This document is a comprehensive set of construction drawing sheets for a federal healthcare infrastructure upgrade project at what appears to be a VA medical center (Montrose VA). The project involves renovation and modernization of existing facility spaces across ground and first levels, with specific scope including HVAC modifications, electrical system upgrades, telecommunications infrastructure installation, fire protection system renovations, hazardous material abatement, and architectural modifications to create new spaces including a 179 SF telecom room.
The drawing index indicates 53 total sheets organized across multiple disciplines: General (cover sheet, notes, air quality requirements), ICRA/Life Safety, Hazardous Materials Abatement, Architectural, Interiors, Fire Protection, Mechanical, Electrical, and Telecommunications. The project is being delivered in three phases (35% Schematic Design, 65% Design Development, 95% Construction Documents), with the document marked as "Issued for Construction." Key requirements include maintaining operational status of existing occupied spaces during construction, implementing Class IV Infection Control Risk Assessment (ICRA) protocols with negative air pressure systems and HEPA filtration, coordinating hazardous material removal (asbestos and lead abatement), providing fire-rated construction barriers, maintaining means of egress, and installing new access control systems (Johnson Controls iSTAR Edge G2), IP-based security cameras (Avigilon), UPS systems, and Category 6A telecommunications cabling infrastructure. The project must comply with 2024 NFPA 101 Life Safety Code, 2025 NFPA 72 Fire Alarm Code, 2026 NEC, Virginia seismic standards, and applicable ASHRAE ventilation standards for medical facilities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.B
.rv t 3/
/2
:5
7:
P M
05G-001
DRAWING INDEX 620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION
GENERAL
05G-000 COVER SHEET Yes Yes Yes Yes 05G-001 DRAWING INDEX Yes Yes Yes Yes 05G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 05G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes
ICRA & LIFE SAFETY
05GI301 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - FIRST LEVEL No Yes Yes Yes 05GI302 INFECTION CONTROL & INTERIM LIFE SAFETY DETAILS No Yes Yes Yes
HAZARDOUS
05H-101 HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL No Yes Yes Yes
ARCHITECTURAL
05A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 05A-400 ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL No Yes Yes Yes 05A-401 ARCHITECTURAL EXTERIOR ELEVATIONS No No Yes Yes 05A-501 ARCHITECTURAL ROOF PLAN & DETAILS No Yes Yes Yes 05A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 05A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 05A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes
INTERIORS
05IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes
FIRE PROTECTION
05FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 05FX101 FIRE PROTECTION PLAN - FIRST LEVEL No Yes Yes Yes 05FX401 FIRE PROTECTION ENLARGED PLANS No Yes Yes Yes 05FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
MECHANICAL
05M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 05M-101 MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes 05M-401 MECHANICAL ENLARGED PLANS - DEMO & NEW No Yes Yes Yes 05M-501 MECHANICAL DETAILS No Yes Yes Yes 05M-701 MECHANICAL SCHEDULES No Yes Yes Yes 05M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 05M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 05M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 05M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
ELECTRICAL
05E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 05E-101 ELECTRICAL PLAN - GROUND LEVEL No Yes Yes Yes 05E-102 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes 05E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 05E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 05E-601 ELECTRICAL ONE-LINE DIAGRAMS Yes Yes Yes Yes 05E-701 ELECTRICAL SCHEDULES Yes Yes Yes Yes 05E-702 ELECTRICAL SCHEDULES Yes Yes Yes Yes 05E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 05E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes
TELECOMMUNICATION
05T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 05T-101 TELECOMMUNICATION PLAN - GROUND LEVEL Yes Yes Yes Yes 05T-102 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes 05T-401 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes 05T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 05T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 05T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 05T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 05T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 05T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 05T-700 TELECOMMUNICATION SCHEDULE & RACK ELEVATIONS No Yes Yes Yes 05T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 05T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 05T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes
REFERENCE
05R-900 PHOTO REFERENCES Yes Yes Yes Yes Grand total: 53
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
05G-011 REMOVED FROM
CONSTRUCTION DOCUMENTS
Ranjan Text Box
26862 SF
EXISTING BUSINESS -
TELECOM
ROOM
110110
COOLER
111111
KITCHEN
107107
SERVICE
UNIT
117117
ELEVATOR
NO. 1
E1E1
STAIR
HALL 3
108108
ELEVATOR
NO. 2
E2E2
FOOD
STORAGE
105105
PASSAGE
107Z-E107Z-E
PASSAGE
107Z-W107Z-W
DISH
STORAGE
112112
TOILET
110A110A
COOLER
113113
STORAGE
117A117A
FEC
E1 ▬ 74.4'
5 4
DISH
WASHING
ROOM NO.
114114
D.W.R.
STAIR
HALL
121Z121Z
REST.
120B120B
STOR. CL.
120A120A
OFFICE
120C120C
OFFICE
120A120A
OFFICE
120B120B
STORAGE
104104
REST.
101B101B
STORAGE
101A101A
STAIR
HALL NO.
122Z122Z
POT
ROOM
116116
NOURISHMENT
115115
SERVICE
UNIT
102A102A
LOBBY
NO. 2
101101
CONFERENCE
119A119A
FOOD &
NUTRITION
SERVICE
119119
PATIENT
DINING
ROOM NO.
102102
DISH
WASHING
ROOM NO.
106106
PATIENT
DINING
ROOM NO.
103103
LOBBY
NO. 1
120120
MRE
STORAGE
118118
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IPC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: BUSINESS Occupancy per Chapter 39
39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply
39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11
BUILDING OCCUPANCY TYPE:
EXISTING - BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.
39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
BUSINESS OCCUPANCY; PROTECTED = 300'-0"
OCCUPANT LOAD:
39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
39.2.3 Capacity of Means of Egress.
39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).
39.2.4 Number of Means of Egress.
39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6
1) the number of means of egress shall be in accordance with section 7.4
2) not less than two separate exits shall be provided on every story.
3) Not less than two separate exits shall be accessible from every part of every story.
39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.
PROTECTION OF VERTICAL OPENINGS:
39.3.1 Protection of Vertical Openings.
39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
39.3.2 Protection from Hazards.
39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7
39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material
The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.
39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
7:
:2
05GI301
INFECTION CONTROL PLAN & INTERIM LIFE
SAFETY - FIRST LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1" = 10'-0"F2 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - FIRST LEVEL
PATH OF TRAVEL SCHEDULE - FIRST LEVEL
Mark From Room To Room Type of Travel Path Length
LEVEL 1
(P-o-T) Distance to Exits
E1 TELECOM ROOM 110 STAIR HALL 3 108 (P-o-T) Distance to Exits 74' - 5"
1 ELEVATORS ARE TO REMAIN OPERATIONAL AT
ALL TIMES
2 ONE ELEVATOR TO BE DESIGNATED FOR
CONTRACTOR USE. CONTRACTOR TO PROTECT /
REPAIR ALL FINISHES AND FOLLOW PROPER ICRA
REMOVAL PROTOCOLS FOR ANY MATERIALS
REMOVED FROM SITE THROUGH ELEVATOR
3 DEBRIS REMOVAL PATH TO ELEVATOR
4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL
TIMES FOR EMERGENCY EGRESS ONLY. THEY
ARE NOT TO BE USED FOR ANY CONSTRUCTION
ACTIVITY.
5 TEMPORARY CONSTRUCTION BARRIER
6 PROVIDE TEMPORARY DUST TIGHT BARRIER
AROUND WORK AREA DURING ANY ACTIVITIES
WHICH PRODUCE DUST - TYPICAL
7 ANTEROOM - SEE INFECTION CONTROL & INTERIM
LIFE SAFETY DETAILS
8 TEMPORARY CONSTRUCTION BARRIER DOOR
WITH CLOSER AND LATCH AND WALK OFF MATS
9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT
ALL TIMES
10 SOLID GRAY HATCH DENOTES LIMITED WORK
AREA - SEE MEP AND TELECOM DRAWINGS FOR
CABLING SCOPE, TYP.
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
FIRST LEVEL EXISTING BUSINESS 26862 SF B Business 150 SF 0 179
NOTE:
DEBRIS REMOVAL:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
TEMPORARY WALL TO EXTEND
AND BE SEALED TO DECK /
FLOOR ABOVE WHEN RATED
ENCLOSURE REQUIRED
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
FI
NI
SH
ED
F
LO
OR
T O
UN
DE
RS
ID
E
OF
S
TR
UC
TU
RE
VE
RI
FY
F
LO
OR
T
O
FL
OO
R
HE
IG
HT
RENOVATED SPRINKLER
SYSTEM
WEEKLY CHANGED
OR MORE AS
NEEDED PRE-FILTER
FLEX DUCTMONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR
UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
PRESSURE INDICATOR SHALL BE AT
0.03 OR GREATER USING A DIGITAL
MANOMETER WITH DATA LOGGING. IF
NOT VERIFY ALL OPENING SUCH AS
DOOR ARE CLOSED AND/OR CHANGE
NEGATIVE AIR PRE-FILTER. DO NOT USE
A "BALL IN THE WALL" OR ANALOG
OTHER PRESSURE INDICATOR.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
OTAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
PUBLIC AREA
CONSTRUCTION AREA
ANTE ROOM
HARD BARRIER ALL THE WAY TO
DECK ABOVE
SIZE ANTE ROOM TO PROVIDE
SPACE FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS' PPE
AND CLEANING, INCLUDING A HEPA
CLOTHING VACUUM
ROUTE DUCT TO EXTERIOR - SEE
PLANS FOR PROPOSED ROUTES -
CONFIRM ROUTE WITH ON-SITE
STAFF PRIOR TO INSTALLATION.
DISCHARGE AT A DISTANCE OF 25
FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. DO NOT
DIRECT EXHAUST INTO ANY
BUILDING SHARED EXHAUST
SYSTEM.
ANTE ROOM FAN
DOOR TO BE SELF-CLOSING AND
SELF-LATCHING - 45 MIN. FIRE
RATING PER NFPA
D7
05GI302
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
PATH OF TRAVEL/DISTANCE TO EXITS
1/4" = 1'-0"F7 TYPICAL CONSTRUCTION LAYOUT- CLASS IV
1/2" = 1'-0"D7 CROSS SECTION A'-A'- CLASS IV
NTSF2 TYPICAL ICRA PRODUCTS
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
7:
:2
05GI302
INFECTION CONTROL & INTERIM LIFE SAFETY
DETAILS
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS
DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE
(COR).
COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH
OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH
THE COR. ALL INTERIOR DOORS THAT LEAD TO THE
CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.
OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING
WORK.
THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL
BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION
AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM
CLEANER PRIOR TO LEAVING THE SITE.
FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR
OCCUPIED AREAS ON THE FLOOR.
PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;
REVIEW WITH COR AND VA SAFETY GROUP.
MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT
ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION
UNITS.
CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE
OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR
EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE
CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN
CONSTRUCTION AREA TO PREVENT CONTAMINATION OF
EXISTING DUCT SYSTEM.
REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND
VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION
AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION
AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".
GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP
A CURRENT HOT WORK PERMIT ON SITE.
TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE
SURE THEY REMAIN EFFECTIVE.
MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL
DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR
CONTAINERS.
SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES
AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN
DUST PROTECTION AND NEGATIVE AIR PRESSURE.
MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,
WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR
CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED
AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA
SHALL BE CLEANED IMMEDIATELY.
AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA
WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,
REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH
OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER
REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.
CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL
PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
ICRA SYMBOL LEGENDINFECTION CONTROL RISK
ASSESSMENT:
TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE
ACTIVITY CATEGORY
IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT
CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP
CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK
CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR
MAINTENANCE
CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR
MAINTENANCE
THIS PROJECT: CATEGORY D
TABLE 2: AFFECTED AREA ASSESSMENT
TABLE 3: PATIENT RISK CATEGORY
IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN
TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH
THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT
RISK CATEGORY FOR THE ACTIVITY.
LOW RISK: NON-PATIENT CARE AREAS
MEDIUM RISK: PATIENT CARE SUPPORT AREAS
HIGH RISK: PATIENT CARE AREAS
HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY
COMPROMISED PATIENT CARE AREAS
THIS PROJECT: HIGH RISK
CL
AS
S
II
Construction Activity Category
RISK GROUP
LOW RISK
MEDIUM RISK
HIGH RISK
HIGHEST RISK
I II II III
I II III IV
I II IV IV
II III IV IV
A
STEP 1:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 2:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 3:
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 4:
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 5:
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 6:
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 7:
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 8:
DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE
WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?
(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN
AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)
STEP 9:
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 10:
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH
THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
Affected Area Assessment
AREA
Activity Area Area Above Area Below Adjacent Area
TR
SEE PLAN
SVC TYPE POC POC CONTACT INFO
SEE PLAN
SEE PLAN
Walter Hoffman (914) 208-6275
MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED
CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO
FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF
INFECTION CONTROL ACTIVITIES REQUIRED.
THIS PROJECT: CATEGORY IV
TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL
PRECAUTIONS
B C D
TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES
BY LEVEL OF PRECAUTIONS
NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)
TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES
REQUIRED UPON COMPLETION OF THE ACTIVITY
1.
2.
1.
2.
A.
B.
C.
D.
E.
1.
2.
1.
2.
3.
1.
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures
Work Area Cleaning:
Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces
Removal of Critical Barriers:
Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
Carefully remove screws and painter tape.
If dust will be generated during screw removal, use hand-held HEPA vacuum.
Drywall cutting is prohibited during removal process Clean all stud tracks with HEPA vacuum before removing outer hard barrier Use a plastic barrier to enclose area if dust could be generated
Negative Air Requirements:
The use of negative air must be designated to remove contaminants from the work area Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC Systems:
Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed Verify that HVAC systems are clean and operational.
Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications
Water Systems:
Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA directive 1061.
CL
AS
S
III
IV
13.
14.
15.
16.
17.
18.
Ensure availability of equipment for cleaning hands Construct and complete critical barriers meeting NFPA 241 requirements.
Barriers must extend to the ceiling or if ceiling tile is removed, to deck above All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type) Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors, or comply with the alternative method outlined in Appendix A of this document.
These control measures must be maintained continuously 24/7 for the duration of the project. HEPA filtered exhaust if discharged directly to the outdoors must be at a istance of 25 feet or greater from entrances, air intakes and operable windows. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable
4.
5.
6.
7.
8.
9.
10.
11.
12.
Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system)Ensure worker clothing is clean and free of visible dust before leaving the work area Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system Seal doors to prevent dust migration Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats just be changed routinely and when visibly soiled.
Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily
1.
2.
3.
Perform work activity in a manner that does not create dust Immediately replace ceiling tile, close access panels, etc. upon completion.
Any materials and equipment being brought into the facility must be free of contaminants and loose material
19.
20.
21.
22.
Barriers must be hard barriers unless temporary to install final barrier.
Containment must include an anteroom to ensure pressure control.
Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable Workers must wear shoe covers or have a method to clean shoes in anteroom. Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
CL
AS
S I
CL
AS
S
III
CL
AS
S
IV
YES
N/A
N/A
N/A
N/A
AFTER-HOURS WORK TO BE COORDINATED WITH VA COR
COORDINATE WITH VA COR ON PATIENT CARE FLOORS
TEMPORARY WALLS TO BE 1-HR RATED - PREFABRICATED
WALLS / DOOR PREFERRED
TECHNOLOGY AND ELECTRICAL FOCUSED WORK -
MINIMAL PLUMBING OR MECHANICAL IMPACT
MINOR INTERIOR RENOVATION IN EXISTING BUSINESS
OCCUPANCY AREAS - SEE PLAN
Walter Hoffman (914) 208-6275 Walter Hoffman (914) 208-6275 Walter Hoffman (914) 208-6275
1 ADDENDUM #1 03/27/202603/30/2026
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES
ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE
FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND
DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE
RESPONSIBLE STATE OF NEW YORK AGENCIES, U.S. ENVIRONMENTAL
PROTECTION AGENCY, U.S. DEPARTMENT OF LABOR, OCCUPATIONAL
SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF
OCCUPATIONAL SAFETY AND HEALTH, STATE OF NEW YORK DEPARTMENT
OF PUBLIC HEALTH, AND THE STATE OF NEW YORK DEPARTMENT OF
ENVIRONMENTAL CONSERVATION
CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA
DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134
CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL
ABATEMENT PROCEDURES. CONTRACTOR SHALL CONDUCT REMOVAL OF
ALL MATERIALS FROM THE SITE WITH A MINIMUM DISTURBANCE AND
PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING
PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC,
THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS (SHEETS GI201-
GI203) FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS.
COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL
CONTAINMENT PLANS WITH THE COR. COORDINATE USAGE OF STAIRS VS
USAGE OF CHUTE FOR DISPOSAL OF REMOVED HAZARDOUS MATERIAL
ON THE FIRST FLOOR.THE ABATEMENT CONTRACTOR SHALL PREPARE
THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE
REGULATIONS. WHERE OVERLAPS OCCUR, THE MOST STRINGENT
REQUIREMENTS APPLY.
THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE
PERFORMED BY A NYS LICENSED ASBESTOS ABATEMENT CONTRACTOR.
THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL
BE PERFORMED BY A NYS LICENSED LEAD ABATEMENT CONTRACTOR.
LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS SHALL BE
REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA
REGULATIONS.
CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES.
COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM
OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE
COMPROMISED.OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS,
AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE
REST OF THE CONTRACT DOCUMENTS, THE GENERAL CONTRACTOR, AND
THE COR.
CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD
OPERATING PROCEDURES FOR ABATEMENT WORK TO ENSURE MAXIMUM
PROTECTION AND SAFEGUARDS FOR LEAD AND/OR ASBESTOS EXPOSURE
TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE
ENVIRONMENT.
LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH VA COR.
CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS,
BARRIERS, AND ASSOCIATED MATERIALS AND EQUIPMENT REQUIRED TO
COMPLETE ALL WORK INDICATED IN THE CONTRACT DOCUMENTS. THE
OWNER OR THIER REPRESENTATIVE SHALL NOT BE RESPONSIBLE FOR
LOST, DAMAGED OR STOLEN ITEMS.
CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND
POSTED INSTRUCTIONS THAT ARE NECESSARY TO PROTECT, INFORM,
AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.
CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE
FOR LABORERS, A COPY OF THE LATEST APPLICABLE REGULATIONS
FROM OSHA, EPA, NIOSH, NYSDPH, AND THE NYSDEC.
CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT,
TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN
WITHIN THE WORK AREAS.
ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER
COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN,
THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF
THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED
TO ORIGINAL CONDITIONS BY THE CONTRACTOR, WITHOUT ADDITIONAL
COST TO THE OWNER.
THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR
SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY
REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION
MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON
THE DRAWINGS.
SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA
FILTER EQUIPPED NEGATIVE PRESSURE MACHINES, AIRLOCKS, AND
DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS SHOWING THE
NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.
PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA.
CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO
MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES. THE
GROUND FLOOR IS INTENDED TO REMAIN OPERATIONAL DURING THIS
PROJECT. UTILIZE GLOVEBAG METHODS ON THE GROUND FLOOR TO
MINIMIZE IMPACT ON BUILDING OPERATIONS.
CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE
CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT
OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD
ABATEMENT REQUIREMENTS, AND THE COR.
CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN
ACTIVITIES IN ADVANCE WITH THE COR. ALL OCCUPIED SPACES
ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.
WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.
THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND
PLUMBING CONTRACTORS SHALL BE RESPONSIBLE FOR DISMANTLING
ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM ON
HVAC EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.
CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS
ON A DAILY BASIS. COORDINATE MEANS, METHODS AND ROUTES WITH VA
ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED
HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED
WASTE SHALL BE PROPERLY PACKAGED PRIOR TO REMOVAL FROM THE
WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE
AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED
BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT
RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE
CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED
TO THE OWNER WITHIN 35 DAYS OF WASTE LEAVING THE SITE.
CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING
MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS
TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED
PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN
CONFIRMED IN PIPE INSULATION AND FITTINGS, SPECIFIC ORIGINAL
FLOORING MATERIALS, AND IN TRANSITE PANELS AT RADIATORS BELOW
WINDOWS. NO ASBESTOS CONTENT HAS BEEN IDENTIFIED IN SAMPLING
OF CEILING TILES, DRYWALL, JOINT COMPOUND, SKIM COAT, FIBERBOARD,
FIRESTOP, COVE BASE, MASONRY WINDOW CAULK, BATHROOM CAULK,
TILE GROUT, TILE GLUE, CERAMIC TILES, OR SPECIFIC FLOORING
MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST
ONE AREA IN THE FACILITY. SHOULD ANY PREVIOUSLY UNIDENTIFIED OR
OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING
CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER
DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR
COLLECT OR ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT
THE APPROVAL OF THE OWNER.
ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE
APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN
CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY
BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
COORDINATE WITH INDUSTRIAL HYGENIST FOR REVIEW OF MONITORING,
AND FINAL CONFIRMATION OF ABATED AREAS, REFER TO SPEC SECTION
02 82 13.13
ABCDEFIJMNP
GO HKL
DISH
WASHING
ROOM NO.
114114
ELEVATOR
NO. 1
E1E1
D.W.R.
STAIR
HALL
121Z121Z
CLOSET
120D120D
REST.
120B120B
STOR. CL.
120A120A
OFFICE
120C120C
OFFICE
120A
226 SF
OFFICE
120B120B
STORAGE
117A117A
STORAGE
104104
REST.
101B101B
CLOSET
102B102B
CLOSET
102C102C
STORAGE
101A101A
STAIR
HALL NO.
122Z122Z
ELEVATOR
NO. 2
E2E2
POT
ROOM
116116
NOURISHMENT
115115
TOILET
110A110A
TELECOM
ROOM
110110
COOLER
111111
CLOSET
109109
STAIR
HALL 3
108108
FOOD
STORAGE
105105
COOLER
113113
CLOSET
120C120C
DISH
STORAGE
112112
SERVICE
UNIT
102A102A
LOBBY
NO. 2
101101
KITCHEN
107107
CONFERENCE
119A119A
FOOD &
NUTRITION
SERVICE
119119
PATIENT
DINING
ROOM NO.
102102
DISH
WASHING
ROOM NO.
106106
PATIENT
DINING
ROOM NO.
103103
LOBBY
NO. 1
120120
MRE
STORAGE
118118
SERVICE
UNIT
117117
PASSAGE
107Z-W107Z-W
PASSAGE
107Z-E107Z-E
SPECKLED CREAM VFT WITH
BLACK AND YELLOW MASTIC
UNDER NON-ACM VFT
TP
SAMPLE
HA 31
NOTE: REFER TO INFECTION CONTROL &
INTERIM LIFE SAFETY SHEETS FOR
PROPOSED CRITICAL BARRIER
LOCATIONS - COORDINATE FINAL
LOCATIONS WITH COR
05A-401 F1
QTYS - ACM MATERIALSLEGEND
180 SF ± TOTAL FLOOR FINISH
MATERIAL TO BE
ABATED THIS FLOOR
REMOVAL PATH
SAMPLE
HA ##
SAMPLE
LOCATION
ASBESTOS /
LEAD PAINT
NOT ALL SAMPLE LOCATIONS SHOWN
FOR CLARITY. ONLY POSITIVE OR
POSITIVE STOP SAMPLES ARE
LOCATED. SAMPLE NUMBER PER
SURVEY REPORT FROM TERRACON.
REFER TO SURVEY REPORT FOR
SPECIFIC SAMPLE INFORMATION
PATH INDICATED IS PROVIDED FOR
INTENT ONLY. COORDINATE FINAL
REMOVAL PATHWAYS, PHASING, AND
METHODS WITH GENERAL
CONTRACTOR AND COR.
SAMPLE
PNT ##
TRANSITE PANELS
TP
100 SF ± TRANSITE PANELS, MASTIC AND
CAULKING (AT WINDOWS) TO BE
ABATED THIS FLOOR.
60 LF ± PIPE FITTINGS, INSULATION AND
MASTIC TO BE COMPLETELY
ABATED AND REMOVED.
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
7:
:2
05H-101
HAZARDOUS MATERIAL ABATEMENT PLAN -
FIRST LEVEL
620-22-700
06/27/2025 M. Perkins C. Raynes
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0"F1 HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL
1 ABATE TRANSITE PANELS ON RADIATOR BELOW WINDOW.
2 ABATE SPECKLED CREAM VINYL TILE AND ASSOCIATED MASTIC IN AREAS AS
INDICATED. SEE LEGEND BELOW. TREAT ANY REMOVED NON-ACM TILE
COVERING (IN DIRECT CONTACT) WITH ACM FLOORING TO BE CONTAMINATED
FOR THE PURPOSES OF DEMOLITION AND REMOVAL REQUIREMENTS.
3 PRIOR TO DEMO PROVIDE CONTAINMENT BARRIER AND PERSONNEL
DECONTAMINATION FACILITY PER 02 82 11 DURING ABATEMENT WORK.
COORDINATE TIMING WITH COR (48 HR MAX) TO MINIMIZE DISRUPTION TO
OCCUPIED SPACES.
# KEYNOTES
1.
2.
3.
4.
A.
ABATEMENT / ICRA NOTES:
ABATEMENT SCOPE INCLUDES DEMO WORK AS REQUIRED TO ACCESS ACM.
CONTRACTOR TO FIELD VERIFY QUANTITIES.
CONTRACTOR TO AVOID DISRUPTION OF PIPE INSULATION LOCATIONS. PROVIDE COORDINATION
DRAWINGS TO LOCATE ANY ACM CONTAINING ITEMS IN CHASES OR PLENUMS THAT CANNOT BE
AVOIDED.
REFER TO ACM REPORTS IN SPECIFICATIONS.
ICRA EVALUATIONS AND REQUIREMENTS TO BE COORDINATED THRU THE COR. REFER TO
INFECTION CONTROL & INTERIM LIFE SAFETY SHEETS.
SUMMARY OF ABATEMENT & INFECTION CONTROL REQUIREMENTS
SHEET SYMBOL LEGEND
KEYNOTES
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A1
A.
B.
C.
D.
E.
F.
G.
H.
I.
SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
NEW TELECOM ROOMS SHALL COMPLY WITH THE LATEST VA
PHYSICAL SECURITY STANDARDS, AND CAMPUS STANDARDS.
SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
SEE TYPICAL CEILING DETAILS ON SHEET A-531
PROVIDE TEMPORARY AIR TIGHT BARRIER AROUND WORK AREA
DURING ANY ACTIVITIES WHICH PRODUCE DUST, TYPICAL.
MAINTAIN CLEAR EXIT PATHS AND STAIRS AT ALL TIMES.
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
NO SCOPE
2"
1/2" 1/2"VARIES
SEE PLAN
WALL - SEE PLAN
FOR TYPE
SEALANT - EA. SIDE
& ALL AROUND,
TYP.
HOLLOW METAL
FRAME
1/ 2"
VA
R
IE
S
SE
E
PL
AN
1/ 2"
UNO
4" 2"
ADJACENT WALL
WHERE OCCURS
SEALANT - EA SIDE &
ALL AROUND, TYP.
HOLLOW METAL FRAME
WALL - SEE PLAN
FOR TYPE
D1
TYPICAL FRAME
H
EI
G H
T
2" WIDTH 2"
D3
FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS
F
FLUSH
05A-400 D7
ELEVATOR
NO. 2
E2E2
STAIR
HALL 3
108108
STAIR
HALL
121Z121Z
STAIR
HALL NO.
122Z122Z
05A-401 F1
05A-400 F3
SERVICE
UNIT
117117
TELECOM
ROOM
179 SF
B
B
B
B
A4
B
TOILET
110A110A
B
(E
XT
G
VI
F)
'-1 0"
(EXTG VIF)
12'-7 1/4"
(EXTG VIF)
4'-3"
(EXTIG VIF)
4'-2 3/4"
B1 05A-51112
ACOUSTICAL OR RATED
FLEXIBLE SEALANT
FLOOR LINE
ADD ONE LAYER OF 5/8" GWB,
ONE-SIDE WITH APPROVED UL
SETTING COMPOUND BETWEEN
LAYERS AND FASTENED TO
WALL AS REQUIRED, AT
EXISTING GWB WALL
ASSEMBLIES
EXISTING STRUCTURAL DECK
EXISTING METAL STUDS AND
BATT INSULATION TO REMAIN
A/C GRADE, 3/4" FIRE-TREATED
PLYWOOD TO 9'-0" ABOVE FINISHED
FLOOR, ADHERED TO CONCRETE AT
EXISTING CONCRETE WALL
ASSEMBLIES
BOTTOM OF PLYWOOD
TO BE AT 12" AFF
UL DESIGN V497
1-HOUR PARTITION RATED FROM BOTH SIDES
EXISTING GWB OR
CONCRETE WALL
ASSEMBLY, WHERE OCCURS
SIDE OF
EXISTING
ROOM OR
CORRIDOR TO
REMAIN
05A-512 D5
05A-512 B5
ACOUSTICAL OR RATED
SEALANT BOTH SIDES
FLOOR LINE
5/8" GWB BOTH SIDES
SOUND ATTENUATION
BATTS (SAB) PER
SCHEDULE.
CEILING LINE
EXISTING STRUCTURAL DECK
METAL STUDS, SIZE
PER SCHEDULE
05A-512 D5
A/C GRADE, 3/4" FIRE-
TREATED PLYWOOD TO 9'-0"
ABOVE FINISHED FLOOR
05A-512 B5
AT FIRE RATED
PARTITIONS
AT SMOKE RATED
PARTITIONS
BOTTOM OF PLYWOOD TO
BE AT 12" AFF
OFFICE
110110
OFFICE
110110
TOILET
110A110A
TELECOM
ROOM
179 SF
TOILET
110A110A
TOILET
110A110A
PATH OF REMOVAL
FROM ELEVATOR
TO EXTERIOR
PROVIDE DUMPSTER 35' FROM ANY
BUILDING, 6'-0" HIGH TEMPORARY
CONSTRUCTION FENCE AND GATE. TO BE
LOCKED AT ALL TIMES, PROVIDE COR
WITH KEY. COORDINATE FINAL LOCATION
WITH COR
PROVIDE CART FOR DAILY WASTE REMOVAL
COORDINATE FINAL LOCATION WITH COR
LOADING DOCKS WILL BE IN USE
DURING CONSTRUCTION.
COORDINATE ANY CONSTRUCTION
VEHICULAR ACTIVITY TO ENSURE
ACCESS TO LOADING AREAS ARE
NOT IMPEDED.
J2
J2
J2
2'- 9"
VI
F
1'- 6"
VIF
2'-3"
PASSAGE
107Z-W107Z-W
SERVICE
UNIT
117117
TYP.
LINE OF
STRUCTURE
LINE OF
STRUCTURE
09 29 00
SOUND ATTENUATION BATTS
(SAB), WHERE OCCURS
NOTE:
IF PARTITION TYPE IS USED IN A
CHASE WALL CONDITION, PROVIDE
CROSS BRACING GUSSETS AT 48"
O.C. MAX VERTICALLY. FABRICATED
FROM 6" MTL STUDS.
6”
09 29 00
5/8" GWB
09 29 00
SAB RETAINER STRAP
WHERE SAB OCCURS
CEILING
07 92 00
SEALANT
09 22 16
METAL STUDS
A-721 B7
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
7:
:3
05A-400
ARCHITECTURAL ENLARGED VIEWS - FIRST
LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
3" = 1'-0"D1 HOLLOW METAL HEAD DETAIL
3" = 1'-0"D3 HOLLOW METAL JAMB DETAIL
1/4" = 1'-0"F1 DOOR AND FRAME TYPES ELEVATIONS
1 REMOVE EXISTING DOOR AND FRAME.
2 REMOVE EXISTING FLOORING AND WALL BASE.
3 EXISTING CEILING TO REMAIN.
4 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C
FIRE EXTINGUISHER LOCATED NO GREATER THAN 75 FEET AWAY
FROM THE NEW TR. CONTRACTOR TO COORDINATE THE NEW
LOCATION WITH THE COR. CONTRACTOR SHALL BID A NEW FEC FOR
EACH TR IN THE SCOPE OF WORK. SEE SPECIFICATION 10 44 13.
5 NEW INFILL AT EXTERIOR. NEW WALL TO MATCH EXISTING.
6 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW WALL IN
ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE WALL SPAN
OR APPROPRIATE TRANSITION LOCATION AS APPROVED BY THE COR.
FINAL COLOR APPROVAL BY COR OR CAMPUS INTERIOR
DESIGNER.
7 TELECOM ROOM TO BE OPEN TO DECK ABOVE.
8 REMOVE EXISTING ACOUSTICAL CEILING AND LIGHTS. MODIFY
AND/OR PROVIDE ADDITIONAL SUPPORTS AS REQUIRED FOR
EXISTING CEILING ITEMS TO REMAIN.
9 REMOVE OBSERVATION WINDOW AND INFILL WALL, FINISH TO MATCH
ON BOTH SIDES
10 NEW DOOR. SEE DOOR SCHEDULE AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION. COORDINATE DOOR AND FRAME WITH
ACCESS CONTROL HARDWARE.
11 REMOVE EXISTING WINDOW, AC UNIT AND METAL SUPPORT FRAME.
PROVIDE TEMPORARY INFILL.
12 ANY NEW GROUND LEVEL CHILLER PIPES ATTACHED TO EXTERIOR
WALLS SHALL BE PAINTED IN THEIR ENTIRETY TO MATCH BRICK
COLOR. REQUIREMENT OF NEW YORK STATE PARKS, RECREATION
AND HISTORIC PRESERVATION (SHPO) DOCUMENT 24PR00345
JFXVGRV7XYPA DATED DECEMBER 9,2024.
13 ACCESS DOOR PER SPECIFICATION, COR TO CONFIRM LOCATION
AND MOUNTING HEIGHT.
1/32" = 1'-0"F7 FIRST LEVEL REFERENCE PLAN
1/4" = 1'-0"D7
ARCHITECTURAL ENLARGED FLOOR PLAN -
FIRST LEVEL - ROOM 110 - NEW
NOTE: FIRE RESISTANCE TEST FOR ONE HOUR RATED WALLS: UL U465
(TYPE A) TYPICAL PARTITION
MARK STUD WIDTH PRTN WIDTH DESIGN STC
A4 4" 5 1/4" 35
NOTE: 2-HOUR PARTITION RATED WALLS: UL V438, U411
(TYPE B) TYPICAL PARTITION
MARK STUD WIDTH PRTN WIDTH DESIGN STC
B 2 1/2" 3/4" 45
DOOR AND FRAME SCHEDULE
IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL
FIRE RATING
HARDWARE
NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL LEVEL 1 110 TELECOM ROOM 110 3' - 6" 7' - 0" 1 3/4" F WD WD NONE 3/8" 1 HM P-2 D1/ 05A-400 D3/ 05A-400 - - HW-SH-3F SEE SPEC 1
1/4" = 1'-0"D6
ARCHITECTURAL ENLARGED FLOOR PLAN -
FIRST LEVEL - ROOM 110 - DEMO
1/4" = 1'-0"B7
ARCHITECTURAL REFLECTED CEILING PLAN -
FIRST LEVEL - ROOM 110 - NEW
1/4" = 1'-0"B6
ARCHITECTURAL REFLECTED CEILING PLAN -
FIRST LEVEL - ROOM 110 - DEMO
3/4" = 1'-0"F6 SITE DIAGRAM - BUILDING 5
1. SEE SPECIFICATION 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.
DOOR HARDWARE LEGEND
HW-SH-3F Secured Access Door - Storeroom Locking (F07 Lockset) with Closer, Overhead Stop, Alarm Contact, Card Reader
1/2" = 1'-0"F3 FIRST LEVEL CHASE - SERVICE UNIT - ROOM 117
ACCESS DOOR SCHEDULE
LEVEL ROOM NAME ROOM NUMBER DESCRIPTION TYPE
LEVEL 1 SERVICE UNIT 117 Drywall Access Door Removable Door - Screwdriver Cam Latch 1'. 24"X24" SIZE
(TYPE J) NON-RATED PARTITION
MARK STUD WIDTH PRTN WIDTH DESIGN STC
J2 2 1/2" 3 1/8" -
25 GA MIN MTL
TRACK
CLIP ANGLE
1" X 20 GA MTL STRAP AT 3'-6"
O.C., EACH SIDE
25 GA MIN MTL TRACK AT
FLOOR
DOUBLE 20 GA MTL STUDS AT
BOTH JAMBS
TYPE A
CONT16 GA 6" WIDE
MTL BACK-UP
STRAP
MO
UN
TI
NG
H
EI
GH
TS
RE
F
TY
PI
CA
L
TYPE B
20 GA MTL RUNNER
TRACK - CLIP
FLANGES TO FIT
OVER STUDS
6" MIN, DEEPER
IF REQUIRED
MO
UN
TI
NG
H
EI
GH
TS
RE
F
TY
PI
CA
L
TYPE C
MO
UN
TI
NG
H
EI
GH
TS
RE
F
TY
PI
CA
L
8" MIN, DEEPER
IF REQUIRED
MIN 20 GA MTL STUDS
FACING OPPOSITE
DIRECTIONS TO ALLOW
MOUNTING PLATE
ATTACHMENT
14 GA STL RUNNER
TRACK-CLIP FLANGES
AND FOLD WEB TO FORM
ATTACHMENT FLANGE
PROVIDE DIAGONAL BRACING (AT 45° TYP) OF
TOP TRACK AT 48" OC MAX BETWEEN FULL
HEIGHT STUDS
DOOR
OPENING
DOOR
OPENING
DOUBLE DOOR OPENING
BELOW CEILING
OPENING
LARGE BELOW CEILING
OPENING
ABOVE CEILING OPENING
LARGE ABOVE CEILING
OPENING
MOUNTING DETAIL
TYPE B
DOUBLE STUDS
DOUBLE
STUDS
DOUBLE STUDS DOUBLE STUDS
DOUBLE STUDS
4' - 6" MAX 8' - 6" MAX 4' - 6" MAX 8' - 6" MAX
ALL STUDS ARE TO BE 20 GAUGE
IF GREATER THAN 8' - 6"
8' - 6" MAX 8' - 6" MAX
4' - 6" MAX
25 GA MIN BOTTOM TRACK (TYP)
FLOOR LINE
20 GA MTL TOP TRACK
(TYP UNO)
CEILING LINE
UNDERSIDE OF SLAB, FLOOR OR
ROOF DECK
2" WIDE 20 GA METAL
STRAP
OPENING ABOVE CEILING WHICH
INTERRUPTS LOWER OPENING JAMB
STUDS
STONE VENEER WALLS
16 GA MIN STUDS AT 20 GA MIN STUDS AT
WALL MOUNTED
ARCHITECTURAL
CABINETS/MILLWORK/
ATTACHED SHELVING
DOOR
OPENING
E8 05A-511
E8 05A-511
F8 05A-511
F8 05A-511
D8 05A-511
D8 05A-511
E8 05A-511
E8 05A-511
F8 05A-511
C8 05A-511
C8 05A-511
C8 05A-511
C8 05A-511
C8 05A-511
C8 05A-511
B8 05A-511
E8 05A-511
SEE: (D4/05A-511)
1.
2.
3.
4.
5.
6.
7.
NOTES:
ALL STUDS ARE SPACED 16"
OC MAXIMUM.
ALL STUDS SHALL BE "C"
STUDS WITH 1/4" RETURN
FLANGE MINIMUM.
INDICATES SHELVING
OR CABINETRY.
INDICATES STONE.
DOUBLE STUDS AT SIDES OF
OPENING SHALL NOT BE CUT
FOR DUCTWORK OR ANY
OTHER MECHANICAL
SYSTEMS.
REFER TO C3 / A-522 FOR
MOUNTING TYPE DETAILS.
PROVIDE PARTITION BRACING
AT ALL ASSEMBLIES OVER
15'-0" IN HEIGHT, U.N.O.
EXTERIOR
SHEATHING
SECOND LAYER OF GWB
WHERE INDICATED BY
PARTITION TYPE
RATED PARTITION AS
INDICATED ON PLAN, EXTEND
GWB TO INTERIOR FACE OF
EXTERIOR SHEATHING
INTERSECTION AT RATED
PARTITION AND EXTERIOR WALL
CONCRETE WALL
OR COLUMN
SEALANT
FURRING PARTITION
AS INDICATED ON PLAN
RATED PARTITION AS INDICATED
ON PLAN
INTERSECTION OF RATED
PARTITION AND CONCRETE
INTERSECTION AT RATED
PARTITION AND CONCRETE
LOWER PRIORITY
PARTITION
HIGHER PRIORITY
PARTITION
INTERSECTION OF CROSS
CORRIDOR DOOR IN RATED
PARTITION
MI
N3"
CONCRETE WALL OR
COLUMN
SEALANT
FURRING PARTITION
AS INDICATED ON PLAN
RATED PARTITION AS
INDICATED ON PLAN
MI
N3"
2 5/8"
SECOND LAYER OF GWB WHERE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .