This document appears to be an Infection Control Risk Assessment (ICRA) plan and details for the Balance of Work project at the VA NY Manhattan Campus. The ICRA plan outlines requirements for infection control and prevention during construction activities, including the use of temporary barriers, HEPA filtration, and procedures for controlling dust and debris. Key details include:

The project involves construction and renovation work in and around the occupied medical center. The ICRA plan requires the contractor to establish and maintain dust control measures, train all personnel in infection prevention, and coordinate closely with the VA's ICRA team. Temporary 1-hour fire-rated barriers must be installed to separate construction from operational areas. HEPA filtration is required where exhaust dust could re-enter occupied spaces. The contractor is responsible for protecting and restoring all public spaces affected by construction. The plan also includes detailed specifications for temporary doors, walls, and other ICRA-related construction elements.

View the file

Other files

File Type Posted
SolicitationCancellation.pdf PDF
SolicitationAmendment0006.pdf PDF
Manhattan VA Asbestos Survey Report 05-2021final (5-24-21).pdf PDF
Manhattan VA Revised Asbestos Survey Report 05-2021Final (Appendix H - First Half).pdf PDF
QA - Balance of Work - 05.08.2024.pdf PDF
Manhattan VA Revised Asbestos Survey Report 05-2021Final (Appendix H - 2nd half).pdf PDF
QA - Balance of Work - 05.02.2024.pdf PDF
SolicitationAmendment0005.pdf PDF
SolicitationAmendment0004.pdf PDF
QA - Balance of Work - 04.16.2024.pdf PDF
C-Mechanical- Part 2.pdf PDF
C-Electrical- Part 5.pdf PDF
B-Mechanical-Part 1.pdf PDF
P03_CDR- Sole Source JA - Access Controls - 11-16-22.pdf PDF
B-Civil.pdf PDF
C-Plumbing- Part 2.pdf PDF
P03_CDR - Sole Source JA - Public Announcement System - 11-16-22.pdf PDF
C-Electrical- Part 4.pdf PDF
A-Architecture-Part 3.pdf PDF
A-ICRA.pdf PDF
C-Architecture- Part 5.pdf PDF
A-Fire Protection-Part 2.pdf PDF
C-Electrical- Part 10.pdf PDF
P03_CDR - Sole Source JA - Triplex Pump 11-16-22.pdf PDF
C-Life Safety.pdf PDF
A-Electrical-Part 1.pdf PDF
VHA Directive 1028_D_2020-02-24.pdf PDF
B-Electrical-Part 2.pdf PDF
B-Architecture-Part 4.pdf PDF
C-Electrical- Part 12.pdf PDF
A-Electrical-Part 3.pdf PDF
C-Electrical- Part 7.pdf PDF
C-Electrical- Part 8.pdf PDF
A-Civil.pdf PDF
A-Structural.pdf PDF
A-General.pdf PDF
QSE 36C10F24R50018.pdf PDF
Amendment 0001 - Missing and Replacement Documents.pdf PDF
B-Electrical-Part 1.pdf PDF
C-Fire Protection- Part 2.pdf PDF
C-Electrical- Part 11.pdf PDF
C-Telecom.pdf PDF
A-Plumbing-Part 2.pdf PDF
C-Architecture- Part 6.pdf PDF
B-Electrical-Part 3.pdf PDF
VAMC CD Refresh IFC Vol 1 Specifications REV 2_ 9-19-23 (Part 3).pdf PDF
C-Mechanical- Part 3.pdf PDF
Shutdown Request Form.pdf PDF
B-Architecture-Part 2.pdf PDF
P03_CD Refresh - Sole Source JA - Fire Alarm System - 11-16-22.pdf PDF
Show 40 more

Latest 50 of 281 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EE

Z

S

U

R R

T

DN

RAMP

161412

CC

DD

Z

AA

BB

Y

EE

BB

AA

DD

EE

DD

BB

22 23 24 26

V

W

X

BUILDING 1

RAMP DN

EX

EX

EX

EX

EX EX

EX

EX

EX

EX

EX

EX

EX

EX

S S

S S

S

S

S

SS

S

S

S

S

S

SSSSS

S S S S

S

S

SS

S

S S

S S

S S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S S

S

S

AA

EX

HH

S S

S

S S

C1S

TC07

M M

H

HEPA

HEPA HEPA

HEPA

C1S

C1S

C1S

TC08

C1S 5

C1S

C1S

6'-0"

LINE OF MAT

FOUNDATION

BELOW

LINE OF MAT

FOUNDATION

BELOW

7'-5"

ICRA SYMBOLS

PROJECT AREA LIMIT

ICRA CONSTRUCTION BARRIER WALL / DOOR

WALL (EXISTING / NEW)

MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)

HEPA FILTERHE

PA

M

H

MAT

TEMPORARY POLYETHYLENE PLASTIC

CONSTRUCTION FILM BARRIER; SEE ICRA

KEYNOTES FOR REQUIREMENTS

TC##

SEE DWG C-GI250 FOR DOOR AND

PARTITION TYPES

1. REFER TO C-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO C-AE002 FOR GENERAL NOTES.

2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS

OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE

RATEDAND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.

6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS

SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.

7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED ON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED

BASED ON SITE CONDITIONS.

8. REFER TO SHEETS C-GI201, C-GI210 & C-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND

EXTENTS OF TEMPORARY WALL CONSTRUCTION.

MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ICRA CONSTRUCTION

BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND

CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.

10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE

COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.

RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF TEMPORARY

PARTITIONS.

13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED

OTHERWISE.

EACH DOOR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER

1 CLOSER C02011/C02021

1 WALL STOP (AT INSWING DOORS) L02101 CONVEX

1 SET SELF-ADHESIVE SEALS R0E154

ICRA NOTES:

11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES

AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,

REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING

CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL

COST TO THE PROJECT/GOVERNMENT.

3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS

AND THEIR REQUIREMENTS.

4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.

INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE

FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.

5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.

9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE

SCHEDULED TO BE MODIFIED OR REPLACED.

12. REFER TO E4/C-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.

1 KICK PLATE J102

1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY

EACH PAIR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT

1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER

1 OVERLAPPING STEEL ASTRAGAL

WITH SELF ADHESIVE SEAL

R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)

1 TYPE 21A

2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY

CLOSERS

KICK PLATES

WALL STOPS

SET SELF ADHESIVE SEALS

COORDINATOR

C02011 / C02021 J102 L02101

ROY154

14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISCPLACED.

15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT /

REDUCE AMOUNT OF FINAL CLEANUP REQUIRED.

1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.

2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA

TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.

3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED

AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.

4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN

PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.

5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER

AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:

a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY

SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER

TO CONTAIN DIRT DEBRIS AND DUST.

b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING

ZONE.

c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE

CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL

BE CHANGED ON A DAILY BASIS.

d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED

MEDICAL CENTER AT THE END OF THE WORK DAY.

e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.

f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO

REPLACEMENT.

g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN

EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.

h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION

OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER

THE REMOVAL.

6. FINAL CLEANUP:

a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION

DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF

THE CONSTRUCTION.

b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.

7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -

SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.

INFECTIOUS DISEASE CONTROL REQUIREMENTS

J b

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SSSS

S

S

S

S

S S

S S

S

S

S

S

H

M

M

MAT

MAT

M

A

T

M

A

T

MAT

MAT

A

C

D

F

G

L

J

E

ICRA KEYNOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 DZ JH / DZ

8'4'0 16'

PLAN

NORTH

SCALE: 1/16" = 1'-0"

BUILDING 1 - PARTIAL GROUND FLOOR ICRA PLAN

E5

# (SPECIFIC TO THIS

DRAWING ONLY)

BUILDING 1 - PARTIAL GROUND

FLOOR ICRA PLAN

C-GI201

EXISTING WALL TO ACT AS 1 HR CONSTRUCTION BARRIER. FIRESTOP ANY OPENINGS IN WALL TO MAINTAIN INTEGRITY OF CONSTRUCTION BARRIER REQUIREMENTS. EXTEND WALL CONSTRUCTION TO DECK. PROVIDE HEAD OF WALL FIRESTOP TERMINATIONS SIMILAR TO DETAIL D1 / A-GI250.

EXISTING 1 HR CONSTRUCTION BARRIER. FIRESTOP ANY EXISTING OR NEW OPENINGS IN WALL TO MAINTAIN INTEGRITY OF CONSTRUCTION BARRIER REQUIREMENTS. EXTEND WALL CONSTRUCTION TO DECK. PROVIDE HEAD OF WALL FIRESTOP TERMINATIONS SIMILAR TO DETAIL D1 / A-GI250.

PROVIDE TEMP SAFETY BARRIERS AT EXTERIOR WALL / WINDOW / DOOR REMOVAL. TEMP SAFETY BARRIERS SHALL NO IMPACT ON VAMC OPERATIONS.

OBTAIN APPROVAL / COORDINATE WITH VA CFM OFFICE PRIOR TO ANY ERECTION OF SAFETY BARRIERS. TEMP SAFETY BARRIER SHALL BE REMOVED ONCE CONSTRUCTION BARRIER IS COMPLETE. CONSTRUCTION BARRIER SHALL BE BUILT IMMEDIATELY AFTER DEMOLITION OF EXTERIOR WALL / WINDOW

REMOVAL.

4 EXISTING FOOD RECEIVING AREA 0218E AND STAIR 1-1 SHALL REMAIN OPERATIONAL AND ACCESSIBLE DURING THE DURATION OF CONSTRUCTION ACTIVITIES. MAINTAIN CLEAR PATH FOR EGRESS / DELIVERIES AND VAMC OPERATIONAL REFUSE REMOVALS. CONSTRUCTION MATERIALS ARE NOT PERMITTED TO BE STORED WITHIN THIS ROOM / AREAS. NOT LESS THAN WEEKLY, MOP DOWN / CLEAN ROOM TO CONTROL CONSTRUCTION RESIDUE / DUST.

5 REMOVE EXISTING DOOR AND FRAME. INSTALL 1 HR CONSTRUCTION BARRIER WITHIN DOOR OPENING.

6 EXISTING 1 HR CONSTRUCTION BARRIER TO BE DEMOLISHED TO PERMIT INSTALLATION OF MAT FOUNDATION. INSTALL "NEW" 1 HR CONSTRUCTION BARRIER

AS SHOWN WITH A CONTINUITY INTERFACE WITH THE EXISTING CONSTRUCTION BARRIERS.

8 6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL BE SEALED TO CEILING/FLOOR/WALLS FOR DUST AND DEBRIS CONTAINMENT. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL NOT IMPEDE VAMC OPERATIONS OR EGRESS. OBTAIN APPROVAL / COORDINATE / FACILITATE ILSM WITH VA CFM OFFICE PRIOR TO CONSTRUCTION ACTIVITIES AND CONSTRUCTION OF TEMPORARY ICRA CONSTRUCTION FILM BARRIERS.

9 HEPA VACUUM ALL CARPET TILES AND LIGHT FIXTURES WITHIN THE WORK AREA AT THE CONCLUSION OF THE WORK ACTIVITIES.

7 ICRA CONSTRUCTION BARRIER ERECTION / EXTENT SHOWN AT THE EXISTING FOOD SERVICE AREA 0218E SHALL BE COORDINATED / MODIFIED AS REQUIRED BASED UPON THE ICRA CONSTRUCTION BARRIER REQUIRED BY THE TEMPORARY VAMC REFRIGERATOR / FREEZER INSTALLATION SHOWN IN PKG. "A" ICRA

PLANS.

6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL BE SEALED TO CEILING/FLOOR/WALLS FOR DUST AND DEBRIS CONTAINMENT DURING THE CMU OPENING INFILL AT THE ABOVE CEILING CONDUIT AND PULL-BOX REMOVAL. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL NOT IMPEDE VAMC OPERATIONS OR EGRESS. TEMPORARY ICRA CONSTRUCTION BARRIERS AND WILL BE REQUIRED TO BE INSTALLED / REMOVED AFTER-HOURS ON A DAILY BASIS FOR AFTER-HOUR WORK ACTIVITIES. OBTAIN APPROVAL / COORDINATE / FACILITATE ILSM WITH VA CFM OFFICE PRIOR TO CONSTRUCTION ACTIVITIES AND CONSTRUCTION OF TEMPORARY ICRA CONSTRUCTION FILM BARRIERS. HEPA FILTER CLEAN-UP WILL BE

REQUIRED UPON CONCLUSION OF EACH DAYS CONSTRUCTION ACTIVITIES.

SCALE: 1/8" = 1'-0"

8'4'0 16'

BUILDING 1 - PARTIAL GROUND FLOOR ICRA PLAN

F2

PLAN

NORTH

AutoCAD SHX Text

CSSSD

AutoCAD SHX Text G580

AutoCAD SHX Text

CLOTHES DIST.

