ATTACHMENT 18 - Montrose.EHRM.Addendum.01.B06.20260330.pdf
PDF 16 MB Posted
- Solicitation number
- RFP-36C77626R0033
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.B
.rv t 3/
/2
:5
1:
P M
06G-001
DRAWING INDEX 620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPDATE
2094 Albany Post Road, Montrose, NY 10548
- DRAWING INDEX -
SHEET NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION
GENERAL
06G-000 COVER SHEET Yes Yes Yes Yes 06G-001 DRAWING INDEX Yes Yes Yes Yes 06G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 06G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes
HAZARDOUS
06H-100 HAZARDOUS MATERIAL ABATEMENT PLAN - GROUND LEVEL No Yes Yes Yes
ICRA & LIFE SAFETY
06GI300 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - GROUND LEVEL No Yes Yes Yes 06GI301 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - FIRST LEVEL No Yes Yes Yes 06GI302 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - SECOND LEVEL No Yes Yes Yes 06GI303 INFECTION CONTROL & INTERIM LIFE SAFETY DETAILS No Yes Yes Yes
ARCHITECTURAL
06A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 06A-400 ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL No Yes Yes Yes 06A-501 ARCHITECTURAL ROOF PLAN & DETAILS No Yes Yes Yes 06A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 06A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 06A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes
INTERIORS
06IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes
FIRE PROTECTION
06FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 06FX101 FIRE PROTECTION PLAN - FIRST LEVEL Yes Yes Yes Yes 06FX102 FIRE PROTECTION PLAN - SECOND LEVEL Yes Yes Yes Yes 06FX401 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes 06FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
MECHANICAL
06M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 06M-100 MECHANICAL PLAN - GROUND LEVEL No Yes Yes Yes 06M-101 MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes 06M-102 MECHANICAL PLAN - SECOND LEVEL No Yes Yes Yes 06M-401 MECHANICAL ENLARGED PLANS No Yes Yes Yes 06M-501 MECHANICAL DETAILS No Yes Yes Yes 06M-701 MECHANICAL SCHEDULES No Yes Yes Yes 06M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 06M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 06M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 06M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
ELECTRICAL
06E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 06E-101 ELECTRICAL PLAN -GROUND LEVEL No Yes Yes Yes 06E-102 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes 06E-103 ELECTRICAL PLAN - SECOND LEVEL No Yes Yes Yes 06E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 06E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 06E-601 ELECTRICAL ONE-LINE DIAGRAMS No Yes Yes Yes 06E-701 ELECTRICAL SCHEDULES No Yes Yes Yes 06E-702 ELECTRICAL SCHEDULES Yes Yes Yes Yes 06E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 06E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes
TELECOMMUNICATION
06T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 06T-101 TELECOMMUNICATION PLAN - GROUND LEVEL Yes Yes Yes Yes 06T-102 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes 06T-103 TELECOMMUNICATION PLAN - SECOND LEVEL Yes Yes Yes Yes 06T-401 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes 06T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 06T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 06T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 06T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 06T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 06T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 06T-604 TELECOMMUNICATION RACK ELEVATIONS Yes Yes Yes Yes 06T-701 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 06T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 06T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 06T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes
REFERENCE
06R-900 PHOTO REFERENCES No Yes Yes Yes 06R-901 PHOTO REFERENCES No Yes Yes Yes 06R-902 PHOTO REFERENCES No Yes Yes Yes Grand total: 62
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
06G-011 REMOVED FROM
CONSTRUCTION DOCUMENTS
Ranjan Text Box
15755 SF
EXISTING HEALTHCARE -
ELEVATOR
NO. 1NO. 1
ELEVATOR
NO. 2NO. 2
STORAGE
0101 ELEV.
LOBBY
21Z21Z
STAIR
HALL A
TV ROOM
14A14A
CORRIDOR
25Z25Z
THERAPY
CORRIDOR
24Z24Z
DATA
CLOSET
01B01B
MIN
1'-0"
E1 ▬ 96.7'
OFFICE
CORRIDOR
SOILED
LINEN
REHAB
ROOM
06A06A
STAIR
HALL B
N.F.S.
0808 OFFICE
CORRIDOR
Room
HAC
MENS TLT
OFFICE
IRM
STORAGE
UTILITY
CLOSET
1818WHEELCHAIR
REPAIR
MECH.
RM.
Room
CORRIDOR
23Z23Z
MORGUE
STORAGE
17A17A
CORRIDOR
26Z26Z
OFFICE
17B17B
CLOSET
14B14B
STORAGE
17C17C
CLOSET
17D17D
TELE. CL.
01A01A
TLT
02B02B
OCCUPATIONAL
THERAPY
02A02ASTORAGE
04A04A
EXAM
ROOM
04B04B
EXAM
ROOM
04C04C
BATHROOM
04D04D
OFFICE
04E04E
EXAM
ROOM
04F04F
EXAM
ROOM
04G04G
EXAM
ROOM
04H04H
04I04I
CLOSET
04J04J
WAITING
ROOM
04K04K
RECEPTIONIST
04L04L
03A03A
BATHROOM
E2E2
E2AE2A
TLT
06B06B
STORAGE
06A106A1
OFFICE
06C06C
STORAGE
06D06D
REHABILITATION
AREA
06E06E
OFFICE
06F06F
TLT
09A09A
PIPE CL.
09B09B
SPEECH
THERAPY
10A10A OFFICE
11A11A
OFFICE
11B11BOFFICE
11C11C
TLT
11A111A1
ELEC
SERVICE
RM
13A13A
CLR
4'-0" MIN INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IMC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: HEALTHCARE Occupancy per Chapter 19
19.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply
19.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11
BUILDING OCCUPANCY TYPE:
EXISTING - HEALTHCARE OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) HEALTHCARE, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
19.2.6.2 The travel distance between any point in a room and an exit shall not exceed 150 ft.
19.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
HEALTHCARE OCCUPANCY; PROTECTED = 200'-0"
OCCUPANT LOAD:
19.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
19.2.3 Capacity of Means of Egress.
19.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
19.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).
19.2.4 Number of Means of Egress.
19.2.4.1 Means of egress shall comply with all of the following: except as permitted by 19.2.4.2-6
1) the number of means of egress shall be in accordance with section 7.4
2) not less than two separate exits shall be provided on every story.
3) Not less than two separate exits shall be accessible from every part of every story.
19.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.
PROTECTION OF VERTICAL OPENINGS:
19.3.1 Protection of Vertical Openings.
19.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
19.3.2 Protection from Hazards.
19.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7
19.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material
The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.
19.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
19.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
2:
:5
06GI300
INFECTION CONTROL PLAN & INTERIM LIFE
SAFETY - GROUND LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPDATE
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0"F1 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - GROUND LEVEL
PATH OF TRAVEL SCHEDULE - GROUND LEVEL
Mark From Room To Room Type of Travel Path Length
GROUND LEVEL
(P-o-T) Distance to Exits
E1 THERAPY 15 STAIR HALL A 14 (P-o-T) Distance to Exits 96' - 9"
1 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL
TIMES
2 ONE ELEVATOR TO BE DESIGNATED FOR
CONTRACTOR USE. CONTRACTOR TO PROTECT /
REPAIR ALL FINISHES AND FOLLOW PROPER ICRA
REMOVAL PROTOCOLS FOR ANY MATERIALS
REMOVED FROM SITE THROUGH ELEVATOR
3 DEBRIS REMOVAL PATH TO EXTERIOR -
COORDINATE PATH OF REMOVAL WITH VA COR
4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES
FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO
BE USED FOR ANY CONSTRUCTION ACTIVITY.
5 TEMPORARY CONSTRUCTION BARRIER
6 PROVIDE TEMPORARY DUST TIGHT BARRIER
AROUND WORK AREA DURING ANY ACTIVITIES
WHICH PRODUCE DUST - TYPICAL
7 ANTEROOM - SEE INFECTION CONTROL & INTERIM
LIFE SAFETY DETAILS
8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -
SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
GROUND LEVEL EXISTING HEALTHCARE 15755 SF I1 Health Care 120 SF 0 131
NOTE:
DEBRIS REMOVAL:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
15664 SF
E1 ▬ 87.3'
TELECOM
ROOM
105105
STORAGE
106106
OFFICE
104104
TREATMENT
ROOM
103103
OFFICE
102102
ELEVATOR
LOBBY
101101
ELEVATOR
ELEVATOR
CORRIDOR
138138
STAIR
HALL 2
144A144A
CORRIDOR
144Z144Z
FEC
OFFICE
107107
CONFERENCE
ROOM
108108
CORRIDOR
109Z109Z
TWO-BEDROOM
110110
STORAGE
111111
TLT
112112
TWO-BEDROOM
113113
TWO-BEDROOM
114114
CLEAN
LINEN
115115
TLT
116116
TWO-BEDROOM
117117
TWO-BEDROOM
118118
SHOWER
ROOM
119119
TLT
120120
LAUNDRY
121121
TWO-BEDROOM
122122
TWO-BEDROOM
123123
TLT
124124
TWO-BEDROOM
125125
DAYROOM
126126
CORRIDOR
127Z127Z
CORRIDOR
128Z128Z
ONE-BEDROOM
129129
UTILITY
RM
131131
TLT
130130
ONE-BEDROOM
132132
DISTRIBUTION
ROOM
133133
NOURISHMENT
134134
MED.
PREP
135135
WARD
CLERK
136136
NURSE
STATION
137137
OFFICE
139139
ONE-BEDROOM
140140
Room
TLTTLT
CLOSET
142142
ONE-BEDROOM
143143
CORRIDOR
145Z145Z
DAY
ROOM
146146
TWO-BEDROOM
147147
TLT
148148
TWO-BEDROOM
149149
TWO-BEDROOM
150150LUXURY
CL.
151151
TLT
152152
SHOWER
ROOM
153153
TWO-BEDROOM
154154
TWO-BEDROOM
155155
TLT
156156
EMS
STORAGE
157157
TWO-BEDROOM
158158
TWO-BEDROOM
159159
TLT
160160
EQUIPMENT
STORAGE
161161
KT CLINIC
162162
CORRIDOR
163Z163Z
OFFICE
164164
STAFF
LOUNGE
165165
STAFF
LOCKER
ROOM
166166
TLT
167167
TLT
168168
VISITORS
ROOM
169169
STAIR
HALL 1
128A128A
CL
R
5'- 0"
M
IN
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IMC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: HEALTHCARE Occupancy per Chapter 19
19.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply
19.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11
BUILDING OCCUPANCY TYPE:
EXISTING - HEALTHCARE OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) HEALTHCARE, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
19.2.6.2 The travel distance between any point in a room and an exit shall not exceed 150 ft.
19.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
HEALTHCARE OCCUPANCY; PROTECTED = 200'-0"
OCCUPANT LOAD:
19.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
19.2.3 Capacity of Means of Egress.
19.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
19.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).
19.2.4 Number of Means of Egress.
19.2.4.1 Means of egress shall comply with all of the following: except as permitted by 19.2.4.2-6
1) the number of means of egress shall be in accordance with section 7.4
2) not less than two separate exits shall be provided on every story.
3) Not less than two separate exits shall be accessible from every part of every story.
19.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.
PROTECTION OF VERTICAL OPENINGS:
19.3.1 Protection of Vertical Openings.
19.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
19.3.2 Protection from Hazards.
19.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7
19.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material
The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.
19.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
19.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
2:
:5
06GI301
INFECTION CONTROL PLAN & INTERIM LIFE
SAFETY - FIRST LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPDATE
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0"F1 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - FIRST LEVEL
PATH OF TRAVEL SCHEDULE - FIRST LEVEL
Mark From Room To Room Type of Travel Path Length
LEVEL 1
(P-o-T) Distance to Exits
E1 TELECOM ROOM 105 STAIR HALL 2 144A (P-o-T) Distance to Exits 87' - 3"
1 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL
TIMES
2 ONE ELEVATOR TO BE DESIGNATED FOR
CONTRACTOR USE. CONTRACTOR TO PROTECT /
REPAIR ALL FINISHES AND FOLLOW PROPER ICRA
REMOVAL PROTOCOLS FOR ANY MATERIALS
REMOVED FROM SITE THROUGH ELEVATOR
3 DEBRIS REMOVAL PATH TO EXTERIOR - COORDINATE
PATH OF REMOVAL WITH VA COR
4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES
FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO
BE USED FOR ANY CONSTRUCTION ACTIVITY.
5 TEMPORARY CONSTRUCTION BARRIER
6 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND
WORK AREA DURING ANY ACTIVITIES WHICH
PRODUCE DUST - TYPICAL
7 ANTEROOM - SEE INFECTION CONTROL & INTERIM
LIFE SAFETY DETAILS
8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -
SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
11 TEMPORARY BARRIERS FOR ACM REMOVAL -
COORDINATE WITH COR TO LIMIT TIME BARRIERS ARE
IN PLACE.
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
FIRST LEVEL EXISTING HEALTHCARE 15664 SF I1 Health Care 120 SF 0 131
NOTE:
DEBRIS REMOVAL:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
1 ADDENDUM #1 03/27/202603/30/2026
15664 SF
E1 ▬ 87.3'
TELECOM
ROOM
205205
STORAGE
206206
OFFICE
204204
TREATMENT
ROOM
203203
OFFICE
202202
ELEV.
LOBBY
201201
ELEVATOR
ELEVATOR
CORRIDOR
238Z238Z
STAIR
HALL 2
242A242A
CORRIDOR
243Z243Z
OFFICE
207207
CONFERENCE
ROOM
208208
CORRIDOR
209Z209Z
KT CLINIC
210210
STORAGE
211211
TLT
212212
TWO-BEDROOM
213213
TWO-BEDROOM
214214
CLEAN
LINEN
215215
TLT
216216
TWO-BEDROOM
217217
TWO-BEDROOM
218218
SHOWER
ROOM
219219
TLT
220220
LAUNDRY
ROOM
221221
TWO-BEDROOM
222222
TWO-BEDROOM
223223
TLT
224224
TWO-BEDROOM
225225
DAY
ROOM
226226
CORRIDOR
227Z227Z
CORRIDOR
228Z228Z
CLOSET
229229
TLT
230230 ONE-BEDROOM
231231
ISOLATION
ANTE
ROOM
232232
GUEST
ROOM
233233
NOURISHMENT
234234
MED PREP
ROOM
235235
NURSE
STATION
236236SITTING
AREA
237237
TWO-BEDROOM
239239
TLT
240240
CLOSET
241241
ONE-BEDROOM
242242
CORRIDOR
244244
DAY
ROOM
245245
TWO-BEDROOM
246246
TLT
247247
TWO-BEDROOM
248248
TWO-BEDROOM
249249LUXURY
CL.
250250
TLT
251251
FULL
BATH
252252
TWO-BEDROOM
253253
TWO-BEDROOM
254254
TLT
255255
EMS
STORAGE
256256
TWO-BEDROOM
257257
TWO-BEDROOM
258258
TLT
259259
EQUIPMENT
STORAGE
260260
TWO-BEDROOM
261261
CORRIDOR
262262
RELAXATION
ROOM
263263
STAFF
LOUNGE
264264
STAFF
LOCKER
ROOM
265265
TLT
266266
TLT
267267
VISITORS
ROOM
268268
STAIR
HALL 1
208A208A
CL
R
5'- 0"
M
IN
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IMC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: HEALTHCARE Occupancy per Chapter 19
19.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply
19.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11
BUILDING OCCUPANCY TYPE:
EXISTING - HEALTHCARE OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) HEALTHCARE, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
19.2.6.2 The travel distance between any point in a room and an exit shall not exceed 150 ft.
19.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
HEALTHCARE OCCUPANCY; PROTECTED = 200'-0"
OCCUPANT LOAD:
19.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
19.2.3 Capacity of Means of Egress.
19.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
19.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).
19.2.4 Number of Means of Egress.
19.2.4.1 Means of egress shall comply with all of the following: except as permitted by 19.2.4.2-6
1) the number of means of egress shall be in accordance with section 7.4
2) not less than two separate exits shall be provided on every story.
3) Not less than two separate exits shall be accessible from every part of every story.
19.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.
PROTECTION OF VERTICAL OPENINGS:
19.3.1 Protection of Vertical Openings.
19.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
19.3.2 Protection from Hazards.
19.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7
19.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material
The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.
19.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
19.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
2:
:5
06GI302
INFECTION CONTROL PLAN & INTERIM LIFE
SAFETY - SECOND LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPDATE
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0"F1 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - SECOND LEVEL
PATH OF TRAVEL SCHEDULE - SECOND LEVEL
Mark From Room To Room Type of Travel Path Length
LEVEL 2
(P-o-T) Distance to Exits
E1 TELECOM ROOM 205 STAIR HALL 2 242A (P-o-T) Distance to Exits 87' - 3"
1 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL
TIMES
2 ONE ELEVATOR TO BE DESIGNATED FOR
CONTRACTOR USE. CONTRACTOR TO PROTECT /
REPAIR ALL FINISHES AND FOLLOW PROPER ICRA
REMOVAL PROTOCOLS FOR ANY MATERIALS
REMOVED FROM SITE THROUGH ELEVATOR
3 DEBRIS REMOVAL PATH TO EXTERIOR -
COORDINATE PATH OF REMOVAL WITH VA COR
4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES
FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO
BE USED FOR ANY CONSTRUCTION ACTIVITY.
5 TEMPORARY CONSTRUCTION BARRIER
6 PROVIDE TEMPORARY DUST TIGHT BARRIER
AROUND WORK AREA DURING ANY ACTIVITIES
WHICH PRODUCE DUST - TYPICAL
7 ANTEROOM - SEE INFECTION CONTROL & INTERIM
LIFE SAFETY DETAILS
8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -
SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
SECOND LEVEL EXISTING HEALTHCARE 15664 SF I1 Health Care 120 SF 0 131
NOTE:
DEBRIS REMOVAL:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
PATH OF TRAVEL/DISTANCE TO EXITS
TEMPORARY WALL TO EXTEND
AND BE SEALED TO DECK /
FLOOR ABOVE WHEN RATED
ENCLOSURE REQUIRED
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
FI
NI
SH
ED
F
LO
OR
T O
UN
DE
RS
ID
E
OF
S
TR
UC
TU
RE
VE
RI
FY
F
LO
OR
T
O
FL
OO
R
HE
IG
HT
RENOVATED SPRINKLER
SYSTEM
WEEKLY CHANGED
OR MORE AS
NEEDED PRE-FILTER
FLEX DUCTMONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR
UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
PRESSURE INDICATOR SHALL BE AT
0.03 OR GREATER USING A DIGITAL
MANOMETER WITH DATA LOGGING. IF
NOT VERIFY ALL OPENING SUCH AS
DOOR ARE CLOSED AND/OR CHANGE
NEGATIVE AIR PRE-FILTER. DO NOT USE
A "BALL IN THE WALL" OR ANALOG
OTHER PRESSURE INDICATOR.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
OTAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
PUBLIC AREA
CONSTRUCTION AREA
ANTE ROOM
HARD BARRIER ALL THE WAY TO
DECK ABOVE
SIZE ANTE ROOM TO PROVIDE
SPACE FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS' PPE
AND CLEANING, INCLUDING A HEPA
CLOTHING VACUUM
ROUTE DUCT TO EXTERIOR - SEE
PLANS FOR PROPOSED ROUTES -
CONFIRM ROUTE WITH ON-SITE
STAFF PRIOR TO INSTALLATION.
DISCHARGE AT A DISTANCE OF 25
FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. DO NOT
DIRECT EXHAUST INTO ANY
BUILDING SHARED EXHAUST
SYSTEM.
ANTE ROOM FAN
DOOR TO BE SELF-CLOSING AND
SELF-LATCHING - 45 MIN. FIRE
RATING PER NFPA
D7
06GI303
1/4" = 1'-0"F7 TYPICAL CONSTRUCTION LAYOUT- CLASS IV
1/2" = 1'-0"D7 CROSS SECTION A'-A'- CLASS IV
NTSF2 TYPICAL ICRA PRODUCTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
7:
:5
06GI303
INFECTION CONTROL & INTERIM LIFE SAFETY
DETAILS
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPDATE
2094 Albany Post Road, Montrose, NY 10548
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS
DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE
(COR).
COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH
OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH
THE COR. ALL INTERIOR DOORS THAT LEAD TO THE
CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.
OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING
WORK.
THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL
BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION
AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM
CLEANER PRIOR TO LEAVING THE SITE.
FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR
OCCUPIED AREAS ON THE FLOOR.
PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;
REVIEW WITH COR AND VA SAFETY GROUP.
MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT
ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION
UNITS.
CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE
OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR
EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE
CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN
CONSTRUCTION AREA TO PREVENT CONTAMINATION OF
EXISTING DUCT SYSTEM.
REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND
VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION
AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION
AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".
GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP
A CURRENT HOT WORK PERMIT ON SITE.
TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE
SURE THEY REMAIN EFFECTIVE.
MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL
DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR
CONTAINERS.
SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES
AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN
DUST PROTECTION AND NEGATIVE AIR PRESSURE.
MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,
WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR
CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED
AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA
SHALL BE CLEANED IMMEDIATELY.
AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA
WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,
REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH
OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER
REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.
CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL
PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
ICRA SYMBOL LEGENDINFECTION CONTROL RISK
ASSESSMENT:
TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE
ACTIVITY CATEGORY
IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT
CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP
CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK
CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR
MAINTENANCE
CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR
MAINTENANCE
THIS PROJECT: CATEGORY D
TABLE 2: AFFECTED AREA ASSESSMENT
TABLE 3: PATIENT RISK CATEGORY
IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN
TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH
THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT
RISK CATEGORY FOR THE ACTIVITY.
LOW RISK: NON-PATIENT CARE AREAS
MEDIUM RISK: PATIENT CARE SUPPORT AREAS
HIGH RISK: PATIENT CARE AREAS
HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY
COMPROMISED PATIENT CARE AREAS
THIS PROJECT: HIGH RISK
CL
AS
S
II
Construction Activity Category
RISK GROUP
LOW RISK
MEDIUM RISK
HIGH RISK
HIGHEST RISK
I II II III
I II III IV
I II IV IV
II III IV IV
A
STEP 1:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 2:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 3:
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 4:
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 5:
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 6:
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 7:
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 8:
DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE
WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?
(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN
AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)
STEP 9:
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 10:
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH
THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
Affected Area Assessment
AREA
Activity Area Area Above Area Below Adjacent Area
TR
SEE PLAN
SVC TYPE POC POC CONTACT INFO
SEE PLAN
SEE PLAN
Walter Hoffman (914) 208-6275
MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED
CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO
FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF
INFECTION CONTROL ACTIVITIES REQUIRED.
THIS PROJECT: CATEGORY IV
TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL
PRECAUTIONS
B C D
TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES
BY LEVEL OF PRECAUTIONS
NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)
TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES
REQUIRED UPON COMPLETION OF THE ACTIVITY
1.
2.
1.
2.
A.
B.
C.
D.
E.
1.
2.
1.
2.
3.
1.
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures
Work Area Cleaning:
Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces
Removal of Critical Barriers:
Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
Carefully remove screws and painter tape.
If dust will be generated during screw removal, use hand-held HEPA vacuum.
Drywall cutting is prohibited during removal process Clean all stud tracks with HEPA vacuum before removing outer hard barrier Use a plastic barrier to enclose area if dust could be generated
Negative Air Requirements:
The use of negative air must be designated to remove contaminants from the work area Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC Systems:
Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed Verify that HVAC systems are clean and operational.
Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications
Water Systems:
Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA directive 1061.
CL
AS
S
III
IV
13.
14.
15.
16.
17.
18.
Ensure availability of equipment for cleaning hands Construct and complete critical barriers meeting NFPA 241 requirements.
Barriers must extend to the ceiling or if ceiling tile is removed, to deck above All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type) Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A of this document.
These control measures must be maintained continuously 24/7 for the duration of the project.