This is Amendment 0003 to Solicitation 36C77626R0033 for EHRM Infrastructure Upgrades Construction at Franklin Delano Roosevelt VA Hospital in Montrose, issued by the Department of Veterans Affairs Program Contracting Activity Central on April 20, 2026. The amendment's purpose is to provide answers to technical questions submitted by offerors. The solicitation number is 36C77626R0033, dated March 12, 2026, with Project Number 620-22-700. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation or as amended, either by completing Items 8 and 15 and returning the required copies, by acknowledging receipt on each copy of the offer submitted, or by separate letter or electronic communication referencing the solicitation and amendment numbers.
Addendum 1 has been incorporated into this amendment, and all attachments have been updated with new files named with "ATTACHMENT" capitalized to maintain consistency with original attachment names. The amendment includes 33 numbered attachments plus two supplemental attachments (33A), which collectively comprise the project specifications, appendices, inspection reports, asbestos and lead paint assessments, geotechnical reports, security requirements, and addenda addressing technical questions (Addenda B01 through B52 and Site). Additional documents include an RFI Tracking Sheet, construction specifications, submittal logs, construction standard procedures, occupational safety and health program guidance, infection control and pandemic control risk assessments, and a construction estimate breakdown template. The contracting officer is Bridget May.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
0003 04-20-2026
620-22-700
36C776
Department of Veterans Affairs
Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490
Independence OH 44131
36C776
Department of Veterans Affairs
Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490
Independence OH 44131
To all Offerors/Bidders
36C77626R0033
03-12-2026
X
X X
Project: 620-22-700 - EHRM Infrastructure Upgrades Construction – Franklin Delano Roosevelt VA Hospital - Montrose
The purpose of this amendment is to provide answers to technical questions.
Addendum 1 has been added. Attachments have been updated. New files are named with ATTACHMENT capitalized.
Attachment numbers with A are not sub or connected attachments, they are named as such to keep attachment numbers consistent with the original attachment names.
Bridget May
Contracting Officer
See attached document: RFI TRACKING SHEET - SOLICITATION 36C77626R0033.
See attached document: ATTACHMENT 1 - SPECS - 620-22-
700.Montrose.EHRM.Spec.IFC.20260410.
See attached document: ATTACHMENT 2 - 01 00 00.A - Appendix A - OIT-
InfrastrucStdTelecomSpaces.
See attached document: ATTACHMENT 3 - 01 00 00.B - Appendix B - Submittal Log.
See attached document: ATTACHMENT 4 - 01 00 00.C - Appendix C - SOP 138-22HV
CONST STD PROCEDURES QLTY ASSRNCE FOR PRJS.
See attached document: ATTACHMENT 5 - 01 00 00.D - Appendix D - SOP 138-06HV
OCCUPATIONAL SAFETY AND HEALTH PROGRAM.
See attached document: ATTACHMENT 6 - 01 00 00.E - Appendix E - VHA ICRA-1.3 Dec 9
2024.
See attached document: ATTACHMENT 7 - 01 00 00.F - Appendix F - VHA PCRA 2024 1.1
Final.Template Fillable.
See attached document: ATTACHMENT 8 - 01 00 00.G - Appendix G - GPRS Triple C
Montrose Full Report.
See attached document: ATTACHMENT 9 - 01 00 00.H - Appendix H - J2237038 Montrose
ACM and Lead Paint Inspection Report Final 8-21-2023.
See attached document: ATTACHMENT 10 - 01 00 00.H1 - Appendix H1 - J2247041
Montrose NY VAMC_ACM Inspctn - Lead Paint Screening Rpt_Final 5-9-2024 - signed.
See attached document: ATTACHMENT 11 - 01 00 00.I - Appendix I - K9245005 VAMC
EHRM Montrose NY GeoReport 4.12.2024.
See attached document: Attachment 12 - Additional Security Badging Requirements rev 2.
See attached document: ATTACHMENT 12A - Summary.Log.Add01_20260410.
See attached document: ATTACHMENT 13 -
Montrose.EHRM.Addendum.01.B01.20260330.
See attached document: ATTACHMENT 14 -
Montrose.EHRM.Addendum.01.B02.20260330.
See attached document: ATTACHMENT 15 -
Montrose.EHRM.Addendum.01.B03.20260330.
See attached document: ATTACHMENT 16 -
Montrose.EHRM.Addendum.01.B04.20260330.
See attached document: ATTACHMENT 17 -
Montrose.EHRM.Addendum.01.B05.20260330.
See attached document: ATTACHMENT 18 -
Montrose.EHRM.Addendum.01.B06.20260330.
See attached document: ATTACHMENT 19 -
Montrose.EHRM.Addendum.01.B07.20260330.
See attached document: ATTACHMENT 20 -
Montrose.EHRM.Addendum.01.B12.20260330.
See attached document: ATTACHMENT 21 -
Montrose.EHRM.Addendum.01.B13.20260330.
See attached document: ATTACHMENT 22 -
Montrose.EHRM.Addendum.01.B14.20260330.
See attached document: ATTACHMENT 23 -
Montrose.EHRM.Addendum.01.B15.20260330.
See attached document: ATTACHMENT 24 -
Montrose.EHRM.Addendum.01.B16.20260330.
See attached document: ATTACHMENT 25 -
Montrose.EHRM.Addendum.01.B17.20260330.
See attached document: ATTACHMENT 26 -
Montrose.EHRM.Addendum.01.B18.20260330.
See attached document: ATTACHMENT 26A -
Montrose.EHRM.Addendum.01.B19.20260330.
See attached document: ATTACHMENT 27 -
Montrose.EHRM.Addendum.01.B20.20260330.
See attached document: ATTACHMENT 28 -
Montrose.EHRM.Addendum.01.B26.20260330.
See attached document: ATTACHMENT 28A -
Montrose.EHRM.Addendum.01.B27.20260330.
See attached document: ATTACHMENT 29 -
Montrose.EHRM.Addendum.01.B28.20260330.
See attached document: ATTACHMENT 30 -
Montrose.EHRM.Addendum.01.B29.20260330.
See attached document: ATTACHMENT 31 -
Montrose.EHRM.Addendum.01.B31.20260330.
See attached document: ATTACHMENT 32 -
Montrose.EHRM.Addendum.01.B52.20260330.
See attached document: ATTACHMENT 33 -
Montrose.EHRM.Addendum.01.Site.20260330.
See attached document: ATTACHMENT 33A - 00 41 13.10 - Construction Estimate
Breakdown Template.
End of Document