AutoCAD SHX Text

0148AS

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 0147S

AutoCAD SHX Text

SPECIMEN CLOS

AutoCAD SHX Text 0170S

AutoCAD SHX Text

SPECIMEN STORAGE

AutoCAD SHX Text 0171S

AutoCAD SHX Text

CANTEEN STORAGE

AutoCAD SHX Text

0252EA

AutoCAD SHX Text

IRM STORAGE

AutoCAD SHX Text

0252EB

AutoCAD SHX Text

VAULT 2

AutoCAD SHX Text 0253E

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 0257E

AutoCAD SHX Text

SUPPLY STORAGE

AutoCAD SHX Text 0253N

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 0253E

AutoCAD SHX Text

EQUIPMENT STOR

AutoCAD SHX Text 0252E

AutoCAD SHX Text

EMS SUPER

AutoCAD SHX Text 0255N

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 0244N

AutoCAD SHX Text

ELEC RM

AutoCAD SHX Text 0247N

AutoCAD SHX Text

LINEN CHUTE RM

AutoCAD SHX Text 0253E

AutoCAD SHX Text

MAIN ELECTRIC-BUILDING 1

AutoCAD SHX Text 0242N

AutoCAD SHX Text

ELEC CL

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text 0253F

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text 0233E

AutoCAD SHX Text

FOOD RECEIVING

AutoCAD SHX Text 0218E

AutoCAD SHX Text

INGREDIENT CONTROL

AutoCAD SHX Text 0216E

AutoCAD SHX Text

MATERIAL OFFICE

AutoCAD SHX Text 0215E

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 0243N

AutoCAD SHX Text

IT ROOM

AutoCAD SHX Text 0211E

AutoCAD SHX Text

EMPTY GAS CYLINDERS

AutoCAD SHX Text 0210E

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 0212E

AutoCAD SHX Text

SERVICE ENTRY

AutoCAD SHX Text 0211E

AutoCAD SHX Text

COMP GAS

AutoCAD SHX Text

AutoCAD SHX Text

NON FLAM GAS

AutoCAD SHX Text

AutoCAD SHX Text

EQUIPMENT STORAGE

AutoCAD SHX Text 0203E

AutoCAD SHX Text

S P D WAREHOUSE

AutoCAD SHX Text 0250E

AutoCAD SHX Text

EMS EQUIPMENT RM

AutoCAD SHX Text 0251E

AutoCAD SHX Text

LOADING DOCK

AutoCAD SHX Text

AutoCAD SHX Text

GOOD RECEIVING

AutoCAD SHX Text 0214E

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text 0213E

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 0242N

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 0241N

AutoCAD SHX Text

STAIRWELL

AutoCAD SHX Text 0254N

AutoCAD SHX Text

SHARED OFFICE

AutoCAD SHX Text

FLUID CART STORAGE

AutoCAD SHX Text G596

AutoCAD SHX Text

VENDOR LOANER

AutoCAD SHX Text G589

AutoCAD SHX Text

BREAKDOWN

AutoCAD SHX Text G590

AutoCAD SHX Text

EQUIP HOLDING / DISPATCH

AutoCAD SHX Text G595

AutoCAD SHX Text

SOILED RECEIVING

AutoCAD SHX Text G591

AutoCAD SHX Text

MECH RM

AutoCAD SHX Text G703

AutoCAD SHX Text

JAN.

AutoCAD SHX Text G598

AutoCAD SHX Text

KITCHENETTE

AutoCAD SHX Text 0142C

AutoCAD SHX Text

ELEC

AutoCAD SHX Text

CAB

AutoCAD SHX Text G001W

AutoCAD SHX Text

MALE TOILET

AutoCAD SHX Text G382

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

ELEV LOBBY

AutoCAD SHX Text G001

AutoCAD SHX Text

WASHER DRYER

AutoCAD SHX Text G003

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text G004

AutoCAD SHX Text

IT (TR-D)

AutoCAD SHX Text

0209SA

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 0209S

AutoCAD SHX Text

RADIOACTIVE RM

AutoCAD SHX Text G206S

AutoCAD SHX Text

LAUNDRY

AutoCAD SHX Text 0184S

AutoCAD SHX Text

INTERIM STORAGE

AutoCAD SHX Text

PUMPS

AutoCAD SHX Text 0166S

AutoCAD SHX Text

PUMP ROOM

AutoCAD SHX Text 0175S

AutoCAD SHX Text

FIRE COMMAND / ATS SWITCH

AutoCAD SHX Text 0273N

AutoCAD SHX Text

EQUIPMENT HOLDING

AutoCAD SHX Text

0230AE

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text G245N

AutoCAD SHX Text

STAIR

AutoCAD SHX Text 1-1

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

PE #1

AutoCAD SHX Text

PE #2

AutoCAD SHX Text

PE #3

AutoCAD SHX Text

PE #4

AutoCAD SHX Text

PE #5

AutoCAD SHX Text

PE #6

AutoCAD SHX Text

PE #7

AutoCAD SHX Text

PE #8

AutoCAD SHX Text

SE #12

AutoCAD SHX Text

SE #11

AutoCAD SHX Text

SE #10

AutoCAD SHX Text

SE #9

AutoCAD SHX Text

SE #13

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

DOCK LEVELER

AutoCAD SHX Text #1

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

DOCK LEVELER

AutoCAD SHX Text #2

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

DOCK LEVELER

AutoCAD SHX Text #3

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

REST RM

AutoCAD SHX Text 0213F

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

RAMP UP

AutoCAD SHX Text

ELECTRIC ROOM

AutoCAD SHX Text G706

AutoCAD SHX Text

TELE. RM.

AutoCAD SHX Text G706A

AutoCAD SHX Text

HLD

AutoCAD SHX Text G535

AutoCAD SHX Text

SCOPE WASH

AutoCAD SHX Text G501

AutoCAD SHX Text

ETO ABATOR

AutoCAD SHX Text

AUTHORIZED ASSEMBLY WORKSTATIONS

AutoCAD SHX Text

DECONTAMINATION

AutoCAD SHX Text G504

AutoCAD SHX Text

DETERGENT

AutoCAD SHX Text G512

AutoCAD SHX Text

WATER TREATMENT

AutoCAD SHX Text G511

AutoCAD SHX Text

PPE

AutoCAD SHX Text G508

AutoCAD SHX Text

MALE LOCKER

AutoCAD SHX Text G507

AutoCAD SHX Text

JAN

AutoCAD SHX Text G505

AutoCAD SHX Text

MALE TOILET

AutoCAD SHX Text G506

AutoCAD SHX Text

FEMALE LOCKER

AutoCAD SHX Text G509

AutoCAD SHX Text

FEMALE TOILET

AutoCAD SHX Text G510

AutoCAD SHX Text

CART STAGING

AutoCAD SHX Text G513

AutoCAD SHX Text

CART STAGING

AutoCAD SHX Text G502

AutoCAD SHX Text

LINEN RM

AutoCAD SHX Text G503

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text G500

AutoCAD SHX Text

BUILDING SUPPORT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV LOBBY

AutoCAD SHX Text

CG-2

AutoCAD SHX Text

STAIR #3

AutoCAD SHX Text

AutoCAD SHX Text

CORR.

AutoCAD SHX Text 258A

AutoCAD SHX Text

HSKP

AutoCAD SHX Text G711

AutoCAD SHX Text G733

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text G736

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text G735

AutoCAD SHX Text

RECEPT

AutoCAD SHX Text G715

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text G714

AutoCAD SHX Text

COPY

AutoCAD SHX Text G716

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text G710

AutoCAD SHX Text

CORR.

AutoCAD SHX Text 258B

AutoCAD SHX Text

TEL & SIG

AutoCAD SHX Text G630A

AutoCAD SHX Text

FUTURE AUDITORIUM

AutoCAD SHX Text G701

AutoCAD SHX Text

FUTURE AUDITORIUM STORAGE

AutoCAD SHX Text G704

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text G601

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text G600

AutoCAD SHX Text

IT (TR-B)

AutoCAD SHX Text G707

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text G713

AutoCAD SHX Text

COAT CLOSET

AutoCAD SHX Text G709

AutoCAD SHX Text

STAIR

AutoCAD SHX Text 6-1

AutoCAD SHX Text

KITCHENETTE

AutoCAD SHX Text G708

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

BUILDING SUPPORT

AutoCAD SHX Text G705

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

AutoCAD SHX Text

BLDG 6

Z.8

AA.2

NORMAL POWER ROOM

1115AC-EL

EMERGENCY POWER ROOM

ELEC

1056S-EL

ELEC

1064S-EL

ELEC

S S S S

S S

S

S

S

S

S

S S

S S

AA.2

Z.8

DD.5

DD.5

20.5

22.8 22.9

20.5

22.8

22.9

18.2 20.5

22.8

18.1

22.9

20.5

22.8

18.1 22.9

18.4

DD.8

DD.8

BB.5

BB.5

AA.5

AA.5

AA.5

AA.5

HH

32302826

Y

V

W

X

Z

AA

U

BUILDING 1

W

X

4 5 7 9

EXTERIOR PLAZA

EMERGENCY GENERATOR

U

V

DD

11 1312

E A S

T

TH

S

TR

EE

T

2 31

EX

EX

EX

EX

EX EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

AA

BB

EX.

EE

22 23

BB

AA

Z

X

W

R

25 29

S S S S

S S

S

S

S

S

S

S S

S S

C

O

N

N

E

C

T

O

R

B

I

D

G

E

EE

EX

DD

DD

EX

EX

EMERGENCY GENERATOR TRAILER

TEMP EMERGENCY

GENERATOR AREA

BUILDING No. 2

B-GI250

B8

C-GI250

B6

C-GI250

B1

C-GI250

B3

MA

T

MA

T

C2S

HE

PA

6'-0"

MA

T

MA

T

C2S

ALT

2 4

TC02

TC01

5'- 0"

M

IN

CL

R

5'- 0"

M

IN

CL

R

5'-0"MIN

CLR

ICRA SYMBOLS

PROJECT AREA LIMIT

ICRA CONSTRUCTION BARRIER WALL / DOOR

WALL (EXISTING / NEW)

MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)

HEPA FILTERHE

PA

M

H

MAT

TEMPORARY POLYETHYLENE PLASTIC

CONSTRUCTION FILM BARRIER; SEE ICRA

KEYNOTES FOR REQUIREMENTS

TC##

TEMPORARY LIGHT FIXTURE.

SEE DWG C-GI250 FOR DOOR AND

PARTITION TYPES

1. REFER TO C-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO C-AE002 FOR GENERAL NOTES.

2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS

OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE

RATEDAND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.

6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS

SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.

7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED ON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED

BASED ON SITE CONDITIONS.

8. REFER TO SHEETS C-GI201, C-GI210 & C-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND

EXTENTS OF TEMPORARY WALL CONSTRUCTION.

MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ICRA CONSTRUCTION

BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND

CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.

10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE

COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.

RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF TEMPORARY

PARTITIONS.

13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED

OTHERWISE.

EACH DOOR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER

1 CLOSER C02011/C02021

1 WALL STOP (AT INSWING DOORS) L02101 CONVEX

1 SET SELF-ADHESIVE SEALS R0E154

ICRA NOTES:

11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES

AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,

REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING

CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL

COST TO THE PROJECT/GOVERNMENT.

3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS

AND THEIR REQUIREMENTS.

4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.

INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE

FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.

5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.

9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE

SCHEDULED TO BE MODIFIED OR REPLACED.

12. REFER TO E4/C-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.

1 KICK PLATE J102

1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY

EACH PAIR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT

1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER

1 OVERLAPPING STEEL ASTRAGAL

WITH SELF ADHESIVE SEAL

R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)

1 TYPE 21A

2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY

CLOSERS

KICK PLATES

WALL STOPS

SET SELF ADHESIVE SEALS

COORDINATOR

C02011 / C02021 J102 L02101

ROY154

14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISCPLACED.

15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT /

REDUCE AMOUNT OF FINAL CLEANUP REQUIRED.

1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.

2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA

TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.

3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED

AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.

4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN

PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.

5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER

AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:

a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY

SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER

TO CONTAIN DIRT DEBRIS AND DUST.

b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING

ZONE.

c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE

CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL

BE CHANGED ON A DAILY BASIS.

d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED

MEDICAL CENTER AT THE END OF THE WORK DAY.

e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.

f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO

REPLACEMENT.

g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN

EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.

h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION

OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER

THE REMOVAL.

6. FINAL CLEANUP:

a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION

DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF

THE CONSTRUCTION.

b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.

7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -

SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.

INFECTIOUS DISEASE CONTROL REQUIREMENTS

ICRA KEYNOTES

3 DAILY ENTRY / USE RESTRICTED. INSTALL TEMPORARY SIGN ON DOOR INDICATING "EMERGENCY EXIT USE ONLY".

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022

C-GI210

BUILDING 1 - FIRST FLOOR ICRA

PLAN

DZ JH / DZ

8'4'0 16'

PLAN

NORTH

SCALE: 1/16" = 1'-0"

FIRST FLOOR ICRA PLAN - BUILDING 1

E1

1 6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL BE ERECTED OUTSIDE VAMC OPERATION HOURS. THE CONSTRUCTION OF THE PERMANENT ROOM WALLS WHICH WILL ACT AS THE CONSTRUCTION BARRIER SHALL BE EXPEDITED. ONCE THE PERMANENT ROOM PARTITION IS 100% COMPLETE, THE TEMPORARY CONSTRUCTION FILM BARRIER SHALL BE REMOVED. TIME DURATION TO COMPLETE PERMANENT ROOM WALLS AND RESTORE ADJACENT CEILING AND WALL SURFACES / FINISHES AFFECTED BY CONSTRUCTION IS LIMITED TO A MAXIMUM OF 5 CONSECUTIVE WORKDAYS. OBTAIN APPROVAL / COORDINATE / FACILITATE ILSM WITH THE VA CFM OFFICE PRIOR TO ERECTION OF TEMPORARY ICRA

CONSTRUCTION FILM BARRIERS FOR CONSTRUCTION ACTIVITIES.

4 HEPA VACUUM BACKSIDE OF ALL ACT PANELS AS THEY ARE REMOVED FOR CEILING ACCESS REQUIRED TO INSTALL LIGHTS / ELECTRICAL SYSTEMS.

5 MOVE ALL FURNITURE / EQUIPMENT AS REQUIRED TO PROVIDE CLEARANCES TO CONSTRUCT THE TEMPORARY CONSTRUCTION FILM BARRIER. AFTER COMPLETITION OF WORK, FURNITURE / EQUIPMENT SHALL BE PUT BACK IN IT'S ORIGINAL LOCATION. ROOM SHALL BE CLEANED AS INDICATED IN

INFECTIOUS DISEASE CONTROL REQUIREMENTS ABOVE.

6 EXISTING DOOR TO BE REMOVED AND WALL OPENING TO BE ENLARGED TO ACCOMMODATE NEW DOOR WIDTH. TEMPORARY HM CONSTRUCTION DOOR AND FRAME TO BE USED FOR DURATION OF THE ELECTRICAL ROOM CONSTRUCTION. AT COMPLETION OF CONSTRUCTION / PROJECT INSTALL

SCHEDULED SCWD DOOR AND HARDWARE.

# (SPECIFIC TO THIS

DRAWING ONLY)

6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS

CONTAINMENT.

7 EXISTING CORRIDOR WALL/WALLS IS TO ACT AS THE 1 HR RATED ICRA CONSTRUCTION BARRIER. FIRESTOP / SEAL ALL ABOVE CEILING THROUGH

WALL PENETRATIONS.

8 6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT. TO MINIMIZE IMPACT ON VAMC OPERATIONS, CORRIDOR WALL / DOOR MODIFICATION ARE TO BE EXPEDITED. CONSTRUCTION IS LIMITED TO A MAXIMUM OF 5 CONSECUTIVE WORKDAYS. OBTAIN APPROVAL / COORDINATE / FACILITATE ILSM WITH THE VA CFM OFFICE PRIOR TO

ERECTION OF TEMPORARY ICRA CONSTRUCTION FILM BARRIERS.

9 6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS.TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT (ALONG ENTIRE LENGTH OF EXISTING FENCE PARTITION) TO MINIMIZE IMPACT ON VAMC OPERATIONS, / MEDICAL ADMINISTRATION RECORDS AREA. OBTAIN APPROVAL / COORDINATE WITH THE VA CFM OFFICE PRIOR TO ERECTION OF TEMPORARY ICRA CONSTRUCTION FILM BARRIERS.

AutoCAD SHX Text F1

AutoCAD SHX Text

C-AE301

AutoCAD SHX Text F5

AutoCAD SHX Text

C-AE301

AutoCAD SHX Text

ELEV. SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV. SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

SERVICE ELEV.

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV. SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV. SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV. SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV. SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV. SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV. SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

DUCT SHAFT

AutoCAD SHX Text

EL. CAB.

AutoCAD SHX Text 1073S

AutoCAD SHX Text

STAIRS #3

AutoCAD SHX Text 1071S

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

INTERVIEW

AutoCAD SHX Text 1078S

AutoCAD SHX Text

INTERVIEW

AutoCAD SHX Text 1077S

AutoCAD SHX Text

INTERVIEW

AutoCAD SHX Text 1076S

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 1075S

AutoCAD SHX Text

CHIEF OF VOLUNTEER

AutoCAD SHX Text 1074S

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text 1072S

AutoCAD SHX Text

BOARD OF ED.

AutoCAD SHX Text 1071S

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 1070S

AutoCAD SHX Text

INTERVIEW

AutoCAD SHX Text 1080S

AutoCAD SHX Text

P16 ELEV

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text 1082S

AutoCAD SHX Text

W. TOILET

AutoCAD SHX Text 1083S

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 1085S

AutoCAD SHX Text

WAITING

AutoCAD SHX Text 1079S

AutoCAD SHX Text

VACANT

AutoCAD SHX Text

1089AS

AutoCAD SHX Text

EL. CAB.

AutoCAD SHX Text 1073A-S

AutoCAD SHX Text

SECONDARY MANIFOLD RM

AutoCAD SHX Text 1091S

AutoCAD SHX Text

PATIENT FUNDS

AutoCAD SHX Text 1114C

AutoCAD SHX Text

MEN'S TOILET

AutoCAD SHX Text 1052C

AutoCAD SHX Text

STAFF FEM.

AutoCAD SHX Text 1038C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 1095S

AutoCAD SHX Text

MED / AIR RM

AutoCAD SHX Text 1092S

AutoCAD SHX Text

BARBER SHOP

AutoCAD SHX Text 1090S

AutoCAD SHX Text

FA ATS

AutoCAD SHX Text 1093S

AutoCAD SHX Text

RETAIL STORE AREA

AutoCAD SHX Text 1064S

AutoCAD SHX Text

ELEC. CLOS.

AutoCAD SHX Text 1087S

AutoCAD SHX Text

QA OFFICE

AutoCAD SHX Text 1086S

AutoCAD SHX Text

SVC. ORGANIZATION

AutoCAD SHX Text 1089S

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 1058S

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 1059S

AutoCAD SHX Text

COMMNUNICATION

AutoCAD SHX Text 1060S

AutoCAD SHX Text

SECRETARY

AutoCAD SHX Text

1060AS

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

1053AS

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 1057S

AutoCAD SHX Text

TRAINING RM.

AutoCAD SHX Text 1056S

AutoCAD SHX Text

WOMEN'S

AutoCAD SHX Text 1055S

AutoCAD SHX Text

MEN'S LOCKER

AutoCAD SHX Text 1054S

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 1053S

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 1095C

AutoCAD SHX Text

CENTRAL PHARMACY

AutoCAD SHX Text 1165 N

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

STAIR

AutoCAD SHX Text 1134 N

AutoCAD SHX Text

PHARM. REFER.

AutoCAD SHX Text

CONTROLLED SUB.

AutoCAD SHX Text 1147N

AutoCAD SHX Text

PHARMACY SERVICE

AutoCAD SHX Text 1133N

AutoCAD SHX Text

ELEC. CLOSET

AutoCAD SHX Text 1132N

AutoCAD SHX Text

CONSULTATION

AutoCAD SHX Text

1125BN

AutoCAD SHX Text

CONSULTATION

AutoCAD SHX Text

1125AN

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

1124AN

AutoCAD SHX Text

OUTPATIENT PHARM. SUPR.

AutoCAD SHX Text 1122N

AutoCAD SHX Text

AGENT CASHIER

AutoCAD SHX Text 1161N

AutoCAD SHX Text

SUPPORT SVC.

AutoCAD SHX Text 1093C

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text 1097C

AutoCAD SHX Text

POLICE OFFICE

AutoCAD SHX Text

1106AC

AutoCAD SHX Text

SUB CORRIDOR

AutoCAD SHX Text 1101C

AutoCAD SHX Text

MEDICAL DATA

AutoCAD SHX Text 1107C

AutoCAD SHX Text

SUPPORT SERV.

AutoCAD SHX Text

1110CC

AutoCAD SHX Text

MAS. SUP.

AutoCAD SHX Text

1110BC

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text

1115BC

AutoCAD SHX Text

CONFERENCE

AutoCAD SHX Text

1115CC

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 1159N

AutoCAD SHX Text

UNASSIGNED

AutoCAD SHX Text

1119BN

AutoCAD SHX Text

STAT.

AutoCAD SHX Text 1144N

AutoCAD SHX Text

FEMALE TOILET

AutoCAD SHX Text 1152N

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 1150N

AutoCAD SHX Text

I.V. STORAGE

AutoCAD SHX Text

1141CN

AutoCAD SHX Text

STAIR #6

AutoCAD SHX Text

I.V. PREP.

AutoCAD SHX Text

1141BN

AutoCAD SHX Text

I.V. ANTE RM.

AutoCAD SHX Text

1141AN

AutoCAD SHX Text

FLAM. STOR.

AutoCAD SHX Text 1140N

AutoCAD SHX Text

FEMALE LOCKER RM.

AutoCAD SHX Text

1152BN

AutoCAD SHX Text

STAFF LOUNGE

AutoCAD SHX Text 1151N

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 1148N

AutoCAD SHX Text

CARTS

AutoCAD SHX Text 1142N

AutoCAD SHX Text

INPATIENT PHARMACY SUPER.

AutoCAD SHX Text 1139N

AutoCAD SHX Text D.F.

AutoCAD SHX Text

PHARM. OFFICE

AutoCAD SHX Text

1121AN

AutoCAD SHX Text

PHARM. OFFICE

AutoCAD SHX Text

1121BN

AutoCAD SHX Text

GAS METERS

AutoCAD SHX Text

1107AC

AutoCAD SHX Text

ELECTRICAL CLOS.

AutoCAD SHX Text 1150N

AutoCAD SHX Text

JANITOR CLOS.

AutoCAD SHX Text 1149N

AutoCAD SHX Text

WATER DISTILLATION

AutoCAD SHX Text 1143N

AutoCAD SHX Text

POLICE OFFICE

AutoCAD SHX Text 1106C

AutoCAD SHX Text

POLICE OFFICE

AutoCAD SHX Text

1106BC

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text 1107 E

AutoCAD SHX Text

STAIR

AutoCAD SHX Text 1-1

AutoCAD SHX Text

MEDICAL ADMINISTRATION RECORDS

AutoCAD SHX Text 1101C

AutoCAD SHX Text

MATERIAL DIST. ROOM

AutoCAD SHX Text

1101AC

AutoCAD SHX Text

MECHANICAL RM.

AutoCAD SHX Text

1099AC

AutoCAD SHX Text

VACANT

AutoCAD SHX Text

1110AC

AutoCAD SHX Text

LOCKER RM.

AutoCAD SHX Text

1117AC

AutoCAD SHX Text

LOCKER RM.

AutoCAD SHX Text

1117BC

AutoCAD SHX Text

CHIEF HEALTH INFO.

AutoCAD SHX Text

1117CC

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 1111C

AutoCAD SHX Text

MALE TOILET

AutoCAD SHX Text

1113AC

AutoCAD SHX Text

FEMALE LOCKERS

AutoCAD SHX Text

1119AC

AutoCAD SHX Text

MALE LOCKERS

AutoCAD SHX Text 1113C

AutoCAD SHX Text

ASSISTANT CHIEF

AutoCAD SHX Text

1117DC

AutoCAD SHX Text

FEMALE TOILET

AutoCAD SHX Text 1119C

AutoCAD SHX Text

EXIST. MECH'L ROOM

AutoCAD SHX Text

MALE TOILET

AutoCAD SHX Text

1153AN

AutoCAD SHX Text

MALE LOCKERS

AutoCAD SHX Text

1153BN

AutoCAD SHX Text

EXIST. MECH'L ROOM

AutoCAD SHX Text

CONF./CLASSROOM

AutoCAD SHX Text 1154N

AutoCAD SHX Text

ASSIST. CHIEF OFF

AutoCAD SHX Text 1158N

AutoCAD SHX Text

CHIEF OFF.

AutoCAD SHX Text 1157N

AutoCAD SHX Text

SECT.

AutoCAD SHX Text 1155N

AutoCAD SHX Text

EXIST. CORRIDOR

AutoCAD SHX Text

EXIST. CORRIDOR

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text

RD

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

ELECTRIC RM

AutoCAD SHX Text

1107C-EL

AutoCAD SHX Text

ELECTRIC RM

AutoCAD SHX Text

1052C-EL

AutoCAD SHX Text

MEDICAL INFORMATION

AutoCAD SHX Text

1115AC

AutoCAD SHX Text

VACANT

AutoCAD SHX Text 1130 N

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

DRESSING ROOM

AutoCAD SHX Text 1067S

AutoCAD SHX Text

HVAC

AutoCAD SHX Text

AutoCAD SHX Text

WAITING

AutoCAD SHX Text

1115CC

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

1115DC

AutoCAD SHX Text

SERVICE ELEV.

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

SERVICE ELEV.

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

SERVICE ELEV.

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

SERVICE ELEV.

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV. SHAFT

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text 1133N

AutoCAD SHX Text

FUEL OIL ROOM

AutoCAD SHX Text

DN

AutoCAD SHX Text

GUARD

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text E

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

ICRA SYMBOLS

PROJECT AREA LIMIT

ICRA CONSTRUCTION BARRIER WALL / DOOR

WALL (EXISTING / NEW)

MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)

M

MAT

TEMPORARY POLYETHYLENE PLASTIC

CONSTRUCTION FILM BARRIER; SEE ICRA

KEYNOTES FOR REQUIREMENTS

TC##

SEE DWG C-GI250 FOR DOOR AND

PARTITION TYPES

MAT

MAT

1115AC-EL

ELEC

MA

T

MA

T

MAT

MAT

C1S

C1S

TC05

TC

MA

T

MA

T

EISTING PARTITION TO

ACT AS 1 HR RATED

CONSTRUCTION

BARRIER. SEAL ALL

PLENUM PENETRATIONS

AND OPENINGS WITH 1

HR FIRE STOP

ASSEMBLIES.

FLOOR LINE

5/8" TYPE "X" GWB BOTH SIDES

(1 LAYER - 1HOUR; 2 LAYERS - 2

HOUR (EACH SIDE)

SOUND ATTENUATION BATTS

(SAB) PER SCHEDULE.

CEILING LINE; REMOVE AND

MODIFY EXISTING CEILING TO

REMAIN AS REQUIRED TO

CONSTRUCT TEMP PARTITION

STRUCTURAL DECK

METAL STUDS, SIZE PER

SCHEDULE

3/4" FIRE RETARDANT TREATED

PLYWOOD AT ALL PARTITIONS

ADJACENT TO AREAS WHERE

CONSTRUCTION ACTIVITIES WILL

IMPACT

TYP

C-GI250

D1

NOTE: ALL THRU WALL

PENETRATIONS SHALL HAVE A

FIRESTOP ASSEMBLY EQUAL TO

THE HOURLY RATING OF THE

PARTITION THAT IT PENETRATES

PUBLIC SIDE CONSTRUCTION SIDE

PAINT (SEMI GLOSS - WHITE)

SEALANT EACH SIDE

CAULK ALL

AROUND (BOTH SIDES)

HM FRAME (WELDED)

3 5/8" 5/8" 5/8"

5/8" GWB ( 1 LAYER - 1 HR; 2

LAYERS - 2 HR (EA SIDE)

2"

RETURN ON

FRAME

2" 5/8

1/2"

1. REFER TO C-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO C-AE002 FOR GENERAL NOTES.

2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS

OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE

RATEDAND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.

6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS

SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.

7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED ON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED

BASED ON SITE CONDITIONS.

8. REFER TO SHEETS C-GI201, C-GI210 & C-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND

EXTENTS OF TEMPORARY WALL CONSTRUCTION.

MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ICRA CONSTRUCTION

BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND

CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.

10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE

COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.

RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF TEMPORARY

PARTITIONS.

13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED

OTHERWISE.

EACH DOOR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER

1 CLOSER C02011/C02021

1 WALL STOP (AT INSWING DOORS) L02101 CONVEX

1 SET SELF-ADHESIVE SEALS R0E154

ICRA NOTES:

11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES

AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,

REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING

CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL

COST TO THE PROJECT/GOVERNMENT.

3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS

AND THEIR REQUIREMENTS.

4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.

INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE

FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.

5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.

9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE

SCHEDULED TO BE MODIFIED OR REPLACED.

12. REFER TO E4/C-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.

1 KICK PLATE J102

1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY

EACH PAIR TO HAVE

HINGES QUANTITY AND TYPE AS REQUIRED

1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT

1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER

1 OVERLAPPING STEEL ASTRAGAL

WITH SELF ADHESIVE SEAL

R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)

1 TYPE 21A

2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY

CLOSERS

KICK PLATES

WALL STOPS

SET SELF ADHESIVE SEALS

COORDINATOR

C02011 / C02021 J102 L02101

ROY154

14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISCPLACED.

15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT /

REDUCE AMOUNT OF FINAL CLEANUP REQUIRED.

100 SQ. IN. MAX

4" X 25"

FIRE

RESISTANT

(FR-1)

3'- 6"

9" 2

A

2"

2"

AS SCHEDULED

DETAIL D1 - "FIRE-RATED WALLS"- ADDITIONAL NOTES:

1. CONDITIONS INDICATED TO SHOW DESIGN INTENT. THEY ARE NOT INTENDED TO BE PROPRIETARY. CONTRACTOR MAY EMPLOY SIMILAR UL-APPROVED TOP-OF-WALL DESIGNS THAT ARE APPROPRIATE FOR CONDITIONS. OBTAIN VA APPROVAL PRIOR TO INSTALLATION.

2. REFER TO FIRESTOPPING SPECS FOR ADDITIONAL REQUIREMENTS REGARDING HEAD-OF-WALL CONDITION FOR FIRE-RATED WALLS.

SLOTTED TOP TRACK

STUD

DESIGN BASIS: UL-HW-D-0042

METAL DECK

(PERPENDICULAR TO FLUTES)

DESIGN BASIS: UL-HW-D-0264

METAL DECK

(PARALLEL TO FLUTES)

1" 1" 2"x20 GA STRAPS @ 16" O.C.

DESIGN BASIS: UL-HW-D-0259

STEEL BEAM

20 GA Z-BARS TO

ACCOMMODATE

SFRM

SPRAY-APPLIED

FIRE-RESISTIVE

MATERIAL (SFRM) - 2HR

PATCH AND REPAIR AS

REQUIRED

SAB

1 OR 2 LAYERS OF GWB; SEE

WALL TYPE

FIRE STOP JOINT SPRAY

MINERAL WOOL FORMING

MATERIAL

5/8

5/8

FIRE STOP JOINT SPRAY

SLOTTED TOP TRACK

STUD

SAB

1 OR 2 LAYERS OF GWB; SEE

WALL TYPE

5/8

MINERAL WOOL FORMING

MATERIAL

SLOTTED TOP TRACK

STUD

DESIGN BASIS: UL-HW-D-0209

CONCRETE SLAB DECK

SAB

1 OR 2 LAYERS OF GWB; SEE

WALL TYPE

FIRE STOP JOINT SPRAY

MA

X

3 4" / M

IN

5 8"

ELEC

1064S-EL

MAT

MA

T

C1SC1S

TC04

MA

T

MA

T

ELEC

1056S-EL

MAT

MAT

MAT

MA

T

C1SC1S

TC03

1'- 2 3

/4"

PUBLIC SIDE CONSTRUCTION SIDE

TYP

C-GI250

D1

STRUCTURAL DECK

CEILING-REMOVE AND REPLACE

WHEN DISTURBED BY

CONSTRUCTION ACTIVITIES

TAPE AND SPACKLE

CONTINUOUS

INTUMESCENT SEALANT

OR FIRE RATED TAPE

NOTE: ALL THRU-WALL PENETRATIONS SHALL HAVE A FIRESTOP

ASSEMBLY EQUAL TO THE HOURLY RATING OF THE PARTITION

THAT IT PENETRATES

7'- 4"

M

IN

C

LE

AR

C-H STUDS @ 24" O.C.

STEEL RUNNER

1" GWB LINER PANEL

8"TYPE 'X' GWB

8" TYPE 'X' GWB

(1 LAYER-1 HR

2 LAYER-2HR)

FIRE RESISTANCE

TEST AER-0903B

RATED TEMPORARY WALL PER DETAIL D6 /

C-GI250 AND ICRA PLANS

EXISTING 6" CMU WALL OR GWB

PARTITION

FLOOR LINE

NOTES:

1. THIS ALTERNATE 1-HR ICRA CONSTRUCTION BARRIER SHALL ONLY BE USED WHEN THE

PLENUM AREA WILL NOT PERMIT A FULL HEIGHT 1-HR TEMPORARY WALL TYPE D6 / C-GI250

TO BE BUILT. APPROVAL TO CONSTRUCT THIS ALTERNATE SHALL BE BY THE VA CFM

OFFICE.

2. ALL OPENINGS IN THE EXISTING PARTITION NOT CONTAINED WITHIN THE ALTERNATE

1-HOUR ICRA CONSTRUCTION BARRIER SHALL BE UPGRADED TO A MINIMUM 45 MINUTE

RATING.

3. THIS ALTERNATE AS A 2-HR TEMPORARY WALL SHALL BE USED AT NORMAL POWER ROOM

102.

C2S

ALT

FASTENER BY UL ASSEMBLY

Z

X

1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.

2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA

TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.

3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED

AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.

4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN

PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.

5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER

AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:

a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY

SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER

TO CONTAIN DIRT DEBRIS AND DUST.

b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING

ZONE.

c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE

CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL

BE CHANGED ON A DAILY BASIS.

d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED

MEDICAL CENTER AT THE END OF THE WORK DAY.

e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.

f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO

REPLACEMENT.

g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN

EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.

h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION

OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER

THE REMOVAL.

6. FINAL CLEANUP:

a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION

DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF

THE CONSTRUCTION.

b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.

7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -

SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.

INFECTIOUS DISEASE CONTROL REQUIREMENTS

Y

EX

WEMERGENCY GENERATOR

V

V

MARK

STUD

SIZE

FIRE

RATING

FIRE-RESISTANCE

SOUND ATTENUATION

TEST SAB STC TEST

C1S 3 5/8" 1 HR / SMK U465, U450 3 1/2" 49 TL-93-325

C2S 3 5/8" 2 HR / SMK U419 3 1/2" 49 TL-93-325

ICRA DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME

FIRE

RATING HARDWARE GROUP NOTESDOOR NO ROOM NO ROOM NAME

WIDTH

H TYPE MATERIAL TYPE MATERIAL

DETAILS

W1 HEAD JAMB

TC01 102 NORMAL POWER 3' - 0" 7' - 0" 6 HM A HM F7/C-GI250 90 REFER TO ICRA NOTES

TC02 103 CORRIDOR 103 3' - 0" 7' - 0" 2 HM A HM 90 REFER TO ICRA NOTES

TC03 1056S-EL ELEC 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES

TC04 1064S-EL ELEC 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES

TC05 1115AC-EL ELEC 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES

TC06 1115AC-EL ELEC 3' - 6" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022

C-GI250

ENLARGED ICRA PLANS DETAILS

& REQUIREMENTS

DZ JH / DZ

ENLARGED ICRA PLAN

B1

PLAN

NORTH

ENLARGED ICRA PLAN

B3

PLAN

NORTH

ENLARGED ICRA PLAN

B6

PLAN

NORTH

ENLARGED ICRA PLAN

B8

PLAN

NORTH

ICRA HEAD OF WALL CONDITION DETAILS

D1 SCALE: NTS

ICRA CONSTRUCTION BARRIER

D6 SCALE: NTS

ICRA DOOR AND FRAME SCHEDULE

E4 SCALE: NTS

ICRA DOOR FRAME TYPE

F4 SCALE: NTS

ICRA SIDE HINGED DOOR TYPES

F5 SCALE: NTS

ICRA DOOR FRAMES

F7 SCALE: NTS

W2

F7/C-GI250

1-HR / 2-HR ICRA CONSTRUCTION BARRIER - ALTERNATE

F1 SCALE: NTS

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

SCALE: 1/4" = 1'-0"

0 2' 4' 8'

LEVEL

F7/C-GI250 F7/C-GI250

F7/C-GI250 F7/C-GI250

F7/C-GI250 F7/C-GI250

F7/C-GI250 F7/C-GI250

TEMPORARY PLASTIC WARNING SIGN " EMERGENCY EXIT USE ONLY"

ICRA DOOR FRAME IS TO REMAIN AS PERMANENT FRAME IN EXISTING

WALL. COORDINATE FRAME WITH SCHEDULED FINAL HDW. REMOVE

FRAME LABEL AT CONCLUSION OF THE PROJECT.

DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-1.

D5-C /

C-AE601

D5-D /

C-AE601

DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-1.

DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-1.

TC07 0216E INGREDIENT CONTROL 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES- 3 F7/C-GI250 F7/C-GI250 DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-6.

TC08 - EXTERIOR 3' - 4" 7' - 0"

(VIF)

2/6 HM - HM 45 REFER TO ICRA NOTES3 - -3' - 4" ICRA DOORS ARE TO BE INSTALLED IN EXISTING FRAME. VERIFY FIELD

CONDITIONS / COORDINATE SCHEDULED HARDWARE ACCORDINGLY.

DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-6.

AutoCAD SHX Text

ELECTRIC RM

AutoCAD SHX Text

1107C-EL

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text

1115BC

AutoCAD SHX Text

PHARM. OFFICE

AutoCAD SHX Text

MEDICAL INFORMATION

AutoCAD SHX Text

1115AC

AutoCAD SHX Text

STAIRS #3

AutoCAD SHX Text 1071S

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

EL. CAB.

AutoCAD SHX Text 1073S

AutoCAD SHX Text

RETAIL STORE AREA

AutoCAD SHX Text 1064S

AutoCAD SHX Text

ELEC. CLOS.

AutoCAD SHX Text 1087S

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .