RFP%20WIFI%20AS%20A%20SERVICE%20COST%20SPREADSHEET.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- RFP 32701-04678 V2
- Issued by
- Tennessee
About this file
This is a cost proposal spreadsheet and scoring guide for an RFP issued by the Tennessee State Parks for Wireless-as-a-Service Provider services. The document serves as the template for respondents to submit detailed pricing for both site visit and non-site visit costs associated with establishing and maintaining WiFi infrastructure across Tennessee State Parks facilities. Site visit costs encompass professional services and equipment installation, including site surveys, project management, network design and installation, conduit and fiber optic installation, electrical work, pole installation, and various network equipment such as wireless access points, routers, controllers, switches, backhaul systems, bridges, media converters, battery backups, enclosures, and patch cables. Non-site visit costs include ongoing operational services such as end-user support (estimated 500 support incidents), technician onsite support (estimated 300 hours), WiFi service and monitoring for equipment during both in-season (April-November, estimated 40 units per month) and off-season (December-March, estimated 20 units per month) periods, training (estimated 22 hours), and annual on-site equipment inspections (estimated 44 inspections). All monetary amounts must be submitted in U.S. currency limited to two decimal places, and the cost proposal must remain valid for at least 120 days following the proposal opening date.
The cost proposal includes a scoring matrix that weights site visit costs at 18 percent and non-site visit costs at 12 percent of the total cost score, with the lowest cost proposal among all submissions serving as the benchmark for evaluation. Respondents must complete all yellow fields in the spreadsheet and may enter zero quantities for line items deemed unnecessary based on site visit requirements, though a price must be provided for all line items. The document explicitly states that estimated quantities are for evaluation purposes only and do not constitute volume guarantees or minimum purchase quantities, and that the State retains no obligation to request any specific dollar amounts or any work at all from the contractor during the contract period. The cost proposal must be signed by an individual with authority to bind the respondent, with supporting documentation of signatory authority required if the signer is not the President or Chief Executive Officer.
View the file
Other files
Show 40 more
Latest 50 of 74 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions RFP # Wifi As A Service for Tennessee State Parks
| COST PROPOSAL & SCORING GUIDE |
| NOTICE: THIS COST PROPOSAL MUST BE COMPLETED EXACTLY AS REQUIRED |
| COST PROPOSAL SCHEDULE— The Cost Proposal, detailed below, shall indicate the proposed price for goods or services defined in the Scope of Services of the RFP Attachment 6.6., Pro Forma Contract and for the entire contract period. The Cost Proposal shall remain valid for at least one hundred twenty (120) days subsequent to the date of the Cost Proposal opening and thereafter in accordance with any contract resulting from this RFP. All monetary amounts shall be in U.S. currency and limited to two (2) places to the right of the decimal point. |
| Instructions: On each tab, please complete the yellow fields only. For the Site Visit Costs, the Respondent shall enter their quantities and costs for each line item based on the site visit. The Respondent must enter a cost for all line items. If the item is not necessary based on the Site Visit, the Respondent should enter a quantity of zero. For the Non-Site Visit Costs, the Respondent must enter a cost for all line items. |
| NOTICE: The Evaluation Factor associated with each cost item is for evaluation purposes only. The evaluation factors do NOT and should NOT be construed as any type of volume guarantee or minimum purchase quantity. The evaluation factors shall NOT create rights, interests, or claims of entitlement in the Respondent. Notwithstanding the cost items herein, pursuant to the second paragraph of the Pro Forma Contract section C.1. (refer to RFP Attachment 6.6.), “The State is under no obligation to request work from the Contractor in any specific dollar amounts or to request any work at all from the Contractor during any period of this Contract.” This Cost Proposal must be signed, in Attachment 6.2. , by an individual empowered to bind the Respondent to the provisions of this RFP and any contract awarded pursuant to it. If said individual is not the President or Chief Executive Officer, this document must attach evidence showing the individual’s authority to legally bind the Respondent. |
RESPONDENT SIGNATURE:
PRINTED NAME & TITLE:
DATE:
Site Visit Costs
| Site Visit Costs | ||||
| Cost Item Description | Quantity | Unit of Measure | Price | Total Line Item Price |
| Site Survey (including all travel expenses) | per day | $ - 0 | ||
| Project Management | per hour | $ - 0 | ||
| Network Design (manhours) | per hour | $ - 0 | ||
| Network Installation (manhours) | per hour | $ - 0 | ||
| Conduit Installation | per linear foot | $ - 0 | ||
| Fiber Optic Installation | per linear foot | $ - 0 | ||
| Ethernet Installation | per linear foot | $ - 0 | ||
| Electrical Installation (dedicated circuit, commonly, but not limited to within campgrounds) | per installation | $ - 0 | ||
| Pole Installation | per installation | $ - 0 | ||
| Wireless Access Point | per each | $ - 0 | ||
| Network Router | per each | $ - 0 | ||
| Network Controller | per each | $ - 0 | ||
| Network Switch | per each | $ - 0 | ||
| Wireless Backhaul | per each | $ - 0 | ||
| Wireless Bridge | per each | $ - 0 | ||
| Fiber Media Converter | per each | $ - 0 | ||
| Sinewave Batter Backup | per each | $ - 0 | ||
| Battery Backup | per each | $ - 0 | ||
| Network Equipment Enclosure/Rack | per each | $ - 0 | ||
| Ethernet Patch Cables | per each | $ - 0 | ||
| Fiber Patch Cables | per each | $ - 0 |
TOTAL SITE VISIT COST $ - 0
Non-Site Visit Costs
| Non-Site Visit Costs | ||||
| Cost Item Description | State's Estimated Quantity | Unit of Measure | Price | Total Line Item Price |
| Wifi End User Support | 500 | per support incident | $ - 0 | |
| Technician Onsite Support, Troubleshooting, Repair, and Upgrades | 300 | per hour | $ - 0 | |
| Wifi Service and Monitoring In-Season: Wireless Access Point | 40 | per wireless access point per month (April-November) | $ - 0 | |
| Wifi Service and Monitoring In-Season: Network Router | 40 | per network route per month (April-November) | $ - 0 | |
| Wifi Service and Monitoring In-Season: Network Controller | 40 | per network controller per month (April-November) | $ - 0 | |
| Wifi service and Monitoring In-Season: Switch | 40 | per switch per month (April-November) | $ - 0 | |
| Wifi Service and Monitoring In-Season: Wireless Backhaul | 40 | per wireless backhaul per month (April-November) | $ - 0 | |
| Wifi Service and Monitoring In-Season: Wireless Bridge | 40 | per wireless bridge per month (April-November) | $ - 0 | |
| Wifi Service and Monitoring Off-Season: Wireless Access Point | 20 | per wireless access point per month (December-March) | $ - 0 | |
| Wifi Service and Monitoring Off-Season: Network Router | 20 | per network route per month (December-March) | $ - 0 | |
| Wifi Service and Monitoring Off-Season: Network Controller | 20 | per network controller per month (December-March) | $ - 0 | |
| Wifi service and Monitoring Off-Season: Switch | 20 | per switch per month (December-March) | $ - 0 | |
| Wifi Service and Monitoring Off-Season: Wireless Backhaul | 20 | per wireless backhaul per month (December-March) | $ - 0 | |
| Wifi Service and Monitoring Off-Season: Wireless Bridge | 20 | per wireless bridge per month (December-March) | $ - 0 | |
| Training | 22 | per hour | $ - 0 | |
| Annual On-Site Equipment Inspection | 44 | per inspection | $ - 0 |
TOTAL NON-SITE VISIT COST $ - 0
Cost Score Matrix *For CPO Solicitation Coordinator Completion Only*
Site Visit Cost Total
| Site Visit Cost Raw Score | Weighting | Site Visit Cost Score | |
| Lowest Site Visit Cost from All Proposals | ERROR:#DIV/0! | 18 | ERROR:#DIV/0! |
| Site Visit Cost Amount Being Evaluated |
Non-Site Visit Cost Total
| Non-Site Visit Cost Raw Score | Weighting | Non-Site Visit Cost Score | |
| Lowest Non-Site Visit Cost from All Proposals | ERROR:#DIV/0! | 12 | ERROR:#DIV/0! |
| Non-Site Visit Cost Amount Being Evaluated |
| Site Visit Score | ERROR:#DIV/0! |
| Non-Site Visit Score | ERROR:#DIV/0! |
Total Cost Score ERROR:#DIV/0!