A-Plumbing-Part 2.pdf

PDF 8 MB Posted

Attached to
36C10F24R50018 Balance of Work VAMC Manhattan, NY -- Y1DA
Solicitation number
QSE--36C10F24R50018
Issued by

About this file

This document appears to be a set of Construction Document drawings for plumbing work related to a federal contract opportunity at the VA NY Manhattan Campus. The drawings provide detailed plans, sections, and details for the demolition, new work, and renovations to the plumbing systems, including domestic water, sanitary, vent, nitrogen, and nitrous oxide piping. Key details include the location of new piping, relocation of existing gas manifolds and controls, installation of new floor drains and sump pumps, and coordination with other building systems. The scope of work covers the underground, ground, and first floor levels of the facility. The related federal contract opportunity is solicitation number QSE--36C10F24R50018 for the Balance of Work at the VAMC Manhattan Campus, to be performed for the Department of Veterans Affairs Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
SolicitationCancellation.pdf PDF
SolicitationAmendment0006.pdf PDF
Manhattan VA Asbestos Survey Report 05-2021final (5-24-21).pdf PDF
Manhattan VA Revised Asbestos Survey Report 05-2021Final (Appendix H - First Half).pdf PDF
QA - Balance of Work - 05.08.2024.pdf PDF
Manhattan VA Revised Asbestos Survey Report 05-2021Final (Appendix H - 2nd half).pdf PDF
QA - Balance of Work - 05.02.2024.pdf PDF
SolicitationAmendment0005.pdf PDF
SolicitationAmendment0004.pdf PDF
QA - Balance of Work - 04.16.2024.pdf PDF
C-Mechanical- Part 2.pdf PDF
C-Electrical- Part 5.pdf PDF
B-Mechanical-Part 1.pdf PDF
P03_CDR- Sole Source JA - Access Controls - 11-16-22.pdf PDF
B-Civil.pdf PDF
C-Plumbing- Part 2.pdf PDF
P03_CDR - Sole Source JA - Public Announcement System - 11-16-22.pdf PDF
C-Electrical- Part 4.pdf PDF
A-Architecture-Part 3.pdf PDF
A-ICRA.pdf PDF
C-Architecture- Part 5.pdf PDF
A-Fire Protection-Part 2.pdf PDF
C-Electrical- Part 10.pdf PDF
P03_CDR - Sole Source JA - Triplex Pump 11-16-22.pdf PDF
C-Life Safety.pdf PDF
A-Electrical-Part 1.pdf PDF
VHA Directive 1028_D_2020-02-24.pdf PDF
B-Electrical-Part 2.pdf PDF
B-Architecture-Part 4.pdf PDF
C-Electrical- Part 12.pdf PDF
A-Electrical-Part 3.pdf PDF
C-Electrical- Part 7.pdf PDF
C-Electrical- Part 8.pdf PDF
A-Civil.pdf PDF
A-Structural.pdf PDF
A-General.pdf PDF
QSE 36C10F24R50018.pdf PDF
Amendment 0001 - Missing and Replacement Documents.pdf PDF
B-Electrical-Part 1.pdf PDF
C-Fire Protection- Part 2.pdf PDF
C-Electrical- Part 11.pdf PDF
C-Telecom.pdf PDF
C-Architecture- Part 6.pdf PDF
B-Electrical-Part 3.pdf PDF
VAMC CD Refresh IFC Vol 1 Specifications REV 2_ 9-19-23 (Part 3).pdf PDF
C-Mechanical- Part 3.pdf PDF
Shutdown Request Form.pdf PDF
B-Architecture-Part 2.pdf PDF
P03_CD Refresh - Sole Source JA - Fire Alarm System - 11-16-22.pdf PDF
A-Life Safety.pdf PDF
Show 40 more

Latest 50 of 281 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET NOTES:

GENERAL NOTES:

DEMOLITION NOTES:

2" SAN PIPE

FROM L-1 ABOVE

2" SAN PIPE

FROM EEW/SH ABOVE

2" SAN

A-

PN

1U

A-

PN

3U

CAP (E) PIPE

GAS METER

G204ASG204AS

PAINT

SHOP

0203S0203S

PAINT SHOP

STOR.

0203S

CORR

G201S

MEN'S

LOCKERS

G204BS

WOMEN'S

LOCKERS

G205S

VEST.

G204CS

CORR.

G297S

VEST.

142A

REGULATED

MEDICAL

WASTE

INTERIM

STORAGE

G207S

EMPTY SHARPS

CONTAINERS

G204S

VEST.

G208S

G206S

IT (TR-D)

0209SA

U

V

W

X

U

2 3 4 5 7 9

Z

Y

CU

H-

TM KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022

PLAN

NORTH

A-PN103U

PARTIAL UNDER GROUND FLOOR NEW

WORK - PART C

PARTIAL UNDER GROUND FLOOR NEW WORK - PART C

NOTE:

THE GROUND FLOOR PLAN HAS BEEN SUPERIMPOSED OVER THE

UNDERGROUND FLOOR PLAN FOR SPACIAL REFERENCE

AutoCAD SHX Text

1. SEE SHEET P001 FOR SYMBOLS AND ABBREVIATIONS. SEE SHEET P001 FOR SYMBOLS AND ABBREVIATIONS. 2. SEE P501 SERIES FOR PLUMBING DETAILS. SEE P501 SERIES FOR PLUMBING DETAILS. 3. SEE P700 SERIES FOR PLUMBING SCHEDULES. SEE P700 SERIES FOR PLUMBING SCHEDULES. 4. ALL DAMAGE TO FLOOR SURFACES AS A RESULT OF THIS WORK, TO BE PATCHED TO MATCH ADJACENT SURFACES. ALL DAMAGE TO FLOOR SURFACES AS A RESULT OF THIS WORK, TO BE PATCHED TO MATCH ADJACENT SURFACES. 5. WHERE APPLICABLE, REFER TO DRAWING LS-001 FOR FIRE AND SMOKE BARRIER WALL LEGEND. WHERE APPLICABLE, REFER TO DRAWING LS-001 FOR FIRE AND SMOKE BARRIER WALL LEGEND. 6. REFER TO ARCHITECTURAL SHEET A-AD101 & A-AD102 FOR LOCATIONS OF FLOOR SAW CUTTING. REFER TO REFER TO ARCHITECTURAL SHEET A-AD101 & A-AD102 FOR LOCATIONS OF FLOOR SAW CUTTING. REFER TO DETAIL A7 ON SHEET A-AE503 UNDERSLAB PIPING DETAIL. DETAIL A7 ON SHEET A-AE503 UNDERSLAB PIPING DETAIL.

AutoCAD SHX Text

1. AS-BUILT DRAWINGS ARE NOT AVAILABLE TO POSITIVELY IDENTIFY ALL EXISTING CONDITIONS. CONTRACTOR MUST AS-BUILT DRAWINGS ARE NOT AVAILABLE TO POSITIVELY IDENTIFY ALL EXISTING CONDITIONS. CONTRACTOR MUST FIELD VERIFY ALL PIPING LOCATED ABOVE CEILINGS, IN WALL CAVITIES AND BELOW FINISHED FLOORS AS PER SCOPE OF WORK WITH DUCTWORK, ELECTRICAL CONDUITS ETC., IN EVERY ROOM WITHIN THE SCOPE OF WORK AND IDENTIFY ACTIVE VERSUS INACTIVE COMPONENTS. CONTRACTOR IS RESPONSIBLE FOR COMPLETE DEMO OF PIPING, FIXTURES, CARRIERS AND ASSOCIATED APPURTENANCES, OR RELOCATION AS REQUIRED TO ACCOMMODATE WITH OTHER DISCIPLINES ASSOCIATED WITH THIS PROJECT. 2. PIPING TO BE DEMOLISHED MUST BE REMOVED COMPLETELY (INCLUDING ASSOCIATED APPURTENANCES BACK TO PIPING TO BE DEMOLISHED MUST BE REMOVED COMPLETELY (INCLUDING ASSOCIATED APPURTENANCES BACK TO IT'S SOURCE AS CLOSE AS POSSIBLE TO AVOID DEAD LEGS AND CAPPED HW/CW, PLUGGED SANITARY AND VENT TO BE PLUGGED OR CAPPED AS CLOSE AS POSSIBLE TO MAIN OR BRANCH PIPE. 3. GROUND FLOOR WALLS AND ROOM NAMES ARE SHOWN FOR SPACIAL ORIENTATION AND ARE FOR REFERENCE GROUND FLOOR WALLS AND ROOM NAMES ARE SHOWN FOR SPACIAL ORIENTATION AND ARE FOR REFERENCE ONLY. ALL WORK SHOWN ON THE UNDERGROUND FLOOR PLAN IS LOCATED BELOW THE GROUND FLOOR LEVEL. 4. CONTRACTOR SHALL PROVIDE A TEMPORARY MEANS OF STORM DRAINAGE DURING RENOVATION.CONTRACTOR SHALL PROVIDE A TEMPORARY MEANS OF STORM DRAINAGE DURING RENOVATION.

AutoCAD SHX Text Open

AutoCAD SHX Text to Above

AutoCAD SHX Text to Above

AutoCAD SHX Text Open

AutoCAD SHX Text

DN

AutoCAD SHX Text N.I.S.

AutoCAD SHX Text

CO

AutoCAD SHX Text

(E)2" SAN

AutoCAD SHX Text

UP TO PAINT SHOP SINK

AutoCAD SHX Text (E)4"

AutoCAD SHX Text

(E)SAN

AutoCAD SHX Text

(E)SAN

AutoCAD SHX Text

(E)4" SAN

AutoCAD SHX Text

(E)SAN

AutoCAD SHX Text

(E)SAN

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

AutoCAD SHX Text 16'

DN

RAMP

E

A

S

T t h

S

R

BUILDING 1

RAMP DN

B

U

I

L

D

I

N

G

N o

FEMALE

TOILET

G383

NON-STOR

1-1A

WOMEN'S

LOCKERS

G205S

REGULATED

MEDICAL

WASTE

G206S

MEN'S

LOCKERS

G204BS

GAS METER

G204AS

PAINT

SHOP

0203S0203S

PAINT

SHOP

STORAGE

0203S0203S

EMPTY

SHARPS

CONTAINERS

G204SG204S

VESTIBULE

0208S

VESTIBULE

G204CS

G207S

INTERIM

STORAGE

CORRIDOR

G297S

CORRIDOR

G201S

DN

DD

RECEIVING

0216E0216E

OFFICE

0216AE

SPECIAL

STORAGE

0218AE0218AE

STORAGE

0218E0218E

ENGINEERING

STORAGE

0233E0233E

CANTEEN

STORAGE

0234E0234E

IRM

0235E0235E

LOGISTICS

0236E0236E

LOGISTICS

INVENTORY

MANAGEMENT

OFFICES

0255E0255E

CORRIDOR

0257E0257E

OFFICE

0255AE0255AE

OFFICE

0255BE0255BE

COPY

ROOM

0255CE

OFFICE

0255DE0255DE

OFFICE

0255EE0255EE

OFFICE

0255FE0255FE

0200B

LOADING

DOCK

0200A

LOADING

DOCK

0256E0256E

IT ROOM

(TR-E)

222018

161412 23 302624

MECHANICAL

ROOM

0269N0269N

OFFICE

0264AN0264AN

MECHANICAL

ROOM

0270N0270N

EMS

OFFICES

0272N

CLEAN

LINEN

0264N0264N

EMS

STORAGE

0253N0253N

WAREHOUSE - B

0250E0250E

PROCESSING

0215E0215E

BIOMED

0212E0212E

EMPTY

CANISTERS

0210E

ENTRY

0214E0214E

TEMPORARY

HOLDING

0230AE0230AE

PROPERTY

MANAGERS

0230E0230E

NON

FLAMMABLE

GAS

0215B

COMPRESSED

GAS

0215A

BLUE

TRUCK

STAGING

0254E0254E

SUPPLY

PALLET

BREAK

DOWN

0253E0253E

EMS

EQUIPMENT

STORAGE

0251E0251E

LINEN

CHUTE

0244N0244N

WOMENS

TOILETS

SHOWER

0248N0248N

MENS

TOILETS

SHOWER

0247N

ENGINEERING

OFFICE

0262N0262N

OFFICE

0272AN0272AN

OFFICE

0272BN0272BN

COPY

ROOM

0272DN

OFFICE

0272EN

OFFICE

0272FN0272FN

OFFICE

0272GN0272GN

MECHANICAL

ROOM

0272CN

FORKLIFT

AND

PALLET

TRUCK

PARKING

0203E0203E

ENTRY

0211E

CORRIDOR

0241N0241N

CORRIDOR

0252E

STAIRWELL

0254N

CORRIDOR

0271N0271N

CORRIDOR

G245NG245N

CORRIDOR

0243N0243N

0200A

LOADING

DOCK

WAREHOUSE

SUPERVISOR

0215AE0215AE

0211AE0211AE

SPRINKLER

RISER

ROOM

BED

STORAGE

0213E

LACTATION

ROOM

G383A

18.2 20.5 22.8

18.1

22.9

Z.8

BB.5

20.5

22.8

18.1 22.9

BB.5

CORRIDOR

0257E0257E

SECURITY

CLOSET

0258E

CORRIDOR

0241N

CORRIDOR

0202S

ELECTRIC RM

0249E

WAREHOUSE - A

0250E0250E

DN

VESTIBULE

142A142A

VEST

G206AS

EX EX EX EX EX EX

DD.5

DD.5

AA.5

DD.8

DD.8

AA.5

PB PB

PB PB

PB

PB

PB

PBPB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

PB

EPU

KS

KS

PB

PB

PB

PB

KS /

PB

PB

PB

PB

KS

/ PB

PB

PB

KS/

PB

PB

G245N.1

CLOSET

R

S

U

T

V

W

X

U

2 3 4 5 7 9

CC

DD

Z

AA

BB

Y

EE

HH

12 323028

22 23 24 2611

EX EX EX EX

EX EX

BB

DD

EE

BB

AA

DD

EX

EX

EX

DD

BB

EX

EX

EX

AA

EX

Z

33 35

Y

V

W

X

Z

AA

U

R

T

S

R

S

U

R

T

A-PN101

A-PN102

A-

PN

A-

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022

SCALE: 1/16" = 1'-0"

16'8'0 32'

D1

PLAN

NORTH

TM KS

A-PN100

PARTIAL GROUND FLOOR NEW

WORK REFERENCE PLAN

PARTIAL GROUND FLOOR NEW WORK REFERENCE PLAN

AutoCAD SHX Text

CSSSD

AutoCAD SHX Text G580

AutoCAD SHX Text

ELEC

AutoCAD SHX Text 0165S

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text 0168S

AutoCAD SHX Text

CHAPLAIN STORAGE

AutoCAD SHX Text 0173S

AutoCAD SHX Text

ELEC

AutoCAD SHX Text 0167S

AutoCAD SHX Text G191S

AutoCAD SHX Text

0148AS

AutoCAD SHX Text

SECURITY RM.

AutoCAD SHX Text 0202S

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 0147S

AutoCAD SHX Text

NAVE

AutoCAD SHX Text 0153S

AutoCAD SHX Text

SPECIMEN CLOS

AutoCAD SHX Text 0170S

AutoCAD SHX Text

SPECIMEN STORAGE

AutoCAD SHX Text 0171S

AutoCAD SHX Text

AUTOPSY

AutoCAD SHX Text 0169S

AutoCAD SHX Text

REFR. MORTUARY

AutoCAD SHX Text 0168S

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

VEST

AutoCAD SHX Text 0166S

AutoCAD SHX Text

SHR

AutoCAD SHX Text G193S

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G190S

AutoCAD SHX Text

VEST

AutoCAD SHX Text 0199S

AutoCAD SHX Text

CLERGY

AutoCAD SHX Text 0163S

AutoCAD SHX Text

ALTAR

AutoCAD SHX Text 0162S

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text 0161S

AutoCAD SHX Text

ELEV.MACH. RM.

AutoCAD SHX Text

0203AS

AutoCAD SHX Text

STAFF TOILET

AutoCAD SHX Text

0202BS

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 0202S

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

0202AS

AutoCAD SHX Text

STAIR

AutoCAD SHX Text 1-2

AutoCAD SHX Text G587

AutoCAD SHX Text G588

AutoCAD SHX Text

PLUMBING EQUIP RM

AutoCAD SHX Text G583

AutoCAD SHX Text

SECURE STORAGE

AutoCAD SHX Text G586

AutoCAD SHX Text

CSSSD STAFF AREA

AutoCAD SHX Text G582

AutoCAD SHX Text G596

AutoCAD SHX Text

VENDOR LOANER

AutoCAD SHX Text G589

AutoCAD SHX Text

BREAKDOWN

AutoCAD SHX Text G590

AutoCAD SHX Text

EQUIP HOLDING / DISPATCH

AutoCAD SHX Text G595

AutoCAD SHX Text

SOILED RECEIVING

AutoCAD SHX Text G591

AutoCAD SHX Text

MECH RM

AutoCAD SHX Text G703

AutoCAD SHX Text

JAN.

AutoCAD SHX Text G598

AutoCAD SHX Text

KITCHENETTE

AutoCAD SHX Text 0142C

AutoCAD SHX Text G001W

AutoCAD SHX Text

MALE TOILET

AutoCAD SHX Text G382

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

ELEV LOBBY

AutoCAD SHX Text G001

AutoCAD SHX Text G003

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text G004

AutoCAD SHX Text

IT (TR-D)

AutoCAD SHX Text

0209SA

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 0209S

AutoCAD SHX Text

LAUNDRY

AutoCAD SHX Text 0184S

AutoCAD SHX Text

PUMPS

AutoCAD SHX Text 0166S

AutoCAD SHX Text

PUMP ROOM

AutoCAD SHX Text 0175S

AutoCAD SHX Text

STAIR

AutoCAD SHX Text 1-1

AutoCAD SHX Text

PE #1

AutoCAD SHX Text

PE #2

AutoCAD SHX Text

PE #3

AutoCAD SHX Text

PE #4

AutoCAD SHX Text

PE #5

AutoCAD SHX Text

PE #6

AutoCAD SHX Text

PE #7

AutoCAD SHX Text

PE #8

AutoCAD SHX Text

SE #12

AutoCAD SHX Text

SE #11

AutoCAD SHX Text

SE #10

AutoCAD SHX Text

SE #9

AutoCAD SHX Text

SE #13

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

STAIRS #3

AutoCAD SHX Text G2189S

AutoCAD SHX Text Open

AutoCAD SHX Text to Above

AutoCAD SHX Text to Above

AutoCAD SHX Text Open

AutoCAD SHX Text

DN

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

DOCK LEVELER

AutoCAD SHX Text #1

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

DOCK LEVELER

AutoCAD SHX Text #2

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

DOCK LEVELER

AutoCAD SHX Text #3

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

0163SA

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 0166S

AutoCAD SHX Text

EMBALMING

AutoCAD SHX Text 0167S

AutoCAD SHX Text

SECURITY CONTROL

AutoCAD SHX Text

RM. (POST 7)

AutoCAD SHX Text 0200S

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

BLDG 6

AA

EX

Z

U

EX

AA

EX

DN

RAMP

DN

AC

U-

1-1/2" CW

1" HW

2"V

1/2"CW

3/4" HWR

0249E

SUPPLY PALLET

BREAK DOWN

0203E

SIZE TO MATCH (E) PIPE

FD-2

ETP-1 , MOUNT

HIGH ON WALL

4" ST PIPE FROM

ABOVE (CONNECT

TO (E) 4" ST PIPE

SERVING (E)RD)

4" ST PIPE DOWN

4" ST PIPE RUN

ABOVE CEILING

N4FCO

ADJUST FLOOR

DRAIN LOCATION

AS REQUIRED

FOR NEW HVAC

EQUIPMENT IF

REQUIRED

RPZBP-1

FD-3

1" CW PIPE TO

HVAC DRAIN

COOLER -

COORDINATE

WITH MECHANICAL

2" V

2" VENT

UP/DN

COORDINATE

LOCATION WITH

NEW AHU

2" V

1" CW PIPE TO HVAC

MAKE-UP WATER

1" CW

(E)2" V UP

COPY

ROOM

0272DN

OFFICE

0272EN

OFFICE

0272FN

OFFICE

0272GN

EMS

OFFICES

0272N

MECH

ROOM

0272CN

CORR.

0271N

MECH

ROOM

0269N

MECH

ROOM

0270N

OFFICE

0272BN

OFFICE

0272AN

ENGINEERING

OFFICE

0262N

CLEAN

LINEN

0264N

EMS

STOR.

0253N

STAIRWELL

0254N

CORR.

0241N

0248N

CORR.

0252E

EMS EQ.

STOR.

0251E

BLUE TRUCK

STAGING

0254E

0253E

WAREHOUSE - B

0250E

LINEN

CHUTE

0244N

BED STOR.

0213E

ELEC. RM

PROCESSING

0215E

CORR.

0243N

BIOMED

0212E

EMPTY

CANISTERS

0210E

ENTRY

0214E

LOADING

DOCK

COMPRESSED

GAS

0215A

0211E

SPRINKLER

RISER RM

0211AE

PROP.

MANAG.

0230E

TEMP.

HOLDING

0230AE

FORKLIFT AND

PALLET TRUCK

PARKING

CORR.

0241N

TOILET

G383

CORR.

0271N

OFFICE

0264AN

WAREHOUSE

0215AE

SUPERVISOR

WOMENS

TOILETS

SHOWER

0247N

MENS

TOILETS

SHOWER

CORR.

0241N

AD-1, AT

BOTTOM OF

AREA WAY

ETP-1

1/2"TP DOWN

THRU SLAB

2" V PIPE

FROM BELOW

2" V

HEAT TRACE 5 WATTS

PER LF APPROX. 200 LF

1-1/2"CW, 1"HW AND

3/4"HWR EACH PIPE

A-P401

D7

N6

N

N2O

BY-PASS N2O TO

DENTAL, PIPE SIZE

TO MATCH (E) PIPE

N O

N O

N5

1"CW

PUMP ROOM

0175S

3/4" HWR

REFER TO PACKAGE "C"

FOR ADDITIONAL PLUMBING

WORK BEYOND THIS POINT

REFER TO PACKAGE "B"

FOR PLUMBING WORK

BEYOND THIS POINT

RAISE 4" PIPE ABOVE

3/4" HWR

3/4" HWR

1 1/4"HWR

1 1/2" N

1 1/2"

SP-1

30"x36"X36" POLYETHYLENE

FLOOR MOUNTED SUMP

PUMP BASIN

SP-1 ELECTRICAL

ALTERNATOR/CONTROL

PANEL

4"

3"

ENTRY

1" HWR 1" HWR

1" HWR

3/4" HWR

1-1/2" N20

PIPE UP

PIPE UP

A-PN101

A-PN102

A-

PN

A-

PN

PROVIDE

FIRESTOP ALL

AROUND NEW

PIPE PENETRATIONS

(TYP)

1/2" TP DOWN

THROUGH FLOOR

CAP (E) PIPE

CAP (E) PIPE

CAP

(E) PIPE

N4FCO

FD-3

1/2" CW

CAP

PD

P D

P D

2"

CAP (E) PIPE

A-P401

F7

CAP

(E) PIPE

N

IT (TR-D)

0209SA

STORAGE

0209S

NON

FLAMMABLE

GAS

0215B

CONNECT TO THE

CW PIPE UPSTREAM, SERVING

THE (E)HEAT EXCHANGERS

RCP-1A

RCP-1

HTC-1

N7

PLUMBING NEW WORK KEYNOTES:SHEET NOTES:

1. SEE SHEET A-P001 FOR SYMBOLS AND ABBREVIATIONS.

2. SEE A-P501 SERIES FOR PLUMBING DETAILS.

3. SEE A-P700 SERIES FOR PLUMBING SCHEDULES.

4. ALL DAMAGE TO FLOOR SURFACES AS A RESULT OF THIS WORK, TO BE PATCHED TO MATCH ADJACENT SURFACES.

5. WHERE APPLICABLE, REFER TO DRAWING LS-001 FOR FIRE AND SMOKE BARRIER WALL LEGEND.

6. REFER TO ARCHITECTURAL SHEET A-AD101 & A-AD102 FOR LOCATIONS OF FLOOR SAW CUTTING. REFER TO DETAIL A7

ON SHEET A-AE503 UNDERSLAB PIPING DETAILS.

(NOTE: NOT ALL KEYED NOTES

APPLY TO THIS DRAWING)

2. RUN 1/2" TP AND ATTACH TO FD AS PER MANUFACTURERS RECOMMENDATIONS. UPON

COMPLETIION OF OF THIS WORK, PATCH FLOOR TO MATCH ADJACENT SURFACES.

3. REPLACE INSULATION IN KIND, ON ALL 8" INCOMING CW SERVICE(S) PIPING COMPLETELY THIS AREA.

4. PROVIDE AND CONNECT NEW FCO LEVEL TO NEW FLOOR.

5. CONNECT AND INSTALL HEAT TRACE AS SHOWN. REFER TO SCHEDULE FOR ADDITIONAL INFORMATION.

6. SCOPE OF WORK FOR NON FLAMMABLE GAS 0215B SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:

1. RECONNECT ALL (E)CW, (E)HW, (E)W AND (E)V TO NEW FIXTURE AS APPLICABLE. PIPE SIZES, PIPE MATERIAL AND

INSULATION TO MATCH EXISTING.

- SWITCH VAMC SUPPLY OF NITROGEN AND NITROUS OXIDE GAS SUPPLY OVER TO SECONDARY MAINFOLD SYSTEM.

- REMOVE AND RE-INSTALL EXISTING MANIFOLDS , HEADERS, CONTROLS, GAS BOTTLES AND ALL ASSOCIATED

APPURTENANCES. (NITROGEN & NITROUS OXIDE) SYSTEMS FROM THE SECONDARY MANIFOLD ROOM 1091S TO THE

NON FLAMMABLE GAS 0215B.

- PROVIDE TIE-IN CONNECTION FROM MANIFOLD TO RISER AS SHOWN ON PLANS SHOWN.

- OMMISION, TEST AND CERTIFY SYSTEM.

- CHANGE-OVER NITROGEN AND NITROUS OXIDE SUPPLY FROM SECONDARY MAINFOLD SYSTEM TO “NEW” PERMANENT

SYSTEM.

- REMOVE ALL TEMPORARY GAS PIPING ASSEMBLIES DOWN TO GROUND FLOOR RISER, ELECTRICAL POWER

CONNECTIONS BACK TO PANEL BOARD, AND PROVIDE PERMANENT FIRESTOP ASSEMBLIES AT PREVIOUS FLOOR

PENETRATIONS.

7. INSTALL NEW ISOLATION VALVES AND CHECK VALVES, THEN CUT AND CAP FOR CONSTRUCTION .

PLUMBING EXISTING KEYNOTES:

1. PROTECT (E) STAINLES STEEL 3 WAY CONTROL BOXES LOCATED JUST BELOW THE CEILING DURING CONSTRUCTION.

2. (E) NITROGEN AND NITROUS OXIDE RISERS TO REMAIN.

3. (E) NITROUS OXIDE PIPE TO REMAIN FIELD VERIFY FOR CONT.

4. (E) VALVE TO REMAIN CLOSE.

12 323028

22 23 24 2611

EX EX

EX EX

EX EX

Y

V

W

X

Z

AA

U

U

V

W

X

U

TM KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022

PLAN

NORTH

A-PN101

PARTIAL GROUND FLOOR NEW WORK

PLAN - PART A

PARTIAL GROUND FLOOR NEW WORK PLAN - PART A

D1

AutoCAD SHX Text

(E)1"HW

AutoCAD SHX Text

(E)3"V UP

AutoCAD SHX Text (E)3"V

AutoCAD SHX Text

(E)8" WATER SERVICE

AutoCAD SHX Text

(E)1-1/4"CW

AutoCAD SHX Text

(E)4"SAN UP/DN

AutoCAD SHX Text

(E)CW

AutoCAD SHX Text

(E)HW

AutoCAD SHX Text

(E)5" CW

AutoCAD SHX Text (E)2" V

AutoCAD SHX Text (E)1-1/2"V

AutoCAD SHX Text

(E)FD

AutoCAD SHX Text

(E)4"SAN UP/DN

AutoCAD SHX Text

(E)WCO EXPOSED WCO EXPOSED EXPOSED IN WALL OPENING

AutoCAD SHX Text

(E)1/2"CW

AutoCAD SHX Text

(E)HW

AutoCAD SHX Text

(E)CW FROM ABOVE

AutoCAD SHX Text

(E)2" V PIPE UP

AutoCAD SHX Text

(E)4"SAN UP

AutoCAD SHX Text

(E)CW DN

AutoCAD SHX Text

(E)1-1/2" N FROM ABOVE

AutoCAD SHX Text

(E)1-1/2" N20 FROM ABOVE

AutoCAD SHX Text (E)1-1/2"

AutoCAD SHX Text (E)1-1/2"

AutoCAD SHX Text E2

AutoCAD SHX Text (E)1 1/2"

AutoCAD SHX Text

(E)NITROGEN CONTROL PANEL

AutoCAD SHX Text

(E)MANIFOLD TYPICAL

AutoCAD SHX Text

(E)NITROUS OXIDE CONTROL PANEL

AutoCAD SHX Text

(E) PIPE TO DENTAL

AutoCAD SHX Text

(E)BOTTLED GAS (TYP.)

AutoCAD SHX Text (E)1-1/2" N2O

AutoCAD SHX Text

(E)5" CW

AutoCAD SHX Text

(E)AREA DRAIN

AutoCAD SHX Text (E)1-1/2" N

AutoCAD SHX Text

(E)3/4" HW

AutoCAD SHX Text

(E)3/4" HW

AutoCAD SHX Text (E)N

AutoCAD SHX Text (E)N20

AutoCAD SHX Text (E)N

AutoCAD SHX Text (E)N20

AutoCAD SHX Text (E)N

AutoCAD SHX Text (E)N20

AutoCAD SHX Text

(E)1-1/2" V PIPE UP

AutoCAD SHX Text

(E)V UP/DN

AutoCAD SHX Text

(E)SAN UP/DN

AutoCAD SHX Text

(E)FD

AutoCAD SHX Text

(E) PIPE

AutoCAD SHX Text

(E)1-1/4" HW & 4" CW PIPE

AutoCAD SHX Text

(E)1" HW & 5" CW PIPE

AutoCAD SHX Text E3

AutoCAD SHX Text (E)2" V

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text N#

AutoCAD SHX Text E#

AutoCAD SHX Text

NOTE: (NOT ALL KEYED NOTES APPLY TO THIS DRAWING)

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

SHEET NOTES:

1. SEE SHEET A-P001 FOR SYMBOLS AND ABBREVIATIONS.

2. SEE A-P501 SERIES FOR PLUMBING DETAILS.

3. SEE A-P700 SERIES FOR PLUMBING SCHEDULES.

4. ALL DAMAGE TO FLOOR SURFACES AS A RESULT OF THIS WORK, TO BE PATCHED TO MATCH ADJACENT SURFACES.

5. WHERE APPLICABLE, REFER TO DRAWING LS-001 FOR FIRE AND SMOKE BARRIER WALL LEGEND.

6. REFER TO ARCHITECTURAL SHEET A-AD101 & A-AD102 FOR LOCATIONS OF FLOOR SAW CUTTING. REFER TO DETAIL A7

ON SHEET A-AE503 UNDERSLAB PIPING DETAILS.

DN

AC

U-

PBPB PB

PB

PB

PB

PB

PB

KS

/ PB

PB

PB

KS/

PB

PB

RAMP DN

NON-STOR

1-1A

LOGISTICS &

INVENTORY

MANAGEMENT

OFFICES

0255E

LOGISTICS

0236E

OFFICE

0255DE

OFFICE

0255FE

OFFICE

0255EE

CORR.

0257E

OFFICE

0216AE

ENGINEERING

STOR.

0233E

CANTEEN

STOR.

0234E

IRM

0235E

RECEIVING

0216E

SPECIAL

STOR.

0218AE

STOR.

0218E

OFFICE

0255BE

OFFICE

0255AE

LOADING

DOCK

LOADING

DOCK

COPY

ROOM

0255CE

IT ROOM

0256E

CORR.

0271N

LOGISTICS

0236E

CORR.

0257E

SEC. CLOS.

0258E

2"ST

2" ST PIPE

DN - SEE BELOW

GROUND PLANS

FOR CONTINUATION

HEAT TRACE

5 WATTS PER LF

APPROX. 25 LF

HEAT TRACE

DN TO SLAB

REFER TO PACKAGE "C"

FOR WORK THIS AREA

RAISE 2" PIPE ABOVE

NEW DOOR ENTRANCE

FROM IT'S SOURCE

RAISE 4" PIPE ABOVE

NEW DOOR ENTRANCE

FROM IT'S SOURCE

A-PN101

A-PN102

N5

SAN

SAN

CAP (E) PIPE

CAP (E) PIPE

0215B

HTC-2

12 323028

22 23 24 2611

EX EX

EX EX

EX EX

BB

DD

EX

EX

EX

BB

DD

EE

33 35

EE

DD

BB

EX

EX

EX

AA

EX

PLUMBING EXISTING KEYNOTES:

1. PROTECT (E) STAINLES STEEL 3 WAY CONTROL BOXES LOCATED JUST BELOW THE CEILING DURING CONSTRUCTION.

2. (E) NITROGEN AND NITROUS OXIDE RISERS TO REMAIN.

3. (E) NITROUS OXIDE PIPE TO REMAIN FIELD VERIFY FOR CONT.

4. (E) VALVE TO REMAIN CLOSE.

CC

DD

AA

BB

EE

HH

TM KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022

PLAN

NORTH

D1

A-PN102

PARTIAL GROUND FLOOR NEW WORK

PLAN - PART B

PARTIAL GROUND FLOOR NEW WORK PLAN - PART B

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

(E)2" ST PIPE FROM RD ABOVE

AutoCAD SHX Text

(E)2"ST

AutoCAD SHX Text

(E)CW PIPE

AutoCAD SHX Text

(E)HW PIPE

AutoCAD SHX Text

(E)4"SAN DN

AutoCAD SHX Text

(E)4" SAN

AutoCAD SHX Text

(E)4" SAN

AutoCAD SHX Text

(E)2" SAN

AutoCAD SHX Text E3

AutoCAD SHX Text E4

AutoCAD SHX Text E4

AutoCAD SHX Text E#

AutoCAD SHX Text

NOTE: (NOT ALL KEYED NOTES APPLY TO THIS DRAWING)

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

PLUMBING EXISTING KEYNOTES:

1. PROTECT (E) STAINLES STEEL 3 WAY CONTROL BOXES LOCATED JUST BELOW THE CEILING DURING CONSTRUCTION.

2. (E) NITROGEN AND NITROUS OXIDE RISERS TO REMAIN.

3. (E) NITROUS OXIDE PIPE TO REMAIN FIELD VERIFY FOR CONT.

4. (E) VALVE TO REMAIN CLOSE.

CU

H-

U

V

W

X

2 3 4 5 7 9

U

Z

Y

GAS METER

G204ASG204AS

PAINT

SHOP

0203S0203S

PAINT SHOP

STOR.

0203S

CORR

G201S

MEN'S

LOCKERS

G204BS

WOMEN'S

LOCKERS

G205S

VEST.

G204CS

CORR.

G297S

VEST.

142A

REGULATED

MEDICAL

WASTE

INTERIM

STORAGE

G207S

EMPTY SHARPS

CONTAINERS

G204S

VEST.

G208S

N2O

1 1/4"HWR

3/4" HWR

1 1/2"

A-P401

F3

1-1/2" N20

PIPE UP

1-1/2" N

PIPE UP

CAP (E) PIPE

A-

PN

A-

PN

PROVIDE

FIRESTOP ALL

AROUND NEW

PIPE PENETRATIONS

(TYP)

G206S

IT (TR-D)

0209SA

RCP-1A

RCP-1

PLUMBING NEW WORK KEYNOTES:SHEET NOTES:

1. SEE SHEET A-P001 FOR SYMBOLS AND ABBREVIATIONS.

2. SEE A-P501 SERIES FOR PLUMBING DETAILS.

3. SEE A-P700 SERIES FOR PLUMBING SCHEDULES.

4. ALL DAMAGE TO FLOOR SURFACES AS A RESULT OF THIS WORK, TO BE PATCHED TO MATCH ADJACENT SURFACES.

5. WHERE APPLICABLE, REFER TO DRAWING LS-001 FOR FIRE AND SMOKE BARRIER WALL LEGEND.

6. REFER TO ARCHITECTURAL SHEET A-AD101 & A-AD102 FOR LOCATIONS OF FLOOR SAW CUTTING. REFER TO DETAIL A7

ON SHEET A-AE503 UNDERSLAB PIPING DETAILS.

(NOTE: NOT ALL KEYED NOTES

APPLY TO THIS DRAWING)

2. RUN 1/2" TP AND ATTACH TO FD AS PER MANUFACTURERS RECOMMENDATIONS. UPON

COMPLETIION OF OF THIS WORK, PATCH FLOOR TO MATCH ADJACENT SURFACES.

3. REPLACE INSULATION IN KIND, ON ALL 8" INCOMING CW SERVICE(S) PIPING COMPLETELY THIS AREA.

4. PROVIDE AND CONNECT NEW FCO LEVEL TO NEW FLOOR.

5. CONNECT AND INSTALL HEAT TRACE AS SHOWN. REFER TO SCHEDULE FOR ADDITIONAL INFORMATION.

6. SCOPE OF WORK FOR NON FLAMMABLE GAS 0215B SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:

1. RECONNECT ALL (E)CW, (E)HW, (E)W AND (E)V TO NEW FIXTURE AS APPLICABLE. PIPE SIZES, PIPE MATERIAL AND

INSULATION TO MATCH EXISTING.

- SWITCH VAMC SUPPLY OF NITROGEN AND NITROUS OXIDE GAS SUPPLY OVER TO SECONDARY MAINFOLD SYSTEM.

- REMOVE AND RE-INSTALL EXISTING MANIFOLDS , HEADERS, CONTROLS, GAS BOTTLES AND ALL ASSOCIATED

APPURTENANCES. (NITROGEN & NITROUS OXIDE) SYSTEMS FROM THE SECONDARY MANIFOLD ROOM 1091S TO THE

NON FLAMMABLE GAS 0215B.

- PROVIDE TIE-IN CONNECTION FROM MANIFOLD TO RISER AS SHOWN ON PLANS SHOWN.

- OMMISION, TEST AND CERTIFY SYSTEM.

- CHANGE-OVER NITROGEN AND NITROUS OXIDE SUPPLY FROM SECONDARY MAINFOLD SYSTEM TO “NEW” PERMANENT

SYSTEM.

- REMOVE ALL TEMPORARY GAS PIPING ASSEMBLIES DOWN TO GROUND FLOOR RISER, ELECTRICAL POWER

CONNECTIONS BACK TO PANEL BOARD, AND PROVIDE PERMANENT FIRESTOP ASSEMBLIES AT PREVIOUS FLOOR

PENETRATIONS.

7. INSTALL NEW ISOLATION VALVES AND CHECK VALVES, THEN CUT AND CAP FOR CONSTRUCTION .

TM KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022

PLAN

NORTH

A-PN103

PARTIAL GROUND FLOOR NEW WORK

PLAN - PART C

PARTIAL GROUND FLOOR NEW WORK PLAN - PART C

D3

AutoCAD SHX Text E#

AutoCAD SHX Text

NOTE: (NOT ALL KEYED NOTES APPLY TO THIS DRAWING)

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text Open

AutoCAD SHX Text to Above

AutoCAD SHX Text to Above

AutoCAD SHX Text Open

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

(E)1-1/4" HW

AutoCAD SHX Text

(E)1-1/2" V UP

AutoCAD SHX Text E1

AutoCAD SHX Text

(E)4" CW

AutoCAD SHX Text E1

AutoCAD SHX Text N#

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

FREEZER 1

3093E

FREEZER 2

3096E

REFRIGERATOR 1

3092E

REFRIGERATOR 2

3095E

REFR 3

3070C

DN

DN DN

22 2720

18161412

V

W

X

Z

AA

U

CC

DD

Z

AA

BB

Y

Y

EE

HH

A-P403

D6

A-P403

D2

TM KS

PARTIAL THIRD FLOOR NEW

WORK REFERENCE PLAN

PLAN

NORTH

E5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022

A-PN130

PARTIAL THIRD FLOOR NEW WORK REFERENCE PLAN

AutoCAD SHX Text

SALAD PREP

AutoCAD SHX Text 0380C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3102E

AutoCAD SHX Text

PAPER

AutoCAD SHX Text

PRODUCTS

AutoCAD SHX Text 3097E

AutoCAD SHX Text 3081S

AutoCAD SHX Text

PATIENT SERVICES

AutoCAD SHX Text 3083E

AutoCAD SHX Text

SPECIAL DIET KITCH

AutoCAD SHX Text

3061AE

AutoCAD SHX Text

FILE STORAGE

AutoCAD SHX Text 3077C

AutoCAD SHX Text

DISTR

AutoCAD SHX Text 3076C

AutoCAD SHX Text

SERVICE LOBBY

AutoCAD SHX Text 3089E

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 3090E

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3091E

AutoCAD SHX Text

STAIR 1-1

AutoCAD SHX Text 3098E

AutoCAD SHX Text

COOKS

AutoCAD SHX Text 3099E

AutoCAD SHX Text

P SUP ASST

AutoCAD SHX Text 3088E

AutoCAD SHX Text

SCULLERY

AutoCAD SHX Text 3086E

AutoCAD SHX Text

MAIN KITCHEN

AutoCAD SHX Text

3108CE

AutoCAD SHX Text

FOOD FOREMAN

AutoCAD SHX Text

3108AE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

3108BE

AutoCAD SHX Text

KITCHEN STOR

AutoCAD SHX Text

3110AN

AutoCAD SHX Text

DIET COMM CENTER

AutoCAD SHX Text 3100E

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text 3101C

AutoCAD SHX Text

STORAGE ROOM

AutoCAD SHX Text 3102C

AutoCAD SHX Text

LC

AutoCAD SHX Text 3103C

AutoCAD SHX Text

JC

AutoCAD SHX Text 3105C

AutoCAD SHX Text

DISH WASHERS

AutoCAD SHX Text 3107N

AutoCAD SHX Text

KITCH & DISH WASHING

AutoCAD SHX Text 3075S

AutoCAD SHX Text

SEC ACNS

AutoCAD SHX Text

EDUCATION

AutoCAD SHX Text 3075S

AutoCAD SHX Text

NURSE RECRUITER

AutoCAD SHX Text 3044S

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

3044AS

AutoCAD SHX Text

NURSING

AutoCAD SHX Text 3043S

AutoCAD SHX Text

PATIENT SERVICES

AutoCAD SHX Text 3042S

AutoCAD SHX Text

PATIENT SERVICES

AutoCAD SHX Text 3040S

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text 3039C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3097E

AutoCAD SHX Text

PAPER PRODUCTS

AutoCAD SHX Text 3038C

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text

AutoCAD SHX Text

ELEV SHAFT

AutoCAD SHX Text 3123N

AutoCAD SHX Text

SEC TO CHIEF

AutoCAD SHX Text

3123CN

AutoCAD SHX Text

PROG CLERK

AutoCAD SHX Text 3123N

AutoCAD SHX Text

SITE MANAGER

AutoCAD SHX Text

3123EN

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

3123DN

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 3120N

AutoCAD SHX Text

SEC/CLERK

AutoCAD SHX Text 3118E

AutoCAD SHX Text

DIETICIAN

AutoCAD SHX Text 3117N

AutoCAD SHX Text

TRAINING RM

AutoCAD SHX Text 3116N

AutoCAD SHX Text

MENS TLT

AutoCAD SHX Text 3115N

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3112N

AutoCAD SHX Text

EL CL

AutoCAD SHX Text 3124N

AutoCAD SHX Text

EL CL

AutoCAD SHX Text 3109N

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

3110AN

AutoCAD SHX Text

DIET COMM CENTER

AutoCAD SHX Text 3125N

AutoCAD SHX Text

STAIR #4

AutoCAD SHX Text 3097E

AutoCAD SHX Text

PAPER PRODUCTS

AutoCAD SHX Text 3110N

AutoCAD SHX Text

PATIENTS CLOTHING

AutoCAD SHX Text 3081E

AutoCAD SHX Text

DIET VOLUNTEER

AutoCAD SHX Text 3085E

AutoCAD SHX Text

DIETETICS OFFICE

AutoCAD SHX Text

3085AE

AutoCAD SHX Text

CHIEF DIETETICS

AutoCAD SHX Text

SE #13

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text 3078C

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text

SCALE: 1/8" = 1'-0"

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

AutoCAD SHX Text 16'

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

BLDG 6

0248N

WOMENS

TOILETS

SHOWER

0247N

MENS

TOILETS

SHOWER

WCO

WCO

FD-1

L-1

WC-2

WC-1

TP-1

4" SAN PIPE DOWN

& 2" VENT PIPE UP/DN

3" SAN PIPE DOWN &

1-1/2" VENT PIPE UP/DN

FD-1

2"FD-4

SH

FD-1

SH

3" SAN PIPE

DN & 1-1/2"

VENT PIPE

UP/DN

2" SAN PIPE

DN & 1-1/2"

VENT PIPE

UP/DN

WC-1

WC-2

4" SAN PIPE

DOWN & 2" VENT

PIPE UP/DN

3" SAN PIPE

DOWN & 1-1/2"

VENT PIPE

UP/DN

TP-1

L-1

2"

BV-4 @ 0.50 GPM

(PROVIDE ACCESS PANEL)

2" SAN PIPE DN

& 2" VENT PIPE

UP/DN

2"

2"

3"

3"

1-1/2"

3/4" HWR, 3/4" HW & 2" CW

PIPE SEE A/PN101 FOR CONT.

1-1/2"

3/4"

1/2"

1-1/2" CW PIPE

DOWN

1-1/2" CW PIPE DOWN

1/2" HW PIPE DOWN

1/2" CW & HW

PIPE DOWN

1/2" CW PIPE DN

1/2" HW PIPE DN

2"FD-4

3"FD-1

1/2" CW & HW

PIPE DOWN

BV-1 @ 2.0 GPM

(PROVIDE ACCESS PANEL)

BV-3 @ 0.50 GPM (PROVIDE

ACCESS PANEL)

3/4"

3/4"

PROVIDE ACCESS

PANEL

PROVIDE ACCESS

PANEL

BV-2 @ 0.50 GPM

(PROVIDE ACCESS PANEL)

WHA "B"

WHA "B"

WHA "A"

WHA "A"

L-1

EEW/SH

CORR

G201S

REGULATED

MEDICAL

WASTE

G206S

2" SAN DN &

1-1/2" V UP

1-1/2" V

1-1/2" SAN PIPE

DN. & 1-1/2" VENT

PIPE UP/DN

1-1/2" TEPID

WATER DOWN

TO EEW/SH

BV

EMV

1-1/2" CW

1" HW

3/4" HWR

BV

MAINTAIN 2 HR WALL RATING

WITH FIRESTOPPING AT

PENETRATIONS THROUGH

WALL THIS AREA.

ETP-1

CU

H-

24 2625

W

X

S

T

O

P

V

W

X

ENTRY

0214E

EEW/SH

EWC

IN-LINE FILTER PROVIDED

BY WATER COOLER

MANUFACTURER

VALVE TO BE

LOCKED OPEN

BV

1-1/2" SAN PIPE DN.

& 1-1/2" VENT PIPE UP/DN

EMV

ETP-1

PB

S A

N

SAN

SAN

0248N

WOMENS

TOILETS

SHOWER

0247N

MENS

TOILETS

SHOWER

CO

4" SAN PIPE FROM

WC-1 & WC-2 ABOVE

1-1/2" VENT

PIPE UP

3" SAN PIPE

FROM 3"FD-1

ABOVE

3" SAN PIPE

FROM 3"FD-1

ABOVE

T P

1/2" TP PIPE

FROM TP-1 ABOVE

CO

CAP

(E) PIPE

CAP

(E) PIPE

4"

3"

1-1/2" VENT

PIPE UP

1-1/2" VENT

PIPE UP

2" SAN PIPE

FROM 2"FD-4

ABOVE

T P

TP TP

2" SAN PIPE

FROM 2"FD-4

ABOVE

2" SAN PIPE

FROM L-1

ABOVE

2" SAN

T P

TP

TP

1/2" TP PIPE

FROM TP-1

ABOVE

4" SAN PIPE

FROM WC-1

& WC-2 ABOVE

3" SAN PIPE

FROM 3"FD-1

ABOVE

4"

3" SAN PIPE

FROM 3"FD-1

ABOVE

CAP

(E) PIPE

3" 2"

3"

3"

NOTE:

FIXTURES SHOWN FOR REFERENCE

ONLY LOCATED ON GROUND FLOOR.

ALL PIPING SHOWN ARE LOCATED

BELOW SLAB.

24 2625

V

W

X

Z

TM KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022

PLAN

NORTH

ENLARGED GROUND FLOOR - MEN'S, WOMENS TOILET & SHOWER (0247N & 0248N)

D7

A-P401

PLUMBING ENLARGED PLANS

PLAN

NORTH

PLUMBING ENLARGED PLAN - GROUND FLOOR - REGULATED MEDICAL WASTE OWER (G206S)

F3

PLAN

NORTH

PLUMBING ENLARGED PLAN - GROUND FLOOR (ENTRY 0214E)

F7

PLAN

NORTH

PLUMBING ENLARGED PLAN - BELOW SLAB - MEN'S, WOMENS TOILET & SHOWER (0247N & 0248N)

D3

AutoCAD SHX Text

3"V UP ETR

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

(E)2" VENT UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

4" SAN PIPE SEE A-PN101U FOR CONT.

AutoCAD SHX Text (E)4"

AutoCAD SHX Text

(E)4" SAN

AutoCAD SHX Text

(E)4" SAN

AutoCAD SHX Text

(E)4" SAN

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

8'

W

X

(E) MANIFOLD - TEMPORARILY

RELOCATED FROM GROUND

FLOOR, RM. 0216

N AND N02 GAS PIPES AND RELIEF VENT

SIZE AND CONNECTION POINTS TO THE

(E)DISTRIBUTION SYSTEMS, SHALL BE

CONFIRMED AND VERIFIED BY CARDINAL

AIR

(E) GAS CYLINDERS

TEMPORARILY RELOCATED

FROM GROUND FLOOR,

RM. 0216 (TYP.)

PROVIDE APPROVED

GAS CYLINDERS

HOLDING RACK (TYP.)

(E) CONTROL PANEL - TEMPORARILY

RELOCATED FROM GROUND FLOOR,

RM. 0216 AND COMMISSIONED

(E) MANIFOLD - TEMPORARILY

RELOCATED FROM GROUND

FLOOR, RM. 0216

1-1/2" N UP FROM

GROUND FLOOR

1-1/2" N2O FROM

GROUND FLOOR

1" CLEARANCE ALL AROUND

GAS CYLINDER (TYP.)

CONNECT TO

CONTROL PANEL (TYP.)

(E)RELOCATED

RACK FROM

GROUND FLOOR

(E) CONTROL PANEL - TEMPORARILY

RELOCATED FROM GROUND FLOOR,

RM. 0216 AND COMMISSIONED

(E) MANIFOLD - TEMPORARILY

RELOCATED FROM GROUND

FLOOR, RM. 0216

NEW RELIEF VENT ROUTING AND SIZE

TO MATCH SIZE AND ROUTING OF (E)

RELIEF VENT

W

X

PLUMBING NEW WORK KEYNOTES:

(NOTE: NOT ALL KEYED NOTES APPLY TO THIS DRAWING)

1. CONTRACTOR SHALL CONTRACT WITH VAMC MEDICAL AIR SYSTEMS VENDOR (CARDINAL AIR : CONTACT CARMINE YEVOLI;

(516)-352-0011) TO REMOVE AND RELOCATE THE NON-FLAM NITROGEN AND NITROUS OXIDE GAS SYSTEMS FROM THE EXISTING

GROUND FLOOR NON FLAM GAS RM 0216 TO THE FIRST FLOOR SECONDARY MANIFOLD ROOM 1091S.

THE ACTUAL RELOCATION OF MANIFOLDS, CONTROL PANELS, HEADERS, ETC. WORK SHALL OCCUR OVER A LIMITED CONTINOUS SHORT

TIME DURATION (ONE WEEKEND MAXIMUM). INSTALLATION OF TEMPORARY MEDICAL AIR PIPING TO EXISTING RISERS; POWER AND

MECHANICAL VENTILATION SHALL BE PRE- INSTALLED IN PREPARATION OF A QUICK CHANGE-OVER. VAMC WILL RELY ON THE EXISTING

SECONDARY MANIFOLD SYSTEM FOR NITROGEN AND NITROUS OXIDE NEEDS DURING THE CHANGE-OVER. NITROGEN AND NITROUS

OXIDE SUPPLY TO THE VAMC SYSTEM SHALL REMAIN CONSTANT WITHOUT NO INTERRUPTION IN SERVICE.

2. SCOPE OF WORK SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:

- SWITCH VAMC SUPPLY OF NITROGEN AND NITROUS OXIDE GAS SUPPLY OVER TO SECONDARY MAINFOLD SYSTEM AT FIRST FLOOR.

- DISCONNECT AND RELOCATE EXISTING VENDOR OWNED MANIFOLDS , HEADERS, ALARMS AND CONTROLS, GAS BOTTLES AND ALL

APPURTENANCES. MOVE (NITROGEN & NITROUS OXIDE) SYSTEMS TO THE FIRST FLOOR SECONDARY MANIFOLD ROOM 1091S.

CAP EXISTING HEADER PIPING AT RISER.

- SHUT-VALVES FOR EACH RESPECTIVE RISER TO BE TEMPORARILY CLOSED.

- PROVIDE TIE-IN CONNECTION FROM FIRST FLOOR SECONDARY MANIFOLD ROOM 1091S TO GROUND FLOOR EXISTING RISERS AS

SHOWN ON PLANS SHOWN.

- COMMISSION, TEST AND CERTIFY SYSTEM.

- CHANGE-OVER NITROGEN AND NITROUS OXIDE SUPPLY FROM SECONDARY MAINFOLD SYSTEM TO TEMPORARY SYSTEM.

3. MECHANICAL CONTRACTOR TO PROVIDE ADEQUATE VENTILATION AS REQUIRED (500 CFM). REFER TO THE

MECHANICAL DRAWINGS.

4. ELECTRICAL CONTRACTOR TO PROVIDE 120V/1/60 TEMPORARY POWER CIRCUIT SERVING THE MANIFOLDS.

REFER TO ELECTRICAL DRAWINGS.

5. CARDINAL AIR SHALL PROVIDE PORTABLE NITROGEN AND NITROUS OXIDE BOTTLED SYSTEMS TO AREA'S

DESIGNATED IN THE CONTRACTORS WORK PLAN FOR ANY DOWN TIME DURING THE CHANGE OVER OR DOWN TIME

OF THESE GAS SYSTEMS AS PER VA CFM. CONTRACTOR TO COORDINATE DOWNTIME WITH THE VA.

6. THE OPERATION OF SEQUENTIALLY CLOSING AND OPENING THE NITROUS OXIDE AND NITROGEN SYSTEM

SHUT OFF VALVES SHALL BE DONE BY CARDINAL AIR.

7. FIRE STOP ALL PIPE WALL AND FLOOR PENETRATIONS.

8. AT THE COMPLETION AND VAMC / CFM ACCEPTANCE OF THE RENOVATIONS TO THE GROUND FLOOR NON FLAMMABLE GAS

0215B, THE TEMPORARY NITROGEN AND NITROUS OXIDE SYSTEMS SHALL BE RE-LOCATED FROM THE SECONDARY MANIFOLD ROOM

1091S TO THE NON FLAMMABLE GAS 0215B. THE SAME PROTOCOLS AND MOP REQUIREMENTS SHALL BE COMPLIED WITH.

9. AT THE COMPLETION AND VAMC / CFM ACCEPTANCE OF THE RENOVATIONS TO THE GROUND FLOOR NON FLAMMABLE GAS

0215B, THE EXISTING NITROGEN AND NITROUS OXIDE SYSTEM WITHIN THIS ROOM SHALL BE RECOMISSIONED AND SERVE AS THE

EMERGENCY BACKUP AS IT WAS ORIGINALLY.

THE CONTRACTOR SHALL FOLLOW OUTGAGE NOTIFICATION TIME FRAMES LISTED IN SPECIFICATIONS.

SHEET NOTES:

1. SEE SHEET A-P001 FOR SYMBOLS AND ABBREVIATIONS.

2. SEE A-P501 SERIES FOR PLUMBING DETAILS.

3. SEE A-P700 SERIES FOR PLUMBING SCHEDULES.

4. ALL DAMAGE TO FLOOR SURFACES AS A RESULT OF THIS WORK, TO BE PATCHED TO MATCH ADJACENT SURFACES.

5. WHERE APPLICABLE, REFER TO DRAWING LS-001 FOR FIRE AND SMOKE BARRIER WALL LEGEND.

6. CARDINAL AIR TO VERIFY EXISTING PIPE SIZES PIPING AND COORDINATE PIPE CONNECTION LOCATIONS WITH SITE CONDITIONS.

TM KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022 A-P402

PLUMBING ENLARGED PLANS -

FIRST FLOOR

PLAN

NORTH

PLUMBING ENLARGED DEMO PLAN - FIRST FLOOR

PLAN

NORTH

PLUMBING ENLARGED TEMPORARY PLAN - FIRST FLOOR - NEW WORK

AutoCAD SHX Text

(E)CONTROL PANEL 120V/1/60, TYPICAL

AutoCAD SHX Text

(E) MANIFOLD (TYP.)MANIFOLD (TYP.)

AutoCAD SHX Text

(E)GAS CYLINDERS (TYP.)

AutoCAD SHX Text

(E)1 1/2" N20 PIPE FROM FLOOR BELOW

AutoCAD SHX Text

(E)1 1/2" NITROGEN PIPE FROM FLOOR BELOW

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)RELIEF VENT

AutoCAD SHX Text

AutoCAD SHX Text

(E)RELIEF VENT FROM MANIFOLDS TO EXTERIOR

AutoCAD SHX Text

SECONDARY MANIFOLD RM

AutoCAD SHX Text 1091S

AutoCAD SHX Text

(E) RELIEF VENTRELIEF VENT

AutoCAD SHX Text

(E)CONTROL PANEL 120V/1/60, TYPICAL

AutoCAD SHX Text

(E) MANIFOLD (TYP.)MANIFOLD (TYP.)

AutoCAD SHX Text

(E)GAS CYLINDERS (TYP.)

AutoCAD SHX Text

(E)1 1/2" N20 PIPE FROM FLOOR BELOW

AutoCAD SHX Text

(E)1 1/2" NITROGEN PIPE FROM FLOOR BELOW

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)RELIEF VENT

AutoCAD SHX Text

AutoCAD SHX Text

(E)RELIEF VENT FROM MANIFOLDS TO EXTERIOR

AutoCAD SHX Text

(E) RELIEF VENTRELIEF VENT

AutoCAD SHX Text

SECONDARY MANIFOLD RM

AutoCAD SHX Text 1091S

AutoCAD SHX Text

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text C7

C2

DN

1 21 3

2" V

FS-1

REFR 3

3070C

FD-3

DN DN

161412

21 3

FREEZER 1

3093E

FREEZER 2

3096E

REFRIGERATOR 1

3092E

REFRIGERATOR 2

3095E

2" VENT PIPE

FROM BELOW

3" SAN BFF

3" SAN BFF

2" V

FS-121

2" VENT PIPE

FROM BELOW

3" SAN BFF

3" SAN BFF

2" V

FS-1

2" V 2" V

1. SEE SCHEDULE FOR FLOOR SINK BASIS OF DESIGN.

2. REFER TO DETAIL F6 THIS DRAWING FOR ADDITIONAL INFORMATION.

3. PROVIDE FLOOR PENETRATIONS WITH SLEEVE AND APPROVED FIRE STOP MATERIAL ALL AROUND PIPE

AS SPECIFIED.

4. PROVIDE 8"x8" SQUARE GRATE, TO FIT MATCH THE TILE QUERRY FLOOR SIZE.

5. PROVIDE NEW FLOOR DRAIN BODY ASSEMBLY AND COVER.

PLUMBING KEYNOTES:

GENERAL NOTES:

1. REFER TO DRAWING A-P001 FOR SYMBOLS AND ABBREVIATIONS

2. REFER TO ARCHITECTURAL DRAWING AE1030 FOR ADDITIONAL INFORMATION.

X

181614

EE

1" NPT

DRAIN

COPPER DRAIN LINE

CLAMP AND SECURE

DRAIN LINE IN PLACE

'P' TRAP

PROVIDED AIR GAP (SPACING)

BETWEEN DRAIN RECEPTACLE

AND DRAIN LINE

MINIMUM 3" SPACE

REQUIRED FOR CLEANING

WALK-IN BOX'S

INSULATED WALL

REFRIGERATOR FLOOR

WALK-IN

BOX'S

CEILING

HVAC REFRIGERATION

EQUIPMENT

FLOOR

RUN CONDENSATE DRAINS FOR NEW

COOLERS/FREEZERS TO NEW FLOOR DRAINS

ADJACENT TO COOLERS/FREEZERS. PIPE

SHALL BE 1” TYPE L HARD COPPER

WITH "P" TRAP AND 6” AIR GAP AT FLOOR

SINK.

PIPE DRAIN

THIRD FLOOR

CEILING

SECOND FLOOR CEILING

SALAD

PREP

0380C

3" SAN

FS-1

2" V

THIRD FLOOR

CEILING

SECOND FLOOR CEILING

FS-1

3" SAN

2" V

FS-1

3" SAN

2" V

2" V

REFRIGERATOR 1

3092E

THIRD FLOOR

CEILING

SECOND FLOOR CEILING

REFRIGERATOR 2

3095E

WALL WALL

TM KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022

PLAN

NORTH

PLUMBING SANITARY AND VENT ENLARGED PLAN - NEW WORK

D2

PLAN

NORTH

D6

WALK IN REFRIGERATOR CONDENSATE DRAIN LINE DETAIL

F6

E1

A-P403

PLUMBING ENLARGED PLANS,

RISER AND DETAIL - THIRD FLOOR

E4

PARTIAL SANITARY AND VENT RISER DIAGRAM

PLUMBING SANITARY AND VENT ENLARGED PLAN - NEW WORK

PARTIAL SANITARY AND VENT RISER DIAGRAM

AutoCAD SHX Text

(E)3-COMP SINK

AutoCAD SHX Text

(E)4"SAN BFF

AutoCAD SHX Text (E)1-1/2" V

AutoCAD SHX Text (E)2" V

AutoCAD SHX Text (E)2V

AutoCAD SHX Text

SALAD PREP

AutoCAD SHX Text 0380C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 3102E

AutoCAD SHX Text 3077C

AutoCAD SHX Text

DISTR

AutoCAD SHX Text 3100E

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text 3101C

AutoCAD SHX Text

STORAGE ROOM

AutoCAD SHX Text 3102C

AutoCAD SHX Text

LC

AutoCAD SHX Text 3103C

AutoCAD SHX Text

JC

AutoCAD SHX Text 3078C

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text (E)2V

AutoCAD SHX Text

(E)4"SAN BFF

AutoCAD SHX Text (E)1-1/2" V

AutoCAD SHX Text

(E)SAN FROM 3-COMP SINK

AutoCAD SHX Text

(E)SAN

AutoCAD SHX Text

(E)SKSK

AutoCAD SHX Text (E)2" V

AutoCAD SHX Text (E)2" V

AutoCAD SHX Text

(E)4"SAN BFF

AutoCAD SHX Text

(E)4"SAN BFF

AutoCAD SHX Text

AIR IN

AutoCAD SHX Text

AIR IN

AutoCAD SHX Text

AIR IN

AutoCAD SHX Text

AIR FLOW OUT

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)3-COMP SINK

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text (E)2" V

AutoCAD SHX Text (E)1-1/2" V

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text (E)2" V

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text (E)2" V

AutoCAD SHX Text (E)2" V

AutoCAD SHX Text F I R S T A V E N U E

AutoCAD SHX Text A S S E R L E V Y P L A C E

AutoCAD SHX Text E A S T 2 3 r d. S T R E E T

AutoCAD SHX Text

BLDG 3

AutoCAD SHX Text

BLDG 2

AutoCAD SHX Text

BLDG 4 / 5

AutoCAD SHX Text

E A S T 25 TH STREET

AutoCAD SHX Text

BLDG 1

AutoCAD SHX Text N

AutoCAD SHX Text

BLDG 6

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text

NOT TO SCALE

NOT TO SCALE

FLOOR

CLEANOUT

BASEMENT

VARIES

VARIES

CONCRETE SLAB

CRAWL SPACE BELOW GROUND FLOOR

MAIN STORM DRAIN (SD)

FOR NON-INSULATED PIPE

CONCRETE FLOOR

ELCEN FIG. 39

PIPE CLAMP SUPPORT

4" ABOVE FLOOR

SEE SPECS. FOR MATERIALS

FLOOR SLEEVE

CLEARANCE

1/2" MINIMUM

FOR INSULATED PIPE

MASTIC ALL AROUND

TAPE FITTING COVER

TO INSULATION VAPOR

BARRIER AS REQUIRED

PIPE INSULATION

WHERE REQUIRED

PREMOLDED ONE PIECE PVC

INSULATED FITTING COVER

BOTH SIDES, THE INSULATION END TREATMENT

PIPE IS REQUIRED TO BE INSULATED ON

ONE SIDE OF CONCRETE FLOOR. WHERE

NOTE: DETAIL ILLUSTRATES PIPE INSULATION ON

SHALL BE DUPLICATED ON BOTH SIDES.

FIREWALL

FOR NON-INSULATED PIPE

FOR INSULATED PIPE

WALL SLEEVE SEE

SPECS. FOR MATERIALS

TAPE INSULATION

COVER TO FIRE

PENETRATION SLEEVE

ASSEMBLY TO MAINTAIN

VAPOR BARRIER

PIPE INSULATION WITH

VAPOR BARRIER WHERE

REQUIRED

DETAIL ILLUSTRATES PIPE INSULATION ON ONE SIDE OF FIRE

RATED WALL. WHERE PIPE IS REQUIRED TO BE INSULATED ON

BOTH SIDES, THE INSULATION END TREATMENT SHALL BE

DUPLICATED ON BOTH SIDES.

NOTE:

NON-FIRE RATED WALL

NOTE: DETAIL ILLUSTRATES PIPE INSULATION PASSING THRU WALL.

FOR INSULATED PIPE

WALL SLEEVE TO BE LARGE

ENOUGH TO ACCOMODATE

PIPE AND PIPE INSULATION.

SEE SPECIFICATIONS FOR

MATERIALS.

NON-FIRE RATED WALL

NOTE: DETAIL ILLUSTRATES PIPE INSULATION PASSING THRU WALL.

FOR INSULATED PIPE

PIPE INSULATION

WHERE REQUIRED

NON-FIRE RATED WALL PIPE PENETRATION DETAIL

BRANCH STORM DRAIN (SD)

PIPE

PIPE INSULATION

HEAT TRACE CABLE

INSTALL AS PER

MANUFACTURE'S

RECOMMENDATIONS

ELECTRICAL

SOURCETEMPERATURE CONTROL

END CAP

SPLICER

(IF REQUIRED)

WARNING LABELS AS PER

MANUFACTURE'S

RECOMMENDATIONS

HOLD DOWN STRAPS

AS PER MANUFACTURE'S

RECOMENDATIONS

UNION

CALIBRATED BALANCING

VALVE

RCP-1 & RCP-1A, IN-LINE CIRCULATING PUMP

SHOWN IN VERTICAL POSITION, TO BE

MOUNTED IN HORIZONTAL POSITION

BALL VALVE

UNION

STRAINER

CHECK VALVE

UNION

CALIBRATED BALANCING

VALVE

(STANDBY) IN-LINE

CIRCULATING PUMP

BALL VALVE

UNION

STRAINER

CHECK VALVE

TYPE 40

PROTECTION

SHIELD

INSULATION

PIPE

INSERT

RIGID INSULATION

PIPING

HANGER

TYPE 43 PIPE

THREADED ROD

HANGER

TYPE 1 PIPE

PIPING-2 1/2" AND SMALLERPIPING-3" AND LARGER

METAL CHANNEL STRUT

UNINSULATED COPPER LINES

AND LARGER.

INSULATION SHIELD ON 3"

PIPE CLAMP. PROVIDE

INSULATED PIPE LINE WITH

HANGER ROD

OR NYLON INSULATOR

PIPE CLAMPS WITH ELASTOMER

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

mm

[IN]

mm

[FT]

mm

[FT]

THRU 20

[THRU

[7]

[5]

[1]

[7]

[6]

[1

[7]

[7]

[1

[9]

[8]

[2]

[10]

[8]

[2

[11]

[9]

[3]

[12]

[10]

[4]

[14]

[12]

[5]

[16]

[13]

[6]

[17]

[14]

[8]

[19]

[16]

[10]

[22]

[12]

[23]

[14]

[25]

[16]

[27]

[18]

[28]

[20]

[30]

[24]

[32]

NOTE:

INSULATION SHIELD LENGTH, X

GAUGE

12"

12"

1"

12"

12"

3/4"

24"

18"

24"

18"

18"18"

LOCK NUT

HANGER

PIPING

INSULATION

12"

12"

1/2"

18"

24"

18"

4"

6"

5"

8" TO 14"

1/2" TO 3"

PIPE SIZE

THREADED ROD

X"

X/2" X/2"

TYPICAL FOR

INSULATED PIPING

HANGER SHIELD IS

INSULATION SHIELD

INSULATION THICKNESS

DETAIL NOTES

DRAIN PIPE-SEE FLOOR PLANS.

NEOPRENE GASKET

IS COMPLETE.

FLOOR DRAIN INSTALLATION

NEW CONCRETE FILL AFTER

FLOOR DRAIN ASSEMBLY.

SLAB TO ACCOMMODATE NEW

BREAK INTO EXST CONCRETE

EXISTING CONCRETE SLAB

MEMBRANE. SEE ARCHITECTURAL DWGS.

MINIMUM 36" DIAMETER WATERPROOF

SEE ARCHITECTURAL DWGS.

SCREED FINISH OR SIMILAR

ADJUSTABLE STRAINER

FLASHING COLLAR

FLOOR FINISH. SEE ARCHITECTURAL DWGS

6 7 8

2 3 4 5

PROVIDE TRAP PRIMER CONNECTION

(WHERE SHOWN ON PLANS)

UL LISTED FILL FOR USE IN THROUGH

PENETRATION FIRE STOPS. SEE A-AE500 SERIES

FOR SUGGESTED ASSEMBLIES (SHEETS A-AE510

TO A-AE516). FIRE RATING OF PENETRATION

ASSEMBLY TO MATCH FIRE RATING OF

PARTITION

UL LISTED FILL FOR USE IN THROUGH

PENETRATION FIRE STOPS. SEE A-AE500 SERIES

FOR SUGGESTED ASSEMBLIES (SHEETS A-AE510

TO A-AE516). FIRE RATING OF PENETRATION

ASSEMBLY TO MATCH FIRE RATING OF

PARTITION

PROVIDE TRAP PRIMER CONNECTION

(WHERE SHOWN ON PLANS)

FUNNEL - PROVIDE WHERE INDICATED

ON FLOOR PLANS

HWR

HWR

HWR

HW

R

HW

R

HWR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022 TM KS

A-P501

PLUMBING DETAILS

AutoCAD SHX Text

PIPING ABOVE AND BELOW MAT DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

PIPING FLOOR SLEEVE DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FIRE RATED WALL PIPE PENETRATION DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

HEAT TRACE DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

DOMESTIC HOT WATER CIRCULATING PUMP DETAIL

AutoCAD SHX Text

PIPE HANGERS SUPPORT SPACING

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

INSULATION SHIELD DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

TRAPEZE HANGAR SUPPORT DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FIRE RATED WALL PIPE PENETRATION DETAIL

AutoCAD SHX Text

AutoCAD SHX Text A-P501

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A-P501

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

FLOOR DRAIN DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A-P501

AutoCAD SHX Text A-P501

AutoCAD SHX Text A-P501

AutoCAD SHX Text A-P501

AutoCAD SHX Text A-P501

AutoCAD SHX Text A-P501

AutoCAD SHX Text A-P501

AutoCAD SHX Text A-P501

A-P501

STAFF SHOWER (P701) DETAIL

SLOPE ENTIRE

SHOWER FLOOR

(ASSUMES

TOPPING SLAB)

24" SLIDE

BAR

SHOWER

HEAD

DRAIN

INTEGRAL

VACUUM

BREAKER

NOTE: LINEAR TRENCH DRAIN AT SHOWER

ENTRANCE IS AN ACCEPTABLE OPTION.

SHOWER CONTROL

TYPE T/P OFFSET MAX

TO THE RIGHT OF

SHOWER HEAD

CONTROL AREA

OFFSET TO OUTSIDE

NOTE:

FOR ADDITIONAL INFORMATION

REFER TO D7/A-AI201

REFER TO

SPECIFICATIONS

FOR HOSE TYPE

AND LENGHT

NOT TO SCALE

EEW/SH (P707) DETAIL

HEADS

BOWL &

EYEWASH

OPERATOR

EYEWASH

OPERATOR

SHOWER

SHOWER HEAD

NOT TO SCALE

WATER CLOSET (P103) DETAIL - SENSOR OPERATED

INSTEAD OF USING A DOUBLE NUT - A

PIPE SLEEVE OVER ROD MAY BE USED

HANGER ROD

SUPPORT FOOT

INSTA…