Shutdown Request Form.pdf
PDF 146 KB Posted
- Solicitation number
- QSE--36C10F24R50018
About this file
This document is a Request for Utility/Equipment Shutdown form. It is used to request the shutdown of various utilities and equipment systems such as smoke detectors, sprinklers, HVAC, electrical circuits, and plumbing at a Department of Veterans Affairs (VA) facility. The form requires details on the shutdown date, time period, device/system, location, nature of the shutdown, affected areas, alternate plans, coordination with affected users, and any lockout/tag-outs required. The form must be approved by the Chief of the Engineering Service at least 48 hours prior to the shutdown, except in the case of an emergency. It also includes sections for VA personnel to be on-site, additional requirements from the VA, and the expected impact to the facility and staff. The document does not provide details on any specific federal contract opportunity.
View the file
Other files
Show 40 more
Latest 50 of 281 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR UTILITY/EQUIPMENT SHUTDOWN REQUEST#:
(SMOKE DETECTOR/SPRINKLER/ALARM (BELL CIRCUIT)/HVAC SYSTEMS/ELEC CIRCUITS/PLUMBING RISER/BRANCH/STEAM)
TO: CHIEF/ASST CHIEF, ENGINEERING SERVICE (138)
138) SECTION REQUESTING SHUTDOWN:
(SAFETY/P&D/M&R/BIOMED)
ENGINEERING EMPLOYEE REQUESTING SHUTDOWN:
(SIGNATURE) (EXT/PAGER)
IN-HOUSE/CONTRACTOR PROJECT#:
SHUTDOWN INFORMATION
SHUTDOWN DATE:
DATE DAY TIME PERIOD
DEVICE/SYSTEM: A)
B)
C)
LOCATION: BLDG: FLOOR: AREA:
NATURE OF THE SHUTDOWN (WHAT IS BEING DONE):
AFFECTED AREAS (WHOLE BLDG, ETC):
ALTERNATE PLAN (WORK AROUND):
WORK HAS BEEN COORDINATED WITH AFFECTED USERS (NAMES/AREA/PHONE OR N/A):
SPECIFIC HOURS FOR THE SHUTDOWN:
PLEASE NOTE: THIS FORM MUST BE APPROVED AT LEAST 48 HOURS
PRIOR TO THE LAST REVISION DATE FOR SHUTDOWN
EXCEPT IN THE CASE OF EMERGENCYINITIAL DATE:
LAST REVISION DATE:
LENGTH OF TIME WORK WILL TAKE:
PERSONS INVOLVED/ONSITE FROM CFM/ARGO/OTHER:
LOCKOUT/TAG OUTS REQUIRED (YES or NO):
COMPONENTS REQUIRED FOR SHUTDOWN (ACCESS TO PANELS/AREAS WITHIN THE STRUCTURE):
VA PERSONNEL TO BE ONSITE (FLICK THE SWITCH):
ADDITIONAL REQUIREMENTS NEEDED FROM VA ENGINEERING/STAFF:
EXPECTED IMPACT TO THE FACILITY/STAFF WITHIN AFFECTED AREA:
APPROVED DISAPPROVED
CHIEF, ENGINEERING SERVICE (138) CHIEF, ENGINEERING SERVICE (138)
LIST ALL PREVIOUS REVISION DATES AND COMMENTS: (LIST ALL REVISION DATES AND WHAT WAS REVISED)
New Bookmark
| Text1: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Day: |
| Time Period: |
File details come from the government source that posted it. Updated .