B-Civil.pdf
PDF 1 MB Posted
- Solicitation number
- QSE--36C10F24R50018
About this file
This document appears to be a set of construction drawings for a partial ground floor demolition and site work at the VA NY Manhattan Campus. The drawings show plans for removing existing elements such as bicycle racks, pipe bollard, and concrete pavement, as well as installing new concrete curbs, pavement, and drainage infrastructure. The drawings also include grading plans and details for concrete curbs, pavement, and utility trench backfill. This appears to be related to the federal contract opportunity 36C10F24R50018 for the Balance of Work at the VAMC Manhattan Campus, which involves construction work to support the Manhattan Hurricane Sandy Recovery Program.
View the file
Other files
Show 40 more
Latest 50 of 281 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PB PB
EPU
W
X
2 3
17'±
17'±
31'±
EXISTING INLET
GR. EL. = 3.72
INV. EL. = 0.15
SEE D8
S
U
T
V
U
SEE F1
EFB ET/EFB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
B-CD101
PARTIAL GROUND FLOOR
DEMOLITION PLAN - CIVIL
PLAN
NORTH
PARTIAL GROUND FLOOR DEMOLITION PLAN - CIVIL
F1
REMOVE BICYCLE RACKS. STOCKPILE AS DIRECTED FOR FUTURE USE.
DEMOLISH PIPE BOLLARD
DEMOLISH AND REMOVE STEEL FACED CONCRETE CURB
SAWCUT AND REMOVE CONCRETE PAVEMENT. LIMITS TO BE VERIFIED IN FIELD.
KEYNOTES:# (SPECIFIC TO THIS
DRAWING ONLY)
PLAN
NORTH
PARTIAL GROUND FLOOR DEMOLITION PLAN - CIVIL
D8
5 STRUCTURE TO REMAIN. PROTECT DURING DEMOLITION.
6 TEMPORARY CONSTRUCTION FENCE
AutoCAD SHX Text 0202S
AutoCAD SHX Text
0203AS
AutoCAD SHX Text
STAFF TOILET
AutoCAD SHX Text
0202BS
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
0202AS
AutoCAD SHX Text
DN
AutoCAD SHX Text
SECURITY CONTROL
AutoCAD SHX Text
RM. (POST 7)
AutoCAD SHX Text 0200S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GATE A
AutoCAD SHX Text
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
W
X
2 3
SEE D8
PB PB
EPUEPU
S
U
T
V
U
SEE F1
EFB ET/EFB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
B-CS101
PARTIAL GROUND FLOOR SITE
PLAN - CIVIL
PLAN
NORTH
PARTIAL GROUND FLOOR SITE PLAN - CIVIL
F1
PLAN
NORTH
PARTIAL GROUND FLOOR SITE PLAN - CIVIL
D8
CONCRETE CURB WITH STEEL FACING (SEE DETAIL B2/B-CS103)
CONCRETE PAVEMENT (SEE DETAIL C8/B-CS103)
LIMIT OF NEW CONCRETE PAVEMENT. ACTUAL LIMIT TO BE VERIFIED IN FIELD.
ACTIVE VEHICLE BARRIER. LOCATION TO BE CONFIRMED IN FIELD BASED UPON DIMENSIONAL LAYOUT AS INDICATED IN ARCHITECTURAL PLAN
C1 / B-AE102. SEE STRUCTURAL DRAWINGS FOR FURTHER INFORMATION ON FOUNDATION.
BOLLARDS FOR ACTIVE VEHICLE BARRIER. SEE ARCHITECTURAL PLAN C1 / B-AE102 FOR PROPOSED DIMENSIONAL LAYOUT. FINAL BOLLARD LAYOUT AND QUANTITY ARE TO BE VALIDATED BY DELEGATED DESIGN. SEE STRUCTURAL DRAWINGS FOR BOLLARD FOUNDATIONS.
KEYNOTES:# (SPECIFIC TO THIS
DRAWING ONLY)
6 ELECTRICAL POWER UNIT AND CONTROLS. CONCRETE FOUNDATIONS PER MFG. RECOMMENDATIONS / STD DETAILS.
AutoCAD SHX Text 0202S
AutoCAD SHX Text
0203AS
AutoCAD SHX Text
STAFF TOILET
AutoCAD SHX Text
0202BS
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
0202AS
AutoCAD SHX Text
DN
AutoCAD SHX Text
SECURITY CONTROL
AutoCAD SHX Text
RM. (POST 7)
AutoCAD SHX Text 0200S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GATE A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
W
X
2 3
PB PB
EPU
S
T
M
S
T
M
S
T
M
S
S
S
S
S
S
D
D
G
G
G
4.75
4.30
5.50
5.50
5.50
INSTALL CLEANOUT
6"X4" VERTICAL WYE
TO 6" 90° BEND
INV. EL. 3.0± (4" - IN))
INV. EL. 0.9± (6" - OUT)
6" DIP PIPE
SLOPE = 1.0%
4.20
+ 4.30
LIMIT OF SAWCUTTING
AND CONCRETE REPLACEMENT
4.30
4.55
4.55
4" Ø PVC DRAINAGE PIPE
PER MANUFACTURER
4.75
EXISTING INLET
GR. EL. = 3.72
INV. EL. 0.15
SEE D8
S
U
T
V
U
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
S
S
S
S
S
S
S
S
D
S
SEE F1
EFB ET/EFB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
B-CS102
PARTIAL GROUND FLOOR
GRADING PLAN - CIVIL
PLAN
NORTH
PARTIAL GROUND FLOOR DEMOLITION WORK - PART B - CIVIL
D1
LIMITS OF GRADING AND PAVEMENT REPLACEMENT. LIMITS TO BE VERIFIED IN FIELD.
4" PVC DRAINAGE PIPE. INSTALL PER BARRIER MANUFACTURER STANDARDS
6" DUCTILE IRON PIPE (DIP)
INSTALL CLEANOUT. INSTALL 4" 45° BEND TO 4" X 6" VERTICAL WYE TO 6" 90° BEND. SEE DETAIL C4/B-CS103 FOR FURTHER INFORMATION.
CONNECT 6" DIP TO EXISTING INLET. INVERT ELEVATION = 0.4 OR AS DIRECTED. CORE DRILL THROUGH EXISTING CONCRETE OR AS DIRECTED BY CFM.
KEYNOTES:# (SPECIFIC TO THIS
DRAWING ONLY)
ADDITIONAL NOTES:
1. EXISTING CONDITIONS AND ELEVATION INFORMATION WAS TAKEN FROM DRAWING ENTITLED "VA MEDICAL CENTER TOPOGRAPHIC AND UTILITY SURVEY", PREPARED BY RTL ENGINEERING, GEOLOGY AND LAND SURVEYING, P.C., LAST REVISED 8/4/2021.
2. ELEVATIONS SHOWN ON THESE CONTRACT DRAWINGS REFER TO MANHATTAN BOROUGH DATUM.
3. ALL ELEVATIONS AND EXISTIGN FEATURES TO BE VERIFIED IN FIELD PRIOR TO THE START OF CONSTRUCTION.
PLAN
NORTH
PARTIAL GROUND FLOOR SITE PLAN - CIVIL
D8
AutoCAD SHX Text 0202S
AutoCAD SHX Text
0203AS
AutoCAD SHX Text
STAFF TOILET
AutoCAD SHX Text
0202BS
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
0202AS
AutoCAD SHX Text
SECURITY CONTROL
AutoCAD SHX Text
RM. (POST 7)
AutoCAD SHX Text 0200S
AutoCAD SHX Text 3.88
AutoCAD SHX Text 4.08
AutoCAD SHX Text 4.78
AutoCAD SHX Text 4.36
AutoCAD SHX Text 4.24
AutoCAD SHX Text 4.21
AutoCAD SHX Text 4.14
AutoCAD SHX Text 4.17
AutoCAD SHX Text 4.45
AutoCAD SHX Text 5.38
AutoCAD SHX Text 5.79
AutoCAD SHX Text 6.87
AutoCAD SHX Text 4.66
AutoCAD SHX Text 4.74
AutoCAD SHX Text 4.61
AutoCAD SHX Text 4.67
AutoCAD SHX Text 6.94
AutoCAD SHX Text 4.23
AutoCAD SHX Text 4.87
AutoCAD SHX Text 4.79
AutoCAD SHX Text 4.74
AutoCAD SHX Text 4.69
AutoCAD SHX Text 4.61
AutoCAD SHX Text 4.66
AutoCAD SHX Text 4.09
AutoCAD SHX Text 4.88
AutoCAD SHX Text 4.89
AutoCAD SHX Text 4.83
AutoCAD SHX Text 4.87
AutoCAD SHX Text 4.50
AutoCAD SHX Text 4.38
AutoCAD SHX Text 4.31
AutoCAD SHX Text 4.10
AutoCAD SHX Text 4.23
AutoCAD SHX Text 5.03
AutoCAD SHX Text 5.84
AutoCAD SHX Text 4.05
AutoCAD SHX Text 3.96
AutoCAD SHX Text 6.90
AutoCAD SHX Text 5.48
AutoCAD SHX Text 5.16
AutoCAD SHX Text 4.97
AutoCAD SHX Text 5.66
AutoCAD SHX Text
RIM 6.24
AutoCAD SHX Text 6.02
AutoCAD SHX Text 6.07
AutoCAD SHX Text 6.59
AutoCAD SHX Text 7.10
AutoCAD SHX Text 7.25
AutoCAD SHX Text 4.89
AutoCAD SHX Text 4.35
AutoCAD SHX Text 5.39
AutoCAD SHX Text 10.02
AutoCAD SHX Text 10.03
AutoCAD SHX Text 10.02
AutoCAD SHX Text 9.99
AutoCAD SHX Text 7.6
AutoCAD SHX Text 7.6
AutoCAD SHX Text 7.8
AutoCAD SHX Text 7.0
AutoCAD SHX Text R.O.H.
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
ENT.
AutoCAD SHX Text
7 STY. BRICK BUILDING 3
AutoCAD SHX Text
CONC. RAMP
AutoCAD SHX Text
CONC. RAMP
AutoCAD SHX Text S.F.C.
AutoCAD SHX Text
GR 3.72
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text G
AutoCAD SHX Text
STM.
AutoCAD SHX Text
VA POLICE STATION POST 7
AutoCAD SHX Text
VENT
AutoCAD SHX Text
FDC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6.29
AutoCAD SHX Text 5.48
AutoCAD SHX Text 6.51
AutoCAD SHX Text 7.87
AutoCAD SHX Text 7.70
AutoCAD SHX Text 8.12
AutoCAD SHX Text 8.11
AutoCAD SHX Text
RIM 6.24
AutoCAD SHX Text
RIM 6.84
AutoCAD SHX Text 7.19
AutoCAD SHX Text 6.02
AutoCAD SHX Text 7.55
AutoCAD SHX Text 7.77
AutoCAD SHX Text 8.21
AutoCAD SHX Text 10.11
AutoCAD SHX Text 10.07
AutoCAD SHX Text 6.70
AutoCAD SHX Text 7.4
AutoCAD SHX Text 6.41
AutoCAD SHX Text
CONC. DWY.
AutoCAD SHX Text
7' I.F. GATE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EPU
AutoCAD SHX Text
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
D E P T H
O
F
T R E N
C H
S E E
S P E C I F I C A T I O
N
D E P T H
V A R I E S
1-0"Ø
MIN.
EFB ET/EFB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
B-CS103
DETAILS
EDGE OF SLAB
NOTES:
1. EXPANSION JOINTS IN THE STEEL CURB FACING AND CONCRETE
BACKING SHALL BE AT A MAXIMUM SPACING OF 24 FEET.
2. NO PIECE OF STEEL FACING SHALL HAVING LESS THAN 2 WELDED
DOWELS MAY BE INSTALLED UNLESS THAT PIECE IS WELDED TO
THE ADJACENT STEEL CURB FACING.
3. STEEL SHALL CONFORM TO ASTM A36.
4. WHERE TWO PIECES OF STEEL CURB FACING ARE JOINED BUT
NOT WELDED, TWO 12" RODS, 24" LONG, SHALL BE INSERTED INTO
THE CONCRETE BACKING, ONE HALF THE LENGTH AT EACH SIDE
OF THE JOINT.
5. CONCRETE SHALL CONFORM WITH SECTION 32 05 23.
CONCRETE CURB WITH STEEL FACING
B2
4"
M
I N
" EXPANSION JOINT
14" X
" PLATE
"Ø X 12" O.C., STAGGERED TOP & BOTTOM
3000 PSI CONCRETE, MIN.
TOP OF PAVEMENT
CONCRETE PAVEMENT AND TRENCH REPAIR
C8
M
I N
TYPE 1 TRENCH PATCH (TRENCHS UP TO 4' WIDE)
F1
B-CS103
UTILITY TRENCH BACKFILL
F3
B-CS103
TYPE 2 TRENCH PATCH (GREATER THAN 4' WIDE)
F5
B-SC103
TEMPORARY CONSTRUCT FENCE
B-CS103
F8
6" X 4" VERTICAL WYE/CLEANOUT FOR
ACTIVE VEHICLE BARRIER DRAIN
C4
4" Ø PVC FROM BARRIER DRAINAGE
6" Ø DIP TO SITE DRAINAGE
6' X 4" VERTICAL WYE/
CLEANOUT
INV. EL. = 3.0 (4" PVC IN)
INV. EL. = 1.0 (6" DIP OUT)
ELEVATION
4" Ø PVC FROM BARRIER DRAINAGE
6" Ø DIP TO SITE DRAINAGE
INV. EL. = 0.90
INV. EL. = 3.0
GROUND SURFACE
6" CLEANOUT CASTING
RIM EL. = 4.6±
6' X 4" VERTICAL WYE
6" 90° BEND (SHORT)
4" 45° BEND
PROVIDE PVC TO DIP TRANSITION
COUPLING IF USING MJ FITTINGS
AutoCAD SHX Text
2" MINIMUM OR THICKNESS OF EXISTING PAVEMENT WHICHEVER IS GREATER.
AutoCAD SHX Text BITUMINOUS SURFACE TREATMENT (CHIPSEAL) REQUIRED ONLY FOR LONGITUDINAL TRENCHES WITH WIDTHS GREATER THAN 6'.
AutoCAD SHX Text REFER TO VA STANDARD DETAIL 32 12 16-04 "UTILITY TRENCH PAVEMENT PATCH NOTES" FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text FOR TRENCH WIDTHS EXCEEDING 4' [1219mm] DELETE LOAD TRANSFER DOWELS.
AutoCAD SHX Text REFER TO NOTE 13 ON VA STANDARD DETAIL 32 12 16-04 "UTILITY TRENCH PAVEMENT PATCH NOTES".
AutoCAD SHX Text
TRENCH BACKFILL
AutoCAD SHX Text CLASS C CONCRETE f'c=3000 PSI [20.7 MPa]
AutoCAD SHX Text
ASPHALTIC CONCRETE
AutoCAD SHX Text
SAW CUT EXISTING. ASPHALT FULL DEPTH BOTH SIDES
AutoCAD SHX Text
TACK COAT (TYP.)
AutoCAD SHX Text
EXISTING PAVEMENT (TYP)
AutoCAD SHX Text
EXISTING ASPHALT CONCRETE PAVEMENT (TYP)
AutoCAD SHX Text 6"-14" [150-355mm]
AutoCAD SHX Text LOAD TRANSFER DOWELS. REFER TO VA STANDARD DETAIL 32 12 16-04 FOR PLACEMENT DETAILS
AutoCAD SHX Text %%uGENERAL NOTES
AutoCAD SHX Text
1. MATERIAL AND COMPACTION REQUIREMENTS FOR PIPE BEDDING/SHADING SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS MATERIAL AND COMPACTION REQUIREMENTS FOR PIPE BEDDING/SHADING SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS FOR THE APPLICABLE UTILITY PIPE. 2. TRENCH BACKFILL SHALL COMMENCE 1 FOOT ABOVE THE TOP OF PIPE AND SHALL BE AS SPECIFIED TRENCH BACKFILL SHALL COMMENCE 1 FOOT ABOVE THE TOP OF PIPE AND SHALL BE AS SPECIFIED 3. BACKFILL COMPACTION REQUIREMENTS AS SPECIFIED BACKFILL COMPACTION REQUIREMENTS AS SPECIFIED 4. THE 1 FOOT TRENCH "SHOULDER" AREAS SHALL BE DELETED FOR TYPE 2 TRENCHES. THE 1 FOOT TRENCH "SHOULDER" AREAS SHALL BE DELETED FOR TYPE 2 TRENCHES. 5. ABC SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS AS SPECIFIED IN SECTION 32 12 16. ABC SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS AS SPECIFIED IN SECTION 32 12 16. 6. PORTLAND CEMENT CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS AS SPECIFIED 32 05 23. PORTLAND CEMENT CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS AS SPECIFIED 32 05 23. 7. ASPHALTIC TACK MATERIAL SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS AS SPECIFIED IN SECTION 32 12 16. ASPHALTIC TACK MATERIAL SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS AS SPECIFIED IN SECTION 32 12 16. 8. ASPHALTIC CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16. ASPHALTIC CONCRETE SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 32 12 16. 9. BITUMINOUS SURFACE TREATMENT (CHIP SEAL) SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE APPLICABLE BITUMINOUS SURFACE TREATMENT (CHIP SEAL) SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE APPLICABLE SPECIFICATION SECTION 32 12 16. 10. LOAD TRANSFER DOWELS FOR JOINTS TRANSVERSE TO THE ROADWAY CENTERLINE SHALL BE SMOOTH STEEL DOWELS IN LOAD TRANSFER DOWELS FOR JOINTS TRANSVERSE TO THE ROADWAY CENTERLINE SHALL BE SMOOTH STEEL DOWELS IN ACCORDANCE WITH THE REQUIREMENTS OF APPLICABLE SPECIFICATION SECTION. DOWELS SHALL BE SIZED AND SPACED AS FOLLOWS: PCCP THICKNESS DOWEL SIZE DOWEL LENGTH DOWEL SPACING THICKNESS DOWEL SIZE DOWEL LENGTH DOWEL SPACING DOWEL SIZE DOWEL LENGTH DOWEL SPACING DOWEL LENGTH DOWEL SPACING DOWEL SPACING 6" [150mm] #5 [No. 16] 12" [305mm] 18" [455mm] #5 [No. 16] 12" [305mm] 18" [455mm] 12" [305mm] 18" [455mm] 18" [455mm] 7" [180mm] #6 [No. 19] 15" [380mm] 15" [380mm] #6 [No. 19] 15" [380mm] 15" [380mm] 15" [380mm] 15" [380mm] 15" [380mm] 8" [180mm] #8 [No. 19] 15" [380mm] 12" [305mm] #8 [No. 19] 15" [380mm] 12" [305mm] 15" [380mm] 12" [305mm] 12" [305mm] 10" [180mm] #10 [No. 19] 15" [380mm] 12" [305mm] #10 [No. 19] 15" [380mm] 12" [305mm] 15" [380mm] 12" [305mm] 12" [305mm] 11. DEFORMED TIE BARS SHALL BE USED IN TRENCH PATCHES LONGITUDINAL TO THE ROADWAY CENTERLINE WHEN THE TRENCH DEFORMED TIE BARS SHALL BE USED IN TRENCH PATCHES LONGITUDINAL TO THE ROADWAY CENTERLINE WHEN THE TRENCH LENGTH IS GREATER THAN 50 FEET [15240mm]. TIE BARS SHALL BE 24 INCHES [610mm] LONG. DEFORMED #4 [No. 13] BARS FOR PCCP LESS THAN 8 INCHES [205mm] THICK AND #5 [No. 16] BARS IF 8 INCHES [205mm] THICK OR MORE. TIE BARS SHALL BE PLACED 30 INCHES [760mm] CENTER-TO-CENTER. 12. HOLES SHALL BE DRILLED 1 FOOT [305mm] INTO THE EXISTING SLAB FOR TIE BARS AND 7 INCHES [180mm] FOR DOWELS. HOLES SHALL BE DRILLED 1 FOOT [305mm] INTO THE EXISTING SLAB FOR TIE BARS AND 7 INCHES [180mm] FOR DOWELS. HOLES SHALL BE OF A DIAMETER SUFFICIENT TO ACCOMMODATE THE TIE BAR ANCHORAGE OR DOWEL CAP. TIE BARS SHALL BE ANCHORED WITH AN APPROVED HIGH VISCOSITY EPOXY. 13. IF THE CONCRETE SLAB REMAINING NEXT TO A LONGITUDINAL OR TRANSVERSE JOINT IS LESS THAN 6 FEET [1829mm] AT IF THE CONCRETE SLAB REMAINING NEXT TO A LONGITUDINAL OR TRANSVERSE JOINT IS LESS THAN 6 FEET [1829mm] AT ITS NARROWEST WIDTH, REMOVE AND REPLACE THE EXISTING CONCRETE TO THE JOINT.
AutoCAD SHX Text FOR TRENCH WIDTHS EXCEEDING 4' [1219mm] DETAIL F6/B-CS103 "TYPE 2 UTILITY TRENCH PATCH". FOR TRENCH WHERE PORTLAND CEMENT CONCRETE (PCC) PAVEMENT EXISTS, REFER TO 32 12 16-03 "TYPE 3 UTILITY TRENCH PATCH".
AutoCAD SHX Text
2" MINIMUM OR THICKNESS OF EXISTING PAVEMENT WHICHEVER IS GREATER.
AutoCAD SHX Text BITUMINOUS SURFACE TREATMENT (CHIPSEAL) REQUIRED ONLY FOR LONGITUDINAL TRENCHES WITH WIDTHS GREATER THAN 6' [1829mm].
AutoCAD SHX Text 4" MINIMUM ABC OR THICKNESS OF EXISTING GRANULAR BASE COURSE MATERIALS (E.G. ABC & SELECT MATERIAL) WHICHEVER IS GREATER.
AutoCAD SHX Text REFER TO VA STANDARD DETAIL 32 12 16-04 "UTILITY TRENCH PAVEMENT PATCH NOTES" FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text
TRENCH BACKFILL
AutoCAD SHX Text
ABC 100% MIN. COMPACTION
AutoCAD SHX Text
ASPHALTIC CONCRETE
AutoCAD SHX Text
SAW CUT EXISTING. ASPHALT FULL DEPTH BOTH SIDES
AutoCAD SHX Text
TACK COAT (TYP.)
AutoCAD SHX Text
EXISTING PAVEMENT
AutoCAD SHX Text 4" MINIMUM ABC OR THICKNESS OF EXISTING GRANULAR BASE COURSE MATERIALS (E.G. ABC & SELECT MATERIAL) WHICHEVER IS GREATER. PORTLAND CEMENT CONCRETE (PCC) THICKNESS EQUAL TO EXISTING.
AutoCAD SHX Text FOR TRENCH WIDTHS 4' OR LESS REFER TO DETAIL F1/B-CS103 "TYPE 1 UTILITY TRENCH PATCH". FOR TRENCH WHERE PORTLAND CEMENT CONCRETE (PCC) PAVEMENT EXISTS, REFER TO 32 12 16-03 "TYPE 3 UTILITY TRENCH PATCH".
AutoCAD SHX Text
2" MINIMUM OR THICKNESS OF EXISTING PAVEMENT WHICHEVER IS GREATER.
AutoCAD SHX Text BITUMINOUS SURFACE TREATMENT (CHIPSEAL) REQUIRED ONLY FOR LONGITUDINAL TRENCHES WITH WIDTHS GREATER THAN 6' [1829mm].
AutoCAD SHX Text REFER TO VA STANDARD DETAIL 32 12 16-04 "UTILITY TRENCH PAVEMENT PATCH NOTES" FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text
GREATER THAN 4'-0"
AutoCAD SHX Text
TRENCH BACKFILL
AutoCAD SHX Text
SAW CUT EXISTING. ASPHALT FULL DEPTH BOTH SIDES
AutoCAD SHX Text
TACK COAT (TYP.)
AutoCAD SHX Text
EXISTING ASPHALT CONCRETE PAVEMENT
AutoCAD SHX Text
ACCORDANCE WITH AGENCY REQUIREMENTS
AutoCAD SHX Text
GRANULAR MATERIAL OR PCC
AutoCAD SHX Text
2'-0"(MAX) UP TO 1'-0"
AutoCAD SHX Text
ABOVE TOP OF PIPE
AutoCAD SHX Text
6" MIN
AutoCAD SHX Text
BACKFILL TO FINISHED
AutoCAD SHX Text
GRADE W/COMPACTED
AutoCAD SHX Text
BACKFILL
AutoCAD SHX Text
SELECT BACKFILL
AutoCAD SHX Text
(NO STONE
AutoCAD SHX Text
APPROX FIN GRADE
AutoCAD SHX Text
WARNING TAPE
AutoCAD SHX Text
3/4" CRUSHED STONE OR
AutoCAD SHX Text
PEA GRAVEL BEDDING
AutoCAD SHX Text
AutoCAD SHX Text
UNLESS OTHERWISE
AutoCAD SHX Text
AutoCAD SHX Text
GREATER THAN 2")
AutoCAD SHX Text
TRENCH LIMIT
AutoCAD SHX Text
UNDERGROUND
AutoCAD SHX Text
INDICATED OR SPECIFIED
AutoCAD SHX Text
LINE OF NARROW
AutoCAD SHX Text NOTES: 1. COMMON FILL, SELECT BACKFILL AND/OR PIPE BEDDING SHALL BE COMPACTED IN COMMON FILL, SELECT BACKFILL AND/OR PIPE BEDDING SHALL BE COMPACTED IN ACCORDANCE WITH ASTM D1557 UNLESS OTHERWISE DIRECTED. 2. PROVIDE APPROPRIATE TRENCH SUPPORT IN CONFORMANCE WITH OSHA REGULATIONS. PROVIDE APPROPRIATE TRENCH SUPPORT IN CONFORMANCE WITH OSHA REGULATIONS. 3. FUEL OIL SUPPLY AND RETURN PIPES SHALL BE DOUBLE CONTAINMENT PIPE. SEE FUEL OIL SUPPLY AND RETURN PIPES SHALL BE DOUBLE CONTAINMENT PIPE. SEE MECHANICAL DRAWINGS.
AutoCAD SHX Text
SEE NOTE 3
AutoCAD SHX Text
REATTACH FABRIC
AutoCAD SHX Text
AS NECESSARY WITH
AutoCAD SHX Text
RUST RESISTING TIES
AutoCAD SHX Text
AT 12" O.C. ON POSTS
AutoCAD SHX Text
AND 24" O.C. ALONG
AutoCAD SHX Text
POURED CONCRETE
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
GALVANIZED STEEL
AutoCAD SHX Text
CHAINLINK FENCE
AutoCAD SHX Text
TOP AND BOTTOM RAIL/WIRE
AutoCAD SHX Text NOTES: PROVIDE TEMPORARY CONSTRUCTION FENCE IN ACCORDANCE WITH SPECIFICATION SECTION 01 00 00 OR AS DIRECTED BY THE RE.
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text
SCALE: N.T.S.
SCALE: NTS
| B-CD101-PARTIAL GROUND FLOOR DEMOLITION PLAN - CIVIL |
| Sheets and Views |
| PARTIAL GROUND FLOOR DEMOLITION PLAN - CIVIL |
| B-CS101-PARTIAL GROUND FLOOR SITE PLAN - CIVIL |
| Sheets and Views |
| PARTIAL GROUND FLOOR SITE PLAN - CIVIL |
| B-CS102-PARTIAL GROUND FLOOR GRADING PLAN - CIVIL |
| Sheets and Views |
| PARTIAL GROUND FLOOR GRADING PLAN - CIVIL |
| B-CS103-DETAILS |
| Sheets and Views |
| DETAILS |
File details come from the government source that posted it. Updated .