This document is a comprehensive construction drawing package for a federal healthcare infrastructure upgrade project at Montrose Veterans Affairs Medical Center. The project involves renovation and modernization of multiple building systems across ground, first, and second floors of an existing business occupancy facility totaling approximately 22,219 square feet.

The scope encompasses hazardous material abatement (asbestos and lead-based paint removal), infection control and life safety measures for occupied building operations, architectural modifications including new telecom rooms and partition construction, fire protection system upgrades, mechanical and electrical system renovations, and complete telecommunications infrastructure installation. Critical requirements include maintaining operational elevators and stairs during construction, implementing Class IV Infection Control Risk Assessment procedures with negative air pressure containment, daily debris removal following contamination protocols, and compliance with 2024 NFPA 101 Life Safety Code and 2025 NFPA 72/13 standards. The project mandates coordination with the Contracting Officer Representative, use of temporary construction barriers with HEPA filtration, establishment of anterooms for dust control, and protection of existing building occupants. Two new telecom rooms must comply with VA physical security standards and house new 4-post racks, UPS systems, Category 6A cabling infrastructure, and Avigilon IP-addressable security cameras integrated with C•CURE 9000 event management systems. The telecommunications upgrade includes new cable tray systems, fiber optic pathways with umbilical cords between multiple computer rooms, and comprehensive data outlet installations throughout all three floors.

View the file

Other files

File Type Posted
Amend 5 - B04.20260330.pdf PDF
Amend 5 - B14.20260330.pdf PDF
Amend 5 - B15.20260330.pdf PDF
Amend 5 - B17.20260330.pdf PDF
Amend 5 - B20.20260330.pdf PDF
Amend 5 - B28.20260330.pdf PDF
Amendment 4 - 36C77626R0033 0004.pdf PDF
Clause 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS - APR 2026.pdf PDF
RFI TRACKING SHEET - SOLICITATION 36C77626R0033.pdf PDF
ATTACHMENT 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260410.pdf PDF
ATTACHMENT 5 - 01 00 00.D - Appendix D - SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
ATTACHMENT 11 - 01 00 00.I - Appendix I - K9245005 VAMC EHRM Montrose NY GeoReport 4.12.2024.pdf PDF
ATTACHMENT 12A - Summary.Log.Add01_20260410.pdf PDF
ATTACHMENT 13 - Montrose.EHRM.Addendum.01.B01.20260330.pdf PDF
ATTACHMENT 14 - Montrose.EHRM.Addendum.01.B02.20260330.pdf PDF
ATTACHMENT 22 - Montrose.EHRM.Addendum.01.B14.20260330.pdf PDF
ATTACHMENT 25 - Montrose.EHRM.Addendum.01.B17.20260330.pdf PDF
ATTACHMENT 26A - Montrose.EHRM.Addendum.01.B19.20260330.pdf PDF
ATTACHMENT 30 - Montrose.EHRM.Addendum.01.B29.20260330.pdf PDF
ATTACHMENT 31 - Montrose.EHRM.Addendum.01.B31.20260330.pdf PDF
ATTACHMENT 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
ATTACHMENT 8 - 01 00 00.G - Appendix G - GPRS Triple C Montrose Full Report.pdf PDF
ATTACHMENT 16 - Montrose.EHRM.Addendum.01.B04.20260330.pdf PDF
ATTACHMENT 21 - Montrose.EHRM.Addendum.01.B13.20260330.pdf PDF
ATTACHMENT 24 - Montrose.EHRM.Addendum.01.B16.20260330.pdf PDF
ATTACHMENT 27 - Montrose.EHRM.Addendum.01.B20.20260330.pdf PDF
ATTACHMENT 28 - Montrose.EHRM.Addendum.01.B26.20260330.pdf PDF
ATTACHMENT 28A - Montrose.EHRM.Addendum.01.B27.20260330.pdf PDF
Amendment 2 - 36C77626R0033 0002.pdf PDF
Site visit sign-in sheet 3-23-26.pdf PDF
RFP - 36C77626R0033.pdf PDF
Attachment 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
Attachment 4 - 01 00 00.C - Appendix C1 SOP 138-22HV CONST STD PROCEDURES QA FOR PROJECTS.pdf PDF
Attachment 5 - 01 00 00.D - Appendix D1 SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
Attachment 16 - Drawing B04 20250627.pdf PDF
Attachment 18 - Drawing B06 20250627.pdf PDF
Attachment 22 - Drawing B14 20250627.pdf PDF
Attachment 27 - Drawing B20 20250627.pdf PDF
Attachment 29 - Drawing B28 20250627.pdf PDF
Attachment 32 - Drawing B52 20250627.pdf PDF
Attachment 36 - Division Cost Breakdown.xlsx XLSX spreadsheet
Attachment 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260205.pdf PDF
Attachment 6 - 01 00 00.E - Appendix E - VHA ICRA-1.3 - Dec 9 2024.pdf PDF
Attachment 7 - 01 00 00.F - Appendix F - VHA PCRA 2024 1.1 Final.Template Fillable.pdf PDF
Attachment 8 - 01 00 00.G - Appendix G - GPRS Triple C Montrose Full Report.pdf PDF
Attachment 9 - 01 00 00.H - Appendix H - J2237038 Montrose ACM Ld Pnt InspRpt Final 8-21-2023.pdf PDF
Attachment 12 - Additional Security Badging Requirements rev 2.pdf PDF
Attachment 13 - Drawing B01 20250627.pdf PDF
Attachment 31 - Drawing B31 20250627.pdf PDF
Attachment 33 - Drawing Site 20250627.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

CONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

STAMP

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .M

EP

.B

.rv t 3/

/2

:3

2:

P M

03G-001

DRAWING INDEX 620-22-700

06/27/2025 M. PERKINS K.

MCDERMOTT

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

- DRAWING INDEX -

SHEET

NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION

GENERAL

03G-000 COVER SHEET Yes Yes Yes Yes 03G-001 DRAWING INDEX Yes Yes Yes Yes 03G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 03G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes

HAZARDOUS

03H-101 HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL No Yes Yes Yes 03H-102 HAZARDOUS MATERIAL ABATEMENT PLAN - SECOND LEVEL No Yes Yes Yes

ICRA & LIFE SAFETY

03GI300 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - GROUND LEVEL No Yes Yes Yes 03GI301 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - FIRST LEVEL No Yes Yes Yes 03GI302 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - SECOND LEVEL No Yes Yes Yes 03GI303 INFECTION CONTROL & INTERIM LIFE SAFETY DETAILS No Yes Yes Yes

ARCHITECTURAL

03A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 03A-400 ARCHITECTURAL ENLARGED VIEWS - GROUND & FIRST LEVELS No Yes Yes Yes 03A-401 ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL No Yes Yes Yes 03A-402 ARCHITECTURAL EXTERIOR ELEVATIONS & DETAILS No Yes Yes Yes 03A-501 ARCHITECTURAL ROOF PLAN & DETAILS No Yes Yes Yes 03A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 03A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 03A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes

INTERIORS

03IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes

FIRE PROTECTION

03FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 03FX100 FIRE PROTECTION PLAN - GROUND LEVEL Yes Yes Yes Yes 03FX101 FIRE PROTECTION PLAN - FIRST LEVEL Yes Yes Yes Yes 03FX102 FIRE PROTECTION PLAN - SECOND LEVEL Yes Yes Yes Yes 03FX401 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes 03FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes

MECHANICAL

03M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 03M-100 MECHANICAL PLAN - GROUND LEVEL No Yes Yes Yes 03M-101 MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes 03M-102 MECHANICAL PLAN - SECOND LEVEL No Yes Yes Yes 03M-401 MECHANICAL ENLARGED PLANS No Yes Yes Yes 03M-501 MECHANICAL DETAILS No Yes Yes Yes 03M-701 MECHANICAL SCHEDULES No Yes Yes Yes 03M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 03M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 03M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 03M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes

ELECTRICAL

03E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 03E-100 ELECTRICAL PLAN - GROUND LEVEL No Yes Yes Yes 03E-101 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes 03E-102 ELECTRICAL PLAN - SECOND LEVEL No Yes Yes Yes 03E-400 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 03E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 03E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 03E-601 ELECTRICAL ONE-LINE DIAGRAMS Yes Yes Yes Yes 03E-701 ELECTRICAL SCHEDULES Yes Yes Yes Yes 03E-702 ELECTRICAL SCHEDULES Yes Yes Yes Yes 03E-703 ELECTRICAL SCHEDULES No No Yes Yes 03E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 03E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes

TELECOMMUNICATION

03T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 03T-100 TELECOMMUNICATION PLAN - GROUND LEVEL Yes Yes Yes Yes 03T-101 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes 03T-102 TELECOMMUNICATION PLAN - SECOND LEVEL Yes Yes Yes Yes 03T-400 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes 03T-401 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes 03T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 03T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 03T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 03T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 03T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 03T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 03T-604 NEW/EXISTING TELECOM RACK ELEVATIONS Yes Yes Yes Yes 03T-605 EXISTING MCR ELEVATIONS RM 214 Yes Yes Yes Yes 03T-606 EXISTING MCR ELEVATIONS RM 214 Yes Yes Yes Yes 03T-607 EXISTING MCR ELEVATIONS RM 214 Yes Yes Yes Yes 03T-608 EXISTING MCR ELEVATIONS RM 214 Yes Yes Yes Yes 03T-609 NEW MCR ELEVATIONS / MDA B07 RM 023 Yes Yes Yes Yes 03T-610 NEW MCR ELEVATIONS / HDA B07 RM 023 Yes Yes Yes Yes 03T-700 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 03T-701 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 03T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 03T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 03T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes

REFERENCE

03R-900 PHOTO REFERENCES No Yes Yes Yes 03R-901 PHOTO REFERENCES No Yes Yes Yes 03R-902 PHOTO REFERENCES No Yes Yes Yes 03R-903 PHOTO REFERENCES No Yes Yes Yes Grand total: 77

# Revisions: Date:

1 ADDENDUM #1 03/30/2026

03G-011 REMOVED FROM

CONSTRUCTION DOCUMENTS

Ranjan Text Box

STAIR HALL A

TELECOM ROOM

OFFICE

051M03

CORRIDOR

C08

ELEVATOR 2

E2

ELEVATOR 1

E1

ELEVATOR

LOBBY

STAIR HALL 1

CORRIDOR

C05

H.A.S. CHECK-IN

WAITING ROOM

051M

CORRIDOR

C06

MI

N.

4'- 2"

C

LR

SHOWER ROOM

051M01

FEC

E1 ▬ 43'

35 4

TOILET

051M02

22179 SF

EXISTING BUSINESS -

CORRIDOR

C04

RECEPT.

051N

MECH ROOM

PACT TEAM

EXAM ROOM

CVT/ EXAM

EXAM ROOM

EXAM ROOM

PACT TEAM

COMMON ROOM

PORCELAIN LAB

OFFICE

DENTAL

SUPPLIES

OPERATORY 9

OPERATORY 8

EXAM ROOM

TELECOM

CLOSET

EMS ROOM

ELECTRICAL

ROOM

TOILET

PIPE CLOSET

TOILET

014A

EXAM ROOM

ELEC CLOSET

PACT TEAM

COMMON ROOM

SOCIAL WORKER

SOILED HOLDING

TOILET

027A

PYXIS ROOM

EXAM ROOM

CLEAN STORAGE

PHARMACIST

TOILET

018A

MED STOR.

019A

EXAM ROOM

SHARED

TREATMENT

TELECOM

CLOSET

MECH. CLOSET

CLOSET

SOILED LINEN

CORRIDOR

C01

CONDENSATE

PUMP ROOM

051L

EXAM ROOM

051I

OFFICE

051H

STORAGE

051F

OFFICE

051E

EXAM ROOM

051K

EXAM ROOM

051J EXAM ROOM

051D

EXAM ROOM

051C

TOILET

051A

CLOSET

15A

ENTRANCE

TOILET

15B

OFFICE

15E

PATIENT ADMIN

SUPPORT

15C

OFFICE

OFFICE

PIPE CLOSET

044A

TOILET

044B

RESIDENT

BEDROOM

CLOSET

043A

BREAKER ROOM

040MECH ROOM

LOCKER ROOM

STAIR HALL A

TRANSFORMER

ROOM

PLASTER LAB

STAFF LOUNGE

CORRIDOR

C037

CORRIDOR

C07

TRIAGE

051B

DENTAL LAB

EXAM ROOM

DENTAL LAB

TOILET

PACT TEAM

COMMON ROOM

STAIR HALL 5

051G

STAIR HALL

48H

PASSAGE 01

PASS1

PASSAGE 02

PASS2

CONFERENCE

ROOM

H.A.S. CHECK-IN

WAITING

CORRIDOR

C03

CORRIDOR

C02

STARBUCKS

TRAVEL OFFICE

051L01

H.A.S.

051L

DETAILS

H.A.S.

H.A.S. SUPV.

057A

ELEC.

EMS

TLT

TLT

WOMEN'S

HEALTH EXAM

RM.

WOMEN'S

HEALTH EXAM

RM.

TOILET

TOILET

WAITING ROOM

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

LIFE SAFETY SYMBOLS

PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES

REFER TO SCHEDULE)

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL

FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD

FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF

NFPA 5000 AND NFPA 900

2024 INTERNATIONAL MECHANICAL CODE (IPC)

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8

2026 NATIONAL ELECTRICAL CODE (NEC)

2024 INTERNATIONAL PLUMBING CODE (IPC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION

(AISC)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE

170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025

SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2024

2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED

BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE

STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1/2 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS

MEDICAL GAS / HAZARDOUS 1 HOUR

STORAGE

CLASSIFICATION OF OCCUPANCY:

EXISTING: BUSINESS Occupancy per Chapter 39

39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply

39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11

BUILDING OCCUPANCY TYPE:

EXISTING - BUSINESS OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.

39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.

BUSINESS OCCUPANCY; PROTECTED = 300'-0"

OCCUPANT LOAD:

39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

MEANS OF EGRESS:

39.2.3 Capacity of Means of Egress.

39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.

39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).

39.2.4 Number of Means of Egress.

39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6

1) the number of means of egress shall be in accordance with section 7.4

2) not less than two separate exits shall be provided on every story.

3) Not less than two separate exits shall be accessible from every part of every story.

39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.

PROTECTION OF VERTICAL OPENINGS:

39.3.1 Protection of Vertical Openings.

39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

39.3.2 Protection from Hazards.

39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7

39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:

(1) Boilder and fuel-fired heater rooms

(2) Central/bulk laundries larger than 100 ft2

(3) Paint Shops

(4) Physical plant maintenance shops

(5) Rooms with soiled linen in volume exceeding 64 gal

(6) Rooms with collected trashed in volume exceeding 64 gal.

(7) Storage rooms larger than 100 ft2 and storing combustible material

The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:

(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.

(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.

39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.

39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

X - XX'

# ICRA SYMBOLSKEYNOTES

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t

-0 3-

6:

:1

03GI300

INFECTION CONTROL PLAN & INTERIM LIFE

SAFETY - GROUND LEVEL

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1/8" = 1'-0"F2 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - GROUND LEVEL

1 ELEVATORS TO REMAIN OPERATIONAL AT ALL TIMES

2 ONE ELEVATOR TO BE DESIGNATED FOR CONTRACTOR

USE. CONTRACTOR TO PROTECT / REPAIR ALL FINISHES

AND FOLLOW PROPER ICRA REMOVAL PROTOCOLS FOR

ANY MATERIALS REMOVED FROM SITE THROUGH

ELEVATOR

3 DEBRIS REMOVAL PATH TO EXTERIOR - COORDINATE

PATH OF REMOVAL WITH VA COR

4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES

FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO BE

USED FOR ANY CONSTRUCTION ACTIVITY.

5 TEMPORARY CONSTRUCTION BARRIER

6 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND

WORK AREA DURING ANY ACTIVITIES WHICH PRODUCE

DUST - TYPICAL

7 ANTEROOM - SEE INFECTION CONTROL & INTERIM LIFE

SAFETY DETAILS

8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH

CLOSER AND LATCH AND WALK OFF MATS

9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL

TIMES

10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA - SEE

MEP AND TELECOM DRAWINGS FOR CABLING SCOPE,

TYP.

11 ACCESS TO THESE DOORS WILL BE LIMITED DURING

DEMOLITION OF ADJACENT EXISTING DOOR AND PATCH

AND REPAIR OF EXISTING WALL.

12 PROVIDE TEMPORARY CONSTRUCTION BARRIERS FOR

REMOVAL AND INFILL OF DOOR AREA. WORK TO BE

SCHEDULED AND COORDINATED WITH COR TO LIMIT

DISRUPTION TO STAFF AND PATIENTS.

PATH OF TRAVEL SCHEDULE - GROUND FLOOR

Mark From Room To Room Type of Travel Path Length

GROUND LEVEL

(P-o-T) Distance to Exits

E1 TELECOM ROOM 050 STAIR HALL A 047 (P-o-T) Distance to Exits 43' - 0"

AREA OCCUPANCIES

LEVEL Name Area SF

Occupancy Requirements

OL

Occupancy

(IBC) Occupancy (NFPA) OLF Fixed Seats

GROUND LEVEL EXISTING BUSINESS 22179 SF B Business 150 SF 0 148

NOTE:

DEBRIS REMOVAL:

COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH

ASBESTOS REPORT AND PLAN.

CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF

MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA

PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO

REMOVAL OF ANY MATERIALS.

SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING

CONSTRUCTION.

LIFE SAFETY:

NEW WORK DOES NOT CHANGE EXISTING SMOKE

COMPARTMENTS, EXIT PATHWAYS, OR EXITS.

# Revisions: Date:

1 ADDENDUM #1 03/30/2026

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

LIFE SAFETY SYMBOLS

PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES

REFER TO SCHEDULE)

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL

FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD

FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF

NFPA 5000 AND NFPA 900

2024 INTERNATIONAL MECHANICAL CODE (IPC)

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8

2026 NATIONAL ELECTRICAL CODE (NEC)

2024 INTERNATIONAL PLUMBING CODE (IPC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION

(AISC)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE

170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025

SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2024

2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED

BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE

STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1/2 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS

MEDICAL GAS / HAZARDOUS 1 HOUR

STORAGE

CLASSIFICATION OF OCCUPANCY:

EXISTING: BUSINESS Occupancy per Chapter 39

39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply

39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11

BUILDING OCCUPANCY TYPE:

EXISTING - BUSINESS OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.

39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.

BUSINESS OCCUPANCY; PROTECTED = 300'-0"

OCCUPANT LOAD:

39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

MEANS OF EGRESS:

39.2.3 Capacity of Means of Egress.

39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.

39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).

39.2.4 Number of Means of Egress.

39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6

1) the number of means of egress shall be in accordance with section 7.4

2) not less than two separate exits shall be provided on every story.

3) Not less than two separate exits shall be accessible from every part of every story.

39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.

PROTECTION OF VERTICAL OPENINGS:

39.3.1 Protection of Vertical Openings.

39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

39.3.2 Protection from Hazards.

39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7

39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:

(1) Boilder and fuel-fired heater rooms

(2) Central/bulk laundries larger than 100 ft2

(3) Paint Shops

(4) Physical plant maintenance shops

(5) Rooms with soiled linen in volume exceeding 64 gal

(6) Rooms with collected trashed in volume exceeding 64 gal.

(7) Storage rooms larger than 100 ft2 and storing combustible material

The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:

(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.

(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.

39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.

39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

X - XX'

# ICRA SYMBOLSKEYNOTES

TELECOM ROOM

EXAM ROOM

EXAM ROOM

CORRIDOR

ELEVATOR NO. 1

E1

ELEVATOR NO. 2

E2

ELEV. LOBBY

01C00

STAIR HALL NO.

STAIR HALL NO.

S3

CORRIDOR

149Z

MI

N

CL

R

3'- 8"

E1 ▬ 43.9'

FEC

21910 SF

EXISTING BUSINESS - B

STAIR HALL NO.

S5

TOILET

112A

STAFF LOUNGE

CORRIDOR

141Z

OFFICE

107G

WAITING AREA

MOP BAL.

120A

CLOSET

118A

STORAGE

OFFICE

CLOSET

121A

HVAC SHAFT

VACUUM PUMP

ROOM

105A

EXAM

TOILET

102A2

STOR. CL.

TELE CL.

101A

OFFICE

107A

OFFICE

107C

CORRIDOR

OFFICE

107F

RECORDS TECH.

107E

OFFICE

107H

OFFICE

107I

OFFICE

CLOSET

134A

OPTOMETRY

EXAM & RETINAL

PHOTO ROOM

OPTOMETRY

EXAM ROOM

OPTOMETRY

EXAM ROOM

VISION FIELD

EXAM ROOM

OPTOMETRY

EXAM ROOM

REST ROOM

PANTRY

MENS TOILET

WOMENS TOILET

OFFICE

OFFICE

OPTOMETRY

STORAGE

CORRIDOR

148Z

OFFICE

CONFERENCE

ROOM

LOW VISION

EXAM ROOM

OFFICE

WAITING ROOM

EXAM ROOM

100B TOILET

100A1

OFFICE

OFFICE

107D

BREAKER ROOM

113G

X-RAY ROOM

113D

CORRIDOR

X-RAY ROOM

113E

EXAM ROOM

100A

PLEBOTOMY

113A

TOILET

EXAM ROOM

EXAM ROOM

102A

OFFICE

102A1

CLOSET

134B

CORRIDOR

150Z

OFFICE

125EMS CL.

OFFICE

117A

PIPE CLOSET

113B

PIPE CLOSET

111A

ROOM

107B

EXAM ROOM

106A

EXAM ROOM

WAITING ROOM

STAFF LOUNGE

OPTOMETRY

EXAM ROOM

PROGRAM

MANAGER

OFFICE

OPEN OFFICE

PIPE CHASE

134A

MED CLERK

OFFICE

118OFFICE

OFFICE

STAIR HALL NO.

PLEBOTOMY

LABORATORY

113F

IMAGING

STATION

113C

STAIR HALL NO.

S4

RECEP

134 WAITING AREA

MECH

TELECOM

CLOSET

ELEC. CL.

OFFICE

MECH ROOM

STORAGE

OEF/OIF CASE

MANAGER

OEF/OIF CASE

MANAGER

OEF/OIF CHIEF

STORAGE

OIF INTERVIEW

OEF INTERVIEW

CORRIDOR

01C03

WAITING

CORRIDOR

01C01

TOILET

STORAGE

STORAGE

166STORAGE

TOILET

STORAGE

FLU CLINIC

OFFICE

WOMEN VET.

OFFICE

WOME VET.

OFFICE

HAS SUPV.

OFFICE

ADMIN. MED.

OFFICE

SHARED CVT

DISPENSING

ROOM

CORRIDOR

01C02

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t

-0 3-

6:

:2

03GI301

INFECTION CONTROL PLAN & INTERIM LIFE

SAFETY - FIRST LEVEL

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL

TIMES

2 ONE ELEVATOR TO BE DESIGNATED FOR

CONTRACTOR USE. CONTRACTOR TO PROTECT /

REPAIR ALL FINISHES AND FOLLOW PROPER ICRA

REMOVAL PROTOCOLS FOR ANY MATERIALS

REMOVED FROM SITE THROUGH ELEVATOR

3 DEBRIS REMOVAL PATH TO ELEVATOR

4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES

FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO

BE USED FOR ANY CONSTRUCTION ACTIVITY.

5 TEMPORARY CONSTRUCTION BARRIER

6 PROVIDE TEMPORARY DUST TIGHT BARRIER

AROUND WORK AREA DURING ANY ACTIVITIES

WHICH PRODUCE DUST - TYPICAL

7 ANTEROOM - SEE INFECTION CONTROL & INTERIM

LIFE SAFETY DETAILS

8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH

CLOSER AND LATCH AND WALK OFF MATS

9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL

TIMES

10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -

SEE MEP AND TELECOM DRAWINGS FOR CABLING

SCOPE, TYP.

1/8" = 1'-0"F2 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - FIRST LEVEL

PATH OF TRAVEL SCHEDULE - FIRST FLOOR

Mark From Room To Room Type of Travel Path Length

LEVEL 1

(P-o-T) Distance to Exits

E1 TELECOM ROOM 150 STAIR HALL NO. 3 S3 (P-o-T) Distance to Exits 43' - 11"

AREA OCCUPANCIES

LEVEL Name Area SF

Occupancy Requirements

OL

Occupancy

(IBC) Occupancy (NFPA) OLF Fixed Seats

FIRST LEVEL EXISTING BUSINESS 21910 SF B Business 150 SF 0 146

NOTE:

DEBRIS REMOVAL:

COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH

ASBESTOS REPORT AND PLAN.

CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF

MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA

PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO

REMOVAL OF ANY MATERIALS.

SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING

CONSTRUCTION.

LIFE SAFETY:

NEW WORK DOES NOT CHANGE EXISTING SMOKE

COMPARTMENTS, EXIT PATHWAYS, OR EXITS.

1 ADDENDUM #1 03/27/202603/30/2026

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

LIFE SAFETY SYMBOLS

PATH OF TRAVEL

(FOR CUMULATIVE DISTANCES

REFER TO SCHEDULE)

EXIT LIGHTING

TM

FIRE EXTINGUISHER CABINET (FEC)

FIRE EXTINGUISHERS (FE)

FIRE HOSE CABINETS (FHC)

HEAT DETECTOR

SMOKE DETECTOR

DIRECTION OF EGRESS

APPLICABLE BUILDING CODES

2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL

FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD

FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF

NFPA 5000 AND NFPA 900

2024 INTERNATIONAL MECHANICAL CODE (IPC)

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION

(OSHA) STANDARDS.

VA SEISMIC DESIGN REQUIREMENTS, H-18-8

2026 NATIONAL ELECTRICAL CODE (NEC)

2024 INTERNATIONAL PLUMBING CODE (IPC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

BUILDING CODE REQUIREMENTS FOR REINFORCED

CONCRETE, AMERICAN CONCRETE INSTITUTE AND

COMMENTARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION

(AISC)

ENERGY POLICY ACT OF 2005 (EPACT)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION

STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-

FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-

RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND

SUSTAINABLE BUILDINGS: MEMORANDUM OF

UNDERSTANDING (MOU)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL

ENVIRONMENTAL, ENERGY, AND TRANSPORTATION

MANAGEMENT

THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.

STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00

AND 01 35 26 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –

ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE

170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025

SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE

STANDARD 15–2024

2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED

BY VA STANDARDS

UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE

STANDARD OR CODE SHALL BE USED

APPLICABLE BUILDING GUIDES

VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)

BUILDING CODE:

CONSTRUCTION TYPE:

TYPE II (222) PER NFPA 220, Chapter 4

TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.

FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING

ELEMENTS:

STRUCTURAL FRAME 2 HOURS

NON-BEARING WALLS 0 HOURS

BEARING WALLS 2 HOURS

FLOORS 2 HOURS

ROOFS/ CEILINGS 1 HOURS

FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)

FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY

FUNCTION:

ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)

SMOKE COMPARTMENTS 1/2 HOUR

SOILED UTILITY ROOMS 1 HOUR

VERTICAL SHAFTS / STAIRS 2 HOURS

MEDICAL GAS / HAZARDOUS 1 HOUR

STORAGE

CLASSIFICATION OF OCCUPANCY:

EXISTING: BUSINESS Occupancy per Chapter 39

39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply

39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11

BUILDING OCCUPANCY TYPE:

EXISTING - BUSINESS OCCUPANCY

6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:

(1) Mercantile, BUSINESS, industrial, or storage use

6.1.14.3 Mixed Occupancies

6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.

Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business

6.2 Hazard of Contents.

6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.

EXIT ACCESS TRAVEL DISTANCE:

39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.

39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.

BUSINESS OCCUPANCY; PROTECTED = 300'-0"

OCCUPANT LOAD:

39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.

MEANS OF EGRESS:

39.2.3 Capacity of Means of Egress.

39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.

39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).

39.2.4 Number of Means of Egress.

39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6

1) the number of means of egress shall be in accordance with section 7.4

2) not less than two separate exits shall be provided on every story.

3) Not less than two separate exits shall be accessible from every part of every story.

39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.

PROTECTION OF VERTICAL OPENINGS:

39.3.1 Protection of Vertical Openings.

39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.

PROTECTION FROM HAZARDS:

39.3.2 Protection from Hazards.

39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7

39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:

(1) Boilder and fuel-fired heater rooms

(2) Central/bulk laundries larger than 100 ft2

(3) Paint Shops

(4) Physical plant maintenance shops

(5) Rooms with soiled linen in volume exceeding 64 gal

(6) Rooms with collected trashed in volume exceeding 64 gal.

(7) Storage rooms larger than 100 ft2 and storing combustible material

The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:

(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.

(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.

39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.

39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.

PARKING SUMMARY:

NO ADDITIONAL PARKING ADDED

WIDTH PROVIDEDP: XX"

R: XX" WIDTH REQUIRED

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

X - XX'

# ICRA SYMBOLSKEYNOTES

TELECOM ROOM

243A

EXAM ROOM

OFFICE

244B

CORRIDOR

246Z

CORRIDOR

248Z

STAIR HALL NO.

ELEV. NO. 2

ELEV NO. 1

ELEV LOBBY

10 9

FEC

E1 ▬ 45.7'

MI

N.

3'- 8"

C

LR

16016 SF

EXISTING BUSINESS -

STAIR HALL NO.4

STAIR HALL NO.

HVAC SHAFT

147F

WAITING ROOM

OFFICE

208A4

TREATMENT

ROOM

209A2

TOILET

209A2A

MECH CL

209D

CLOSET

207A

CORRIDOR

247Z

OFFICE

208A3

OFFICE

208A1

GROUP OFFICE

208A

CLOSET

TOILET

202B

STOR CL

CLOSET

202A

TELE CL

EXAM ROOM

201A

CLOSET

242A

CLOSET

242B

ACCESSABLE

OPERATORY

SOILED ROOM

Room

OPERATORY

OPERATORY

STAFF DENTIST

RESIDENTS /

INTERNS

OPERATORY

OPERATORY

SERVICE CHIEF

WOMENS

LOCKER

MENS LOCKER

WOMENS TOILET

231A

MENS TOILET

230A

TRAINING ROOM

OFFICE

PIPE CL

220A

MOP BAL.

222A

MED CLERK

OFFICE

OFFICE

217 EMS CL

DARK ROOM

PANORAMIC

X-RAY

OPERATORY

OPERATORY

CLEAN ROOM

DENTAL

LABORATORY

CORRIDOR

249Z

RECEPTION

234A

RECORD / FILES

GROUP OFFICE

208A2

OFFICE

209A

Room

209B

STAFF DENTIST

STORAGE CL

WAITING AREA

CLOSET

219A

WAITING ROOM

EXAM

ROOM/OFFICE

209C

OFFICE

209A1

ENTRY

MY HEALTHY

VET

207B1

WAITING ROOM

207B

OFFICE

EXAM ROOM

EXAM ROOM

EXAM ROOM

OPERATORY

Room

SUPPLIES

OPERATORY

EXAM ROOM

DISPENSING

ROOM

TOILET

220B

OFFICE

219OFFICE

OFFICE

214A

STAIR HALL NO.

SERVER ROOM

OPERATORY

WAITING AREA

OFFICE

244A

200A

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t

-0 3-

6:

:2

03GI302

INFECTION CONTROL PLAN & INTERIM LIFE

SAFETY - SECOND LEVEL

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

1 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL

TIMES

2 ONE ELEVATOR TO BE DESIGNATED FOR

CONTRACTOR USE. CONTRACTOR TO PROTECT /

REPAIR ALL FINISHES AND FOLLOW PROPER ICRA

REMOVAL PROTOCOLS FOR ANY MATERIALS

REMOVED FROM SITE THROUGH ELEVATOR

3 DEBRIS REMOVAL PATH TO ELEVATOR

4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES

FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO

BE USED FOR ANY CONSTRUCTION ACTIVITY.

5 TEMPORARY CONSTRUCTION BARRIER

6 PROVIDE TEMPORARY DUST TIGHT BARRIER

AROUND WORK AREA DURING ANY ACTIVITIES

WHICH PRODUCE DUST - TYPICAL

7 ANTEROOM - SEE INFECTION CONTROL & INTERIM

LIFE SAFETY DETAILS

8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH

CLOSER AND LATCH AND WALK OFF MATS

9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL

TIMES

10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -

SEE MEP AND TELECOM DRAWINGS FOR CABLING

SCOPE, TYP.

1/8" = 1'-0"F2 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - SECOND LEVEL

PATH OF TRAVEL SCHEDULE - SECOND FLOOR

Mark From Room To Room Type of Travel Path Length

LEVEL 2

(P-o-T) Distance to Exits

E1 TELECOM ROOM 243A STAIR HALL NO. 3 226 (P-o-T) Distance to Exits 45' - 9"

AREA OCCUPANCIES

LEVEL Name Area SF

Occupancy Requirements

OL

Occupancy

(IBC) Occupancy (NFPA) OLF Fixed Seats

SECOND LEVEL EXISTING BUSINESS 16016 SF B Business 150 SF 0 107

NOTE:

DEBRIS REMOVAL:

COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH

ASBESTOS REPORT AND PLAN.

CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF

MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA

PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO

REMOVAL OF ANY MATERIALS.

SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING

CONSTRUCTION.

LIFE SAFETY:

NEW WORK DOES NOT CHANGE EXISTING SMOKE

COMPARTMENTS, EXIT PATHWAYS, OR EXITS.

TEMPORARY WALL TO EXTEND

AND BE SEALED TO DECK /

FLOOR ABOVE WHEN RATED

ENCLOSURE REQUIRED

FLOOR LINE

CEILING SYSTEM AS

SCHEDULED

EXISTING STRUCTURE

FI

NI

SH

ED

F

LO

OR

T O

UN

DE

RS

ID

E

OF

S

TR

UC

TU

RE

VE

RI

FY

F

LO

OR

T

O

FL

OO

R

HE

IG

HT

RENOVATED SPRINKLER

SYSTEM

WEEKLY CHANGED

OR MORE AS

NEEDED PRE-FILTER

FLEX DUCTMONTHLY CHANGED

HEPA FILTER

HEPA NEGATIVE AIR

UNIT

PROVIDE STICKY MATS (CHANGED END OF

EVERY SHIFT OR MORE IF NECESSARY TO

MAINTAIN CLEANLINESS).

PRESSURE INDICATOR SHALL BE AT

0.03 OR GREATER USING A DIGITAL

MANOMETER WITH DATA LOGGING. IF

NOT VERIFY ALL OPENING SUCH AS

DOOR ARE CLOSED AND/OR CHANGE

NEGATIVE AIR PRE-FILTER. DO NOT USE

A "BALL IN THE WALL" OR ANALOG

OTHER PRESSURE INDICATOR.

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN NOT

RUNNING TO KEEP

DUST OUT.

A

V

OTAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

E

FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET

(SHALL REQUIRE MORE THAN

ONE.)

PUBLIC AREA

CONSTRUCTION AREA

ANTE ROOM

HARD BARRIER ALL THE WAY TO

DECK ABOVE

SIZE ANTE ROOM TO PROVIDE

SPACE FOR EQUIPMENT STAGING,

CART CLEANING, WORKERS' PPE

AND CLEANING, INCLUDING A HEPA

CLOTHING VACUUM

ROUTE DUCT TO EXTERIOR - SEE

PLANS FOR PROPOSED ROUTES -

CONFIRM ROUTE WITH ON-SITE

STAFF PRIOR TO INSTALLATION.

DISCHARGE AT A DISTANCE OF 25

FEET OR GREATER FROM

ENTRANCES, AIR INTAKES AND

OPERABLE WINDOWS. DO NOT

DIRECT EXHAUST INTO ANY

BUILDING SHARED EXHAUST

SYSTEM.

ANTE ROOM FAN

DOOR TO BE SELF-CLOSING AND

SELF-LATCHING - 45 MIN. FIRE

RATING PER NFPA

D7

03GI303

INFECTION CONTROL / DUST

CONTROL PARTITION / BARRIER

INFECTION CONTROL/DUST CONTROL

EGRESS DOOR NON-TRANSFERRING

MULTI-SHEETED ADHESIVE FLOOR PADS

PATH OF DEMOLITION/TRASH

REMOVAL TRAVEL

CONSTRUCTION LIMIT LINE

NOT IN CONTRACT AREA

DEMOLITION

LASER PARTICLE COUNT LOCATION

PATH OF TRAVEL/DISTANCE TO EXITS

1/4" = 1'-0"F7 TYPICAL CONSTRUCTION LAYOUT- CLASS IV

1/2" = 1'-0"D7 CROSS SECTION A'-A'- CLASS IV

NTSF2 TYPICAL ICRA PRODUCTS

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202

MAT PERKINS

(315) 484-5958

Au to de sk

D oc s:

//6

-2

2-

M on tro se V

AM

C

E H

R M

IU

/6

-2

2-

0.

M on tro se .E

H R

M .A

R C

H .B

.rv t

-0 3-

6:

:2

03GI303

INFECTION CONTROL & INTERIM LIFE SAFETY

DETAILS

620-22-700

06/27/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

(EHRM) INFRASTRUCTURE

UPGRADES

2094 Albany Post Road, Montrose, NY 10548

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS

DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE

(COR).

COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH

OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH

THE COR. ALL INTERIOR DOORS THAT LEAD TO THE

CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.

OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING

WORK.

THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL

BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.

CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION

AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS

THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM

CLEANER PRIOR TO LEAVING THE SITE.

FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR

OCCUPIED AREAS ON THE FLOOR.

PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;

REVIEW WITH COR AND VA SAFETY GROUP.

MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT

ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT

DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION

UNITS.

CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE

OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR

EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE

CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN

CONSTRUCTION AREA TO PREVENT CONTAMINATION OF

EXISTING DUCT SYSTEM.

REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND

VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION

AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION

AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".

GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP

A CURRENT HOT WORK PERMIT ON SITE.

TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE

SURE THEY REMAIN EFFECTIVE.

MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL

DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR

CONTAINERS.

SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES

AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN

DUST PROTECTION AND NEGATIVE AIR PRESSURE.

MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,

WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR

CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED

AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA

SHALL BE CLEANED IMMEDIATELY.

AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA

WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,

REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH

OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER

REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.

CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

ICRA NOTES:

ICRA SYMBOL LEGENDINFECTION CONTROL RISK

ASSESSMENT:

TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE

ACTIVITY CATEGORY

IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT

CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP

CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK

CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR

MAINTENANCE

CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR

MAINTENANCE

THIS PROJECT: CATEGORY D

TABLE 2: AFFECTED AREA ASSESSMENT

TABLE 3: PATIENT RISK CATEGORY

IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN

TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH

THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT

RISK CATEGORY FOR THE ACTIVITY.

LOW RISK: NON-PATIENT CARE AREAS

MEDIUM RISK: PATIENT CARE SUPPORT AREAS

HIGH RISK: PATIENT CARE AREAS

HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY

COMPROMISED PATIENT CARE AREAS

THIS PROJECT: MEDIUM RISK

CL

AS

S

II

Construction Activity Category

RISK GROUP

LOW RISK

MEDIUM RISK

HIGH RISK

HIGHEST RISK

I II II III

I II III IV

I II IV IV

II III IV IV

A

STEP 1:

IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT

ROOMS, MEDICATION ROOM, AND SO ON.

STEP 2:

IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND

ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE

OUTAGES.

STEP 3:

IDENTIFY CONTAINMENT MEASURES, USING PRIOR

ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,

SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?

STEP 4:

CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A

RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR

EXAMPLE, WALL, CEILING, ROOF)?

NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE

ISOLATED FROM THE OCCUPIED AREAS DURING

CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO

SURROUNDING AREAS.

STEP 5:

WORK HOURS: CAN OR WILL THE WORK BE DONE DURING

NON-PATIENT-CARE HOURS?

STEP 6:

DO PLANS ALLOW FOR ADEQUATE NUMBER OF

ISOLATION/NEGATIVE AIRFLOW ROOMS?

STEP 7:

DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE

OF HAND-WASHING SINKS?

STEP 8:

DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE

WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?

(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN

AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)

STEP 9:

DOES THE INFECTION PREVENTION AND CONTROL STAFF

AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED

UTILITY ROOMS?

STEP 10:

PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH

THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,

HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).

Affected Area Assessment

AREA

Activity Area Area Above Area Below Adjacent Area

TR

SEE PLAN

SVC TYPE POC POC CONTACT INFO

SEE PLAN

SEE PLAN

Walter Hoffman (914) 208-6275

MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED

CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO

FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF

INFECTION CONTROL ACTIVITIES REQUIRED.

THIS PROJECT: CATEGORY IV

TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL

PRECAUTIONS

B C D

TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES

BY LEVEL OF PRECAUTIONS

NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)

TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES

REQUIRED UPON COMPLETION OF THE ACTIVITY

1.

2.

1.

2.

A.

B.

C.

D.

E.

1.

2.

1.

2.

3.

1.

Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures

Work Area Cleaning:

Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces

Removal of Critical Barriers:

Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

Carefully remove screws and painter tape.

If dust will be generated during screw removal, use hand-held HEPA vacuum.

Drywall cutting is prohibited during removal process Clean all stud tracks with HEPA vacuum before removing outer…