PDX 2026-5 (00) COVER.pdf
PDF 728 KB Posted
- Attached to
- Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation
- Solicitation number
- 146992
- Issued by
- Multnomah County, Oregon
About this file
This is a cover sheet for a bid set prepared by the Port of Portland for the Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation project at Portland International Airport (PDX) in Oregon. The project, identified as PDX 2026-5, involves civil and electrical work at the airport's taxiway infrastructure. The bid set was prepared for October 2026 distribution and includes 56 sheets of drawings organized into general information (sheets 1-4), civil work (sheets 5-41), and electrical work (sheets 42-56). Chris Edwards serves as the project manager, with Curtis Robinhold as the Port of Portland Executive Director and Dan Gilkison as the Engineering Director overseeing the project. The drawing set references project identification number PDX-2025D033103134 and AIP funding source 3-41-0048-111.
The cover sheet serves as the introductory document to the complete design and bidding package for this airport rehabilitation project. No specific pricing information, contract terms, response deadlines, or award details are contained within this cover sheet, which functions primarily to identify the project scope, provide administrative contact information for the Port of Portland Commission members, and index the comprehensive set of technical drawings that form the basis of the construction bid package.
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
50014
99W
VANCOUVER
N
TUALATIN
RIVER CLACKAMAS
RIVER
W
ILLA
M
ETTE
RIVER
COLUMBIA
RIVER
WASHINGTON
OREGON
MULTNOMAH CO.
CLARK CO.
WASHINGTON CO.
CLACKAMAS CO.
PORTLAND
TAXIWAY K WEST GATES E3 TO E6 & VEHICLE SERVICE ROAD REHABILITATION
PORT OF PORTLAND COMMISSION
KATY COBA - PRESIDENT
RICHELLE LUTHER - VICE PRESIDENT
KETAN SAMPAT - SECRETARY
KATHERINE LAM - TREASURER
RUKAIYAH ADAMS
MIKE DEVAUGHN
MEG NIEMI
STUART STRADER
MICHAEL JORDAN
PORT OF PORTLAND
CURTIS ROBINHOLD - EXECUTIVE DIRECTOR
DAN GILKISON - ENGINEERING DIRECTOR
SHEET INDEX
SHEET
NUMBER DESCRIPTION
1 - 4 GENERAL INFORMATION
5 - 41 CIVIL
42 - 56 ELECTRICAL
TAXIWAY K WEST GATES E3 TO E6
& VEHICLE SERVICE ROAD
REHABILITATION
9/30/202612:22:17 PM CHASECr:\aviation\pdx\2026\0005 - taxiway k west e3-e6 and vsr rehab\cover 2023-22x34.dwgPRINTED:
PROJECT LOCATION
PAN # EAN # DRAWING #
PROJECT MANAGER
PORTLAND INTERNATIONAL AIRPORT
PROJECT
LOCATION
PDX -
2025D033103134 PDX 2026-5
CHRIS EDWARDSBID SET
OCTOBER 2026
AIP# 3-41-0048-111
File details come from the government source that posted it. Updated .