This document is a comprehensive set of construction drawing sheets for a federal healthcare infrastructure upgrade project at Montrose Veterans Administration Medical Center. The project involves renovation and infrastructure improvements across multiple building levels, with construction documents issued for full implementation.

The scope encompasses architectural, mechanical, electrical, fire protection, and telecommunications systems across ground, first, and second levels of the facility. Key construction requirements include Infection Control Risk Assessment (ICRA) Category IV precautions with dust control partitions, HEPA filtration systems, negative air pressure maintenance, and specialized debris removal protocols to protect occupied medical spaces during construction. Specific architectural work includes new telecom rooms (137 SF on Ground Level Room 12, 78 SF on First Level Room 130A, and 77 SF on Second Level Room 277A) with fire extinguisher cabinets, modified wall configurations, and ceiling modifications. Electrical systems involve new access control panels, emergency and normal power circuits, UPS systems (5KW rack-mounted 208V), GFCI receptacles, and updated panel schedules. Telecommunications infrastructure requires Category 6A cabling throughout, new 4-post racks with PDU and wire management systems, cable trays with maximum 40% fill capacity, new Avigilon IP-addressable security cameras with ceiling mounting, and fiber optic conduit sleeves through rated walls. Fire protection, mechanical HVAC modifications, and plumbing systems coordinate with structural elements to maintain existing building operations during phased construction. The project mandates compliance with 2024 NFPA 101 Life Safety Code, 2025 NFPA 72 Fire Alarm Code, 2025 NFPA 13 Sprinkler Standards, 2026 NEC, ASHRAE 62.1-2025 and 170-2025 ventilation standards, and VA-specific seismic design and accessibility requirements.

View the file

Other files

File Type Posted
Amendment 5 - 36C77626R0033 0005.pdf PDF
5-4 - RFI TRACKING SHEET.pdf PDF
Amend 5 - B01.20260330.pdf PDF
Amend 5 - B16.20260330.pdf PDF
Amend 5 - B19.20260330.pdf PDF
Amend 5 - B29.20260330.pdf PDF
Amend 5 - B52.20260330.pdf PDF
Amend 5 - SITE.20260330.pdf PDF
Original attachments 1-12.zip ZIP file
ATTACHMENT 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
ATTACHMENT 8 - 01 00 00.G - Appendix G - GPRS Triple C Montrose Full Report.pdf PDF
ATTACHMENT 21 - Montrose.EHRM.Addendum.01.B13.20260330.pdf PDF
ATTACHMENT 24 - Montrose.EHRM.Addendum.01.B16.20260330.pdf PDF
ATTACHMENT 27 - Montrose.EHRM.Addendum.01.B20.20260330.pdf PDF
ATTACHMENT 28 - Montrose.EHRM.Addendum.01.B26.20260330.pdf PDF
ATTACHMENT 28A - Montrose.EHRM.Addendum.01.B27.20260330.pdf PDF
ATTACHMENT 32 - Montrose.EHRM.Addendum.01.B52.20260330.pdf PDF
ATTACHMENT 33A - 00 41 13.10 - Construction Estimate Breakdown Template.xlsx XLSX spreadsheet
RFI TRACKING SHEET - SOLICITATION 36C77626R0033.pdf PDF
ATTACHMENT 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260410.pdf PDF
ATTACHMENT 5 - 01 00 00.D - Appendix D - SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
ATTACHMENT 11 - 01 00 00.I - Appendix I - K9245005 VAMC EHRM Montrose NY GeoReport 4.12.2024.pdf PDF
ATTACHMENT 12A - Summary.Log.Add01_20260410.pdf PDF
ATTACHMENT 13 - Montrose.EHRM.Addendum.01.B01.20260330.pdf PDF
ATTACHMENT 14 - Montrose.EHRM.Addendum.01.B02.20260330.pdf PDF
ATTACHMENT 22 - Montrose.EHRM.Addendum.01.B14.20260330.pdf PDF
ATTACHMENT 25 - Montrose.EHRM.Addendum.01.B17.20260330.pdf PDF
ATTACHMENT 26A - Montrose.EHRM.Addendum.01.B19.20260330.pdf PDF
Amendment 2 - 36C77626R0033 0002.pdf PDF
Site visit sign-in sheet 3-23-26.pdf PDF
Attachment 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260205.pdf PDF
Attachment 6 - 01 00 00.E - Appendix E - VHA ICRA-1.3 - Dec 9 2024.pdf PDF
Attachment 7 - 01 00 00.F - Appendix F - VHA PCRA 2024 1.1 Final.Template Fillable.pdf PDF
Attachment 8 - 01 00 00.G - Appendix G - GPRS Triple C Montrose Full Report.pdf PDF
Attachment 9 - 01 00 00.H - Appendix H - J2237038 Montrose ACM Ld Pnt InspRpt Final 8-21-2023.pdf PDF
Attachment 12 - Additional Security Badging Requirements rev 2.pdf PDF
Attachment 13 - Drawing B01 20250627.pdf PDF
Attachment 31 - Drawing B31 20250627.pdf PDF
Attachment 33 - Drawing Site 20250627.pdf PDF
RFP - 36C77626R0033.pdf PDF
Attachment 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
Attachment 4 - 01 00 00.C - Appendix C1 SOP 138-22HV CONST STD PROCEDURES QA FOR PROJECTS.pdf PDF
Attachment 5 - 01 00 00.D - Appendix D1 SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
Attachment 16 - Drawing B04 20250627.pdf PDF
Attachment 18 - Drawing B06 20250627.pdf PDF
Attachment 22 - Drawing B14 20250627.pdf PDF
Attachment 27 - Drawing B20 20250627.pdf PDF
Attachment 29 - Drawing B28 20250627.pdf PDF
Attachment 32 - Drawing B52 20250627.pdf PDF
Attachment 36 - Division Cost Breakdown.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .M

EP

.B

.rv t 3/

/2

:0

2:

A M

04G-001

DRAWING INDEX 620-22-700

06/27/2025 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

- DRAWING INDEX -

SHEET

NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION

GENERAL

04G-000 COVER SHEET Yes Yes Yes Yes 04G-001 DRAWING INDEX Yes Yes Yes Yes 04G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 04G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes

ICRA & LIFE SAFETY

04GI300 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - GROUND LEVEL No Yes Yes Yes 04GI301 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - FIRST LEVEL No Yes Yes Yes 04GI302 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - SECOND LEVEL No Yes Yes Yes 04GI303 INFECTION CONTROL & INTERIM LIFE SAFETY DETAILS No Yes Yes Yes

ARCHITECTURAL

04A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 04A-400 ARCHITECTURAL ENLARGED VIEWS - GROUND & FIRST LEVELS No Yes Yes Yes 04A-401 ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL No Yes Yes Yes 04A-403 ARCHITECTURAL EXTERIOR ELEVATIONS No Yes Yes Yes 04A-501 ARCHITECTURAL ROOF PLAN & DETAILS No Yes Yes Yes 04A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 04A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 04A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes

INTERIORS

04IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes

FIRE PROTECTION

04FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 04FX100 FIRE PROTECTION PLAN - GROUND LEVEL No Yes Yes Yes 04FX101 FIRE PROTECTION PLAN - FIRST LEVEL No Yes Yes Yes 04FX102 FIRE PROTECTION PLAN - SECOND LEVEL No Yes Yes Yes 04FX401 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes 04FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

MECHANICAL

04M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 04M-100 MECHANICAL PLAN - GROUND LEVEL No Yes Yes Yes 04M-101 MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes 04M-102 MECHANICAL PLAN - SECOND LEVEL No Yes Yes Yes 04M-401 MECHANICAL ENLARGED PLANS No Yes Yes Yes 04M-501 MECHANICAL DETAILS No Yes Yes Yes 04M-701 MECHANICAL SCHEDULES Yes Yes Yes Yes 04M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 04M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 04M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 04M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

ELECTRICAL

04E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 04E-100 ELECTRICAL PLAN - GROUND LEVEL No Yes Yes Yes 04E-101 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes 04E-102 ELECTRICAL PLAN - SECOND LEVEL No Yes Yes Yes 04E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 04E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 04E-601 ELECTRICAL ONE-LINE DIAGRAMS Yes Yes Yes Yes 04E-701 ELECTRICAL SCHEDULES No Yes Yes Yes 04E-702 ELECTRICAL SCHEDULES No Yes Yes Yes 04E-703 ELECTRICAL SCHEDULES No Yes Yes Yes 04E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 04E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes

TELECOMMUNICATION

04T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 04T-100 TELECOMMUNICATION PLAN - GROUND LEVEL Yes Yes Yes Yes 04T-101 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes 04T-102 TELECOMMUNICATION PLAN - SECOND LEVEL Yes Yes Yes Yes 04T-401 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes 04T-402 TELECOMMUNICATION ENLARGED PLANS Yes Yes Yes Yes 04T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 04T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 04T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 04T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 04T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 04T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 04T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes 04T-701 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 04T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 04T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 04T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes

REFERENCE

04R-900 PHOTO REFERENCES Yes Yes Yes Yes Grand total: 64

# Revisions: Date:

1 ADDENDUM #1 03/30/2026

04G-011 REMOVED FROM

CONSTRUCTION DOCUMENTS

Ranjan Text Box

FEC

15631 SF

EXISTING BUSINESS -

ADA BATHROOM

CORRIDOR

23Z

HOUSE KEEPING

STAIR HALL 2

ELEVATOR

LOBBY

25Z

ELEVATOR 2

ELEVATOR 1

E1 ▬ 61.3'

MI

N

4'- 0"

C

LR

DATA CLOSET

1B

TELE CLOSET

1A

CORRIDOR

24Z

OFFICE

17E

TOILET

17D1

CLOSET

17C1

MISC. ROOM

17B4

MEDICATION

VUALT

17B3

OFFICE

15D

OFFICE

15B

TOILET

11B

CLOSET

11A

CORRIDOR

21Z

CLOSET

07B

CLOSET

9A

STORAGE

BATHROOM

3A

OFFICE

CLOSET

07A1

UTILITY CLOSET

SECURITY ROOM

CORRIDOR

OFFICE

07A

OFFICE

UNIFORM

CLEANERS

SAFE ROOM

5B

LAUNDRY

OFFICE

ELEVATOR

EQUIPMENT

ROOM

STAFF LOUNGE

17D

LOCKER ROOM

17C

UTILITY CLOSET

17B5

COMPUTER

ROOM

17B2

UTILITY CLOSET

17B1

PHARMACY

17B

LOBBY

CONSULTATION

7 RECEPTION

17A

DOCK

ENTRANCE

OFFICE

15A

CONFERENCE

ROOM

15C

TRANSFORMER

ROOM

15F

OFFICE

15E

MECH ROOM

STAIR HALL A

TOILET

07C

PATIENT GAME

ROOM

15G

CLINICAL

PHARMACY

OFFICE

CLOSET

10A

CLOSET

10B

UNIFORM

CLEANERS

5A

CORRIDOR

22Z

OFFICE

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

LIFE SAFETY SYMBOLS

PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES

REFER TO SCHEDULE)

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL

FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD

FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF

NFPA 5000 AND NFPA 900

2024 INTERNATIONAL MECHANICAL CODE (IPC)

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8

2026 NATIONAL ELECTRICAL CODE (NEC)

2024 INTERNATIONAL PLUMBING CODE (IPC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION

(AISC)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE

170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025

SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2024

2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED

BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE

STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1/2 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS

MEDICAL GAS / HAZARDOUS 1 HOUR

STORAGE

CLASSIFICATION OF OCCUPANCY:

EXISTING: BUSINESS Occupancy per Chapter 39

39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply

39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11

BUILDING OCCUPANCY TYPE:

EXISTING - BUSINESS OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.

39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.

BUSINESS OCCUPANCY; PROTECTED = 300'-0"

OCCUPANT LOAD:

39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

MEANS OF EGRESS:

39.2.3 Capacity of Means of Egress.

39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.

39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).

39.2.4 Number of Means of Egress.

39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6

1) the number of means of egress shall be in accordance with section 7.4

2) not less than two separate exits shall be provided on every story.

3) Not less than two separate exits shall be accessible from every part of every story.

39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.

PROTECTION OF VERTICAL OPENINGS:

39.3.1 Protection of Vertical Openings.

39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

39.3.2 Protection from Hazards.

39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7

39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:

(1) Boilder and fuel-fired heater rooms

(2) Central/bulk laundries larger than 100 ft2

(3) Paint Shops

(4) Physical plant maintenance shops

(5) Rooms with soiled linen in volume exceeding 64 gal

(6) Rooms with collected trashed in volume exceeding 64 gal.

(7) Storage rooms larger than 100 ft2 and storing combustible material

The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:

(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.

(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.

39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.

39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

X - XX'

# ICRA SYMBOLSKEYNOTES

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t

-0 3-

9:

:0

04GI300

INFECTION CONTROL PLAN & INTERIM LIFE

SAFETY - GROUND LEVEL

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1/8" = 1'-0"F2 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - GROUND LEVEL

PATH OF TRAVEL SCHEDULE - GROUND LEVEL

Mark From Room To Room Type of Travel Path Length

GROUND LEVEL

(P-o-T) Distance to Exits

E1 TOILET 11B STAIR HALL 2 14 (P-o-T) Distance to Exits 61' - 4"

1 ELEVATORS TO REMAIN OPERATIONAL AT ALL TIMES

2 ONE ELEVATOR TO BE DESIGNATED FOR CONTRACTOR

USE. CONTRACTOR TO PROTECT / REPAIR ALL FINISHES

AND FOLLOW PROPER ICRA REMOVAL PROTOCOLS FOR

ANY MATERIALS REMOVED FROM SITE THROUGH

ELEVATOR

3 DEBRIS REMOVAL PATH TO DOCK

4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES

FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO BE

USED FOR ANY CONSTRUCTION ACTIVITY.

5 TEMPORARY CONSTRUCTION BARRIER

6 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND

WORK AREA DURING ANY ACTIVITIES WHICH PRODUCE

DUST - TYPICAL

7 ANTEROOM - SEE INFECTION CONTROL & INTERIM LIFE

SAFETY DETAILS

8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH

CLOSER AND LATCH AND WALK OFF MATS

9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL

TIMES

10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -

SEE MEP AND TELECOM DRAWINGS FOR CABLING

SCOPE, TYP.

11 COORDINATE TEMPORARY HEPA EXHAUST ROUTING

OUT OF BUILDING - MAINTAIN 25 FEET MINIMUM FROM

INTAKES, OPERABLE WINDOWS, AND ENTRANCES.

PROVIDE BLOCK-OFF PANELS IN EXISTING WINDOWS

FOR DISCHARGE, TYP.

12 REMOVE EXISTING WINDOW, AC UNIT AND METAL

SUPPORT FRAME. PROVIDE TEMPORARY INFILL.

AREA OCCUPANCIES

LEVEL Name Area SF

Occupancy Requirements

OL

Occupancy

(IBC) Occupancy (NFPA) OLF Fixed Seats

GROUND LEVEL EXISTING BUSINESS 15631 SF B Business 150 SF 0 104

NOTE:

DEBRIS REMOVAL:

CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF

MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA

PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO

REMOVAL OF ANY MATERIALS.

SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING

CONSTRUCTION.

LIFE SAFETY:

NEW WORK DOES NOT CHANGE EXISTING SMOKE

COMPARTMENTS, EXIT PATHWAYS, OR EXITS.

# Revisions: Date:

1 ADDENDUM #1 03/30/2026

15665 SF

EXISTING BUSINESS -

MULTIPURPOSE

ROOM

130 TELECOM ROOM

130A

BATHROOM

130A

EMS CLOSET

STAIR HALL 2

ELEVATOR 1

ELEVATOR 2

ELEVATOR

LOBBY

LOCKER ROOM

E1 ▬ 70.7'

7 8

MI

N

4'- 0"

C

LR

TWO BEDROOM

CORRIDOR

CLOSET

NURSE STATION

ELEC CL

107A

BATHROOM

113A

TWO BEDROOM

BATHROOM

108A

TWO BEDROOM

BATHROOM

111A

TWO BEDROOM

ONE BEDROOM

EMS CL

STAIR HALL 1

SECLUSION

ROOM

124A

MED ROOM

125A

CORRIDOR

TWO BEDROOM

BATHROOM

150A

EMS CL

BATHROOM

152A

CORRIDOR

BATHROOM

146A

OFFICE

ONE BEDROOM

146CBATHROOM

157A

NURSE STATION

ELEC

CLOSET

TOILET

TOILET

126A

TREATMENT

ROOM

CONFERENCE

ROOM

BATHROOM

118A

ONE BEDROOM

BATHROOM

120A

ONE BEDROOM

TWO BEDROOM

TWO BEDROOM

ONE BEDROOM

BATHROOM

116A

ONE BEDROOM

OFFICE

OFFICE

OFFICE

LAUNDRY

OFFICE

SOILED LINNEN

OFFICE

TOILET

137A

STAFF TOILET

STORAGE

BATHROOM

109A

TWO BEDROOM

BATHROOM

112A

BATHROOM

114A

MULTI-PURPOSE

ROOM

TOILET

LAUNDRY

KITCHEN

125B

CORRIDOR

CORRIDOR

26DAY ROOM

RECEPTION

AREA

CLOSET

MEDICATION

ROOM

CORRIDOR

CORRIDOR

NURSE

MANAGER

MEDICATION

ROOM

OFFICE

125C

NURSE STATION

TWO BEDROOM

CORRIDOR

BATHROOM

148A

TWO BEDROOM

BATHROOM

149A

TWO BEDROOM

ONE BEDROOM

BATHROOM

153A

TWO BEDROOM

BATHROOM

147A

LAUNDY

144A

OFFICE

CLEAN LINNEN

OFFICE

STAFF LOUNGE

TOILET

CORRIDOR

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

LIFE SAFETY SYMBOLS

PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES

REFER TO SCHEDULE)

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL

FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD

FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF

NFPA 5000 AND NFPA 900

2024 INTERNATIONAL MECHANICAL CODE (IPC)

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8

2026 NATIONAL ELECTRICAL CODE (NEC)

2024 INTERNATIONAL PLUMBING CODE (IPC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION

(AISC)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE

170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025

SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2024

2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED

BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE

STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1/2 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS

MEDICAL GAS / HAZARDOUS 1 HOUR

STORAGE

CLASSIFICATION OF OCCUPANCY:

EXISTING: BUSINESS Occupancy per Chapter 39

39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply

39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11

BUILDING OCCUPANCY TYPE:

EXISTING - BUSINESS OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.

39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.

BUSINESS OCCUPANCY; PROTECTED = 300'-0"

OCCUPANT LOAD:

39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

MEANS OF EGRESS:

39.2.3 Capacity of Means of Egress.

39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.

39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).

39.2.4 Number of Means of Egress.

39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6

1) the number of means of egress shall be in accordance with section 7.4

2) not less than two separate exits shall be provided on every story.

3) Not less than two separate exits shall be accessible from every part of every story.

39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.

PROTECTION OF VERTICAL OPENINGS:

39.3.1 Protection of Vertical Openings.

39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

39.3.2 Protection from Hazards.

39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7

39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:

(1) Boilder and fuel-fired heater rooms

(2) Central/bulk laundries larger than 100 ft2

(3) Paint Shops

(4) Physical plant maintenance shops

(5) Rooms with soiled linen in volume exceeding 64 gal

(6) Rooms with collected trashed in volume exceeding 64 gal.

(7) Storage rooms larger than 100 ft2 and storing combustible material

The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:

(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.

(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.

39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.

39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

X - XX'

# ICRA SYMBOLSKEYNOTES

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t

-0 3-

6:

:3

04GI301

INFECTION CONTROL PLAN & INTERIM LIFE

SAFETY - FIRST LEVEL

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1/8" = 1'-0"F2 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - FIRST LEVEL

PATH OF TRAVEL SCHEDULE - FIRST LEVEL

Mark From Room To Room Type of Travel Path Length

LEVEL 1

(P-o-T) Distance to Exits

E1 BATHROOM 130A STAIR HALL 2 132 (P-o-T) Distance to Exits 70' - 8"

1 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL

TIMES

2 ONE ELEVATOR TO BE DESIGNATED FOR

CONTRACTOR USE. CONTRACTOR TO PROTECT /

REPAIR ALL FINISHES AND FOLLOW PROPER ICRA

REMOVAL PROTOCOLS FOR ANY MATERIALS

REMOVED FROM SITE THROUGH ELEVATOR

3 DEBRIS REMOVAL PATH TO ELEVATOR

4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES

FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO

BE USED FOR ANY CONSTRUCTION ACTIVITY.

5 TEMPORARY CONSTRUCTION BARRIER

6 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND

WORK AREA DURING ANY ACTIVITIES WHICH

PRODUCE DUST - TYPICAL

7 ANTEROOM - SEE INFECTION CONTROL & INTERIM

LIFE SAFETY DETAILS

8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH

CLOSER AND LATCH AND WALK OFF MATS

9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL

TIMES

10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -

SEE MEP AND TELECOM DRAWINGS FOR CABLING

SCOPE, TYP.

AREA OCCUPANCIES

LEVEL Name Area SF

Occupancy Requirements

OL

Occupancy

(IBC) Occupancy (NFPA) OLF Fixed Seats

FIRST LEVEL EXISTING BUSINESS 15665 SF B Business 150 SF 0 104

NOTE:

DEBRIS REMOVAL:

CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF

MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA

PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO

REMOVAL OF ANY MATERIALS.

SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING

CONSTRUCTION.

LIFE SAFETY:

NEW WORK DOES NOT CHANGE EXISTING SMOKE

COMPARTMENTS, EXIT PATHWAYS, OR EXITS.

1 ADDENDUM #1 03/27/202603/30/2026

15662 SF

EXISTING BUSINESS -

TWO BEDROOM

TELECOM ROOM

277A

HYPNO THERAPY

STAIR HALL 2

CORRIDOR

C2-01

CORRIDOR

C2-02

ELEVATOR 1

ELEVATOR 2

34ELEVATION

LOBBY

E1 ▬ 66.8'

MI

N

3'- 8"

C

LR

7 8

TOILET

I.C.P.U.

I.C.P.U.

I.C.P.U.

BATHROOM

I.C.P.U.

I.C.P.U.

TIME-OUT ROOM

212B

TWO BEDROOM

SECLUSION

ROOM

206A

TWO BEDROOM

TWO BEDROOM

BATHROOM

205A

BATHROOM

210A

BATHROOM

208A

BATHROOM

207A

ONE BEDROOM

ELEC. CL.

TOILET

256A

LUXURY CL.

252 BATHROOM

244A

BATHROOM

246A

BATHROOM

245A

BATHROOM

248A

BATHROOM

247A

BATHROOM

250A

BATHROOM

251A

ONE BEDROOM

TWO BEDROOM

TWO BEDROOM

OFFICE

CLEAN LINEN

OFFICE

S.T.D. SUPPLIES

OFFICE

EXAM ROOM

OFFICE

NOURISHMENT

ROOM

TOILET

242A

CORRIDOR

C2-05

BATHROOM

226A

NURSE STATION

TOILET

TOILET

ONE BEDROOM

SOILED LINEN

ELEC. CL.

TWO BEDROOM

BATHROOM

223A

TWO BEDROOM

OBSERVATION

ROOM

MEDICATION

ROOM

212A

TWO BEDROOM

E.M.S.

DAY ROOM

CONFERENCE

ROOM

CLOSET

204A

EQUIPMENT

ROOM

VISITORS ROOM

BATHROOM

255A

E.M.S.

TWO BEDROOM

TWO BEDROOM

TWO BEDROOM

STAFF LAUNDRY

OFFICE

CORRIDOR

C2-04

STAFF LOOUNGE

OFFICE

SOILED LINEN

BATHROOM

225A

STAIR HALL 1

Room

BATHROOM

227A

TELE. CL.

STORAGE CL.

TWO BEDROOM

OFFICE

DAY ROOM

CORRIDOR

C2-08

CORRIDOR

C2-07

CORRIDOR

C2-06

SEATING AREA

C2-01A

CORRIDOR

C2-03

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

LIFE SAFETY SYMBOLS

PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES

REFER TO SCHEDULE)

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL

FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD

FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF

NFPA 5000 AND NFPA 900

2024 INTERNATIONAL MECHANICAL CODE (IPC)

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8

2026 NATIONAL ELECTRICAL CODE (NEC)

2024 INTERNATIONAL PLUMBING CODE (IPC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION

(AISC)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE

170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025

SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2024

2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED

BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE

STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1/2 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS

MEDICAL GAS / HAZARDOUS 1 HOUR

STORAGE

CLASSIFICATION OF OCCUPANCY:

EXISTING: BUSINESS Occupancy per Chapter 39

39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply

39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11

BUILDING OCCUPANCY TYPE:

EXISTING - BUSINESS OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.

39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.

BUSINESS OCCUPANCY; PROTECTED = 300'-0"

OCCUPANT LOAD:

39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

MEANS OF EGRESS:

39.2.3 Capacity of Means of Egress.

39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.

39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).

39.2.4 Number of Means of Egress.

39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6

1) the number of means of egress shall be in accordance with section 7.4

2) not less than two separate exits shall be provided on every story.

3) Not less than two separate exits shall be accessible from every part of every story.

39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.

PROTECTION OF VERTICAL OPENINGS:

39.3.1 Protection of Vertical Openings.

39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

39.3.2 Protection from Hazards.

39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7

39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:

(1) Boilder and fuel-fired heater rooms

(2) Central/bulk laundries larger than 100 ft2

(3) Paint Shops

(4) Physical plant maintenance shops

(5) Rooms with soiled linen in volume exceeding 64 gal

(6) Rooms with collected trashed in volume exceeding 64 gal.

(7) Storage rooms larger than 100 ft2 and storing combustible material

The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:

(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.

(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.

39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.

39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

X - XX'

# ICRA SYMBOLSKEYNOTES

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t

-0 3-

6:

:4

04GI302

INFECTION CONTROL PLAN & INTERIM LIFE

SAFETY - SECOND LEVEL

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1/8" = 1'-0"F2 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - SECOND LEVEL

PATH OF TRAVEL SCHEDULE - SECOND LEVEL

Mark From Room To Room Type of Travel Path Length

LEVEL 2

(P-o-T) Distance to Exits

E1 TWO BEDROOM 277 STAIR HALL 2 229 (P-o-T) Distance to Exits 66' - 9"

1 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL

TIMES

2 ONE ELEVATOR TO BE DESIGNATED FOR

CONTRACTOR USE. CONTRACTOR TO PROTECT /

REPAIR ALL FINISHES AND FOLLOW PROPER ICRA

REMOVAL PROTOCOLS FOR ANY MATERIALS

REMOVED FROM SITE THROUGH ELEVATOR

3 DEBRIS REMOVAL PATH TO ELEVATOR

4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL

TIMES FOR EMERGENCY EGRESS ONLY. THEY ARE

NOT TO BE USED FOR ANY CONSTRUCTION

ACTIVITY.

5 TEMPORARY CONSTRUCTION BARRIER

6 PROVIDE TEMPORARY DUST TIGHT BARRIER

AROUND WORK AREA DURING ANY ACTIVITIES

WHICH PRODUCE DUST - TYPICAL

7 ANTEROOM - SEE INFECTION CONTROL & INTERIM

LIFE SAFETY DETAILS

8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH

CLOSER AND LATCH AND WALK OFF MATS

9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL

TIMES

10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA

- SEE MEP AND TELECOM DRAWINGS FOR CABLING

SCOPE, TYP.

11 DOOR TO BE LOCKED DURING DEMOLITION AND

CONSTRUCTION

AREA OCCUPANCIES

LEVEL Name Area SF

Occupancy Requirements

OL

Occupancy

(IBC) Occupancy (NFPA) OLF Fixed Seats

SECOND LEVEL EXISTING BUSINESS 15662 SF B Business 150 SF 0 104

NOTE:

DEBRIS REMOVAL:

CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF

MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA

PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO

REMOVAL OF ANY MATERIALS.

SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING

CONSTRUCTION.

LIFE SAFETY:

NEW WORK DOES NOT CHANGE EXISTING SMOKE

COMPARTMENTS, EXIT PATHWAYS, OR EXITS.

TEMPORARY WALL TO EXTEND

AND BE SEALED TO DECK /

FLOOR ABOVE WHEN RATED

ENCLOSURE REQUIRED

FLOOR LINE

CEILING SYSTEM AS

SCHEDULED

EXISTING STRUCTURE

FI

NI

SH

ED

F

LO

OR

T O

UN

DE

RS

ID

E

OF

S

TR

UC

TU

RE

VE

RI

FY

F

LO

OR

T

O

FL

OO

R

HE

IG

HT

RENOVATED SPRINKLER

SYSTEM

WEEKLY CHANGED

OR MORE AS

NEEDED PRE-FILTER

FLEX DUCTMONTHLY CHANGED

HEPA FILTER

HEPA NEGATIVE AIR

UNIT

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

PRESSURE INDICATOR SHALL BE AT

0.03 OR GREATER USING A DIGITAL

MANOMETER WITH DATA LOGGING. IF

NOT VERIFY ALL OPENING SUCH AS

DOOR ARE CLOSED AND/OR CHANGE

NEGATIVE AIR PRE-FILTER. DO NOT USE

A "BALL IN THE WALL" OR ANALOG

OTHER PRESSURE INDICATOR.

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN NOT

RUNNING TO KEEP

DUST OUT.

A

V

OTAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

PUBLIC AREA

CONSTRUCTION AREA

ANTE ROOM

HARD BARRIER ALL THE WAY TO

DECK ABOVE

SIZE ANTE ROOM TO PROVIDE

SPACE FOR EQUIPMENT STAGING,

CART CLEANING, WORKERS' PPE

AND CLEANING, INCLUDING A HEPA

CLOTHING VACUUM

ROUTE DUCT TO EXTERIOR - SEE

PLANS FOR PROPOSED ROUTES -

CONFIRM ROUTE WITH ON-SITE

STAFF PRIOR TO INSTALLATION.

DISCHARGE AT A DISTANCE OF 25

FEET OR GREATER FROM

ENTRANCES, AIR INTAKES AND

OPERABLE WINDOWS. DO NOT

DIRECT EXHAUST INTO ANY

BUILDING SHARED EXHAUST

SYSTEM.

ANTE ROOM FAN

DOOR TO BE SELF-CLOSING AND

SELF-LATCHING - 45 MIN. FIRE

RATING PER NFPA

D7

04GI303

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

PATH OF TRAVEL/DISTANCE TO EXITS

1/4" = 1'-0"F7 TYPICAL CONSTRUCTION LAYOUT- CLASS IV

1/2" = 1'-0"D7 CROSS SECTION A'-A'- CLASS IV

NTSF2 TYPICAL ICRA PRODUCTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t

-0 3-

6:

:4

04GI303

INFECTION CONTROL & INTERIM LIFE SAFETY

DETAILS

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS

DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE

(COR).

COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH

OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH

THE COR. ALL INTERIOR DOORS THAT LEAD TO THE

CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.

OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING

WORK.

THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL

BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.

CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION

AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS

THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM

CLEANER PRIOR TO LEAVING THE SITE.

FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR

OCCUPIED AREAS ON THE FLOOR.

PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;

REVIEW WITH COR AND VA SAFETY GROUP.

MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT

ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT

DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION

UNITS.

CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE

OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR

EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE

CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN

CONSTRUCTION AREA TO PREVENT CONTAMINATION OF

EXISTING DUCT SYSTEM.

REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND

VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION

AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION

AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".

GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP

A CURRENT HOT WORK PERMIT ON SITE.

TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE

SURE THEY REMAIN EFFECTIVE.

MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL

DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR

CONTAINERS.

SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES

AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN

DUST PROTECTION AND NEGATIVE AIR PRESSURE.

MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,

WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR

CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED

AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA

SHALL BE CLEANED IMMEDIATELY.

AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA

WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,

REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH

OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER

REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.

CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

ICRA SYMBOL LEGENDINFECTION CONTROL RISK

ASSESSMENT:

TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE

ACTIVITY CATEGORY

IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT

CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP

CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK

CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR

MAINTENANCE

CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR

MAINTENANCE

THIS PROJECT: CATEGORY D

TABLE 2: AFFECTED AREA ASSESSMENT

TABLE 3: PATIENT RISK CATEGORY

IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN

TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH

THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT

RISK CATEGORY FOR THE ACTIVITY.

LOW RISK: NON-PATIENT CARE AREAS

MEDIUM RISK: PATIENT CARE SUPPORT AREAS

HIGH RISK: PATIENT CARE AREAS

HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY

COMPROMISED PATIENT CARE AREAS

THIS PROJECT: HIGH RISK

CL

AS

S

II

Construction Activity Category

RISK GROUP

LOW RISK

MEDIUM RISK

HIGH RISK

HIGHEST RISK

I II II III

I II III IV

I II IV IV

II III IV IV

A

STEP 1:

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT

ROOMS, MEDICATION ROOM, AND SO ON.

STEP 2:

IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND

ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE

OUTAGES.

STEP 3:

IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 4:

CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A

RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR

EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 5:

WORK HOURS: CAN OR WILL THE WORK BE DONE DURING

NON-PATIENT-CARE HOURS?

STEP 6:

DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 7:

DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE

OF HAND-WASHING SINKS?

STEP 8:

DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE

WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?

(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN

AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)

STEP 9:

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED

UTILITY ROOMS?

STEP 10:

PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH

THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,

HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

Affected Area Assessment

AREA

Activity Area Area Above Area Below Adjacent Area

TR

SEE PLAN

SVC TYPE POC POC CONTACT INFO

SEE PLAN

SEE PLAN

Walter Hoffman (914) 208-6275

MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED

CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO

FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF

INFECTION CONTROL ACTIVITIES REQUIRED.

THIS PROJECT: CATEGORY IV

TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL

PRECAUTIONS

B C D

TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES

BY LEVEL OF PRECAUTIONS

NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)

TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES

REQUIRED UPON COMPLETION OF THE ACTIVITY

1.

2.

1.

2.

A.

B.

C.

D.

E.

1.

2.

1.

2.

3.

1.

Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures

Work Area Cleaning:

Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces

Removal of Critical Barriers:

Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

Carefully remove screws and painter tape.

If dust will be generated during screw removal, use hand-held HEPA vacuum.

Drywall cutting is prohibited during removal process Clean all stud tracks with HEPA vacuum before removing outer hard barrier Use a plastic barrier to enclose area if dust could be generated

Negative Air Requirements:

The use of negative air must be designated to remove contaminants from the work area Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC Systems:

Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed Verify that HVAC systems are clean and operational.

Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications

Water Systems:

Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA directive 1061.

CL

AS

S

III

IV

13.

14.

15.

16.

17.

18.

Ensure availability of equipment for cleaning hands Construct and complete critical barriers meeting NFPA 241 requirements.

Barriers must extend to the ceiling or if ceiling tile is removed, to deck above All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.

Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type) Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A of this document.

These control measures must be maintained continuously 24/7 for the duration of the project. HEPA filtered exhaust if discharged directly to the outdoors must be at a istance of 25 feet or greater from entrances, air intakes and operable windows.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .