A-ICRA.pdf
PDF 2 MB Posted
- Solicitation number
- QSE--36C10F24R50018
About this file
This document is an Infection Control Risk Assessment (ICRA) plan for a construction project at the VA NY Manhattan Campus. The ICRA plan outlines the requirements for infection control and dust control measures to be implemented during construction activities, including the use of temporary 1-hour and 2-hour fire-rated ICRA construction barriers, HEPA filtration, walk-off mats, and daily cleaning protocols. The plan provides details on the layout and dimensions of the ICRA barriers, as well as specifications for temporary doors and hardware. It also includes notes on coordination with the VA CFM office, restrictions on construction personnel circulation, and requirements for restoring existing ceiling and MEP infrastructure after barrier removal. The ICRA plan covers the areas of work for this particular construction package, with the contractor responsible for preparing and executing any additional incidental ICRA plans as part of the base contract work.
View the file
Other files
Show 40 more
Latest 50 of 281 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ICRA SYMBOLS
PROJECT AREA LIMIT
ICRA CONSTRUCTION BARRIER WALL / DOOR
WALL (EXISTING / NEW)
MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)
HEPA FILTERHE
PA
M
H
MAT
TEMPORARY POLYETHYLENE PLASTIC
CONSTRUCTION FILM BARRIER; SEE ICRA
KEYNOTES FOR REQUIREMENTS
TC##
TEMPORARY LIGHT FIXTURE.
RESTRICTED CONSTRUCTION
SEE DWG A-GI250 FOR DOOR AND
PARTITION TYPES
FEMALE
TOILET
G383
NON-STOR
1-1A
WOMEN'S
LOCKERS
G205S
REGULATED
MEDICAL
WASTE
G206S
MEN'S
LOCKERS
G204BS
GAS METER
G204AS
PAINT
SHOP
0203S0203S
PAINT
SHOP
STORAGE
0203S0203S
EMPTY
SHARPS
CONTAINERS
G204SG204S
VESTIBULE
0208S
VESTIBULE
G204CS
G207S
INTERIM
STORAGE
CORRIDOR
G297S
CORRIDOR
G201S
DN
DD
RECEIVING
0216E0216E
OFFICE
0216AE
SPECIAL
STORAGE
0218AE0218AE
STORAGE
0218E0218E
ENGINEERING
STORAGE
0233E0233E
CANTEEN
STORAGE
0234E0234E
IRM
0235E0235E
LOGISTICS
0236E0236E
LOGISTICS
INVENTORY
MANAGEMENT
OFFICES
0255E0255E
CORRIDOR
0257E0257E
OFFICE
0255AE0255AE
OFFICE
0255BE0255BE
COPY
ROOM
0255CE
OFFICE
0255DE0255DE
OFFICE
0255EE0255EE
OFFICE
0255FE0255FE
0200B
LOADING
DOCK
0200A
LOADING
DOCK
0256E0256E
IT ROOM
(TR-E)
222018
161412 23 302624
MECHANICAL
ROOM
0269N0269N
OFFICE
0264AN0264AN
MECHANICAL
ROOM
0270N0270N
EMS
OFFICES
0272N
CLEAN
LINEN
0264N0264N
EMS
STORAGE
0253N0253N
WAREHOUSE - B
0250E0250E
PROCESSING
0215E0215E
BIOMED
0212E0212E
EMPTY
CANISTERS
0210E
ENTRY
0214E0214E
TEMPORARY
HOLDING
0230AE0230AE
PROPERTY
MANAGERS
0230E0230E
NON
FLAMMABLE
GAS
0215B
COMPRESSED
GAS
0215A
BLUE
TRUCK
STAGING
0254E0254E
SUPPLY
PALLET
BREAK
DOWN
0253E0253E
EMS
EQUIPMENT
STORAGE
0251E0251E
LINEN
CHUTE
0244N0244N
WOMENS
TOILETS
SHOWER
0248N0248N
MENS
TOILETS
SHOWER
0247N
ENGINEERING
OFFICE
0262N0262N
OFFICE
0272AN0272AN
OFFICE
0272BN0272BN
COPY
ROOM
0272DN
OFFICE
0272EN
OFFICE
0272FN0272FN
OFFICE
0272GN0272GN
MECHANICAL
ROOM
0272CN
FORKLIFT
AND
PALLET
TRUCK
PARKING
0203E0203E
ENTRY
0211E
CORRIDOR
0241N0241N
CORRIDOR
0252E
STAIRWELL
0254N
CORRIDOR
0271N0271N
CORRIDOR
G245NG245N
CORRIDOR
0243N0243N
0200A
LOADING
DOCK
WAREHOUSE
SUPERVISOR
0215AE0215AE
0211AE0211AE
SPRINKLER
RISER
ROOM
BED
STORAGE
0213E
LACTATION
ROOM
G383A
18.2 20.5 22.8
18.1
22.9
Z.8
BB.5
20.5
22.8
18.1 22.9
BB.5
CORRIDOR
0257E0257E
S
S S
S S
S
S
SS
S
SSSSS
S S S S
S
S
SS
S
S S
SS
S S
S
S
S
S
S
S S
S
S
S S
S
S
S
S
S
S
S
S
S
SECURITY
CLOSET
0258E
CORRIDOR
0241N
CORRIDOR
0202S
ELECTRIC RM
0249E
WAREHOUSE - A
0250E0250E
DN
S
VESTIBULE
142A142A
S
S
S
S
S
S S S
S
S
VEST
G206AS
AC
U-
AC
U-
EX EX EX EX EX EX
DD.5
DD.5
AA.5
DD.8
DD.8
AA.5
CU
H-
PB PB
PB PB
PB
PB
PB
PBPB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
EPU
KS
KS
PB
PB
PB
PB
KS /
PB
PB
PB
PB
KS
/ PB
PB
PB
KS/
PB
PB
S S
S
S S
G245N.1
CLOSET
S
T
O
P
FEMALE
TOILET
G383
NON-STOR
1-1A
WOMEN'S
LOCKERS
G205S
REGULATED
MEDICAL
WASTE
G206S
MEN'S
LOCKERS
G204BS
GAS METER
G204AS
PAINT
SHOP
0203S0203S
PAINT
SHOP
STORAGE
0203S0203S
EMPTY
SHARPS
CONTAINERS
G204SG204S
VESTIBULE
0208S
VESTIBULE
G204CS
G207S
INTERIM
STORAGE
CORRIDOR
G297S
CORRIDOR
G201S
DN
DD
RECEIVING
0216E0216E
OFFICE
0216AE
SPECIAL
STORAGE
0218AE0218AE
STORAGE
0218E0218E
ENGINEERING
STORAGE
0233E0233E
CANTEEN
STORAGE
0234E0234E
IRM
0235E0235E
LOGISTICS
0236E0236E
LOGISTICS
INVENTORY
MANAGEMENT
OFFICES
0255E0255E
CORRIDOR
0257E0257E
OFFICE
0255AE0255AE
OFFICE
0255BE0255BE
COPY
ROOM
0255CE
OFFICE
0255DE0255DE
OFFICE
0255EE0255EE
OFFICE
0255FE0255FE
0200B
LOADING
DOCK
0200A
LOADING
DOCK
0256E0256E
IT ROOM
(TR-E)
222018
161412 23 302624
MECHANICAL
ROOM
0269N0269N
OFFICE
0264AN0264AN
MECHANICAL
ROOM
0270N0270N
EMS
OFFICES
0272N
CLEAN
LINEN
0264N0264N
EMS
STORAGE
0253N0253N
WAREHOUSE - B
0250E0250E
PROCESSING
0215E0215E
BIOMED
0212E0212E
EMPTY
CANISTERS
0210E
ENTRY
0214E0214E
TEMPORARY
HOLDING
0230AE0230AE
PROPERTY
MANAGERS
0230E0230E
NON
FLAMMABLE
GAS
0215B
COMPRESSED
GAS
0215A
BLUE
TRUCK
STAGING
0254E0254E
SUPPLY
PALLET
BREAK
DOWN
0253E0253E
EMS
EQUIPMENT
STORAGE
0251E0251E
LINEN
CHUTE
0244N0244N
WOMENS
TOILETS
SHOWER
0248N0248N
MENS
TOILETS
SHOWER
0247N
ENGINEERING
OFFICE
0262N0262N
OFFICE
0272AN0272AN
OFFICE
0272BN0272BN
COPY
ROOM
0272DN
OFFICE
0272EN
OFFICE
0272FN0272FN
OFFICE
0272GN0272GN
MECHANICAL
ROOM
0272CN
FORKLIFT
AND
PALLET
TRUCK
PARKING
0203E0203E
ENTRY
0211E
CORRIDOR
0241N0241N
CORRIDOR
0252E
STAIRWELL
0254N
CORRIDOR
0271N0271N
CORRIDOR
G245NG245N
CORRIDOR
0243N0243N
0200A
LOADING
DOCK
WAREHOUSE
SUPERVISOR
0215AE0215AE
0211AE0211AE
SPRINKLER
RISER
ROOM
BED
STORAGE
0213E
LACTATION
ROOM
G383A
18.2 20.5 22.8
18.1
22.9
Z.8
BB.5
20.5
22.8
18.1 22.9
BB.5
CORRIDOR
0257E0257E
S
S S
S S
S
S
SS
S
SSSSS
S S S S
S
S
SS
S
S S
SS
S S
S
S
S
S
S
S S
S
S
S S
S
S
S
S
S
S
S
S
S
SECURITY
CLOSET
0258E
CORRIDOR
0241N
CORRIDOR
0202S
ELECTRIC RM
0249E
WAREHOUSE - A
0250E0250E
DN
S
VESTIBULE
142A142A
S
S
S
S
S
S S S
S
S
VEST
G206AS
AC
U-
AC
U-
EX EX EX EX EX EX
DD.5
DD.5
AA.5
DD.8
DD.8
AA.5
CU
H-
PB PB
PB PB
PB
PB
PB
PBPB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
EPU
KS
KS
PB
PB
PB
PB
KS /
PB
PB
PB
PB
KS
/ PB
PB
PB
KS/
PB
PB
S S
S
S S
G245N.1
CLOSET
S
T
O
P
EE
Z
S
U
T
S
U
Y
R
T
V
DN
RAMP
161412
V
W W
X
Z
AA
BB
2 3 4 5 7 9
U U
323028
DD
EE
CC
DD
Z
AA
BB
Y
EE
BB
AA
DD
EE
DD
BB
22 23 24 26
V
W
X
RAMP DN
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
AA
EX
HH
X
C1S
C1S
M M
2'- 6"
4 4
C1S
C1S
1 1
HEPAHEPA HEPA HEPA HEPA
HEPA
TA03
TA02
A-GI250
B1
A-GI250
B2
C1S
HEPA
M
M M
M
A-GI250
B4
A-GI250
B6
C1S
M
M
TA09
TA05
TA04
C1S
M M
TA10
M M
5'-0
CLR
HEPA
HEPA
HEPA HEPA
HEPA
HE
PA HE
PA
HE
PA
9'-0"
2'-6"
H H
5 55
C1S
2'- 6"
H5
A-GI250
B8
M
M
M
M
MMATMAT MAT MAT
MM
M
7 7
M M
C1S
3 3
TYP
TYP
TYP
TYP
TYP
TYP
TYP TYP
TYP
1. REFER TO A-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO A-AE002 FOR GENERAL NOTES.
2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS
OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE RATED
AND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.
6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER ERECTION AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS
SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.
7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED UPON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED
BASED ON SITE CONDITIONS.
8. REFER TO SHEETS A-GI201 AND A-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND
EXTENTS OF ICRA CONSTRUCTION BARRIERS.
MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ACCOMMODATE
ICRA CONSTRUCTION BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.
10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE
COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.
RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION
BARRIERS.
11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES
AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,
REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING
CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL
COST TO THE PROJECT/GOVERNMENT.
3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS
AND THEIR REQUIREMENTS.
4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.
INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE
FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.
5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.
9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE
SCHEDULED TO BE MODIFIED OR REPLACED.
13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED
OTHERWISE.
EACH DOOR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER
1 CLOSER C02011/C02021
1 WALL STOP (AT INSWING DOORS) L02101 CONVEX
1 SET SELF-ADHESIVE SEALS R0E154
COST TO THE PROJECT/GOVERNMENT.
12. REFER TO E4/A-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.
1 KICK PLATE J102
1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY
EACH PAIR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT
1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER
1 OVERLAPPING STEEL ASTRAGAL
WITH SELF ADHESIVE SEAL
R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)
1 TYPE 21A
2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY
CLOSERS
KICK PLATES
WALL STOPS
SET SELF ADHESIVE SEALS
COORDINATOR
C02011 / C02021 J102 L02101
ROY154
14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISPLACED.
15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT / REDUCE
AMOUNT OF FINAL CLEANUP REQUIRED.
1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.
2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA
TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.
3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED
AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.
4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN
PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.
5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER
AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:
a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY
SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER
TO CONTAIN DIRT DEBRIS AND DUST.
b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING
ZONE.
c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE
CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL
BE CHANGED ON A DAILY BASIS.
d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED
MEDICAL CENTER AT THE END OF THE WORK DAY.
e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.
f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO
REPLACEMENT.
g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN
EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.
h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION
OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER
THE REMOVAL.
6. FINAL CLEANUP:
a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION
DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF
THE CONSTRUCTION.
b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.
7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -
SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.
2 DOORS AND EXTERIOR OPENINGS TO BE PROTECTED FROM UNAUTHORIZED ACCESS DURING ALL PHASES OF 2A CONSTRUCTION ACTIVITIES. DOOR
PROTECTION TO PERMIT EGRESSING / INTERIUM LIFE SAFETY OF OCCUPANTS IN WORK AREA.
EXISTING WALL TO ACT AS 1 HR ICRA CONSTRUCTION BARRIER. FIRESTOP ANY OPENINGS IN WALL TO MAINTAIN INTEGRITY OF CONSTRUCTION BARRIER REQUIREMENTS. EXTEND WALL CONSTRUCTION TO DECK. PROVIDE HEAD OF WALL FIRESTOP TERMINATIONS SIMILAR TO DETAIL D1 / A-GI250.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
MODIFY EXISTING CEILING AND LIGHTS AS REQUIRED TO ACCOMMODATE TEMPORARY WALL INSTALLATION. CEILING ASSEMBLY AT PUBLIC SIDE TO BE
RESTORED AFTER ICRA CONSTRUCTION BARRIER INSTALLATION.
3 DOOR / WINDOW OPENING TO BE PROTECTED FROM UNAUTHORIZED ACCESS DURING ALL PHASES OF 2A DEMOLITION OR CONSTRUCTION ACTIVITIES.
A-GI201
PARTIAL GROUND FLOOR ICRA
PLAN
DZ JH / DZ
SCALE: 1/16" = 1'-0"
8'4'0 16'
PLAN
NORTH
PARTIAL GROUND FLOOR ICRA PLAN
D2
6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL BE SEALED TO CEILING /FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL BE USED ONLY WHERE THE ERECTION OF TEMPORARY GWB ICRA WALLS FOR CONSTRUCTION ACTIVITIES WILL IMPEDE VAMC OPERATIONS. TEMPORARY ICRA CONSTRUCTION FILM BARRIERS FOR CONSTRUCTION ACTIVITIES OUTSIDE VAMC OPERATION HOURS SHALL BE ERECTED AND REMOVED DAILY OUTSIDE VAMC OPERATION HOURS AND SHALL HAVE NO IMPACT ON VAMC OPERATIONS. OBTAIN APPROVAL / COORDINATE / FACILITATE ILSM WITH VA CFM OFFICE PRIOR TO CONSTRUCTION ACTIVITIES AND ERECTION OF
TEMPORARY ICRA CONSTRUCTION FILM BARRIERS.
ICRA NOTES (CONTINUED)ICRA NOTESINFECTIOUS DISEASE CONTROL REQUIREMENTSICRA SYMBOLS
6 INSTALL 2 HR ICRA CONSTRUCTION BARRIER ALTERNATE (CS2 ALT; DETAIL F1 / A-GI250) IMMEDIATELY AFTER PHASED REMOVAL OF ELEVATOR DOOR FOR NEW DOOR SKINS. COORDINATE / COMPLY WITH THE REQUIREMENTS OF SPECIFICATION SECTIONS 14 27 16 "CUSTOM ELEVATOR DOORS AND FRAMES" AND
09 91 00 "PAINTING".
ICRA KEYNOTES:
7 PROVIDE CONNECTION FOR TEMPORARY LIGHTING FROM ELECTRICAL PANEL IN ROOM 0242N. INSTALL ADDITIONAL BRANCH BREAKERS AS REQUIRED AND MATCH IN FIELD FOR CORRECT MANUFACTURER. QUANTITY OF LIGHTING SHALL BE DICTATED BY CONSTRUCTION CONDITIONS. ADJUST/ MODIFY TEMPORARY LIGHTS AS REQUIRED BY THE PROGRESSION OF "NEW" CONSTRUCTION. PROVIDE ADDITIONAL TEMPORARY LIGHT FIXTURES (NOT SHOWN) WITHIN THE WORK AREAS AS REQUIRED BY LIFE SAFETY/ SPECIFICATIONS. REMOVE ALL TEMPORARY LIGHTS/ CONDUCTORS IN THEIR ENTIRETY BACK TO
THE PANEL AT THE COMPLETION OF THE PROJECT.
(SPECIFIC TO THIS
DRAWING ONLY)
8 PROVIDE / COORDINATE THE ERECTION OF A 1 HR ICRA CONSTRUCTION BARRIER PRIOR TO THE INSTALLATION OF THE INTERIM COOLER / FREEZER THAT WILL BE PROVIDED AND INSTALLED BY THE GOVERNMENT. CONTRACTOR SHALL COORDINATE THE DEMOLITION AND AND NEW WORK ACTIVITIES WITH THE VA CFM OFFICE FOR THIS AREA. AFTER THE COMPLETION AND GOVERNMENT'S ACCEPTANCE OF THE PERMANENT COOLER / FREEZERS ON THE THIRD FLOOR KITCHEN / FOOD SERVICE AREA, THE INTERIM COOLER / FREEZER WILL BE REMOVED BY THE GOVERNMENT AND THE CONSTRUCTION BARRIER SHALL BE REMOVED OR ADAPTED AS REQUIRED FOR THE NEXT PHASE OF WORK BY THE CONTRACTOR. SEE DETAIL F1 / A-AE102 FOR PROPOSED GOVERNMENT
COOLER / FREEZER LAYOUT. ALSO SEE DETAIL D6/A-GI250 PARTITION TYPE C1S.
AutoCAD SHX Text
CSSSD
AutoCAD SHX Text G580
AutoCAD SHX Text
ELEC
AutoCAD SHX Text 0165S
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text 0168S
AutoCAD SHX Text
CHAPLAIN STORAGE
AutoCAD SHX Text 0173S
AutoCAD SHX Text
ELEC
AutoCAD SHX Text 0167S
AutoCAD SHX Text G191S
AutoCAD SHX Text
SECURITY RM.
AutoCAD SHX Text 0202S
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 0147S
AutoCAD SHX Text
SPECIMEN CLOS
AutoCAD SHX Text 0170S
AutoCAD SHX Text
SPECIMEN STORAGE
AutoCAD SHX Text 0171S
AutoCAD SHX Text
AUTOPSY
AutoCAD SHX Text 0169S
AutoCAD SHX Text
REFR. MORTUARY
AutoCAD SHX Text 0168S
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
VEST
AutoCAD SHX Text 0166S
AutoCAD SHX Text
SHR
AutoCAD SHX Text G193S
AutoCAD SHX Text
TOILET
AutoCAD SHX Text G190S
AutoCAD SHX Text
VEST
AutoCAD SHX Text 0199S
AutoCAD SHX Text
CLERGY
AutoCAD SHX Text 0163S
AutoCAD SHX Text
ALTAR
AutoCAD SHX Text 0162S
AutoCAD SHX Text
ELEV.MACH. RM.
AutoCAD SHX Text
0203AS
AutoCAD SHX Text
STAFF TOILET
AutoCAD SHX Text
0202BS
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 0202S
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
0202AS
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 1-2
AutoCAD SHX Text
PLUMBING EQUIP RM
AutoCAD SHX Text G583
AutoCAD SHX Text
SECURE STORAGE
AutoCAD SHX Text G586
AutoCAD SHX Text G582
AutoCAD SHX Text
BREAKDOWN
AutoCAD SHX Text G590
AutoCAD SHX Text
EQUIP HOLDING / DISPATCH
AutoCAD SHX Text G595
AutoCAD SHX Text
SOILED RECEIVING
AutoCAD SHX Text G591
AutoCAD SHX Text
MECH RM
AutoCAD SHX Text G703
AutoCAD SHX Text
JAN.
AutoCAD SHX Text G598
AutoCAD SHX Text
MALE TOILET
AutoCAD SHX Text G382
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
ELEV LOBBY
AutoCAD SHX Text G001
AutoCAD SHX Text G004
AutoCAD SHX Text
IT (TR-D)
AutoCAD SHX Text
0209SA
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 0209S
AutoCAD SHX Text
LAUNDRY
AutoCAD SHX Text 0184S
AutoCAD SHX Text
PUMPS
AutoCAD SHX Text 0166S
AutoCAD SHX Text
PUMP ROOM
AutoCAD SHX Text 0175S
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 1-1
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
PE #5
AutoCAD SHX Text
PE #6
AutoCAD SHX Text
PE #7
AutoCAD SHX Text
PE #8
AutoCAD SHX Text
SE #12
AutoCAD SHX Text
SE #11
AutoCAD SHX Text
SE #10
AutoCAD SHX Text
SE #9
AutoCAD SHX Text
SE #13
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIRS #3
AutoCAD SHX Text G2189S
AutoCAD SHX Text Open
AutoCAD SHX Text to Above
AutoCAD SHX Text to Above
AutoCAD SHX Text Open
AutoCAD SHX Text
DN
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
DOCK LEVELER
AutoCAD SHX Text #1
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
DOCK LEVELER
AutoCAD SHX Text #2
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
DOCK LEVELER
AutoCAD SHX Text #3
AutoCAD SHX Text
DN
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
0163SA
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 0166S
AutoCAD SHX Text
EMBALMING
AutoCAD SHX Text 0167S
AutoCAD SHX Text
UP
AutoCAD SHX Text
SECURITY CONTROL
AutoCAD SHX Text
RM. (POST 7)
AutoCAD SHX Text 0200S
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
ICRA CONSTRUCTION BARRIER WALL / DOOR
WALL (EXISTING / NEW)
MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)
HEPA FILTERHE
PA
M
H
MAT
TEMPORARY POLYETHYLENE PLASTIC
CONSTRUCTION FILM BARRIER; SEE ICRA
KEYNOTES FOR REQUIREMENTS
TC##
TEMPORARY LIGHT FIXTURE.
RESTRICTED CONSTRUCTION
CIRCULATION PATH
SEE DWG A-GI250 FOR DOOR AND
PARTITION TYPES
REFR 3
3070C
DN
V
W
X
Z
U
Z
Y
Y
TA14
C1S
C1S
C1S
C L R
7'-0"
MM
A L I G
N
CONSTRUCTION AREA #2
4 4
4 9
MAT
MAT
MAT
MAT
MAIN KITCHEN
3086E
MAIN KITCHEN
3086E
1. REFER TO A-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO A-AE002 FOR GENERAL NOTES.
2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS
OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE RATED
AND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.
6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER ERECTION AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS
SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.
7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED UPON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED
BASED ON SITE CONDITIONS.
8. REFER TO SHEETS A-GI201 AND A-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND
EXTENTS OF ICRA CONSTRUCTION BARRIERS.
MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ACCOMMODATE
ICRA CONSTRUCTION BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.
10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE
COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.
RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION
BARRIERS.
11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES
AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,
REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING
CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL
COST TO THE PROJECT/GOVERNMENT.
3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS
AND THEIR REQUIREMENTS.
4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.
INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE
FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.
5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.
9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE
SCHEDULED TO BE MODIFIED OR REPLACED.
13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED
OTHERWISE.
EACH DOOR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER
1 CLOSER C02011/C02021
1 WALL STOP (AT INSWING DOORS) L02101 CONVEX
1 SET SELF-ADHESIVE SEALS R0E154
COST TO THE PROJECT/GOVERNMENT.
12. REFER TO E4/A-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.
1 KICK PLATE J102
1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY
EACH PAIR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT
1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER
1 OVERLAPPING STEEL ASTRAGAL
WITH SELF ADHESIVE SEAL
R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)
1 TYPE 21A
2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY
CLOSERS
KICK PLATES
WALL STOPS
SET SELF ADHESIVE SEALS
COORDINATOR
C02011 / C02021 J102 L02101
ROY154
14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISPLACED.
15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT / REDUCE
AMOUNT OF FINAL CLEANUP REQUIRED.
1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.
2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA
TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.
3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED
AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.
4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN
PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.
5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER
AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:
a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY
SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER
TO CONTAIN DIRT DEBRIS AND DUST.
b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING
ZONE.
c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE
CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL
BE CHANGED ON A DAILY BASIS.
d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED
MEDICAL CENTER AT THE END OF THE WORK DAY.
e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.
f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO
REPLACEMENT.
g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN
EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.
h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION
OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER
THE REMOVAL.
6. FINAL CLEANUP:
a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION
DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF
THE CONSTRUCTION.
b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.
7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -
SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.
FREEZER 1
3093E
FREEZER 2
3096E
REFRIGERATOR 1
3092E
REFRIGERATOR 2
3095E
DN DN
18161412
CC
DD
EE
HH
C1S
C1S
TA12
TA13
M I N
C
L R
MM
MM
2'-0"
A L I G
N
M M
CONSTRUCTION AREA #11
3 4
54 4
MAIN KITCHEN
3086E
MAIN KITCHEN
3086E
22 2723 2624
2 SERVICE ELEVATORS #10, #11 AND #12 ARE TO BE USED FOR THE MOVEMENT OF DEMOLITION AND "NEW" MATERIALS TO AND FROM CONSTRUCTION AREA #2. CONSTRUCTION PERSONNEL ARE REQUIRED TO USE SERVICE ELEVATORS #10, #11 AND #12 FOR DAILY ACCESS TO THE CONSTRUCTION AREA #2.
MATERIAL TRANSPORT IN SERVICE ELEVATORS IS RESTRICTED TO THE HOURS OF 4:00 PM AND 5:00 AM DAILY. ALL TRANSPORTED MATERIALS SHALL BE ENCLOSED / COVERED. COORDINATE WEIGHT LIMITATIONS OF SERVICE ELEVATORS WITH VAMC FACILITIES / ENGINEERING DEPT. BEFORE WORK ACTIVITIES.
SERVICE ELEVATOR #13 IS TO BE USED FOR THE MOVEMENT OF DEMOLITION AND "NEW" MATERIALS TO AND FROM CONSTRUCTION AREA #1.
CONSTRUCTION PERSONNEL ARE REQUIRED TO USE STAIR 1-1 FOR ACCESS TO CONSTRUCTION AREA #1. MATERIAL TRANSPORT IN SERVICE ELEVATOR IS RESTRICTED TO THE HOURS OF 4:00 PM AND 5:00 AM DAILY. ALL TRANSPORTED MATERIALS SHALL BE ENCLOSED / COVERED. COORDINATE WEIGHT LIMITATIONS OF SERVICE ELEVATORS WITH VAMC FACILITIES / ENGINEERING DEPT. BEFORE WORK ACTIVITIES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
CONSTRUCTION PERSONNEL CROSS CIRCULATION THROUGH KITCHEN IS LIMITED / RESTRICTED. CROSS CIRCULATION IS NOT PERMITTED DURING THE
HOURS OF 6:00 AM AND 7:15 PM DAILY.
DZ JH / DZ
#ICRA NOTES (CONTINUED)ICRA NOTESINFECTIOUS DISEASE CONTROL REQUIREMENTSICRA SYMBOLS
ICRA KEYNOTES
(SPECIFIC TO THIS
DRAWING ONLY)
1/8" = 1'-0"D2 PARTIAL THIRD FLOOR ICRA PLAN
0 4'-0" 8'-0" 16'-0"
PLAN
NORTH
CIRCULATION PATHS / FLOOR AREAS TO AND FROM WORK AREAS SHALL BE CLEANED AND SANITIZED BY THE CONTRACTOR ON A DAILY BASIS WHEN CONSTRUCTION IS IN PROGRESS. CONTRACTOR SHALL CLEAN / SANITIZE ELEVATORS USED PRIOR TO KITCHEN RE-OPENING AT 5:00 AM.
3 SERVICE ELEVATORS #10, #11, #12 AND #13 SHALL BE CLEANED AND SANITIZED BY THE CONTRACTOR ON A DAILY BASIS WHEN THIRD FLOOR CONSTRUCTION IS IN PROGRESS. CONTRACTOR SHALL CLEAN / SANITIZE ELEVATORS USED PRIOR TO KITCHEN RE-OPENING AT 5:00 AM
6 THE ICRA CONSTRUCTION BARRIER WILL BE REQUIRED CONSTRUCTED TO BE BEHIND A TEMPORARY 6 MIL THICK FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT. THE INSTALLATION OF THE TEMPORARY POLYETHYLENE CONSTRUCTION FILM BARRIER SHALL BE DONE OUTSIDE THE VAMC KITCHEN HOURS OF 6:00 AM AND 7:15 PM DAILY. THE GWB ICRA CONSTRUCTION BARRIER CONSTRUCTION ACTIVITIES SHALL BE EXPEDITED ( ONE WEEK DURATION TOTAL / MAX.) TO LIMIT THE AMOUNT OF TIME THAT THE TEMPORARY POLYETHYLENE ICRA CONSTRUCTION BARRIER IS ERECTED. THE ERECTION OF TEMPORARY POLYETHYLENE OR GWB ICRA WALLS FOR CONSTRUCTION ACTIVITIES SHALL NOT IMPEDE VAMC KITCHEN OPERATIONS. OBTAIN APPROVAL / COORDINATE / FACILITATE ISLM WITH VA CFM OFFICE
PRIOR TO CONSTRUCTION ACTIVITIES AND THE ERECTION OF THE CONSTRUCTION BARRIERS.
7 MODIFY EXISTING CEILING TO ACCOMMODATE ICRA CONSTRUCTION BARRIER. CEILING TO BE RESTORED TO MATCH EXISTING CONDITIONS AFTER REMOVAL
OF THE TEMPORARY CONSTRUCTION BARRIER.
8 EXISTING WALL TO ACT AS ICRA CONSTRUCTION BARRIER. SEAL / FIRESTOP ANY OPENING IN WALL TO MAINTAIN INTEGRITY OF I HR CONSTRUCTION
BARRIER REQUIREMENTS.
9 6 MIL THICK FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT. DEMOLITION / CONSTRUCTION ACTIVITIES SHALL BE EXPEDITED ( THREE WEEK DURATION TOTAL / MAX.) TO LIMIT THE AMOUNT OF TIME THAT THE TEMPORARY ICRA CONSTRUCTION BARRIER IS ERECTED. THE ERECTION OF TEMPORARY GWB ICRA WALLS FOR CONSTRUCTION ACTIVITIES SHALL NOT IMPEDE VAMC OPERATIONS. OBTAIN APPROVAL / COORDINATE / FACILITATE ISLM WITH VA CFM OFFICE PRIOR TO CONSTRUCTION ACTIVITIES
AND THE ERECTION OF TEMPORARY ICRA CONSTRUCTION FILM BARRIERS.
A-GI230
PARTIAL THIRD FLOOR ICRA
PLAN
AutoCAD SHX Text
SALAD PREP
AutoCAD SHX Text 0380C
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3102E
AutoCAD SHX Text 3081S
AutoCAD SHX Text
PATIENT SERVICES
AutoCAD SHX Text 3083E
AutoCAD SHX Text
SPECIAL DIET KITCH
AutoCAD SHX Text
3061AE
AutoCAD SHX Text
FILE STORAGE
AutoCAD SHX Text 3077C
AutoCAD SHX Text
DISTR
AutoCAD SHX Text 3076C
AutoCAD SHX Text
SERVICE LOBBY
AutoCAD SHX Text
3108AE
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
3110AN
AutoCAD SHX Text
DIET COMM CENTER
AutoCAD SHX Text 3100E
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text 3101C
AutoCAD SHX Text
STORAGE ROOM
AutoCAD SHX Text 3102C
AutoCAD SHX Text
LC
AutoCAD SHX Text 3103C
AutoCAD SHX Text
JC
AutoCAD SHX Text 3105C
AutoCAD SHX Text
DISH WASHERS
AutoCAD SHX Text 3107N
AutoCAD SHX Text
KITCH & DISH WASHING
AutoCAD SHX Text 3075S
AutoCAD SHX Text
SEC ACNS
AutoCAD SHX Text
EDUCATION
AutoCAD SHX Text 3075S
AutoCAD SHX Text
NURSE RECRUITER
AutoCAD SHX Text 3044S
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
3044AS
AutoCAD SHX Text
NURSING
AutoCAD SHX Text 3043S
AutoCAD SHX Text
PATIENT SERVICES
AutoCAD SHX Text 3042S
AutoCAD SHX Text
PATIENT SERVICES
AutoCAD SHX Text 3040S
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
ELEV SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV SHAFT
AutoCAD SHX Text 3039C
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3097E
AutoCAD SHX Text
PAPER PRODUCTS
AutoCAD SHX Text 3123N
AutoCAD SHX Text
SEC TO CHIEF
AutoCAD SHX Text
3123CN
AutoCAD SHX Text
PROG CLERK
AutoCAD SHX Text 3123N
AutoCAD SHX Text
SITE MANAGER
AutoCAD SHX Text
3123EN
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
3123DN
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 3120N
AutoCAD SHX Text
SEC/CLERK
AutoCAD SHX Text 3118E
AutoCAD SHX Text
DIETICIAN
AutoCAD SHX Text 3117N
AutoCAD SHX Text
TRAINING RM
AutoCAD SHX Text 3116N
AutoCAD SHX Text
MENS TLT
AutoCAD SHX Text 3115N
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3112N
AutoCAD SHX Text
EL CL
AutoCAD SHX Text 3124N
AutoCAD SHX Text
EL CL
AutoCAD SHX Text 3109N
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
3110AN
AutoCAD SHX Text
DIET COMM CENTER
AutoCAD SHX Text 3125N
AutoCAD SHX Text
STAIR #4
AutoCAD SHX Text 3097E
AutoCAD SHX Text
PAPER PRODUCTS
AutoCAD SHX Text 3110N
AutoCAD SHX Text
PATIENTS CLOTHING
AutoCAD SHX Text 3081E
AutoCAD SHX Text
DIET VOLUNTEER
AutoCAD SHX Text 3085E
AutoCAD SHX Text
DIETETICS OFFICE
AutoCAD SHX Text 3078C
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
PAPER
AutoCAD SHX Text
PRODUCTS
AutoCAD SHX Text 3097E
AutoCAD SHX Text 3090E
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 3091E
AutoCAD SHX Text
STAIR 1-1
AutoCAD SHX Text 3098E
AutoCAD SHX Text
COOKS
AutoCAD SHX Text
SE #13
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
REFRIGERATOR
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
Haselby, John Stamp
ICRA CONSTRUCTION BARRIER WALL / DOOR
WALL (EXISTING / NEW)
MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)
HEPA FILTERHE
PA
M
H
MAT
TEMPORARY POLYETHYLENE PLASTIC
CONSTRUCTION FILM BARRIER; SEE ICRA
KEYNOTES FOR REQUIREMENTS
TC##
TEMPORARY LIGHT FIXTURE.
SEE DWG A-GI250 FOR DOOR AND
PARTITION TYPES
TA01
M
M
C1S
HE
PA
C1S 3'- 0"
5'- 0"
TA11
M
M
C2S HEPA
C2S 3'- 0"
5'- 8"
FLOOR LINE
5/8" TYPE "X" GWB BOTH SIDES
(1 LAYER - 1HOUR; 2 LAYERS - 2
HOUR (EACH SIDE)
SOUND ATTENUATION BATTS
(SAB) PER SCHEDULE.
CEILING LINE; REMOVE AND
MODIFY EXISTING CEILING TO
REMAIN AS REQUIRED TO
CONSTRUCT TEMP PARTITION
METAL STUDS, SIZE PER
SCHEDULE
3/4" FIRE RETARDANT TREATED
PLYWOOD AT ALL PARTITIONS
ADJACENT TO AREAS WHERE
CONSTRUCTION ACTIVITIES WILL
IMPACT
NOTE: ALL THRU WALL
PENETRATIONS SHALL HAVE A
FIRESTOP ASSEMBLY EQUAL TO
THE HOURLY RATING OF THE
PARTITION THAT IT PENETRATES
PUBLIC SIDE CONSTRUCTION SIDE
PAINT (SEMI GLOSS - WHITE)
SEALANT EACH SIDE
NOTE: SEE D1/A-GI250 FOR HEAD OF
WALL CONDITIONS AT DIFFERENT
LOCATIONS IN THE BUILDING
CAULK ALL
AROUND (BOTH SIDES)
HM FRAME (WELDED)
3 5/8" 5/8" 5/8"
5/8" GWB ( 1 LAYER - 1 HR; 2
LAYERS - 2 HR (EA SIDE)
2"
RETURN ON
FRAME
2" 5/8
1/2"
1. REFER TO A-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO A-AE002 FOR GENERAL NOTES.
2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS
OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE RATED
AND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.
6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER ERECTION AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS
SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.
7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED UPON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED
BASED ON SITE CONDITIONS.
8. REFER TO SHEETS A-GI201 AND A-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND
EXTENTS OF ICRA CONSTRUCTION BARRIERS.
MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ACCOMMODATE
ICRA CONSTRUCTION BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.
10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE
COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.
RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION
BARRIERS.
13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED
OTHERWISE.
EACH DOOR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER
1 CLOSER C02011/C02021
1 WALL STOP (AT INSWING DOORS) L02101 CONVEX
1 SET SELF-ADHESIVE SEALS R0E154
ICRA NOTES:
11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES
AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,
REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING
CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL
COST TO THE PROJECT/GOVERNMENT.
3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS
AND THEIR REQUIREMENTS.
4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.
INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE
FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.
5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.
9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE
SCHEDULED TO BE MODIFIED OR REPLACED.
12. REFER TO E4/A-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.
1 KICK PLATE J102
1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY
EACH PAIR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT
1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER
1 OVERLAPPING STEEL ASTRAGAL
WITH SELF ADHESIVE SEAL
R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)
1 TYPE 21A
2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY
CLOSERS
KICK PLATES
WALL STOPS
SET SELF ADHESIVE SEALS
COORDINATOR
C02011 / C02021 J102 L02101
ROY154
14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISPLACED.
15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT / REDUCE
AMOUNT OF FINAL CLEANUP REQUIRED.
100 SQ. IN. MAX
4" X 25"
FIRE
RESISTANT
(FR-1)
3'- 6"
9" 2
A
2"
2"
AS SCHEDULED
DETAIL D1 - "FIRE-RATED WALLS"- ADDITIONAL NOTES:
1. CONDITIONS INDICATED TO SHOW DESIGN INTENT. THEY ARE NOT INTENDED TO BE PROPRIETARY. CONTRACTOR MAY EMPLOY SIMILAR UL-APPROVED TOP-OF-WALL DESIGNS THAT ARE APPROPRIATE FOR CONDITIONS. OBTAIN VA APPROVAL PRIOR TO INSTALLATION.
2. REFER TO FIRESTOPPING SPECS FOR ADDITIONAL REQUIREMENTS REGARDING HEAD-OF-WALL CONDITION FOR FIRE-RATED WALLS.
SLOTTED TOP TRACK
STUD
DESIGN BASIS: UL-HW-D-0042
METAL DECK
(PERPENDICULAR TO FLUTES)
DESIGN BASIS: UL-HW-D-0264
METAL DECK
(PARALLEL TO FLUTES)
1" 1" 2"x20 GA STRAPS @ 16" O.C.
DESIGN BASIS: UL-HW-D-0259
STEEL BEAM
20 GA Z-BARS TO
ACCOMMODATE
SFRM
SPRAY-APPLIED
FIRE-RESISTIVE
MATERIAL (SFRM) - 2HR
PATCH AND REPAIR AS
REQUIRED
SAB
1 OR 2 LAYERS OF GWB; SEE
WALL TYPE
FIRE STOP JOINT SPRAY
MINERAL WOOL FORMING
MATERIAL
5/8
5/8
FIRE STOP JOINT SPRAY
SLOTTED TOP TRACK
STUD
SAB
1 OR 2 LAYERS OF GWB; SEE
WALL TYPE
5/8
MINERAL WOOL FORMING
MATERIAL
SLOTTED TOP TRACK
STUD
DESIGN BASIS: UL-HW-D-0209
CONCRETE SLAB DECK
SAB
1 OR 2 LAYERS OF GWB; SEE
WALL TYPE
FIRE STOP JOINT SPRAY
MA
X
3 4" / M
IN
5 8"
S
PB
TA06
M
M C1S
TA07
M
M
C1S
AL
IG
N
AL
IG
N 3'- 0"
5'- 6"
OFFICE
PB
PB
HEPA
TA08
M
M C1S
AL
IG
N 2'- 6"
C1S
6'- 0"
1'- 2 3
/4"
PUBLIC SIDE CONSTRUCTION SIDE
CEILING-REMOVE AND REPLACE
WHEN DISTURBED BY
CONSTRUCTION ACTIVITIES
TAPE AND SPACKLE
CONTINUOUS
INTUMESCENT SEALANT
OR FIRE RATED TAPE
NOTE: ALL THRU-WALL PENETRATIONS SHALL HAVE A FIRESTOP
ASSEMBLY EQUAL TO THE HOURLY RATING OF THE PARTITION
THAT IT PENETRATES
7'- 4"
M
IN
C
LE
AR
C-H STUDS @ 24" O.C.
8"TYPE 'X' GWB
8" TYPE 'X' GWB
(1 LAYER-1 HR
2 LAYER-2HR)
FIRE RESISTANCE
TEST AER-0903B
RATED TEMPORARY WALL PER DETAIL
D6/B-GI203 AND ICRA PLANS
EXISTING 6" CMU WALL OR GWB
PARTITION
FLOOR LINE
NOTES:
1. U.O.N., THIS ALTERNATE 1-HR ICRA CONSTRUCTION BARRIER SHALL ONLY BE USED WHEN
THE PLENUM AREA WILL NOT PERMIT A FULL HEIGHT 1-HR BARRIER TYPE D6/A-GI250 TO BE
BUILT. APPROVAL TO CONSTRUCT THIS ALTERNATE SHALL BE BY THE VA CFM OFFICE.
2. ALL OPENINGS IN THE EXISTING PARTITION NOT CONTAINED WITHIN THE ALTERNATE
1-HOUR ICRA CONSTRUCTION BARRIER SHALL BE UPGRADED TO A MINIMUM 45 MINUTE
RATING.
3. THIS ALTERNATE AS A 2-HR BARRIER SHALL BE USED AT THE CORRIDOR 0243N (SERVICE
ELEVATOR LOBBY) C2S
ALT
STEEL RUNNER
1" GWB LINER PANEL
INTUMESCENT
SEALANT
NOTE: SEE D1/A-GI250 FOR HEAD OF
WALL CONDITIONS AT DIFFERENT
LOCATIONS IN THE BUILDING
FASTENER PER UL ASSEMBLY
U U
V
V
V
U
1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.
2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA
TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.
3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED
AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.
4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN
PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.
5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER
AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:
a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY
SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER
TO CONTAIN DIRT DEBRIS AND DUST.
b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING
ZONE.
c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE
CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL
BE CHANGED ON A DAILY BASIS.
d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED
MEDICAL CENTER AT THE END OF THE WORK DAY.
e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.
f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO
REPLACEMENT.
g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN
EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.
h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION
OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER
THE REMOVAL.
6. FINAL CLEANUP:
a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION
DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF
THE CONSTRUCTION.
b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.
7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -
SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.
INFECTIOUS DISEASE CONTROL REQUIREMENTS
CORRIDOR
0243N0243N
0211AE0211AE
SPRINKLER
RISER
ROOM
S
S S S S
S
G245N.1
CLOSET
6'-0"
2'- 0"
5'-4"
C2S
ALT
C2S
ALT
C2S
ALT
C2S
ALT
'-0
V
MARK
STUD
SIZE
FIRE
RATING
FIRE-RESISTANCE
SOUND ATTENUATION
TEST SAB STC TEST
C1S 3 5/8" 1 HR / SMK U465, U450 3 1/2" 49 TL-93-325
C2S 3 5/8" 2 HR / SMK U419 3 1/2" 49 TL-93-325
ICRA DOOR AND FRAME SCHEDULE
IDENTIFICATION DIMENSIONS PANEL FRAME
FIRE
RATING HARDWARE GROUP NOTESDOOR NO ROOM NO ROOM NAME
WIDTH
H TYPE MATERIAL TYPE MATERIAL
DETAILS
W1 HEAD JAMB
TA01 0202S CORRIDOR 3' - 0" 7' - 0" 6 HM A HM F7/A-GI250 45 REFER TO ICRA NOTES
TA02 G297S CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES
TA03 G297S CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES
TA04 0243N CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES
TA05 0243N CORRIDOR 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES
TA06 0241N CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES
TA07 0241N CORRIDOR 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES
TA08 0241N CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES
TA09
1-1 STAIR 3' - 0" 7' - 0" 2 HM A HM 90 REFER TO ICRA NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
Key Plan
Balance of Work
9/12/2022
A-GI250
ENLARGED ICRA PLANS, DETAILS
& REQUIREMENTS
DZ JH / DZ
ENLARGED ICRA PLAN
B1
PLAN
NORTH
ENLARGED ICRA PLAN
B2
PLAN
NORTH
ENLARGED ICRA PLAN
B4
PLAN
NORTH
ENLARGED ICRA PLAN
B6
PLAN
NORTH
ICRA HEAD OF WALL CONDITION DETAILS
D1 SCALE: NTS
ICRA CONSTRUCTION BARRIER
D6 SCALE: NTS
ICRA DOOR AND FRAME SCHEDULE
E4 SCALE: NTS
ICRA DOOR FRAME TYPE
F4 SCALE: NTS
ICRA SIDE HINGED DOOR TYPES
F5 SCALE: NTS
ICRA DOOR FRAMES
F7 SCALE: NTS
W2
F7/A-GI250
1-HR / 2-HR ICRA CONSTRUCTION BARRIER
F1 SCALE: NTS
F7/A-GI250 F7/A-GI250
F7/A-GI250 F7/A-GI250
F7/A-GI250 F7/A-GI250
F7/A-GI250 F7/A-GI250
F7/A-GI250 F7/A-GI250
F7/A-GI250 F7/A-GI250
F7/A-GI250 F7/A-GI250
F7/A-GI250 F7/A-GI250
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0 2' 4' 8' SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
TA11
0241N CORRIDOR 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES- F7/A-GI250 F7/A-GI250 G245N CORRIDOR 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES- F7/A-GI250 F7/A-GI250TA10
LEVEL
ENLARGED ICRA PLAN
B8
PLAN
NORTH
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
3090E CORRIDOR 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES- F7/A-GI250 F7/A-GI250TA12 3
3080C SALAD PREP 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES- F7/A-GI250 F7/A-GI250TA14 3
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
3097E PAPER PRODUCTS 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES- F7/A-GI250 F7/A-GI250TA13 3 DOOR AND FRAME SURFACES AT THE PUBLIC SIDE SHALL BE PAINTED P-1.
AutoCAD SHX Text to Above
AutoCAD SHX Text Open
AutoCAD SHX Text
UP
AutoCAD SHX Text
SE #12
AutoCAD SHX Text
SE #11
AutoCAD SHX Text
SE #10
AutoCAD SHX Text
SE #9
| Sheets and Views |
| A-GI201 PARTIAL GROUND FLOOR ICRA PLAN |
| Sheets and Views |
| A-GI250 ENLARGED ICRA PLANS, DETAILS & REQUIREMENTS |
| Sheets and Views |
| PARTIAL THIRD FLOOR ICRA PLAN |
File details come from the government source that posted it. Updated .