENT
BED
208208
PATIENT
BATH
208A208A
PATIENT
BED
209209
PATIENT
BED ADA
238238
CORRIDOR
200C8200C8
GROUP
RM 3/
CONFERENCE
RM
261261
CORRIDOR
200C7200C7
PATIENT
BED
265265
PATIENT
BATH
265A265A
PATIENT
BED
225225
ALCOVE
213213
NURSE
STATION
213A213A
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t 3/
/2
5:
:5
PM
13GI301
INTERIM LIFE SAFETY & INFECTION CONTROL
PLAN - SECOND LEVEL
620-22-700
06/27/2025 M.PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0"F1 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - SECOND LEVEL
1 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
2 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES
FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO BE
USED FOR ANY CONSTRUCTION ACTIVITY.
3 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL
TIMES
A
ONE ELEVATOR TO BE DESIGNATED FOR CONTRACTOR
USE. CONTRACTOR TO PROTECT / REPAIR ALL FINISHES
AND FOLLOW PROPER ICRA REMOVAL PROTOCOLS FOR
ANY MATERIALS REMOVED FROM SITE THROUGH
ELEVATOR
4 DEBRIS REMOVAL PATH TO EXTERIOR - COORDINATE
REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN
5 REMOVE EXISTING WINDOW, AC UNIT AND METAL
SUPPORT FRAME. PROVIDE TEMPORARY INFILL.
6 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -
SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
7 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
8 COORDINATE TEMPORARY HEPA EXHAUST ROUTING
OUT OF BUILDING - MAINTAIN 25 FEET MINIMUM FROM
INTAKES, OPERABLE WINDOWS, AND ENTRANCES.
PROVIDE BLOCK-OFF PANELS IN EXISTING WINDOWS
FOR DISCHARGE, TYP.
9 TEMPORARY CONSTRUCTION BARRIER
10 ANTEROOM - SEE INFECTION CONTROL & INTERIM LIFE
SAFETY DETAILS
PATH OF TRAVEL SCHEDULE - SECOND LEVEL
Mark From Room To Room Type of Travel Path Length
SECOND FLOOR
(P-o-T) Distance to Exits
E1 TELECOM ROOM 202 SOUTH STAIR 227 (P-o-T) Distance to Exits 112' - 8"
NOTE:
DEBRIS REMOVAL:
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
SECOND LEVEL EXISTING RESIDENTIAL 17064 SF R4 Residential Board & Care
200 SF 0 85
TEMPORARY WALL TO EXTEND
AND BE SEALED TO DECK /
FLOOR ABOVE WHEN RATED
ENCLOSURE REQUIRED
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
FI
NI
SH
ED
F
LO
OR
T O
UN
DE
RS
ID
E
OF
S
TR
UC
TU
RE
VE
RI
FY
F
LO
OR
T
O
FL
OO
R
HE
IG
HT
RENOVATED SPRINKLER
SYSTEM
WEEKLY CHANGED
OR MORE AS
NEEDED PRE-FILTER
FLEX DUCTMONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR
UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
PRESSURE INDICATOR SHALL BE AT
0.03 OR GREATER USING A DIGITAL
MANOMETER WITH DATA LOGGING. IF
NOT VERIFY ALL OPENING SUCH AS
DOOR ARE CLOSED AND/OR CHANGE
NEGATIVE AIR PRE-FILTER. DO NOT USE
A "BALL IN THE WALL" OR ANALOG
OTHER PRESSURE INDICATOR.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
OTAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
PUBLIC AREA
CONSTRUCTION AREA
ANTE ROOM
HARD BARRIER ALL THE WAY TO
DECK ABOVE
SIZE ANTE ROOM TO PROVIDE
SPACE FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS' PPE
AND CLEANING, INCLUDING A HEPA
CLOTHING VACUUM
ROUTE DUCT TO EXTERIOR - SEE
PLANS FOR PROPOSED ROUTES -
CONFIRM ROUTE WITH ON-SITE
STAFF PRIOR TO INSTALLATION.
DISCHARGE AT A DISTANCE OF 25
FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. DO NOT
DIRECT EXHAUST INTO ANY
BUILDING SHARED EXHAUST
SYSTEM.
ANTE ROOM FAN
DOOR TO BE SELF-CLOSING AND
SELF-LATCHING - 45 MIN. FIRE
RATING PER NFPA
D7
13GI302
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
1/4" = 1'-0"F7
TYPICAL CONSTRUCTION
LAYOUT- CLASS IV
1/2" = 1'-0"D7 CROSS SECTION A'-A'- CLASS IV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t 3/
/2
5:
:5
PM
13GI302
INTERIM LIFE SAFETY & INFECTION CONTROL
DETAILS
620-22-700
06/27/2025 M.PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS
DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE
(COR).
COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH
OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH
THE COR. ALL INTERIOR DOORS THAT LEAD TO THE
CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.
OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING
WORK.
THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL
BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION
AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM
CLEANER PRIOR TO LEAVING THE SITE.
FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR
OCCUPIED AREAS ON THE FLOOR.
PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;
REVIEW WITH COR AND VA SAFETY GROUP.
MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT
ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION
UNITS.
CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE
OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR
EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE
CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN
CONSTRUCTION AREA TO PREVENT CONTAMINATION OF
EXISTING DUCT SYSTEM.
REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND
VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION
AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION
AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".
GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP
A CURRENT HOT WORK PERMIT ON SITE.
TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE
SURE THEY REMAIN EFFECTIVE.
MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL
DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR
CONTAINERS.
SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES
AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN
DUST PROTECTION AND NEGATIVE AIR PRESSURE.
MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,
WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR
CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED
AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA
SHALL BE CLEANED IMMEDIATELY.
AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA
WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,
REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH
OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER
REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.
CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL
PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
ICRA SYMBOL LEGENDINFECTION CONTROL RISK
ASSESSMENT:
TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE
ACTIVITY CATEGORY
IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT
CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP
CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK
CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR
MAINTENANCE
CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR
MAINTENANCE
THIS PROJECT: CATEGORY D
TABLE 2: AFFECTED AREA ASSESSMENT
TABLE 3: PATIENT RISK CATEGORY
IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN
TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH
THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT
RISK CATEGORY FOR THE ACTIVITY.
LOW RISK: NON-PATIENT CARE AREAS
MEDIUM RISK: PATIENT CARE SUPPORT AREAS
HIGH RISK: PATIENT CARE AREAS
HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY
COMPROMISED PATIENT CARE AREAS
THIS PROJECT: HIGH RISK
CL
AS
S
II
Construction Activity Category
RISK GROUP
LOW RISK
MEDIUM RISK
HIGH RISK
HIGHEST RISK
I II II III
I II III IV
I II IV IV
II III IV IV
A
STEP 1:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 2:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 3:
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 4:
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 5:
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 6:
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 7:
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 8:
DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE
WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?
(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN
AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)
STEP 9:
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 10:
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH
THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
Affected Area Assessment
AREA
Activity Area Area Above Area Below Adjacent Area
TR
SEE PLAN
SVC TYPE POC POC CONTACT INFO
SEE PLAN
SEE PLAN
Walter Hoffman (914) 208-6275
MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED
CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO
FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF
INFECTION CONTROL ACTIVITIES REQUIRED.
THIS PROJECT: CATEGORY IV
TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL
PRECAUTIONS
B C D
TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES
BY LEVEL OF PRECAUTIONS
NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)
TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES
REQUIRED UPON COMPLETION OF THE ACTIVITY
1.
2.
1.
2.
A.
B.
C.
D.
E.
1.
2.
1.
2.
3.
1.
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures
Work Area Cleaning:
Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces
Removal of Critical Barriers:
Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
Carefully remove screws and painter tape.
If dust will be generated during screw removal, use hand-held HEPA vacuum.
Drywall cutting is prohibited during removal process Clean all stud tracks with HEPA vacuum before removing outer hard barrier Use a plastic barrier to enclose area if dust could be generated
Negative Air Requirements:
The use of negative air must be designated to remove contaminants from the work area Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC Systems:
Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed Verify that HVAC systems are clean and operational.
Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications
Water Systems:
Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA directive 1061.
CL
AS
S
III
IV
13.
14.
15.
16.
17.
18.
Ensure availability of equipment for cleaning hands Construct and complete critical barriers meeting NFPA 241 requirements.
Barriers must extend to the ceiling or if ceiling tile is removed, to deck above All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type) Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A of this document.
These control measures must be maintained continuously 24/7 for the duration of the project. HEPA filtered exhaust if discharged directly to the outdoors must be at a istance of 25 feet or greater from entrances, air intakes and operable windows. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable
4.
5.
6.
7.
8.
9.
10.
11.
12.
Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system)Ensure worker clothing is clean and free of visible dust before leaving the work area Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system Seal doors to prevent dust migration Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats just be changed routinely and when visibly soiled.
Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily
1.
2.
3.
Perform work activity in a manner that does not create dust Immediately replace ceiling tile, close access panels, etc. upon completion.
Any materials and equipment being brought into the facility must be free of contaminants and loose material
19.
20.
21.
22.
Barriers must be hard barriers unless temporary to install final barrier.
Containment must include an anteroom to ensure pressure control.
Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable Workers must wear shoe covers or have a method to clean shoes in anteroom. Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
CL
AS
S I
CL
AS
S
III
CL
AS
S
IV
YES
N/A
N/A
N/A
N/A
AFTER-HOURS WORK TO BE COORDINATED WITH VA COR
COORDINATE WITH VA COR ON PATIENT CARE FLOORS
TEMPORARY WALLS TO BE 1-HR RATED - PREFABRICATED
WALLS / DOOR PREFERRED
TECHNOLOGY AND ELECTRICAL FOCUSED WORK -
MINIMAL PLUMBING OR MECHANICAL IMPACT
MINOR INTERIOR RENOVATION IN EXISTING BUSINESS
OCCUPANCY AREAS - SEE PLAN
Walter Hoffman (914) 208-6275 Walter Hoffman (914) 208-6275 Walter Hoffman (914) 208-6275
NTSF2 TYPICAL ICRA PRODUCTS
DN
UP
UP
DN
UP
DN
SHEET SYMBOL LEGEND
KEYNOTES
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A1
A.
B.
C.
D.
E.
F.
G.
H.
I.
SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
NEW TELECOM ROOMS SHALL COMPLY WITH THE LATEST VA
PHYSICAL SECURITY STANDARDS, AND CAMPUS STANDARDS.
SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
SEE TYPICAL CEILING DETAILS ON SHEET A-531
PROVIDE TEMPORARY AIR TIGHT BARRIER AROUND WORK AREA
DURING ANY ACTIVITIES WHICH PRODUCE DUST, TYPICAL.
MAINTAIN CLEAR EXIT PATHS AND STAIRS AT ALL TIMES.
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
NO SCOPE
13A-400 D3
TELECOM
ROOM
110 SF
B
B B
B
EXTG VIF
9'-4"
EX
TG
V
IF
'-0
4'-3"
(EXTG V.I.F.)
1'-1"5
B1 13A-511
IT CLOSET
102102
IT CLOSET
102102
ELEVATOR
93 SF
ELEVATOR
72 SF
ELEVATOR
VESTIBULE
166Z
95 SF
CENTER
STAIR
101C101C
TELECOM
ROOM
110 SF 78
PATH OF REMOVAL
FROM ELEVATOR
TO EXTERIOR
PROVIDE DUMPSTER 35' MINIMUM FROM
ANY BUILDING, AND 6'-0" HIGH
TEMPORARY CONSTRUCTION FENCE AND
GATE. TO BE LOCKED AT ALL TIMES,
PROVIDE COR WITH KEY. COORDINATE
FINAL LOCATION WITH COR
PROVIDE CART FOR DAILY
WASTE REMOVAL
COORDINATE FINAL
LOCATION WITH COR
LOADING DOCKS WILL BE IN
USE DURING CONSTRUCTION.
COORDINATE ANY
CONSTRUCTION VEHICULAR
ACTIVITY TO ENSURE ACCESS
TO LOADING AREAS ARE NOT
IMPEDED.
TRANSITE PANELS
TP
100 SF ± TRANSITE PANELS BEHIND
RADIATOR, MASTIC AND CAULKING
(AT WINDOWS) TO BE ABATED
GROUND FLOOR
TP10
TELECOM
ROOM
105 SF
B
B
B
B
EXTG VIF
11'-2"
EX
TG
V
IF
9'- 2"
3'-10"
(EXTG V.I.F.)
4'-3" 5
B1 13A-511
IT ROOM
202202
IT ROOM
202202
13A-400 D8
TELECOM
ROOM
105 SF
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t 3/
/2
5:
:0
PM
13A-400
ARCHITECTURAL ENLARGED VIEWS - FIRST &
SECOND LEVELS
620-22-700
06/27/2025 M.PERKINS N.
BLANCHARD
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1 REMOVE EXISTING DOOR AND FRAME.
2 REMOVE EXISTING FLOORING AND WALL BASE.
3 EXISTING CEILING TO REMAIN.
4 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C
FIRE EXTINGUISHER LOCATED NO GREATER THAN 75 FEET AWAY
FROM THE NEW TR. CONTRACTOR SHALL BID A NEW FEC FOR EACH
TR IN THE SCOPE OF WORK. SEE SPECIFICATION 10 44 13.
5 NEW INFILL AT EXTERIOR. NEW WALL TO MATCH EXISTING.
6 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA
DURING ANY ACTIVITIES WHICH PRODUCE DUST - TYPICAL
7 TELECOM ROOM TO BE OPEN TO DECK ABOVE.
8 REMOVE EXISTING ACOUSTICAL CEILING AND LIGHTS. MODIFY
AND/OR PROVIDE ADDITIONAL SUPPORTS AS REQUIRED FOR
EXISTING CEILING ITEMS TO REMAIN.
9 NEW DOOR. SEE DOOR SCHEDULE AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION. COORDINATE DOOR AND FRAME WITH
ACCESS CONTROL HARDWARE.
10 ABATE TRANSITE PANEL BEHIND RADIATOR BELOW WINDOW
11 ACCESS DOOR PER SPECIFICATION, COR TO CONFIRM LOCATION
AND MOUNTING HEIGHT.
12 REMOVE EXISTING WINDOW. PROVIDE TEMPORARY INFILL.
13 EXISTING STAIR TO BE REMOVED BY VA, PRIOR TO START OF EHRM
PROJECT.
14 ANY NEW GROUND LEVEL CHILLER PIPES ATTACHED TO EXTERIOR
WALLS SHALL BE PAINTED IN THEIR ENTIRETY TO MATCH BRICK
COLOR. REQUIREMENT OF NEW YORK STATE PARKS, RECREATION
AND HISTORIC PRESERVATION (SHPO) DOCUMENT 24PR00345
JFXVGRV7XYPA DATED DECEMBER 9,2024.
15 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW WALL
IN ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE WALL SPAN
OR APPROPRIATE TRANSITION LOCATION AS APPROVED BY THE
COR. OR CAMPUS INTERIOR DESIGNER.
1/32" = 1'-0"F3 FIRST LEVEL REFERENCE PLAN
1/4" = 1'-0"D3
ARCHITECTURAL ENLARGED FLOOR PLAN -
FIRST LEVEL - ROOM 102 - NEW
1/4" = 1'-0"D1
ARCHITECTURAL ENLARGED FLOOR PLAN -
FIRST LEVEL - ROOM 102 - DEMO
1/4" = 1'-0"B3
ARCHITECTURAL REFLECTED CEILING PLAN -
FIRST LEVEL - ROOM 102 - NEW
1/4" = 1'-0"B2
ARCHITECTURAL REFLECTED CEILING PLAN -
FIRST LEVEL - ROOM 102 - DEMO
1/32" = 1'-0"F7 SECOND LEVEL REFERENCE PLAN
1/4" = 1'-0"D8
ARCHITECTURAL ENLARGED FLOOR PLAN -
SECOND LEVEL - ROOM 202 - NEW
1/4" = 1'-0"D6
ARCHITECTURAL ENLARGED FLOOR PLAN -
SECOND LEVEL - ROOM 202 - DEMO
1/4" = 1'-0"B8
ARCHITECTURAL REFLECTED CEILING PLAN -
SECOND LEVEL - ROOM 202 - NEW
1/4" = 1'-0"B6
ARCHITECTURAL REFLECTED CEILING PLAN -
SECOND LEVEL - ROOM 202 - DEMO
NTSF4 SITE DIAGRAM - BUILDING 13
SUMMARY OF ESTIMATED QUANTITY OF ASBESTOS CONTAINING
MATERIAL TO BE REMOVED
1.
2.
3.
4.
FLOORING 0 SF ANTICIPATED
LEAD-CONTAINING PAINT 0 SF ANTICIPATED
NOTES:
ABATEMENT SCOPE INCLUDES DEMO WORK AS REQUIRED TO ACCESS ACM.
CONTRACTOR TO FIELD VERIFY QUANTITIES.
CONTRACTOR TO AVOID DISRUPTION OF ACM WIRING LOCATIONS. PROVIDE
COORDINATION DRAWINGS TO LOCATE ANY ACM CONTAINING ITEMS IN CHASES
OR PLENUMS THAT CANNOT BE AVOIDED.
REFER TO ACM REPORTS IN SPECIFICATIONS.
CONFERENCE ROOM
15E
OFFICE
15F
OFFICE
15D
OFFICE
15C
OFFICE
15G
MENTAL HEALTH
15H
TOILET
15B
STAFF LOUNGE
15AMECHANICAL CLOSET
OFFICE
15I
UNION OFFICE
UNION OFFICE
STORAGE
ELEV. SERVICE ROOM
STAIRS
PHONE CLOSET
1A
OFFICE
14D
GYM / REHAB CLINIC
NORTH STAIR
HOUSE-KEEPING
SHOWER ROOM
11A
MALE LOCKER ROOM
TRANSFORMER ROOM
14E
TOILET
14B
STORAGE
STORAGE
4D
VACANT
OFFICE
4A
OFFICE
4B
STORAGE
4C
RECEIVING AREA
TOILET
6B
HALL
6D
TOILET
6C
TOILET
6A1
PIPE CHASE
6A
CANTEEN RETAIL STORE
6E
SOUTH STAIR
OFFICE
OFFICE
TOILET
10B
SUPPLY CLOSET
10A
MENTAL HEALTH
OFFICE
10G
OFFICE
10F
OFFICE
10E1
CONFERENCE ROOM
10E
OFFICE
6F
KITCHEN
6G
HALLWAY
STORAGE
STORAGE
9A
TELEPHONE CLOSET
1B
CANTEEN DINING AREA
PIPE SPACE
14A
PIPE SPACE
14F
CLOSET
3A
CLOSET
9B
SOUTHWEST STAIR
Room
Room
CLOSET
15K
TOILET
14G
GYM / REHAB CLINIC
B13-MDPB
13E-401 F3
13E-401 F1
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
GENERAL NOTES
KEYNOTES
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.B
.rv t 3/
/2
5:
:2
PM
13E-101
ELECTRICAL PLAN - GROUND LEVEL 620-22-700
06/27/2025 M. Perkins J. Castenir
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
PROVIDE NEW 16" x 4" BONDING BAR, SET OF INSULATORS STAND-OFF
BRACKETS, AND STAINLESS STEEL SCREWS. PROVIDE ALL GROUNDING CABLE
AND CONNECTORS AND INSTALL PER TYPICAL DETAIL ON T-500 SERIES SHEETS.
NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH
NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V 3-PHASE
CIRCUIT AND RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES
SHEETS FOR MORE DETAILS. ADDITIONALLY PROVIDE ADEQUATE RACK RAIL KIT
AND NIC FOR THE ASSOCIATED UPS.
PROVIDE ONE NEW EMERGENCY AND ONE NEW NORMAL POWER BRANCH
120/208 TPST CIRCUIT BREAKER FED FROM ABOVE FOR EACH RACK UPS
CIRCUIT. PROVIDE NEW CONDUIT, CONDUCTORS, AND DEVICES TO SUPPLY
EACH NEW RECEPTACLE. SEE T-500 SERIES SHEETS FOR MORE DETAILS.
NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE FOR ADDITIONAL
INFORMATION.
NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE FOR
ADDITIONAL INFORMATION.
NEW GFCI WET LOCATION RATED SERVICE RECEPTACLE. PROVIDE WITH A
WEATHERPROOF, EXTRA-DUTY, IN-USE COVER PER NEC 406.9.
NEW MECHANICAL INDOOR AND OUTDOOR UNITS, SEE MECHANICAL SHEETS
FOR ADDITIONAL INFORMATION.
NOT USED.
NOT USED.
PROVIDE AND INSTALL NEW JOHNSON CONTROLS iSTAR EDGE G2 IP-BASED
ACCESS CONTROL PANEL. PROVIDE LIFESAFETY POWER (LSP) PSX UNIFIED
ENCLOSURE WITH INTEGRATED BACKUP BATTERIES PROVIDING A MINIMUM OF 4
HOURS OF STANDBY POWER.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .