ATTACHMENT 22 - Montrose.EHRM.Addendum.01.B14.20260330.pdf
PDF 29 MB Posted
- Solicitation number
- RFP-36C77626R0033
About this file
This is an architectural drawing index and associated construction drawings for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at Franklin Delano Roosevelt VA Hospital in Montrose, New York. The project (620-22-700) is a competitive small business set-aside issued by the Department of Veterans Affairs Technology Acquisition Center Austin.
The construction scope encompasses infrastructure upgrades across three floors of Building 14, a fully sprinklered facility classified as Type II construction per NFPA 220. Work includes demolition of existing conditions, hazardous material abatement (asbestos-containing materials, lead-based paint, and transite panels), fire protection system renovations, interim life safety measures, and installation of new telecommunications and electrical systems. Major components include new telecom rooms on the first and second levels with Category 6A cabling, electrical panel upgrades, mechanical unit replacements, access control systems, fire protection upgrades, and architectural modifications involving new partitions and wall infills. The project must maintain occupied spaces during construction, with specific infection control and interim life safety protocols required per ICRA standards. Construction documents are issued at 100% completion level with addendum dated March 30, 2026, addressing drawing revisions and removal of sheet 14G-011. Building codes referenced include 2024 NFPA 101 Life Safety Code, 2026 National Electrical Code, 2024 International Building Code, and VA-specific standards. The contractor must coordinate with the VA Contracting Officer Representative on all phasing, debris removal, hazardous material containment, and occupied space protection throughout execution.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.B
.rv t 3/
/2
:2
9:
P M
14G-001
DRAWING INDEX 620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION
GENERAL
14G-000 COVER SHEET Yes Yes Yes Yes 14G-001 DRAWING INDEX Yes Yes Yes Yes 14G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 14G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes
ICRA & LIFE SAFETY
14GI300 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - GROUND LEVEL No Yes Yes Yes 14GI301 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL No Yes Yes Yes 14GI302 INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - SECOND LEVEL No Yes Yes Yes 14GI303 INTERIM LIFE SAFETY & INFECTION CONTROL DETAILS No Yes Yes Yes
HAZARDOUS
14H-101 HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL No Yes Yes Yes 14H-102 HAZARDOUS MATERIAL ABATEMENT PLAN - SECOND FLOOR No Yes Yes Yes
ARCHITECTURAL
14A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 14A-400 ARCHITECTURAL ENLARGED VIEWS - GROUND & FIRST LEVEL No Yes Yes Yes 14A-401 ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL No Yes Yes Yes 14A-402 ARCHITECTURAL EXTERIOR ELEVATIONS Yes Yes 14A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 14A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 14A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes
INTERIORS
14IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes
FIRE PROTECTION
14FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 14FX102 FIRE PROTECTION PLAN - FIRST LEVEL No Yes Yes Yes 14FX102F FIRE PROTECTION PLAN - FIRST LEVEL - FUTURE No Yes Yes Yes 14FX103 FIRE PROTECTION PLAN - SECOND LEVEL No Yes Yes Yes 14FX103F FIRE PROTECTION PLAN - SECOND LEVEL - FUTURE No Yes Yes Yes 14FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
PLUMBING
14P-001 PLUMBING ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 14PD-103 PLUMBING PLAN - SECOND LEVEL No Yes Yes Yes
MECHANICAL
14M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 14M-101 MECHANICAL PLAN - GROUND LEVEL No Yes Yes Yes 14M-102 MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes 14M-102F MECHANICAL PLAN - FIRST LEVEL - FUTURE No Yes Yes Yes 14M-103 MECHANICAL PLAN - SECOND LEVEL No Yes Yes Yes 14M-103F MECHANICAL PLAN - SECOND LEVEL - FUTURE No Yes Yes Yes 14M-401 MECHANICAL ENLARGED PLANS No Yes Yes Yes 14M-401F MECHANICAL ENLARGED PLANS - FUTURE No Yes Yes Yes 14M-501 MECHANICAL DETAILS No Yes Yes Yes 14M-701 MECHANICAL SCHEDULES No Yes Yes Yes 14M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 14M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 14M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 14M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
ELECTRICAL
14E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 14E-101 ELECTRICAL PLAN - GROUND LEVEL No Yes Yes Yes 14E-102 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes 14E-102F ELECTRICAL PLAN - FIRST LEVEL - FUTURE No Yes Yes Yes 14E-103 ELECTRICAL PLAN - SECOND LEVEL No Yes Yes Yes 14E-103F ELECTRICAL PLAN - SECOND LEVEL - FUTURE No Yes Yes Yes 14E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 14E-402 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 14E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 14E-601 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes 14E-701 ELECTRICAL SCHEDULES No Yes Yes Yes 14E-702 ELECTRICAL SCHEDULES No Yes Yes Yes 14E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 14E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes
TELECOMMUNICATION
14T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 14T-101 TELECOMMUNICATION PLAN - GROUND LEVEL Yes Yes Yes Yes 14T-102 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes 14T-102F TELECOMMUNICATION PLAN - FIRST LEVEL - FUTURE Yes Yes Yes Yes 14T-103 TELECOMMUNICATION PLAN - SECOND LEVEL Yes Yes Yes Yes 14T-103F TELECOMMUNICATION PLAN - SECOND LEVEL - FUTURE Yes Yes Yes Yes 14T-401 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes 14T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 14T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 14T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 14T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 14T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 14T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 14T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes 14T-700 TELECOMMUNICATION SCHEDULES Yes Yes Yes Yes 14T-701 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 14T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 14T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 14T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes
REFERENCE
14R-900 PHOTO REFERENCES Yes Yes Yes Yes Grand total: 74
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
14G-011 REMOVED FROM
CONSTRUCTION DOCUMENTS
sagar Text Box
E1 ▬ 40.6'
Room 1A1A
Room 1B1B
ELEVATOR
E-1E-1Room
1C1C
ELEV
MACHINE
RM
22A22A
STORAGE
CORRIDOR
CORRIDOR
NORTH
STAIR
3 3A
18291 SF
EXISTING BUSINESS -
FEC
MIN
4'-4" CLR
STAIR
HALL 1
ENTRY
OFFICE
19A19A
ROOM
19B19B
OFFICE
19C19C
PICKUP
POSTAL
SERV
19D19D
ELECTRICAL
NOURISH
KITCHEN
PREP
OFFICE
STORAGE
STORAGE
COOLER
RM
RESTROOM
6B6BOFFICE
6F6F
LINEN
CLOSET
6G6G
EQUIPMENT
6H6H
TELEWORK
RECEPTION
SECRETARIAL
OFFICE
8L8L
SECT II
8K8K
LAV
8J8J
CLOSET
8H8H
SECT I
8G8G
OFFICE
8D-18D-1
CONF
ROOM
8F8F
UPPER
PART OF
SERVICE
ROOM
OFFICE
(VACANT)
CHAPLAIN'S
OFFICE
CLOSET
TOILET
13A13A
EDUCATION
STORAGE
13B13B
ATTENDANT
LOCKER
ROOM
TOILET
SHOWER
14A14A
JAN
STORAGE
17A17A
PATIENT
TOILET
17B17B
TOILET
21A21A
ART
THERAPY
ELECTRICAL
8Z8Z
ELEVATOR
TOILET
11A11A
CORRIDOR
CORRIDOR
TOILET
8A8A
EMPLOYEE
RELAXATION
ROOM
6C6C
OFFICE
6E6E
EXAM/TELE
HEALTH
6D16D1
SWING
SPACE
6D6D
CORRIDOR
ROOM
6A6A
CLOSET
6D26D2
OFFICE
8D8D
STORAGE
8E8E
TV
SYSTEM
8B8B
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
• 2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
• 2024 INTERNATIONAL MECHANICAL CODE (IPC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2026 NATIONAL ELECTRICAL CODE (NEC)
• 2024 INTERNATIONAL PLUMBING CODE (IPC)
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
• 2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
• VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS (4 FLOORS)
(INCL. MECHANICAL SHAFTS) 1 HOUR (1 - 3 FLOORS)
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: RESIDENTIAL BOARD AND CARE Occupancy per Chapter 33 and BUSINESS Occupancy per Chapter 39
BUILDING OCCUPANCY TYPE:
PRIMARY - EXISTING RESIDENTIAL BOARD AND CARE, LARGE
SECONDARY - EXISTING BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Board and Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
33.3.2.5.2 COMMON PATH OF TRAVEL 75 FT
33.3.2.5.4 DEAD END 30 FT
33.3.2.6 TRAVEL DISTANCE FROM ANY 250 FT
POINT IN ROOM TO EXIT
OCCUPANT LOAD:
33.1.4 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
33.3.2 Capacity of Means of Egress.
33.3.2.3.3 The clear width of any corridor or passageway required for exit access shall not be less than 60 in. (1525 mm).
PROTECTION OF VERTICAL OPENINGS:
33.3.3.1 Protection of Vertical Openings.
33.3.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
33.3.3.2 Protection from Hazards.
33.3.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 9.7.1.1(1)
33.3.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7:
(1) Boilder and fuel-fired heater rooms
(2) Laundries
(3) Repair Shops
(4) Rooms or spaces used for storage of combustible supplies and equipment in quantities deemed hazardous by the AHJ.
33.3.3.5.7 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
SUBDIVISION OF BUILDING SPACES:
33.3.3.7 SUBDIVISION OF BUILDING SPACES
33.3.3.7.1 EVERY STORY SHALL BE DIVIDED INTO NOT LESS THAN
TWO SMOKE COMPARTMENTS.
33.3.3.7.3 THE TRAVEL DISTANCE FROM ANY POINT TO REACH A
DOOR IN THE REQUIRED SMOKE BARRIER SHALL NOT EXCEED
200 FT.
33.3.3.7.9 SMOKE BARRIERS IN ACCORDANCE WITH SECTION 8.5
SHALL HAVE A MINIMUM 1-HOUR FIRE RESISTANCE RATING.
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
OCCUPANCY SEPARATION
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
A u to d e s k D o c s /6
-2
-7
M o n tr o s e V
A M
C E
H R
M I U
/6
-2
-7
.M o n tr o s e
.E H
R M
.A R
C H
.B
.r v t
/3
/2
:2
:4
A
M
14GI300
INTERIM LIFE SAFETY & INFECTION CONTROL
PLAN - GROUND LEVEL
620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0" F1
INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - GROUND LEVEL
1 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
2 STAIRS ARE TO REMAIN OPERATIONAL AT ALL
TIMES FOR EMERGENCY EGRESS ONLY. THEY ARE
NOT TO BE USED FOR ANY CONSTRUCTION
ACTIVITY.
3 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL
TIMES
3A ONE ELEVATOR TO BE DESIGNATED FOR
CONTRACTOR USE. CONTRACTOR TO PROTECT /
REPAIR ALL FINISHES AND FOLLOW PROPER ICRA
REMOVAL PROTOCOLS FOR ANY MATERIALS
REMOVED FROM SITE THROUGH ELEVATOR
4 DEBRIS REMOVAL PATH TO EXTERIOR -
COORDINATE REMOVAL OF MATERIALS ON THIS
FLOOR WITH ASBESTOS REPORT AND PLAN
5 ANTEROOM - SEE INFECTION CONTROL & INTERIM
LIFE SAFETY DETAILS
6 SOLID GRAY HATCH DENOTES LIMITED WORK AREA
- SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
7 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
8 COORDINATE TEMPORARY HEPA EXHAUST
ROUTING OUT OF BUILDING - MAINTAIN 25 FEET
MINIMUM FROM INTAKES, OPERABLE WINDOWS,
AND ENTRANCES. PROVIDE BLOCK-OFF PANELS IN
EXISTING WINDOWS FOR DISCHARGE, TYP.
