C-Electrical- Part 4.pdf
PDF 9 MB Posted
- Solicitation number
- QSE--36C10F24R50018
About this file
This document appears to be a set of construction drawings and plans for the Balance of Work at the VA Medical Center (VAMC) in Manhattan, New York as part of the Manhattan Hurricane Sandy Recovery Program. The drawings detail the electrical, power, lighting, and equipment layout for various buildings and floors of the VAMC campus, including Building 1, Building 5, Building 6, and the Generator Platform. Key features include the emergency power rooms, normal power rooms, electrical rooms, generators, and other electrical infrastructure. The related federal contract opportunity is Solicitation Number QSE--36C10F24R50018, which is for the construction of the Balance of Work at the VAMC Manhattan campus for the VA NY Healthcare System. The solicitation is for the Department of Veterans Affairs Office of Construction and Facilities Management.
View the file
Other files
Show 40 more
Latest 50 of 281 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
DD
LOGISTICS
0236E0236E
LOGISTICS
INVENTORY
MANAGEMENT
OFFICES
0255E0255E
CORRIDOR
0257E0257E
OFFICE
0255AE0255AE
OFFICE
0255BE0255BE
COPY
ROOM
0255CE
OFFICE
0255DE0255DE
OFFICE
0255EE0255EE
0256E0256E
IT ROOM
(TR-E)
23 302624
MECHANICAL
ROOM
0269N0269N
OFFICE
0264AN0264AN
MECHANICAL
ROOM
0270N0270N
EMS
OFFICES
0272N
CLEAN
LINEN
0264N0264N
EMS
STORAGE
0253N0253N
BLUE
TRUCK
STAGING
0254E0254E
SUPPLY
PALLET
BREAK
DOWN
0253E0253E
EMS
EQUIPMENT
STORAGE
0251E0251E
LINEN
CHUTE
0244N0244N
WOMENS
TOILETS
SHOWER
0248N0248N
MENS
TOILETS
SHOWER
0247N
ENGINEERING
OFFICE
0262N0262N
OFFICE
0272AN0272AN
OFFICE
0272BN0272BN
COPY
ROOM
0272DN
OFFICE
0272EN
OFFICE
0272FN0272FN
OFFICE
0272GN0272GN
MECHANICAL
ROOM
0272CN
CORRIDOR
0241N0241N
CORRIDOR
0252E
STAIRWELL
0254N
CORRIDOR
0271N0271N
22.9
BB.5
S
S
S S
S
S
SSSSS
S
S S S S
S
S S
SECURITY
CLOSET
0258E
AC
U-
EX EX EX
AA.5
Z
S
U
R
Q
T
R
T
Y
S
33 35
V
W
X
Z
AA
BB
U
DD
BB
AA
DD
B.7
B.2
A.8
B.8
C.1
B.8
B.2
A.8
B
Q
EX
EX
EX
S
S
S S
S
S
SSSSS
S
S S S S
S
S S
KEY NOTES
BLDG. 1 & 6 - PARTIAL GROUND FLOOR PLAN - NEW WORKF6
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP104
BLDG. 1 & 6 - PARTIAL GROUND
FLOOR PLAN - NEW WORK
SN KS
NON-STOR
1-1A
OFFICE
0255FE0255FE
20.5
22.818.1 22.9
DD.5
DD.5
DD.8
DD.8
PB
GENERAL NOTES
EE
161412 323028
EE
DD
EE EE
DD
18 20 22 23 24 2611
SWITCHGEAR / CHILLER
BUILDINGS 4 / 5
(ABOVE)
EX EX EX EX EX EX
EX
EX
EX
EX
HH
BLDG. 1, 5 & 6 - PARTIAL GROUND FLOOR PLAN - NEW WORKF6
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP105
BLDG. 1, 5 & 6 - PARTIAL GROUND
F I R S T A V E N U E
MAIN ENTRANCE
AMBULA
NCE E
NTR
ANCE
NON-FE
DER
AL P
ROPE
RTY
F.
E.
C.
F.
E.
C.
SWITCHGEAR / CHILLER
BUILDINGS 4 / 5
BUILDING 1
BUILDING 6
EXTERIOR PLAZA
EMERGENCY GENERATOR
F I R S T A V E N U E
E A S
T
TH
S
TR
EE
T
BUILDING 6
S S S S S S
S
SSS
S
S S
S S
S
S S
S
S
S S
S
S S
S
S S
S S
S S
S
S S
S
S
S S S
S S
S S S S
S S
S
S S
S S
S
S
S S S S
S S
S
S
S S
S S S
S
S
SS
S S
S
S S
S
S
S
S
S
S
S
SS
S
S
SSSSSSSSSSSS
S
S
SS
S S
S S
S
S S
S
SSS
S
SS
S
S
S
S S
S
SS
CONNECTOR BRIDGE
EMERGENCY GENERATOR TRAILER
TEMP EMERGENCY
GENERATOR AREA
A S S E R L E V Y P LACE
E A S
T
3 r d.
S T
R E E T
E A S
T
3 r d.
S T
R E E T
BLDG. #5
MAIN ELECTRIC ROOM
MER-5
NORMAL POWER ROOM
1115AC-EL
EMERGENCY POWER ROOM
ELEC
1056S-EL
ELEC
1064S-EL
ELEC
GENSET #2
GEN-2
GENSET #3
GEN-3
PARALLELING SWITCHGEAR ROOM
PSR-1
S S S S S S
S
SSS
S
S S
S S
S
S S
S
S
S S
S
S S
S
S S
S S
S S
S
S S
S
S
S S S
S S
S S S S
S S
S
S S
S S
S
S
S S S S
S S
S
S
S S
S S S
S
S
SS
S S
S
S S
S
S
S
S
S
S
S
SS
S
S
SSSSSSSSSSSS
S
S
SS
S S
S S
S
S S
S
SSS
S
SS
S
S
S
S S
S
SS
BLDG. #5 MAIN ELECTRIC ROOM
MER-5
ACH-1
NORMAL POWER ROOM
EMERGENCY POWER ROOM
C-EP115
C-EP114
C-EP112
C-EP111
C-EP113
OVERALL BLDGS - FIRST FLOOR PLAN - NEW WORKF7
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP110
OVERALL BLDGS - FIRST FLOOR
PLAN - NEW WORK
MAIN ENTRANCE
A
A
B
A.8
Stair #1
E
F
H
G
S S
S
S
S S
S S
S
S
S S
S
S
S S
S
SS
B
C
D
GENERAL NOTES
S
S
S
S
S S
S S
S
S
S S
S
S
S S
S
SS
BLDG. 1 & 6 - PARTIAL FIRST FLOOR PLAN - NEW WORKF2
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP111
BLDG. 1 & 6 - PARTIAL FIRST FLOOR
S S
S
S
S S
S
S S
S
S S
S S
S S
S
S S
S
S
S S S
S S
S S S S
S S
S
S S
S S
S
S
S S S S
S S
S
S
S S
S S S
S
S
SS
S S
S
S S
S
S
S
S
S
S
S
SS
S
S
SSSSSSSSSSSS
S
S
SS
S S
S S
S
S S
S
SSS
S
SS
S
F I R S T A V E N U E
F.
E.
C.
38.6
35.1
40.5
H
I
F.6
E.7
C.1
D.1
39.3
40.9
40.8
40.3
39.9
D.3
C.4
C.1
BUILDING 6
F I R S T A V E N U E
BUILDING 6
S S
S
S
S S
S
S S
S
S S
S S
S S
S
S S
S
S
S S S
S S
S S S S
S S
S
S S
S S
S
S
S S S S
S S
S
S
S S
S S S
S
S
SS
S S
S
S S
S
S
S
S
S
S
S
SS
S
S
SSSSSSSSSSSS
S
S
SS
S S
S S
S
S S
S
SSS
S
SS
BLDG. 1 & 6 - PARTIAL FIRST FLOOR PLAN - NEW WORKF4
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP112
BLDG. 1 & 6 - PARTIAL FIRST FLOOR
Z.8
AA.2
1115AC-EL
EMERGENCY POWER ROOM
ELEC
1056S-EL
ELEC
1064S-EL
ELEC
20.5 22.8 22.918.2 20.5 22.818.1 22.918.4
BB.5
AA.5AA.5
2220 2119
BB
AA
18 20 22 23
DD
10 11
W
X
Q
R
Z
BUILDING 1
4 5 7 92 31
EX
EX
EX
EX
EX EX
BRIDGE
DD
EX
EMERGENCY POWER ROOM
BLDG. 1 & 6 - PARTIAL FIRST FLOOR PLAN - NEW WORKF3
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP113
BLDG. 1 & 6 - PARTIAL FIRST FLOOR
25 29 33 35
BB
AA
23 24
C.1 C.1
B.8
B.7
B.2
A.8
B
Y
V
W
X
Z
AA
U
EXTERIOR PLAZA
EMERGENCY GENERATOR
EX
EX
EX EX
S S S S S S
S
SSS
S
S S
S S
S S
DD
EX
EMERGENCY GENERATOR TRAILER
TEMP EMERGENCY
GENERATOR AREA
GENERAL NOTES
S S S S S S
S
SSS
S
S S
S S
S S
AA.2
Z.8
2.8 22.92.8 22.9
BB.5
AA.5AA.5
BLDG. 1 & 6 - PARTIAL FIRST FLOOR PLAN - NEW WORKF6
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP114
BLDG. 1 & 6 - PARTIAL FIRST FLOOR
SWITCHGEAR / CHILLER
BUILDINGS 4 / 5
EE
18 20 22 23 24
DD
HH
32302826
E A S
T
TH
S
TR
EE
TEX EX EX EX EX EX
EX
EX.
DD
EX
EX
EE
EX
DD.5
DD.5
20.5
22.8 22.920.5
22.818.1 22.9
DD.8
DD.8
BLDG. #5
MAIN ELECTRIC ROOM
MER-5
BLDG. 1, 5 & 6 - PARTIAL FIRST FLOOR PLAN - NEW WORKF7
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP115
BLDG. 1, 5 & 6 - PARTIAL FIRST
EE
BB
AA
18 20 22 23
EX EX EX EX
EX
EX
EX
DD
EX
Z.8
AA.2
DD.5
20.5
22.8 22.920.5
22.818.1 22.9
DD.8
BB.5
AA.5AA.5
NORMAL POWER ROOM
EMERGENCY POWER ROOM
ENLARGED FLOOR PLAN - EQUIPMENT LAYOUT - NEW WORKF1
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP411
BLDG. 1 - ENLARGED FLOOR PLAN -
EQUIPMENT LAYOUT - NEW WORK
Y
33 35
V
W
X
Z
AA
ENLARGED FLOOR PLAN - POWER - NEW WORKF4
PLAN
NORTH
MECHANICAL
ROOM
0269N0269NOFFICE
0264AN0264AN
MECHANICAL
ROOM
0270N0270N
EMS
OFFICES
0272N
CLEAN
LINEN
0264N0264N
ENGINEERING
OFFICE
0262N0262N
OFFICE
0272AN0272AN
OFFICE
0272BN0272BN
COPY
ROOM
0272DN
OFFICE
0272EN
OFFICE
0272FN0272FN
OFFICE
0272GN0272GN
MECHANICAL
ROOM
0272CN0272CN
CORRIDOR
0241N0241N
CORRIDOR
0271N0271N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP412
BLDG. 1 - ENLARGED FLOOR PLAN -
POWER - NEW WORK
NORMAL POWER ROOM
EMERGENCY POWER ROOM
EE
BB
AA
18 20 22 23
EX
EX
EX
DD
EX
ENLARGED FLOOR PLAN - LIGHTING AND POWER - NEW WORKF1
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP413
BLDG. 1 - ENLARGED FLOOR PLAN -
LIGHTING AND POWER - NEW WORK
17171513
F
E
151312
Y
X
Z
13 1512
ENLARGED FLOOR PLAN - ELECTRICAL ROOM 1019W-ELC2
ENLARGED FLOOR PLAN - ELECTRICAL ROOM 1052C-ELC6
ENLARGED FLOOR PLAN - ELECTRICAL ROOM 1003W-ELF2
ENLARGED FLOOR PLAN - ELECTRICAL ROOM 1107C-ELF6
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
L
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP414
BLDG. 1 - ENLARGED FLOOR PLANS -
V
U
X
ENLARGED FLOOR PLAN - ELECTRICAL ROOM 1115AC-ELF6
ENLARGED FLOOR PLAN - ELECTRICAL ROOM 1056S-ELC6
ENLARGED FLOOR PLAN - ELECTRICAL ROOM 1064S-ELC2
NORTH
PLAN
NORTH
PLAN
NORTH
10 1198
W
X
Y
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP415
BLDG. 1 - ENLARGED FLOOR PLANS -
BUILDING 1 - PARTIAL SECOND FLOOR ROOF PLAN - NEW WORKF3
NORTH
Z.8
AA.2 AA.2
Z.8
DD.5
DD.5
20.5
22.8 22.9
18.2 20.5 22.818.1 22.9
20.5
22.818.1 22.9
18.4
DD.8
DD.8
BB.5
BB.5
AA.5 AA.5
BB
AA
EE
BB
AA
18 20 22 23 24
EX EX EX EX EX EX
EX
EX
EX
EX
EX
EX
EX
EX EX
EX
DD
DD
EX
EX
EE
EX
EX
GENERAL NOTES
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP416
BLDG. 1 - PARTIAL SECOND FLOOR
ROOF PLAN - POWER - NEW WORK
HF.6
E.7
C .1
D .1
D .3
C .4
C .1
B.8
B.7
B.2
A.8 B
ENLARGED FLOOR PLAN - EQUIPMENT LAYOUT - NEW WORK - ROOMS 604 AND 605 F1
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP461
BLDG. 6 - ENLARGED FLOOR PLAN -
EQUIPMENT LAYOUT - NEW WORK
S
S
F.E.C.
H
F.6
E.7
C.1
D.1
40.9
40.8
D.3
C.4
C.1
B.8
B.7
B.2
SS
S
S
S
MERGE
ENLARGED FLOOR PLAN - LIGHTING AND POWER - NEW WORKF6
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP462
BLDG. 6 - ENLARGED FLOOR PLAN -
S
S
GENERAL NOTES
SS
S
ENLARGED ROOF PLAN - POWER - NEW WORKF6
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP463
BLDG. 6 - ENLARGED ROOF PLAN -
POWER - NEW WORK
S
S
S
S
S S
S
S S
S
S
S S S
S S
S
S S S
ENLARGED FLOOR PLAN - ELEC. ROOM 1609A (CORE C)F5
ENLARGED FLOOR PLAN - ELEC. ROOM 1523 (CORE B)C5
ENLARGED FLOOR PLAN - ELEC. ROOM 1503-EL (FORMERLY G200-EL, CORE A)C2
L
N
35 36
D
E
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
X
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP464
BLDG. 6 - ENLARGED FLOOR PLANS -
GENERATOR PLATFORM - ENLARGED GROUND PLAN - LIGHTING - NEW WORKF1
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP471
GEN. PLATFORM - ENLARGED GROUND
FLOOR PLAN - LIGHTING - NEW WORK
GENSET #2
GEN-2
GENSET #3
GEN-3
PARALLELING SWITCHGEAR ROOM
PSR-1
GENSET #2
GEN-2
GENSET #3
GEN-3
PARALLELING SWITCHGEAR ROOM
PSR-1
GENERATOR PLATFORM - ENLARGED FIRST PLAN - LIGHTING AND POWER - NEW WORKF1
PLAN
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-EP472
GEN. PLATFORM - ENLARGED FIRST
FLR PLAN - LTG & POWER - NEW WORK
File details come from the government source that posted it. Updated .