This is an architectural drawing index and associated construction drawings for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at Franklin Delano Roosevelt VA Hospital in Montrose, New York. The project (620-22-700) is a competitive small business set-aside issued by the Department of Veterans Affairs Technology Acquisition Center Austin.

The construction scope encompasses infrastructure upgrades across three floors of Building 14, a fully sprinklered facility classified as Type II construction per NFPA 220. Work includes demolition of existing conditions, hazardous material abatement (asbestos-containing materials, lead-based paint, and transite panels), fire protection system renovations, interim life safety measures, and installation of new telecommunications and electrical systems. Major components include new telecom rooms on the first and second levels with Category 6A cabling, electrical panel upgrades, mechanical unit replacements, access control systems, fire protection upgrades, and architectural modifications involving new partitions and wall infills. The project must maintain occupied spaces during construction, with specific infection control and interim life safety protocols required per ICRA standards. Construction documents are issued at 100% completion level with addendum dated March 30, 2026, addressing drawing revisions and removal of sheet 14G-011. Building codes referenced include 2024 NFPA 101 Life Safety Code, 2026 National Electrical Code, 2024 International Building Code, and VA-specific standards. The contractor must coordinate with the VA Contracting Officer Representative on all phasing, debris removal, hazardous material containment, and occupied space protection throughout execution.

View the file

Other files

File Type Posted
Amend 5 - B04.20260330.pdf PDF
Amend 5 - B14.20260330.pdf PDF
Amend 5 - B15.20260330.pdf PDF
Amend 5 - B17.20260330.pdf PDF
Amend 5 - B20.20260330.pdf PDF
Amend 5 - B28.20260330.pdf PDF
Amendment 4 - 36C77626R0033 0004.pdf PDF
Clause 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
RFI TRACKING SHEET - SOLICITATION 36C77626R0033.pdf PDF
ATTACHMENT 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260410.pdf PDF
ATTACHMENT 5 - 01 00 00.D - Appendix D - SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
ATTACHMENT 11 - 01 00 00.I - Appendix I - K9245005 VAMC EHRM Montrose NY GeoReport 4.12.2024.pdf PDF
ATTACHMENT 12A - Summary.Log.Add01_20260410.pdf PDF
ATTACHMENT 13 - Montrose.EHRM.Addendum.01.B01.20260330.pdf PDF
ATTACHMENT 14 - Montrose.EHRM.Addendum.01.B02.20260330.pdf PDF
ATTACHMENT 25 - Montrose.EHRM.Addendum.01.B17.20260330.pdf PDF
ATTACHMENT 26A - Montrose.EHRM.Addendum.01.B19.20260330.pdf PDF
ATTACHMENT 30 - Montrose.EHRM.Addendum.01.B29.20260330.pdf PDF
ATTACHMENT 31 - Montrose.EHRM.Addendum.01.B31.20260330.pdf PDF
Amendment 3 - 36C77626R0033 0003.pdf PDF
ATTACHMENT 4 - 01 00 00.C - Appendix C - SOP 138-22HV CONST STD PROCEDURES QLTY ASSRNCE FOR PRJS.pdf PDF
ATTACHMENT 6 - 01 00 00.E - Appendix E - VHA ICRA-1.3 Dec 9 2024.pdf PDF
ATTACHMENT 9 - 01 00 00.H - Appendix H - J2237038 Montrose ACM and Lead Paint Inspection Report Final 8-21-2023.pdf PDF
ATTACHMENT 10 - 01 00 00.H1 - Appendix H1 - J2247041 Montrose NY VAMC_ACM Inspctn - Lead Paint Screening Rpt_Final 5-9-2024 - signed.pdf PDF
ATTACHMENT 15 - Montrose.EHRM.Addendum.01.B03.20260330.pdf PDF
ATTACHMENT 17 - Montrose.EHRM.Addendum.01.B05.20260330.pdf PDF
ATTACHMENT 19 - Montrose.EHRM.Addendum.01.B07.20260330.pdf PDF
ATTACHMENT 20 - Montrose.EHRM.Addendum.01.B12.20260330.pdf PDF
ATTACHMENT 26 - Montrose.EHRM.Addendum.01.B18.20260330.pdf PDF
Site visit sign-in sheet 3-23-26.pdf PDF
Amendment 1 - 36C77626R0033 0001.pdf PDF
RFP - 36C77626R0033.pdf PDF
Attachment 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
Attachment 4 - 01 00 00.C - Appendix C1 SOP 138-22HV CONST STD PROCEDURES QA FOR PROJECTS.pdf PDF
Attachment 5 - 01 00 00.D - Appendix D1 SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
Attachment 16 - Drawing B04 20250627.pdf PDF
Attachment 18 - Drawing B06 20250627.pdf PDF
Attachment 22 - Drawing B14 20250627.pdf PDF
Attachment 27 - Drawing B20 20250627.pdf PDF
Attachment 29 - Drawing B28 20250627.pdf PDF
Attachment 32 - Drawing B52 20250627.pdf PDF
Attachment 36 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 10 - 01 00 00.H1 - Appendix H1 - J2247041 ACM Insp - Lead Paint Rpt_Final 5-9-2024.pdf PDF
Attachment 17 - Drawing B05 20250627.pdf PDF
Attachment 20 - Drawing B12 20250627.pdf PDF
Attachment 24 - Drawing B16 20250627.pdf PDF
Attachment 25 - Drawing B17 20250627.pdf PDF
Attachment 30 - Drawing B29 20250627.pdf PDF
Attachment 38 - PPQ.docx DOCX document
Attachment 40 - RFI TRACKING SHEET - SOLICITATION 36C77626R0033 - Project 620-22-700.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .M

EP

.B

.rv t 3/

/2

:2

9:

P M

14G-001

DRAWING INDEX 620-22-700

06/27/2025 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

- DRAWING INDEX -

SHEET

NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION

GENERAL

14G-000 COVER SHEET Yes Yes Yes Yes 14G-001 DRAWING INDEX Yes Yes Yes Yes 14G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 14G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes

ICRA & LIFE SAFETY

14GI300 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - GROUND LEVEL No Yes Yes Yes 14GI301 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL No Yes Yes Yes 14GI302 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - SECOND LEVEL No Yes Yes Yes 14GI303 INTERIM LIFE SAFETY & INFECTION CONTROL DETAILS No Yes Yes Yes

HAZARDOUS

14H-101 HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL No Yes Yes Yes 14H-102 HAZARDOUS MATERIAL ABATEMENT PLAN - SECOND FLOOR No Yes Yes Yes

ARCHITECTURAL

14A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 14A-400 ARCHITECTURAL ENLARGED VIEWS - GROUND & FIRST LEVEL No Yes Yes Yes 14A-401 ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL No Yes Yes Yes 14A-402 ARCHITECTURAL EXTERIOR ELEVATIONS Yes Yes 14A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 14A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 14A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes

INTERIORS

14IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes

FIRE PROTECTION

14FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 14FX102 FIRE PROTECTION PLAN - FIRST LEVEL No Yes Yes Yes 14FX102F FIRE PROTECTION PLAN - FIRST LEVEL - FUTURE No Yes Yes Yes 14FX103 FIRE PROTECTION PLAN - SECOND LEVEL No Yes Yes Yes 14FX103F FIRE PROTECTION PLAN - SECOND LEVEL - FUTURE No Yes Yes Yes 14FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

PLUMBING

14P-001 PLUMBING ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 14PD-103 PLUMBING PLAN - SECOND LEVEL No Yes Yes Yes

MECHANICAL

14M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 14M-101 MECHANICAL PLAN - GROUND LEVEL No Yes Yes Yes 14M-102 MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes 14M-102F MECHANICAL PLAN - FIRST LEVEL - FUTURE No Yes Yes Yes 14M-103 MECHANICAL PLAN - SECOND LEVEL No Yes Yes Yes 14M-103F MECHANICAL PLAN - SECOND LEVEL - FUTURE No Yes Yes Yes 14M-401 MECHANICAL ENLARGED PLANS No Yes Yes Yes 14M-401F MECHANICAL ENLARGED PLANS - FUTURE No Yes Yes Yes 14M-501 MECHANICAL DETAILS No Yes Yes Yes 14M-701 MECHANICAL SCHEDULES No Yes Yes Yes 14M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 14M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 14M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 14M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

ELECTRICAL

14E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 14E-101 ELECTRICAL PLAN - GROUND LEVEL No Yes Yes Yes 14E-102 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes 14E-102F ELECTRICAL PLAN - FIRST LEVEL - FUTURE No Yes Yes Yes 14E-103 ELECTRICAL PLAN - SECOND LEVEL No Yes Yes Yes 14E-103F ELECTRICAL PLAN - SECOND LEVEL - FUTURE No Yes Yes Yes 14E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 14E-402 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 14E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 14E-601 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes 14E-701 ELECTRICAL SCHEDULES No Yes Yes Yes 14E-702 ELECTRICAL SCHEDULES No Yes Yes Yes 14E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 14E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes

TELECOMMUNICATION

14T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 14T-101 TELECOMMUNICATION PLAN - GROUND LEVEL Yes Yes Yes Yes 14T-102 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes 14T-102F TELECOMMUNICATION PLAN - FIRST LEVEL - FUTURE Yes Yes Yes Yes 14T-103 TELECOMMUNICATION PLAN - SECOND LEVEL Yes Yes Yes Yes 14T-103F TELECOMMUNICATION PLAN - SECOND LEVEL - FUTURE Yes Yes Yes Yes 14T-401 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes 14T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 14T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 14T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 14T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 14T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 14T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 14T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes 14T-700 TELECOMMUNICATION SCHEDULES Yes Yes Yes Yes 14T-701 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 14T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 14T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 14T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes

REFERENCE

14R-900 PHOTO REFERENCES Yes Yes Yes Yes Grand total: 74

# Revisions: Date:

1 ADDENDUM #1 03/30/2026

14G-011 REMOVED FROM

CONSTRUCTION DOCUMENTS

sagar Text Box

E1 ▬ 40.6'

Room 1A1A

Room 1B1B

ELEVATOR

E-1E-1Room

1C1C

ELEV

MACHINE

RM

22A22A

STORAGE

CORRIDOR

CORRIDOR

NORTH

STAIR

3 3A

18291 SF

EXISTING BUSINESS -

FEC

MIN

4'-4" CLR

STAIR

HALL 1

ENTRY

OFFICE

19A19A

MAIL

ROOM

19B19B

OFFICE

19C19C

MAIL

PICKUP

POSTAL

SERV

19D19D

ELECTRICAL

NOURISH

KITCHEN

PREP

OFFICE

STORAGE

STORAGE

COOLER

RM

RESTROOM

6B6BOFFICE

6F6F

LINEN

CLOSET

6G6G

EQUIPMENT

6H6H

TELEWORK

RECEPTION

SECRETARIAL

OFFICE

8L8L

SECT II

8K8K

LAV

8J8J

CLOSET

8H8H

SECT I

8G8G

OFFICE

8D-18D-1

CONF

ROOM

8F8F

UPPER

PART OF

SERVICE

ROOM

OFFICE

(VACANT)

CHAPLAIN'S

OFFICE

CLOSET

TOILET

13A13A

EDUCATION

STORAGE

13B13B

ATTENDANT

LOCKER

ROOM

TOILET

SHOWER

14A14A

JAN

STORAGE

17A17A

PATIENT

TOILET

17B17B

TOILET

21A21A

ART

THERAPY

ELECTRICAL

8Z8Z

ELEVATOR

TOILET

11A11A

CORRIDOR

CORRIDOR

TOILET

8A8A

EMPLOYEE

RELAXATION

ROOM

6C6C

OFFICE

6E6E

EXAM/TELE

HEALTH

6D16D1

SWING

SPACE

6D6D

CORRIDOR

ROOM

6A6A

CLOSET

6D26D2

OFFICE

8D8D

STORAGE

8E8E

TV

SYSTEM

8B8B

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

LIFE SAFETY SYMBOLS

PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES

REFER TO SCHEDULE)

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

• 2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL

FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD

FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF

NFPA 5000 AND NFPA 900

• 2024 INTERNATIONAL MECHANICAL CODE (IPC)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2026 NATIONAL ELECTRICAL CODE (NEC)

• 2024 INTERNATIONAL PLUMBING CODE (IPC)

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION

(AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE

170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2024

• 2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED

BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE

STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

• VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS (4 FLOORS)

(INCL. MECHANICAL SHAFTS) 1 HOUR (1 - 3 FLOORS)

MEDICAL GAS / HAZARDOUS 1 HOUR

STORAGE

CLASSIFICATION OF OCCUPANCY:

EXISTING: RESIDENTIAL BOARD AND CARE Occupancy per Chapter 33 and BUSINESS Occupancy per Chapter 39

BUILDING OCCUPANCY TYPE:

PRIMARY - EXISTING RESIDENTIAL BOARD AND CARE, LARGE

SECONDARY - EXISTING BUSINESS OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Board and Care and Business

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

33.3.2.5.2 COMMON PATH OF TRAVEL 75 FT

33.3.2.5.4 DEAD END 30 FT

33.3.2.6 TRAVEL DISTANCE FROM ANY 250 FT

POINT IN ROOM TO EXIT

OCCUPANT LOAD:

33.1.4 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

MEANS OF EGRESS:

33.3.2 Capacity of Means of Egress.

33.3.2.3.3 The clear width of any corridor or passageway required for exit access shall not be less than 60 in. (1525 mm).

PROTECTION OF VERTICAL OPENINGS:

33.3.3.1 Protection of Vertical Openings.

33.3.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

33.3.3.2 Protection from Hazards.

33.3.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 9.7.1.1(1)

33.3.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7:

(1) Boilder and fuel-fired heater rooms

(2) Laundries

(3) Repair Shops

(4) Rooms or spaces used for storage of combustible supplies and equipment in quantities deemed hazardous by the AHJ.

33.3.3.5.7 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

SUBDIVISION OF BUILDING SPACES:

33.3.3.7 SUBDIVISION OF BUILDING SPACES

33.3.3.7.1 EVERY STORY SHALL BE DIVIDED INTO NOT LESS THAN

TWO SMOKE COMPARTMENTS.

33.3.3.7.3 THE TRAVEL DISTANCE FROM ANY POINT TO REACH A

DOOR IN THE REQUIRED SMOKE BARRIER SHALL NOT EXCEED

200 FT.

33.3.3.7.9 SMOKE BARRIERS IN ACCORDANCE WITH SECTION 8.5

SHALL HAVE A MINIMUM 1-HOUR FIRE RESISTANCE RATING.

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

X - XX'

# ICRA SYMBOLSKEYNOTES

OCCUPANCY SEPARATION

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

201 E. Jefferson Street, Suite 200

Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

A u to d e s k D o c s /6

-2

-7

M o n tr o s e V

A M

C E

H R

M I U

/6

-2

-7

.M o n tr o s e

.E H

R M

.A R

C H

.B

.r v t

/3

/2

:2

:4

A

M

14GI300

INTERIM LIFE SAFETY & INFECTION CONTROL

PLAN - GROUND LEVEL

620-22-700

06/27/2025 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1/8" = 1'-0" F1

INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - GROUND LEVEL

1 TEMPORARY CONSTRUCTION BARRIER DOOR WITH

CLOSER AND LATCH AND WALK OFF MATS

2 STAIRS ARE TO REMAIN OPERATIONAL AT ALL

TIMES FOR EMERGENCY EGRESS ONLY. THEY ARE

NOT TO BE USED FOR ANY CONSTRUCTION

ACTIVITY.

3 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL

TIMES

3A ONE ELEVATOR TO BE DESIGNATED FOR

CONTRACTOR USE. CONTRACTOR TO PROTECT /

REPAIR ALL FINISHES AND FOLLOW PROPER ICRA

REMOVAL PROTOCOLS FOR ANY MATERIALS

REMOVED FROM SITE THROUGH ELEVATOR

4 DEBRIS REMOVAL PATH TO EXTERIOR -

COORDINATE REMOVAL OF MATERIALS ON THIS

FLOOR WITH ASBESTOS REPORT AND PLAN

5 ANTEROOM - SEE INFECTION CONTROL & INTERIM

LIFE SAFETY DETAILS

6 SOLID GRAY HATCH DENOTES LIMITED WORK AREA

- SEE MEP AND TELECOM DRAWINGS FOR CABLING

SCOPE, TYP.

7 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL

TIMES

8 COORDINATE TEMPORARY HEPA EXHAUST

ROUTING OUT OF BUILDING - MAINTAIN 25 FEET

MINIMUM FROM INTAKES, OPERABLE WINDOWS,

AND ENTRANCES. PROVIDE BLOCK-OFF PANELS IN

EXISTING WINDOWS FOR DISCHARGE, TYP.

9 TEMPORARY CONSTRUCTION BARRIER

PATH OF TRAVEL SCHEDULE - GROUND LEVEL

Mark From Room To Room Type of Travel Path Length

GROUND FLOOR

(P-o-T) Distance to Exits

E1 Room 1A (P-o-T) Distance to Exits 40' - 8"

NOTE:

DEBRIS REMOVAL:

COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH

ASBESTOS REPORT AND PLAN.

CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF

MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA

PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO

REMOVAL OF ANY MATERIALS.

SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING

CONSTRUCTION.

LIFE SAFETY:

NEW WORK DOES NOT CHANGE EXISTING SMOKE

COMPARTMENTS, EXIT PATHWAYS, OR EXITS.

AREA OCCUPANCIES

LEVEL Name Area SF

Occupancy Requirements

OL

Occupancy

(IBC) Occupancy (NFPA) OLF Fixed Seats

GROUND LEVEL EXISTING BUSINESS 18921 SF B Business 150 SF 0 126

# Revisions: Date:

1 ADDENDUM #1 03/30/2026

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

LIFE SAFETY SYMBOLS

PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES

REFER TO SCHEDULE)

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

• 2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL

FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD

FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF

NFPA 5000 AND NFPA 900

• 2024 INTERNATIONAL MECHANICAL CODE (IPC)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2026 NATIONAL ELECTRICAL CODE (NEC)

• 2024 INTERNATIONAL PLUMBING CODE (IPC)

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION

(AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE

170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2024

• 2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED

BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE

STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

• VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS (4 FLOORS)

(INCL. MECHANICAL SHAFTS) 1 HOUR (1 - 3 FLOORS)

MEDICAL GAS / HAZARDOUS 1 HOUR

STORAGE

CLASSIFICATION OF OCCUPANCY:

EXISTING: RESIDENTIAL BOARD AND CARE Occupancy per Chapter 33 and BUSINESS Occupancy per Chapter 39

BUILDING OCCUPANCY TYPE:

PRIMARY - EXISTING RESIDENTIAL BOARD AND CARE, LARGE

SECONDARY - EXISTING BUSINESS OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Board and Care and Business

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

33.3.2.5.2 COMMON PATH OF TRAVEL 75 FT

33.3.2.5.4 DEAD END 30 FT

33.3.2.6 TRAVEL DISTANCE FROM ANY 250 FT

POINT IN ROOM TO EXIT

OCCUPANT LOAD:

33.1.4 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

MEANS OF EGRESS:

33.3.2 Capacity of Means of Egress.

33.3.2.3.3 The clear width of any corridor or passageway required for exit access shall not be less than 60 in. (1525 mm).

PROTECTION OF VERTICAL OPENINGS:

33.3.3.1 Protection of Vertical Openings.

33.3.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

33.3.3.2 Protection from Hazards.

33.3.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 9.7.1.1(1)

33.3.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7:

(1) Boilder and fuel-fired heater rooms

(2) Laundries

(3) Repair Shops

(4) Rooms or spaces used for storage of combustible supplies and equipment in quantities deemed hazardous by the AHJ.

33.3.3.5.7 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

SUBDIVISION OF BUILDING SPACES:

33.3.3.7 SUBDIVISION OF BUILDING SPACES

33.3.3.7.1 EVERY STORY SHALL BE DIVIDED INTO NOT LESS THAN

TWO SMOKE COMPARTMENTS.

33.3.3.7.3 THE TRAVEL DISTANCE FROM ANY POINT TO REACH A

DOOR IN THE REQUIRED SMOKE BARRIER SHALL NOT EXCEED

200 FT.

33.3.3.7.9 SMOKE BARRIERS IN ACCORDANCE WITH SECTION 8.5

SHALL HAVE A MINIMUM 1-HOUR FIRE RESISTANCE RATING.

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

X - XX'

# ICRA SYMBOLSKEYNOTES

OCCUPANCY SEPARATION

E1 ▬ 118.3'

STAFF

LOUNGE

102102

TELECOM

ROOM

202202

RECEPTION

/ WAITING

101A101A

ELEVATOR

LOBBY

101101

ELEVATOR

100E-1100E-1

EXAM

ROOM

100A100A

CORRIDOR

174Z174Z

STAIR

HALL 2

137137

CORRIDOR

177Z177Z

FEC

6 7

3 3A

17569 SF

EXISTING BUSINESS -

STAIR

HALL 1

123123

COMPUTER

LAB

108108

OFFICE

109109

OFFICE

103103

TOILET

124124

OFFICE

118A118A

OFFICE

118118

OFFICE

106106

STOR.

113113

TOILET

112112

SHOWER

111A111A

TOILET

TOILET

114A114A

TOILET

114B114B

STORAGE

116116

DEBRIEFING

ROOM

115115

PREP

ROOM

122122

STORAGE

121121

OFFICE

117117

OFFICE

119119

OFFICE

125125 OFFICE -

CHIEF

126126

OFFICE

126B126B

SWING

OFFICE

127127

LARGE

CLASSROOM

128128

TOILET

129129

STORAGE

131131

STORAGE

132132

HAC

133133

C&P

OFFICES

134134

C&P EXAM

ROOM

135135

HAC

136136

TOILET

146146

SHARED

OFFICE

139139

SHARED

OFFICE

140140

STORAGE

149149

SHARED

OFFICE

142142

STORAGE

151151

SHARED

OFFICE

144144

CONF.

ROOM

145145

PRINT /

COPY

148148

SHOWERS

149B149B

OFFICE

150150

SHARED

OFFICE

SHARED

OFFICE

152152

SHARED

OFFICE

153153

SHARED

OFFICE

154154

EXAM

ROOM

155155

EXAM

ROOM

156156

C&P EXAM

ROOM

166166

C&P EXAM

ROOM

167167

TOILET

168C168C

TOILET

100B100B

TRAINING

ROOM

114114

STAFF

BATHROOM

106A106A

OFFICE

105105

OFFICE

104104

CORRIDOR

170Z170Z

MEETING

ROOM

107107

TELECOM

168A168A

SHARED

OFFICE

168168

STORAGE

147147

BREAK

ROOM

MEN'S

RESTROOM

CORRIDOR

179Z179Z

CORRIDOR

180Z180Z

CORRIDOR

172Z172Z

CORRIDOR

170ZS170ZS

CORRIDOR

173Z173Z

CORRIDOR

175Z175Z

CORRIDOR

178Z178Z

ELEVATOR

CORRIDOR

171Z171Z

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

201 E. Jefferson Street, Suite 200

Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

A u to d e s k D o c s /6

-2

-7

M o n tr o s e V

A M

C E

H R

M I U

/6

-2

-7

.M o n tr o s e

.E H

R M

.A R

C H

.B

.r v t

/3

/2

:2

:4

A

M

14GI301

INTERIM LIFE SAFETY & INFECTION CONTROL

PLAN - FIRST LEVEL

620-22-700

06/27/2025 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1/8" = 1'-0" F1

INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL

1 TEMPORARY CONSTRUCTION BARRIER DOOR WITH

CLOSER AND LATCH AND WALK OFF MATS

2 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES

FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO BE

USED FOR ANY CONSTRUCTION ACTIVITY.

3 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL

TIMES

3A ONE ELEVATOR TO BE DESIGNATED FOR CONTRACTOR

USE. CONTRACTOR TO PROTECT / REPAIR ALL

FINISHES AND FOLLOW PROPER ICRA REMOVAL

PROTOCOLS FOR ANY MATERIALS REMOVED FROM

SITE THROUGH ELEVATOR

4 DEBRIS REMOVAL PATH TO EXTERIOR - COORDINATE

REMOVAL OF MATERIALS ON THIS FLOOR WITH

ASBESTOS REPORT AND PLAN

5 REMOVE EXISTING WINDOW, AC UNIT AND METAL

SUPPORT FRAME. PROVIDE TEMPORARY INFILL.

6 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -

SEE MEP AND TELECOM DRAWINGS FOR CABLING

SCOPE, TYP.

7 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL

TIMES

8 COORDINATE TEMPORARY HEPA EXHAUST ROUTING

OUT OF BUILDING - MAINTAIN 25 FEET MINIMUM FROM

INTAKES, OPERABLE WINDOWS, AND ENTRANCES.

PROVIDE BLOCK-OFF PANELS IN EXISTING WINDOWS

FOR DISCHARGE, TYP.

9 TEMPORARY CONSTRUCTION BARRIER

10 ANTEROOM - SEE INFECTION CONTROL & INTERIM LIFE

SAFETY DETAILS

PATH OF TRAVEL SCHEDULE - FIRST LEVEL

Mark From Room To Room Type of Travel Path Length

FIRST FLOOR

(P-o-T) Distance to Exits

E1 TELECOM ROOM 202 STAIR HALL 2 137 (P-o-T) Distance to Exits 118' - 4"

NOTE:

DEBRIS REMOVAL:

COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH

ASBESTOS REPORT AND PLAN.

CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF

MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA

PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO

REMOVAL OF ANY MATERIALS.

SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING

CONSTRUCTION.

LIFE SAFETY:

NEW WORK DOES NOT CHANGE EXISTING SMOKE

COMPARTMENTS, EXIT PATHWAYS, OR EXITS.

AREA OCCUPANCIES

LEVEL Name Area SF

Occupancy Requirements

OL

Occupancy

(IBC) Occupancy (NFPA) OLF Fixed Seats

FIRST LEVEL EXISTING BUSINESS 17569 SF R4 Business 200 SF 0 88

12183 SF

EXISTING BUSINESS -

TELECOM

ROOM

201C201C

WARD

CLERK

202202

OFFICE

203203

ELEVATOR

200E-2200E-2

ELEVATOR

200E-1200E-1

ELEVATOR

LOBBY

200200

TOILET

201A201A

CONFERENCE

235B235B

CORRIDOR

245Z245Z

CORRIDOR

248Z248Z

STAIR

HALL 2

226226

FEC

E1 ▬ 128.1'

6 7

3 3A

9 9

OFFICE

223223

EXAM

ROOM

224224

LAUNDRY

ROOM

225225

TOILET

201B201B

OFFICE

204204

EXAM

ROOM

205B205B

EXAM

ROOM

205A205A

CORRIDOR

237Z237Z

OPEN

OFFICE

207207

TOILETS

208208

SINK

208A208A

SHOWERS

208C208C

ONE

BEDROOM

209209

DAY

ROOM

210210

ONE

BEDROOM

211211

STAIR

HALL 1

212212 KITCHEN

213213

EXAM

ROOM

214A214A

UTILITY

CLOSET

216216

TOILET

SHOWER

215215

TOILET

219219

LUXURY

CLOSET

220220

DAY

ROOM

230230

TOILETS

231231

CLEAN

LINEN

233233

BEDROOM

234234

CONFERENCE

235235

SUPPLY

CLOSET

218218CORRIDOR

246Z246Z

THERAPY

GYM

210A210A

CORRIDOR

249Z249Z

BATH

208B208B

OFFICE

222222

NURSE

STATION

210B210B

MED PREP

214214

EMS

221221

OFFICE

206206

TOILET

205205

LOCKER

ROOM

201201

DORM

232232

BEDROOM

232A232A

OFFICE

232B232B

OFFICE

232C232C

BEDROOM

227227

DORM

228228

BEDROOM

229229

CORRIDOR

217217

OFFICE

217A217A

OFFICE

217B217B

CONFERENCE

217C217C

STAFF

LOUNGE

217D217D

OFFICE

217E217E

VESTIBULE

235Z235Z

IT

235A235A

DORM

228A228A

CORRIDOR

236Z236Z

EMS

221A221A

5119 SF

EXISTING RESIDENTIAL -

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

LIFE SAFETY SYMBOLS

PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES

REFER TO SCHEDULE)

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

• 2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL

FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD

FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF

NFPA 5000 AND NFPA 900

• 2024 INTERNATIONAL MECHANICAL CODE (IPC)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2026 NATIONAL ELECTRICAL CODE (NEC)

• 2024 INTERNATIONAL PLUMBING CODE (IPC)

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION

(AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE

170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2024

• 2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED

BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE

STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

• VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS (4 FLOORS)

(INCL. MECHANICAL SHAFTS) 1 HOUR (1 - 3 FLOORS)

MEDICAL GAS / HAZARDOUS 1 HOUR

STORAGE

CLASSIFICATION OF OCCUPANCY:

EXISTING: RESIDENTIAL BOARD AND CARE Occupancy per Chapter 33 and BUSINESS Occupancy per Chapter 39

BUILDING OCCUPANCY TYPE:

PRIMARY - EXISTING RESIDENTIAL BOARD AND CARE, LARGE

SECONDARY - EXISTING BUSINESS OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Board and Care and Business

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

33.3.2.5.2 COMMON PATH OF TRAVEL 75 FT

33.3.2.5.4 DEAD END 30 FT

33.3.2.6 TRAVEL DISTANCE FROM ANY 250 FT

POINT IN ROOM TO EXIT

OCCUPANT LOAD:

33.1.4 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

MEANS OF EGRESS:

33.3.2 Capacity of Means of Egress.

33.3.2.3.3 The clear width of any corridor or passageway required for exit access shall not be less than 60 in. (1525 mm).

PROTECTION OF VERTICAL OPENINGS:

33.3.3.1 Protection of Vertical Openings.

33.3.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

33.3.3.2 Protection from Hazards.

33.3.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 9.7.1.1(1)

33.3.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7:

(1) Boilder and fuel-fired heater rooms

(2) Laundries

(3) Repair Shops

(4) Rooms or spaces used for storage of combustible supplies and equipment in quantities deemed hazardous by the AHJ.

33.3.3.5.7 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

SUBDIVISION OF BUILDING SPACES:

33.3.3.7 SUBDIVISION OF BUILDING SPACES

33.3.3.7.1 EVERY STORY SHALL BE DIVIDED INTO NOT LESS THAN

TWO SMOKE COMPARTMENTS.

33.3.3.7.3 THE TRAVEL DISTANCE FROM ANY POINT TO REACH A

DOOR IN THE REQUIRED SMOKE BARRIER SHALL NOT EXCEED

200 FT.

33.3.3.7.9 SMOKE BARRIERS IN ACCORDANCE WITH SECTION 8.5

SHALL HAVE A MINIMUM 1-HOUR FIRE RESISTANCE RATING.

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

X - XX'

# ICRA SYMBOLSKEYNOTES

OCCUPANCY SEPARATION

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

201 E. Jefferson Street, Suite 200

Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

A u to d e s k D o c s /6

-2

-7

M o n tr o s e V

A M

C E

H R

M I U

/6

-2

-7

.M o n tr o s e

.E H

R M

.A R

C H

.B

.r v t

/3

/2

:2

:5

A

M

14GI302

INTERIM LIFE SAFETY & INFECTION CONTROL

PLAN - SECOND LEVEL

620-22-700

06/27/2025 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1/8" = 1'-0" F1

INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - SECOND LEVEL

PATH OF TRAVEL SCHEDULE - SECOND LEVEL

Mark From Room To Room Type of Travel Path Length

SECOND FLOOR

(P-o-T) Distance to Exits

E1 TELECOM ROOM 201C STAIR HALL 2 226 (P-o-T) Distance to Exits 128' - 1"

1 TEMPORARY CONSTRUCTION BARRIER DOOR WITH

CLOSER AND LATCH AND WALK OFF MATS

2 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES

FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO

BE USED FOR ANY CONSTRUCTION ACTIVITY.

3 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL

TIMES

3A ONE ELEVATOR TO BE DESIGNATED FOR

CONTRACTOR USE. CONTRACTOR TO PROTECT /

REPAIR ALL FINISHES AND FOLLOW PROPER ICRA

REMOVAL PROTOCOLS FOR ANY MATERIALS

REMOVED FROM SITE THROUGH ELEVATOR

4 DEBRIS REMOVAL PATH TO EXTERIOR -

COORDINATE REMOVAL OF MATERIALS ON THIS

FLOOR WITH ASBESTOS REPORT AND PLAN

5 REMOVE EXISTING WINDOW, AC UNIT AND METAL

SUPPORT FRAME. PROVIDE TEMPORARY INFILL.

6 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -

SEE MEP AND TELECOM DRAWINGS FOR CABLING

SCOPE, TYP.

7 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL

TIMES

8 COORDINATE TEMPORARY HEPA EXHAUST ROUTING

OUT OF BUILDING - MAINTAIN 25 FEET MINIMUM

FROM INTAKES, OPERABLE WINDOWS, AND

ENTRANCES. PROVIDE BLOCK-OFF PANELS IN

EXISTING WINDOWS FOR DISCHARGE, TYP.

9 TEMPORARY CONSTRUCTION BARRIER

10 ANTEROOM - SEE INFECTION CONTROL & INTERIM

LIFE SAFETY DETAILS

NOTE:

DEBRIS REMOVAL:

COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH

ASBESTOS REPORT AND PLAN.

CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF

MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA

PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO

REMOVAL OF ANY MATERIALS.

SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING

CONSTRUCTION.

LIFE SAFETY:

NEW WORK DOES NOT CHANGE EXISTING SMOKE

COMPARTMENTS, EXIT PATHWAYS, OR EXITS.

# Revisions: Date:

1 ADDENDUM #1 03/30/2026

AREA OCCUPANCIES

LEVEL Name Area SF

Occupancy Requirements

OL

Occupancy

(IBC) Occupancy (NFPA) OLF Fixed Seats

SECOND LEVEL EXISTING RESIDENTIAL 5119 SF R4 Residential Board & Care

200 SF 0 26

SECOND LEVEL EXISTING BUSINESS 12183 SF B Business 150 SF 0 81

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

TEMPORARY WALL TO EXTEND

AND BE SEALED TO DECK /

FLOOR ABOVE WHEN RATED

ENCLOSURE REQUIRED

FLOOR LINE

CEILING SYSTEM AS

SCHEDULED

EXISTING STRUCTURE

F

IN

IS

H E

D F

LO

O

R T

O U

N D

E R

S

ID

E O

F S

T R

U C

T U

R E

V E

R

IF

Y F

LO

O

R T

O F

LO

O

R H

E

IG

H T

RENOVATED SPRINKLER

SYSTEM

WEEKLY CHANGED

OR MORE AS

NEEDED PRE-FILTER

FLEX DUCT

MONTHLY CHANGED

HEPA FILTER

HEPA NEGATIVE AIR

UNIT

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

PRESSURE INDICATOR SHALL BE AT

0.03 OR GREATER USING A DIGITAL

MANOMETER WITH DATA LOGGING. IF

NOT VERIFY ALL OPENING SUCH AS

DOOR ARE CLOSED AND/OR CHANGE

NEGATIVE AIR PRE-FILTER. DO NOT USE

A "BALL IN THE WALL" OR ANALOG

OTHER PRESSURE INDICATOR.

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN NOT

RUNNING TO KEEP

DUST OUT.

A

V

O

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

PUBLIC AREA

CONSTRUCTION AREA

ANTE ROOM

HARD BARRIER ALL THE WAY TO

DECK ABOVE

SIZE ANTE ROOM TO PROVIDE

SPACE FOR EQUIPMENT STAGING,

CART CLEANING, WORKERS' PPE

AND CLEANING, INCLUDING A HEPA

CLOTHING VACUUM

ROUTE DUCT TO EXTERIOR - SEE

PLANS FOR PROPOSED ROUTES -

CONFIRM ROUTE WITH ON-SITE

STAFF PRIOR TO INSTALLATION.

DISCHARGE AT A DISTANCE OF 25

FEET OR GREATER FROM

ENTRANCES, AIR INTAKES AND

OPERABLE WINDOWS. DO NOT

DIRECT EXHAUST INTO ANY

BUILDING SHARED EXHAUST

SYSTEM.

ANTE ROOM FAN

DOOR TO BE SELF-CLOSING AND

SELF-LATCHING - 45 MIN. FIRE

RATING PER NFPA

D7

14GI303

1/4" = 1'-0" F7

TYPICAL CONSTRUCTION LAYOUT- CLASS IV

1/2" = 1'-0" D7

CROSS SECTION A'-A'- CLASS IV

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

201 E. Jefferson Street, Suite 200

Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

A u to d e s k D o c s /6

-2

-7

M o n tr o s e V

A M

C E

H R

M I U

/6

-2

-7

.M o n tr o s e

.E H

R M

.A R

C H

.B

.r v t

/3

/2

:2

:0

A

M

14GI303

INTERIM LIFE SAFETY & INFECTION CONTROL

DETAILS

620-22-700

06/27/2025 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS

DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE

(COR).

B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH

OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH

THE COR. ALL INTERIOR DOORS THAT LEAD TO THE

CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.

C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING

WORK.

D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL

BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.

E. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION

AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS

THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM

CLEANER PRIOR TO LEAVING THE SITE.

F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR

OCCUPIED AREAS ON THE FLOOR.

G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;

REVIEW WITH COR AND VA SAFETY GROUP.

H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT

ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT

DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION

UNITS.

J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE

OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR

EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE

CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN

CONSTRUCTION AREA TO PREVENT CONTAMINATION OF

EXISTING DUCT SYSTEM.

K. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND

VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION

AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION

AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".

L. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP

A CURRENT HOT WORK PERMIT ON SITE.

M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE

SURE THEY REMAIN EFFECTIVE.

N. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL

DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR

CONTAINERS.

O. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES

AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN

DUST PROTECTION AND NEGATIVE AIR PRESSURE.

P. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,

WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR

CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED

AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA

SHALL BE CLEANED IMMEDIATELY.

Q. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA

WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,

REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH

OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER

REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.

R. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

ICRA SYMBOL LEGENDINFECTION CONTROL RISK

ASSESSMENT:

TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE

ACTIVITY CATEGORY

IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT

CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP

CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK

CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR

MAINTENANCE

CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR

MAINTENANCE

THIS PROJECT: CATEGORY D

TABLE 2: AFFECTED AREA ASSESSMENT

TABLE 3: PATIENT RISK CATEGORY

IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN

TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH

THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT

RISK CATEGORY FOR THE ACTIVITY.

LOW RISK: NON-PATIENT CARE AREAS

MEDIUM RISK: PATIENT CARE SUPPORT AREAS

HIGH RISK: PATIENT CARE AREAS

HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY

COMPROMISED PATIENT CARE AREAS

THIS PROJECT: HIGH RISK

C

LA

S S

II

Construction Activity Category

RISK GROUP

LOW RISK

MEDIUM RISK

HIGH RISK

HIGHEST RISK

I II II III

I II III IV

I II IV IV

II III IV IV

A

STEP 1:

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT

ROOMS, MEDICATION ROOM, AND SO ON.

STEP 2:

IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND

ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE

OUTAGES.

STEP 3:

IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 4:

CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A

RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR

EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 5:

WORK HOURS: CAN OR WILL THE WORK BE DONE DURING

NON-PATIENT-CARE HOURS?

STEP 6:

DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 7:

DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE

OF HAND-WASHING SINKS?

STEP 8:

DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE

WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?

(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN

AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)

STEP 9:

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED

UTILITY ROOMS?

STEP 10:

PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH

THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,

HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

Affected Area Assessment

AREA

Activity Area Area Above

Area Below

Adjacent Area

TR

SEE PLAN

SVC TYPE POC POC CONTACT INFO

SEE PLAN

SEE PLAN

Walter Hoffman (914) 208-6275

MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED

CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO

FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF

INFECTION CONTROL ACTIVITIES REQUIRED.

THIS PROJECT: CATEGORY IV

TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL

PRECAUTIONS

B C D

TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES

BY LEVEL OF PRECAUTIONS

NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)

TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES

REQUIRED UPON COMPLETION OF THE ACTIVITY

Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

A. Carefully remove screws and painter tape.

B. If dust will be generated during screw removal, use hand-held HEPA vacuum.

C. Drywall cutting is prohibited during removal process D. Clean all stud tracks with HEPA vacuum before removing outer hard barrier E. Use a plastic barrier to enclose area if dust could be generated

Negative Air Requirements:

1. The use of negative air must be designated to remove contaminants from the work area

2. Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC Systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed

2. Verify that HVAC systems are clean and operational.

3. Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications Water Systems:

1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA directive 1061.

C

LA

S S

II

I &

IV

13. Ensure availability of equipment for cleaning hands

14. Construct and complete critical barriers meeting NFPA 241 requirements.

Barriers must extend to the ceiling or if ceiling tile is removed, to deck above

15. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.

16. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type)

17. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A of this document.

These control measures must be maintained continuously 24/7 for the duration of the project. HEPA filtered exhaust if discharged directly to the outdoors must be at a istance of 25 feet or greater from entrances, air intakes and operable windows. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited

18. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable

4. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system)Ensure worker clothing is clean and free of visible dust before leaving the work area

5. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation

6. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system

7. Seal doors to prevent dust migration

8. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.

9. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility…