A-Electrical-Part 1.pdf
PDF 9 MB Posted
- Solicitation number
- QSE--36C10F24R50018
About this file
This document appears to be a set of electrical drawings for a construction project at the VA NY Manhattan Campus. The drawings include plans for demolition and new electrical work on the ground, third, and fourth floors, as well as electrical schedules, riser diagrams, and details.
The related federal contract opportunity is Solicitation Number QSE-36C10F24R50018 for the "Balance of Work VAMC Manhattan, NY -- Y1DA" project. This project involves constructing the Manhattan Hurricane Sandy Recovery Program Balance of Work at the VAMC Manhattan Campus of the VA NY Healthcare System. The solicitation is being issued by the Department of Veterans Affairs Office of Construction and Facilities Management.
View the file
Other files
Show 40 more
Latest 50 of 281 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL SYMBOLS - LIGHTING PLAN ELECTRICAL SYMBOLS - POWER PLAN
SPECIAL OUTLETS SCHEDULE
ABBREVIATIONS
ELECTRICAL SYMBOLS - GENERAL
S
S
C1
F6
C-ED462
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022 A-E001
ELECTRICAL SYMBOLS AND
ABBREVIATIONS
SN KS
GENERAL NOTESDEMOLITION GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022 SN KS
A-E002
ELECTRICAL DEMOLITION AND
GENERAL NOTES
PROPOSED NEW (NOT REPLACEMENT) PANELBOARD DESIGNATIONS
PROPOSED NEW (NOT REPLACEMENT) EQUIPMENT DESIGNATIONS
WIRE AND CONDUIT SCHEDULE **
LIGHTING FIXTURE SCHEDULE LIGHTING FIXTURE SCHEDULE
PROPOSED NEW/REPLACEMENT EQUIPMENT IDENTIFICATION SIGNS
PANEL 1PSL
CRITICAL
208/120V, 3Ø - 4W 225A MCB, 22k AIC
FED FROM: PANEL 1DSL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022 SN KS
A-E003
ELECTRICAL SCHEDULES
Z
S
U
T
DN
RAMP
Z
AA
Y
AA
V
W
X
EX
EX
S S
S
S
SS
S
SSSSS
S S S S S
S
SS S
S S
SS
S S
S
S
S
S
S S S S
S
S SS
S S
S
S
S
S
S
S
S
S
S
S
S S
S
S S S
S
S
AA
EX
S S
MA
TC
H
LIN
E, F
OR
C
ON
TI
NU
AT
IO
N, S
EE
A -E
DL
U
T
V
W
X
Y
Z
AA
S
11 12 14 16 20 22 24 26 28 30 3218
MATCH LINE, FOR CONTINUATION, SEE A-EDL102
MATCH LINE, FOR CONTINUATION, SEE A-EDL102
PARTIAL GROUND FLOOR PLAN - PART A - LIGHTING - DEMOLITIOND1
7 7 7
7 7 7 7
PLAN
NORTH
GENERAL NOTESKEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EDL101
PARTIAL GROUND FLOOR PLAN -
PART A - LIGHTING - DEMOLITION
EE
161412
BB
323028
DD
EE
CC
DD
AA
BB
EE
BB
DD
EE
DD
BB
18 20 22 23 24 2611
R E
E TSWITCHGEAR / CHILLER
BUILDINGS 4 / 5
RAMP DN
EX EX EX EX EX EX
EX
EX
EX
EX
EX
EX
EX
AA
EX
HH
AA
11 12 14 16 20 22 24 26 28 30 3218 23
MATCH LINE, FOR CONTINUATION, SEE A-EDL101
MATCH LINE, FOR CONTINUATION, SEE A-EDL101
PARTIAL GROUND FLOOR PLAN - PART B - LIGHTING - DEMOLITIOND1
PLAN
NORTH
GENERAL NOTESKEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EDL102
PARTIAL GROUND FLOOR PLAN -
PART B - LIGHTING - DEMOLITION
U
T
V
W
2 3 4 5 7 9
U
Z
Y
S
S S
S S
S S
X
U
T
V
W
X
S
1 2 3 4 5 7 9
MA
TC
H
LIN
E, F
OR
C
ON
TI
NU
AT
IO
N, S
EE
A -E
DL
PARTIAL GROUND FLOOR PLAN - PART C - LIGHTING - DEMOLITIOND6
PLAN
NORTH
PARTIAL PLAN - G204AS MEZZANINE - LIGHTING - DEMOLITIONB2
NORTH
3 4
V
GENERAL NOTESKEY NOTES
B2
A-EDL103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EDL103
PARTIAL GROUND FLOOR PLAN -
PART C - LIGHTING - DEMOLITION
18161412
CC
DD
Z
AA
BB
Y
HH
PARTIAL THIRD FLOOR PLAN - LIGHTING - DEMOLITIONF5
NORTH
GENERAL NOTES
KEY NOTES
2018161412
U
V
W
X
U
V
W
X
Y
Z
AA
BB
DD
EE
CC
4 4 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EDL130
SN KS
PARTIAL THIRD FLOOR PLAN -
LIGHTING - DEMOLITION
U
T
DN
RAMP
Z
AA
Y
AA
V
W
X
EX
EX
S S
S
S
SS
S
SSSSS
S S S S S
S
SS S
S S
SS
S S
S
S
S
S
S S S S
S
S SS
S S
S
S
S
S
S
S
S
S
S
S
S S
S
S S S
S
S
AA
EX
S S
MA
TC
H
LIN
E, F
OR
C
ON
TI
NU
AT
IO
N, S
EE
A -E
DP
U
T
V
W
X
Y
Z
AA
S
11 12 14 16 20 22 24 26 28 30 3218
MATCH LINE, FOR CONTINUATION, SEE A-EDP102MATCH LINE, FOR CONTINUATION, SEE A-EDP102
PARTIAL GROUND FLOOR PLAN - PART A - POWER - DEMOLITIOND1
PLAN
NORTH
GENERAL NOTESKEY NOTES KEY NOTES (CONTINUED)
D6
A-EDP411
24 24
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EDP101
SN KS
PARTIAL GROUND FLOOR PLAN -
PART A - POWER - DEMOLITION
161412
BB
323028
DD
EE
CC
DD
AA
BB
EE
BB
DD
EE
DD
BB
18 20 22 23 24 2611
SWITCHGEAR / CHILLER
BUILDINGS 4 / 5
RAMP DN
EX EX EX EX EX EX
EX
EX
EX
EX
EX
EX
EX
AA
EX
HH
AA
11 12 14 16 20 22 24 26 28 30 3218 23
MATCH LINE, FOR CONTINUATION, SEE A-EDP101MATCH LINE, FOR CONTINUATION, SEE A-EDP101
PARTIAL GROUND FLOOR PLAN - PART B - POWER - DEMOLITIOND1
PLAN
NORTH
GENERAL NOTESKEY NOTES (CONTINUED)
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EDP102
SN KS
PART B - POWER - DEMOLITION
T
V
W
2 3 4 5 7 9
U
Z
AA
Y
BUILDING No. 3
E A S
T 2 3 r d . S
T R E
E
S
S S
S S
S S
X
MA
TC
H
LIN
E , F
OR
C
ON
TI
NU
AT
IO
N, S
EE
A -E
DP
U
T
V
W
X
1 2 3 4 5 7 9
PARTIAL GROUND FLOOR PLAN - PART C - POWER - DEMOLITIOND6
PLAN
NORTH
GENERAL NOTESKEY NOTES
10 11
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EDP103
SN KS
PART C - POWER - DEMOLITION
CC
DD
Z
AA
BB
Y
EE
HH
GENERAL NOTES2018161412
U
V
W
X
U
V
W
X
Y
Z
AA
BB
DD
CC
PARTIAL THIRD FLOOR PLAN - POWER - DEMOLITIONF5
NORTH
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EDP130
SN KS
POWER - DEMOLITION
CC
DD
Z
AA
BB
Y
EE
HH
2018161412
X
Y
Z
AA
BB
DD
EE
CC
PARTIAL FOURTH FLOOR / ROOF PLAN - POWER - DEMOLITIONF5
NORTH
GENERAL NOTES
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EDP140
SN KS
PARTIAL FOURTH FLOOR, ROOF
PLAN - POWER - DEMOLITION
10 11
W
X
V
W
X
Y
11 12 13
PARTIAL FIRST FLOOR PLAN - POWER - TEMPORARYD6
NORTH
GENERAL NOTESKEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EDP411
SN KS
PARTIAL FIRST FLOOR PLAN -
POWER - TEMPORARY
U
T
DN
RAMP
33 35
Z
AA
Y
AA
V
W
X
EX
EX
S S
S
S
SS
S
SSSSS
S S S S S
S
SS S
S S
SS
S S
S
S
S
S
S S S S
S
S SS
S S
S
S
S
S
S
S
S
S
S
S
S S
S
S S S
S
S
AA
EX
S S
VEST.
G208S
CORR.
0257E
COPY
ROOM
0272DN
OFFICE
0272EN
OFFICE
0272FN
OFFICE
0272GN
EMS
OFFICES
0272N
MECH
ROOM
0272CN
CORR.
0271N
OFFICE
0264AN
MECH
ROOM
0269N
MECH
ROOM
0270N
OFFICE
0272BN
OFFICE
0272AN
ENG
OFFICE
0262N
CLEAN
LINEN
0264N
EMS
STOR.
0253N
STAIR
0254N
CORR.
0241N
WOMENS
0248N
MENS
0247N
CORR.
0252E
EMS EQ.
STOR.
0251E
BLUE TRUCK
STAGING
0254E
SUPPLY PALLET
BREAK DOWN
0253E
WAREHOUSE
0250E
LINEN
CHUTE
0244N
BED STOR.
0213E
ELEC. RM
0249E
PROCESSING
0215E
W H
. S U
PV
AE
CORR.
0243N
BIOMED
0212E
EMPTY
CANISTERS
0210E
ENTRY
0214ELOADING
DOCK
NON-FLAM
GAS 0215B
CMPRSSD
GAS 0215A
ENTRY
0211E
SPRINKLER
RISER RM
0211AE
PROP.
MANAG.
0230E
TEMP.
HOLDING
0230AE
FORKLIFT AND
PALLET TRUCK
PARKING
0203E
CORR.
0241N
CORR.
0245N
FEMALE
TOILET
G383
CORR.
0257E
CORR.
0257E
MA
TC
H
LIN
E, F
OR
C
ON
TI
NU
AT
IO
N, S
EE
A -E
L1
U
T
V
W
X
Y
Z
AA
S
11 12 14 16 20 22 24 26 28 30 3218
MATCH LINE, FOR CONTINUATION, SEE A-EL102MATCH LINE, FOR CONTINUATION, SEE A-EL102
PARTIAL GROUND FLOOR PLAN - PART A - LIGHTING - NEW WORKD1
NORTH
GENERAL NOTESKEY NOTES
222018161412 23 302624
18.2 20.5 22.818.1 22.9
Z.8
S S
S
S
SS
S
SSSSS
S S S S S
S
SS S
S S
SS
S S
S
S
S
S
S S S S
S
S SS
S S
S
S
S
S
S
S
DN
S
S
S
S S
S
S S S
S
S
AC
U-
EX EX EX EX EX EX
PB PB
PB
PB
PB
PBPB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
KS
PB
PB
PB
KS /
PB
PB
PB
S
S S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EL101
SN KS
PART A - LIGHTING - NEW WORK
161412
BB
323028
DD
EE
CC
DD
AA
BB
EE
BB
DD
EE
DD
BB
18 20 22 23 24 2611
R E
E TSWITCHGEAR / CHILLER
BUILDINGS 4 / 5
RAMP DN
EX EX EX EX EX EX
EX
EX
EX
EX
EX
EX
EX
AA
EX
HH
LOGISTICS &
INVENTORY
MANAGEMENT
OFFICES
0255E
LOGISTICS
0236E
OFFICE
0255DE
OFFICE
0255FE
OFFICE
0255EE
CORR.
0257E
OFFICE
0216AE
ENGINEERING
STOR.
0233E
CANTEEN
STOR.
0234E
IRM
0234E
RECEIVING
0216E
SPECIAL
STOR.
0218AE
STOR.
0218E
OFFICE
0255BE
OFFICE
0255AE
LOADING
DOCK
LOADING
DOCK
COPY
ROOM
0255CE
IT ROOM
(TR-E)
0256E
SEC. CLOS.
0258E
0230E
LOGISTICS
0236ELOGISTICS
0236E
CORR.
0257E
CORR.
0257E
AA
11 12 16 20 22 24 26 28 30 3223
MATCH LINE, FOR CONTINUATION, SEE A-EL101MATCH LINE, FOR CONTINUATION, SEE A-EL101
1 1
PARTIAL GROUND FLOOR PLAN - PART B - LIGHTING - NEW WORKD1
PLAN
NORTH
GENERAL NOTESKEY NOTES
DN
DD
222018161412 23 302624
Z.8
BB.5
20.5
22.818.1 22.9
BB.5
EX EX EX EX EX EX
DD.5
DD.5
AA.5
DD.8
DD.8
AA.5
PB
PB
PB PB
PB
PB
PB
PB
PB
KS
/ PB
PB
PB
KS/
PB
PB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EL102
SN KS
PART B - LIGHTING - NEW WORK
T
V
W
2 3 4 5 7 9
U
Z
AA
Y
X
RADIOACTIVE
GAS METER
G204AS
PAINT
SHOP
0203S0203S
PAINT SHOP
STOR.
0203S
CORR
G201S
MEN'S
LOCKERS
G204BS
WOMEN'S
LOCKERS
G205S
VEST.
G204CS
CORR.
G297S
VEST.
REGULATED
MEDICAL WASTE
G206S
INTERIM
STORAGE
G207S
EMPTY SHARPS
CONTAINERS
G204S
VEST.
G208S
VEST
G206AS
U
T
V
W
X
S
1 2 3 4 5 7 9
MA
TC
H
LIN
E, F
OR
C
ON
TI
NU
AT
IO
N, S
EE
A -E
L1
SCALE: 1/8" = 1'-0"
8'4'0 16'
PARTIAL GROUND FLOOR PLAN - PART C - LIGHTING - NEW WORKD6
PLAN
NORTH
PARTIAL MEZZANINE PLAN - LIGHTING - NEW WORKB3
NORTH
GENERAL NOTESKEY NOTES#
3 4
V
J
TYP
S
S S
S S
CU
H-
S S
ST
B3
A-EL103
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EL103
SN KS
PART C - LIGHTING - NEW WORK
CC
DD
Z
AA
BB
Y
EE
HH
18161412
U
V
W
X
U
V
W
X
Y
Z
AA
BB
DD
EE
CC
20 22 23 26
FREEZER 1
3093E
FREEZER 2
3096E
REFRIGERATOR 1
3092E REFRIGERATOR 2
3095E
REFR 3
3070C
DN
DN DN
PARTIAL THIRD FLOOR PLAN - LIGHTING - NEW WORKF5
NORTH
GENERAL NOTES
KEY NOTES
3 3 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EL130
SN KS
LIGHTING - NEW WORK
U
T
DN
RAMP
33 35
Z
AA
Y
AA
V
W
X
EX
EX
S S
S
S
SS
S
SSSSS
S S S S S
S
SS S
S S
SS
S S
S
S
S
S
S S S S
S
S SS
S S
S
S
S
S
S
S
S
S
S
S
S S
S
S S S
S
S
AA
EX
S S
ERIM
RAGE
207S
VEST.
G208S
CORR.
0257E
COPY
ROOM
0272DN
OFFICE
0272EN
OFFICE
0272FN
OFFICE
0272GN
EMS
OFFICES
0272N
MECH
ROOM
0272CN
CORR.
0271N
OFFICE
0264AN
MECH
ROOM
0269N
MECH
ROOM
0270N
OFFICE
0272BNOFFICE
0272AN
ENGINEERING
OFFICE
0262N
CLEAN
LINEN
0264N
EMS
STOR.
0253N
STAIR
0254N
CORR.
0241N
WOMENS
0248N
MENS
0247N
CORR.
0252E
EMS EQ.
STOR.
0251E
BLUE TRUCK
STAGING
0254E
SUPPLY PALLET
BREAK DOWN
0253E
WAREHOUSE
0250E
LINEN
CHUTE
0244N
BED STOR.
0213E
ELEC. RM
0249E
PROCESSING
0215E
WH. SUPV.
0215AE
CORR.
0243N
BIOMED
0212E
EMPTY
CANISTERS
0210E
ENTRY
0214E
LOADING
DOCK
NON
FLAMMABLE
GAS
0215B
COMPRESSED
GAS
0215A
ENTRY
0211E
SPRINK.
RSR RM
0211AE
PROP.
MANAG.
0230E
TEMP.
HOLDING
0230AE
FORKLIFT AND
PALLET TRUCK
PARKING
0203E
CORR.
0241N
CORR.
G245N
FEMALE
TOILET
G383
CORR.
0257E
MA
TC
H
LIN
E, F
OR
C
ON
TI
NU
AT
IO
N, S
EE
A -E
P1
U
T
V
W
X
Y
Z
AA
S
11 12 14 16 20 22 24 26 28 3218
MATCH LINE, FOR CONTINUATION, SEE A-EP102MATCH LINE, FOR CONTINUATION, SEE A-EP102
PARTIAL GROUND FLOOR PLAN - PART A - POWER - NEW WORKD1
A-EP401
F2
A-EP401
C5
PLAN
NORTH
GENERAL NOTESKEY NOTES# KEY NOTES (CONTINUED)#
222018161412 23 302624
18.2 20.5 22.818.1 22.9
Z.8
S S
S
S
SS
S
SSSSS
S S S S S
S
SS S
S S
SS
S S
S
S
S
S
S S S S
S
S SS
S S
S
S
S
S
S
S
DN
S
S
S
S S
S
S S S
S
S
AC
U-
EX EX EX EX EX EX
PB PB
PB
PB
PB
PBPB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
KS
PB
PB
PB
KS /
PB
PB
PB
S
S S
24 24
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EP101
SN KS
PART A - POWER - NEW WORK
161412
BB
323028
DD
EE
CC
DD
AA
BB
EE
BB
DD
EE
DD
BB
18 20 22 23 24 2611
RAMP DN
EX EX EX EX EX EX
EX
EX
EX
EX
EX
EX
EX
AA
EX
HH
NON-STOR
1-1A
LOGISTICS &
INVENTORY
MANAGEMENT
OFFICES
0255E
LOGISTICS
0236E
OFFICE
0255DE
OFFICE
0255FE
OFFICE
0255EE
CORR.
0257E
OFFICE
0216AE
ENGINEERING
STOR.
0233E
CANTEEN
STOR.
0234E
IRM
0235E
RECEIVING
0216E
SPECIAL
STOR.
0218AE
STOR.
0218E
OFFICE
0255BE
OFFICE
0255AE
LOADING
DOCK
LOADING
DOCK
COPY
0255CE
IT ROOM
(TR-E)
0256E
SEC. CLOS.
0258E
0230AE
LOGISTICS
0236E
CORR.
0257E
AA
11 12 14 16 20 22 24 26 28 30 3218 23
MATCH LINE, FOR CONTINUATION, SEE A-EP101MATCH LINE, FOR CONTINUATION, SEE A-EP101
PARTIAL GROUND FLOOR PLAN - PART B - POWER - NEW WORKD1
F5
PLAN
NORTH
GENERAL NOTES
DN
DD
222018161412 23 302624
Z.8
BB.5
20.5
22.818.1 22.9
BB.5
AC
U-
EX EX EX EX EX EX
DD.5
DD.5
AA.5
DD.8
DD.8
AA.5
PB
PB
PB PB
PB
PB
PB
PB
PB
KS
/ PB
PB
PB
KS/
PB
PB
KEY NOTES#
17 17
161412
CC
DD
BB
EE
RAMP DN
HH
PARTIAL GROUND FLOOR PLAN - PART B - TEMPORARY INTERIM COOLER / FREEZERF1
NORTH
COOLER
FREEZER
DN
DN
CU CU
NOTE
ALL ELECTRICAL WORK SHOWN ON THIS PARTIAL PLAN IS TEMPORARY (GOVERNMENT PROVIDED, INSTALLED AND REMOVED) FOR INTERIM COOLER / FREEZER AND EXTERIOR CONDENSER UNITS (GOVERNMENT PROVIDED, INSTALLED AND REMOVED). CONTRACTOR SHALL PROVIDE ALL OCPD/PANELBOARD/DISCONNECT MEANS/CONTROLLERS/TEMPORARY WIRING CONNECTIONS PER CODES, AND COORDINATE THE DEMOLITION AND NEW WORK ACTIVITIES WITH THE VA CFM OFFICE FOR THIS AREA.
1 1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EP102
SN KS
PART B - POWER - NEW WORK
S
S S
PB PB
EPU
S S
STOP
S
U
T
V
W
2 3 4 5 7 9
U
Z
AA
Y
BUILDING No. 3
E A S
T 2 3 r d . S
T R E
E
S
S S
S S
S S
X
RADIOACTIVE
GAS METER
G204ASG204AS
PAINT
SHOP
0203S0203S
PAINT SHOP
STOR.
0203S
CORR
G201S
MEN'S
LOCKERS
G204BS
WOMEN'S
LOCKERS
G205S
VEST.
G204CS CORR.
G297S
VEST.
142A
REGULATED
MEDICAL WASTE
G206S
INTERIM
STORAGE
G207S
EMPTY SHARPS
CONTAINERS
G204S
VEST.
G208S
VEST
G206AS
MA
TC
H
LIN
E, F
OR
C
ON
TI
NU
AT
IO
N, S
EE
A -E
P1
U
T
V
W
X
S
1 2 3 4 5 7 9
PARTIAL GROUND FLOOR PLAN - PART C - POWER - NEW WORKD1
PLAN
NORTH
GENERAL NOTESKEY NOTES#
A-EP401
C2
11 11
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EP103
SN KS
PART C - POWER - NEW WORK
CC
DD
Z
AA
BB
Y
EE
HH
GENERAL NOTES
U
V
W
X
Y
Z
AA
BB
DD
EE
CC
HH
22 23 26
FREEZER 1
3093E
FREEZER 2
3096E
REFRIGERATOR 1
3092E REFRIGERATOR 2
3095E
REFR 3
3070C
DN DN
PARTIAL THIRD FLOOR PLAN - POWER - NEW WORKF5
NORTH
KEY NOTES1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EP130
SN KS
POWER - NEW WORK
CC
DD
Z
AA
BB
Y
EE
HH
2018161412
X
Y
Z
AA
BB
DD
EE
CC
HH
22 23 26
18161412
CC
DD
Z
AA
BB
Y
EE
PARTIAL FOURTH FLOOR / ROOF PLAN - POWER - NEW WORKF5
NORTH
GENERAL NOTES
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EP140
SN KS
PARTIAL FOURTH FLOOR, ROOF
PLAN - POWER - NEW WORK
AC
U-
16 17 18
X
W
0213E
ELEC. RM
0249E
BED STOR.
U
V
6 7 8 9
KEY NOTES
ENLARGED FLOOR PLAN - ELECTRICAL ROOMS 0167S AND 0165SC2
ENLARGED FLOOR PLAN - MECHANICAL ROOMS 0270N AND 0272CNC5
ENLARGED FLOOR PLAN - ELECTRICAL ROOM 0249EF2
ENLARGED FLOOR PLAN - SEC. CLOS. 0258E AND IT RM 0256EF5
BB
W
X
33 3534
ELEC. CAB
0167S
ELEC. RM
0165S
LOCKERS
0168S
STAIR #3
LAUNDRY
0184S
CORR.
G297S
GENERAL NOTES
MECH. RM
0270N
ENGINEERING
OFFICE
0262N
MECH. RM
0269N
COPY RM
0255CE
OFFICE
0255BE
OFFICE
0255AE
IT ROOM
(TR-E)
0256E
SEC. CLOS.
0258E
OFFICE
0255DE
LOGISTICS
0236E
LOGISTICS &
INVENTORY
MANAGEMENT
OFFICES
0255E
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
MECH. RM
0272CN
Y
COPY RM
0272DN
OFFICE
0272BN
OFFICE
0272AN
EMS
OFFICES
0272N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
ENLARGED PARTIAL GROUND
FLOOR PLANS - POWER - NEW WORK
NOTES:
N.T.S.C9 TYPICAL GROUND BAR
N.T.S.C6 TYPICAL GROUNDING SCHEME
N.T.S.C3 TYPICAL RECEPTACLE / SWITCH IDENTIFICATION
N.T.S.F9 TYPICAL SYSTEMS FURNITURE WIRING DIAGRAM
N.T.S.F6 TYPICAL CONDULET SEALING FITTINGS
N.T.S.F1 TYPICAL CONDUIT MOUNTING DETAIL
NOTES:
NOTES:
NOTES:
NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-EG501
ELECTRICAL DETAILS
N.T.S.B8 GRID CEILING RECESSED LIGHT FIXTURE MOUNTING DETAIL
N.T.S.D8 TYPICAL MULTIPLE OCCUPANCY SENSORS WITH POWER PACK
N.T.S.F8 TYPICAL OCCUPANCY SENSOR WITH OVERRIDE SWITCH
N.T.S.D6 TYPICAL 3-WAY LIGHTING CONTROL WITH MULTIPLE OCCUPANCY SENSORS
N.T.S.F6 TYPICAL SINGLE POLE LIGHTING CONTROL WITH MULTIPLE OCCUPANCY SENSORS
NOTES:
NOTES: NOTES:
N.T.S.B6 TYPICAL 4-WAY LIGHTING CONTROL WITH MULTIPLE OCCUPANCY SENSORS
NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
ELECTRICAL DETAILS
A-EG502
LEGEND
BLDG. 1 - PARTAIL POWER RISER DIAGRAM - NEW WORKF1
BLDG. 1 - PARTAIL POWER RISER DIAGRAM - DEMOLITIONC1
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022 A-E601
BLDG. 1 - PARTIAL POWER RISER
DIAGRAMS - DEMO & NEW WORK
BLDG. 1 - PARTAIL POWER RISER DIAGRAM - NEW WORKF3
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh 1, 2 and 6
Key Plan
Balance of Work
9/12/2022 A-E602
BLDG. 1 - PARTIAL POWER RISER
DIAGRAM & SCHEDULE - NEW WORK
SN KS
ERP3E
(EXIST)
3PELE
(NEW)
ERP3E
(MOD)
File details come from the government source that posted it. Updated .