This is an Amendment to Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Program Contracting Activity Central for RFP 36C77626R0033, effective April 7, 2026.

The amendment updates solicitation requirements for the EHRM Infrastructure Upgrades Construction project at Franklin Delano Roosevelt VA Hospital. Key changes include revised section 2.8 Proposal Requirements and section 2.9 Evaluation Methodology in the Instructions to Offerors. Proposals must be submitted via email to jason.phillip@va.gov with copy to bridget.may@va.gov in three separate volumes: Volume I Past Performance (30 pages maximum), Volume II Price with Division Cost Breakdown, and Volume III Administrative Information. Each volume must be submitted as searchable PDF attachments in separate emails, each under 5MB in size, using Times New Roman 12-point font. Offerors must demonstrate successful experience in large-scale communication infrastructure construction projects exceeding $20 million in value, completed within the past five years or at least 75% complete, preferably within Veterans Health Administration facilities. At least one project must have been completed by the prime contractor. Past Performance will be evaluated based on recency, relevancy, and quality to determine an Overall Confidence Rating, and is significantly more important than Price. Offerors must provide FAR 52.203-2 Certificate of Independent Price Determination if applicable and comply with VAAR 852.204-70 (Personal Identity Verification) and VAAR 852.204-72 (Personnel Vetting and Credentialing) requirements. General contractors performing construction work are designated as Non-Sensitive Positions - Tier 1/Low Risk under the personnel vetting requirements.

View the file

Other files

File Type Posted
Amend 5 - B02.20260330.pdf PDF
Amend 5 - B07.20260330.pdf PDF
Amend 5 - B12.20260330.pdf PDF
Amend 5 - B13.20260330.pdf PDF
Amend 5 - B18.20260330.pdf PDF
Amend 5 - B31.20260330.pdf PDF
Amendment 4 - 36C77626R0033 0004.pdf PDF
Amendment 3 - 36C77626R0033 0003.pdf PDF
ATTACHMENT 4 - 01 00 00.C - Appendix C - SOP 138-22HV CONST STD PROCEDURES QLTY ASSRNCE FOR PRJS.pdf PDF
ATTACHMENT 6 - 01 00 00.E - Appendix E - VHA ICRA-1.3 Dec 9 2024.pdf PDF
ATTACHMENT 9 - 01 00 00.H - Appendix H - J2237038 Montrose ACM and Lead Paint Inspection Report Final 8-21-2023.pdf PDF
ATTACHMENT 10 - 01 00 00.H1 - Appendix H1 - J2247041 Montrose NY VAMC_ACM Inspctn - Lead Paint Screening Rpt_Final 5-9-2024 - signed.pdf PDF
ATTACHMENT 15 - Montrose.EHRM.Addendum.01.B03.20260330.pdf PDF
ATTACHMENT 17 - Montrose.EHRM.Addendum.01.B05.20260330.pdf PDF
ATTACHMENT 19 - Montrose.EHRM.Addendum.01.B07.20260330.pdf PDF
ATTACHMENT 20 - Montrose.EHRM.Addendum.01.B12.20260330.pdf PDF
ATTACHMENT 26 - Montrose.EHRM.Addendum.01.B18.20260330.pdf PDF
RFI TRACKING SHEET - SOLICITATION 36C77626R0033.pdf PDF
ATTACHMENT 1 - SPECS - 620-22-700.Montrose.EHRM.Spec.IFC.20260410.pdf PDF
ATTACHMENT 5 - 01 00 00.D - Appendix D - SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
ATTACHMENT 11 - 01 00 00.I - Appendix I - K9245005 VAMC EHRM Montrose NY GeoReport 4.12.2024.pdf PDF
ATTACHMENT 12A - Summary.Log.Add01_20260410.pdf PDF
ATTACHMENT 13 - Montrose.EHRM.Addendum.01.B01.20260330.pdf PDF
ATTACHMENT 14 - Montrose.EHRM.Addendum.01.B02.20260330.pdf PDF
ATTACHMENT 22 - Montrose.EHRM.Addendum.01.B14.20260330.pdf PDF
ATTACHMENT 25 - Montrose.EHRM.Addendum.01.B17.20260330.pdf PDF
ATTACHMENT 26A - Montrose.EHRM.Addendum.01.B19.20260330.pdf PDF
ATTACHMENT 30 - Montrose.EHRM.Addendum.01.B29.20260330.pdf PDF
ATTACHMENT 31 - Montrose.EHRM.Addendum.01.B31.20260330.pdf PDF
Amendment 1 - 36C77626R0033 0001.pdf PDF
Site visit sign-in sheet 3-23-26.pdf PDF
Attachment 10 - 01 00 00.H1 - Appendix H1 - J2247041 ACM Insp - Lead Paint Rpt_Final 5-9-2024.pdf PDF
Attachment 17 - Drawing B05 20250627.pdf PDF
Attachment 20 - Drawing B12 20250627.pdf PDF
Attachment 24 - Drawing B16 20250627.pdf PDF
Attachment 25 - Drawing B17 20250627.pdf PDF
Attachment 30 - Drawing B29 20250627.pdf PDF
Attachment 38 - PPQ.docx DOCX document
Attachment 40 - RFI TRACKING SHEET - SOLICITATION 36C77626R0033 - Project 620-22-700.xlsx XLSX spreadsheet
RFP - 36C77626R0033.pdf PDF
Attachment 3 - 01 00 00.B - Appendix B - Submittal Log.pdf PDF
Attachment 4 - 01 00 00.C - Appendix C1 SOP 138-22HV CONST STD PROCEDURES QA FOR PROJECTS.pdf PDF
Attachment 5 - 01 00 00.D - Appendix D1 SOP 138-06HV OCCUPATIONAL SAFETY AND HEALTH PROGRAM.pdf PDF
Attachment 16 - Drawing B04 20250627.pdf PDF
Attachment 18 - Drawing B06 20250627.pdf PDF
Attachment 22 - Drawing B14 20250627.pdf PDF
Attachment 27 - Drawing B20 20250627.pdf PDF
Attachment 29 - Drawing B28 20250627.pdf PDF
Attachment 32 - Drawing B52 20250627.pdf PDF
Attachment 36 - Division Cost Breakdown.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 11

0002 04-07-2026

620-22-700

36C776

Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490

Independence OH 44131

36C776

Department of Veterans Affairs

Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490

Independence OH 44131

To all Offerors/Bidders

36C77626R0033

03-12-2026

X

X X

Project: 620-22-700 - EHRM Infrastructure Upgrades Construction – Franklin Delano Roosevelt VA Hospital

The purpose of this amendment is to provide the following:

1. Updated section 2.8 Proposal Requirements in the Instructions to Offerors

2. Updated section 2.9 Evaluation Methodology in the Instructions to Offerors

3. FAR 52.203-2 has been added as a Full Provision to the solicitation. Offeror must provide their response to

FAR 52.203-2 as part of their proposal/bid, if applicable.

4. VAAR 852.204-70 (DEV MAR 2026) has been added as a Full Clause to replace the previous VAAR 852.204-70

5. VAAR 852.204-72 has been added as a Full Clause.

Bridget May

Contracting Officer

2.8 PROPOSAL REQUIREMENTS

A. General:

Proposal Submission: Offerors shall submit their proposals via email to:

jason.phillip@va.gov copy (cc) bridget.may@va.gov. Proposals shall be based on solicitation documents issued for RFP number 36C77626R0033. Proposals will be in the format set forth in this document. Proposals shall be received on or before the date and time specified in Block 13 of the SF1442. There will be no public opening of the proposals. Only proposals submitted by email will be accepted. Hard-copy proposals will not be accepted.

B. Proposal Format:

1. Past Performance, Price and Administrative sections of the Offerors’ proposals will be evaluated independently; therefore, the Offeror must submit the proposal in three (3) Volumes: Volume I Past Performance, Volume II Price and Volume III Administrative.

Offerors must send Volumes I, II and III as attachments in separate e-mails. Each volume must be labeled with the Offeror's organization, business address, and VA Solicitation Number. Each volume must be submitted as searchable PDF documents attached to an e-mail. Portions of proposals submitted via drop-box, hyperlink, or format rather than a searchable PDF attached to an email will not be considered, which may render the proposal incomplete. The proposal, in its entirety, shall not exceed three (3) e-mails (one e-mail for each volume). Each e-mail, including its attachments, must be less than 5MB in size. Offerors must Include page numbers and its company name in the header or footer of each page of all attachments.

2. Volume I Past Performance: Offerors shall format the Volume I Past Performance proposal as listed below. The specific evaluation criteria and methodology is below.

a. Volume I Past Performance must include a title page and detailed table of contents. Volume I Past Performance shall be submitted in one (1) PDF document for Volume I Past Performance and shall not exceed a total of Thirty

(30) pages. The title page and table of contents are excluded from the page limit.

Offerors must not include any price or price related material in the Volume I Past Performance proposal. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.

b. A page is defined as each face of an 8.5 X 11-inch sheet of paper with 1-inch margins. The background color of each page of the submission shall be white or ivory stock only and each page shall count as one (1) page. Excess pages will not be evaluated. Text lines will be single-spaced, and proposals shall be submitted using Times New Roman, with font no smaller than 12 point with normal proportional spacing. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye.

Fonts other than Times New Roman are permissible in the presentation of graphic material only. CPARS and PPQs must be submitted in their existing format, which may differ from what is listed above.

c. The Offeror’s proposal must address each evaluation factor listed in this solicitation. Failure to submit a proposal in the format required that addresses each factor may result in the proposal being deemed ineligible for award.

d. Volume I Past Performance, Proposal Requirements: The proposal must address the following submission requirements for Factor 1 Past Performance.

mailto:jason.phillip@va.gov mailto:bridget.may@va.gov

Offerors shall demonstrate successful experience in large-scale communication infrastructure construction projects. Past performance will be evaluated based on the size, scope, and complexity of completed projects, within active healthcare environments, particularly within the Veterans Health Administration (VHA).

1. Number of Projects: Offerors shall provide at least two (2) and no more than three (3) projects that demonstrate their ability to perform the proposed effort.

Projects must be at least 75% completed or have been completed within the past five (5) years from the date proposals are due.

2. Size: Each submitted project must have a total value exceeding $20 million.

3. Scope: Projects must involve phased construction in an active healthcare setting, including but not limited to demolition, earthwork, carpentry, HVAC, electrical, telecommunications, plumbing, fire suppression, and phased telecommunications infrastructure upgrades. Preferably projects completed within VHA facilities.

4. Complexity: It is preferred that projects demonstrate successful coordination of telecommunications infrastructure upgrades in an active healthcare setting, with minimal system downtime. This includes effective phasing, coordination of critical path activities, and a detailed understanding of General Construction Specifications Division 27 – Telecommunications as outlined in the specifications.

5. Other Elements: Additionally, projects should reflect experience with:

• Infection control protocols

• Facility utility systems

• Construction phasing in operational hospital environments

6. Narrative: Each project submitted for past performance evaluation shall use Attachment 39 - Project Information Sheet for Contractors and include all the required/requested information. Offerors shall also provide a narrative describing past performance on projects requiring complex coordination and the risk mitigation actions taken. This shall include:

• Management of site outages, system cutovers, and the communication standards used to inform multiple stakeholders of key coordination dates

• Handling of long-lead item procurement and adherence to critical path schedules

• Resolution of past performance issues, including corrective actions taken for substandard performance

• Description of the mitigation plan for any current performance challenges such as cost overruns, schedule delays, subcontractor issues, or changes in key personnel or subcontractors.

At least one of the projects submitted must have been completed by the

Prime. Submissions with more prime contractor examples may receive more favorable ratings. Offerors lacking relevant past performance history may submit information regarding predecessor companies or key personnel who have performed on other contracts. Such information shall, as a minimum, include:

• Name(s) of Predecessor Company/Sub-contractor and/or Key Personnel and include: Complete Address and Point of Contact; Telephone Number;

and email address.

PPQ/CPARS: If an Offeror has recent and relevant past performance to submit, a corresponding completed and signed Past Performance Questionnaire (PPQ) or a Contractor Performance Assessment Rating System (CPARS) must be submitted for each project in accordance with the direction below. If a completed past performance evaluation is available in CPARS, it shall be submitted with the proposal for each project identified. If there is not a completed past performance evaluation available in CPARS, then the Offeror shall submit PPQ (See Attachment 38 - PPQ) for that project. The Offeror shall notify their client that the PPQ shall be submitted back to the Offeror and incorporated into the proposal submission. If the Offeror is unable to obtain a completed PPQ from a client for a project before the proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s), and documentation of the attempts to have the PPQ signed. The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information;

however, the Government is not responsible for the failure to obtain information from a POC on a PPQ. Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires.

For offerors that are joint ventures, the evaluation will take into account past performance of the joint venture as well as the past performance of each party to the joint venture.

3. Volume II Price & Proposal Requirements: Offerors shall format the Volume II Price proposal as listed below. The proposal must include the following for Factor 2 Price.

a. Offerors shall complete the Price Schedule in part A of this solicitation, providing their price for Line Item 0001. In addition to the Price Schedule, Offerors shall submit a complete Breakdown of the Division Pricing for Line Item 0001 (See Attachment 36 - Division Cost Breakdown). The Division Pricing will be used to determine price reasonableness. The Government also reserves the right to use this Division Pricing breakdown as part of negotiations during the competitive range, if they are required.

b. The price must be Firm Fixed Price. The Offeror must take care not to include remarks that take exception to the Government’s Specifications/Drawings or pricing requirements or otherwise preclude the Government from evaluating the offer, which will result in the offeror’s proposal being rejected.

c. Offerors shall ensure the Signed Standard Form (SF) 1442 is provided. Offerors shall acknowledge receiving amendments by filling out section 19 of the SF 1442.

d. Bid Guarantee: The Offeror shall furnish a bid guarantee as stipulated in the solicitation (see FAR 52.228-1). The bid guarantee shall be provided on Standard Form 24. The bid bond shall be submitted as part of the electronic submission. In accordance with Class Deviation from the Federal Acquisition Regulation to Eliminate Hard Copy Original Documents, Signatures, Notarization, Seals on Bonds, and Other Seals for Certain Contract Requirements issued by the VA Executive Director, Office of Acquisition and Logistics and the Senior Procurement Executive on May 11, 2020, the requirement for an original bond, with the original signatures, notarization and seals has been eliminated. Failure to furnish the required bid guarantee on the proper form and for the proper amount by the time specified in Block 13 of SF 1442, may result in rejection of the proposal.

4. Volume III Administrative Information: If an offeror fails to include all of the below information in its proposal, then the proposal may be deemed incomplete and ineligible for award.

a. Representations & Certifications:

By submitting its offer, the Offeror verifies that, as of the date of its offer, its representations and certifications posted electronically in SAM for the applicable provisions are current, accurate, and complete. The Offeror’s representations and certifications in SAM are hereby incorporated by reference into its offer.

b. Information Regarding Responsibility Matters:

Offeror must provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.

c. Certification Regarding Tax Matters:

Offeror shall provide their response to FAR 52.209-12 (b) Certification Regarding Tax Matters

d. Violation of Arms Controls Treaties or Agreements:

Offeror must provide their response to FAR 52.209-13 (b)(1) or (2) Violation of Arms Controls Treaties or Agreements.

e. Tax on Certain Foreign Procurements – Notice and Representation:

Offeror must provide their response to FAR 52.229-11 (d).

f. Certification of Independent Price Determination Offeror must provide their response to FAR 52.203-2 Certificate of Independent Price Determination, if applicable.

2.9 EVALUATION METHODOLOGY

A. The Government reserves the right to award without negotiations based upon the initial evaluation of the proposals but reserves the right to open negotiations if determined to be necessary. All proposals shall be subject to evaluation by a team of Government personnel.

The proposals will be evaluated in accordance with the criteria provided in the solicitation.

Using the tradeoff process under best value, it may be in the Government's best interest to consider award to other than the lowest price Offeror or other than highest rated Offeror.

The intent is to award to the Offeror that offers the best value to the Government. “Best Value” means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirements. The Past Performance factor is significantly more important than Price.

B. Factor 1 Past Performance: Past Performance will be evaluated on the basis of recency, relevancy and quality to arrive at an overall Confidence Rating.

Recency and Relevancy Evaluation: The Government will evaluate each project submitted to ensure the project is recent, meaning projects must have been completed within the last five years, or at least 75% complete. Projects older than five years, or not at least 75% completed will not be evaluated. The Government will evaluate each recent project to determine the relevancy of the project to the solicitation requirements. The relevancy determination will be based on the Project Information Sheet provided by the Offeror.

Projects under $20 million will not be evaluated.

Performance Quality Assessment: The Government will consider the performance quality of any submitted project determined to be recent and rated somewhat relevant, relevant, or very relevant. In addition to evaluating the extent to which the Offeror’s performance meets contract specification requirements, the assessment will also consider aspects such as: the Offeror’s adhering to schedules (including the administrative aspects of performance);

reasonable and cooperative behavior and commitment to customer satisfaction; controlling project cost; the timeliness of contract completion and submission of deliverables; the contractor’s compliance with the terms and conditions of the contract; the overall quality of the work performed on the contract; the Offeror’s managerial performance (to include use and control of subcontractors); and whether or not the reference would enter into a contract with the contractor again.

The Government reserves the right to conduct a past performance assessment using information obtained from CPARS and any other sources deemed appropriate by the CO.

Other sources may include, but are not limited to, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), and any other known sources not provided by the Offeror. While the Government may elect to consider data obtained from other sources, the burden of providing current, accurate and complete past performance information rests with the Offeror.

Overall Performance Confidence Rating: The purpose of the past performance evaluation is to assess the degree of confidence the Government has in the Offeror’s ability to meet the solicitation requirements based on the Offeror’s demonstrated record of performance. The Government will combine the recency, relevancy, and performance quality assessment considered for the Offeror to assign a single Past Performance Confidence Rating of Substantial Confidence, Satisfactory Confidence, Neutral Confidence, Limited Confidence or No Confidence.

Per FAR 15.202 (c)(1), offerors without a record of relevant past performance or for whom information on past performance is not available may not be evaluated favorably or unfavorably on past performance. Offerors with no recent and relevant performance history or whose performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned shall receive the “Neutral Confidence” rating, meaning the rating is treated neither favorably nor unfavorably.

C. Factor 2 Price: The total evaluated price will be determined by the Offeror's price provided on the Price Schedule.

Note: If none of the offerors are within the available funding limitation or is otherwise determined to be other than fair and reasonable, the VA reserves the right to enter into negotiations with those offerors who are determined to be within the competitive range.

If the Offeror communicates in its proposal any qualifications, exceptions, exclusions, or conditions to the proposed prices in the Offerors proposal documents, the Contracting Officer may reject the proposal and exclude the Offeror from further negotiations.

A.1 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION

(APR 1985)

(a) The offeror certifies that—

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to—

(i) Those prices;

(ii) The intention to submit an offer; or

(iii) The methods or factors used to calculate the prices offered.

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory—

(1) Is the person in the offeror’s organization responsible for determining the prices being offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to paragraphs (a)(1) through (a)(3) of this provision; or

(2)(i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to paragraphs (a)(1) through (a)(3) of this provision ____________________ [insert full name of person(s) in the offeror’s organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror’s organization];

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) of this provision have not participated, and will not participate, in any action contrary to paragraphs (a)(1) through (a)(3) of this provision; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to paragraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies paragraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

A.2 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF

CONTRACTOR PERSONNEL (MAY 2020) (DEVIATION MAR 2026)

(a) The Contractor shall comply with current Department of Veterans Affairs policy for personal identity verification of all employees performing under this contract when physical access to VA facilities, and/or logical access to VA information and VA information systems is required.

(b) The Contractor shall insert this clause in all subcontracts when the subcontractor’s employees will require physical access to VA facilities, and/or logical access to VA information and VA information systems is required.

(End of Clause)

A.3 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (MAR

2026)

(a) Definitions. As used in this clause –

VA Information system is the same as information system and means, pursuant to

38 U.S.C. 5727, a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information whether automated or manual.

VA sensitive information means all VA data, on any storage media or in any form or format, which requires protection due to the risk of harm that could result from inadvertent or deliberate disclosure, alteration, or destruction of the information and includes sensitive personal information. The term includes information where improper use or disclosure could adversely affect the ability of VA to accomplish its mission, proprietary information, records about individuals requiring protection under various confidentiality provisions such as the

Privacy Act and the HIPAA Privacy Rule, and information that can be withheld under the

Freedom of Information Act. Examples of VA sensitive information include the following:

individually-identifiable medical, benefits, and personnel information; financial, budgetary, research, quality assurance, confidential commercial, critical infrastructure, investigatory, and law enforcement information; information that is confidential and privileged in litigation such as information protected by the deliberative process privilege, attorney work-product privilege, and the attorney-client privilege; and other information which, if released, could result in violation of law or harm or unfairness to any individual or group, or could adversely affect the national interest or the conduct of Federal programs.

(b) General. Contractor personnel assigned to work for or on behalf of VA must undergo a background investigation commensurate with the risk and sensitivity level designation associated with the work to be performed at the level indicated in the contract. The Contractor and subcontractors shall comply with VA Directive/Handbook 0710, Personnel Security and Suitability Program, which can be accessed at:

https://vaww.va.gov/vapubs/index.cfm

(c) Risk and Sensitivity Levels. The following table identifies the risk and sensitivity levels that apply to any personnel providing services under this contract.

*VA Administrations, organizations and staff offices will use the OPM Position Designation Tool.

Positions/Tasks Designated as Non-Sensitive Positions - Tier 1/Low Risk

General Contractor - Construction

Positions/Tasks Designated as Non-Sensitive Positions - Tier 2/Mod Risk

NONE

Positions/Tasks Designated as Non-Sensitive Positions - Tier 4/High Risk

NONE

https://vaww.va.gov/vapubs/index.cfm https://pdt.nbis.mil/consent https://pdt.nbis.mil/consent

Security clearances are granted to individuals with a specific requirement for access to classified material (for example, Confidential, Secret and Top Secret). Contractor personnel that are required to obtain a security clearance will be subject to a Tier 3 or Tier

5 investigation. The following sensitivity designations have been assigned for the identified

Tier 3 and Tier 5 required by this contract:

Tier 3: NOT APPLICABLE

Tier 5: NOT APPLICABLE

(d) Fitness. The results from a background investigation are used to determine if an individual’s fitness is sufficient for that individual to perform work for or on behalf of VA in the position identified in this contract. Contractor fitness determinations are made in accordance with 5 CFR Part 731.202.

Fitness requirements for employment are separate and distinct from job qualifications. If a

Contractor or subcontractor employee is found to be unsuitable or unfit to provide services under this contract, the Contractor shall immediately remove the employee from working on this contract and take those necessary steps that restrict the employee’s logical access to

VA data, information, VA sensitive information, or information technology or VA information systems containing such data or information.

The Contractor shall advise the employee that they are not permitted to access any VA controlled building or real property in relation to this contract.

The removal of an unfit Contractor or subcontractor employee does not alleviate the

Contractor from satisfying the requirements of this contract. The Government will not reimburse the Contractor for any costs associated with the recruitment/replacement of an employee or subcontractor employee who is found to be unfit.

(e) Identification Cards. The Government will provide a Personal Identification

Verification (PIV) card or other identification card, as necessary, to fit Contractor personnel who require physical access to VA facilities and/or logical access to VA data, information, VA sensitive information, or information technology or VA information systems containing such data or information. Contractor and subcontractor personnel shall prominently display their PIV/identification card on their persons while working at a VA facility and shall present their PIV/identification card for inspection upon request by a VA official. The Contractor must surrender the employee or subcontractor employee’s PIV/identification card in accordance with the requirements set forth in Directive/Handbook 0735 when any of the following events occur:

1. When no longer needed for contract performance.

2. Upon completion of the Contractor/subcontractor employee’s employment.

3. Upon contract completion or termination.

(f) Lost/stolen. Immediately upon detection, the Contractor shall report a lost or stolen PIV/identification card to the Government authorities as identified in Directive/Handbook 0735. Within 48 hours of reporting the lost/stolen PIV/identification card, the Contractor shall submit to the Program Manager an incident report that describes the relevant facts and circumstances regarding the loss/theft. If the loss/theft was reported by the Contractor to the local police, the Contractor shall further submit a copy of the final police report to the Program Manager within 48 hours of the report being made available by the local police department. The Government will not reimburse the Contractor for any costs that result from lost/stolen PIV/identification card(s).

(g) Regular Reporting. The Contractor shall submit a status report to PIV Sponsor within 5 working days after the end of each calendar quarter and as requested by the Government in order to initiate contract closeout procedures. The report must provide the status of each contractor/subcontractor employee who is required to have a PIV/identification card during the performance of the contract. The report shall identify the Contractor and the contract number, and list the following status for each contractor/subcontractor employee who holds a PIV/identification card under this contract:

1. Contractor/subcontractor employee name..

2. Name of VA facility where Contractor/subcontractor employee works, if applicable.

3. Date background check submitted for Contractor/subcontractor employee.

4. Date PIV/identification card issued to Contractor/subcontractor employee.

5. Contractor/subcontractor employee’s PIV/identification card number, as applicable.

6. Date Contractor/subcontractor employee no longer has need for PIV/identification card.

7. Date Contractor notified VA that PIV/identification card is no longer required.

8. Date Contractor returned PIV/identification card was returned to VA.

(h) Flow down of clause. The Contractor shall include the substance of this clause in subcontracts, third-party agreements, and BAA’s, in which subcontractors, third-party servicers/employees, and business associates will perform functions where they will have physical access to a VA facility or logical access to VA data, information, VA sensitive information, or information technology or VA information system containing such data or information.

(End of Clause) End of Document

File details come from the government source that posted it. Updated .