9 TEMPORARY CONSTRUCTION BARRIER
PATH OF TRAVEL SCHEDULE - GROUND LEVEL
Mark From Room To Room Type of Travel Path Length
GROUND FLOOR
(P-o-T) Distance to Exits
E1 Room 1A (P-o-T) Distance to Exits 40' - 8"
NOTE:
DEBRIS REMOVAL:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
GROUND LEVEL EXISTING BUSINESS 18921 SF B Business 150 SF 0 126
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
• 2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
• 2024 INTERNATIONAL MECHANICAL CODE (IPC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2026 NATIONAL ELECTRICAL CODE (NEC)
• 2024 INTERNATIONAL PLUMBING CODE (IPC)
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
• 2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
• VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS (4 FLOORS)
(INCL. MECHANICAL SHAFTS) 1 HOUR (1 - 3 FLOORS)
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: RESIDENTIAL BOARD AND CARE Occupancy per Chapter 33 and BUSINESS Occupancy per Chapter 39
BUILDING OCCUPANCY TYPE:
PRIMARY - EXISTING RESIDENTIAL BOARD AND CARE, LARGE
SECONDARY - EXISTING BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Board and Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
33.3.2.5.2 COMMON PATH OF TRAVEL 75 FT
33.3.2.5.4 DEAD END 30 FT
33.3.2.6 TRAVEL DISTANCE FROM ANY 250 FT
POINT IN ROOM TO EXIT
OCCUPANT LOAD:
33.1.4 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
33.3.2 Capacity of Means of Egress.
33.3.2.3.3 The clear width of any corridor or passageway required for exit access shall not be less than 60 in. (1525 mm).
PROTECTION OF VERTICAL OPENINGS:
33.3.3.1 Protection of Vertical Openings.
33.3.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
33.3.3.2 Protection from Hazards.
33.3.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 9.7.1.1(1)
33.3.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7:
(1) Boilder and fuel-fired heater rooms
(2) Laundries
(3) Repair Shops
(4) Rooms or spaces used for storage of combustible supplies and equipment in quantities deemed hazardous by the AHJ.
33.3.3.5.7 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
SUBDIVISION OF BUILDING SPACES:
33.3.3.7 SUBDIVISION OF BUILDING SPACES
33.3.3.7.1 EVERY STORY SHALL BE DIVIDED INTO NOT LESS THAN
TWO SMOKE COMPARTMENTS.
33.3.3.7.3 THE TRAVEL DISTANCE FROM ANY POINT TO REACH A
DOOR IN THE REQUIRED SMOKE BARRIER SHALL NOT EXCEED
200 FT.
33.3.3.7.9 SMOKE BARRIERS IN ACCORDANCE WITH SECTION 8.5
SHALL HAVE A MINIMUM 1-HOUR FIRE RESISTANCE RATING.
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
OCCUPANCY SEPARATION
E1 ▬ 118.3'
STAFF
LOUNGE
102102
TELECOM
ROOM
202202
RECEPTION
/ WAITING
101A101A
ELEVATOR
LOBBY
101101
ELEVATOR
100E-1100E-1
EXAM
ROOM
100A100A
CORRIDOR
174Z174Z
STAIR
HALL 2
137137
CORRIDOR
177Z177Z
FEC
6 7
3 3A
17569 SF
EXISTING BUSINESS -
STAIR
HALL 1
123123
COMPUTER
LAB
108108
OFFICE
109109
OFFICE
103103
TOILET
124124
OFFICE
118A118A
OFFICE
118118
OFFICE
106106
STOR.
113113
TOILET
112112
SHOWER
111A111A
TOILET
TOILET
114A114A
TOILET
114B114B
STORAGE
116116
DEBRIEFING
ROOM
115115
PREP
ROOM
122122
STORAGE
121121
OFFICE
117117
OFFICE
119119
OFFICE
125125 OFFICE -
CHIEF
126126
OFFICE
126B126B
SWING
OFFICE
127127
LARGE
CLASSROOM
128128
TOILET
129129
STORAGE
131131
STORAGE
132132
HAC
133133
C&P
OFFICES
134134
C&P EXAM
ROOM
135135
HAC
136136
TOILET
146146
SHARED
OFFICE
139139
SHARED
OFFICE
140140
STORAGE
149149
SHARED
OFFICE
142142
STORAGE
151151
SHARED
OFFICE
144144
CONF.
ROOM
145145
PRINT /
COPY
148148
SHOWERS
149B149B
OFFICE
150150
SHARED
OFFICE
SHARED
OFFICE
152152
SHARED
OFFICE
153153
SHARED
OFFICE
154154
EXAM
ROOM
155155
EXAM
ROOM
156156
C&P EXAM
ROOM
166166
C&P EXAM
ROOM
167167
TOILET
168C168C
TOILET
100B100B
TRAINING
ROOM
114114
STAFF
BATHROOM
106A106A
OFFICE
105105
OFFICE
104104
CORRIDOR
170Z170Z
MEETING
ROOM
107107
TELECOM
168A168A
SHARED
OFFICE
168168
STORAGE
147147
BREAK
ROOM
MEN'S
RESTROOM
CORRIDOR
179Z179Z
CORRIDOR
180Z180Z
CORRIDOR
172Z172Z
CORRIDOR
170ZS170ZS
CORRIDOR
173Z173Z
CORRIDOR
175Z175Z
CORRIDOR
178Z178Z
ELEVATOR
CORRIDOR
171Z171Z
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
A u to d e s k D o c s /6
-2
-7
M o n tr o s e V
A M
C E
H R
M I U
/6
-2
-7
.M o n tr o s e
.E H
R M
.A R
C H
.B
.r v t
/3
/2
:2
:4
A
M
14GI301
INTERIM LIFE SAFETY & INFECTION CONTROL
PLAN - FIRST LEVEL
620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0" F1
INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - FIRST LEVEL
1 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
2 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES
FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO BE
USED FOR ANY CONSTRUCTION ACTIVITY.
3 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL
TIMES
3A ONE ELEVATOR TO BE DESIGNATED FOR CONTRACTOR
USE. CONTRACTOR TO PROTECT / REPAIR ALL
FINISHES AND FOLLOW PROPER ICRA REMOVAL
PROTOCOLS FOR ANY MATERIALS REMOVED FROM
SITE THROUGH ELEVATOR
4 DEBRIS REMOVAL PATH TO EXTERIOR - COORDINATE
REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN
5 REMOVE EXISTING WINDOW, AC UNIT AND METAL
SUPPORT FRAME. PROVIDE TEMPORARY INFILL.
6 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -
SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
7 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
8 COORDINATE TEMPORARY HEPA EXHAUST ROUTING
OUT OF BUILDING - MAINTAIN 25 FEET MINIMUM FROM
INTAKES, OPERABLE WINDOWS, AND ENTRANCES.
PROVIDE BLOCK-OFF PANELS IN EXISTING WINDOWS
FOR DISCHARGE, TYP.
9 TEMPORARY CONSTRUCTION BARRIER
10 ANTEROOM - SEE INFECTION CONTROL & INTERIM LIFE
SAFETY DETAILS
PATH OF TRAVEL SCHEDULE - FIRST LEVEL
Mark From Room To Room Type of Travel Path Length
FIRST FLOOR
(P-o-T) Distance to Exits
E1 TELECOM ROOM 202 STAIR HALL 2 137 (P-o-T) Distance to Exits 118' - 4"
NOTE:
DEBRIS REMOVAL:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
FIRST LEVEL EXISTING BUSINESS 17569 SF R4 Business 200 SF 0 88
12183 SF
EXISTING BUSINESS -
TELECOM
ROOM
201C201C
WARD
CLERK
202202
OFFICE
203203
ELEVATOR
200E-2200E-2
ELEVATOR
200E-1200E-1
ELEVATOR
LOBBY
200200
TOILET
201A201A
CONFERENCE
235B235B
CORRIDOR
245Z245Z
CORRIDOR
248Z248Z
STAIR
HALL 2
226226
FEC
E1 ▬ 128.1'
6 7
3 3A
9 9
OFFICE
223223
EXAM
ROOM
224224
LAUNDRY
ROOM
225225
TOILET
201B201B
OFFICE
204204
EXAM
ROOM
205B205B
EXAM
ROOM
205A205A
CORRIDOR
237Z237Z
OPEN
OFFICE
207207
TOILETS
208208
SINK
208A208A
SHOWERS
208C208C
ONE
BEDROOM
209209
DAY
ROOM
210210
ONE
BEDROOM
211211
STAIR
HALL 1
212212 KITCHEN
213213
EXAM
ROOM
214A214A
UTILITY
CLOSET
216216
TOILET
SHOWER
215215
TOILET
219219
LUXURY
CLOSET
220220
DAY
ROOM
230230
TOILETS
231231
CLEAN
LINEN
233233
BEDROOM
234234
CONFERENCE
235235
SUPPLY
CLOSET
218218CORRIDOR
246Z246Z
THERAPY
GYM
210A210A
CORRIDOR
249Z249Z
BATH
208B208B
OFFICE
222222
NURSE
STATION
210B210B
MED PREP
214214
EMS
221221
OFFICE
206206
TOILET
205205
LOCKER
