This document appears to be a set of construction drawings for the VA NY Manhattan Campus, specifically a partial power riser diagram for new work in Buildings 1, 5, 6, and the General Platform. The drawings show the electrical system layout and connections for the new work, including key notes, general notes, and a legend.

The related federal contract opportunity is Solicitation Number QSE--36C10F24R50018, titled "36C10F24R50018 Balance of Work VAMC Manhattan, NY -- Y1DA". This solicitation is for the construction of the Manhattan Hurricane Sandy Recovery Program Balance of Work at the VAMC Manhattan Campus of the VA NY Healthcare System. The solicitation is being issued by the Department of Veterans Affairs Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
SolicitationCancellation.pdf PDF
SolicitationAmendment0006.pdf PDF
Manhattan VA Asbestos Survey Report 05-2021final (5-24-21).pdf PDF
Manhattan VA Revised Asbestos Survey Report 05-2021Final (Appendix H - First Half).pdf PDF
QA - Balance of Work - 05.08.2024.pdf PDF
Manhattan VA Revised Asbestos Survey Report 05-2021Final (Appendix H - 2nd half).pdf PDF
QA - Balance of Work - 05.02.2024.pdf PDF
SolicitationAmendment0005.pdf PDF
SolicitationAmendment0004.pdf PDF
QA - Balance of Work - 04.16.2024.pdf PDF
C-Mechanical- Part 2.pdf PDF
C-Electrical- Part 5.pdf PDF
B-Mechanical-Part 1.pdf PDF
P03_CDR- Sole Source JA - Access Controls - 11-16-22.pdf PDF
B-Civil.pdf PDF
C-Plumbing- Part 2.pdf PDF
P03_CDR - Sole Source JA - Public Announcement System - 11-16-22.pdf PDF
C-Electrical- Part 4.pdf PDF
A-Architecture-Part 3.pdf PDF
A-ICRA.pdf PDF
C-Architecture- Part 5.pdf PDF
A-Fire Protection-Part 2.pdf PDF
C-Electrical- Part 10.pdf PDF
P03_CDR - Sole Source JA - Triplex Pump 11-16-22.pdf PDF
C-Life Safety.pdf PDF
A-Electrical-Part 1.pdf PDF
VHA Directive 1028_D_2020-02-24.pdf PDF
B-Electrical-Part 2.pdf PDF
B-Architecture-Part 4.pdf PDF
C-Electrical- Part 12.pdf PDF
A-Electrical-Part 3.pdf PDF
C-Electrical- Part 7.pdf PDF
C-Electrical- Part 8.pdf PDF
A-Civil.pdf PDF
A-Structural.pdf PDF
A-General.pdf PDF
QSE 36C10F24R50018.pdf PDF
Amendment 0001 - Missing and Replacement Documents.pdf PDF
B-Electrical-Part 1.pdf PDF
C-Fire Protection- Part 2.pdf PDF
C-Electrical- Part 11.pdf PDF
C-Telecom.pdf PDF
A-Plumbing-Part 2.pdf PDF
C-Architecture- Part 6.pdf PDF
B-Electrical-Part 3.pdf PDF
VAMC CD Refresh IFC Vol 1 Specifications REV 2_ 9-19-23 (Part 3).pdf PDF
C-Mechanical- Part 3.pdf PDF
Shutdown Request Form.pdf PDF
B-Architecture-Part 2.pdf PDF
P03_CD Refresh - Sole Source JA - Fire Alarm System - 11-16-22.pdf PDF
Show 40 more

Latest 50 of 281 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLDG. 1 - PARTIAL POWER RISER DIAGRAM - NEW WORKF1

KEY NOTES

GENERAL NOTES

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022

C-E611 C-E612 C-E613

C-E614 C-E615 C-E616

C-E617 C-E618 - C-E613

BLDG. 1 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

GENERAL NOTES

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E614

BLDG. 1 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E611 C-E612 C-E613

C-E614 C-E615 C-E616

C-E617 C-E618 -

GENERAL NOTES

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E615

BLDG. 1 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E611 C-E612 C-E613

GENERAL NOTES

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E616

BLDG. 1 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E611 C-E612 C-E613

GENERAL NOTES

LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E617

BLDG. 1 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E611 C-E612 C-E613

BLDG. 5 - PARTIAL POWER RISER DIAGRAM - NEW WORKF1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E618

BLDG. 5 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E611 C-E612 C-E613

C-E666 F1

C-E667 F1

C-E668 F1

C-E663 F1

C-E664 F1

C-E665 F1

C-E661 F1

C-E662 F1

C-E671 F1

SCALE: NTS

BLDG. 6 - POWER RISER DIAGRAM - NEW WORKF1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E660

BLDG. 6 - POWER RISER DIAGRAM -

NEW WORK

SN KS

GENERAL NOTES

LEGEND

EXISTING TO REMAIN.

NEW WORK

EXTENT OF DEMOLITION.

POINT OF CONNECTION TO EXISTING.

C-E661 C-E662

C-E663 C-E664 C-E665

C-E666 C-E667 C-E668

C-E671

GEN 1 PLATFORM - PARTIAL POWER RISER DIAGRAM - NEW WORKF1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E661

GEN 1 PLATFORM - PARTIAL POWER

RISER DIAGRAM - NEW WORK

SN KS

C-E661 C-E662

C-E663 C-E664 C-E665

BLDG. 6 - PARTIAL POWER RISER DIAGRAM - NEW WORKF1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E662

BLDG. 6 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E661 C-E662

C-E663 C-E664 C-E665

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E663

BLDG. 6 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E661 C-E662

C-E663 C-E664 C-E665

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E664

BLDG. 6 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E661 C-E662

C-E663 C-E664 C-E665

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E665

BLDG. 6 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E661 C-E662

C-E663 C-E664 C-E665

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E666

BLDG. 6 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E661 C-E662

C-E663 C-E664 C-E665

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E667

BLDG. 6 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E661 C-E662

C-E663 C-E664 C-E665

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

1 & GEN PLTFRM

Key Plan

Balance of Work

9/12/2022 C-E668

BLDG. 6 - PARTIAL POWER RISER

DIAGRAM - NEW WORK

SN KS

C-E661 C-E662

C-E663 C-E664 C-E665

File details come from the government source that posted it. Updated .