ATTACHMENT 15 - Montrose.EHRM.Addendum.01.B03.20260330.pdf
PDF 17 MB Posted
- Solicitation number
- RFP-36C77626R0033
About this file
This document is a comprehensive construction drawing package for a federal healthcare infrastructure upgrade project at Montrose Veterans Affairs Medical Center. The project involves renovation and modernization of multiple building systems across ground, first, and second floors of an existing business occupancy facility totaling approximately 22,219 square feet.
The scope encompasses hazardous material abatement (asbestos and lead-based paint removal), infection control and life safety measures for occupied building operations, architectural modifications including new telecom rooms and partition construction, fire protection system upgrades, mechanical and electrical system renovations, and complete telecommunications infrastructure installation. Critical requirements include maintaining operational elevators and stairs during construction, implementing Class IV Infection Control Risk Assessment procedures with negative air pressure containment, daily debris removal following contamination protocols, and compliance with 2024 NFPA 101 Life Safety Code and 2025 NFPA 72/13 standards. The project mandates coordination with the Contracting Officer Representative, use of temporary construction barriers with HEPA filtration, establishment of anterooms for dust control, and protection of existing building occupants. Two new telecom rooms must comply with VA physical security standards and house new 4-post racks, UPS systems, Category 6A cabling infrastructure, and Avigilon IP-addressable security cameras integrated with C•CURE 9000 event management systems. The telecommunications upgrade includes new cable tray systems, fiber optic pathways with umbilical cords between multiple computer rooms, and comprehensive data outlet installations throughout all three floors.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
CONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
STAMP
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .M
EP
.B
.rv t 3/
/2
:3
2:
P M
03G-001
DRAWING INDEX 620-22-700
06/27/2025 M. PERKINS K.
MCDERMOTT
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME INCLUDED IN 35% SD INCLUDED IN 65% DD INCLUDED IN 95% CD ISSUED FOR CONSTRUCTION
GENERAL
03G-000 COVER SHEET Yes Yes Yes Yes 03G-001 DRAWING INDEX Yes Yes Yes Yes 03G-010 GENERAL PROJECT NOTES Yes Yes Yes Yes 03G-012 GENERAL INDOOR AIR QUALITY NOTES Yes Yes Yes Yes
HAZARDOUS
03H-101 HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL No Yes Yes Yes 03H-102 HAZARDOUS MATERIAL ABATEMENT PLAN - SECOND LEVEL No Yes Yes Yes
ICRA & LIFE SAFETY
03GI300 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - GROUND LEVEL No Yes Yes Yes 03GI301 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - FIRST LEVEL No Yes Yes Yes 03GI302 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - SECOND LEVEL No Yes Yes Yes 03GI303 INFECTION CONTROL & INTERIM LIFE SAFETY DETAILS No Yes Yes Yes
ARCHITECTURAL
03A-001 ARCHITECTURAL SYMBOLS, & GENERAL NOTES No Yes Yes Yes 03A-400 ARCHITECTURAL ENLARGED VIEWS - GROUND & FIRST LEVELS No Yes Yes Yes 03A-401 ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL No Yes Yes Yes 03A-402 ARCHITECTURAL EXTERIOR ELEVATIONS & DETAILS No Yes Yes Yes 03A-501 ARCHITECTURAL ROOF PLAN & DETAILS No Yes Yes Yes 03A-511 ARCHITECTURAL PARTITION AND FRAMING DETAILS No Yes Yes Yes 03A-512 ARCHITECTURAL PARTITION HEAD DETAILS No Yes Yes Yes 03A-531 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes
INTERIORS
03IN101 INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES No Yes Yes Yes
FIRE PROTECTION
03FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND DETAILS No Yes Yes Yes 03FX100 FIRE PROTECTION PLAN - GROUND LEVEL Yes Yes Yes Yes 03FX101 FIRE PROTECTION PLAN - FIRST LEVEL Yes Yes Yes Yes 03FX102 FIRE PROTECTION PLAN - SECOND LEVEL Yes Yes Yes Yes 03FX401 FIRE PROTECTION ENLARGED PLANS Yes Yes Yes Yes 03FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes
MECHANICAL
03M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS No Yes Yes Yes 03M-100 MECHANICAL PLAN - GROUND LEVEL No Yes Yes Yes 03M-101 MECHANICAL PLAN - FIRST LEVEL No Yes Yes Yes 03M-102 MECHANICAL PLAN - SECOND LEVEL No Yes Yes Yes 03M-401 MECHANICAL ENLARGED PLANS No Yes Yes Yes 03M-501 MECHANICAL DETAILS No Yes Yes Yes 03M-701 MECHANICAL SCHEDULES No Yes Yes Yes 03M-801 MECHANICAL CONTROL SYMBOL LEGEND AND ABBREVIATIONS No Yes Yes Yes 03M-802 MECHANICAL CONTROL DIAGRAMS No Yes Yes Yes 03M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes Yes Yes 03M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN No Yes
ELECTRICAL
03E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 03E-100 ELECTRICAL PLAN - GROUND LEVEL No Yes Yes Yes 03E-101 ELECTRICAL PLAN - FIRST LEVEL No Yes Yes Yes 03E-102 ELECTRICAL PLAN - SECOND LEVEL No Yes Yes Yes 03E-400 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 03E-401 ELECTRICAL ENLARGED PLANS No Yes Yes Yes 03E-501 ELECTRICAL DETAILS Yes Yes Yes Yes 03E-601 ELECTRICAL ONE-LINE DIAGRAMS Yes Yes Yes Yes 03E-701 ELECTRICAL SCHEDULES Yes Yes Yes Yes 03E-702 ELECTRICAL SCHEDULES Yes Yes Yes Yes 03E-703 ELECTRICAL SCHEDULES No No Yes Yes 03E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 03E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN No No No Yes
TELECOMMUNICATION
03T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes 03T-100 TELECOMMUNICATION PLAN - GROUND LEVEL Yes Yes Yes Yes 03T-101 TELECOMMUNICATION PLAN - FIRST LEVEL Yes Yes Yes Yes 03T-102 TELECOMMUNICATION PLAN - SECOND LEVEL Yes Yes Yes Yes 03T-400 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes 03T-401 TELECOMMUNICATION ENLARGED PLANS No Yes Yes Yes 03T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes 03T-502 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 03T-503 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS Yes Yes Yes Yes 03T-504 TELECOMMUNICATION ROOM OIT TEMPLATE DETAILS No Yes Yes Yes 03T-601 TELECOMMUNICATION RISER DIAGRAMS Yes Yes Yes Yes 03T-603 TELECOMMUNICATION FIBER RISER DIAGRAM - NEW No Yes Yes Yes 03T-604 NEW/EXISTING TELECOM RACK ELEVATIONS Yes Yes Yes Yes 03T-605 EXISTING MCR ELEVATIONS RM 214 Yes Yes Yes Yes 03T-606 EXISTING MCR ELEVATIONS RM 214 Yes Yes Yes Yes 03T-607 EXISTING MCR ELEVATIONS RM 214 Yes Yes Yes Yes 03T-608 EXISTING MCR ELEVATIONS RM 214 Yes Yes Yes Yes 03T-609 NEW MCR ELEVATIONS / MDA B07 RM 023 Yes Yes Yes Yes 03T-610 NEW MCR ELEVATIONS / HDA B07 RM 023 Yes Yes Yes Yes 03T-700 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 03T-701 TELECOMMUNICATION SCHEDULES No Yes Yes Yes 03T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes 03T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes 03T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN No No Yes Yes
REFERENCE
03R-900 PHOTO REFERENCES No Yes Yes Yes 03R-901 PHOTO REFERENCES No Yes Yes Yes 03R-902 PHOTO REFERENCES No Yes Yes Yes 03R-903 PHOTO REFERENCES No Yes Yes Yes Grand total: 77
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
03G-011 REMOVED FROM
CONSTRUCTION DOCUMENTS
Ranjan Text Box
STAIR HALL A
TELECOM ROOM
OFFICE
051M03
CORRIDOR
C08
ELEVATOR 2
E2
ELEVATOR 1
E1
ELEVATOR
LOBBY
STAIR HALL 1
CORRIDOR
C05
H.A.S. CHECK-IN
WAITING ROOM
051M
CORRIDOR
C06
MI
N.
4'- 2"
C
LR
SHOWER ROOM
051M01
FEC
E1 ▬ 43'
35 4
TOILET
051M02
22179 SF
EXISTING BUSINESS -
CORRIDOR
C04
RECEPT.
051N
MECH ROOM
PACT TEAM
EXAM ROOM
CVT/ EXAM
EXAM ROOM
EXAM ROOM
PACT TEAM
COMMON ROOM
PORCELAIN LAB
OFFICE
DENTAL
SUPPLIES
OPERATORY 9
OPERATORY 8
EXAM ROOM
TELECOM
CLOSET
EMS ROOM
ELECTRICAL
ROOM
TOILET
PIPE CLOSET
TOILET
014A
EXAM ROOM
ELEC CLOSET
PACT TEAM
COMMON ROOM
SOCIAL WORKER
SOILED HOLDING
TOILET
027A
PYXIS ROOM
EXAM ROOM
CLEAN STORAGE
PHARMACIST
TOILET
018A
MED STOR.
019A
EXAM ROOM
SHARED
TREATMENT
TELECOM
CLOSET
MECH. CLOSET
CLOSET
SOILED LINEN
CORRIDOR
C01
CONDENSATE
PUMP ROOM
051L
EXAM ROOM
051I
OFFICE
051H
STORAGE
051F
OFFICE
051E
EXAM ROOM
051K
EXAM ROOM
051J EXAM ROOM
051D
EXAM ROOM
051C
TOILET
051A
CLOSET
15A
ENTRANCE
TOILET
15B
OFFICE
15E
PATIENT ADMIN
SUPPORT
15C
OFFICE
OFFICE
PIPE CLOSET
044A
TOILET
044B
RESIDENT
BEDROOM
CLOSET
043A
BREAKER ROOM
040MECH ROOM
LOCKER ROOM
STAIR HALL A
TRANSFORMER
ROOM
PLASTER LAB
STAFF LOUNGE
CORRIDOR
C037
CORRIDOR
C07
TRIAGE
051B
DENTAL LAB
EXAM ROOM
DENTAL LAB
TOILET
PACT TEAM
COMMON ROOM
STAIR HALL 5
051G
STAIR HALL
48H
PASSAGE 01
PASS1
PASSAGE 02
PASS2
CONFERENCE
ROOM
H.A.S. CHECK-IN
WAITING
CORRIDOR
C03
CORRIDOR
C02
STARBUCKS
TRAVEL OFFICE
051L01
H.A.S.
051L
DETAILS
H.A.S.
H.A.S. SUPV.
057A
ELEC.
EMS
TLT
TLT
WOMEN'S
HEALTH EXAM
RM.
WOMEN'S
HEALTH EXAM
RM.
TOILET
TOILET
WAITING ROOM
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IPC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: BUSINESS Occupancy per Chapter 39
39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply
39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11
BUILDING OCCUPANCY TYPE:
EXISTING - BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.
39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
BUSINESS OCCUPANCY; PROTECTED = 300'-0"
OCCUPANT LOAD:
39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
39.2.3 Capacity of Means of Egress.
39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).
39.2.4 Number of Means of Egress.
39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6
1) the number of means of egress shall be in accordance with section 7.4
2) not less than two separate exits shall be provided on every story.
3) Not less than two separate exits shall be accessible from every part of every story.
39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.
PROTECTION OF VERTICAL OPENINGS:
39.3.1 Protection of Vertical Openings.
39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
39.3.2 Protection from Hazards.
39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7
39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material
The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.
39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
6:
:1
03GI300
INFECTION CONTROL PLAN & INTERIM LIFE
SAFETY - GROUND LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1/8" = 1'-0"F2 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - GROUND LEVEL
1 ELEVATORS TO REMAIN OPERATIONAL AT ALL TIMES
2 ONE ELEVATOR TO BE DESIGNATED FOR CONTRACTOR
USE. CONTRACTOR TO PROTECT / REPAIR ALL FINISHES
AND FOLLOW PROPER ICRA REMOVAL PROTOCOLS FOR
ANY MATERIALS REMOVED FROM SITE THROUGH
ELEVATOR
3 DEBRIS REMOVAL PATH TO EXTERIOR - COORDINATE
PATH OF REMOVAL WITH VA COR
4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES
FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO BE
USED FOR ANY CONSTRUCTION ACTIVITY.
5 TEMPORARY CONSTRUCTION BARRIER
6 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND
WORK AREA DURING ANY ACTIVITIES WHICH PRODUCE
DUST - TYPICAL
7 ANTEROOM - SEE INFECTION CONTROL & INTERIM LIFE
SAFETY DETAILS
8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA - SEE
MEP AND TELECOM DRAWINGS FOR CABLING SCOPE,
TYP.
11 ACCESS TO THESE DOORS WILL BE LIMITED DURING
DEMOLITION OF ADJACENT EXISTING DOOR AND PATCH
AND REPAIR OF EXISTING WALL.
12 PROVIDE TEMPORARY CONSTRUCTION BARRIERS FOR
REMOVAL AND INFILL OF DOOR AREA. WORK TO BE
SCHEDULED AND COORDINATED WITH COR TO LIMIT
DISRUPTION TO STAFF AND PATIENTS.
PATH OF TRAVEL SCHEDULE - GROUND FLOOR
Mark From Room To Room Type of Travel Path Length
GROUND LEVEL
(P-o-T) Distance to Exits
E1 TELECOM ROOM 050 STAIR HALL A 047 (P-o-T) Distance to Exits 43' - 0"
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
GROUND LEVEL EXISTING BUSINESS 22179 SF B Business 150 SF 0 148
NOTE:
DEBRIS REMOVAL:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
# Revisions: Date:
1 ADDENDUM #1 03/30/2026
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IPC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: BUSINESS Occupancy per Chapter 39
39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply
39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11
BUILDING OCCUPANCY TYPE:
EXISTING - BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.
39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
BUSINESS OCCUPANCY; PROTECTED = 300'-0"
OCCUPANT LOAD:
39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
39.2.3 Capacity of Means of Egress.
39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).
39.2.4 Number of Means of Egress.
39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6
1) the number of means of egress shall be in accordance with section 7.4
2) not less than two separate exits shall be provided on every story.
3) Not less than two separate exits shall be accessible from every part of every story.
39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.
PROTECTION OF VERTICAL OPENINGS:
39.3.1 Protection of Vertical Openings.
39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
39.3.2 Protection from Hazards.
39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7
39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material
The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.
39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
TELECOM ROOM
EXAM ROOM
EXAM ROOM
CORRIDOR
ELEVATOR NO. 1
E1
ELEVATOR NO. 2
E2
ELEV. LOBBY
01C00
STAIR HALL NO.
STAIR HALL NO.
S3
CORRIDOR
149Z
MI
N
CL
R
3'- 8"
E1 ▬ 43.9'
FEC
21910 SF
EXISTING BUSINESS - B
STAIR HALL NO.
S5
TOILET
112A
STAFF LOUNGE
CORRIDOR
141Z
OFFICE
107G
WAITING AREA
MOP BAL.
120A
CLOSET
118A
STORAGE
OFFICE
CLOSET
121A
HVAC SHAFT
VACUUM PUMP
ROOM
105A
EXAM
TOILET
102A2
STOR. CL.
TELE CL.
101A
OFFICE
107A
OFFICE
107C
CORRIDOR
OFFICE
107F
RECORDS TECH.
107E
OFFICE
107H
OFFICE
107I
OFFICE
CLOSET
134A
OPTOMETRY
EXAM & RETINAL
PHOTO ROOM
OPTOMETRY
EXAM ROOM
OPTOMETRY
EXAM ROOM
VISION FIELD
EXAM ROOM
OPTOMETRY
EXAM ROOM
REST ROOM
PANTRY
MENS TOILET
WOMENS TOILET
OFFICE
OFFICE
OPTOMETRY
STORAGE
CORRIDOR
148Z
OFFICE
CONFERENCE
ROOM
LOW VISION
EXAM ROOM
OFFICE
WAITING ROOM
EXAM ROOM
100B TOILET
100A1
OFFICE
OFFICE
107D
BREAKER ROOM
113G
X-RAY ROOM
113D
CORRIDOR
X-RAY ROOM
113E
EXAM ROOM
100A
PLEBOTOMY
113A
TOILET
EXAM ROOM
EXAM ROOM
102A
OFFICE
102A1
CLOSET
134B
CORRIDOR
150Z
OFFICE
125EMS CL.
OFFICE
117A
PIPE CLOSET
113B
PIPE CLOSET
111A
ROOM
107B
EXAM ROOM
106A
EXAM ROOM
WAITING ROOM
STAFF LOUNGE
OPTOMETRY
EXAM ROOM
PROGRAM
MANAGER
OFFICE
OPEN OFFICE
PIPE CHASE
134A
MED CLERK
OFFICE
118OFFICE
OFFICE
STAIR HALL NO.
PLEBOTOMY
LABORATORY
113F
IMAGING
STATION
113C
STAIR HALL NO.
S4
RECEP
134 WAITING AREA
MECH
TELECOM
CLOSET
ELEC. CL.
OFFICE
MECH ROOM
STORAGE
OEF/OIF CASE
MANAGER
OEF/OIF CASE
MANAGER
OEF/OIF CHIEF
STORAGE
OIF INTERVIEW
OEF INTERVIEW
CORRIDOR
01C03
WAITING
CORRIDOR
01C01
TOILET
STORAGE
STORAGE
166STORAGE
TOILET
STORAGE
FLU CLINIC
OFFICE
WOMEN VET.
OFFICE
WOME VET.
OFFICE
HAS SUPV.
OFFICE
ADMIN. MED.
OFFICE
SHARED CVT
DISPENSING
ROOM
CORRIDOR
01C02
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
6:
:2
03GI301
INFECTION CONTROL PLAN & INTERIM LIFE
SAFETY - FIRST LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL
TIMES
2 ONE ELEVATOR TO BE DESIGNATED FOR
CONTRACTOR USE. CONTRACTOR TO PROTECT /
REPAIR ALL FINISHES AND FOLLOW PROPER ICRA
REMOVAL PROTOCOLS FOR ANY MATERIALS
REMOVED FROM SITE THROUGH ELEVATOR
3 DEBRIS REMOVAL PATH TO ELEVATOR
4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES
FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO
BE USED FOR ANY CONSTRUCTION ACTIVITY.
5 TEMPORARY CONSTRUCTION BARRIER
6 PROVIDE TEMPORARY DUST TIGHT BARRIER
AROUND WORK AREA DURING ANY ACTIVITIES
WHICH PRODUCE DUST - TYPICAL
7 ANTEROOM - SEE INFECTION CONTROL & INTERIM
LIFE SAFETY DETAILS
8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -
SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
1/8" = 1'-0"F2 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - FIRST LEVEL
PATH OF TRAVEL SCHEDULE - FIRST FLOOR
Mark From Room To Room Type of Travel Path Length
LEVEL 1
(P-o-T) Distance to Exits
E1 TELECOM ROOM 150 STAIR HALL NO. 3 S3 (P-o-T) Distance to Exits 43' - 11"
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
FIRST LEVEL EXISTING BUSINESS 21910 SF B Business 150 SF 0 146
NOTE:
DEBRIS REMOVAL:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
1 ADDENDUM #1 03/27/202603/30/2026
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
LIFE SAFETY SYMBOLS
PATH OF TRAVEL
(FOR CUMULATIVE DISTANCES
REFER TO SCHEDULE)
EXIT LIGHTING
TM
FIRE EXTINGUISHER CABINET (FEC)
FIRE EXTINGUISHERS (FE)
FIRE HOSE CABINETS (FHC)
HEAT DETECTOR
SMOKE DETECTOR
DIRECTION OF EGRESS
APPLICABLE BUILDING CODES
2024 NFPA 101 LIFE SAFETY CODE & 2025 NFPA 72 NATIONAL
FIRE ALARM AND SIGNALING CODE & 2025 NFPA 13 STANDARD
FOR INSTALLATION OF SPRINKLER SYSTEMS. EXCEPTION OF
NFPA 5000 AND NFPA 900
2024 INTERNATIONAL MECHANICAL CODE (IPC)
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
2026 NATIONAL ELECTRICAL CODE (NEC)
2024 INTERNATIONAL PLUMBING CODE (IPC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION
(AISC)
ENERGY POLICY ACT OF 2005 (EPACT)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-
FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-
RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS.
STATED IN THE GENERAL REQUIREMENTS SECTION 01 00 00
AND 01 35 26 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY –
ASHRAE STANDARD 62.1-2025; MEDICAL SPACES - ASHRAE
170-2025, NON-MEDICAL SPACES - ASHRAE 62.1-2025
SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE
STANDARD 15–2024
2024 INTERNATIONAL BUILDING CODE (IBC) WHERE DIRECTED
BY VA STANDARDS
UNLESS NOTED OTHERWISE, CURRENT EDITION OF APPLICABLE
STANDARD OR CODE SHALL BE USED
APPLICABLE BUILDING GUIDES
VA FIRE PROTECTION DESIGN GUIDE, 9TH EDITION (2023)
BUILDING CODE:
CONSTRUCTION TYPE:
TYPE II (222) PER NFPA 220, Chapter 4
TYPE OF BUILDING REHABILITATION: MODIFICATION, CHAPTER 43.
FIRE RESISTIVE CONSTRUCTION (NFPA 220 Table 4.1.1)
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING
ELEMENTS:
STRUCTURAL FRAME 2 HOURS
NON-BEARING WALLS 0 HOURS
BEARING WALLS 2 HOURS
FLOORS 2 HOURS
ROOFS/ CEILINGS 1 HOURS
FIRE RESISTIVE CONSTRUCTION FOR OCCUPANCY (VA & NFPA 101)
FIRE RESISTANCE RATING REQUIREMENTS FOR SPACES BY
FUNCTION:
ELECTRICAL CLOSETS (DEPENDENT ON EQUIPMENT SIZE)
SMOKE COMPARTMENTS 1/2 HOUR
SOILED UTILITY ROOMS 1 HOUR
VERTICAL SHAFTS / STAIRS 2 HOURS
MEDICAL GAS / HAZARDOUS 1 HOUR
STORAGE
CLASSIFICATION OF OCCUPANCY:
EXISTING: BUSINESS Occupancy per Chapter 39
39.1.1.6 Where construction, alteration, or demolition operations are conducted, the provisions of 4.6.10.2 shall apply
39.1.2 Business occupancies shall include all buildings and structures or parts thereof with occupancy defined in 6.1.11
BUILDING OCCUPANCY TYPE:
EXISTING - BUSINESS OCCUPANCY
6.1.14.1.3 Where incidental to another occupant, areas used as follows shall be permitted to be considered part of the predominant occupancy and shall be subject to the provisions of the Code that apply to the predominant occupancy:
(1) Mercantile, BUSINESS, industrial, or storage use
6.1.14.3 Mixed Occupancies
6.1.14.3.2 The building shall comply with the most restrictive requirements of the occupancies involved, unless separate safeguards are approved.
Table 6.1.14.4.1 (a) - separation of occupancies - 2 Hr between Health Care and Business
6.2 Hazard of Contents.
6.2.1.3 For the purpose of this Code, where difference degrees of hazard of contents exist in different parts of a building or structure, the most hazardous shall govern the classification, unless hazardous areas are separated or protected as specified in Section 8.7 and the applicable sections of Chapters 11 through 43.
EXIT ACCESS TRAVEL DISTANCE:
39.2.6.2 The travel distance between any point in a room and an exit shall not exceed 200 ft.
39.2.6.3 The maximum travel distance...shall not exceed 300 ft in buildings protected throughout by an approved automatic sprinkler system in accordance with Section 9.7.
BUSINESS OCCUPANCY; PROTECTED = 300'-0"
OCCUPANT LOAD:
39.1.7 Occupant Load. The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table 7.3.1.2 that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater.
MEANS OF EGRESS:
39.2.3 Capacity of Means of Egress.
39.2.3.1 The capacity of any required means of egress shall be determined in accordance with the provisions Section 7.3.
39.2.3.2 The clear width of any corridor or passageway serving an occupant load of 50 or more shall not be less than 44 in. (1120 mm).
39.2.4 Number of Means of Egress.
39.2.4.1 Means of egress shall comply with all of the following: except as permitted by 39.2.4.2-6
1) the number of means of egress shall be in accordance with section 7.4
2) not less than two separate exits shall be provided on every story.
3) Not less than two separate exits shall be accessible from every part of every story.
39.2.5.3 In building protected throughout by and approved supervised automatic sprinkler system, Dead-end corridors shall not exceed 50 ft.
PROTECTION OF VERTICAL OPENINGS:
39.3.1 Protection of Vertical Openings.
39.3.1.1 Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted.
PROTECTION FROM HAZARDS:
39.3.2 Protection from Hazards.
39.3.2.1 Hazardous Areas - Any hazardous areas shall be protected in accordance with Section 8.7
39.3.2.2 The following areas shall be considered hazardous areas and shall be protected by fire barriers having a minimum 1-hour fire resistance rating in accordance with Section 8.3:
(1) Boilder and fuel-fired heater rooms
(2) Central/bulk laundries larger than 100 ft2
(3) Paint Shops
(4) Physical plant maintenance shops
(5) Rooms with soiled linen in volume exceeding 64 gal
(6) Rooms with collected trashed in volume exceeding 64 gal.
(7) Storage rooms larger than 100 ft2 and storing combustible material
The following areas shall be considered hazardous areas and shall be protected by smoke partitions in accordance with Section 8.4:
(1) Laboratories employing flammable or combustible materials in quantities less than those that would be considered a severe hazard.
(2) Storage rooms larger than 50 ft2 but not exceeding 100 ft2 and storing combustible material.
39.3.2.5 Medical Gas. Medical gas storage shall be in accordance with Section 8.7 and the provisions of NFPA 99, Health Care Facilities Code, applicable to operation, maintenance, and testing.
39.3.5 Portable fire extinguishers shall be provided in all health care occupancies facilities in accordance with Section 9.9.
PARKING SUMMARY:
NO ADDITIONAL PARKING ADDED
WIDTH PROVIDEDP: XX"
R: XX" WIDTH REQUIRED
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
X - XX'
# ICRA SYMBOLSKEYNOTES
TELECOM ROOM
243A
EXAM ROOM
OFFICE
244B
CORRIDOR
246Z
CORRIDOR
248Z
STAIR HALL NO.
ELEV. NO. 2
ELEV NO. 1
ELEV LOBBY
10 9
FEC
E1 ▬ 45.7'
MI
N.
3'- 8"
C
LR
16016 SF
EXISTING BUSINESS -
STAIR HALL NO.4
STAIR HALL NO.
HVAC SHAFT
147F
WAITING ROOM
OFFICE
208A4
TREATMENT
ROOM
209A2
TOILET
209A2A
MECH CL
209D
CLOSET
207A
CORRIDOR
247Z
OFFICE
208A3
OFFICE
208A1
GROUP OFFICE
208A
CLOSET
TOILET
202B
STOR CL
CLOSET
202A
TELE CL
EXAM ROOM
201A
CLOSET
242A
CLOSET
242B
ACCESSABLE
OPERATORY
SOILED ROOM
Room
OPERATORY
OPERATORY
STAFF DENTIST
RESIDENTS /
INTERNS
OPERATORY
OPERATORY
SERVICE CHIEF
WOMENS
LOCKER
MENS LOCKER
WOMENS TOILET
231A
MENS TOILET
230A
TRAINING ROOM
OFFICE
PIPE CL
220A
MOP BAL.
222A
MED CLERK
OFFICE
OFFICE
217 EMS CL
DARK ROOM
PANORAMIC
X-RAY
OPERATORY
OPERATORY
CLEAN ROOM
DENTAL
LABORATORY
CORRIDOR
249Z
RECEPTION
234A
RECORD / FILES
GROUP OFFICE
208A2
OFFICE
209A
Room
209B
STAFF DENTIST
STORAGE CL
WAITING AREA
CLOSET
219A
WAITING ROOM
EXAM
ROOM/OFFICE
209C
OFFICE
209A1
ENTRY
MY HEALTHY
VET
207B1
WAITING ROOM
207B
OFFICE
EXAM ROOM
EXAM ROOM
EXAM ROOM
OPERATORY
Room
SUPPLIES
OPERATORY
EXAM ROOM
DISPENSING
ROOM
TOILET
220B
OFFICE
219OFFICE
OFFICE
214A
STAIR HALL NO.
SERVER ROOM
OPERATORY
WAITING AREA
OFFICE
244A
200A
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
6:
:2
03GI302
INFECTION CONTROL PLAN & INTERIM LIFE
SAFETY - SECOND LEVEL
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
1 ELEVATORS ARE TO REMAIN OPERATIONAL AT ALL
TIMES
2 ONE ELEVATOR TO BE DESIGNATED FOR
CONTRACTOR USE. CONTRACTOR TO PROTECT /
REPAIR ALL FINISHES AND FOLLOW PROPER ICRA
REMOVAL PROTOCOLS FOR ANY MATERIALS
REMOVED FROM SITE THROUGH ELEVATOR
3 DEBRIS REMOVAL PATH TO ELEVATOR
4 STAIRS ARE TO REMAIN OPERATIONAL AT ALL TIMES
FOR EMERGENCY EGRESS ONLY. THEY ARE NOT TO
BE USED FOR ANY CONSTRUCTION ACTIVITY.
5 TEMPORARY CONSTRUCTION BARRIER
6 PROVIDE TEMPORARY DUST TIGHT BARRIER
AROUND WORK AREA DURING ANY ACTIVITIES
WHICH PRODUCE DUST - TYPICAL
7 ANTEROOM - SEE INFECTION CONTROL & INTERIM
LIFE SAFETY DETAILS
8 TEMPORARY CONSTRUCTION BARRIER DOOR WITH
CLOSER AND LATCH AND WALK OFF MATS
9 MAINTAIN EXIT PATHWAYS FOR OCCUPANTS AT ALL
TIMES
10 SOLID GRAY HATCH DENOTES LIMITED WORK AREA -
SEE MEP AND TELECOM DRAWINGS FOR CABLING
SCOPE, TYP.
1/8" = 1'-0"F2 INFECTION CONTROL PLAN & INTERIM LIFE SAFETY - SECOND LEVEL
PATH OF TRAVEL SCHEDULE - SECOND FLOOR
Mark From Room To Room Type of Travel Path Length
LEVEL 2
(P-o-T) Distance to Exits
E1 TELECOM ROOM 243A STAIR HALL NO. 3 226 (P-o-T) Distance to Exits 45' - 9"
AREA OCCUPANCIES
LEVEL Name Area SF
Occupancy Requirements
OL
Occupancy
(IBC) Occupancy (NFPA) OLF Fixed Seats
SECOND LEVEL EXISTING BUSINESS 16016 SF B Business 150 SF 0 107
NOTE:
DEBRIS REMOVAL:
COORDINATE REMOVAL OF MATERIALS ON THIS FLOOR WITH
ASBESTOS REPORT AND PLAN.
CONFIRM WITH COR FOR FINAL PLAN AND PROCEDURE OF
MATERIAL REMOVAL WITH ANTEROOMS, HEPA FILTRATION, ICRA
PROTOCOLS, AND ROUTE THRU OCCUPIED SPACES; PRIOR TO
REMOVAL OF ANY MATERIALS.
SECURE STAIRWELLS FROM UNAUTHORIZED ENTRY DURING
CONSTRUCTION.
LIFE SAFETY:
NEW WORK DOES NOT CHANGE EXISTING SMOKE
COMPARTMENTS, EXIT PATHWAYS, OR EXITS.
TEMPORARY WALL TO EXTEND
AND BE SEALED TO DECK /
FLOOR ABOVE WHEN RATED
ENCLOSURE REQUIRED
FLOOR LINE
CEILING SYSTEM AS
SCHEDULED
EXISTING STRUCTURE
FI
NI
SH
ED
F
LO
OR
T O
UN
DE
RS
ID
E
OF
S
TR
UC
TU
RE
VE
RI
FY
F
LO
OR
T
O
FL
OO
R
HE
IG
HT
RENOVATED SPRINKLER
SYSTEM
WEEKLY CHANGED
OR MORE AS
NEEDED PRE-FILTER
FLEX DUCTMONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR
UNIT
PROVIDE STICKY MATS (CHANGED END OF
EVERY SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS).
PRESSURE INDICATOR SHALL BE AT
0.03 OR GREATER USING A DIGITAL
MANOMETER WITH DATA LOGGING. IF
NOT VERIFY ALL OPENING SUCH AS
DOOR ARE CLOSED AND/OR CHANGE
NEGATIVE AIR PRE-FILTER. DO NOT USE
A "BALL IN THE WALL" OR ANALOG
OTHER PRESSURE INDICATOR.
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN NOT
RUNNING TO KEEP
DUST OUT.
A
V
OTAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION
E
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(SHALL REQUIRE MORE THAN
ONE.)
PUBLIC AREA
CONSTRUCTION AREA
ANTE ROOM
HARD BARRIER ALL THE WAY TO
DECK ABOVE
SIZE ANTE ROOM TO PROVIDE
SPACE FOR EQUIPMENT STAGING,
CART CLEANING, WORKERS' PPE
AND CLEANING, INCLUDING A HEPA
CLOTHING VACUUM
ROUTE DUCT TO EXTERIOR - SEE
PLANS FOR PROPOSED ROUTES -
CONFIRM ROUTE WITH ON-SITE
STAFF PRIOR TO INSTALLATION.
DISCHARGE AT A DISTANCE OF 25
FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND
OPERABLE WINDOWS. DO NOT
DIRECT EXHAUST INTO ANY
BUILDING SHARED EXHAUST
SYSTEM.
ANTE ROOM FAN
DOOR TO BE SELF-CLOSING AND
SELF-LATCHING - 45 MIN. FIRE
RATING PER NFPA
D7
03GI303
INFECTION CONTROL / DUST
CONTROL PARTITION / BARRIER
INFECTION CONTROL/DUST CONTROL
EGRESS DOOR NON-TRANSFERRING
MULTI-SHEETED ADHESIVE FLOOR PADS
PATH OF DEMOLITION/TRASH
REMOVAL TRAVEL
CONSTRUCTION LIMIT LINE
NOT IN CONTRACT AREA
DEMOLITION
LASER PARTICLE COUNT LOCATION
PATH OF TRAVEL/DISTANCE TO EXITS
1/4" = 1'-0"F7 TYPICAL CONSTRUCTION LAYOUT- CLASS IV
1/2" = 1'-0"D7 CROSS SECTION A'-A'- CLASS IV
NTSF2 TYPICAL ICRA PRODUCTS
TN
PN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group 201 E. Jefferson Street, Suite 200 Syracuse, NY 13202
MAT PERKINS
(315) 484-5958
Au to de sk
D oc s:
//6
-2
2-
M on tro se V
AM
C
E H
R M
IU
/6
-2
2-
0.
M on tro se .E
H R
M .A
R C
H .B
.rv t
-0 3-
6:
:2
03GI303
INFECTION CONTROL & INTERIM LIFE SAFETY
DETAILS
620-22-700
06/27/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
(EHRM) INFRASTRUCTURE
UPGRADES
2094 Albany Post Road, Montrose, NY 10548
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)
PROCEDURES AS PER THE MONTROSE VA ICRA PLAN AND AS
DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE
(COR).
COORDINATE ALL DEMOLITION/ CONSTRUCTION DEBRIS PATH
OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH
THE COR. ALL INTERIOR DOORS THAT LEAD TO THE
CONSTRUCTION SITE SHALL BE POSTED AS PER THE ISLM PLAN.
OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING
WORK.
THE ONE HOUR FIRE RATED CONSTRUCTION BARRIERS SHALL
BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
CONSTRUCT ANTEROOM AT ENTRANCES TO CONSTRUCTION
AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS
THROUGH THIS ROOM TO BE VACUUMED WITH HEPA VACUUM
CLEANER PRIOR TO LEAVING THE SITE.
FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR
OCCUPIED AREAS ON THE FLOOR.
PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS;
REVIEW WITH COR AND VA SAFETY GROUP.
MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT
ALL TIMES (24/7). WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION
UNITS.
CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE
OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR
EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE
CONSTRUCTION AREA. ISOLATE HVAC SYSTEM WITHIN
CONSTRUCTION AREA TO PREVENT CONTAMINATION OF
EXISTING DUCT SYSTEM.
REDIRECT ALL MEDICAL CENTER PERSONNEL. PATIENTS AND
VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION
AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION
AREA THAT READS: "CONSTRUCTION AREA-DO NOT ENTER".
GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP
A CURRENT HOT WORK PERMIT ON SITE.
TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE
CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE
SURE THEY REMAIN EFFECTIVE.
MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA. ALL
DEBRIS REMOVAL SHALL BE IN COVERED CARTS AND/OR
CONTAINERS.
SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES
AND CONDUITS APPROPRIATELY AND IMMEDIATELY TO MAINTAIN
DUST PROTECTION AND NEGATIVE AIR PRESSURE.
MAINTAIN STAFFING AND EQUIPMENT INCLUDING DUST MOPS,
WET MOPS, BROOMS, BUCKETS AND CLEAN WIPING RAGS FOR
CLEANING FINE DUST FROM FLOORS AND ADJACENT OCCUPIED
AREAS. ANY DUST TRACKED OUTSIDE OF CONSTRUCTION AREA
SHALL BE CLEANED IMMEDIATELY.
AFTER COMPLETION OF WORK: VACUUM CONSTRUCTION AREA
WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,
REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL). PATCH
OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER
REMOVAL AND REMOVE ISOLATION OF HVAC SYSTEM.
CONSTRUCTION BARRIERS SHALL NOT BE REMOVE UNTIL
PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
ICRA NOTES:
ICRA SYMBOL LEGENDINFECTION CONTROL RISK
ASSESSMENT:
TABLE 1: CONSTRUCTION, RENOVATION AND/OR MAINTENANCE
ACTIVITY CATEGORY
IDENTIFY THE CATEGORY OF CONSTRUCTION PROJECT
CATEGORY A: INSPECTION AND/OR FACILITY UPKEEP
CATEGORY B: GENERAL MAINTENANCE AND REPAIR WORK
CATEGORY C: SMALL-SCALE CONSTRUCTION, RENOVATION, AND/OR
MAINTENANCE
CATEGORY D: LARGE-SCALE CONSTRUCTION, RENOVATION, OR
MAINTENANCE
THIS PROJECT: CATEGORY D
TABLE 2: AFFECTED AREA ASSESSMENT
TABLE 3: PATIENT RISK CATEGORY
IDENTIFY THE PATIENT RISK CATEGORY FOR EACH AREA LISTED IN
TABLE 2. OF THE PATIENT RISK CATEGORIES IDENTIFIED, THE ONE WITH
THE GREATEST RISK SHALL BE SELECTED AS THE OVERALL PATIENT
RISK CATEGORY FOR THE ACTIVITY.
LOW RISK: NON-PATIENT CARE AREAS
MEDIUM RISK: PATIENT CARE SUPPORT AREAS
HIGH RISK: PATIENT CARE AREAS
HIGHEST RISK: PROCEDURAL, INVASIVE, STERILE SUPPORT AND HIGLY
COMPROMISED PATIENT CARE AREAS
THIS PROJECT: MEDIUM RISK
CL
AS
S
II
Construction Activity Category
RISK GROUP
LOW RISK
MEDIUM RISK
HIGH RISK
HIGHEST RISK
I II II III
I II III IV
I II IV IV
II III IV IV
A
STEP 1:
IDENTIFY SPECIFIC SITE OF ACTIVITY, FOR EXAMPLE, PATIENT
ROOMS, MEDICATION ROOM, AND SO ON.
STEP 2:
IDENTIFY ISSUES RELATED TO: VENTILATION, PLUMBING, AND
ELECTRICAL IN TERMS OF THE OCCURRENCE OF PROBABLE
OUTAGES.
STEP 3:
IDENTIFY CONTAINMENT MEASURES, USING PRIOR
ASSESSMENT. WHAT TYPES OF BARRIERS (FOR EXAMPLE,
SOLIDS WALLS)? WILL HEPA FILTRATION BE REQUIRED?
STEP 4:
CONSIDER POTENTIAL RISK OF WATER DAMAGE. IS THERE A
RISK DUE TO COMPROMISING STRUCTURAL INTEGRITY (FOR
EXAMPLE, WALL, CEILING, ROOF)?
NOTE: RENOVATION/CONSTRUCTION AREA SHALL BE
ISOLATED FROM THE OCCUPIED AREAS DURING
CONSTRUCTION AND SHALL BE NEGATIVE WITH RESPECT TO
SURROUNDING AREAS.
STEP 5:
WORK HOURS: CAN OR WILL THE WORK BE DONE DURING
NON-PATIENT-CARE HOURS?
STEP 6:
DO PLANS ALLOW FOR ADEQUATE NUMBER OF
ISOLATION/NEGATIVE AIRFLOW ROOMS?
STEP 7:
DO THE PLANS ALLOW FOR THE REQUIRED NUMBER AND TYPE
OF HAND-WASHING SINKS?
STEP 8:
DOES THE INFECTION PREVENTION AND CONTROL STAFF AGREE
WITH THE MINIMUM NUMBER OF SINKS FOR THIS PROJECT?
(VERIFY AGAINST FACILITY GUIDELINES INSTITUTE (FGI) DESIGN
AND CONSTRUCTION GUIDELINES FOR TYPES AND AREA.)
STEP 9:
DOES THE INFECTION PREVENTION AND CONTROL STAFF
AGREE WITH THE PLANS RELATIVE TO CLEAN AND SOILED
UTILITY ROOMS?
STEP 10:
PLAN TO DISCUSS THE FOLLOWING CONTAINMENT ISSUES WITH
THE PROJECT TEAM, FOR EXAMPLE, TRAFFIC FLOW,
HOUSEKEEPING, DEBRIS REMOVAL (HOW AND WHEN).
Affected Area Assessment
AREA
Activity Area Area Above Area Below Adjacent Area
TR
SEE PLAN
SVC TYPE POC POC CONTACT INFO
SEE PLAN
SEE PLAN
Walter Hoffman (914) 208-6275
MATCH THE OVERALL PATIENT RISK CATEGORY WITH THE PLANNED
CONSTRUCTION PROJECT CATEGORY ON THE FOLLOWING MATRIX, TO
FIND THE CLASS OF PRECAUTIONS (I, II, III OR IV) OR LEVEL OF
INFECTION CONTROL ACTIVITIES REQUIRED.
THIS PROJECT: CATEGORY IV
TABLE 4: LEVEL OF INFECTION PREVENTION AND CONTROL
PRECAUTIONS
B C D
TABLE 5: REQUIRED INFECTION PREVENTION AND CONTROL MEASURES
BY LEVEL OF PRECAUTIONS
NOTE: LIST IS CUMULATIVE FROM CLASS I THROUGH CLASS IV)
TABLE 6: MINIMUM INFECTION PREVENTION AND CONTROL MEASURES
REQUIRED UPON COMPLETION OF THE ACTIVITY
1.
2.
1.
2.
A.
B.
C.
D.
E.
1.
2.
1.
2.
3.
1.
Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures
Work Area Cleaning:
Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces
Removal of Critical Barriers:
Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
Carefully remove screws and painter tape.
If dust will be generated during screw removal, use hand-held HEPA vacuum.
Drywall cutting is prohibited during removal process Clean all stud tracks with HEPA vacuum before removing outer…
This is the start of the file's text. The full file is on GovTribe.