ROOM
201201
DORM
232232
BEDROOM
232A232A
OFFICE
232B232B
OFFICE
232C232C
BEDROOM
227227
DORM
228228
BEDROOM
229229
CORRIDOR
217217
OFFICE
217A217A
OFFICE
217B217B
CONFERENCE
217C217C
STAFF
LOUNGE
217D217D
OFFICE
217E217E
VESTIBULE
235Z235Z
IT
235A235A
DORM
228A228A
CORRIDOR
236Z236Z
EMS
221A221A
5119 SF
EXISTING RESIDENTIAL -
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
• 2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
• 2024 INTERNATIONAL MECHANICAL CODE (IPC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2026 NATIONAL ELECTRICAL CODE (NEC)
• 2024 INTERNATIONAL PLUMBING CODE (IPC)
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
• 2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
• VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS (4 FLOORS)
(INCL. MECHANICAL SHAFTS) 1 HOUR (1 - 3 FLOORS)
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: RESIDENTIAL BOARD AND CARE Occupancy per Chapter 33 and BUSINESS Occupancy per Chapter 39
BUILDING OCCUPANCY TYPE:
PRIMARY - EXISTING RESIDENTIAL BOARD AND CARE, LARGE
SECONDARY - EXISTING BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Board and Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
33.3.2.5.2 COMMON PATH OF TRAVEL 75 FT
33.3.2.5.4 DEAD END 30 FT
33.3.2.6 TRAVEL DISTANCE FROM ANY 250 FT
POINT IN ROOM TO EXIT
OCCUPANT LOAD:
33.1.4 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
33.3.2 Capacity of Means of Egress.
33.3.2.3.3 The clear width of any corridor or passageway required for exit access shall not be less than 60 in. (1525 mm).
PROTECTION OF VERTICAL OPENINGS:
33.3.3.1 Protection of Vertical Openings.
33.3.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
33.3.3.2 Protection from Hazards.
33.3.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 9.7.1.1(1)
33.3.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.7:
(1) Boilder and fuel-fired heater rooms
(2) Laundries
(3) Repair Shops
(4) Rooms or spaces used for storage of combustible supplies and equipment in quantities deemed hazardous by the AHJ.
33.3.3.5.7 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
SUBDIVISION OF BUILDING SPACES:
33.3.3.7 SUBDIVISION OF BUILDING SPACES
33.3.3.7.1 EVERY STORY SHALL BE DIVIDED INTO NOT LESS THAN
TWO SMOKE COMPARTMENTS.
33.3.3.7.3 THE TRAVEL DISTANCE FROM ANY POINT TO REACH A
DOOR IN THE REQUIRED SMOKE BARRIER SHALL NOT EXCEED
200 FT.
33.3.3.7.9 SMOKE BARRIERS IN ACCORDANCE WITH SECTION 8.5
SHALL HAVE A MINIMUM 1-HOUR FIRE RESISTANCE RATING.
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
OCCUPANCY SEPARATION
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
A u to d e s k D o c s /6
-2
-7
M o n tr o s e V
A M
C E
H R
M I U
/6
-2
-7
.M o n tr o s e
.E H
R M
.A R
C H
.B
.r v t
/3
/2
:2
:5
A
M
14GI302
INTERIM LIFE SAFETY & INFECTION CONTROL
PLAN - SECOND LEVEL
620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0" F1
INTERIM LIFE SAFETY & INFECTION CONTROL PLAN - SECOND LEVEL
PATH OF TRAVEL SCHEDULE - SECOND LEVEL
Mark From Room To Room Type of Travel Path Length
SECOND FLOOR
(P-o-T) Distance to Exits
E1 TELECOM ROOM 201C STAIR HALL 2 226 (P-o-T) Distance to Exits 128' - 1"
1 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
2 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES
FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO
BE USED FOR ANY CONSTRUCTION ACTIVITY.
3 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL
TIMES
3A ONE ELEVATOR TO BE DESIGNATED FOR
CONTRACTOR USE. CONTRACTOR TO PROTECT /
REPAIR ALL FINISHES AND FOLLOW PROPER ICRA
REMOVAL PROTOCOLS FOR ANY MATERIALS
REMOVED FROM SITE THROUGH ELEVATOR
4 DEBRIS REMOVAL PATH TO EXTERIOR -
COORDINATE REMOVAL OF MATERIALS ON THIS
FLOOR WITH ASBESTOS REPORT AND PLAN
5 REMOVE EXISTING WINDOW, AC UNIT AND METAL
SUPPORT FRAME. PROVIDE TEMPORARY INFILL.
6 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -
SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
7 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
8 COORDINATE TEMPORARY HEPA EXHAUST ROUTING
OUT OF BUILDING - MAINTAIN 25 FEET MINIMUM
FROM INTAKES, OPERABLE WINDOWS, AND
ENTRANCES. PROVIDE BLOCK-OFF PANELS IN
EXISTING WINDOWS FOR DISCHARGE, TYP.
9 TEMPORARY CONSTRUCTION BARRIER
10 ANTEROOM - SEE INFECTION CONTROL & INTERIM
LIFE SAFETY DETAILS
NOTE:
DEBRIS REMOVAL:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
SECOND LEVEL EXISTING RESIDENTIAL 5119 SF R4 Residential Board & Care
200 SF 0 26
SECOND LEVEL EXISTING BUSINESS 12183 SF B Business 150 SF 0 81
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
TEMPORARY WALL TO EXTEND
AND BE SEALED TO DECK /
FLOOR ABOVE WHEN RATED
ENCLOSURE REQUIRED
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
F
IN
IS
H E
D F
LO
O
R T
O U
N D
E R
S
ID
E O
F S
T R
U C
T U
R E
V E
R
IF
Y F
LO
O
R T
O F
LO
O
R H
E
IG
H T
RENOVATED SPRINKLER
SYSTEM
WEEKLY CHANGED
OR MORE AS
NEEDED PRE-FILTER
FLEX DUCT
MONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR
UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
PRESSURE INDICATOR SHALL BE AT
0.03 OR GREATER USING A DIGITAL
MANOMETER WITH DATA LOGGING. IF
NOT VERIFY ALL OPENING SUCH AS
DOOR ARE CLOSED AND/OR CHANGE
NEGATIVE AIR PRE-FILTER. DO NOT USE
A "BALL IN THE WALL" OR ANALOG
OTHER PRESSURE INDICATOR.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
O
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
PUBLIC AREA
CONSTRUCTION AREA
ANTE ROOM
HARD BARRIER ALL THE WAY TO
DECK ABOVE
SIZE ANTE ROOM TO PROVIDE
SPACE FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS' PPE
AND CLEANING, INCLUDING A HEPA
CLOTHING VACUUM
ROUTE DUCT TO EXTERIOR - SEE
PLANS FOR PROPOSED ROUTES -
CONFIRM ROUTE WITH ON-SITE
STAFF PRIOR TO INSTALLATION.
DISCHARGE AT A DISTANCE OF 25
FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. DO NOT
DIRECT EXHAUST INTO ANY
BUILDING SHARED EXHAUST
SYSTEM.
ANTE ROOM FAN
DOOR TO BE SELF-CLOSING AND
SELF-LATCHING - 45 MIN. FIRE
RATING PER NFPA
D7
14GI303
1/4" = 1'-0" F7
TYPICAL CONSTRUCTION LAYOUT- CLASS IV
1/2" = 1'-0" D7
CROSS SECTION A'-A'- CLASS IV
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
201 E. Jefferson Street, Suite 200
Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
A u to d e s k D o c s /6
-2
-7
M o n tr o s e V
A M
C E
H R
M I U
/6
-2
-7
.M o n tr o s e
.E H
R M
.A R
C H
.B
.r v t
/3
/2
:2
:0
A
M
14GI303
INTERIM LIFE SAFETY & INFECTION CONTROL
DETAILS
620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
A. IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS
DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE
(COR).
B. COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH
OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH
THE COR. ALL INTERIOR DOORS THAT LEAD TO THE
CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.
C. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING
WORK.
D. THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL
BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
E. CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION
AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM
CLEANER PRIOR TO LEAVING THE SITE.
F. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR
OCCUPIED AREAS ON THE FLOOR.
G. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;
REVIEW WITH COR AND VA SAFETY GROUP.
H. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
I. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT
ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION
UNITS.
J. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE
OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR
EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE
CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN
CONSTRUCTION AREA TO PREVENT CONTAMINATION OF
EXISTING DUCT SYSTEM.
K. REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND
VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION
AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION
AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".
L. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP
A CURRENT HOT WORK PERMIT ON SITE.
M. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE
SURE THEY REMAIN EFFECTIVE.
N. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL
DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR
CONTAINERS.
O. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES
AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN
DUST PROTECTION AND NEGATIVE AIR PRESSURE.
P. MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,
WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR
CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED
AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA
SHALL BE CLEANED IMMEDIATELY.
Q. AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA
WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,
REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH
OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER
REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.
R. CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL
PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
ICRA SYMBOL LEGENDINFECTION CONTROL RISK
ASSESSMENT:
TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE
ACTIVITY CATEGORY
IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT
CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP
CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK
CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR
MAINTENANCE
CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR
MAINTENANCE
THIS PROJECT: CATEGORY D
TABLE 2: AFFECTED AREA ASSESSMENT
TABLE 3: PATIENT RISK CATEGORY
IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN
TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH
THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT
RISK CATEGORY FOR THE ACTIVITY.
LOW RISK: NON-PATIENT CARE AREAS
MEDIUM RISK: PATIENT CARE SUPPORT AREAS
HIGH RISK: PATIENT CARE AREAS
HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY
COMPROMISED PATIENT CARE AREAS
THIS PROJECT: HIGH RISK
C
LA
S S
II
Construction Activity Category
RISK GROUP
LOW RISK
MEDIUM RISK
HIGH RISK
HIGHEST RISK
I II II III
I II III IV
I II IV IV
II III IV IV
A
STEP 1:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 2:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 3:
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 4:
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 5:
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 6:
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 7:
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 8:
DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE
WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?
(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN
AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)
STEP 9:
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 10:
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH
THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
Affected Area Assessment
AREA
Activity Area Area Above
Area Below
Adjacent Area
TR
SEE PLAN
SVC TYPE POC POC CONTACT INFO
SEE PLAN
SEE PLAN
Walter Hoffman (914) 208-6275
MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED
CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO
FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF
INFECTION CONTROL ACTIVITIES REQUIRED.
THIS PROJECT: CATEGORY IV
TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL
PRECAUTIONS
B C D
TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES
BY LEVEL OF PRECAUTIONS
NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)
TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES
REQUIRED UPON COMPLETION OF THE ACTIVITY
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
A. Carefully remove screws and painter tape.
B. If dust will be generated during screw removal, use hand-held HEPA vacuum.
C. Drywall cutting is prohibited during removal process D. Clean all stud tracks with HEPA vacuum before removing outer hard barrier E. Use a plastic barrier to enclose area if dust could be generated
Negative Air Requirements:
1. The use of negative air must be designated to remove contaminants from the work area
2. Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC Systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed
2. Verify that HVAC systems are clean and operational.
3. Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications Water Systems:
1. Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA directive 1061.
C
LA
S S
II
I &
IV
13. Ensure availability of equipment for cleaning hands
14. Construct and complete critical barriers meeting NFPA 241 requirements.
Barriers must extend to the ceiling or if ceiling tile is removed, to deck above
15. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
16. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type)
17. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A of this document.
These control measures must be maintained continuously 24/7 for the duration of the project. HEPA filtered exhaust if discharged directly to the outdoors must be at a istance of 25 feet or greater from entrances, air intakes and operable windows. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited
18. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable
4. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system)Ensure worker clothing is clean and free of visible dust before leaving the work area
5. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation
6. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system
7. Seal doors to prevent dust migration
8. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
9. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area
10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area
11. Install a sticky (dust collection) mat at entrance of contained work area based on facility…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .